A preparation device and method for photovoltaic front panel

By adopting continuous preparation steps and embossing roll set technology in the production of photovoltaic front panels, the problems of complexity and uneven quality of traditional processes are solved, and high-efficiency and high-quality photovoltaic front panel production are achieved.

CN119384084BActive Publication Date: 2025-04-25CANGZHOU NEWMAT ADVANCED MATERIALS TECH CO LTD +1

Patent Information

Application Number
CN202411957978.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-12-30
Publication Date
2025-04-25
Estimated Expiration
2044-12-30

AI Technical Summary

Technical Problem

The production process of existing photovoltaic front panels is complex, with uneven quality, and it is difficult for traditional methods to achieve continuous production and high-efficiency manufacturing.

Method used

The photovoltaic front panel is prepared by continuous spreading of resin powder, impregnation, coating, front crosslink curing, embossing, post crosslink curing and shaping steps, and the production efficiency and product quality are improved by embossing roller set and multi-layer conveyor belt structure.

Benefits of technology

It realizes continuous production of photovoltaic front panels, improves production efficiency and product thickness uniformity, has high light transmittance, strong bonding between functional film and glass fiber cloth, simple operation, and is suitable for large-scale production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119384084B_ABST
    Figure CN119384084B_ABST
Patent Text Reader

Abstract

The present invention relates to the technical field of photovoltaic modules, and provides a preparation equipment and method for a photovoltaic front panel. After the glass fiber cloth is unwound, the present invention continuously performs resin powder sprinkling, impregnation, lamination, pre-crosslinking curing, embossing, post-crosslinking curing and shaping in a transmission state to obtain the photovoltaic front panel; the impregnation includes sequentially performing melt impregnation, heating and pressurization, thickness control and first cooling; the curing degree of the resin after the pre-crosslinking curing is 30-60%. The preparation equipment and method provided by the present invention can realize the continuous production of photovoltaic front panels, with high production efficiency, low energy consumption, and energy saving, and the obtained product has good thickness uniformity, high light transmittance, and strong bonding force of the functional film, and has broad application prospects.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of photovoltaic components, and in particular to equipment and a method for preparing a photovoltaic front panel. Background Art

[0002] Photovoltaic power generation is a technology that uses the photovoltaic effect of semiconductor interfaces to directly convert light energy into electrical energy. It is mainly composed of three parts: photovoltaic modules (solar panels), controllers, and inverters. The photovoltaic front panel is an important component of photovoltaic modules. It is mainly made of transparent glass. Its main function is to protect photovoltaic cells from the external environment (such as rain, wind and sand, etc.), while allowing sunlight to pass through so that the cells can effectively perform photoelectric conversion. At present, the mainstream product of photovoltaic front panels is low-iron tempered embossed glass, which is made by using a special embossing machine to press a special pyramid-shaped pattern on the surface of ultra-white glass. However, this low-iron tempered embossed glass is too heavy and the production process is complicated.

[0003] Photovoltaic front panels made of glass fiber cloth and polymer film are light in weight, easy to install and transport, and are being used more and more, especially in the packaging structure of lightweight components. Related technologies disclose a method for preparing lightweight photovoltaic front panels using glass fiber cloth, wherein it is necessary to first prepare a resin liquid using solvents, resins, curing agents, modifiers, etc., and then apply the resin liquid on the surface of the glass fiber cloth to prepare a dipped glass fiber cloth, which is then cut and then pressed into one piece using a press. This method is complex to operate, has low production efficiency, and has poor thickness uniformity of the product. Summary of the invention

[0004] In view of this, the present invention provides a preparation device and method for a photovoltaic front sheet. The photovoltaic front sheet preparation method provided by the present invention is simple to operate, can realize continuous production of photovoltaic front sheets, has high production efficiency, and the obtained product has good thickness uniformity, high light transmittance, and strong bonding force of the functional film.

[0005] In order to achieve the above-mentioned object of the invention, the present invention provides the following technical solutions:

[0006] The present invention provides a method for preparing a photovoltaic front plate, comprising the following steps:

[0007] After the glass fiber cloth is unwound, the resin powder is sprinkled, impregnated, coated, pre-crosslinked, embossed, post-crosslinked, and cured, and the photovoltaic front panel is obtained in a transmission state;

[0008] The impregnation comprises sequentially performing melt impregnation, heating and pressurizing, thickness control and first cooling;

[0009] The curing degree of the resin after the pre-crosslinking curing is 30-60%.

[0010] Furthermore, the unwinding tension of the glass fiber cloth is 0-50N; the resin powder includes one or more of epoxy resin powder, acrylic resin powder, polyolefin resin powder, polyester resin powder and resin-based composite powder; and the average particle size of the resin powder is 1-1000µm.

[0011] Furthermore, the temperature of the melt impregnation is 80-160° C., and the time is 10-30 min; the melt impregnation is performed in a melt impregnation oven; exhaust is performed during the melt impregnation process;

[0012] The heating and pressurizing are carried out by a heating and pressurizing roller group, the temperature of the heating and pressurizing roller group is 80~180℃, and the air gap is 0.15~5mm; the thickness control is carried out by a thickness control roller group, the temperature of the thickness control roller group is 80~180℃, and the air gap is 0.1~4mm; the first cooling is carried out by a first cooling roller group; the temperature of the first cooling is below 90℃.

[0013] Furthermore, the functional film used in the lamination is a weather-resistant film, an anti-reflection film, a UV cutoff film or a water-blocking film; the unwinding tension of the functional film is 0~50N; the lamination is carried out under the action of a laminating roller group, the temperature of the laminating roller group is 50~150℃, and the line pressure is 20~150N / mm.

[0014] Furthermore, the pre-crosslinking curing is carried out in a pre-crosslinking curing oven, which includes an upper oven and a lower oven, the temperature of the upper oven is 120-180° C., and the temperature of the lower oven is 100-130° C.; the pre-crosslinking curing time is 2-30 min.

