Cooling device and method for accelerating titanium gold-bearing cast ingot smelting process
By designing a cooling device including a gantry and a cross beam, the problems of low cooling efficiency and limited cooling range in the prior art are solved, and more efficient cooling effect and wider cooling adaptability are achieved.
Patent Information
- Application Number
- CN202411540173.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-31
- Publication Date
- 2025-02-11
AI Technical Summary
The prior art has problems with low cooling efficiency and limited cooling range in fast cooling of titanium alloy ingots, especially when the number of titanium alloy ingots to be cooled is large, which affects the rhythm of the titanium alloy smelting production process.
A cooling device including a gantry and a beam is designed. A fan is provided at the bottom of the beam. The air outlet of the fan is obliquely facing the ingot to be cooled. A sliding steel cable and cable are arranged between the gantry. The fan speed is adjustable, and the fan is connected with The distance between the ingots to be cooled can be adjusted according to requirements.
By moving the gantry and adjusting the fan speed and air outlet inclination angle, the cooling efficiency and the cooling range are improved, and the cooling range is expanded, adapting to the cooling needs of different numbers and diameters of titanium alloy ingots.
Smart Images

Figure CN119407151A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of titanium alloys, in particular to a cooling device and a method for accelerating the smelting process of titanium-gold-containing ingots. Background Art
[0002] Titanium alloys have become important structural materials in aerospace manufacturing due to their low density, high specific strength, thermal strength and corrosion resistance. At present, vacuum consumable arc melting (VAR) or electron beam cooling furnace process (EB) is mainly used for large-scale industrial production of titanium alloy ingots. In order to make the titanium alloy composition uniform and meet the quality requirements, it is usually necessary to use secondary and tertiary vacuum consumable arc melting processes to remove inclusions in the alloy. After the secondary and tertiary vacuum consumable arc melting processes come out of the furnace, the titanium alloy ingot needs to be cooled to below 80°C before the next step of the finished product melting process or machining process can be carried out. Therefore, rapid cooling of the titanium alloy ingot is crucial to improving production efficiency.
[0003] The "Mobile Cooling Device for Titanium and Titanium Alloy Ingot Melting Process" (Patent No.: CN202021428251.7) applied by Xinjiang Xiangrun New Materials Technology Co., Ltd. cools the ingot by designing a mobile bracket. At the same time, the height of the axial flow fan can be adjusted according to the diameter of the ingot, so that the distance between the axial flow fan and the ingot to be cooled is in a favorable cooling position to ensure the cooling effect. However, it can usually only cool a single ingot, and the fan speed is low, the number of fans is small, there is a cooling blind spot, and the cooling efficiency needs to be improved. When faced with a large number of titanium alloy ingots to be cooled, it will face greater cooling pressure, affecting the rhythm of the titanium alloy smelting production process.
[0004] Therefore, the present invention proposes a cooling device and method for accelerating the smelting process of titanium alloy ingots, which is of great significance to further improving the production efficiency of the smelting process. Summary of the invention
[0005] In view of the above-mentioned shortcomings of the prior art, the purpose of the present invention is to provide a cooling device and method for accelerating the smelting process of titanium-gold ingots, which achieves high device stability, simple process, and easy implementation, and has great significance for practical application.
[0006] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a cooling device for accelerating the smelting process of titanium-gold-containing ingots, comprising a gantry and a crossbeam, wherein the ingot to be cooled is placed on the ground, a fan is provided at the bottom of the crossbeam, and the air outlet of the fan is obliquely downward toward the ingot to be cooled, a sliding steel cable is arranged between the two gantries, and an electric cable is arranged on the sliding steel cable.
[0007] Preferably, the door frame is movable, and a locking mechanism is provided at the bottom end of the door frame.
[0008] Preferably, the support column of the gantry includes an upper column and a lower column, and the height of the lower column can be freely adjusted according to the diameter of the ingot to be cooled.
[0009] Preferably, the downward inclination angle of the blower outlet of the fan is 20-70°.
[0010] Preferably, the fan speed is adjustable in three gears according to cooling requirements, namely 1500, 2000 and 2500 r / min.
