Stay wire measuring method for installation of sintering ring type cooler back-up roll

By using the wire pull measurement method and trigonometric function calculation in the sintered ring cooler, the problem of line-of-view occlusion during support roller installation is solved, and efficient and accurate support roller installation is achieved.

CN119413145APending Publication Date: 2025-02-11LIUZHOU IRON & STEEL
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411424406.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-12
Publication Date
2025-02-11

Smart Images

  • Figure CN119413145A_ABST
    Figure CN119413145A_ABST
Patent Text Reader

Abstract

The embodiment of the invention provides a stay wire measurement method for sintering ring type cooler support roller installation, and the method comprises the steps: building a stay wire for a to-be-installed support roller which is shielded and cannot be measured by a total station based on a left side support roller and a right side support roller which are installed at the left side and the right side and can be measured by the total station; according to the position information of the left supporting roller and the right supporting roller, the theoretical mounting position information of the to-be-mounted supporting roller and the stay wire, the initial position of the to-be-mounted supporting roller at the stay wire and the distance relation between the theoretical mounting position of the to-be-mounted supporting roller and the initial position are determined; and adjusting the to-be-mounted support roller from the initial position to the theoretical mounting position according to the obtained distance relationship.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of sintering ring coolers, and in particular to a wire drawing measurement method for installing a supporting roller of a sintering ring cooler. Background Art

[0002] The multifunctional blast ring cooler (hereinafter referred to as the ring cooler) is one of the most important equipment in the sintering production process. Today, with the large-scale ring cooler equipment, the ring cooler must be assembled and debugged on site. The quality of its on-site installation is directly related to the operating performance and service life of the ring cooler equipment. During the operation of the ring cooler, a number of rotating frame trolleys connected to form a circular motion are used to support the hot ore. The blowers evenly distributed on the periphery of the ring cooler blow out cold air from the lower half of the rotating frame trolley through the hot material layer to exchange heat, and use the exhaust gas to take away the heat to achieve the cooling of the hot sintered ore. Therefore, the stable operation of the rotating frame is crucial to the ring cooler. The support roller is the basis for supporting the rotating frame trolley to achieve circular motion. At the same time, the support roller is prone to failure in daily operation. The deviation of the ring cooler support roller from the rotating frame trolley track will cause axial load. The failure rate of the support roller under comprehensive operating conditions such as dust and temperature alternation is very high, so the position and geometric dimensions of the support roller will significantly affect whether the rotating frame trolley runs off. Therefore, the installation accuracy of the support roller is directly related to its stability during operation, and further determines whether the slewing frame trolley can operate safely and smoothly in actual production operation. Multiple support rollers are installed on the upper plane of the main beam and the middle beam of the frame plane beam. There are two support rollers on each single main beam or middle beam, which are symmetrically arranged on both sides of the ring center line with the ring center line of the ring cooler. Several support rollers are combined to form two support rings located on both sides of the ring center line for supporting the rotating body. In the ring cooler, there are inner ring columns for installing components such as plane beams and side rollers, and inner ring columns for setting up waste heat recovery wind and smoke ducts. The inner ring columns will block the line of sight of the total station type electronic rangefinder (hereinafter referred to as the total station) installed on the central measuring platform. At the same time, the inner ring support rollers also block the outer ring support rollers. Only indirect measurement can be performed during measurement, which brings great inconvenience to the installation and measurement of the support rollers.

[0003] In the process of implementing the present invention, the applicant discovered that there are at least the following problems in the prior art:

[0004] The sight line of the total station electronic distance meter is blocked by the inner ring column and the inner ring support roller, which makes the installation and positioning of the support roller difficult. Summary of the invention

[0005] The embodiment of the present invention provides a wire drawing measurement method for installing a support roller of a sintering ring cooler, so as to solve the problem that the sight line of a total station type electronic distance meter is blocked by an inner ring column and an inner ring support roller, resulting in difficulty in installing and positioning the support roller.

[0006] To achieve the above-mentioned purpose, an embodiment of the present invention provides a wire drawing measurement method for installing a support roller of a sintering ring cooler, comprising:

[0007] A pull line is arranged between the leftmost end of the front side surface of the roller body at the actual position of the left support roller and the rightmost end of the front side surface of the roller body at the actual position of the right support roller;

[0008] According to the leftmost end of the front side surface of the roller body at the actual position of the left support roller, the rightmost end of the front side surface of the roller body at the actual position of the right support roller, the pull line and the theoretical installation position of the support roller to be installed, determine the positions of the leftmost end, the center point and the rightmost end of the front side surface of the roller body at the initial position of the support roller to be installed on the pull line; wherein the center point of the front side surface of the roller body at the initial position of the support roller to be installed, the center point of the front side surface at the theoretical installation position of the support roller to be installed and the center point of the ring cooler are collinear with the first reference line;

[0009] According to the theoretical installation position of the support roller to be installed, the leftmost end, the center point and the rightmost end of the front side surface of the roller body at the initial position of the support roller to be installed, determine the first distance, the second distance and the third distance along the Y-axis direction corresponding to the leftmost end, the center point and the rightmost end of the front side surface of the roller body at the theoretical installation position of the support roller to be installed, respectively, from the leftmost end, the center point and the rightmost end of the front side surface of the roller body at the initial position of the support roller to be installed;

[0010] Firstly, the support roller to be installed is placed at the initial position, and then the center point of the front side surface of the roller body of the support roller to be installed is kept moving along the first reference line, and the actual position of the support roller to be installed is adjusted so that the distances of the leftmost end, the center point and the rightmost end of the front side surface of the roller body at the actual position of the support roller to be installed and the leftmost end, the center point and the rightmost end of the front side surface of the roller body at the initial position of the support roller to be installed along the corresponding Y-axis direction of the support roller to be installed are respectively equal to the first distance, the second distance and the third distance;

[0011] Among them, the support roller to be installed cannot be directly measured by the total station at the center point of the ring cooler; the left support roller is located on the left side of the support roller to be installed and can be directly measured by the total station at the center point of the ring cooler; the right support roller is located on the right side of the support roller to be installed and can be directly measured by the total station at the center point of the ring cooler; the corresponding Y-axis of the support roller to be installed is defined as a straight line connecting the center point of the front side of the roller body of the theoretical installation position of the support roller to be installed with the center point of the ring cooler as the origin.

[0012] Further, according to the leftmost end of the front side surface of the actual position roller body of the left support roller, the rightmost end of the front side surface of the actual position roller body of the right support roller, the pull line and the theoretical installation position of the support roller to be installed, the positions of the leftmost end, the center point and the rightmost end of the front side surface of the initial position roller body of the support roller to be installed on the pull line are determined, including:

[0013] According to the first triangle, the second triangle and the third triangle, using the triangle sine theorem and the triangle cosine theorem, determine the fourth distance from the center point of the front side surface of the roller body at the initial position of the support roller to be installed to the leftmost end of the front side surface of the roller body at the actual position of the left support roller, and the fifth distance from the center point of the front side surface of the roller body at the initial position of the support roller to be installed to the rightmost end of the front side surface of the roller body at the actual position of the right support roller;

[0014] Determine the position of the leftmost end of the front side surface of the roller body of the support roller to be installed at the initial position on the tension line according to the radius of the support roller to be installed and the fourth distance;

[0015] Determine the position of the rightmost end of the front side surface of the initial position roller body of the support roller to be installed on the tension line according to the radius of the support roller to be installed and the fifth distance;

[0016] Wherein, the first triangle is a triangle formed by the center point of the ring cooler, the leftmost end of the front side surface of the roller body at the actual position of the left support roller, and the rightmost end of the front side surface of the roller body at the actual position of the right support roller;

[0017] The second triangle is a triangle formed by the center point of the ring cooler, the leftmost end of the front side surface of the roller body at the actual position of the left support roller, and the center point of the front side surface of the roller body at the initial position of the support roller to be installed;

[0018] The third triangle is a triangle formed by the center point of the ring cooler, the rightmost end of the front side surface of the roller body at the actual position of the right support roller, and the center point of the front side surface of the roller body at the initial position of the support roller to be installed;

[0019] The center point of the front side of the roller body at the initial position of the support roller to be installed is the intersection of the line connecting the center point of the front side of the roller body at the theoretical installation position of the support roller to be installed and the center of the ring cooler and the pull line.