[0015] Further, the embossing is performed by an embossing roller set, the upper roller temperature of the embossing roller set is 80-190° C., and the lower roller temperature is 70-150° C.;

[0016] Preheating is performed before the post-crosslinking and curing, and the preheating temperature is 40-150° C.;

[0017] The post-crosslinking curing includes a first stage and a second stage, wherein the temperature of the first stage is 100-190°C and the time is 10-90 min, and the temperature of the second stage is 100-150°C and the time is 10-90 min; the post-crosslinking curing is carried out in a post-crosslinking curing oven;

[0018] After the post-crosslinking and curing, a second cooling is performed; the second cooling is performed by a second cooling roller group, and the temperature of the second cooling is below 90°C.

[0019] Further, the shaping includes sequentially performing tempering and third cooling; the tempering is performed by a tempering roller group, and the third cooling is performed by a third cooling roller group;

[0020] The tempering temperature is 80-130° C., the time is 1-20 min, and the pressure is 0-50N; the third cooling temperature is below 90° C., the time is 1-30 min, and the pressure is 0-40N.

[0021] The present invention also provides a preparation equipment for the photovoltaic front panel used in the preparation method described in the above scheme, including a pretreatment module, a coating device, a pre-crosslinking curing oven, an embossing roller group, an embossing roller group, a post-crosslinking curing device, and a shaping device arranged in sequence along the conveying direction of the glass fiber cloth; the pretreatment module can sprinkle resin powder on the unwound glass fiber cloth, and heat and pressurize, control thickness and perform a first cooling in sequence after melt impregnation; the coating device has a coating unwinding roller and a coating roller group arranged up and down, and the surface of the coating roller group is provided with staggered rollers, which can separate the product after the first cooling from the coating unwinding roller and the coating roller group. The film released by the roller is pressed and connected; the pre-crosslinking curing oven arranged at the end of the laminating device includes an upper oven and a lower oven, and the laminated product passes between the upper oven and the lower oven; the embossing roller group is arranged at the end of the pre-crosslinking curing oven, which includes an upper roller and a lower roller, and the upper roller and the lower roller can emboss the pre-crosslinked and cured coated glass fiber cloth; the post-crosslinking curing device includes a first preheating roller, a post-crosslinking curing oven and a second cooling roller group which are sequentially arranged at the end of the embossing roller group; the shaping device is located at the end of the second cooling roller group, including a tempering roller group and a third cooling roller group.

[0022] Furthermore, the pretreatment module includes a melt impregnation device, a heating and pressure roller group, a thickness control roller group and a first cooling roller group arranged in sequence along the transmission direction of the glass fiber cloth; the melt impregnation device includes a melt impregnation oven and an exhaust roller group; a unwinding device and a powder sprinkler are provided at the front end of the melt impregnation oven, the unwinding device can unwind and convey the glass fiber cloth to the melt impregnation oven, and the powder sprinkler can sprinkle resin powder on the glass fiber cloth located between the melt impregnation oven and the unwinding device.

[0023] Furthermore, it also includes a plurality of conveying devices, which are respectively located at the front end of the pretreatment module, between the pretreatment module and the coating device, between the coating device and the pre-crosslinking curing oven, between the pre-crosslinking curing oven and the embossing roller group, between the embossing roller group and the post-crosslinking curing device, and between the post-crosslinking curing device and the shaping device; the conveying device includes a horizontally arranged active transmission roller and a driven transmission roller, and the active transmission roller and the driven transmission roller are connected by a closed conveyor belt, and the conveyor belt includes a release layer, a heat-conducting diffusion layer and an anti-skid layer arranged in sequence from the outside to the inside. Through the layered structure of the conveyor belt, the side of the conveyor belt that contacts the active transmission roller and the driven transmission roller will not slip, and the transmission process is more stable. The release layer and the heat-conducting diffusion layer can achieve uniform and stable heat on the surface of the conveyor belt, ensuring that the resin powder is heated and melted evenly, so that the product is infiltrated, cured, and has uniform performance, ensuring uniform product performance and quality.

[0024] The present invention provides a method for preparing a photovoltaic front plate, comprising the following steps: after unwinding the glass fiber cloth, continuously performing resin powder sprinkling, impregnation, laminating, pre-crosslinking curing, embossing, post-crosslinking curing and shaping in a transmission state to obtain the photovoltaic front plate; the impregnation comprises sequentially performing melt impregnation, heating and pressurization, thickness control and first cooling; the curing degree of the resin after the pre-crosslinking curing is 30-60%. The present invention uses solid resin powder as a raw material, and continuously performs the subsequent steps after sprinkling resin powder on the surface of the glass fiber cloth, omitting the preparation process of the resin liquid, being suitable for continuous production, being able to greatly improve production efficiency, reducing production energy consumption, saving energy, and the obtained product has good thickness uniformity, high light transmittance, and strong binding force of the functional film. At the same time, the present application sets the embossing step between the pre-crosslinking curing and the post-crosslinking curing, and by controlling the curing degree of the pre-crosslinking curing, the embossing can be effectively performed; further, the embossing step of the traditional method is usually performed using a pressing machine, which is inconvenient to operate and cannot achieve continuous production. The present invention uses an embossing roller group for embossing, which can achieve embossing during the transmission process of the glass fiber cloth, with simple operation and high efficiency.

[0025] In addition, the present invention can further ensure the performance of the products obtained by continuous production and ensure the stable progress of the production process by controlling the process parameters of each step.

[0026] In addition, the present invention uses a coating roller group to coat the film, which can improve the flatness and thickness uniformity of the product and improve the bonding strength between the functional film and the glass fiber cloth. Moreover, the traditional method usually requires covering a layer of adhesive film on the surface of the glass fiber cloth and using the adhesive film to composite the glass fiber cloth and the functional film. The method of the present invention can omit the use of the adhesive film.