[0011] Preferably, the crossbeams are arranged in two rows, and the distance between the crossbeams is adjusted according to the number and diameter of the ingots to be cooled, and each row of the crossbeams is equipped with eight fans, and the crossbeams are equipped with fixing devices that can control the inclination angle of the fans.
[0012] Preferably, one end of the cable of each fan is wound around the door frame, and the other end is gathered into a bundle of wires and suspended on the sliding steel cable.
[0013] A method for accelerating the cooling device of a titanium gold-containing ingot smelting process comprises the following steps:
[0014] S1: According to the cooling requirements, eight fan tuyere installed on two rows of beams are blown obliquely downward toward the ingot to be cooled;
[0015] S2: During the cooling process, the cooling device is first moved to the middle of the ingot to be cooled, so that the fans on the two rows of beams above the cooling device are aligned with the two sides of the ingot to be cooled. After the position is determined, the locking mechanism is controlled to lock the position of the moving gantry to prevent the vibration of the fan from causing the position of the moving gantry to change.
[0016] S3: The support column of the gantry is located near the cooling area of the ingot to be cooled, which is convenient for setting up sliding cables between the two gantries. The sliding cables are higher than the upper ends of the gantry. The cables of the fan are set up on the sliding cables in a loose state, so that the cables can move on the sliding cables to adapt to the movement of the mobile gantry, while avoiding damage to a large number of cables and electric shock problems;
[0017] S4: During the cooling process, the height of the gantry can be adjusted according to the diameter of the ingot to be cooled, and the appropriate cooling distance can be selected to improve the cooling efficiency. A fixing device that can control the inclination angle of the fan is installed on the crossbeam, which can be adjusted according to the diameter of the ingot to be cooled. The downward inclination angle of the fan outlet ranges from 20-70°;
[0018] S5: Eight fans 3 are installed on both rows of beams, with a power of 3kW and a speed adjustable in three levels of 1500, 2000 and 2500r / min. The door frame width adjustment range is 2000-5000mm, and the door frame height adjustment range is 1500-4000mm, which can be freely adjusted according to the cooling conditions.
[0019] Compared with the prior art, the present invention has the following beneficial effects:
[0020] The present invention designs a movable gantry so that the cooling device can move with the position of the ingot to be cooled. At the same time, the distance between the upper beams of the cooling device and the height and rotation speed of the two rows of fans on the beams can be adjusted according to the number and diameter of the ingots to be cooled, so that the distance between the fans and the ingots to be cooled is well matched, thereby optimizing the cooling efficiency. At the same time, the fan speed is adjustable in three levels, which can cope with different cooling working conditions and expand the cooling range and requirements of titanium alloy ingots. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is the front view of the present invention;
[0022] Figure 2 It is a left side view of the present invention;
[0023] Figure 3 It is a top view of the present invention.
[0024] Numbers in the figure: 1. Gantry; 2. Crossbeam; 3. Fan; 4. Sliding steel cable; 5. Ingot to be cooled; 6. Cable; 7. Locking mechanism; 8. Upper column; 9. Lower column; 10. Fixing device. DETAILED DESCRIPTION
[0025] See also Figure 1-3 The present invention provides a technical solution: a cooling device for accelerating the melting process of titanium-containing gold ingots, comprising a door frame 1 and a crossbeam 2, an ingot 5 to be cooled is placed on the ground, a fan 3 is provided at the bottom of the crossbeam 2, the air outlet of the fan 3 is obliquely downward toward the ingot 5 to be cooled, a sliding steel cable 4 is set between the two door frames 1, and a cable 6 is provided on the sliding steel cable 4, the door frame 1 is movable, and a locking mechanism 7 is provided at the bottom of the door frame 1, and the support column of the door frame 1 includes an upper column 8 and a lower column 9, and the height of the lower column 9 is freely adjustable according to the diameter of the ingot 5 to be cooled The air outlet of the fan 3 is adjusted downward at an angle of 20-70°. The speed of the fan 3 can be adjusted in three gears according to the cooling requirements, namely 1500, 2000, and 2500 r / min. There are two rows of beams 2, and the distance between the beams 2 is adjusted according to the number and diameter of the ingots 5 to be cooled. Eight fans 3 are installed on each row of beams 2. A fixing device 10 for controlling the inclination angle of the fan 3 is installed on the beam 2. One end of the cable 6 of each fan 3 is wound around the door frame 1, and the other end is gathered into a bundle of wires and suspended on the sliding steel cable 4.