[0020] Further, according to the theoretical installation position of the support roller to be installed, the leftmost end, center point and rightmost end of the front side surface of the roller body at the initial position of the support roller to be installed, the leftmost end, center point and rightmost end of the front side surface of the roller body at the theoretical installation position of the support roller to be installed are determined, and the first distance, the second distance and the third distance along the Y-axis direction corresponding to the support roller to be installed are respectively determined from the leftmost end, center point and rightmost end of the front side surface of the roller body at the initial position of the support roller to be installed, including:

[0021] According to the preset radius of the annular cooler, the thickness of the support roller to be installed, the first triangle, the second triangle, and the triangle sine theorem and triangle cosine theorem, a second distance from the center point of the front side surface of the roller body at the theoretical installation position of the support roller to be installed to the center point of the front side surface of the roller body at the initial position of the support roller to be installed is determined;

[0022] According to the fourth triangle and the fifth triangle, based on the principle of similar triangles, determine a first distance from the leftmost end of the front side surface of the roller body at the theoretical installation position of the support roller to be installed to the leftmost end of the front side surface of the roller body at the initial position of the support roller to be installed;

[0023] According to the fifth triangle and the sixth triangle, based on the principle of similar triangles, a third distance from the rightmost end of the front side surface of the roller body at the theoretical installation position of the support roller to be installed to the rightmost end of the front side surface of the roller body at the initial position of the support roller to be installed is determined;

[0024] Wherein, the first triangle is a triangle formed by the center point of the ring cooler, the leftmost end of the front side surface of the roller body at the actual position of the left support roller, and the rightmost end of the front side surface of the roller body at the actual position of the right support roller;

[0025] The second triangle is a triangle formed by the center point of the ring cooler, the leftmost end of the front side surface of the roller body at the actual position of the left support roller, and the center point of the front side surface of the roller body at the initial position of the support roller to be installed;

[0026] The center point of the front side surface of the roller body at the initial position of the support roller to be installed is the intersection of the line connecting the center point of the front side surface of the roller body at the theoretical installation position of the support roller to be installed and the center of the ring cooler and the pull line;

[0027] The fourth triangle is a triangle formed by the leftmost end of the front side surface of the roller body at the initial position of the support roller to be installed, the leftmost end of the front side surface of the roller body at the theoretical installation position of the support roller to be installed, and the first auxiliary reference point;

[0028] The fifth triangle is a triangle formed by the center point of the front side surface of the roller body at the initial position of the support roller to be installed, the center point of the front side surface of the roller body at the theoretical installation position of the support roller to be installed, and the first auxiliary reference point;

[0029] The sixth triangle is a triangle formed by the rightmost end of the front side surface of the roller body at the initial position of the support roller to be installed, the rightmost end of the front side surface of the roller body at the theoretical installation position of the support roller to be installed, and the first auxiliary reference point;

[0030] The first auxiliary reference point is the intersection of the extension line of the pull line and the straight line in the X-axis direction of the support roller to be installed that passes through the center point of the front side surface of the roller body at the theoretical installation position of the support roller to be installed;

[0031] The corresponding X-axis direction of the support roller to be installed is a horizontal line parallel to the front side surface of the roller body at the theoretical installation position of the support roller to be installed.

[0032] Further, according to the first triangle, the second triangle and the third triangle, the fourth distance from the center point of the front side surface of the roller body at the initial position of the support roller to be installed to the leftmost end of the front side surface of the roller body at the actual position of the left support roller, and the fifth distance from the center point of the front side surface of the roller body at the initial position of the support roller to be installed to the rightmost end of the front side surface of the roller body at the actual position of the right support roller are determined by using the triangle sine theorem and the triangle cosine theorem, including:

[0033] Determine the first angle using the following formula:

[0034]

[0035] Among them, L OA′J is the distance from the center point of the ring cooler to the leftmost end of the front side of the roller body at the actual position of the left support roller, in millimeters, measured by a total station; L A′jC′q is the distance from the leftmost end of the front side of the actual position roller body of the left support roller to the rightmost end of the front side of the actual position roller body of the right support roller, in millimeters, obtained by actually measuring the distance of the pull line; L OC′q It is the distance from the center point of the ring cooler to the rightmost end of the front side of the roller body at the actual position of the right support roller, in millimeters, measured by a total station;

[0036] The actual position of the left support roller and the theoretical installation position of the left support roller are measured to obtain the X-axis offset value and Y-axis offset value of the left support roller in the X-axis and Y-axis directions corresponding to the support roller to be installed, of the center point of the roller body at the actual position of the left support roller relative to the center point of the roller body at the theoretical installation position of the left support roller;

[0037] According to the following formula, the sixth distance from the center point of the ring cooler to the center of the actual position roller of the left support roller is determined in millimeters:

[0038]

[0039] Wherein, W is the outer diameter of the support roller, in millimeters, and M is the axial thickness of the support roller, in millimeters;

[0040] Determine the value of the second angle in degrees using the following formula:

[0041]

[0042] Determine the value of the third angle in degrees using the following formula:

[0043]

[0044] Among them, L OA is the distance from the center point of the annular cooler to the center point of the roller body at the theoretical installation position of the left support roller, obtained from the design drawing; ∠AOB is obtained from the design drawing of the annular cooler; Ae is the Y-axis offset value of the left support roller; Ak is the X-axis offset value of the left support roller;

[0045] Determine the fourth angle in degrees using the following formula:

[0046] ∠A′jOB=∠A'jOA'+∠A'OB (5)

[0047] The fourth distance is determined according to the following formula, in millimeters:

[0048]

[0049] The actual position and theoretical installation position of the right support roller are measured to obtain the X-axis offset value and Y-axis offset value of the right support roller in the X-axis and Y-axis directions corresponding to the support roller to be installed, the center of the roller body at the actual position of the right support roller relative to the center of the roller body at the theoretical installation position of the right support roller, in millimeters;

[0050] According to the following formula, determine the seventh distance from the center point of the ring cooler to the center of the actual position roller body of the right support roller, in millimeters:

[0051]

[0052] Among them, L OC'q It is the distance from the center point of the ring cooler to the rightmost end of the front side of the roller body at the actual position of the right support roller, in millimeters, measured by a total station;

[0053] Determine the fifth angle in degrees using the following formula:

[0054]

[0055] Determine the value of the sixth angle in degrees using the following formula:

[0056]

[0057] Among them, L OC is the distance from the center point of the annular cooler to the center point of the roller body at the theoretical installation position of the right support roller, in millimeters, obtained from the design drawing of the annular cooler; ∠COB is obtained from the design drawing of the annular cooler; Ce is the Y-axis offset value of the right support roller; Ak is the X-axis offset value of the right support roller;

[0058] Determine the seventh angle in degrees using the following formula:

[0059] ∠BOC'q=∠BOC'+∠C'OC'q (10)

[0060] The fifth distance is determined according to the following formula, in millimeters:

[0061]

[0062] Among them, O is the center point of the ring cooler, A is the center point of the roller body at the theoretical installation position of the left support roller, A' is the center point of the roller body at the actual position of the left support roller, A'j is the leftmost end of the front side of the roller body at the actual position of the left support roller, C is the center point of the roller body at the theoretical installation position of the right support roller, C' is the center point of the roller body at the actual position of the right support roller, C'q is the rightmost end of the front side of the roller body at the actual position of the right support roller, B is the center point of the front side of the roller body at the theoretical installation position of the support roller to be installed, and B' is the center point of the front side of the roller body at the initial position of the support roller to be installed.

[0063] Further, according to the radius of the support roller to be installed and the fourth distance, determining the position of the leftmost end of the front side surface of the initial position roller body of the support roller to be installed on the tension line includes:

[0064] Subtract the radius of the support roller to be installed from the fourth distance to obtain the distance from the leftmost end of the front side of the roller body of the initial position of the support roller to be installed along the pull line to the leftmost end of the front side of the roller body of the actual position of the left support roller.

[0065] Further, according to the radius of the support roller to be installed and the fifth distance, determining the position of the rightmost end of the front side surface of the initial position roller body of the support roller to be installed on the tension line includes:

[0066] Subtract the radius of the support roller to be installed from the fifth distance to obtain the distance from the rightmost end of the front side of the roller body of the initial position of the support roller to be installed along the pull line to the rightmost end of the front side of the roller body of the actual position of the right support roller.

[0067] Further, according to the preset radius of the annular cooler, the thickness of the support roller to be installed, the first triangle, and the second triangle, the second distance from the center point of the front side surface of the roller body at the theoretical installation position of the support roller to be installed to the center point of the front side surface of the roller body at the initial position of the support roller to be installed is determined by using the triangle sine theorem and the triangle cosine theorem, including:

[0068] According to formula (1), determine the first angle in degrees;

[0069] Among them, L OA′J is the distance from the center point of the ring cooler to the leftmost end of the front side of the roller body at the actual position of the left support roller, measured by a total station; L AjC′q is the distance from the leftmost end of the front side surface of the actual position roller body of the left support roller to the rightmost end of the front side surface of the actual position roller body of the right support roller, obtained by actually measuring the distance of the pull line; L OC′q is the distance from the center point of the annular cooler to the rightmost end of the front side of the roller body at the actual position of the right support roller, measured by a total station;

[0070] The actual position of the left support roller and the theoretical installation position of the left support roller are measured to obtain the X-axis offset value and Y-axis offset value of the left support roller in the X-axis and Y-axis directions corresponding to the support roller to be installed, of the center of the roller body at the actual position of the left support roller relative to the center of the roller body at the theoretical installation position of the left support roller;

[0071] According to formula (2), determine the sixth distance from the center point of the ring cooler to the center of the actual position roller body of the left support roller, in millimeters;

[0072] According to formula (3), determine the angle value of the second angle in degrees;

[0073] According to formula (4), determine the angle value of the third angle in degrees;

[0074] According to formula (5), determine the fourth angle in degrees;

[0075] The second distance is determined according to the following formula, in millimeters:

[0076]

[0077] Wherein, R is the design radius of the annular cooler, in millimeters;

[0078] Among them, O is the center point of the ring cooler, A is the center point of the roller body at the theoretical installation position of the left support roller, A' is the center point of the roller body at the actual position of the left support roller, A'j is the leftmost end of the front side of the roller body at the actual position of the left support roller, B is the center point of the front side of the roller body at the theoretical installation position of the support roller to be installed, and B' is the center point of the front side of the roller body at the initial position of the support roller to be installed.

