Public security integrated management system and public security integrated management method

Through the design of comprehensive security management systems, personnel identification, environmental analysis and activity resettlement modules are used to solve the problems of difficult monitoring and management of different types of personnel in cities, and improve the effectiveness of management and the stability of the living environment.

CN119378999AInactive Publication Date: 2025-01-28NANCHANG KERTE SOFTWARE TECHNOLOGY CO LTD

Patent Information

Application Number
CN202411518271.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-29
Publication Date
2025-01-28
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing public security management methods are difficult to effectively monitor and manage different types of personnel in cities, resulting in a decrease in the effectiveness and authenticity of management methods, especially in the congested areas where the third type of personnel cannot be effectively placed.

Method used

A comprehensive public security management system is designed, including personnel recognition modules, environmental analysis modules and activity resettlement modules. By collecting and analyzing the communication record data and environmental data of the activity personnel, different types of personnel are identified, and the processing scheme and resettlement scheme are set up according to the risk model and resettlement model.

Benefits of technology

Improved the effectiveness of the comprehensive management of various types of people in the city, provided the resettlement method of special personnel, and reduced the instability of the living environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119378999A_ABST
    Figure CN119378999A_ABST
Patent Text Reader

Abstract

The invention discloses a public security integrated management system and a public security integrated management method, and relates to the field of integrated management.The public security integrated management system comprises a personnel identification module, an environment analysis module and an activity placement module. The method comprises the following steps: setting a first-class personnel distribution module, analyzing the distribution data of the first-class personnel to obtain each first-class risk activity area and each second-class risk activity area, setting a first-class personnel processing scheme, analyzing the current environment data of each activity area through an environment analysis module to obtain each congestion area, and finally setting a first-class personnel processing scheme through an activity placement module. And analyzing the activity data of each congestion area, and setting a placement scheme of each third type of personnel, thereby improving the effectiveness of comprehensive management of various types of personnel in a city, and meanwhile, the invention also provides a method for placing special personnel, and the instability of a living environment is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of comprehensive management, and in particular to a comprehensive public security management system and a comprehensive public security management method. Background Art

[0002] With the advancement of urbanization, urban populations are becoming increasingly dense, social activity problems are becoming increasingly prominent, and all kinds of people are causing serious impacts on living order and safety. The existing public security management methods are difficult to deal with these problems. Therefore, a new management system that can monitor and manage cities in real time is needed.

[0003] The first type of people, for example, take advantage of tourists' sympathy to defraud money, the second type of people, such as vagrants, make a living by begging, and the third type of people are the second type of people in congested areas, who may affect the prosperity of the area. At present, the public security management methods for various types of urban populations are mostly based on the experience of staff. The staff judges the type of people based on their experience, and cannot analyze and judge based on the historical communication data of the people, and thus cannot place the third type of people, which reduces the effectiveness and authenticity of the management method. Summary of the invention

[0004] In view of the above-mentioned technical deficiencies, the purpose of the present invention is to provide a comprehensive public security management system and a method for comprehensive public security management.

[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions: The present invention provides a comprehensive public security management system, including the following modules: a personnel identification module, which is used to collect the communication record data of each active person, analyze the communication record data of each active person based on the communication behavior model, identify each first-category person and each second-category person, collect the distribution data of the first-category person, analyze the distribution data of the first-category person based on the activity risk model, obtain each first-category risk activity area and each second-category risk activity area, and then set a first-category person handling plan.

[0006] The environmental analysis module is used to collect the current environmental data of each activity area, and analyze the current environmental data of each activity area based on the activity impact model to obtain each congested area and each third type of personnel.

[0007] The activity placement module is used to collect activity data of each congested area, analyze the activity data of each congested area based on the activity placement model, set up a placement plan for each third category of personnel, and prompt staff to place each third category of personnel.

[0008] Preferably, the distribution data of the first category of personnel is analyzed, and the specific analysis process is as follows: the distribution data of the first category of personnel includes the total number of historical activities of the first category of personnel in each activity area and the current number of the first category of personnel, and the distribution data of the first category of personnel is input into the activity risk model to obtain the output results of each activity area, and the output results include the values ​​of 1 and 2.

