Novel building template secondary edge integrated equipment
By using industrial vacuum cleaners to absorb debris and dissipate heat from cutting blades in the construction formwork production equipment, the problems of high temperature deformation and water layer affecting quality during the cutting process are solved, and more efficient production and better product quality are achieved.
Patent Information
- Application Number
- CN202411805714.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-10
- Publication Date
- 2025-02-14
- Estimated Expiration
- 2044-12-10
AI Technical Summary
During the production process of building formwork, the high-speed rotation of the cutting machine causes high temperatures to occur in the cutting blade and the cutting blade, resulting in deformation and quality problems. At the same time, the adhesion of the water layer on the outer surface of the cutting after cutting affects the quality.
A new type of integrated building formwork is designed, using an industrial vacuum cleaner to suck the cut debris into the material box, and the cutting blade is dissipated through the exhausted air to avoid water spraying and drying steps.
It effectively reduces the temperature of the cutting blade and the Silenne, avoids deformation and quality problems, and avoids adhering to the outer surface of the Silenne and moisture affecting the quality.
Smart Images

Figure CN119426712A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of secondary ribs of building templates, in particular to a novel secondary rib integrated equipment for building templates. Background Art
[0002] The secondary ribs of the formwork refer to the formwork components used in construction. They are usually made of wood or metal and are used to support the shape and size of concrete during pouring and to bear the lateral expansion pressure generated by concrete during pouring. The integrated production of secondary ribs usually refers to the integrated design of the main ribs and secondary ribs of the formwork during the design and manufacturing process of the building formwork to improve the overall stability and construction efficiency of the formwork; the following are the general steps of the integrated production of secondary ribs: Design: First, according to the structure and size requirements of the building, the structure and size of the integrated formwork unit are designed; this includes the shape, size and quantity of the main rib side panels, main rib end panels and secondary rib rib panels; Material selection: Select suitable materials for production. Generally speaking, in order to ensure the strength and stability of the formwork, steel or other metal materials will be selected for production. Cutting and processing: According to the requirements of the design drawings, the materials are cut and processed to obtain the required various components. Assembly: Assemble the cut and processed components to form an integrated formwork unit. This includes welding two main rib side panels and two main rib end panels to each other to form a rectangular frame structure, and then inserting the two ends of multiple secondary rib rib panels into the U-shaped hole grooves on the two main rib side panels. Connection: When two integrated formwork units need to be connected to each other, they can be butted together through internal threaded sleeves and locked together through bolts and locking nuts to achieve seamless connection. Inspection and testing: Finally, the produced formwork is inspected and tested to ensure that it meets the design requirements and quality standards.
[0003] At present, when producing secondary flutes, it is necessary to cut the secondary flutes into a size that is compatible with the building formwork. However, during cutting, due to the operation of the cutting machine, the contact part between the secondary flutes and the cutting machine will generate heat due to friction under the high-speed rotation of the cutting machine, resulting in a higher temperature of the cutting blade of the cutting machine and the secondary flutes. The higher temperature will cause the secondary flutes to deform, affecting the quality of the produced secondary flutes. To solve this problem, the existing integrated secondary flutes equipment for building formwork is provided. Through the reciprocating sliding of the piston plate in the piston cylinder and the water sprayed on the cutting machine and the secondary flutes during cutting, the water flow absorbs the temperature and enters the piston cylinder. Under the action of the piston cylinder, the water flow passes through the heat exchange tube and is sprayed onto the blade of the cutting blade of the cutting machine through the water spray pipe. On the one hand, the water flow sprayed by the clamping part is heated to prevent the temperature of the cutting blade of the cutting machine and the secondary flutes from gradually increasing as the cutting continues, while the temperature of the water flow sprayed by the clamping part increases. The temperature remains unchanged, resulting in thermal stress on the cutting blade and secondary ridges of the cutting machine when they contact