[0027] The present invention also provides a preparation equipment for a photovoltaic front panel. The equipment provided by the present invention can realize the continuous production of photovoltaic front panels, has high production efficiency, high automation level, and broad application prospects. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 A schematic diagram of a photovoltaic front panel manufacturing device according to one embodiment of the present invention;

[0029] Figure 2 A schematic cross-sectional view of a conveyor belt according to one embodiment of the present invention;

[0030] Figure 3 This is a schematic diagram of the pressing state of the first cooling roller group in one embodiment of the present invention;

[0031] Figure 4 A schematic front view of a laminating roller assembly according to one embodiment of the present invention;

[0032] Figure 5 A schematic top view of a laminating roller assembly according to one embodiment of the present invention;

[0033] Figure 6 The process flow chart of preparing the photovoltaic front panel of the present invention.

[0034] In the figure: 1-unwinding device, 2-powder spreading machine, 3-first preheating roller, 4-melt impregnation oven, 5-exhaust roller group, 6-heating and pressure roller group, 7-thickness control roller group, 8-first cooling roller group, 9-film coating unwinding roller, 10-film coating roller group, 11-pre-crosslinking curing oven, 12-embossing roller group, 13-second preheating roller, 14-post-crosslinking curing oven, 15-second cooling roller group, 16-tempering roller group, 17-third cooling roller group, 18-thickness gauge, 19-trimming machine, 20-cutting machine, 21-conveyor belt, 2101-release layer, 2102-thermal diffusion layer, 2103-anti-slip layer, 22-glass fiber cloth. DETAILED DESCRIPTION

[0035] The present invention provides a method for preparing a photovoltaic front plate, comprising the following steps:

[0036] After the glass fiber cloth is unwound, the resin powder is sprinkled, impregnated, coated, pre-crosslinked, embossed, post-crosslinked, and cured, and the photovoltaic front panel is obtained in a transmission state;

[0037] The impregnation comprises sequentially performing melt impregnation, heating and pressurizing, thickness control and first cooling;

[0038] The curing degree of the resin after the pre-crosslinking curing is 30-60%.

[0039] The present invention has no special requirements for the glass fiber cloth, and any cloth known to those skilled in the art can be used.

[0040] In the present invention, the unwinding tension of the glass fiber cloth is preferably 0-50N, specifically 0N, 5N, 10N, 20N, 25N or 50N; the resin powder includes one or more of epoxy resin powder, acrylic resin powder, polyolefin resin powder, polyester resin powder and resin-based composite powder; in the present invention, the resin-based composite powder is preferably the strontium titanate nanomaterial in ZL202310776712.1; specifically, the raw materials for preparing the strontium titanate nanomaterial include a base material and a dispersant, and the mass of the dispersant is 0.05-0.2% of the mass of the base material; in terms of mass fractions, the base material includes the following preparation raw materials: powder 50-90 parts of resin, 10-50 parts of curing agent, 0-20 parts of antioxidant, 0.05-0.2 parts of catalyst, 0-10 parts of surface adjuster, 0-20 parts of light stabilizer, 0.05-5 parts of strontium titanate nano-additive, wherein the strontium titanate nano-additive is a mixture of octahedral strontium titanate, hexahedral strontium titanate and irregular strontium titanate, and the mass ratio of the octahedral strontium titanate, the hexahedral strontium titanate and the irregular strontium titanate is 3-4:4-6:1-2; the particle size of the matrix material is 30-150 μm; the dispersant includes one or more of alumina, fumed silica and glass beads, and the particle size of the dispersant is 2-8 μm.

[0041] In the present invention, the average particle size of the resin powder is preferably 1-1000µm, specifically 5µm, 10µm, 50µm, 60µm, 100µm, 200µm, 300µm, 500µm or 1000µm; the present invention controls the particle size of the resin powder within the above range, which can improve the uniformity of the resin powder on the surface of the glass fiber cloth, is beneficial to the melting and uniform infiltration of the resin, and is beneficial to the thickness control of the product; in a specific embodiment of the present invention, the resin powder is preferably sprinkled by a powder sprinkler, and the unwound glass fiber cloth passes under the powder sprinkler, and the powder sprinkler sprinkles the resin powder evenly on the surface of the glass fiber cloth.

[0042] In the present invention, the impregnation includes sequentially performing melt impregnation, heating and pressurization, thickness control and first cooling; before the melt impregnation, it is preferably further included to preheat the glass fiber cloth after powdering, and the preheating temperature is preferably 40-150°C, specifically 50°C, 70°C, 80°C, 100°C, 120°C or 150°C.

[0043] In the present invention, the temperature of the melt impregnation is preferably 80-160°C, specifically 100°C, 120°C or 140°C, and the time of the melt impregnation is preferably 10-30min, specifically 15min, 20min or 25min; the melt impregnation is preferably carried out in a melt impregnation oven, and the time of the melt impregnation is specifically calculated based on the time for the glass fiber cloth with resin powder on the surface to pass through the melt impregnation oven; exhaust is preferably performed during the melt impregnation, specifically, an exhaust roller group is arranged inside the melt impregnation oven, and the gas between the molten resin and the glass fiber cloth is discharged during the melt impregnation process, so as to fully ensure that the molten resin has high fluidity, and multiple groups of small pressing rollers are continuously rolled for multiple times, so as to fully discharge the gas between the resin and the glass fiber cloth and accelerate the resin to infiltrate the glass fiber.

[0044] In the present invention, the heating and pressurizing are preferably performed by a heating and pressurizing roller group, the temperature of the heating and pressurizing roller group is preferably 80-180°C, specifically 100°C, 120°C, 150°C or 160°C, the air gap of the heating and pressurizing roller group is preferably 0.15-5mm, specifically 0.3mm, 0.45mm, 1mm, 2mm, 3mm or 4.5mm, and in a specific embodiment of the present invention, the air gap of the heating and pressurizing roller group is preferably set according to the specifications of the target product; the present invention uses heating and pressurizing to completely penetrate the glass fiber cloth with the molten resin and achieve preliminary surface flattening.

[0045] In the present invention, the thickness control is preferably carried out by a thickness control roller group, the temperature of the thickness control roller group is preferably 80~180℃, specifically 100℃, 120℃, 150℃ or 160℃, the air gap of the thickness control roller group is preferably 0.1~4mm, specifically 0.5mm, 0.3mm, 1mm, 1.5mm, 2mm or 3mm; the first cooling is preferably carried out by a first cooling roller group; the temperature of the first cooling is preferably below 90℃, preferably 10~90℃.

