Updating method for multi-parameter simulation model of transformer substation

By recording and analyzing parameter changes of the equipment model in the substation simulation system and updating the equipment parameters, the problem of insufficient parameter adjustment in the substation simulation model update is solved, and the accuracy of the simulation effect and the efficiency of the model are improved.

CN119397744APending Publication Date: 2025-02-07HAINAN ELECTRIC POWER SCHOOL (HAINAN ELECTRIC POWER TECH SCHOOL)
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411402704.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-09
Publication Date
2025-02-07

AI Technical Summary

Technical Problem

During the update of the substation simulation model, the parameter adjustment is not meticulous enough, resulting in poor simulation results, and the simulation model needs to be updated accurately.

Method used

By recording the original parameters of the device model during the steady-state and transient processes of the substation, input simulation input data, obtain the first simulation output data, and then change the device model parameters, obtain the second simulation output data, analyze the data differences, and determine the The source and scope of impact of abnormal data, and update the device parameters.

Benefits of technology

Make the simulation data closer to the actual data, improve the accuracy of the simulation effect of the substation, and improve the efficiency of the model usage in the simulation system by repairing and replacing abnormal equipment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119397744A_ABST
    Figure CN119397744A_ABST
Patent Text Reader

Abstract

The invention discloses a method for updating a multi-parameter simulation model of a transformer substation, which comprises the following updating steps of: S1, recording original parameters of an equipment model in a steady-state process and a transient-state process of the transformer substation, respectively inputting simulation input data into a transformer substation model, acquiring first simulation output data, and acquiring second simulation output data; s2, by changing the equipment model parameters of the primary simulation system and the secondary simulation system of the transformer substation, inputting the same simulation input data again, recording the action of the equipment model, and obtaining the secondary simulation output data, the simulation data and the actual data are compared and analyzed, so that the parameters of the simulation model of the transformer substation are updated, and the simulation accuracy of the transformer substation is improved. Therefore, the simulation effect is closer to the actual effect, the simulation accuracy is improved, meanwhile, abnormal model equipment in the transformer substation simulation system is analyzed and updated in a repairing and replacing mode, and the use efficiency of the model in the transformer substation simulation system can be better improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of substation simulation, and in particular to a method for updating a multi-parameter simulation model of a substation. Background Art

[0002] The substation setting simulation system is a system based on virtual reality 3D technology and aimed at the safe production of intelligent substations. The system simulates intelligent primary equipment and deep secondary equipment to achieve high-precision and realistic display of three-dimensional substations. It can carry out equipment inspections, switching operations and accident handling training for operation and maintenance stations, thereby improving the actual operation ability and abnormal and accident handling ability of operation and maintenance personnel, which is conducive to the safe production of intelligent substations. In the simulation system of the substation, the simulation model needs to be updated regularly according to the actual situation of the substation to ensure more accurate simulation effects;

[0003] However, in the process of updating the substation simulation model, the adjustment of parameters is not detailed enough, and the simulation effect of the substation is not good. It is necessary to accurately update the substation simulation model. Summary of the invention

[0004] The present invention provides a method for updating a multi-parameter simulation model of a substation, which can effectively solve the problem raised in the above background technology that during the updating process of the substation simulation model, the adjustment of parameters is not detailed enough, the simulation effect of the substation is not good, and the substation simulation model needs to be accurately updated.

[0005] To achieve the above object, the present invention provides the following technical solution: a method for updating a multi-parameter simulation model of a substation, comprising the following updating steps:

[0006] S1. During the steady-state and transient processes of the substation, the original parameters of the equipment model are recorded, and simulation input data are input into the substation model respectively to obtain the first simulation output data;

[0007] S2, by changing the equipment model parameters of the primary simulation system and the secondary simulation system of the substation, inputting the same simulation input data again, recording the action of the equipment model, and obtaining the second simulation output data;

[0008] S3, analyzing the equipment model action, analyzing the second simulation output data according to the actual input data, output data, actual equipment parameters, equipment model parameters before and after the change, and the first simulation output data of the substation;

[0009] S4, determining whether the second simulation output data has an abnormality, and determining an output device for the abnormal data;

[0010] S5. Detecting the input data of the abnormal data output device to determine the source of the abnormal data;

[0011] S6. Finally, determine the scope of equipment affected by the abnormal data;

[0012] S7, updating the equipment in the substation model;

[0013] S8. Detect the equipment in the updated substation model to determine the usage of the updated equipment.