the temperature-constant water flow sprayed by the clamping part, resulting in the risk of deformation and fracture of the cutting blade and secondary ridges of the cutting machine. On the other hand, the temperature-controlled water flow acting on the cutting blade of the cutting machine can make the temperature-controlled water flow quickly volatilize the accumulated smoke and dust, so that the smoke and dust can be washed down more quickly by the water flow sprayed by the clamping part, thereby ensuring the cleanliness of the cutting blade of the cutting machine and thus ensuring the quality of the end face of the secondary ridge obtained by cutting. However, after the cutting is completed, a layer of water will adhere to the outer surface of the secondary ridge, and the secondary ridge needs to be dried after cutting. In fact, water on the surface of the secondary ridge is indeed more likely to be contaminated with debris. This is because water can form a thin film on the surface of the secondary ridge, which can reduce the contact between the surface and the air, making it easier for debris to adhere to the wet surface. For this reason, we propose a new type of integrated equipment for secondary ridges of building templates. Summary of the invention
[0004] The object of the present invention is to provide a novel integrated equipment for building formwork secondary ridges, comprising a lifting frame, a cover body fixedly mounted on the lifting frame, one end of a pipe one passing through the inner side of the lifting frame and connected to the inner cavity of the cover body, a plurality of groups of air outlet nozzles are connected to the inner wall of the cover body, the air outlet nozzles are all aligned with the cutting blade, the pipe one is connected to the pipe two, the air outlet hood at the bottom of the pipe two is aligned with the motor, the pipe one is mounted with a solenoid valve one, the pipe two is mounted with a solenoid valve two, the end of the pipe one away from the lifting frame is connected to one end of a spring tube, the spring tube The other end is connected to an air outlet pipe, the air outlet pipe runs through the inside of the operating cover, the end of the air outlet pipe away from the spring pipe is connected to the air outlet end of the industrial vacuum cleaner, the suction port of the industrial vacuum cleaner is connected to one end of the suction pipe, the other end of the suction pipe is connected to a material collecting component, a collecting hopper is fixedly installed on the top of the material collecting component, the collecting hopper is fixedly installed on the bottom of the workbench, a through hole is opened on the workbench, the aperture inside the air outlet pipe gradually decreases from one end close to the spring pipe to the other end, and the aperture inside the suction pipe gradually decreases from one end close to the industrial vacuum cleaner to the other end;
[0005] The material receiving assembly includes a material receiving frame, the top of which is fixedly connected to a collecting hopper, the bottom of which is connected to a suction pipe, a filter plate is fixedly installed on the inner wall of the material receiving frame, a pressing block cavity is provided in the material receiving frame, an L-shaped plate is slidably connected to the material receiving frame, the bottom of the L-shaped plate slides in contact with the filter plate, a plurality of filter holes are provided on the L-shaped plate, the top of the L-shaped plate slides in contact with a triangular strip, the triangular strip is fixedly installed on the inner wall of the material receiving frame, the material receiving frame is hinged with a blocking door through a hinge, and two groups of locks are provided between the material receiving frame and the blocking door.
[0006] Preferably, the motor is fixedly mounted on the outer wall of the lifting frame, and the driving end of the motor passes through the inner side of the lifting frame and is fixedly connected to the cutting blade.
[0007] Preferably, the operation cover is fixedly mounted on the top ends of two groups of fixed long plates, and the two groups of fixed long plates are fixedly mounted on the top ends of the workbench.
[0008] Preferably: an electric push rod is fixedly installed on the top of the operating cover, the telescopic end of the electric push rod slides through the inside of the operating cover and is fixedly connected to the lifting frame, and two groups of guide rods are fixedly installed on the top of the lifting frame, and the two groups of guide rods slide through the inside of the operating cover.
[0009] Preferably: two groups of electric push rods 2 are installed on the outer wall of the operating cover, the telescopic ends of the two groups of electric push rods 2 slide through the inner side of the operating cover and are respectively fixedly connected to a group of clamping blocks, the two groups of clamping blocks are each provided with a notch, the two groups of clamping blocks are respectively fixedly connected to two groups of guide rods 2, and the guide rods 2 slide through the inner side of the operating cover.