[0046] In a specific embodiment of the present invention, after the glass fiber cloth with resin powder on the surface is preheated, it passes through a melt impregnation oven (an exhaust roller group is provided in the melt impregnation oven), a heating and pressure roller group, a thickness control roller group and a first cooling roller group in sequence under the action of a conveyor belt; in the melt impregnation oven, the resin powder is melted at a high temperature and preliminarily infiltrated into the glass fiber cloth, the exhaust roller group exhausts the molten resin-glass fiber cloth structure, and then the molten resin is completely impregnated into the glass fiber cloth through the heating and pressure rollers and the surface is preliminarily flattened, and then it is gradually pressed to the target thickness of the melt impregnation stage through the thickness control roller group, and then the resin-glass fiber cloth is demolded from the conveyor belt through the first cooling roller group.

[0047] In the present invention, the coating is specifically a functional film coated on the surface of the resin-glass fiber cloth obtained after the first cooling; the functional film used for the coating is preferably a weather-resistant film, an anti-reflection film, a UV cut-off film or a water-blocking film, and the functional film is a polymer film, specifically preferably an ETFE film, a PVDF film or a PVF film; the unwinding tension of the functional film is preferably 0~50N, specifically 0N, 5N, 10N, 20N, 25N or 50N; the coating is preferably carried out under the action of a coating roller group, the temperature of the coating roller group is preferably 50~150℃, specifically 60℃, 80℃, 120℃ or 140℃, and the line pressure is preferably 20~150N / mm, specifically 30N / mm, 50N / mm, 80N / mm or 120N / mm. Before the lamination, the first cooled resin-glass fiber cloth is preferably preheated, and the preheating temperature is preferably 100-150° C., specifically 100° C., 120° C., 140° C. or 150° C. In a specific embodiment of the present invention, after the first cooled resin-glass fiber cloth is demoulded from the conveyor belt, it continues to be transmitted, passes through the laminating roller group, and is compounded with the functional film to obtain a coated glass fiber cloth.

[0048] In the present invention, the pre-crosslinking curing is preferably carried out in a pre-crosslinking curing oven, and the pre-crosslinking curing oven preferably includes an upper oven and a lower oven, the temperature of the upper oven is preferably 120-180°C, specifically 130°C, 150°C or 160°C, and the temperature of the lower oven is preferably 100-130°C, specifically 110°C or 120°C; the pre-crosslinking curing time is preferably 2-30min, specifically 5min, 10min or 15min, and the pre-crosslinking curing time is preferably calculated based on the time for the coated glass fiber cloth obtained after coating to pass through the pre-crosslinking curing oven. During the pre-crosslinking and curing process, the temperature is raised again to increase the crosslinking and curing degree of the resin, increase the bonding strength between the functional film and the resin, and soften the resin in preparation for embossing; in the present invention, after the pre-crosslinking and curing, the curing degree of the resin in the obtained pre-crosslinking and curing material is 30-60%, so that the resin remains in a highly elastic state; in the present invention, the upper surface of the coated glass fiber cloth is a functional film, and the resin on the upper surface does not directly contact the upper roller of the embossing roller group during subsequent embossing. The present invention can make the upper surface of the resin in a highly elastic state by controlling a relatively high upper oven temperature, thereby increasing the bonding strength between the functional film and the resin, and at the same time softening the resin for surface embossing; at the same time, the resin on the lower surface of the coated glass fiber cloth will directly contact the lower roller of the embossing roller group during subsequent embossing. The present invention controls a relatively low lower oven temperature, which can ensure that the lower surface of the product is better demoulded from the lower roller of the embossing roller group.

[0049] In the present invention, the embossing is preferably performed by an embossing roller group, the upper roller temperature of the embossing roller group is preferably 80-190°C, specifically 100°C, 130°C, 150°C or 180°C, and the lower roller temperature is preferably 70-150°C, specifically 80°C, 90°C or 120°C; the gap between the upper roller and the lower roller in the embossing roller group is preferably 0.1-1.2mm. The present invention utilizes the embossing roller group to hot-press the required pattern on the surface of the functional film, and controls the thickness of the product by controlling the gap of the embossing roller group; and the present invention performs a release treatment on the roller surface of the lower roller of the embossing roller group, which can achieve high-temperature demolding at 130°C (demolding release force <1N / cm), and the demolding angle is 30-90°; the release treatment is preferably coating a release coating or performing an ultra-fine grinding mirror treatment, the release coating is preferably a non-sticky material coating, more preferably a polytetrafluoroethylene coating; the roughness (Ra) of the ultra-fine grinding mirror treatment is preferably less than 0.01μm.

[0050] In the present invention, before the post-crosslinking and curing, it is preferred that the embossed material is preheated, and the preheating temperature is preferably 45-150°C, specifically 50°C, 70°C, 80°C, 100°C, 120°C or 150°C.

[0051] In the present invention, the post-crosslinking curing preferably includes a first stage and a second stage, the temperature of the first stage is preferably 100-190°C, specifically 120°C, 150°C, 160°C or 180°C, the time of the first stage is preferably 10-90min, specifically 20min, 40min, 60min or 80min, the temperature of the second stage is preferably 100-150°C, specifically 110°C, 120°C or 130°C, the time of the second stage is preferably 10-90min, specifically 20min, 40min, 60min or 80min; the post-crosslinking curing is preferably carried out in a post-crosslinking curing oven.

[0052] In the present invention, the post-crosslinking and curing is preferably followed by a second cooling; the second cooling is preferably conducted by a second cooling roller set, and the temperature of the second cooling is preferably below 90°C, preferably 10-90°C.

[0053] In a specific embodiment of the present invention, after the embossed product is preheated, it passes through a post-crosslinking curing oven and a second cooling roller group in sequence under the action of a conveyor belt. In the post-crosslinking curing oven, it is heated again to increase the crosslinking of the resin to a target curing degree range of the product, and then passes through the second cooling roller group to demold the post-crosslinking curing material and the conveyor belt.