[0079] Further, the determining of a first distance from the leftmost end of the front side surface of the roller body at the theoretical installation position of the support roller to be installed to the leftmost end of the front side surface of the roller body at the initial position of the support roller to be installed based on the fourth triangle and the fifth triangle and the principle of similar triangles includes:

[0080] According to the following formula, the eighth distance from the center point of the front side surface of the roller body at the theoretical installation position of the support roller to be installed to the first auxiliary reference point is determined in millimeters:

[0081]

[0082] The first distance is determined according to the following formula, in millimeters:

[0083]

[0084] Wherein, By is the leftmost end of the front side of the roller body at the theoretical installation position of the support roller to be installed, and B'y is the leftmost end of the front side of the roller body at the initial position of the support roller to be installed.

[0085] Further, the determining of the third distance from the rightmost end of the front side surface of the roller body at the theoretical installation position of the support roller to be installed to the rightmost end of the front side surface of the roller body at the initial position of the support roller to be installed based on the fifth triangle and the sixth triangle and the principle of similar triangles includes:

[0086] The third distance is determined according to the following formula, in millimeters:

[0087]

[0088] Wherein, Bt is the leftmost end of the front side of the roller body at the theoretical installation position of the support roller to be installed, and B't is the leftmost end of the front side of the roller body at the initial position of the support roller to be installed.

[0089] Further, there are one or more supporting rollers to be installed between the actual position of the left supporting roller and the actual position of the right supporting roller.

[0090] The above technical scheme has the following beneficial effects: the left support roller and the right support roller that have completed the installation measurement are used to assist in the installation of the support roller to be installed that is blocked between the two, and the position data of the blocked support roller to be installed and the length of each section of the wire in the installation technical steps of the wire measurement method are obtained according to the actual position of the unblocked support rollers on the left and right sides of the inner ring column that blocks the support roller to be installed, and the support roller to be installed blocked by the inner ring column is adjusted to the theoretical installation position. The problem that a single support roller is blocked by the inner ring column and cannot be measured when using a total station to measure and install the ring cooler support roller is solved. It can be measured during on-site construction, which improves the measurement efficiency, is simple to operate, and has high installation efficiency. It effectively improves the speed and ease of use of the support roller installation measurement, and can meet the needs of on-site use. BRIEF DESCRIPTION OF THE DRAWINGS

[0091] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0092] Figure 1 It is a flow chart of a wire drawing measurement method for installing a support roller of a sintering ring cooler according to one embodiment of the present invention;

[0093] Figure 2 A schematic diagram of reference lines and reference points for determining the position of a support roller to be installed, used in a wire drawing measurement method for installing a support roller of a sintering ring cooler according to one embodiment of the present invention;

[0094] Figure 3 It is a schematic diagram of one embodiment of the present invention in which there is only one supporting roller to be installed between the left supporting roller and the right supporting roller;

[0095] Figure 4 It is a schematic diagram of a plurality of support rollers to be installed between a left support roller and a right support roller according to one embodiment of the present invention;

[0096] Figure 5 It is a schematic top view of a ring cooler according to one embodiment of the present invention;

[0097] Figure 6 It is a cross-sectional schematic diagram of an annular cooler according to one embodiment of the present invention;

[0098] Figure 7 This is a partial schematic diagram of a ring cooler viewed from above according to one embodiment of the present invention.

[0099] Figure 8It is a schematic diagram of a method for determining an X-axis offset value Ak of ​​a left support roller and a Y-axis offset value Ae of a left support roller according to one embodiment of the present invention;

[0100] Fig. 9 It is a schematic diagram of a method for determining an X-axis offset value Ck of a right support roller and a Y-axis offset value Ce of a right support roller according to one embodiment of the present invention.

[0101] The accompanying drawings are represented by the following symbols: 1. Theoretical installation position of the left support roller; 2. The actual position of the left support roller; 3. Theoretical installation position of the support roller to be installed; 4. The initial position of the support roller to be installed; 5. Theoretical installation position of the right support roller; 6. The actual position of the right support roller; A'j, the leftmost end of the front side of the roller body at the actual position of the left support roller; C'q, the rightmost end of the front side of the roller body at the actual position of the right support roller; B'y, the leftmost end of the front side of the roller body at the initial position of the support roller to be installed; B', the center point of the front side of the roller body at the initial position of the support roller to be installed; B't, the rightmost end of the front side of the roller body at the initial position of the support roller to be installed; B, the center point of the front side of the theoretical installation position of the support roller to be installed; O, the center point of the ring cooler; By, the leftmost end of the front side of the roller body at the theoretical installation position of the support roller to be installed; B, the theoretical The center point of the front side of the roller body at the installation position; Bt, the rightmost end of the front side of the roller body at the theoretical installation position of the support roller to be installed; N, the first auxiliary reference point; Ak, the X-axis offset value of the left support roller; Ae, the Y-axis offset value of the left support roller; W, the outer diameter of the support roller; M, the axial thickness of the support roller; C', the center of the roller body at the actual position of the right support roller; C, the center of the roller body at the theoretical installation position of the right support roller; Ck, the X-axis offset value of the right support roller; Ce, the Y-axis offset value of the right support roller; A, the center point of the roller body at the theoretical installation position of the left support roller; A', the center point of the roller body at the actual position of the left support roller; 7, support roller to be installed; 8, left support roller; 9, right support roller; 10, pull wire; 11, support roller; 12, plane beam; 13, middle beam; 14, annular center line of the annular cooler; 15, inner ring column; 16, center measuring table. DETAILED DESCRIPTION

[0102] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0103] like Figure 1 As shown, an embodiment of the present invention provides a wire drawing measurement method for installing a support roller of a sintering ring cooler, comprising:

[0104] Step S10, setting a tension wire between the leftmost end A'j of the front side surface of the roller body at the actual position 2 of the left support roller and the rightmost end C'q of the front side surface of the roller body at the actual position 6 of the right support roller;

[0105] Step S11, according to the actual position 2 of the left support roller, the leftmost end A'j of the front side of the roller body, the actual position 6 of the right support roller, the rightmost end C'q of the front side of the roller body, the pull line and the theoretical installation position 3 of the support roller to be installed, determine the positions of the initial position 4 of the support roller to be installed, the leftmost end B'y of the front side of the roller body, the center point B' and the rightmost end B't on the pull line; wherein the initial position 4 of the support roller to be installed, the center point B' of the front side of the roller body, the center point B of the front side of the theoretical installation position 3 of the support roller to be installed and the center point O of the ring cooler are collinear with the first reference line;

[0106] Step S12, according to the theoretical installation position 3 of the support roller to be installed and the initial position 4 of the support roller to be installed, the leftmost end By, the center point B and the rightmost end Bt of the front side of the roller body at the theoretical installation position 3 of the support roller to be installed are determined, respectively, as the first distance, the second distance and the third distance along the corresponding Y-axis direction of the support roller to be installed from the leftmost end B'y, the center point B' and the rightmost end B't of the front side of the roller body at the initial position 4 of the support roller to be installed;

[0107] Step S13, firstly placing the support roller to be installed at the initial position 4, then keeping the center point of the front side surface of the roller body of the support roller to be installed moving along the first reference line, adjusting the actual position of the support roller to be installed, so that the leftmost end, center point and rightmost end of the front side surface of the roller body at the actual position of the support roller to be installed are respectively equal to the first distance, the second distance and the third distance along the corresponding Y-axis direction of the support roller to be installed with the leftmost end B'y, the center point B' and the rightmost end B't of the front side surface of the roller body at the initial position 3 of the support roller to be installed;

[0108] Among them, the support roller to be installed cannot be directly measured by the total station at the center point of the ring cooler; the left support roller is located on the left side of the support roller to be installed and can be directly measured by the total station at the center point of the ring cooler; the right support roller is located on the right side of the support roller to be installed and can be directly measured by the total station at the center point of the ring cooler; the corresponding Y-axis of the support roller to be installed is defined as a straight line connecting the center point of the front side of the roller body of the theoretical installation position of the support roller to be installed with the center point of the ring cooler as the origin.

[0109] The left and right support rollers that have been installed and measured are used to assist in the installation of the support rollers to be installed that are blocked between them. According to the actual positions of the unblocked support rollers on the left and right sides of the inner ring column that blocks the support rollers to be installed, the position data of the blocked support rollers to be installed and the lengths of each section of the wire in the installation technical steps of the wire measurement method are obtained, and the support rollers to be installed that are blocked by the inner ring column are adjusted to the theoretical installation position. The problem that a single support roller is blocked by the inner ring column and cannot be measured when using a total station to measure and install the support rollers of the ring cooler is solved. It can be measured during on-site construction, which improves the measurement efficiency, is simple to operate, and has high installation efficiency. It effectively improves the speed and ease of use of the support roller installation measurement, and can meet the needs of on-site use.

