A stable installation pile foundation structure for building construction
By using a stable installation of pile foundation structures on soft soil foundations, including installation tables, fixing mechanisms, locking mechanisms and maintenance mechanisms, the problem of steel pipe inclination is solved, and the stability and accuracy of pile foundations are achieved.
Patent Information
- Application Number
- CN202411943868.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-27
- Publication Date
- 2025-04-22
- Estimated Expiration
- 2044-12-27
AI Technical Summary
Under soft soil foundation conditions, the steel pipe is prone to tilt during the thrashing process, resulting in unstable foundation and difficult to fix the position of the steel pipe, affecting the stability of the pile foundation.
A stable installation pile foundation structure including a mounting table, a fixing mechanism, a locking mechanism and a maintenance mechanism is adopted. The installation table is fixed by conical columns and grouting columns, and the soil connection is strengthened by electric telescopic rods. The locking unit is driven to fix the steel pipes in multiple directions to prevent tilt.
Ensure that the steel pipe remains vertical during the thrashing process, improve the stability and accuracy of the pile foundation, and enhance the durability of the pile foundation.
Smart Images

Figure CN119373107B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of pile foundation installation structures, in particular to a stable installation pile foundation structure for building construction. Background Art
[0002] Pile construction is a very critical part of construction projects, which involves installing piles (a deep foundation structure) into the ground to support the weight of a building or structure and ensure its stability and durability.
[0003] Therefore, the pile foundation structure can be said to be the basic part used to support buildings or structures in construction projects. With the development of construction technology and engineering needs, the requirements for pile foundation structures are becoming higher and higher, especially in complex geological conditions, high-rise and super-high-rise buildings, and large-scale infrastructure construction.
[0004] When the construction site is a soft soil foundation, usually the pipe sinking method is adopted. This kind of pile foundation usually uses vibration or hammering to sink the steel pipe into the ground, and then pour concrete into the pipe. After that, the steel pipe is pulled out and the concrete pile is left. However, due to the soft soil, it is difficult to provide a reference surface and fix the position of the steel pipe. At the same time, the steel pipe is easy to tilt during hammering, and there is already a certain degree of tilt during pouring, which leads to unstable foundation. Summary of the invention
[0005] The technical problem to be solved by the present invention is: to determine the reference surface through the installation structure, to determine the horizontal and vertical directions, to fix the position of the steel pipe and provide supporting force to the steel pipe at the same time, to fix the steel pipe through two locking mechanisms to ensure that the steel pipe will not tilt during the hammering process, to ensure that the steel pipe always remains vertical, thereby ensuring the stability of the pile foundation.
[0006] In order to solve the above technical problems, the present invention provides the following technical solutions: a stable installation pile foundation structure for construction, comprising: a mounting platform, a fixing mechanism, a locking mechanism and a maintaining mechanism;
[0007] The fixing mechanism comprises a cone column, a grouting column, an electric telescopic rod, a limit block and a fixing ring. A receiving cavity is provided in the middle of the cone column, a grouting column is provided inside the receiving cavity, a plurality of electric telescopic rods are fixedly provided on the outside of the grouting column, four limit blocks are provided, and the four limit blocks are evenly distributed on the outside of the grouting column, one end of the four limit blocks is fixedly connected to the inner wall of the cone column, and the other end is fixedly connected to the outer wall of the grouting column, the inner wall of the fixing ring is fixedly connected to the outer wall of the grouting column, and the outer wall of the fixing ring is fixedly connected to the inner wall of the cone column;
[0008] The locking mechanism includes a first locking component and a second locking component. The first locking component includes a double-sided gear, a support rail and a first locking unit. A first rotating groove is opened in the middle of the double-sided gear. The inner wall of the first rotating groove is used to install the support rail. The first locking unit is rotatably connected to the double-sided gear. The second locking component includes a gear ring, a ring rail, a support rod and a second locking unit. A second rotating groove is opened in the middle of the gear ring. The inner wall of the second rotating groove is used to install the ring rail. A plurality of support rods are evenly fixed on the top and bottom of the gear ring, and the second locking unit is rotatably connected to the gear ring.