[0054] In the present invention, the shaping preferably includes tempering and third cooling in sequence; the tempering temperature is preferably 80-130°C, specifically 100°C or 120°C, the tempering time is preferably 1-20min, specifically 3min, 5min or 15min, and in a specific embodiment of the present invention, the tempering time can be calculated by the vehicle speed and the contact area between the product and the tempering roller group; the tempering pressure is preferably 0-50N, specifically 5N, 10N, 30N or 45N; the tempering is preferably performed by a tempering roller group, and the third cooling is performed by a third cooling roller group; the third cooling temperature is preferably below 90°C, more preferably 10-90°C, and the third cooling time is preferably 1-30min, specifically 2min, 5min or 20min; in a specific embodiment of the present invention, the third cooling time can be calculated by the vehicle speed and the contact area between the product and the third cooling roller group; the third cooling pressure is preferably 0-40N, specifically 5N, 10N or 30N. The present invention releases the internal stress of the product through tempering and the third cooling to achieve product shaping.

[0055] In the present invention, after the third cooling, it is preferred to further include thickness measurement, cutting and screening and classification of the obtained product. In a specific embodiment of the present invention, the product after the third cooling passes through a thickness measurement section, a cutting section and a screening and classification section in sequence. In the thickness measurement section, the uniformity of the product thickness is detected, and the thickness control system is used to automatically / manually adjust the thickness to achieve stable control. In the cutting section, the trimming position, width and cutting length of the target product are automatically / manually adjusted to cut the specified product specifications as required. In the screening and classification section, the target product screening standard is input into the defect detection system. After the product is defectively detected, the system automatically determines and screens the product according to the standard, and the robot classifies and places the product.

[0056] In a specific embodiment of the present invention, the transmittance of the prepared photovoltaic front panel is 88-93%, the thickness deviation is ≤±10%, the peeling force of the functional film is >5N, and the tensile strength of the photovoltaic front panel is 20-200N / 10mm.

[0057] The present invention also provides a preparation device for a photovoltaic front panel used in the preparation method described in the above scheme, referring to Figure 1The structure includes a melt impregnation oven 4, an exhaust roller group 5, a heating and pressure roller group 6, a thickness control roller group 7, a first cooling roller group 8, a coating device, a pre-crosslinking curing oven 11, an embossing roller group 12, a post-crosslinking curing device, a tempering roller group 16 and a third cooling roller group 17, which are arranged in sequence along the conveying direction of the glass fiber cloth 22. The crosslinking curing box and the melt impregnation oven 4 are both known structures. A post-processing module is also provided at the end of the third cooling roller group 17. The post-processing module includes a thickness gauge 18, a trimming machine 19, a cutting machine 20, a product inspection machine and a manipulator, etc., which adopt mature and known structures. The product can be measured and trimmed, and cut to the required length, and then transferred to the storage device by a manipulator after passing the inspection. The front end of the melt impregnation oven 4 is provided with a reeling device 1 and a powder spreading machine 2. The unwinding device 1 and the powder sprinkler 2 are both known structures, so they are not described in detail. The unwinding device 1 can unwind the glass fiber cloth 22 and transport it to the melt impregnation oven 4, and the powder sprinkler 2 can sprinkle resin powder on the glass fiber cloth 22 located between the melt impregnation oven 4 and the unwinding device 1; a second preheating roller 13 is arranged at the front end of the melt impregnation oven 4, which can preliminarily preheat the product after powder sprinkling, and the melt impregnation oven 4, the exhaust roller group 5, the heating and pressure roller group 6, the thickness control roller group 7, and the first cooling roller group 8 can sprinkle resin powder on the unwinding glass fiber cloth 22, and heat and pressurize, control thickness and perform the first cooling in sequence after melt impregnation; the coating device has a coating unwinding roller 9 and a coating roller group 10 arranged up and down, and heating ovens are arranged before and after the coating roller group 10, which can control the temperature of the products before and after coating respectively. Figure 4 and Figure 5 As shown, the surface of the coating roller group 10 is provided with staggered rollers, which can hot-press and bond the product after the first cooling with the film released by the coating unwinding roller; specifically, the coating roller group 10 comprises a pre-hot-pressing coating roller group and a post-hot-pressing coating roller group, and the surface of the pre-hot-pressing coating roller group adopts a special staggered roller design, combined with the smooth surface design of the post-hot-pressing coating roller group, to achieve efficient exhaust and bonding between the film and the resin layer; when working, the pre-hot-pressing coating roller group forms an airway at the staggered roller stripes after pressing, and the post-hot-pressing coating roller group expels the gas from the airway. The pre-crosslinking curing oven 11 disposed at the end of the coating device includes an upper oven and a lower oven, and the coated glass fiber cloth passes through the upper oven and the lower oven; the embossing roller group 12 is disposed at the end of the pre-crosslinking curing oven 11, and includes an upper roller and a lower roller, and the upper roller and the lower roller can emboss the pre-crosslinked cured coated glass fiber cloth; the post-crosslinking curing device includes a first preheating roller 3, a post-crosslinking curing oven 14 and a second cooling roller group 15, which are sequentially disposed at the end of the embossing roller group 12; Figure 3As shown, the first cooling roller group 8, the second cooling roller group 15 and the third cooling roller group 17 of the present embodiment have the same structure, including cooling rollers arranged alternately up and down, and the cooling rollers are all mature known structures; the first cooling roller group 8, the second cooling roller group 15 and the third cooling roller group 17 all adopt the cooling roller arrangement form of upper and lower offset pressing, which effectively increases the contact area between the cooling roller group and the glass fiber cloth, improves the cooling effect, avoids damage to the product due to direct pressing during the cooling process, and can avoid cooling damage, especially for resins that harden after cooling.