[0110] Further, according to the actual position 2 of the left support roller, the leftmost end A'j of the front side of the roller body, the actual position 6 of the right support roller, the rightmost end C'q of the front side of the roller body, the tension line and the theoretical installation position 3 of the support roller to be installed, the initial position 4 of the support roller to be installed, the positions of the leftmost end B'y, the center point B' and the rightmost end B't of the front side of the roller body on the tension line are determined, including:

[0111] According to the first triangle, the second triangle and the third triangle, using the triangle sine theorem and the triangle cosine theorem, determine the fourth distance from the center point B' of the front side surface of the roller body at the initial position 4 of the support roller to be installed to the leftmost end A'j of the front side surface of the roller body at the actual position 2 of the left support roller, and the fifth distance from the center point B' of the front side surface of the roller body at the initial position 4 of the support roller to be installed to the rightmost end C'q of the front side surface of the roller body at the actual position 6 of the right support roller;

[0112] According to the radius of the support roller to be installed and the fourth distance, determine the position of the leftmost end B'y of the front side surface of the initial position 4 roller body of the support roller to be installed on the tension line;

[0113] According to the radius of the support roller to be installed and the fifth distance, determine the position of the rightmost end B't of the front side surface of the initial position 4 roller body of the support roller to be installed on the tension line;

[0114] The first triangle is a triangle formed by the center point O of the ring cooler, the leftmost end A'j of the front side of the roller body at the actual position 2 of the left support roller, and the rightmost end C'q of the front side of the roller body at the actual position 6 of the right support roller;

[0115] The second triangle is a triangle formed by the center point O of the ring cooler, the actual position 2 of the left support roller, the leftmost end A'j of the front side of the roller body, and the center point B' of the front side of the roller body at the initial position 4 of the support roller to be installed;

[0116] The third triangle is a triangle formed by the center point O of the ring cooler, the rightmost end C'q of the front side of the roller body at the actual position 6 of the right support roller, and the center point B' of the front side of the roller body at the initial position 4 of the support roller to be installed;

[0117] The center point B' of the front side of the roller body at the initial position 4 of the support roller to be installed is the intersection of the line connecting the center point B of the front side of the roller body at the theoretical installation position 3 of the support roller to be installed and the center O of the ring cooler and the pull line.

[0118] The embodiment of the present invention has the following technical effects: through simple triangle-related trigonometric function calculations, the support roller to be installed can be accurately positioned, effectively improving the speed and ease of support roller installation measurement, and meeting the needs of on-site use. The measurement is intuitive and convenient, and the installation efficiency is greatly improved.

[0119] Further, according to the theoretical installation position 3 of the support roller to be installed, the leftmost end B'y, the center point B' and the rightmost end B't of the front side of the roller body at the initial position 4 of the support roller to be installed, the leftmost end By, the center point B and the rightmost end Bt of the front side of the roller body at the theoretical installation position 3 of the support roller to be installed are determined, and the first distance, the second distance and the third distance along the corresponding Y-axis direction of the support roller to be installed are respectively with the leftmost end B'y, the center point B' and the rightmost end B't of the front side of the roller body at the initial position 4 of the support roller to be installed, including:

[0120] According to the preset radius of the annular cooler, the thickness of the support roller to be installed, the first triangle, the second triangle, and the triangle sine theorem and triangle cosine theorem, a second distance from the center point B of the front side surface of the roller body at the theoretical installation position 3 of the support roller to be installed to the center point B' of the front side surface of the roller body at the initial position 4 of the support roller to be installed is determined;

[0121] According to the fourth triangle and the fifth triangle, based on the principle of similar triangles, determine a first distance from the leftmost end By of the front side surface of the roller body at the theoretical installation position 3 of the support roller to be installed to the leftmost end B'y of the front side surface of the roller body at the initial position 4 of the support roller to be installed;

[0122] According to the fifth triangle and the sixth triangle, based on the principle of similar triangles, a third distance from the rightmost end Bt of the front side surface of the roller body at the theoretical installation position 3 of the support roller to be installed to the rightmost end B't of the front side surface of the roller body at the initial position 4 of the support roller to be installed is determined;

[0123] The first triangle is a triangle formed by the center point O of the ring cooler, the leftmost end A'j of the front side of the roller body at the actual position 2 of the left support roller, and the rightmost end C'q of the front side of the roller body at the actual position 6 of the right support roller;

[0124] The second triangle is a triangle formed by the center point O of the ring cooler, the leftmost end A'j of the front side of the roller body at the actual position 2 of the left support roller, and the center point B' of the front side of the roller body at the initial position 4 of the support roller to be installed;

[0125] The center point B' of the front side of the roller body at the initial position 4 of the support roller to be installed is the intersection of the line connecting the center point B of the front side of the roller body at the theoretical installation position 3 of the support roller to be installed and the center O of the ring cooler with the pull line;

[0126] The fourth triangle is a triangle formed by the leftmost end B'y of the front side of the roller body at the initial position 4 of the support roller to be installed, the leftmost end By of the front side of the roller body at the theoretical installation position 3 of the support roller to be installed, and the first auxiliary reference point N;

[0127] The fifth triangle is a triangle formed by the center point B' of the front side of the roller body at the initial position 4 of the support roller to be installed, the center point B of the front side of the roller body at the theoretical installation position 3 of the support roller to be installed, and the first auxiliary reference point N;

[0128] The sixth triangle is a triangle formed by the rightmost end B't of the front side of the roller body at the initial position 4 of the support roller to be installed, the rightmost end Bt of the front side of the roller body at the theoretical installation position 3 of the support roller to be installed, and the first auxiliary reference point N;

[0129] The first auxiliary reference point N is the intersection of the extension line of the pull line and the straight line in the X-axis direction of the support roller to be installed that passes through the center point B of the front side surface of the roller body at the theoretical installation position 3 of the support roller to be installed;

[0130] The corresponding X-axis direction of the support roller to be installed is a horizontal line parallel to the front side of the roller body at the theoretical installation position 3 of the support roller to be installed.

[0131] The embodiment of the present invention has the following technical effects: through simple triangle-related trigonometric function calculations, the support roller to be installed can be accurately positioned, effectively improving the speed and ease of support roller installation measurement, and meeting the needs of on-site use. The measurement is intuitive and convenient, and the installation efficiency is greatly improved.

[0132] Further, according to the first triangle, the second triangle and the third triangle, the fourth distance from the center point B' of the front side surface of the roller body at the initial position 4 of the support roller to be installed to the leftmost end A'j of the front side surface of the roller body at the actual position 2 of the left support roller, and the fifth distance from the center point B' of the front side surface of the roller body at the initial position 4 of the support roller to be installed to the rightmost end C'q of the front side surface of the roller body at the actual position 6 of the right support roller are determined by using the triangle sine theorem and the triangle cosine theorem, including:

[0133] According to formula (1), determine the first angle ∠OA'jC'q, unit degree;

[0134] The actual position of the left support roller and the theoretical installation position of the left support roller are measured to obtain the X-axis offset value Ak and the Y-axis offset value Ae of the left support roller in the X-axis and Y-axis directions corresponding to the support roller to be installed, the center point A' of the actual position of the left support roller relative to the center point A of the theoretical installation position of the left support roller, in millimeters;

[0135] In some embodiments, Figure 8 As shown, the actual position of the left support roller, the roller body center point A' relative to the theoretical installation position of the left support roller, the axial offset Ah and radial offset At of the theoretical installation position of the left support roller can be obtained by actual measurement, and then Ae and Ak can be obtained according to formula (16) and formula (17);

[0136] According to formula (2), the sixth distance L from the center point O of the ring cooler to the actual position 2 of the left support roller, the center A' of the roller body, is determined: OA′ , unit: mm;

[0137] According to formula (3), determine the angle value of the second angle ∠A'jOA', in degrees;

[0138] According to formula (4), determine the angle value of the third angle ∠A'OB in degrees;

[0139] According to formula (5), determine the fourth angle ∠A'jOB, unit degree;

[0140] ∠A'jOB=∠A'jOA'+∠A'OB

[0141] According to formula (6), the fourth distance L is determined A,jB, , unit: mm;

[0142] The actual position 6 and the theoretical installation position 5 of the right support roller are measured to obtain the X-axis offset value Ck and the Y-axis offset value Ce of the right support roller in the X-axis and Y-axis directions corresponding to the support roller to be installed, the center C' of the roller body at the actual position 6 of the right support roller relative to the center C of the roller body at the theoretical installation position 5 of the right support roller, in millimeters;

[0143] In some embodiments, Fig. 9 As shown, the actual position of the roller body center point C' of the right support roller relative to the theoretical installation position roller body center C of the right support roller, the axial offset Ch and radial offset Ct of the theoretical installation position of the right support roller can be obtained by actual measurement, and then Ce and Ck can be obtained according to formula (18) and formula (19);

[0144] According to formula (7), determine the seventh distance L from the center point O of the ring cooler to the actual position roller center C' of the right support roller. OC′ ;

[0145] According to formula (8), determine the angle value of the fifth angle ∠C'OC'q, in degrees;

[0146] According to formula (9), determine the angle value of the sixth angle ∠BOC' in degrees;

[0147] According to formula (10), determine the seventh angle ∠BOC'q, in degrees;

[0148] According to formula (11), the fifth distance L is determined C,qB, , unit: mm;

[0149] The embodiment of the present invention has the following technical effects: by measuring the wire drawing distance, the offset distance of the left support roller and the right support roller, and measuring the linear distance between the visible left support roller and the right support roller by a total station, it is not necessary to measure the angle, only the length of the line segment is needed, and combined with simple triangle-related trigonometric function calculations, the support roller to be installed can be accurately positioned, effectively improving the speed and ease of use of the support roller installation measurement, and meeting the needs of on-site use. The measurement is intuitive and convenient, and the installation efficiency is greatly improved.

[0150] Further, according to the radius of the support roller to be installed and the fourth distance, determining the position of the leftmost end B'y of the front side surface of the initial position 4 roller body of the support roller to be installed on the tension line includes:

[0151] Subtract the radius of the support roller to be installed from the fourth distance to obtain the initial position 4 of the support roller to be installed, the leftmost end B'y of the front side of the roller body, and the distance along the pull line to the actual position 2 of the left support roller, the leftmost end A'j of the front side of the roller body.