[0009] As a preferred solution of the stable installation pile foundation structure for construction described in the present invention, the mounting platform includes a support plate, a ring plate and a fixed plate, the top of the support plate is fixedly connected to one end of the ring plate, the other end of the ring plate is fixedly connected to the bottom of the fixed plate, the four corners of the support plate are respectively provided with first mounting holes, a conical column is installed in the first mounting hole, and the top of the conical column is fixedly connected to the bottom of the fixed plate.
[0010] As a preferred solution of the stable installation pile foundation structure for construction described in the present invention, a fourth installation groove is opened in the middle of the support plate, and a small level and a level sensor are installed in the fourth installation groove.
[0011] As a preferred solution of the stable installation pile foundation structure for construction described in the present invention, a first installation groove and a second installation hole are opened in the middle of the ring plate, a ring rail is installed in the first installation groove, and the second installation hole is used to install the second locking unit.
[0012] As a preferred solution of the stable installation pile foundation structure for construction described in the present invention, wherein: grouting holes are respectively opened at the four corners of the fixed plate corresponding to the positions of the grouting columns, a third rotation groove, a second installation groove and a third installation groove are opened in the middle of the fixed plate, a support rail is installed in the third rotation groove, a first gear and a second gear are installed in the second installation groove, the first gear and the second gear are meshed, the second gear is fixedly connected to the motor, and a maintaining mechanism is installed in the third installation groove.
[0013] As a preferred solution of the stable installation pile foundation structure for construction described in the present invention, a connecting rod is fixedly arranged in the middle of the first gear, and the other end of the connecting rod is fixedly connected to the sixth gear, and the sixth gear is meshed with the gear ring.
[0014] As a preferred solution of the stable installation pile foundation structure for construction described in the present invention, there are four first locking units, and the four first locking units include a bearing, a third gear, a first tooth plate, a slide plate, a first slide rail and a stop wheel. The bottom of the bearing is fixedly connected to the fixed plate, the top of the bearing is rotatably connected to the third gear, the third gear is meshed with the first tooth plate, the inner wall of one end of the first tooth plate is rotatably connected to the stop wheel, the bottom of the first tooth plate is fixedly provided with a slide plate, the slide plate is slidably connected to the first slide rail, and the bottom of the first slide rail is fixedly connected to the fixed plate.
[0015] As a preferred solution of the stable installation pile foundation structure for construction described in the present invention, four second locking units are provided, and the four second locking units include a fourth gear, a fifth gear, a second tooth plate, a slider, a second slide rail and an arc bar, the fourth gear is meshed with the support rod, the outer wall of the fourth gear is fixedly connected to the inner wall of the fifth gear, the fifth gear is meshed with the second tooth plate, an arc bar is fixedly provided at one end of the second tooth plate, a second slide rail is fixedly provided on the top of the second tooth plate, the second slide rail is slidably connected to the slider, and the top of the slider is fixedly connected to the inner wall of the second mounting hole.
[0016] As a preferred solution of the stable installation pile foundation structure for construction described in the present invention, the electric telescopic rod is provided with a first introduction hole in the middle, the cone column is provided with a second introduction hole at the position corresponding to the first introduction hole, and the cone column is provided with a moving hole corresponding to the size of the telescopic end of the electric telescopic rod.
[0017] As a preferred solution of the stable installation pile foundation structure for construction described in the present invention, the maintaining mechanism includes a first magnetic block, a spring, a second magnetic block and a clamping block, one side of the first magnetic block is fixedly connected to the bottom of the third installation groove, the other side of the first magnetic block is fixedly connected to one end of the spring, the other end of the spring is fixedly connected to one side of the second magnetic block, and the other side of the second magnetic block is fixedly connected to the clamping block.