[0014] According to the above technical solution, in S1, after the substation system enters a steady state, simulation input data is input, transient simulation is performed on the substation system, and simulation output data is obtained;

[0015] The simulation input data is set to be greater than 3 groups, and the corresponding first simulation output data and second simulation output data are obtained.

[0016] According to the above technical solution, in S2, when adjusting the parameters, the parameters of one device involved in the simulation data are adjusted each time;

[0017] After adjusting the parameters, obtain the second simulation output data, restore the adjusted parameters, and adjust the parameters of another device until all the devices involved have their parameters adjusted once;

[0018] Each time the device parameters are adjusted, a set of second simulation output data is obtained.

[0019] According to the above technical solution, in S2 and S3, the adjustable parameters of the substation equipment include ambient temperature, operating humidity, power input, rated test capacity, resonant voltage, frequency adjustment range, system measurement accuracy, frequency adjustment resolution and reactor Q value;

[0020] The output data of substation equipment includes rated voltage, rated current, no-load loss, load loss, impedance voltage and voltage regulation range.

[0021] According to the above technical solution, in S3, the second simulation output data is inferred according to the change of parameters, and the inferred data is compared with the actual second simulation output data. If the two are the same, the output is normal, and if they are different, abnormal data exists.

[0022] According to the above technical solution, in S4, the actual input data, output data, and actual equipment parameters of the substation are compared and analyzed with the simulation input data, the first simulation output data, and the second simulation output data to determine the abnormal conditions between the data.

[0023] According to the above technical solution, in S4 and S5, the output device is first determined according to the input and output paths of the abnormal data and the participating devices;

[0024] After the output device of the abnormal data is determined, the input data of the device is determined, the source of the data is found according to the data transmission path, and the generation location of the abnormal data is analyzed in turn.

[0025] According to the above technical solution, in S6, the devices affected by the abnormal data include an output device of the abnormal data, a transmission device of the abnormal data and an input device of the abnormal data;

[0026] Among them, the input device of abnormal data and the output device of abnormal data are devices with determined impact, and the transmission device of abnormal data is a device with pending impact;

[0027] For devices with pending impact, secondary testing is required to determine whether the device is abnormal by inputting normal data and testing whether the output data is abnormal.

[0028] According to the above technical solution, in S7-S8, the affected devices are first determined, then the connection relationship of the devices is determined, and finally the devices are updated;

[0029] When updating a device, first repair the device itself, then input data to test the repaired device. If no abnormality is detected, the update is complete.

[0030] The data is taken in to detect the repaired equipment. If an abnormality is detected, a new device is used for update. The data is input to detect the usage of the new equipment in the substation system. If no abnormality is detected, the update is completed.

[0031] According to the above technical solution, in S8, after all equipment in the substation system is updated, the simulation input data is input into the substation system again to obtain the simulation output data after detection, and the simulation output data is analyzed to determine the usage of the updated equipment in the overall substation system.

[0032] Compared with the prior art, the present invention has the following beneficial effects:

[0033] 1. By inputting simulation input data into the substation simulation system, obtaining the first simulation output data, and then comparing it with the actual data, determining the difference between the data, and updating the equipment parameters, the simulation data is closer to the actual data, so that multiple parameters of the equipment are more consistent with the actual substation, making the simulation effect of the substation better.

[0034] 2. By analyzing the data in the actual substation and the substation simulation system, the abnormal data is analyzed to find the corresponding equipment, and the equipment involved in the abnormal data is analyzed in turn to update the abnormal equipment, so that the model equipment in the substation simulation system can be better simulated.

[0035] In summary, by comparing and analyzing the simulation data with the actual data, the parameters of the substation simulation model are updated, so that the simulation effect is closer to the actual effect and the accuracy of the simulation is increased. At the same time, the abnormal model equipment in the substation simulation system is analyzed and updated by repairing and replacing, which can better improve the efficiency of model utilization in the substation simulation system. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] The accompanying drawings are used to provide further understanding of the present invention and constitute a part of the specification. They are used to explain the present invention together with the embodiments of the present invention and do not constitute a limitation of the present invention.

[0037] In the attached picture:

[0038] Figure 1 It is an update step diagram of the present invention. DETAILED DESCRIPTION

[0039] The preferred embodiments of the present invention are described below in conjunction with the accompanying drawings. It should be understood that the preferred embodiments described herein are only used to illustrate and explain the present invention, and are not used to limit the present invention.