[0058] In one embodiment, in order to ensure that the glass fiber cloth 22 can be smoothly transmitted between various devices, a plurality of conveying devices are designed, and the conveying devices are respectively located at the front end of the pretreatment module, between the pretreatment module and the coating device, between the coating device and the pre-crosslinking curing oven 11, between the pre-crosslinking curing oven 11 and the embossing roller group 12, between the embossing roller group 12 and the post-crosslinking curing device, and between the post-crosslinking curing device and the shaping device; in one embodiment, the conveying device includes a horizontally arranged active drive roller and a driven drive roller, and the active drive roller and the driven drive roller are connected by a closed conveyor belt 21. During the transmission between two adjacent processing sections, the glass fiber cloth is located on the conveyor belt 21, so as to achieve its smooth transmission.

[0059] In one embodiment, in order to achieve uniform and stable heat on the surface of the conveyor belt, ensure that the resin powder is heated and melted evenly, make the product wetted, cured, and have uniform performance, and ensure uniform product performance and quality, the conveyor belt 21 in the prepreg section and the curing section of this embodiment adopts a special multi-layer structure. The conveyor belt 21 with a multi-layer structure includes a release layer 2101, a thermal diffusion layer 2102, and an anti-slip layer 2103, which are sequentially connected between layers by a temperature-resistant thermally conductive adhesive from the outside to the inside to achieve high-strength bonding between layers. Among them, the release layer 2101 can be formed by a high temperature resistant fabric surface that can be coated with fluorine (such as Teflon), coated with silicon release treatment (such as silicone oil release agent), etc.; the thermal diffusion layer 2102 can be a single or multiple excellent thermal conductive metal wires (copper, aluminum, silver, etc. or alloys) uniformly woven in the longitudinal and transverse directions (the diameter of the metal wire is 100-2000µm), or it can be a uniform layer of excellent thermal conductive materials such as graphene, which can prevent the uneven heating of the resin caused by the possible uneven heating of the oven. When the conveyor belt is heated unevenly, the heat can quickly diffuse to the low temperature area to make up for the temperature difference and ensure temperature uniformity, thereby achieving surface temperature uniformity of the release layer 2101. Figure 2 As shown, Figure 2The middle arrow is the direction of heat diffusion; the anti-skid layer 2103 is in direct contact with the active transmission roller and the driven transmission roller to prevent slipping between the active transmission roller and the driven transmission roller. It adopts a structure of a rubber material with certain elasticity and high temperature resistance plus an anti-skid cloth woven cloth, so that the anti-skid layer has a certain elasticity and anti-skid. Its elasticity applies a certain pressure value between the anti-skid layer and the guide roller during operation, further improving the anti-skid effect.

[0060] Combine the following Figure 1 The process of preparing the photovoltaic front panel of the present invention is described in detail: the glass fiber cloth 22 is unwound by the unwinding device 1 and passes under the powder spreading machine 2. The powder spreading machine 2 sprinkles the resin powder on the surface of the glass fiber cloth 22, and then passes through the second preheating roller 13 for preheating under the conveying action of the conveyor belt 21, and then enters the melt impregnation oven 4 for melt impregnation, and passes through the exhaust roller group 5 for exhaust during the melt impregnation process. After the melt-impregnated product is conveyed out of the melt impregnation oven 5, it passes through the heating and pressure roller group 6, the thickness control roller group 7 and the first cooling roller group 8 in sequence, and the resin-glass fiber cloth is demolded from the conveyor belt by the first cooling roller group 8. Afterwards, the resin-glass fiber cloth is pressed and connected with the functional film unwound by the coating unwinding roller 9 through the coating roller group 10, and the obtained coated glass fiber cloth enters the pre-crosslinking curing oven 11 for pre-crosslinking curing, and then passes through the embossing roller group 12 for embossing, and then passes through the first preheating roller 13 for preheating, and then enters the post-crosslinking curing oven 14 for post-crosslinking curing, and then cools the second cooling roller group 15, and then passes through the tempering roller group 16 for tempering, and then passes through the third cooling roller group 17 for cooling, and then passes through the thickness gauge 18 for thickness measurement, passes through the trimming machine 19 for trimming, and passes through the cutting machine 20 for cutting to obtain the photovoltaic front panel of the present invention.

[0061] The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solutions of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0062] The photovoltaic special powder used in the following examples is prepared according to the method in Example 1 of ZL202310776712.1. By controlling the sieve mesh number, photovoltaic special powders with average particle sizes of 60±5µm and 300±10µm are obtained, which are respectively used in Example 1 and Example 2.

[0063] Example 1

[0064] use Figure 1 The equipment used in the preparation of photovoltaic front panels is as follows: Figure 6 As shown, the specific preparation method is as follows:

[0065] The glass fiber cloth is unwound to the lower part of the powder spreading machine 2, and the unwinding tension is 3N. The photovoltaic special powder (particle size is 60±5µm) is evenly sprinkled on the surface of the glass fiber cloth 22; then, under the action of the conveyor belt 21, it is preheated by the second preheating roller 13 and enters the melt impregnation oven 4 for melt impregnation, and is exhausted by the exhaust roller group 5, and then passes through the heating and pressure roller group 6, the thickness control roller group 7 and the first cooling roller group 8 in sequence to demould the resin-glass fiber composite material from the conveyor belt; wherein the temperature of the second preheating roller 13 is 50°C, and the melt impregnation The temperature of the oven 4 is 160°C, and the time for passing through the melt impregnation oven 4 is 20 minutes; the exhaust roller group 5 is designed inside the melt impregnation oven 4, with a total of 6 groups of small pressing rollers. After continuous multiple rolling, the gas between the resin and the glass fiber cloth is fully discharged to accelerate the resin infiltration of the glass fiber; the temperature of the heating and pressure roller group 6 is 160°C, the air gap is 0.45mm, the temperature of the thickness control roller group 7 is 160°C, the air gap is 0.35mm, and the first cooling roller group 8 cools the temperature of the resin-glass fiber composite material to below 80°C.