[0010] Preferably: multiple groups of conveying rollers are rotatably installed between the two groups of fixed long plates through sealed bearings, the multiple groups of conveying rollers are respectively fixedly connected to a group of bevel gear 1, the multiple groups of bevel gear 1 are respectively meshed with a group of bevel gear 2, the multiple groups of bevel gear 2 are all fixedly installed on the outer wall of the rotating shaft, the rotating shaft is rotatably connected to two groups of fixed blocks through bearings, the two groups of fixed blocks are all fixedly installed on the top of the workbench, one end of the rotating shaft is fixedly connected to a servo motor, the servo motor is fixedly installed on a support frame, and the support frame is fixedly connected to the outer wall of the workbench.
[0011] Preferably: a group of bevel gear one is meshed with bevel gear three, bevel gear three is fixedly connected to one end of a rotating rod, the rotating rod is rotatably connected to a fixed frame through a bearing, the fixed frame is fixedly connected to the outer wall of the workbench, the fixed frame is rotatably connected to a rotating column through a bearing, and a group of bevel gear four is fixedly installed on one end of the rotating rod away from bevel gear three and the top of the rotating column respectively, and the two groups of bevel gears four are meshed with each other.
[0012] Preferably: the bottom end of the rotating column is fixedly connected to the rotating disk, the rotating disk is rotatably connected to connecting plate one, the connecting plate one is rotatably connected to connecting plate two, the end of connecting plate two away from connecting plate one slides through the inner side of the material receiving frame and is fixedly connected to the L-shaped plate, the inner side of the material receiving frame slides through two groups of guide rods three, and one end of the guide rod three is fixedly connected to the L-shaped plate.
[0013] Preferably, a plurality of groups of supporting legs are fixedly mounted on the bottom of the workbench.
[0014] Compared with the prior art, the present invention has the following beneficial effects:
[0015] 1. When the present invention is used, the debris generated by cutting can be sucked into the material receiving frame through an industrial vacuum cleaner, and the air discharged by the industrial vacuum cleaner can dissipate the heat of the cutting blade, so that the temperature between the cutting blade and the secondary ribs will not be too high. When the cutting blade dissipates heat, there is no need to spray water, which avoids a layer of water adhering to the outer surface of the secondary ribs after cutting is completed, and the need to dry the secondary ribs after cutting is avoided. At the same time, it is avoided that the surface of the secondary ribs is contaminated with debris due to water; the air discharged by the industrial vacuum cleaner can also dissipate the heat of the motor, avoid the motor temperature being too high, and extend the service life of the motor.
[0016] 2. When the present invention is in use, the conveying roller can be driven to rotate by the drive of the servo motor, thereby conveying the secondary flutes, and during the conveying process, the L-shaped plate will be driven to move back and forth in the receiving frame by the drive of the servo motor. The receiving frame moves back and forth, and the debris on the filter plate can be pushed into the pressing block cavity, which can avoid the filter plate from being blocked, ensure air circulation, and thus ensure the normal operation of the industrial vacuum cleaner. At the same time, the L-shaped plate pushes the debris into the pressing block cavity. As the debris in the pressing block cavity increases, the debris can be gradually squeezed, and then the debris in the pressing block cavity is squeezed into blocks; when the servo motor stops working, the L-shaped plate will also stop moving. If the end of the L-shaped plate away from the connecting plate two is in the pressing block cavity, since there are multiple groups of filter holes on the L-shaped plate, air circulation can be ensured through the filter holes, and when the L-shaped plate moves back and forth, the triangular strip can clean up the debris on the top of the L-shaped plate to prevent the filter holes from being blocked by debris. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a schematic diagram of the structure of the present invention;
[0018] Figure 2 This is a schematic diagram of the operation hood;
[0019] Figure 3 It is a partial structural schematic diagram of the present invention;
[0020] Figure 4 It is a schematic diagram of the interior of the cover;
[0021] Figure 5 This is a schematic diagram of the interior of the receiving frame;
[0022] Figure 6 Schematic diagram of L-shaped plate structure.