[0018] Beneficial effects of the present invention:
[0019] 1. The stable installation pile foundation structure for this building construction is first installed on the ground through a cone column. The horizontal sensor on the support plate is used to feedback the situation of the small level to ensure that the support plate is completely in contact with the horizontal surface. After the contact, the telescopic ends of multiple electric telescopic rods are inserted into the deep soil, and then cement slurry is injected into the surrounding soil through the grouting holes to further strengthen the connection between the installation platform and the soil, enhance the bearing capacity of the installation platform, thereby ensuring that the installation platform provides sufficient support for the pile foundation and ensures the accuracy of piling.
[0020] 2. The stable installation pile foundation structure for construction uses two sets of indentation components to fix the position of the pile foundation, and the double-sided gear and the gear ring are driven by a motor to rotate simultaneously, thereby driving the first tooth plate and the second tooth plate to slide, and the sliding of the first tooth plate and the second tooth plate enables the push wheel and the arc bar to fix the steel pipe at the same time. Because the push wheel and the arc bar are at two heights, they can effectively prevent the steel pipe from tilting during the hammering process, thereby ensuring stability and accuracy during piling, thereby ensuring the stability and durability of the pile foundation.
[0021] 3. The stable installation pile foundation structure for construction uses a maintaining mechanism to permanently fix the steel pipe. When the motor is running, the first magnetic block is magnetic and attracts the second magnetic block to compress the spring. The card block is received into the third installation groove, and the first tooth plate can move normally to fix the pile foundation steel pipe. When the motor stops, the magnetism of the first magnetic block disappears. Due to the elastic force of the spring, the card block moves up instantly to limit the movement of the first tooth plate, preventing the hammering force from being too large, causing the first tooth plate to move, thereby ensuring the stability of the steel pipe during the piling process. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 It is a schematic diagram of the overall structure of a stable installation pile foundation structure for building construction in an embodiment of the present disclosure.
[0023] Figure 2 It is a schematic diagram of the side structure of a stable installation pile foundation structure for building construction in an embodiment of the present disclosure.
[0024] Figure 3 It is a structural schematic diagram of a stable installation pile foundation structure installation platform for building construction in an embodiment of the present disclosure.
[0025] Figure 4 It is a cross-sectional view of a stable installation pile foundation structure fixing mechanism for building construction in an embodiment of the present disclosure.
[0026] Figure 5 It is a cross-sectional view of a stable installation pile foundation structure for building construction in an embodiment of the present disclosure.
[0027] Figure 6 It is a structural schematic diagram of a locking mechanism for a stable installation pile foundation structure for building construction in an embodiment of the present disclosure.
[0028] Figure 7 It is a schematic structural diagram of a first locking assembly of a pile foundation structure for stable installation in building construction according to an embodiment of the present disclosure.
[0029] Figure 8 It is a schematic structural diagram of a second locking assembly of a pile foundation structure for stable installation in building construction according to an embodiment of the present disclosure.
[0030] Fig. 9It is a structural schematic diagram of a stable installation pile foundation structure maintenance mechanism for building construction in an embodiment of the present disclosure.