[0066] The ETFE film is unwound with an unwinding tension of 5N. The resin-glass fiber composite material passes through the first cooling roller group 8 and is preheated in an oven in front of the coating roller group (preheating temperature is 100°C). Then, it is hot-pressed and bonded to the ETFE film under the action of the coating roller group. The temperature of the coating roller group 10 is 150°C and the line pressure is 50N / mm. The coated material enters a pre-crosslinking curing oven 11 with an upper oven temperature of 150°C and a lower oven temperature of 110°C. The material passes through the pre-crosslinking curing oven 11 for 15 minutes. Then, the material is embossed through an embossing roller group 12 with an upper roller temperature of 150°C and a lower roller temperature of 100°C. The gap between the upper roller and the lower roller is 0.3mm.

[0067] The embossed material is preheated by the first preheating roller 3 under the action of the conveyor belt 21 and then enters the post-crosslinking curing oven 14, wherein the temperature of the first preheating roller 3 is 60°C, and the post-crosslinking curing oven 14 is divided into two sections, the temperature of the front section is 150°C, and the temperature of the rear section is 140°C. The embossed material passes through the front section of the post-crosslinking curing oven 14 for 30 minutes, and the time for passing through the rear section of the post-crosslinking curing oven 14 is 30 minutes; the material passing through the post-crosslinking curing oven 14 is cooled to below 80°C by the second cooling roller group 15, and demolded from the conveyor belt, and then passes through the tempering roller group 16 and the third cooling roller group 17 in turn, the temperature of the tempering roller group 16 is 130°C, and the pressure is 10N, and the temperature of the material is cooled to below 80°C by the third cooling roller group 17, and the pressure of the third cooling roller group 17 is 10N.

[0068] The material passing through the third cooling roller 17 is measured by a thickness gauge 18 for thickness detection and adjustment, and then is trimmed by a trimming machine 19 and cut into specified product specifications by a cutting machine 20. The material then goes to the screening and classification section, and the target product screening standards are input into the defect detection system. After the product is defect-detected, the system automatically determines and screens it according to the standards, and classifies and places it by a robot.

[0069] Example 2

[0070] use Figure 1 The photovoltaic front panel is prepared by the equipment in the invention, and the specific preparation method is as follows:

[0071] The glass fiber cloth 22 is unwound to the lower part of the powder spreading machine 2, and the unwinding tension is 10N. The photovoltaic special powder (average particle size is 300±10µm) is evenly sprinkled on the surface of the glass fiber cloth 22; then, under the action of the conveyor belt 21, it is preheated by the second preheating roller 13 and enters the melt impregnation oven 4 for melt impregnation, and is exhausted by the exhaust roller group 5, and then passes through the heating and pressure roller group 6, the thickness control roller group 7 and the first cooling roller group 8 in sequence to demold the resin-glass fiber composite material from the conveyor belt; the temperature of the second preheating roller 13 is 60℃ The temperature of the melt impregnation oven 4 is 180°C, and the time of passing through the melt impregnation oven 4 is 30 minutes; the exhaust roller group is designed inside the melt impregnation oven 4, with a total of 6 groups of small pressing rollers. After continuous multiple rolling, the gas between the resin and the glass fiber cloth is fully discharged to accelerate the resin infiltration of the glass fiber; the temperature of the heating and pressure roller group 6 is 160°C, the air gap is 1.2mm, the temperature of the thickness control roller group 7 is 150°C, the air gap is 1.05mm, and the first cooling roller group 8 cools the temperature of the resin-glass fiber composite material to below 80°C.

[0072] The ETFE film is unwound with an unwinding tension of 10N. The resin-glass cloth passing through the first cooling roller group 8 is preheated in an oven in front of the coating roller group (the preheating temperature is 100°C), and then hot-pressed and bonded with the ETFE film under the action of the coating roller group 10. The temperature of the coating roller group 10 is 150°C and the line pressure is 60N / mm. The coated material enters a pre-crosslinking curing oven 11. The upper oven temperature of the pre-crosslinking curing oven 11 is 170°C, and the lower oven temperature is 120°C. The time for passing through the pre-crosslinking curing oven 11 is 30 minutes. Then, it is embossed by the embossing roller group 12. The upper roller temperature of the embossing roller group 12 is 160°C, the lower roller temperature is 120°C, and the gap between the upper roller and the lower roller is 1.0mm.

[0073] The embossed material is preheated by the first preheating roller 3 under the action of the conveyor belt 21 and then enters the post-crosslinking curing oven 14, wherein the temperature of the first preheating roller 3 is 50°C, and the post-crosslinking curing oven 14 is divided into two sections, the temperature of the front section is 165°C, and the temperature of the rear section is 150°C. The embossed material passes through the front section of the post-crosslinking curing oven 14 for 35 minutes, and passes through the rear section of the post-crosslinking curing oven 14 for 25 minutes; the material passing through the post-crosslinking curing oven 14 is cooled to below 80°C by the second cooling roller group 15, and demolded from the conveyor belt, and then passes through the tempering roller group 16 and the third cooling roller group 17 in turn, the temperature of the tempering roller group 16 is 130°C, and the pressure is 5N, and the temperature of the material is cooled to below 80°C by the third cooling roller group 17, and the pressure of the third cooling roller is 5N.

[0074] The material passing through the third cooling roller 17 is measured by a thickness gauge 18 for thickness detection and adjustment, and then is trimmed by a trimming machine 19 and cut into specified product specifications by a cutting machine 20. The material then goes to the screening and classification section, and the target product screening standards are input into the defect detection system. After the product is defect-detected, the system automatically determines and screens it according to the standards, and classifies and places it by a robot.

[0075] The transmittance, thickness, thickness deviation, and peeling force between the ETFE film and the resin-glass fiber cloth layer of the photovoltaic front panels prepared in Examples 1-2 were tested. The results are shown in Table 1.

[0076] Table 1 Performance test results

[0077]

[0078] It can be seen from the results in Table 1 that the photovoltaic front panel prepared by the present invention has good thickness uniformity, high light transmittance, strong bonding force of the functional film, and high tensile strength of the panel.