[0023] In the figure: 1. lifting frame; 2. cover body; 3. pipe 1; 4. air outlet nozzle; 5. cutting blade; 6. pipe 2; 7. motor; 8. solenoid valve 1; 9. solenoid valve 2; 10. spring tube; 11. air outlet pipe; 12. operation cover; 13. industrial vacuum cleaner; 14. suction tube; 15. material collecting assembly; 1501. material collecting frame; 1502. filter plate; 1503. briquetting chamber; 1504. L-shaped plate; 1505. blocking door; 1506. filter hole; 1507. triangular strip; 16. collecting hopper; 17. workbench ; 18. Through hole; 19. Fixed long board; 20. Electric push rod 1; 21. Guide rod 1; 22. Electric push rod 2; 23. Clamping block; 24. Guide rod 2; 25. Conveying roller; 26. Bevel gear 1; 27. Bevel gear 2; 28. Rotating shaft; 29. Fixed block; 30. Servo motor; 31. Support frame; 32. Bevel gear 3; 33. Rotating rod; 34. Fixed frame; 35. Rotating column; 36. Bevel gear 4; 37. Turntable; 38. Connecting plate 1; 39. Connecting plate 2; 40. Guide rod 3; 41. Support leg. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0025] See also Figure 1 - Figure 6 The figure shows a new type of building template secondary ridge integrated equipment of the present invention, including a lifting frame 1, a cover body 2 is fixedly installed on the lifting frame 1, one end of a pipe 3 passes through the inner side of the lifting frame 1 and is connected to the inner cavity of the cover body 2, a plurality of groups of air outlet nozzles 4 are connected to the inner wall of the cover body 1, and the air outlet nozzles 4 are all aligned with the cutting blade 5, the pipe 1 3 is connected to a pipe 2 6, and the air outlet hood at the bottom of the pipe 2 6 is aligned with the motor 7, the pipe 1 3 is installed with a solenoid valve 1 8, and the pipe 2 6 is installed with a solenoid valve 2 9, the end of the pipe 1 3 away from the lifting frame 1 is connected to one end of a spring tube 10, and the other end of the spring tube 10 is connected to an air outlet pipe 11, The air outlet pipe 11 passes through the inner side of the operating cover 12, and the end of the air outlet pipe 11 away from the spring tube 10 is connected to the air outlet end of the industrial vacuum cleaner 13, and the dust suction port 13 of the industrial vacuum cleaner 13 is connected to one end of the suction pipe 14, and the other end of the suction pipe 14 is connected to the material receiving component 15, and a collecting hopper 16 is fixedly installed on the top of the material receiving component 15, and the collecting hopper 16 is fixedly installed at the bottom of the workbench 17, and a through hole 18 is opened on the workbench 17, and the aperture inside the air outlet pipe 11 gradually decreases from one end close to the spring tube 10 to the other end, and the aperture inside the suction pipe 14 gradually decreases from one end close to the industrial vacuum cleaner 13 to the other end;
[0026] The material receiving assembly 15 includes a material receiving frame 1501, the top of which is fixedly connected to a collecting hopper 16, the bottom of which is connected to a suction pipe 14, a filter plate 1502 is fixedly installed on the inner wall of the material receiving frame 1501, a pressing block cavity 1503 is provided in the material receiving frame 1501, an L-shaped plate 1504 is slidably connected to the material receiving frame 1501, the bottom of the L-shaped plate 1504 slides in contact with the filter plate 1502, a plurality of filter holes 1506 are provided on the L-shaped plate 1504, the top of the L-shaped plate 1504 slides in contact with a triangular strip 1507, the triangular strip 1507 is fixedly installed on the inner wall of the material receiving frame 1501, the material receiving frame 1501 is hinged with a blocking door 1505 through a hinge, and two groups of locks are provided between the material receiving frame 1501 and the blocking door 1505.