[0009] If the output result of an activity area is 1, it indicates that the activity area is a first-class risk activity area, and a safety voice prompt is given to the area through the broadcasting device. If the output result of an activity area is 2, it indicates that the activity area is a second-class risk activity area, and a safety voice prompt is given to the activity area through the broadcasting device, and the first-class personnel in the activity area are persuaded to leave.

[0010] Preferably, the activity data of each congested area is analyzed, and the specific analysis process is as follows: the activity data of each congested area includes the number of shops in each living area in each congested area and the area of ​​vacant public space in each living area, and the activity data of each congested area is input into the activity placement model to obtain the output results of each living area in each congested area, and the output results include values ​​of 0 and 1.

[0011] If the output result of a living area in a congested area is 0, it indicates that the living area is an idle area, so as to obtain the idle areas in each congested area. If the output result of a living area in a congested area is 1, it indicates that the living area is a non-idle area, so as to obtain the non-idle areas in each congested area. If the position of a third category of personnel is in the non-idle area in the corresponding congested area, the idle area with the shortest distance is selected as the idle area of ​​the third category of personnel, and the staff is prompted to persuade the third category of personnel to move to the corresponding idle area for activities, so as to accommodate each third category of personnel.

[0012] On the other hand, the present invention provides a method for comprehensive public security management, comprising the following steps: Step 1, personnel identification: collecting communication record data of each active person, analyzing the communication record data of each active person based on a communication behavior model, identifying each first-category person and each second-category person, collecting distribution data of the first-category person, analyzing the distribution data of the first-category person based on an activity risk model, obtaining each first-category risk activity area and each second-category risk activity area, and then setting a first-category person handling plan.

[0013] Step 2: Environmental analysis: Collect the current environmental data of each activity area, analyze the current environmental data of each activity area based on the activity impact model, and obtain each congested area and each third type of personnel.

[0014] Step 3: Activity placement: Collect activity data from each congested area, analyze the activity data from each congested area based on the activity placement model, set up a placement plan for each third category of personnel, and prompt staff to place each third category of personnel.

[0015] The beneficial effects of the present invention are as follows: the present invention discloses a comprehensive public security management system and a method for comprehensive public security management, which relate to the field of comprehensive management. The present invention comprises a personnel identification module, an environmental analysis module and an activity placement module. First, the first-category personnel and the second-category personnel are screened out through the personnel identification module, and then the distribution data of the first-category personnel are analyzed to obtain the first-category risk activity areas and the second-category risk activity areas, and then a first-category personnel processing plan is set. Next, the current environmental data of each activity area is analyzed through the environmental analysis module to obtain each congested area. Finally, the activity data of each congested area is analyzed through the activity placement module to set a placement plan for each third-category personnel. The present invention improves the effectiveness of comprehensive management of various types of personnel in the city. At the same time, the present invention also provides a method for placing special personnel, which reduces the instability of the living environment. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0017] Figure 1 It is a schematic diagram of the system structure connection of the present invention.

[0018] Figure 2 The present invention is a schematic flow chart of the steps for implementing the method. DETAILED DESCRIPTION

[0019] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0020] according to Figure 1 As shown, the present invention provides a comprehensive public security management system, including the following modules: a personnel identification module, an environment analysis module, an activity placement module and a database.

[0021] The personnel identification module is connected to the environment analysis module and the database respectively, and the activity placement module is connected to the environment analysis module.

[0022] The personnel identification module is used to collect the communication record data of each active person, analyze the communication record data of each active person based on the communication behavior model, identify the first-category personnel and the second-category personnel, and analyze the distribution data of the first-category personnel in the database based on the activity risk model to obtain the first-category risk activity areas and the second-category risk activity areas, and then set up a handling plan for the first-category personnel.