[0031] 1. Mounting platform; 11. Support plate; 111. First mounting hole; 112. Fourth mounting slot; 113. Small level; 114. Level sensor; 12. Ring plate; 121. First mounting slot; 122. Second mounting hole; 13. Fixing plate; 131. Grouting hole; 132. Third rotating slot; 133. Second mounting slot; 134. Third mounting slot; 2. Fixing mechanism; 21. Cone column; 211. Moving hole; 212. Second introduction hole; 213. Accommodating chamber; 22. Grouting column; 23. Electric telescopic rod; 231. First introduction hole; 24. Limit block; 25. Fixing ring; 3. Locking mechanism; 31. First locking assembly; 311. Double-sided gear; 3111. First rotating slot; 312. Support Rail; 313, first locking unit; 3131, bearing; 3132, third gear; 3133, first tooth plate; 3134, slide plate; 3135, first slide rail; 3136, stop wheel; 32, second locking assembly; 321, gear ring; 3211, second rotating groove; 322, ring rail; 323, support rod; 324, second locking unit; 3241, fourth gear; 3242, fifth gear; 3243, second tooth plate; 3244, slider; 3245, second slide rail; 3246, arc strip; 33, first gear; 34, connecting rod; 35, second gear; 36, sixth gear; 37, motor; 4, maintaining mechanism; 41, first magnetic block; 42, spring; 43, second magnetic block; 44, clamping block. DETAILED DESCRIPTION
[0032] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings. Example 1
[0033] Reference Figure 1-Figure 8 , this embodiment provides a stable installation pile foundation structure for construction, including a mounting platform 1, a fixing mechanism 2, a locking mechanism 3 and a maintaining mechanism 4;
[0034] The fixing mechanism 2 includes a cone column 21, a grouting column 22, an electric telescopic rod 23, a limit block 24 and a fixing ring 25. A receiving cavity 213 is provided in the middle of the cone column 21, a grouting column 22 is provided inside the receiving cavity 213, a plurality of electric telescopic rods 23 are fixedly provided on the outside of the grouting column 22, four limit blocks 24 are provided, and the four limit blocks 24 are evenly distributed on the outside of the grouting column 22, one end of the four limit blocks 24 is fixedly connected to the inner wall of the cone column 21, and the other end is fixedly connected to the outer wall of the grouting column 22, the inner wall of the fixing ring 25 is fixedly connected to the outer wall of the grouting column 22, and the outer wall of the fixing ring 25 is fixedly connected to the inner wall of the cone column 21;
[0035] The mounting platform 1 comprises a support plate 11, a ring plate 12 and a fixing plate 13, wherein the top of the support plate 11 is fixedly connected to one end of the ring plate 12, and the other end of the ring plate 12 is fixedly connected to the bottom of the fixing plate 13, and the four corners of the support plate 11 are respectively provided with first mounting holes 111, and a cone column 21 is installed in the first mounting hole 111, and the top of the cone column 21 is fixedly connected to the bottom of the fixing plate 13;
[0036] A fourth installation slot 112 is provided in the middle of the support plate 11, and a small level 113 and a level sensor 114 are installed in the fourth installation slot 112;
[0037] Grouting holes 131 are respectively provided at the four corners of the fixing plate 13 corresponding to the positions of the grouting columns 22, a third rotation groove 132, a second installation groove 133 and a third installation groove 134 are provided in the middle of the fixing plate 13, a support rail 312 is installed in the third rotation groove 132, a first gear 33 and a second gear 35 are installed in the second installation groove 133, the first gear 33 and the second gear 35 are meshed, the second gear 35 is fixedly connected to the motor 37, and a maintaining mechanism 4 is installed in the third installation groove 134;
[0038] A first introduction hole 231 is opened in the middle of the electric telescopic rod 23 , a second introduction hole 212 is opened in the cone column 21 corresponding to the position of the first introduction hole 231 , and a moving hole 211 is opened in the cone column 21 corresponding to the size of the telescopic end of the electric telescopic rod 23 .
[0039] In the preferred embodiment of the present invention, the cone column 21 is fixedly connected to the mounting platform 1, and the cone column 21 is convenient for the operator to install the mounting platform 1 on the ground. During installation, the small level 113 and the level sensor 114 on the support plate 11 accurately reflect the horizontal position of the mounting platform 1, so as to ensure that the mounting platform 1 can be completely horizontal and provide a reference surface for the pile foundation steel pipe. When the mounting platform 1 is completely horizontal, the telescopic end of the electric telescopic rod 23 moves and is inserted into the surrounding soil to enhance the stability of the mounting platform 1. Then, cement slurry is injected into the grouting column 22 through the grouting hole 131 on the fixing plate 13, and the cement slurry is driven into the soil through the first introduction hole 231 and the second introduction hole 212. The connection between the mounting platform 1 and the soil is further strengthened by the cement slurry, and the bearing capacity of the mounting platform 1 is enhanced to ensure that the mounting platform 1 can provide sufficient supporting force for the pile foundation steel pipe, thereby ensuring the accuracy of piling. The position of the grouting column 22 is fixed by the limit block 24 and the fixing ring 25 to prevent the cement slurry from being too heavy and the position of the grouting column 22 from being deviated, that is, the grouting cost is saved and the service life of the fixing mechanism 2 is increased.