[0027] The motor 7 is fixedly mounted on the outer wall of the lifting frame 1, and the driving end of the motor 7 passes through the inner side of the lifting frame 1 and is fixedly connected to the cutting blade 5; when in use, starting the motor 7 will drive the cutting blade 5 to rotate, and the cutting blade 5 is vertically aligned downward with the gap between the two sets of conveying rollers 25.
[0028] The operation cover 12 is fixedly mounted on the top of two groups of fixed long plates 19, and the two groups of fixed long plates 19 are fixedly mounted on the top of the workbench 17, so that the device installation structure is stable.
[0029] An electric push rod 20 is fixedly installed on the top of the operating cover 12. The telescopic end of the electric push rod 20 slides through the inner side of the operating cover 12 and is fixedly connected to the lifting frame 1. Two groups of guide rods 21 are fixedly installed on the top of the lifting frame 1. Both groups of guide rods 21 slide through the inner side of the operating cover 12. When in use, starting the electric push rod 20 will drive the lifting frame 1 to move up and down. The up and down movement of the lifting frame 1 will drive the motor 7 and the cutting blade 5 to move up and down, thereby cutting the secondary ribs of the building template. Two groups of guide rods 21 are provided so that the lifting frame 1 can move up and down stably.
[0030] Two groups of electric push rods 22 are installed on the outer wall of the operating cover 12, and the telescopic ends of the two groups of electric push rods 22 slide through the inner side of the operating cover 12 and are respectively fixedly connected to a group of clamping blocks 23, and notches are opened on the two groups of clamping blocks 23. The two groups of clamping blocks 23 are respectively fixedly connected to two groups of guide rods 24, and the guide rods 24 slide through the inner side of the operating cover 12; during use, the secondary ribs are transported to the bottom of the cutting blade 5 by the conveying roller 25. When the length of the secondary ribs extending out of the cutting blade 5 meets the size of the building template, the servo motor 30 is stopped, so that the conveying roller 25 stops conveying, and then the two groups of electric push rods 22 are started to drive the two groups of clamping blocks 23 to approach each other, so that the secondary ribs can be clamped.
[0031] Multiple groups of conveying rollers 25 are rotatably installed between the two groups of fixed long plates 19 through sealed bearings, and the multiple groups of conveying rollers 25 are respectively fixedly connected to a group of bevel gears 1 26, and the multiple groups of bevel gears 1 26 are respectively meshed with a group of bevel gears 27, and the multiple groups of bevel gears 27 are all fixedly installed on the outer wall of the rotating shaft 28. The rotating shaft 28 is rotatably connected to the two groups of fixed blocks 29 through bearings, and the two groups of fixed blocks 29 are all fixedly installed on the top of the workbench 17. One end of the rotating shaft 28 is fixedly connected to the servo motor 30, and the servo motor 30 is fixedly installed on the support frame 31, and the support frame 31 is fixedly connected to the outer wall of the workbench 17; when in use, starting the servo motor 30 will drive the rotating shaft 28 to rotate, and the rotation of the rotating shaft 28 will drive the multiple groups of bevel gears 27 to rotate, and the rotation of the multiple groups of bevel gears 27 will drive the multiple groups of bevel gears 1 26 to rotate, and the rotation of the bevel gear 1 26 will drive the conveying rollers 25 to rotate, so that the secondary ribs of the building template can be conveyed.
[0032] A group of bevel gears 26 mesh with bevel gear 32, and bevel gear 32 is fixedly connected to one end of a rotating rod 33. The rotating rod 33 is rotatably connected to a fixing frame 34 through a bearing. The fixing frame 34 is fixedly connected to the outer wall of the workbench 17, and the fixing frame 34 is rotatably connected to a rotating column 35 through a bearing. One end of the rotating rod 33 away from the bevel gear 32 and the top of the rotating column 35 are respectively fixedly installed with a group of bevel gears 4 36, and the two groups of bevel gears 4 36 are meshed with each other. When in use, the rotation of bevel gear 1 26 will drive the rotation of bevel gear 3 32, and the rotation of bevel gear 3 32 will drive the rotating rod 33 to rotate. The rotation of the rotating rod 33 and the rotation column 35 will be driven by the transmission action of the two groups of meshing bevel gears 4 36.