[0023] In a specific embodiment, the communication record data of each active person is collected, and the specific collection process is as follows: each person is monitored by a camera. If a person stays in an activity area for longer than a preset time, the person is recorded as an active person, so as to obtain each active person, and then the number of communications between the target active person and each active person is collected through monitoring, and each active person is divided into various types of active persons according to age and gender. The number of communications between the target active person and each type of active person is used to select the maximum number of communications and divide it by the preset standard number of communications to obtain the maximum communication rate of the target active person with a single type of person, so as to obtain the maximum communication rate of each active person with a single type of person, and at the same time, the activity area of ​​each active person within the preset time is obtained through surveillance video, and the activity areas corresponding to each active person are obtained by statistics, and the area of ​​each activity area is obtained from the database, and the activity area of ​​each active person is obtained by merging.

[0024] In a specific embodiment, the communication record data of each communication personnel is analyzed, and the specific analysis process is as follows: the communication record data of each activity personnel includes the maximum communication rate and activity area of ​​each activity personnel with a single type of personnel, and the communication record data of each activity personnel is input into the communication behavior model to obtain the output results of each communication personnel, and the output results include values ​​of 0 and 1.

[0025] If the output result of a certain communication personnel is 0, the communication personnel is recorded as the first category personnel, and the first category personnel are obtained. If the output result of a certain communication personnel is 1, the communication personnel is recorded as the second category personnel, and the second category personnel are obtained.

[0026] In a specific embodiment, the communication behavior model expression is: , in, is the output result of the communication behavior model of communicator a, a is the communicator's number, , , and are the maximum exchange rate and activity area of ​​exchange personnel a to a single type of personnel, and They are respectively the standard maximum exchange rate for a single type of personnel and the preset standard activity area in the database. and are the weight factors of the exchange rate and the activity area in the database, respectively. , , , It is a standard communication behavior index preset in the database.

[0027] It should be noted that , , , and All are set by staff, e.g. 1.2 2.4 0.3 0.7 is 1.5.

[0028] In a specific embodiment, the distribution data of the first category of personnel is analyzed, and the specific analysis process is as follows: the distribution data of the first category of personnel includes the total number of historical activities of the first category of personnel in each activity area and the current number of the first category of personnel, and the distribution data of the first category of personnel is input into the activity risk model to obtain the output results of each activity area, and the output results include the values ​​of 1 and 2.

[0029] If the output result of an activity area is 1, it indicates that the activity area is a first-class risk activity area, and a safety voice prompt is given to the area through the broadcasting device. If the output result of an activity area is 2, it indicates that the activity area is a second-class risk activity area, and a safety voice prompt is given to the activity area through the broadcasting device, and the first-class personnel in the activity area are persuaded to leave.

[0030] It should be noted that the first type of people, for example, take advantage of the sympathy of tourists and pedestrians to defraud money. When the risk index of the target activity area reaches the minimum risk index, safety voice prompts are given. When the risk index of the target activity area reaches the standard risk index, people are persuaded to leave, which increases the stability of the activity area.

[0031] In a specific embodiment, the activity risk model expression is: , in, is the output result of the activity area b, where b is the number of the activity. , , and are the total number of historical activities of the first category of personnel in activity area b and the current number of the first category of personnel, and They are the total number of standard activities and the number of people in the standard activities preset in the database. and are the weight factors of the total number of activities in the database and the number of people in the activity, respectively. , , , and They are the standard risk index and minimum risk index preset in the database respectively.

[0032] It should be noted that , , , , and All are set by staff, e.g. 1.3 2.1 0.25, 0.75, 2.5 and is 1.4.

[0033] The environmental analysis module is used to collect the current environmental data of each activity area, and analyze the current environmental data of each activity area based on the activity impact model to obtain each congested area and each third type of personnel.

[0034] In a specific embodiment, the current environmental data of each activity area is collected, and the specific collection process is as follows: the current number of people in each activity area, the number of people entering within a preset time, and the number of people leaving within a preset time are collected through a camera, and the public area of ​​each activity area is obtained from a database at the same time, the current number of people in each activity area is divided by the public area to obtain the current density of people stationed in each activity area, the number of people entering within the preset time plus the number of people leaving each activity area is equal to the flow of people in each activity area, and the flow of people in each activity area is divided by the public area to obtain the current density of people flow in each activity area.