[0152] Further, according to the radius of the support roller to be installed and the fifth distance, determining the position of the rightmost end B't of the front side surface of the initial position 4 of the support roller to be installed on the tension line includes:

[0153] Subtract the radius of the support roller to be installed from the fifth distance to obtain the initial position 4 of the support roller to be installed, the rightmost end B't of the front side of the roller body, and the distance along the pull line to the actual position 6 of the right support roller, the rightmost end C'q of the front side of the roller body.

[0154] Further, according to the preset radius of the annular cooler, the thickness of the support roller to be installed, the first triangle, the second triangle, and the triangle sine theorem and triangle cosine theorem, a second distance from the center point B of the front side of the roller body at the theoretical installation position 3 of the support roller to be installed to the center point B' of the front side of the roller body at the initial position 4 of the support roller to be installed is determined, including:

[0155] According to formula (1), determine the first angle ∠OA'jC'q, unit degree;

[0156] The actual position 2 of the left support roller and the theoretical installation position 1 of the left support roller are measured to obtain the roller body center A' of the actual position 2 of the left support roller relative to the roller body center A of the theoretical installation position 1 of the left support roller, the left support roller X-axis offset value Ak and the left support roller Y-axis offset value Ae in the corresponding X-axis and Y-axis directions of the support roller to be installed, in millimeters;

[0157] According to formula (2), the sixth distance L from the center point O of the ring cooler to the actual position 2 of the left support roller, the center A' of the roller body, is determined: OA′ , unit: mm;

[0158] According to formula (3), determine the angle value of the second angle ∠A'jOA', in degrees;

[0159] According to formula (4), determine the angle value of the third angle ∠A'OB in degrees;

[0160] According to formula (5), determine the fourth angle ∠A'jOB, unit degree;

[0161] According to formula (12), the second distance L is determined BB' , unit: mm;

[0162] Further, the first distance from the leftmost end By of the front side surface of the roller body at the theoretical installation position 3 of the support roller to be installed to the leftmost end B'y of the front side surface of the roller body at the initial position 4 of the support roller to be installed is determined based on the fourth triangle and the fifth triangle and the principle of similar triangles, including:

[0163] According to formula (13), the eighth distance L from the center point B of the front side of the roller body of the theoretical installation position 3 of the support roller to be installed to the first auxiliary reference point N is determined: BN , unit: mm;

[0164] According to formula (14), the first distance L is determined ByB'y , unit: mm;

[0165] Further, the third distance from the rightmost end Bt of the front side surface of the roller body at the theoretical installation position 3 of the support roller to be installed to the rightmost end B't of the front side surface of the roller body at the initial position 4 of the support roller to be installed is determined based on the fifth triangle and the sixth triangle and the principle of similar triangles, including:

[0166] According to formula (15), the third distance L is determined BtB't , unit is millimeters.

[0167] The embodiment of the present invention has the following technical effects: by measuring the wire drawing distance, the offset distance of the left support roller and the right support roller, and measuring the linear distance between the visible left support roller and the right support roller by a total station, it is not necessary to measure the angle, only the length of the line segment is needed, and combined with simple triangle-related trigonometric function calculations, the support roller to be installed can be accurately positioned, effectively improving the speed and ease of use of the support roller installation measurement, and meeting the needs of on-site use. The measurement is intuitive and convenient, and the installation efficiency is greatly improved.

[0168] Further, there are one or more supporting rollers to be installed between the actual position of the left supporting roller and the actual position of the right supporting roller.

[0169] In some embodiments, Figure 3 As shown, there is only one shielded support roller 7 to be installed between the left support roller 8 and the right support roller 9. Figure 4 As shown, there are multiple shielded support rollers 7 to be installed between the left support roller 8 and the right support roller 9. For each support roller to be installed, a pull wire 10 is set using the method of the embodiment of the present invention for installation. The embodiment of the present invention can support the installation of multiple support rollers to be installed based on the same method steps.

[0170] The above technical solution of the embodiment of the present invention is described in detail below in conjunction with specific application examples. For technical details not introduced during the implementation process, please refer to the relevant description in the previous text.

[0171] like Figure 5 , Figure 6 ,and Figure 7The figure shows the layout of the support rollers of the ring cooler and the position of the inner ring columns; 100 support rollers 11 are respectively installed on the upper planes of the main beam and the middle beam 13 of the frame plane beam 12. There are two support rollers 11 on each single main beam or middle beam 13, which are symmetrically arranged on both sides of the ring center line 14 of the ring cooler. Several support rollers 11 are combined to form two support rings located on both sides of the ring center line 14 for supporting the rotating body. In the ring cooler, there are inner ring columns 15 for installing components such as plane beams and side rollers, and inner ring columns 15 for setting up waste heat recovery wind and smoke ducts. The inner ring columns 15 will block the line of sight of the total station type electronic rangefinder (hereinafter referred to as the total station) set up on the central measuring platform 16. At the same time, the support rollers of the inner ring also block the outer ring support rollers. Only indirect measurement can be performed during measurement, which brings great inconvenience to the installation and measurement of the support rollers. Therefore, it is urgent to improve the installation project of the support rollers.

[0172] The embodiment of the present invention mainly solves the problem that when using a total station to measure and install the support rollers of the ring cooler, a single support roller is blocked by the inner ring column, or multiple continuous support rollers are blocked by the inner ring column and cannot be measured. The embodiment of the present invention provides a method for quickly and conveniently measuring the installation position during the installation of the support rollers of the ring cooler, and uses the support rollers that have completed the installation measurement to assist in the installation of the blocked support rollers. The embodiment of the present invention is simple and easy to operate, and can be measured during on-site construction, which improves the measurement efficiency. There is no need to measure the angle, only the length of the line segment needs to be measured, which effectively improves the speed and ease of support roller installation measurement and can meet the needs of on-site use.

[0173] In the actual installation process of the ring cooler support roller, the actual installation position of the support roller deviates from the theoretical design installation position due to factors such as measurement accuracy and installation process. The embodiment of the present invention can calculate the position data of the blocked support roller and the length of each section of the wire in the installation technical step of the wire measurement method according to the actual position of the unblocked support rollers on the left and right sides of the inner ring column through the calculation formula provided by the embodiment of the present invention, and adjust the support roller to be installed blocked by the inner ring column to the designed installation position.

[0174] According to the distance between the center point of the ring cooler and the leftmost end of the front side surface of the support roller at the actual position measurable on the left, the distance between the center point of the ring cooler and the rightmost end of the front side surface of the support roller at the actual position measurable on the right, the distance between the leftmost end of the front side surface of the support roller at the actual position measurable on the left and the rightmost end of the front side surface of the support roller at the actual position measurable on the right, the axial deviation and radial deviation of the actual installation position of the support roller measurable on the left, and the axial deviation and radial deviation of the actual installation position of the support roller measurable on the right, the length of each section of the wire drawing in the installation technical step of the wire drawing measurement method is calculated by the calculation formula provided in the embodiment of the present invention, and the support roller to be installed blocked by the inner ring column is adjusted to the designed installation position.

[0175] The specific method is as follows:

[0176] Step S1: Use a total station mounted on the central measuring platform of the annular cooler to measure the unobstructed measurable support rollers on the left and right sides of the support rollers blocked by the inner ring columns, measure the axial deviation and radial deviation of their installation, and establish a coordinate system at the designed installation position of the support rollers to be installed and perform a series of calculations.

[0177] Preferably, if Figure 2 As shown, let the center point of the ring cooler be O (the origin of the coordinate system; establish a coordinate system, the line connecting the center point B of the front side of the roller body at the (designed) theoretical installation position of the support roller to be installed and point O (the origin of the coordinate system) is the Y axis, and the horizontal line passing through the center point B of the front side of the roller body at the design theoretical installation position of the support roller to be installed and parallel to the front side of the roller body at the design theoretical installation position of the support roller to be installed is the X axis; the inherent dimensions of the support roller include: wheel width W (equivalent to the outer diameter) and wheel thickness M; the theoretical position of the roller body center point of the left support roller is A, and the theoretical position of the roller body center point of the right support roller is C. ∠AOB=a, ∠COB=β; wherein, the values ​​of ∠AOB and ∠COB can be obtained from the design drawing of the annular cooler.

[0178] According to the actual measurement data, the axial deviation of the left support roller is Ah, and the radial deviation is At; the axial deviation of the right support roller is Ch, and the radial deviation is Ct;

[0179] According to the actual deviations of the left support roller and the right support roller, the actual position of the center point of the roller body of the left support roller is set to A', and the actual position of the center point of the roller body of the right support roller is set to C'; the inherent dimensions of the support rollers include the wheel width W and the wheel thickness M; the leftmost end of the front side of the actual position roller body of the left support roller is A'j, and the rightmost end of the front side of the actual position roller body of the right support roller is C'q; the deviation between the theoretical position of the roller body center point of the left support roller A and the actual position A' in the X-axis direction is recorded as the X-axis deviation of the left support roller Ak, and the deviation between the theoretical position of the roller body center point of the left support roller A and the actual position A' in the Y-axis direction is recorded as the Y-axis deviation of the left support roller Ae; the deviation between the theoretical position of the roller body center point of the right support roller C and the actual position C' in the X-axis direction is recorded as the X-axis deviation of the right support roller Ck, and the deviation between the theoretical position of the roller body center point of the right support roller C and the actual position C' in the Y-axis direction is recorded as the Y-axis deviation of the right support roller Ce;

[0180] The positive direction of the X-axis points to the right, and the positive direction of the Y-axis points upward; the X-axis deviation is negative to the left and positive to the right; the Y-axis deviation is positive upward and negative downward.