[0040] Example 1: Figure 1 As shown, the present invention provides a technical solution, a method for updating a multi-parameter simulation model of a substation, comprising the following updating steps:

[0041] S1. During the steady-state and transient processes of the substation, the original parameters of the equipment model are recorded, and simulation input data are input into the substation model respectively to obtain the first simulation output data;

[0042] S2, by changing the equipment model parameters of the primary simulation system and the secondary simulation system of the substation, inputting the same simulation input data again, recording the action of the equipment model, and obtaining the second simulation output data;

[0043] S3, analyzing the equipment model action, analyzing the second simulation output data according to the actual input data, output data, actual equipment parameters, equipment model parameters before and after the change, and the first simulation output data of the substation;

[0044] S4, determining whether the second simulation output data has an abnormality, and determining an output device for the abnormal data;

[0045] S5. Detecting the input data of the abnormal data output device to determine the source of the abnormal data;

[0046] S6. Finally, determine the scope of equipment affected by the abnormal data;

[0047] S7, updating the equipment in the substation model;

[0048] S8. Detect the equipment in the updated substation model to determine the usage of the updated equipment.

[0049] According to the above technical solution, in S1, after the substation system enters a steady state, simulation input data is input, transient simulation is performed on the substation system, and simulation output data is obtained;

[0050] The simulation input data is set to be greater than 3 groups, and the corresponding first simulation output data and second simulation output data are obtained.

[0051] According to the above technical solution, in S2, when adjusting the parameters, the parameters of one device involved in the simulation data are adjusted each time;

[0052] After adjusting the parameters, obtain the second simulation output data, restore the adjusted parameters, and adjust the parameters of another device until all the devices involved have their parameters adjusted once;

[0053] Each time the device parameters are adjusted, a set of second simulation output data is obtained.

[0054] According to the above technical solution, in S2 and S3, the adjustable parameters of the substation equipment include ambient temperature, operating humidity, power input, rated test capacity, resonant voltage, frequency adjustment range, system measurement accuracy, frequency adjustment resolution and reactor Q value;

[0055] The output data of substation equipment includes rated voltage, rated current, no-load loss, load loss, impedance voltage and voltage regulation range.

[0056] According to the above technical solution, in S3, the second simulation output data is inferred according to the change of parameters, and the inferred data is compared with the actual second simulation output data. If the two are the same, the output is normal, and if the two are different, abnormal data exists.

[0057] According to the above technical solution, in S4, the actual input data, output data, and actual equipment parameters of the substation are compared and analyzed with the simulated input data, the first simulation output data, and the second simulation output data to determine the abnormal conditions between the data.

[0058] Input simulation input data into the substation simulation system, obtain the first simulation output data, compare it with the actual data, determine the difference between the data, and update the equipment parameters to make the simulation data closer to the actual data, so that multiple parameters of the equipment are more consistent with the actual substation, making the simulation effect of the substation better.

[0059] According to the above technical solution, in S4 and S5, the output device is first determined according to the input and output paths of the abnormal data and the participating devices;

[0060] After the output device of the abnormal data is determined, the input data of the device is determined, the source of the data is found according to the data transmission path, and the generation location of the abnormal data is analyzed in turn.

[0061] According to the above technical solution, in S6, the devices affected by the abnormal data include an output device of the abnormal data, a transmission device of the abnormal data, and an input device of the abnormal data;

[0062] Among them, the input device of abnormal data and the output device of abnormal data are devices with determined impact, and the transmission device of abnormal data is a device with pending impact;

[0063] For devices with pending impact, secondary testing is required to determine whether the device is abnormal by inputting normal data and testing whether the output data is abnormal.

[0064] Analyze the data in the actual substation and substation simulation system, so as to analyze the abnormal data and find the corresponding equipment. Analyze the equipment involved in the abnormal data in turn, so as to update the abnormal equipment and make the model equipment in the substation simulation system better simulated;

[0065] According to the above technical solution, in S7-S8, the affected devices are first determined, then the connection relationship of the devices is determined, and finally the devices are updated;

[0066] When updating a device, first repair the device itself, then input data to test the repaired device. If no abnormality is detected, the update is complete.

[0067] The data is taken in to detect the repaired equipment. If an abnormality is detected, a new device is used for update. The data is input to detect the usage of the new equipment in the substation system. If no abnormality is detected, the update is completed.

[0068] According to the above technical solution, in S8, after all equipment in the substation system is updated, the simulation input data is input into the substation system again, the simulation output data after detection is obtained, the simulation output data is analyzed, and the usage of the updated equipment in the overall substation system is determined;

[0069] After the update, the simulation model of the substation can be verified through testing to ensure that the updated equipment can operate normally in the substation simulation model.