[0035] In a specific embodiment, the current environmental data of each activity area is analyzed, and the specific analysis process is as follows: the current environmental data of each activity area includes the current crowd density and the current density of stationed personnel in each activity area, and the current environmental data of each activity area is input into the activity impact model to obtain the output results of each activity area, and the output results include values ​​of 0 and 1.

[0036] If the output result of an activity area is 0, it indicates that the activity area is a normal activity area. If the output result of an activity area is 1, it indicates that the activity area is a congested area. The second type of personnel in the area is recorded as the third type of personnel, so as to obtain the third type of personnel in each congested area.

[0037] In a specific embodiment, the activity impact model expression is: , in, is the output result of the active area b, and are the current flow density and the current density of people standing in the activity area b, respectively. and They are the standard flow density and standard stationary density preset in the database. and are the weight factors of the density of pedestrian flow and the density of stationed personnel preset in the database, , , , It is a standard activity impact index preset in the database.

[0038] It should be noted that , , , and All are set by staff, e.g. 1.6 1.2 0.6 is 0.4 and is 1.1.

[0039] The activity placement module is used to collect activity data of each congested area, analyze the activity data of each congested area based on the activity placement model, set up a placement plan for each third category of personnel, and prompt staff to place each third category of personnel.

[0040] In a specific embodiment, the activity data of each congested area is collected, and the specific collection process is as follows: each activity area is divided into living areas corresponding to each activity area, so as to obtain each living area of ​​each congested area, and pictures of each living area of ​​each congested area are collected by a camera, and the number of stores in each living area in each congested area and the area of ​​vacant public space in each living area are obtained from the pictures.

[0041] In a specific embodiment, the activity data of each congested area is analyzed, and the specific analysis process is as follows: the activity data of each congested area includes the number of stores in each living area within each congested area and the area of ​​vacant public space in each living area, and the activity data of each congested area is input into the activity placement model to obtain the output results of each living area in each congested area, and the output results include values ​​of 0 and 1.

[0042] If the output result of a living area in a congested area is 0, it indicates that the living area is an idle area, so as to obtain the idle areas in each congested area. If the output result of a living area in a congested area is 1, it indicates that the living area is a non-idle area, so as to obtain the non-idle areas in each congested area. If the position of a third category of personnel is in the non-idle area in the corresponding congested area, the idle area with the shortest distance is selected as the idle area of ​​the third category of personnel, and the staff is prompted to persuade the third category of personnel to move to the corresponding idle area for activities, so as to accommodate each third category of personnel.

[0043] It should be noted that the congested area only means that the area has a large flow of people. The living areas in the congested area are not necessarily congested. The third type of people are vagrants in the congested area. Staying in the congested area will increase the safety risks of the activity area and reduce the commercial atmosphere of the activity area. Therefore, it is necessary to persuade the third type of people to leave. At the same time, by dividing the congested area into various living areas and screening out the vacant areas in the congested area to accommodate the third type of people, the commercial atmosphere of the activity area is not affected and the demand for traffic of the third type of people is also met.

[0044] In a specific embodiment, the activity placement model expression is: , in, is the living area d of the congested area c, where c is the congested area number, , , d is the number of the living area, , , and are the number of shops in living area d in congested area c and the area of ​​vacant public space in living area d, and They are the standard number of stores and the standard area of ​​vacant public space preset in the database. and are the weight factors of the number of stores and the area of ​​vacant public space preset in the database, respectively. , , , is the environmental correction factor of living area d in congested area c preset in the database, , is the preset standard placement index.

[0045] It should be noted that , , , , and All are set by staff, e.g. 1.4 1.2 0.13 0.87 is 1.6 and is 1.9.