[0181] like Figure 8 and Fig. 9 , calculated based on the trigonometric relationship:

[0182] Ak=At·cosa-Ah·sina (16)

[0183] Ae=At·sina+Ah·cosa (17)

[0184] Ck=Ct·cosβ+Ch·sinβ (18)

[0185] Ce=Ch·cosβ-Ct·sinβ (19)

[0186] According to the trigonometric relationship, we can calculate:

[0187]

[0188] We get formula (7).

[0189] Step S2: Use a total station mounted on the central measuring platform of the annular cooler to measure the distance between the center point of the annular cooler and the leftmost end of the front side surface of the roller body of the actual position of the left support roller, and the distance between the center point of the annular cooler and the rightmost end of the front side surface of the roller body of the actual position of the right support roller. Pull a line between the leftmost end of the front side surface of the roller body of the actual position of the left support roller and the rightmost end of the front side surface of the roller body of the actual position of the right support roller and measure its length. Then, through a series of calculations, the length of the line between the leftmost end of the front side surface of the roller body of the support roller to be installed and the leftmost end of the front side surface of the roller body of the actual position of the left support roller, and the length of the line between the rightmost end of the front side surface of the roller body of the support roller to be installed and the rightmost end of the front side surface of the roller body of the actual position of the right support roller are obtained, and the position of the support roller to be installed is adjusted according to the calculated data.

[0190] Preferably, the distance L between the center point O of the ring cooler and the rightmost end C′q of the front side of the right support roller is OC,q , which can be measured by the total station installed on the measuring platform at the center of the ring cooler.

[0191] like Figure 2 As shown, let ∠C′OC′q be θ, and according to the trigonometric function relationship, we get formula (8);

[0192] Assume ∠BOC′ is β′, and the following formula is obtained based on the trigonometric function relationship:

[0193]

[0194] Taking the arc cosine of formula (21), we get formula (9);

[0195] Where: OC is the radius R of the theoretical position of the support roller; From the design diagram, we know that ∠COB = β; From formula (7), we know that L OC′ ; From formula (18) and formula (19), or through actual measurement, it can be known that the X-axis deviation of the right support roller is Ck and the Y-axis deviation is Ce.

[0196] Based on formula (8) and formula (9), we can get formula (10);

[0197] Similarly, let ∠A′jOA′ be ∠A′OB is a′, and formulas (2), (3), (4) and (5) can be obtained; where L is the distance between the center point O of the annular cooler and the leftmost end A′j of the front side of the roller body at the actual position of the left support roller. OA′j , which can be measured by the total station installed on the measuring platform at the center of the ring cooler.

[0198] A line L is drawn between the leftmost end A′j of the front side of the roller body at the actual position of the left support roller and the rightmost end C′q of the front side of the roller body at the actual position of the right support roller. A′jC′qAnd measure the length of the wire. According to the triangle cosine theorem, we can get formula (1);

[0199] According to the trigonometric relationship, we can calculate:

[0200] Where ∠OB′A′j=π-∠OA′jC′q-∠A′jOB (22)

[0201] like Figure 2 , as shown, according to the sine theorem:

[0202]

[0203] Right now:

[0204] According to formula (22) and formula (24), we get formula (6);

[0205] Similarly, we can know:

[0206] According to formula (25), formula (11) can be obtained;

[0207] Put the front side of the support roller to be installed close to the pull line L A′jC′q , so that the length of the wire between the leftmost end of the front side of the support roller to be installed and A′j is Make the wire length between the rightmost end of the front side of the support roller to be installed and C'q

[0208] According to formula (23) the sine theorem we get:

[0209]

[0210] Known get:

[0211] BB′=OB-OB′ (27)

[0212] According to formula (23), formula (26) and formula (27), formula (12) is obtained;

[0213] Step S3: Calculate the distance between the center point B of the front side surface of the roller body at the design theoretical installation position of the support roller to be installed and the drawing line between the leftmost end A′j of the front side surface of the roller body at the actual position of the left support roller and the rightmost end C′q of the front side surface of the roller body at the actual position of the right support roller. Since the drawing line may not be parallel to the front side surface of the roller body at the design theoretical installation position of the support roller to be installed, the distances between the left end, center point and right end of the front side surface of the roller body of the support roller to be installed and the drawing line are different, and the distances need to be calculated separately, and the position of the support roller to be installed along the positive direction of the Y axis is adjusted according to the calculated distance.

[0214] Preferably, the pull line L A′jC′q The projection extension line of intersects the straight line in the X-axis direction passing through point B at point N. Let the endpoint of the front side surface of the roller body at the design theoretical installation position of the support roller to be installed close to N be Bt, and the endpoint of the front side surface of the roller body at the design theoretical installation position of the support roller to be installed away from N be By.

[0215] like Figure 2 As shown, according to the sine theorem:

[0216]

[0217]

[0218] According to the similar triangle theorem:

[0219]

[0220] Therefore, let the center point B of the front side of the roller body and the pull line L at the design theoretical installation position of the support roller to be installed. A′jC′q The distance between the end point Bt on the front side of the roller body near the N side of the design theoretical installation position of the support roller to be installed and the tension line L is BB′. A′jC′q The distance between the end point By on the side away from N and the tension line L is BtB′t, and the distance between the end point By on the side away from N and the front side of the roller body at the design theoretical installation position of the support roller to be installed is BtB′t. A′jC′q The distance is ByB′y, and the support roller to be installed is adjusted along the positive direction of the Y axis.

[0221] According to formula (30), we can get:

[0222]

[0223] and formula (32):

[0224]

[0225] According to formula (32), we get formula (14);

[0226] According to formula (31), we get formula (15);

[0227] Align the left end, center point, and right end of the front side of the roller body at the actual installation position of the support roller to be installed with the tension line L A′jC′q The distance is adjusted to the left end, center point and right end of the front side of the roller body at the design theoretical installation position of the support roller to be installed and the tension line L A′jC′q The distance between the inner ring column and the support roller to be installed is adjusted to complete the installation position adjustment of the support roller to be installed which is blocked by the inner ring column.

[0228] Preferably, when multiple consecutive support rollers to be installed are blocked by the inner ring columns and cannot be measured, it is only necessary to repeat the above steps S1 to S3 separately for each support roller to be installed blocked by the inner ring columns to complete the adjustment of the installation positions of the multiple blocked support rollers to be installed.

[0229] The embodiment of the present invention has the following technical effects: the embodiment of the present invention provides a method for quickly and conveniently measuring the installation position during the installation of the ring cooler support roller, and uses the support roller that has completed the installation measurement to assist in the installation of the blocked support roller to be installed. Specifically, according to the actual position of the unblocked support rollers on the left and right sides of the inner ring column that blocks the support roller to be installed, the position data of the blocked support roller to be installed and the length of each section of the wire in the installation technical step of the wire measurement method are obtained through the embodiment of the present invention, and the support roller to be installed blocked by the inner ring column is adjusted to the designed installation position. The embodiment of the present invention solves the problem that when using a total station to measure and install the ring cooler support roller, a single support roller is blocked by the inner ring column, or multiple continuous support rollers are blocked by the inner ring column and cannot be measured. The embodiment of the present invention is simple and easy to operate, can be measured in on-site construction, improves the measurement efficiency, and does not need to measure the angle, only the length of the line segment needs to be measured, effectively improves the rapidity and ease of use of the support roller installation measurement, and can meet the needs of on-site use. The embodiment of the present invention was tested by installing the support roller of the 2#360m2 sintering ring cooler of Liuzhou Iron and Steel Sintering Plant. The embodiment of the present invention is intuitive and convenient to measure, and the installation efficiency is greatly improved.

[0230] It should be understood that the specific order or hierarchy of steps in the disclosed process is an example of an exemplary method. Based on design preferences, it should be understood that the specific order or hierarchy of steps in the process can be rearranged without departing from the scope of protection of the present disclosure. The attached method claims present the elements of the various steps in an exemplary order and are not intended to be limited to the specific order or hierarchy described.

[0231] In the above detailed description, various features are grouped together in a single embodiment to simplify the disclosure. This method of disclosure should not be interpreted as reflecting an intention that the embodiments of the claimed subject matter require more features than are clearly stated in each claim. On the contrary, as reflected in the appended claims, the invention is in a state of having less than all the features of the disclosed individual embodiments. Therefore, the appended claims are hereby expressly incorporated into the detailed description, with each claim standing on its own as a separate preferred embodiment of the invention.

[0232] The disclosed embodiments are described above to enable any person skilled in the art to implement or use the present invention. Various modifications of these embodiments are obvious to those skilled in the art, and the general principles defined herein may also be applied to other embodiments without departing from the spirit and scope of the present disclosure. Therefore, the present disclosure is not limited to the embodiments given herein, but is consistent with the broadest scope of the principles and novel features disclosed in this application.

[0233] The above description includes examples of one or more embodiments. Of course, it is impossible to describe all possible combinations of components or methods for the purpose of describing the above embodiments, but it should be recognized by those skilled in the art that the various embodiments may be further combined and arranged. Therefore, the embodiments described herein are intended to cover all such changes, modifications and variations that fall within the scope of protection of the appended claims. In addition, with respect to the term "comprising" used in the specification or claims, the word is covered in a manner similar to the term "including". In addition, any term "or" used in the specification of the claims is intended to mean "non-exclusive or".