[0040] A fourth installation slot 112 is defined in the middle of the support plate 11 , and a small level 113 and a level sensor 114 are installed in the fourth installation slot 112 .
[0041] In this embodiment, the small level 113 is preferably a Hengda TC-1001 mini level. The small level 113 adopts an aluminum alloy shell, which is sturdy and durable. It is a simple and accurate level measuring instrument with low cost, which reduces the cost of use. The level sensor 114 is a SCL3300 inclination sensor. The level sensor 114 is sturdy and durable, can provide timely feedback on the status of the small level 113, and can help the operator level the mounting platform 1, thereby ensuring the stability of the mounting platform 1.
[0042] The locking mechanism 3 includes a first locking component 31 and a second locking component 32. The first locking component 31 includes a double-sided gear 311, a support rail 312 and a first locking unit 313. A first rotating groove 3111 is opened in the middle of the double-sided gear 311. The inner wall of the first rotating groove 3111 is used to install the support rail 312. The first locking unit 313 is rotatably connected to the double-sided gear 311. The second locking component 32 includes a gear ring 321, a ring rail 322, a support rod 323 and a second locking unit 324. A second rotating groove 3211 is opened in the middle of the gear ring 321. The inner wall of the second rotating groove 3211 is used to install the ring rail 322. A plurality of support rods 323 are evenly fixed on the top and bottom of the gear ring 321. The second locking unit 324 is rotatably connected to the gear ring 321.
[0043] A connecting rod 34 is fixedly disposed in the middle of the first gear 33 , and the other end of the connecting rod 34 is fixedly connected to a sixth gear 36 , and the sixth gear 36 is meshed with the gear ring 321 .
[0044] Preferably, in this embodiment, a first mounting groove 121 and a second mounting hole 122 are opened in the middle of the ring plate 12, a ring rail 322 is installed in the first mounting groove 121, and the second mounting hole 122 is used to install the second locking unit 324. Since the connecting rod 34 connects the first gear 33 and the sixth gear 36, and the sixth gear 36 is meshed with the gear ring 321, the double-sided gear 311 and the gear ring 321 can be rotated simultaneously through the motor 37.
[0045] The first locking units 313 are provided with four, and the four first locking units 313 include a bearing 3131, a third gear 3132, a first tooth plate 3133, a slide plate 3134, a first slide rail 3135 and a stop wheel 3136. The bottom of the bearing 3131 is fixedly connected to the fixed plate 13, the top of the bearing 3131 is rotatably connected to the third gear 3132, the third gear 3132 is meshed with the first tooth plate 3133, the inner wall of one end of the first tooth plate 3133 is rotatably connected to the stop wheel 3136, the bottom of the first tooth plate 3133 is fixedly provided with a slide plate 3134, the slide plate 3134 is slidably connected to the first slide rail 3135, and the bottom of the first slide rail 3135 is fixedly connected to the fixed plate 13;
[0046] There are four second locking units 324, and the four second locking units 324 include a fourth gear 3241, a fifth gear 3242, a second tooth plate 3243, a slider 3244, a second slide rail 3245 and an arcuate bar 3246. The fourth gear 3241 is meshed with the support rod 323, the outer wall of the fourth gear 3241 is fixedly connected to the inner wall of the fifth gear 3242, the fifth gear 3242 is meshed with the second tooth plate 3243, one end of the second tooth plate 3243 is fixedly provided with an arcuate bar 3246, the top of the second tooth plate 3243 is fixedly provided with a second slide rail 3245, the second slide rail 3245 is slidably connected to the slider 3244, and the top of the slider 3244 is fixedly connected to the inner wall of the second mounting hole 122.