[0046] A database is used to store the standard maximum communication rate for a single type of personnel, the standard activity area, the weight factor of the communication rate, the weight factor of the activity area, the standard communication behavior index, the standard total number of activities, the standard number of people in activities, the weight factor of the total number of activities, the weight factor of the number of people in activities, the standard risk index, the minimum risk index, the standard crowd density, the standard density of stationed personnel, the weight factor of the crowd density, the weight factor of the stationed personnel density, the standard activity impact index, the standard number of stores, the standard free public space area, the weight factor of the number of stores, the weight factor of the free public space area, the environmental correction factor of each living area in each congested area and the standard resettlement index.

[0047] according to Figure 2 As shown, the present invention provides a method for comprehensive public security management, comprising the following steps: Step 1, personnel identification: collecting communication record data of each active person, analyzing the communication record data of each active person based on a communication behavior model, identifying each first-category person and each second-category person, collecting distribution data of the first-category person, analyzing the distribution data of the first-category person based on an activity risk model, obtaining each first-category risk activity area and each second-category risk activity area, and then setting a first-category person handling plan.

[0048] Step 2: Environmental analysis: Collect the current environmental data of each activity area, analyze the current environmental data of each activity area based on the activity impact model, and obtain each congested area and each third type of personnel.

[0049] Step 3: Activity placement: Collect activity data from each congested area, analyze the activity data from each congested area based on the activity placement model, set up a placement plan for each third category of personnel, and prompt staff to place each third category of personnel.

[0050] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined in this specification, they shall all fall within the protection scope of the present invention.

Claims

1. A comprehensive public security management system, characterized in that: Includes the following modules: The personnel identification module is used to collect the communication record data of each activity personnel, analyze the communication record data of each activity personnel based on the communication behavior model, identify each first-category personnel and each second-category personnel, collect the distribution data of the first-category personnel, analyze the distribution data of the first-category personnel based on the activity risk model, obtain each first-category risk activity area and each second-category risk activity area, and then set the first-category personnel handling plan; The environment analysis module is used to collect the current environment data of each activity area, analyze the current environment data of each activity area based on the activity impact model, and obtain each congestion area and each third type of personnel; The activity placement module is used to collect activity data of each congested area, analyze the activity data of each congested area based on the activity placement model, set up a placement plan for each third category of personnel, and prompt staff to place each third category of personnel.

2. A comprehensive public security management system according to claim 1, characterized in that: The communication record data of each activity personnel is analyzed, and the specific analysis process is as follows: The communication record data of each activity personnel includes the maximum communication rate and activity area of ​​each activity personnel to a single type of personnel. The communication record data of each activity personnel is input into the communication behavior model to obtain the output results of each activity personnel, and the output results include values ​​of 0 and 1; If the output result of a certain activity personnel is 0, the activity personnel is recorded as the first category personnel, so as to obtain the first category personnel. If the output result of a certain activity personnel is 1, the activity personnel is recorded as the second category personnel, so as to obtain the second category personnel.

3. A comprehensive public security management system according to claim 2, characterized in that: The communication behavior model expression is: , in, is the output result of the communication behavior model of activity personnel a, a is the number of the activity personnel, , , and are the maximum exchange rate and activity area of ​​active personnel a to a single type of personnel, and They are respectively the standard maximum exchange rate for a single type of personnel and the preset standard activity area in the database. and are the weight factors of the exchange rate and the activity area in the database, respectively. , , , It is a standard communication behavior index preset in the database.

4. The integrated public security management system according to claim 1, characterized in that: The distribution data of the first type of personnel is analyzed, and the specific analysis process is as follows: The distribution data of the first category of personnel include the total number of historical activities of the first category of personnel in each activity area and the current number of the first category of personnel. The distribution data of the first category of personnel are input into the activity risk model to obtain the output results of each activity area, and the output results include the values ​​of 1 and 2; If the output result of an activity area is 1, it indicates that the activity area is a first-class risk activity area, and a safety voice prompt is given to the area through the broadcasting device. If the output result of an activity area is 2, it indicates that the activity area is a second-class risk activity area, and a safety voice prompt is given to the activity area through the broadcasting device, and the first-class personnel in the activity area are persuaded to leave.