[0033] The bottom end of the rotating column 35 is fixedly connected to the rotating disk 37, and the rotating disk 37 is rotatably connected to the connecting plate 1 38, and the connecting plate 1 38 is rotatably connected to the connecting plate 2 39. The end of the connecting plate 2 39 away from the connecting plate 1 38 slides through the inner side of the material receiving frame 1501 and is fixedly connected to the L-shaped plate 1504. Two groups of guide rods 3 40 slide through the inner side of the material receiving frame 1501, and one end of the guide rods 3 40 is fixedly connected to the L-shaped plate 1504. When in use, the rotation of the rotating column 35 will drive the rotating disk 37 to rotate, and the rotation of the rotating disk 37 and the action of the connecting plate 1 38 will drive the connecting plate 2 39 to move back and forth, and the back and forth movement of the connecting plate 2 39 will drive the L-shaped plate 1504 to move back and forth in the material receiving frame 1501.
[0034] A plurality of supporting legs 41 are fixedly mounted on the bottom of the workbench 17 ; the workbench 17 can be strongly supported by the plurality of supporting legs 41 .
[0035] Working principle of the present invention: when in use, the secondary rib of the building template is placed on the top of the conveying roller 25, and the servo motor 30 is started to drive the rotating shaft 28 to rotate. The rotation of the rotating shaft 28 will drive the multiple sets of bevel gears 27 to rotate. The rotation of the multiple sets of bevel gears 27 will drive the multiple sets of bevel gears 1 26 to rotate. The rotation of the bevel gear 1 26 will drive the conveying roller 25 to rotate, and then the secondary rib of the building template can be conveyed. The secondary rib is conveyed to the right below the cutting blade 5 through the conveying roller 25. When the length of the secondary rib extending out of the cutting blade 5 meets the size adapted to the building template, the servo motor 30 is stopped, so that the conveying roller 25 stops conveying. Then, the two sets of electric push rods 22 are started to drive the two sets of clamping blocks 23 to approach each other, so that the secondary rib can be clamped; then the motor 7 is started to drive the cutting blade 5 to rotate, and at the same time, the electric push rod 1 20 is started to drive the lifting frame 1 to move downward. The downward movement of the lifting frame 1 will drive the motor 7 and the cutting blade 5 to move downward, so that the secondary rib of the building template can be cut;
[0036] During the cutting process, the industrial vacuum cleaner 13 is started, and the debris generated by the cutting can be absorbed through the suction pipe 14, the material receiving frame 1501, the collecting hopper 16 and the through hole 18, and the absorbed debris will enter the material receiving frame 1501 and fall on the top of the filter plate 1502. In the process of absorbing the debris, air enters the industrial vacuum cleaner 13 through the suction pipe 14. Since the aperture inside the suction pipe 14 gradually decreases from one end close to the industrial vacuum cleaner 13 to the other end, the temperature of the air entering the industrial vacuum cleaner 13 will become lower, and then the air in the industrial vacuum cleaner 13 will be discharged from the outlet pipe 11, and the aperture inside the outlet pipe 11 gradually decreases from one end close to the spring tube 10 to the other end, and the temperature of the discharged air will be further reduced;
[0037] The air discharged from the air outlet pipe 11 will enter the inner cavity of the cover body 2 through the spring tube 10 and the pipe 1 3, and then be discharged from the air outlet nozzle 4. The air discharged from the air outlet nozzle 4 will blow on the cutting blade 5, and the air temperature is relatively low, which can reduce the hot air around the cutting blade 5; at the same time, the air discharged from the air outlet pipe 11 can also pass through the spring tube 10 and the pipe 1 3, and then be discharged from the pipe 2 6. The air will be discharged on the motor 7, and the air temperature is relatively low, which can reduce the hot air around the motor 7 and accelerate the heat dissipation of the motor 7;