[0234] The specific implementation methods described above further illustrate the objectives, technical solutions and beneficial effects of the present invention in detail. It should be understood that the above description is only a specific implementation method of the present invention and is not intended to limit the scope of protection of the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A wire drawing measurement method for the installation of a support roller of a sintering ring cooler, characterized in that: include: A tension wire is provided between the leftmost end (A'j) of the front side surface of the roller body at the actual position (2) of the left support roller and the rightmost end (C'q) of the front side surface of the roller body at the actual position (6) of the right support roller; According to the actual position (2) of the left support roller, the leftmost end (A'j) of the front side of the roller body, the actual position (6) of the right support roller, the rightmost end (C'q) of the front side of the roller body, the drawing line and the theoretical installation position (3) of the support roller to be installed, determine the initial position (4) of the support roller to be installed, the leftmost end (B'y), the center point (B') and the rightmost end (B't) of the front side of the roller body on the drawing line; wherein the initial position (4) of the support roller to be installed, the center point (B') of the front side of the roller body, the center point (B) of the front side of the theoretical installation position (3) of the support roller to be installed and the center point (O) of the ring cooler are collinear with the first reference line; According to the theoretical installation position (3) of the support roller to be installed, the leftmost end (B'y), the center point (B') and the rightmost end (B't) of the front side of the roller body at the initial position (4) of the support roller to be installed, determine the first distance, the second distance and the third distance along the corresponding Y-axis direction of the support roller to be installed from the leftmost end (B'y), the center point (B') and the rightmost end (B't) of the front side of the roller body at the theoretical installation position (3) of the support roller to be installed, respectively. First, the support roller to be installed is placed at the initial position (4), and then the center point of the front side surface of the roller body of the support roller to be installed is kept moving along the first reference line, and the actual position of the support roller to be installed is adjusted so that the leftmost end, center point and rightmost end of the front side surface of the roller body at the actual position of the support roller to be installed are respectively equal to the first distance, the second distance and the third distance along the corresponding Y-axis direction of the support roller to be installed with the leftmost end (B'y), the center point (B') and the rightmost end (B't) of the front side surface of the roller body at the initial position (3) of the support roller to be installed; Among them, the support roller to be installed cannot be directly measured by the total station at the center point of the ring cooler; the left support roller is located on the left side of the support roller to be installed and can be directly measured by the total station at the center point of the ring cooler; the right support roller is located on the right side of the support roller to be installed and can be directly measured by the total station at the center point of the ring cooler; the corresponding Y-axis of the support roller to be installed is defined as a straight line connecting the center point of the front side of the roller body of the theoretical installation position of the support roller to be installed with the center point of the ring cooler as the origin.

2. The wire drawing measurement method for the installation of the support roller of the sintering ring cooler according to claim 1, characterized in that: According to the actual position (2) of the left support roller, the leftmost end (A'j) of the front side of the roller body, the actual position (6) of the right support roller, the rightmost end (C'q) of the front side of the roller body, the tension line and the theoretical installation position (3) of the support roller to be installed, the initial position (4) of the support roller to be installed, the positions of the leftmost end (B'y), the center point (B') and the rightmost end (B't) of the front side of the roller body on the tension line are determined, including: According to the first triangle, the second triangle and the third triangle, using the triangle sine theorem and the triangle cosine theorem, determine the fourth distance from the initial position (4) of the support roller to be installed, the center point (B') of the front side of the roller body to the actual position (2) of the left support roller, the leftmost end (A'j) of the front side of the roller body, and the fifth distance from the initial position (4) of the support roller to be installed, the center point (B') of the front side of the roller body to the actual position (6) of the right support roller, the rightmost end (C'q) of the front side of the roller body; Determine the initial position of the support roller to be installed (4) the position of the leftmost end (B'y) of the front side of the roller body on the pull line according to the radius of the support roller to be installed and the fourth distance; According to the radius of the support roller to be installed and the fifth distance, determine the initial position of the support roller to be installed (4) the position of the rightmost end (B't) of the front side of the roller body on the tension line; The first triangle is a triangle formed by the center point (O) of the ring cooler, the leftmost end (A'j) of the front side of the roller body at the actual position (2) of the left support roller, and the rightmost end (C'q) of the front side of the roller body at the actual position (6) of the right support roller; The second triangle is a triangle formed by the center point (O) of the ring cooler, the actual position (2) of the left support roller, the leftmost end (A'j) of the front side of the roller body, and the initial position (4) of the support roller to be installed, the center point (B') of the front side of the roller body; The third triangle is a triangle formed by the center point (O) of the ring cooler, the rightmost end (C'q) of the front side of the roller body at the actual position (6) of the right support roller, and the center point (B') of the front side of the roller body at the initial position (4) of the support roller to be installed; The center point (B') of the front side of the roller body at the initial position (4) of the support roller to be installed is the intersection of the line connecting the center point (B) of the front side of the roller body at the theoretical installation position (3) of the support roller to be installed and the center (O) of the ring cooler and the pull line.

3. The wire drawing measurement method for installing the support roller of the sintering ring cooler according to claim 1, characterized in that: According to the theoretical installation position (3) of the support roller to be installed, the leftmost end (B'y), the center point (B') and the rightmost end (B't) of the front side of the roller body at the initial position (4) of the support roller to be installed, the leftmost end (By), the center point (B) and the rightmost end (Bt) of the front side of the roller body at the theoretical installation position (3) of the support roller to be installed are determined, and the first distance, the second distance and the third distance along the corresponding Y-axis direction of the support roller to be installed are respectively with the leftmost end (B'y), the center point (B') and the rightmost end (B't) of the front side of the roller body at the initial position (4) of the support roller to be installed, including: According to the preset radius of the annular cooler, the thickness of the support roller to be installed, the first triangle, the second triangle, and the triangle sine theorem and triangle cosine theorem, a second distance from the center point (B) of the front side surface of the roller body at the theoretical installation position (3) of the support roller to be installed to the center point (B') of the front side surface of the roller body at the initial position (4) of the support roller to be installed is determined; According to the fourth triangle and the fifth triangle, based on the principle of similar triangles, a first distance from the theoretical installation position (3) of the support roller to be installed, the leftmost end (By) of the front side surface of the roller body, to the initial position (4) of the support roller to be installed, the leftmost end (B'y) of the front side surface of the roller body; According to the fifth triangle and the sixth triangle, based on the principle of similar triangles, a third distance from the rightmost end (Bt) of the front side surface of the roller body at the theoretical installation position (3) of the support roller to be installed to the rightmost end (B't) of the front side surface of the roller body at the initial position (4) of the support roller to be installed is determined; The first triangle is a triangle formed by the center point (O) of the ring cooler, the leftmost end (A'j) of the front side of the roller body at the actual position (2) of the left support roller, and the rightmost end (C'q) of the front side of the roller body at the actual position (6) of the right support roller; The second triangle is a triangle formed by the center point (O) of the ring cooler, the leftmost end (A'j) of the front side of the roller body at the actual position (2) of the left support roller, and the center point (B') of the front side of the roller body at the initial position (4) of the support roller to be installed; The center point (B') of the front side of the roller body at the initial position (4) of the support roller to be installed is the intersection of the line connecting the center point (B) of the front side of the roller body at the theoretical installation position (3) of the support roller to be installed and the center (O) of the ring cooler with the pull line; The fourth triangle is a triangle formed by the leftmost end (B'y) of the front side surface of the roller body at the initial position (4) of the support roller to be installed, the leftmost end (By) of the front side surface of the roller body at the theoretical installation position (3) of the support roller to be installed, and the first auxiliary reference point (N); The fifth triangle is a triangle formed by the center point (B') of the front side surface of the roller body at the initial position (4) of the support roller to be installed, the center point (B) of the front side surface of the roller body at the theoretical installation position (3) of the support roller to be installed, and the first auxiliary reference point (N); The sixth triangle is a triangle formed by the rightmost end (B't) of the front side of the roller body at the initial position (4) of the support roller to be installed, the rightmost end (Bt) of the front side of the roller body at the theoretical installation position (3) of the support roller to be installed, and the first auxiliary reference point (N); The first auxiliary reference point (N) is the intersection of the extension line of the pull line and the straight line in the X-axis direction of the support roller to be installed that passes through the center point (B) of the front side surface of the roller body at the theoretical installation position (3) of the support roller to be installed; The corresponding X-axis direction of the support roller to be installed is a horizontal line parallel to the front side of the roller body at the theoretical installation position (3) of the support roller to be installed.