[0047] Preferably, in this embodiment, the double-sided gear 311 is used to drive the third gear 3132 to rotate. Since the third gear 3132 is meshed with the first tooth plate 3133, the first tooth plate 3133 moves accordingly, and the four stop wheels 3136 fix the pile foundation steel pipe at the same time. At the same time, the gear ring 321 is used to drive the fourth gear 3241 to rotate, and the fourth gear 3241 drives the fifth gear 3242 to rotate. Since the fifth gear 3242 is meshed with the second tooth plate 3243, the second tooth plate 3243 moves accordingly, and the four arc bars 3246 fix the pile foundation steel pipe at the same time. Since the stop wheels 3136 and the arc bars 3246 are located in two planes, the pile foundation steel pipe can be better fixed to prevent the steel pipe from tilting at an angle during hammering, thereby ensuring stability and accuracy during piling. Example 2
[0048] Reference Figure 5 and Fig. 9 This embodiment is based on the previous embodiment, and differs from the previous embodiment in that.
[0049] refer to Figure 5 A first mounting groove 121 and a second mounting hole 122 are opened in the middle of the ring plate 12 . A ring rail 322 is installed in the first mounting groove 121 , and the second mounting hole 122 is used to install a second locking unit 324 .
[0050] Preferably, in this embodiment, a first mounting groove 121 and a second mounting hole 122 are opened in the middle of the ring plate 12, and a ring rail 322 is installed in the first mounting groove 121 to provide a rotation support track for the gear ring 321 to ensure the normal operation of the gear ring 321. The second mounting hole 122 is used to install the second locking unit 324, thereby ensuring that the wheel 3136 and the arc bar 3246 are in the same vertical position at the beginning, thereby achieving simultaneous fixation of the pile foundation steel pipe by the wheel 3136 and the arc bar 3246, and ensuring stability during piling from all directions.
[0051] refer to Fig. 9 The maintaining mechanism 4 includes a first magnetic block 41, a spring 42, a second magnetic block 43 and a clamping block 44, one side of the first magnetic block 41 is fixedly connected to the bottom of the third mounting groove 134, the other side of the first magnetic block 41 is fixedly connected to one end of the spring 42, the other end of the spring 42 is fixedly connected to one side of the second magnetic block 43, and the other side of the second magnetic block 43 is fixedly connected to the clamping block 44.
[0052] In the preferred embodiment of the present invention, when the motor 37 is running, the first magnetic block 41 is magnetic, attracting the second magnetic block 43 to compress the spring 42, thereby receiving the clamping block 44 into the third mounting groove 134, and the first tooth plate 3133 can move normally to fix the pile foundation steel pipe. When the motor 37 stops, the magnetism of the first magnetic block 41 disappears, and due to the elastic force of the spring 42, the clamping block 44 is rebounded and moves upward instantly, thereby limiting the movement of the first tooth plate 3133, preventing excessive hammering force from causing the first tooth plate 3133 to move, thereby ensuring the stability and accuracy of the pile foundation steel pipe during the piling process.
[0053] The working principle of the present invention is as follows: during installation, the small level 113 and the level sensor 114 on the support plate 11 accurately reflect the horizontal position of the mounting platform 1, ensuring that the mounting platform 1 can be completely horizontal and provide a reference surface for the pile foundation steel pipe. When the mounting platform 1 is completely horizontal, the mounting platform 1 is fixed by the cone column 21. After fixation, the telescopic end of the electric telescopic rod 23 moves and is inserted into the surrounding soil to enhance the stability of the mounting platform 1. Then, cement slurry is injected into the grouting column 22 through the grouting hole 131 on the fixing plate 13, and the cement slurry is driven into the soil through the first introduction hole 231 and the second introduction hole 212. The cement slurry is used to further strengthen the connection between the mounting platform 1 and the soil, enhance the bearing capacity of the mounting platform 1, and ensure that the mounting platform 1 can provide sufficient supporting force for the pile foundation steel pipe, thereby ensuring the accuracy of piling. After the mounting platform 1 is completely fixed, the pile foundation steel pipe is placed in the middle of the ring plate 12.