[0026] A method for accelerating the cooling device of a titanium gold-containing ingot smelting process comprises the following steps:
[0027] S1: according to the cooling requirements, the eight fans 3 installed on the two rows of beams 2 are blown obliquely downward toward the ingot 5 to be cooled;
[0028] S2: During the cooling process, the cooling device is first moved to the middle of the ingot 5 to be cooled, so that the fans 3 on the two rows of beams 2 above the cooling device are aligned with the two sides of the ingot 5 to be cooled. After the position is determined, the locking mechanism 7 is controlled to lock the position of the movable gantry 1 to prevent the vibration of the fan 3 from causing the position change of the movable gantry 1;
[0029] S3: The support column of the gantry 1 is located near the cooling area of the ingot 5 to be cooled, so that the sliding cable 4 can be set up between the two gantry 1. The sliding cable 4 is higher than the upper end of the gantry 1. The cable 6 of the fan 3 is set up on the sliding cable 4 in a loose state, so that the cable 6 can move on the sliding cable 4 to adapt to the movement of the mobile gantry 1, while avoiding the damage of a large number of cables 6 and electric shock problems;
[0030] S4: During the cooling process, the height of the gantry 1 can be adjusted according to the diameter of the ingot 5 to be cooled, and a suitable cooling distance can be selected to improve the cooling efficiency. A fixing device 10 for controlling the inclination angle of the fan 3 is installed on the crossbeam 2, which can be adjusted according to the diameter of the ingot 5 to be cooled, wherein the downward inclination angle of the fan 3 outlet ranges from 20 to 70°;
[0031] S5: Eight fans 3 are installed on both rows of beams 2, with a power of 3kW and a speed adjustable in three levels of 1500, 2000 and 2500r / min. The width adjustment range of the gantry 1 is 2000-5000mm, and the height adjustment range of the gantry 1 is 1500-4000mm, which can be freely adjusted according to the cooling conditions.
[0032] Working principle: according to the cooling requirements, the air outlets of the eight fans 3 installed on the two rows of beams 2 are blown obliquely downward to the ingot 5 to be cooled. During the cooling process, the cooling device is first moved to the middle of the ingot 5 to be cooled, so that the fans 3 on the two rows of beams 2 above the cooling device are corresponding to the two sides of the ingot 5 to be cooled. After the position is determined, the locking mechanism 7 is controlled to lock the position of the movable gantry 1 to prevent the vibration of the fan 3 from causing the position of the movable gantry 1 to change. The support column of the gantry 1 is located near the cooling area of the ingot 5 to be cooled, which is convenient for setting up a sliding cable 4 between the two gantries 1. The sliding cable 4 is higher than the upper end of the gantry 1. The cable 6 of the fan 3 is set on the sliding cable 4 in a loose state, so that the cable 6 can move on the sliding cable 4 to adapt to The movable gantry 1 moves, while avoiding damage to a large number of cables 6 and electric shock problems. During the cooling process, the height of the gantry 1 can be adjusted according to the diameter of the ingot 5 to be cooled, and a suitable cooling distance can be selected to improve the cooling efficiency. A fixing device 10 for controlling the inclination angle of the fan 3 is installed on the beam 2, which can be adjusted according to the diameter of the ingot 5 to be cooled, wherein the downward inclination angle of the air outlet of the fan 3 ranges from 20-70°. Eight fans 3 are installed on both rows of beams 2, with a power of 3kW and a speed adjustable in three levels of 1500, 2000, and 2500r / min. The width adjustment range of the gantry 1 is 2000-5000mm, and the height adjustment range of the gantry 1 is 1500-4000mm, which can be freely adjusted according to the cooling conditions.