[0079] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A method for preparing a photovoltaic front panel, characterized in that: The following steps are involved: After the glass fiber cloth is unwound, the resin powder is sprinkled, impregnated, coated, pre-crosslinked, embossed, post-crosslinked, and cured, and the photovoltaic front panel is obtained in a transmission state; The impregnation comprises sequentially performing melt impregnation, heating and pressurizing, thickness control and first cooling; The curing degree of the resin after the pre-crosslinking curing is 30-60%; The pre-crosslinking curing is carried out in a pre-crosslinking curing oven, which includes an upper oven and a lower oven, the temperature of the upper oven is 120-180°C, and the temperature of the lower oven is 100-130°C; the pre-crosslinking curing time is 2-30 minutes; by controlling the upper oven temperature at a higher level, the upper surface of the resin can be in a highly elastic state, and by controlling the lower oven temperature at a lower level, the lower surface of the product can be better demoulded from the lower roller of the embossing roller group; The shaping includes tempering and third cooling in sequence.

2. The preparation method according to claim 1, characterized in that: The unwinding tension of the glass fiber cloth is 0-50N; the resin powder includes one or more of epoxy resin powder, acrylic resin powder, polyolefin resin powder, polyester resin powder and resin-based composite powder; the average particle size of the resin powder is 1-1000µm.

3. The preparation method according to claim 1, characterized in that: The temperature of the melt impregnation is 80-160°C, and the time is 10-30 minutes; the melt impregnation is carried out in a melt impregnation oven; exhaust is performed during the melt impregnation process; The heating and pressurizing are carried out by a heating and pressurizing roller group, the temperature of the heating and pressurizing roller group is 80~180℃, and the air gap is 0.15~5mm; the thickness control is carried out by a thickness control roller group, the temperature of the thickness control roller group is 80~180℃, and the air gap is 0.1~4mm; the first cooling is carried out by a first cooling roller group; the temperature of the first cooling is below 90℃.

4. The preparation method according to claim 1, characterized in that: The functional film used in the lamination is a weather-resistant film, an anti-reflection film, an ultraviolet cut-off film or a water-blocking film; the unwinding tension of the functional film is 0~50N; the lamination is carried out under the action of a laminating roller group, the temperature of the laminating roller group is 50~150℃, and the line pressure is 20~150N / mm.

5. The preparation method according to claim 1, characterized in that: The embossing is performed by an embossing roller group, wherein the upper roller temperature of the embossing roller group is 80-190° C., and the lower roller temperature is 70-150° C.; Preheating is performed before the post-crosslinking and curing, and the preheating temperature is 40-150° C.; The post-crosslinking curing includes a first stage and a second stage, wherein the temperature of the first stage is 100-190°C and the time is 10-90 min, and the temperature of the second stage is 100-150°C and the time is 10-90 min; the post-crosslinking curing is carried out in a post-crosslinking curing oven; After the post-crosslinking and curing, a second cooling is performed; the second cooling is performed by a second cooling roller group, and the temperature of the second cooling is below 90°C.

6. The preparation method according to claim 1, characterized in that: The tempering is performed by a tempering roller group, and the third cooling is performed by a third cooling roller group; The tempering temperature is 80-130° C., the time is 1-20 min, and the pressure is 0-50N; the third cooling temperature is below 90° C., the time is 1-30 min, and the pressure is 0-40N.

7. The preparation equipment for the photovoltaic front sheet used in the preparation method according to any one of claims 1 to 6, characterized in that: include: A pretreatment module, which can sprinkle resin powder on the unwound glass fiber cloth, and then heat and pressurize, control thickness and perform the first cooling in sequence after melting and impregnation; A film coating device, comprising a film coating unwinding roller and a film coating roller group arranged up and down, wherein the surface of the film coating roller group is provided with staggered rollers, which can press and connect the product after the first cooling with the film released by the film coating unwinding roller; A pre-crosslinking curing oven provided at the end of the film coating device, comprising an upper oven and a lower oven, and the film coated product passes between the upper oven and the lower oven; An embossing roller group is arranged at the end of the pre-crosslinking curing oven, and comprises an upper roller and a lower roller, and the upper roller and the lower roller can emboss the pre-crosslinked and cured coated glass fiber cloth; A post-crosslinking and curing device comprises a first preheating roller, a post-crosslinking and curing oven and a second cooling roller group which are sequentially arranged at the end of the embossing roller group; The shaping device is located at the end of the second cooling roller group and includes a tempering roller group and a third cooling roller group.

8. The photovoltaic front panel manufacturing equipment according to claim 7, characterized in that: The pretreatment module comprises a melt impregnation device, a heating and pressure roller group, a thickness control roller group and a first cooling roller group which are sequentially arranged along the transmission direction of the glass fiber cloth; the melt impregnation device comprises a melt impregnation oven and an exhaust roller group; a unwinding device and a powder sprinkler are arranged at the front end of the melt impregnation oven, the unwinding device can unwind and convey the glass fiber cloth to the melt impregnation oven, and the powder sprinkler can sprinkle resin powder on the glass fiber cloth located between the melt impregnation oven and the unwinding device.

9. The photovoltaic front panel manufacturing equipment according to claim 7, characterized in that: It also includes multiple conveying devices, which are respectively located at the front end of the pretreatment module, between the pretreatment module and the laminating device, between the laminating device and the pre-crosslinking curing oven, between the pre-crosslinking curing oven and the embossing roller group, between the embossing roller group and the post-crosslinking curing device, and between the post-crosslinking curing device and the shaping device; the conveying device includes a horizontally arranged active transmission roller and a driven transmission roller, the active transmission roller and the driven transmission roller are connected by a closed conveyor belt, and the conveyor belt includes a release layer, a heat-conducting diffusion layer and an anti-slip layer arranged in sequence from the outside to the inside.

Citation Information

Patent Citations

  • Strontium titanate nanomaterials, their preparation method and applications

    CN116535919B

  • Hot melt adhesive powder scattering and compounding machine

    CN108688283A

  • Process and equipment for preparing front plate and back plate of light-weight photovoltaic module

    CN115284644A

  • Laminate

    JP2012071419A

Cited By

  • Photovoltaic front panel production process

    CN121793488A