[0054] Start the motor 37, the first magnetic block 41 is magnetic, attracting the second magnetic block 43 to compress the spring 42, so that the block 44 is received in the third mounting groove 134, ensuring that the first tooth plate 3133 can move normally, the motor 37 drives the second gear 35 to rotate, the second gear 35 drives the first gear 33 and the sixth gear 36 to rotate, the first gear 33 drives the double-sided gear 311 to rotate, the sixth gear 36 drives the gear ring 321 to rotate, the double-sided gear 311 drives the four third gears 3132 to rotate, the third gear 3132 drives the first tooth plate 3133 to move, so that the wheel 3136 is close to the pile foundation steel pipe for fixation, and the gear ring 321 drives the fourth gear 3241 to rotate. The fourth gear 3241 drives the fifth gear 3242 to rotate, and the fifth gear 3242 drives the second tooth plate 3243 to move, so that the arc bar 3246 is close to the pile foundation steel pipe for fixing. The pile foundation steel pipe is simultaneously fixed in two planes and multiple directions by the anti-wheel 3136 and the arc bar 3246 to ensure the accuracy of the pile foundation. After the anti-wheel 3136 and the arc bar 3246 fix the pile foundation steel pipe, the motor 37 stops and the first magnetic block 41 is demagnetized. Due to the elastic force of the spring 42, the block 44 rebounds and moves up instantly, limiting the movement of the first tooth plate 3133, ensuring that the first tooth plate 3133 does not move during the hammering process, thereby ensuring the stability and accuracy of the pile foundation steel pipe during the piling process.
Claims
1. A stable installation pile foundation structure for building construction, characterized in that: It comprises a mounting platform (1), a fixing mechanism (2), a locking mechanism (3) and a maintaining mechanism (4); The fixing mechanism (2) comprises a cone column (21), a grouting column (22), an electric telescopic rod (23), a stop block (24) and a fixing ring (25); a receiving cavity (213) is provided in the middle of the cone column (21); a grouting column (22) is provided inside the receiving cavity (213); a plurality of electric telescopic rods (23) are fixedly provided outside the grouting column (22); four stop blocks (24) are provided, and the four stop blocks (24) are evenly distributed outside the grouting column (22); one end of the four stop blocks (24) is fixedly connected to the inner wall of the cone column (21), and the other end is fixedly connected to the outer wall of the grouting column (22); the inner wall of the fixing ring (25) is fixedly connected to the outer wall of the grouting column (22); and the outer wall of the fixing ring (25) is fixedly connected to the inner wall of the cone column (21); The locking mechanism (3) comprises a first locking component (31) and a second locking component (32); the first locking component (31) comprises a double-sided gear (311), a support rail (312) and a first locking unit (313); a first rotation groove (3111) is provided in the middle of the double-sided gear (311); an inner wall of the first rotation groove (3111) is used to mount the support rail (312); the first locking unit (313) is rotatably connected to the double-sided gear (311); the second locking component (32) comprises a gear ring (321), a ring rail (322), a support rod (323) and a second locking unit (324); a second rotation groove (3211) is provided in the middle of the gear ring (321); an inner wall of the second rotation groove (3211) is used to mount the ring rail (322); a plurality of support rods (323) are evenly fixedly arranged on the top and bottom of the gear ring (321); and the second locking unit (324) is rotatably connected to the gear ring (321); The mounting platform (1) comprises a support plate (11), a ring plate (12) and a fixing plate (13); the top of the support plate (11) is fixedly connected to one end of the ring plate (12); the other end of the ring plate (12) is fixedly connected to the bottom of the fixing plate (13); four corners of the support plate (11) are respectively provided with first mounting holes (111); a cone column (21) is installed in the first mounting hole (111); the top of the cone column (21) is fixedly connected to the bottom of the fixing plate (13); Grouting holes (131) are respectively provided at the four corners of the fixing plate (13) corresponding to the positions of the grouting columns (22); a third rotation groove (132), a second installation groove (133) and a third installation groove (134) are provided in the middle of the fixing plate (13); a support rail (312) is installed in the third rotation groove (132); a first gear (33) and a second gear (35) are installed in the second installation groove (133); the first gear (33) and the second gear (35) are meshed; the second gear (35) is fixedly connected to a motor (37); and a maintaining mechanism (4) is installed in the third installation groove (134); Four first locking units (313) are provided, and the four first locking units (313) include a bearing (3131), a third gear (3132), a first tooth plate (3133), a slide plate (3134), a first slide rail (3135) and a stop wheel (3136); the bottom of the bearing (3131) is fixedly connected to the fixed plate (13); the top of the bearing (3131) is rotatably connected to the third gear (3132); the third gear (3132) is meshed with the first tooth plate (3133); the inner wall of one end of the first tooth plate (3133) is rotatably connected to the stop wheel (3136); the bottom of the first tooth plate (3133) is fixedly provided with a slide plate (3134); the slide plate (3134) is slidably connected to the first slide rail (3135); the bottom of the first slide rail (3135) is fixedly connected to the fixed plate (13); Four second locking units (324) are provided, and the four second locking units (324) include a fourth gear (3241), a fifth gear (3242), a second tooth plate (3243), a slider (3244), a second slide rail (3245) and an arc-shaped bar (3246); the fourth gear (3241) is meshed with the support rod (323); the outer wall of the fourth gear (3241) is fixedly connected to the inner wall of the fifth gear (3242); the fifth gear (3242) is meshed with the second tooth plate (3243); an arc-shaped bar (3246) is fixedly provided at one end of the second tooth plate (3243); a second slide rail (3245) is fixedly provided at the top of the second tooth plate (3243); the second slide rail (3245) is slidably connected to the slider (3244); the top of the slider (3244) is fixedly connected to the inner wall of the second mounting hole (122).
2. A stable installation pile foundation structure for construction as claimed in claim 1, characterized in that: A fourth installation groove (112) is provided in the middle of the support plate (11), and a small level (113) and a level sensor (114) are installed in the fourth installation groove (112).
3. A stable installation pile foundation structure for construction as claimed in claim 1, characterized in that: A first mounting groove (121) and a second mounting hole (122) are provided in the middle of the ring plate (12); a ring rail (322) is installed in the first mounting groove (121); and the second mounting hole (122) is used for installing a second locking unit (324).
4. A stable installation pile foundation structure for construction as claimed in claim 2, characterized in that: A connecting rod (34) is fixedly arranged in the middle of the first gear (33); the other end of the connecting rod (34) is fixedly connected to a sixth gear (36); and the sixth gear (36) is meshed with a gear ring (321).
5. A stable installation pile foundation structure for construction as claimed in claim 1, characterized in that: A first introduction hole (231) is provided in the middle of the electric telescopic rod (23), a second introduction hole (212) is provided in the cone column (21) at a position corresponding to the first introduction hole (231), and a moving hole (211) is provided in the cone column (21) corresponding to the size of the telescopic end of the electric telescopic rod (23).
6. A stable installation pile foundation structure for construction as claimed in claim 1, characterized in that: The maintaining mechanism (4) comprises a first magnetic block (41), a spring (42), a second magnetic block (43) and a clamping block (44); one side of the first magnetic block (41) is fixedly connected to the bottom of the third mounting groove (134); the other side of the first magnetic block (41) is fixedly connected to one end of the spring (42); the other end of the spring (42) is fixedly connected to one side of the second magnetic block (43); and the other side of the second magnetic block (43) is fixedly connected to the clamping block (44).
Citation Information
Patent Citations
Stable mounting pile foundation structure for building construction
CN220746887U
Pile foundation structure for building construction
CN221398956U