Claims
1. A cooling device for accelerating the melting process of titanium-gold ingots, comprising a gantry (1) and a crossbeam (2), characterized in that: An ingot (5) to be cooled is placed on the ground, a fan (3) is provided at the bottom of each crossbeam (2), and an air outlet of the fan (3) is obliquely downward toward the ingot (5) to be cooled. A sliding steel cable (4) is arranged between the two door frames (1), and an electric cable (6) is arranged on the sliding steel cable (4).
2. A cooling device for accelerating the smelting process of titanium-gold ingot according to claim 1, characterized in that: The door frame (1) is movable, and a locking mechanism (7) is provided at the bottom end of the door frame (1).
3. The cooling device for accelerating the smelting process of titanium-gold ingot according to claim 1, characterized in that: The support column of the gantry (1) comprises an upper column (8) and a lower column (9), and the height of the lower column (9) can be freely adjusted according to the diameter of the ingot (5) to be cooled.
4. The cooling device for accelerating the smelting process of titanium-gold ingot according to claim 1, characterized in that: The blowing port of the fan (3) is inclined downward at an angle of 20-70°.
5. The cooling device for accelerating the smelting process of titanium-gold ingot according to claim 1, characterized in that: The rotation speed of the fan (3) can be adjusted to three levels of 1500, 2000 and 2500 r / min respectively according to cooling requirements.
6. The cooling device for accelerating the smelting process of titanium-gold ingot according to claim 1, characterized in that: The cross beams (2) are arranged in two rows, and the distance between the cross beams (2) is adjusted according to the number and diameter of the ingots (5) to be cooled, and each row of the cross beams (2) is equipped with eight fans (3), and a fixing device (10) capable of controlling the inclination angle of the fans (3) is installed on the cross beams (2).
7. The cooling device for accelerating the smelting process of titanium-gold ingot according to claim 1, characterized in that: One end of the cable (6) of each fan (3) is wound around the door frame (1), and the other end is gathered into a bundle of wires and suspended on the sliding steel cable (4).
8. A method for accelerating the cooling process of a titanium-gold ingot smelting device according to any one of claims 1 to 7, characterized in that: The following steps are involved: S1: according to the cooling requirements, the air outlets of eight fans (3) installed on two rows of beams (2) are blown obliquely downward toward the ingot (5) to be cooled; S2: During the cooling process, the cooling device is first moved to the middle of the ingot (5) to be cooled, so that the fans (3) on the two rows of beams (2) above the cooling device are aligned with the two sides of the ingot (5) to be cooled. After the position is determined, the locking mechanism (7) is controlled to lock the position of the movable door frame (1) to prevent the vibration of the fan (3) from causing the position of the movable door frame (1) to change. S3: The support column of the gantry (1) is located near the cooling area of the ingot (5) to be cooled, so as to facilitate the installation of a sliding steel cable (4) between the two gantry (1). The sliding steel cable (4) is higher than the upper end of the gantry (1). The cable (6) of the fan (3) is installed on the sliding steel cable (4) in a loose state, so that the cable (6) can move on the sliding steel cable (4) to adapt to the movement of the movable gantry (1), while avoiding the damage of a large number of cables (6) and the problem of electric shock; S4: During the cooling process, the height of the gantry (1) can be adjusted according to the diameter of the ingot (5) to be cooled, and a suitable cooling distance can be selected to improve the cooling efficiency. A fixing device (10) capable of controlling the tilt angle of the fan (3) is installed on the crossbeam (2), and the tilt angle can be adjusted according to the diameter of the ingot (5) to be cooled, wherein the downward tilt angle of the fan (3) is in the range of 20-70°; S5: Eight fans 3 are installed on both rows of beams (2), with a power of 3 kW and a rotation speed adjustable in three levels of 1500, 2000 and 2500 r / min. The width adjustment range of the door frame (1) is 2000-5000 mm, and the height adjustment range of the door frame (1) is 1500-4000 mm, which can be freely adjusted according to the cooling conditions.
Citation Information
Patent Citations
Movable cooling device for titanium and titanium alloy ingot casting smelting process
CN212917593U