[0070] Finally, it should be noted that the above description is only a preferred example of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. A method for updating a multi-parameter simulation model of a substation, characterized in that: The update steps include the following: S1. During the steady-state and transient processes of the substation, the original parameters of the equipment model are recorded, and simulation input data are input into the substation model respectively to obtain the first simulation output data; S2, by changing the equipment model parameters of the primary simulation system and the secondary simulation system of the substation, inputting the same simulation input data again, recording the action of the equipment model, and obtaining the second simulation output data; S3, analyzing the equipment model action, analyzing the second simulation output data according to the actual input data, output data, actual equipment parameters, equipment model parameters before and after the change, and the first simulation output data of the substation; S4, determining whether the second simulation output data has an abnormality, and determining an output device for the abnormal data; S5. Detecting the input data of the abnormal data output device to determine the source of the abnormal data; S6. Finally, determine the scope of equipment affected by the abnormal data; S7, updating the equipment in the substation model; S8. Detect the equipment in the updated substation model to determine the usage of the updated equipment.

2. The method for updating a multi-parameter simulation model of a substation according to claim 1, characterized in that: In S1, after the substation system enters a steady state, simulation input data is input, transient simulation is performed on the substation system, and simulation output data is obtained; The simulation input data is set to be greater than 3 groups, and the corresponding first simulation output data and second simulation output data are obtained.

3. The method for updating a multi-parameter simulation model of a substation according to claim 1, characterized in that: In said S2, when adjusting the parameters, the parameters of one device involved in the simulation data are adjusted each time; After adjusting the parameters, obtain the second simulation output data, restore the adjusted parameters, and adjust the parameters of another device until all the devices involved have their parameters adjusted once; Each time the device parameters are adjusted, a set of second simulation output data is obtained.

4. The updating method of a substation multi-parameter simulation model according to claim 1, characterized in that: In S2 and S3, the adjustable parameters of the substation equipment include ambient temperature, operating humidity, power input, rated test capacity, resonant voltage, frequency adjustment range, system measurement accuracy, frequency adjustment resolution and reactor Q value; The output data of substation equipment includes rated voltage, rated current, no-load loss, load loss, impedance voltage and voltage regulation range.

5. The method for updating a multi-parameter simulation model of a substation according to claim 1, characterized in that: In S3, the second simulation output data is inferred according to the change of the parameters, and the inferred data is compared with the actual second simulation output data. If the two are the same, the output is normal, and if they are different, abnormal data exists.

6. The method for updating a multi-parameter simulation model of a substation according to claim 1, characterized in that: In S4, the actual input data, output data, and actual equipment parameters of the substation are compared and analyzed with the simulation input data, the first simulation output data, and the second simulation output data to determine the abnormal conditions between the data.

7. The method for updating a multi-parameter simulation model of a substation according to claim 1, characterized in that: In S4 and S5, the output device is first determined according to the input and output paths of the abnormal data and the participating devices; After the output device of the abnormal data is determined, the input data of the device is determined, the source of the data is found according to the data transmission path, and the generation location of the abnormal data is analyzed in turn.

8. The method for updating a multi-parameter simulation model of a substation according to claim 1, characterized in that: In said S6, the devices affected by the abnormal data include an output device of the abnormal data, a transmission device of the abnormal data and an input device of the abnormal data; Among them, the input device of abnormal data and the output device of abnormal data are devices with determined impact, and the transmission device of abnormal data is a device with pending impact; For devices with pending impact, secondary testing is required to determine whether the device is abnormal by inputting normal data and testing whether the output data is abnormal.

9. The method for updating a multi-parameter simulation model of a substation according to claim 1, characterized in that: In S7-S8, the affected devices are first determined, then the connection relationship of the devices is determined, and finally the devices are updated; When updating a device, first repair the device itself, then input data to test the repaired device. If no abnormality is detected, the update is complete. The data is taken in to detect the repaired equipment. If an abnormality is detected, a new device is used for update. The data is input to detect the usage of the new equipment in the substation system. If no abnormality is detected, the update is completed.

10. The method for updating a multi-parameter simulation model of a substation according to claim 1, characterized in that: In S8, after all equipment in the substation system is updated, the simulation input data is input into the substation system again to obtain the simulated output data after detection, and the simulation output data is analyzed to determine the usage of the updated equipment in the overall substation system.