5. A comprehensive public security management system according to claim 4, characterized in that: The activity risk model expression is: , in, is the output result of the activity area b, where b is the number of the activity. , , and are the total number of historical activities of the first category of personnel in activity area b and the current number of the first category of personnel, and They are the total number of standard activities and the number of people in the standard activities preset in the database. and are the weight factors of the total number of activities in the database and the number of people in the activity, respectively. , , , and They are the standard risk index and minimum risk index preset in the database respectively.

6. The integrated public security management system according to claim 1, characterized in that: The current environmental data of each activity area is analyzed, and the specific analysis process is as follows: The current environmental data of each activity area includes the current density of people flow and the current density of people standing in each activity area. The current environmental data of each activity area is input into the activity impact model to obtain the output results of each activity area. The output results include values ​​of 0 and 1. If the output result of an activity area is 0, it indicates that the activity area is a normal activity area. If the output result of an activity area is 1, it indicates that the activity area is a congested area. The second type of personnel in the area is recorded as the third type of personnel, so as to obtain the third type of personnel in each congested area.

7. A comprehensive public security management system according to claim 6, characterized in that: The activity impact model expression is: , in, is the output result of the active area b, and are the current flow density and the current density of people standing in the activity area b, respectively. and They are the standard flow density and standard stationary density preset in the database. and are the weight factors of the density of pedestrian flow and the density of stationed personnel preset in the database, , , , It is a standard activity impact index preset in the database.

8. The integrated public security management system according to claim 1, characterized in that: The activity data of each congested area is analyzed, and the specific analysis process is as follows: The activity data of each congested area includes the number of stores in each living area in each congested area and the area of ​​vacant public space in each living area. The activity data of each congested area is input into the activity placement model to obtain the output results of each living area in each congested area. The output results include values ​​of 0 and 1. If the output result of a living area in a congested area is 0, it indicates that the living area is an idle area, so as to obtain the idle areas in each congested area. If the output result of a living area in a congested area is 1, it indicates that the living area is a non-idle area, so as to obtain the non-idle areas in each congested area. If the position of a third category of personnel is in the non-idle area in the corresponding congested area, the idle area with the shortest distance is selected as the idle area of ​​the third category of personnel, and the staff is prompted to persuade the third category of personnel to move to the corresponding idle area for activities, so as to accommodate each third category of personnel.

9. A comprehensive public security management system according to claim 8, characterized in that: The activity placement model expression is: , in, is the living area d of the congested area c, where c is the congested area number, , , d is the number of the living area, , , and are the number of shops in living area d in congested area c and the area of ​​vacant public space in living area d, and They are the standard number of stores and the standard area of ​​vacant public space preset in the database. and are the weight factors of the number of stores and the area of ​​vacant public space preset in the database, respectively. , , , is the environmental correction factor of living area d in congested area c preset in the database, , is the preset standard placement index.

10. A method for comprehensive public security management based on artificial intelligence using the comprehensive public security management system according to any one of claims 1 to 9, characterized in that: The steps include: Step 1: Personnel identification: Collect the communication record data of each activity personnel, analyze the communication record data of each activity personnel based on the communication behavior model, identify each first-category personnel and each second-category personnel, collect the distribution data of the first-category personnel, analyze the distribution data of the first-category personnel based on the activity risk model, obtain each first-category risk activity area and each second-category risk activity area, and then set up a treatment plan for the first-category personnel; Step 2: Environmental analysis: Collect the current environmental data of each activity area, analyze the current environmental data of each activity area based on the activity impact model, and obtain each congested area and each third type of personnel; Step 3: Activity placement: Collect activity data from each congested area, analyze the activity data from each congested area based on the activity placement model, set up a placement plan for each third category of personnel, and prompt staff to place each third category of personnel.

Citation Information

Patent Citations

  • Big data-based passenger flow analysis method and system, intelligent terminal and storage medium

    CN113569659A

  • Method and system for analyzing behaviors of people in key area

    CN117079351A

  • Intelligent scenic spot intelligent early warning system

    CN118430218A

  • Method for determining crowd concentration area and device for performing same method

    WO2024151148A1

Cited By

  • Power monitoring method for measuring landslide stability by using rainfall

    CN119942733A