4. The wire drawing measurement method for installing the support roller of the sintering ring cooler according to claim 2, characterized in that: According to the first triangle, the second triangle and the third triangle, using the triangle sine theorem and the triangle cosine theorem, the fourth distance from the center point (B') of the front side surface of the roller body at the initial position (4) of the support roller to be installed to the leftmost end (A'j) of the front side surface of the roller body at the actual position (2) of the left support roller, and the fifth distance from the center point (B') of the front side surface of the roller body at the initial position (4) of the support roller to be installed to the rightmost end (C'q) of the front side surface of the roller body at the actual position (6) of the right support roller are determined, including: Determine the first angle (∠OA'jC'q) according to the following formula: Among them, L OA′J is the distance from the center point (O) of the annular cooler to the leftmost end (A'j) of the front side of the roller body at the actual position (2) of the left support roller, in millimeters, measured by a total station; L A′jC′q is the distance from the leftmost end (A'j) of the front side of the roller body at the actual position (2) of the left support roller to the rightmost end (C'q) of the front side of the roller body at the actual position (6) of the right support roller, in millimeters, obtained by actually measuring the distance of the wire; L OC′q is the distance from the center point (O) of the annular cooler to the rightmost end (C'q) of the front side of the roller body at the actual position (6) of the right support roller, in millimeters, measured by a total station; The actual position of the left support roller and the theoretical installation position of the left support roller are measured to obtain the X-axis offset value (Ak) and Y-axis offset value (Ae) of the left support roller in the X-axis and Y-axis directions corresponding to the support roller to be installed, of the center point (A') of the actual position of the left support roller relative to the center point (A) of the theoretical installation position of the left support roller; According to the following formula, the sixth distance (L) from the center point (O) of the ring cooler to the actual position (2) of the left support roller and the center (A') of the roller body is determined: OA′ ), in millimeters: Wherein, W is the outer diameter of the support roller, and M is the axial thickness of the support roller; Determine the value of the second angle (∠A'jOA') in degrees using the following formula: Determine the third angle (∠A'OB) in degrees using the following formula: Among them, L OA is the distance from the center point (O) of the annular cooler to the center point (A) of the roller body of the theoretical installation position (1) of the left support roller, obtained from the design drawing; ∠AOB is obtained from the design drawing of the annular cooler; Determine the fourth angle (∠A'jOB) in degrees using the following formula: ∠A'jOB=∠A'jOA'+∠A'OB According to the following formula, the fourth distance (L A′jB′ ), in millimeters: The actual position (6) and the theoretical installation position (5) of the right support roller are measured to obtain the X-axis offset value (Ck) and the Y-axis offset value (Ce) of the right support roller in the X-axis and Y-axis directions corresponding to the support roller to be installed, the unit is millimeter, of the roller body center (C') of the actual position (6) of the right support roller relative to the roller body center (C) of the theoretical installation position (5) of the right support roller; According to the following formula, the seventh distance (L) from the center point (O) of the ring cooler to the center (C') of the actual position of the right support roller is determined: OC′ ), in millimeters: Among them, L OC'q is the distance from the center point (O) of the annular cooler to the rightmost end (C'q) of the front side of the roller body at the actual position (6) of the right support roller, in millimeters, measured by a total station; Determine the fifth angle (∠C'OC'q) in degrees using the following formula: Determine the sixth angle (∠BOC') in degrees using the following formula: Among them, L OC is the distance from the center point (O) of the annular cooler to the center point (C) of the roller body of the theoretical installation position (5) of the right support roller, in millimeters, obtained from the design drawing of the annular cooler; ∠COB is obtained from the design drawing of the annular cooler; Determine the seventh angle (∠BOC'q) in degrees using the following formula: ∠BOC'q=∠BOC'+∠C'OC'q According to the following formula, the fifth distance (L C′qB′ ), in millimeters: Among them, O is the center point of the annular cooler, A is the center point of the roller body at the theoretical installation position (1) of the left support roller, A' is the center point of the roller body at the actual position (2) of the left support roller, A'j is the leftmost end of the front side of the roller body at the actual position (2) of the left support roller, C is the center point of the roller body at the theoretical installation position (5) of the right support roller, C' is the center point of the roller body at the actual position (6) of the right support roller, C'q is the rightmost end of the front side of the roller body at the actual position (6) of the right support roller, B is the center point of the front side of the roller body at the theoretical installation position (3) of the support roller to be installed, and B' is the center point of the front side of the roller body at the initial position (4) of the support roller to be installed.

5. The wire drawing measurement method for installing the support roller of the sintering ring cooler according to claim 2, characterized in that: Determining the initial position (4) of the support roller to be installed and the position of the leftmost end (B'y) of the front side of the roller body on the pull line according to the radius of the support roller to be installed and the fourth distance, comprising: Subtract the radius of the support roller to be installed from the fourth distance to obtain the initial position (4) of the support roller to be installed, the leftmost end (B'y) of the front side of the roller body, and the distance along the pull line to the actual position (2) of the left support roller, the leftmost end (A'j) of the front side of the roller body.

6. The wire drawing measurement method for installing the support roller of the sintering ring cooler according to claim 2, characterized in that: Determining the initial position (4) of the support roller to be installed and the position of the rightmost end (B't) of the front side of the roller body on the pull line according to the radius of the support roller to be installed and the fifth distance, comprising: Subtract the radius of the support roller to be installed from the fifth distance to obtain the initial position (4) of the support roller to be installed, the rightmost end (B't) of the front side of the roller body, and the distance along the pulling line to the actual position (6) of the right support roller, the rightmost end (C'q) of the front side of the roller body.

7. The wire drawing measurement method for installing the support roller of the sintering ring cooler according to claim 3, characterized in that: According to the preset radius of the annular cooler, the thickness of the support roller to be installed, the first triangle, the second triangle, and the triangle sine theorem and triangle cosine theorem, a second distance from the center point (B) of the front side surface of the roller body at the theoretical installation position (3) of the support roller to be installed to the center point (B') of the front side surface of the roller body at the initial position (4) of the support roller to be installed is determined, including: Determine the first angle (∠OA'jC'q) in degrees using the following formula: Among them, L OA′J is the distance from the center point (O) of the annular cooler to the leftmost end (A'j) of the front side of the roller body at the actual position (2) of the left support roller, in millimeters, measured by a total station; L A′jC′q is the distance from the leftmost end (A'j) of the front side of the roller body at the actual position (2) of the left support roller to the rightmost end (C'q) of the front side of the roller body at the actual position (6) of the right support roller, in millimeters, obtained by actually measuring the distance of the wire; L OC′q is the distance from the center point (O) of the annular cooler to the rightmost end (C'q) of the front side of the roller body at the actual position (6) of the right support roller, in millimeters, measured by a total station; The actual position (2) of the left support roller and the theoretical installation position (1) of the left support roller are measured to obtain the X-axis offset value (Ak) and Y-axis offset value (Ae) of the left support roller in the X-axis and Y-axis directions corresponding to the support roller to be installed, the actual position (2) of the left support roller, the roller center (A') relative to the theoretical installation position (1) of the left support roller, the roller center (A), in millimeters; According to the following formula, the sixth distance (L) from the center point (O) of the ring cooler to the actual position (2) of the left support roller and the center (A') of the roller body is determined: OA′ ), in millimeters: Wherein, W is the outer diameter of the support roller, in millimeters, and M is the axial thickness of the support roller, in millimeters; Determine the value of the second angle (∠A'jOA') in degrees using the following formula: Determine the third angle (∠A'OB) in degrees using the following formula: Among them, L OA is the distance from the center point (O) of the annular cooler to the center point (A) of the roller body of the theoretical installation position (1) of the left support roller, obtained from the design drawing; ∠AOB is obtained from the design drawing of the annular cooler; Determine the fourth angle (∠A'jOB) in degrees using the following formula: ∠A'jOB=∠A'jOA'+∠A'OB According to the following formula, the second distance (L BB' ), in millimeters: Wherein, R is the design radius of the annular cooler, in millimeters; Wherein, O is the center point of the annular cooler, A is the theoretical installation position of the left support roller (1) the center point of the roller body, A' is the actual position of the left support roller (2) the center point of the roller body, A'j is the actual position of the left support roller (2) the leftmost end of the front side of the roller body, B is the theoretical installation position of the support roller to be installed (3) the center point of the front side of the roller body, and B' is the initial position of the support roller to be installed (4) the center point of the front side of the roller body.

8. The wire drawing measurement method for installing the support roller of the sintering ring cooler according to claim 7, characterized in that: The method of determining the first distance between the leftmost end (By) of the front side surface of the roller body at the theoretical installation position (3) of the support roller to be installed and the leftmost end (B'y) of the front side surface of the roller body at the initial position (4) of the support roller to be installed based on the fourth triangle and the fifth triangle based on the principle of similar triangles comprises: According to the following formula, the eighth distance (L) from the center point (B) of the front side of the roller body to the first auxiliary reference point (N) is determined as follows: BN ), in millimeters: According to the following formula, the first distance (L ByB'y ), in millimeters: Wherein, By is the leftmost end of the front side of the roller body at the theoretical installation position (3) of the support roller to be installed, and B'y is the leftmost end of the front side of the roller body at the initial position (4) of the support roller to be installed.

9. The wire drawing measurement method for installing the support roller of the sintering ring cooler according to claim 8, characterized in that: The method of determining the third distance between the rightmost end (Bt) of the front side surface of the roller body at the theoretical installation position (3) of the support roller to be installed and the rightmost end (B't) of the front side surface of the roller body at the initial position (4) of the support roller to be installed based on the fifth triangle and the sixth triangle based on the principle of similar triangles includes: According to the following formula, the third distance (L BtB't ), in millimeters: Wherein, Bt is the leftmost end of the front side of the roller body at the theoretical installation position (3) of the support roller to be installed, and B't is the leftmost end of the front side of the roller body at the initial position (4) of the support roller to be installed.

10. The wire drawing measurement method for installing the support roller of the sintering ring cooler according to claim 1, characterized in that: One or more supporting rollers to be installed are located between the actual position of the left supporting roller and the actual position of the right supporting roller.