[0038] When in use, the rotation of bevel gear 1 26 will drive bevel gear 3 32 to rotate, the rotation of bevel gear 3 32 will drive rotating rod 33 to rotate, the rotation of rotating rod 33 and under the transmission action of two sets of mutually meshing bevel gear 4 36, it will drive rotating column 35 to rotate, the rotation of rotating column 35 will drive rotating disk 37 to rotate, the rotation of rotating disk 37 and under the action of connecting plate 1 38, it will drive connecting plate 2 39 to move back and forth, the back and forth movement of connecting plate 2 39 will drive L-shaped plate 1504 to move back and forth in material receiving frame 1501, the back and forth movement of material receiving frame 1501 can push the debris on filter plate 1502 into pressing block cavity 1503, so as to avoid the filter plate 1502 being blocked and ensure air circulation, and at the same time, L-shaped plate 1504 pushes the debris into pressing block cavity 1503 As more and more debris is contained in the pressing block cavity 1503, the debris can be gradually squeezed and then squeezed into blocks; when the servo motor 30 stops working, the L-shaped plate 1504 will also stop working. If the end of the L-shaped plate 1504 away from the connecting plate 2 39 is in the pressing block cavity 1503, since there are multiple groups of filter holes 1506 on the L-shaped plate 1504, air circulation can be ensured through the filter holes 1506, and when the L-shaped plate 1504 moves back and forth, the triangular strip 1507 can clean up the debris on the top of the L-shaped plate 1504 to prevent the filter holes 1506 from being blocked by debris; when the work is completed, the blocking door 1505 can be opened, and then the debris blocks squeezed into blocks can be taken out.
[0039] It should be noted that when the device of the present invention is used, an appropriate external power supply and intelligent controller are required to control the operation of the servo motor 30, the electric push rod 22, the motor 7, the industrial vacuum cleaner 13, the electric push rod 22, etc. through the external intelligent controller, and provide power support for the operation of the servo motor 30, the electric push rod 22, the motor 7, the industrial vacuum cleaner 13, the electric push rod 22, etc. through the external power supply.
[0040] The above content is a further detailed description of the present invention in combination with specific implementation methods. It cannot be determined that the specific implementation of the present invention is limited to these descriptions. For ordinary technicians in the technical field to which the present invention belongs, several simple deductions or substitutions can be made without departing from the concept of the present invention, which should be regarded as belonging to the scope of protection determined by the claims submitted for the present invention.
Claims
1. A novel building formwork secondary rib integrated equipment, comprising a lifting frame (1), characterized in that: A cover body (2) is fixedly mounted on the lifting frame (1); one end of a pipe 1 (3) passes through the inner side of the lifting frame (1) and is connected to the inner cavity of the cover body (2); a plurality of groups of air outlet nozzles (4) are connected to the inner wall of the cover body (1); the air outlet nozzles (4) are all aligned with the cutting blade (5); the pipe 1 (3) is connected to a pipe 2 (6); the air outlet hood at the bottom of the pipe 2 (6) is aligned with the motor (7); a solenoid valve 1 (8) is mounted on the pipe 1 (3); a solenoid valve 2 (9) is mounted on the pipe 2 (6); one end of the pipe 1 (3) away from the lifting frame (1) is connected to one end of a spring tube (10); the other end of the spring tube (10) is connected to an air outlet pipe (11); the air outlet pipe (11) passes through an operating On the inner side of the cover (12), one end of the air outlet pipe (11) away from the spring tube (10) is connected to the air outlet end of the industrial vacuum cleaner (13), the dust suction port (13) of the industrial vacuum cleaner (13) is connected to one end of the suction pipe (14), the other end of the suction pipe (14) is connected to the material receiving component (15), the top of the material receiving component (15) is fixedly equipped with a collecting hopper (16), the collecting hopper (16) is fixedly equipped at the bottom of a workbench (17), a through hole (18) is provided on the workbench (17), the aperture of the air outlet pipe (11) gradually decreases from one end close to the spring tube (10) to the other end, and the aperture of the suction pipe (14) gradually decreases from one end close to the industrial vacuum cleaner (13) to the other end; The material receiving assembly (15) comprises a material receiving frame (1501), the top of the material receiving frame (1501) is fixedly connected to a collecting hopper (16), the bottom of the material receiving frame (1501) is connected to a suction pipe (14), a filter plate (1502) is fixedly installed on the inner wall of the material receiving frame (1501), a pressing block cavity (1503) is arranged in the material receiving frame (1501), an L-shaped plate (1504) is slidably connected in the material receiving frame (1501), and the L-shaped plate (1504) is connected to the inner wall of the material receiving frame (1501). 04) The bottom slides and fits the filter plate (1502), and a plurality of filter holes (1506) are provided on the L-shaped plate (1504). The top of the L-shaped plate (1504) slides and fits the triangular strip (1507), and the triangular strip (1507) is fixedly mounted on the inner wall of the material receiving frame (1501). The material receiving frame (1501) is hinged with a blocking door (1505) through hinges, and two sets of locks are provided between the material receiving frame (1501) and the blocking door (1505).
2. A new type of building formwork secondary fluting integrated equipment according to claim 1, characterized in that: The motor (7) is fixedly mounted on the outer wall of the lifting frame (1); the driving end of the motor (7) passes through the inner side of the lifting frame (1) and is fixedly connected to the cutting blade (5).
3. The novel building formwork secondary flute integrated equipment according to claim 1 is characterized by: The operating cover (12) is fixedly mounted on the top of two groups of fixed long plates (19), and the two groups of fixed long plates (19) are both fixedly mounted on the top of the workbench (17).
4. The novel building formwork secondary flute integrated equipment according to claim 1 is characterized by: An electric push rod (20) is fixedly mounted on the top of the operating cover (12); the telescopic end of the electric push rod (20) slides through the inside of the operating cover (12) and is fixedly connected to the lifting frame (1); two groups of guide rods (21) are fixedly mounted on the top of the lifting frame (1); both groups of guide rods (21) slide through the inside of the operating cover (12).
5. The novel building formwork secondary flute integrated equipment according to claim 1 is characterized by: Two groups of electric push rods (22) are installed on the outer wall of the operating cover (12), and the telescopic ends of the two groups of electric push rods (22) are slidably passed through the inner side of the operating cover (12) and are respectively fixedly connected to a group of clamping blocks (23), and the two groups of clamping blocks (23) are each provided with a notch. The two groups of clamping blocks (23) are respectively fixedly connected to two groups of guide rods (24), and the two guide rods (24) are both slidably passed through the inner side of the operating cover (12).
6. The novel building formwork secondary flute integrated equipment according to claim 1 is characterized by: A plurality of conveying rollers (25) are rotatably mounted between the two groups of fixed long plates (19) via sealed bearings. The plurality of conveying rollers (25) are respectively fixedly connected to a group of bevel gears 1 (26). The plurality of bevel gears 1 (26) are respectively meshed with a group of bevel gears 2 (27). The plurality of bevel gears 2 (27) are all fixedly mounted on the outer wall of a rotating shaft (28). The rotating shaft (28) is rotatably connected to two groups of fixed blocks (29) via bearings. The two groups of fixed blocks (29) are all fixedly mounted on the top of the workbench (17). One end of the rotating shaft (28) is fixedly connected to a servo motor (30). The servo motor (30) is fixedly mounted on a support frame (31). The support frame (31) is fixedly connected to the outer wall of the workbench (17).
7. The novel building template secondary flute integrated equipment according to claim 6 is characterized by: A group of bevel gears 1 (26) meshes with bevel gear 3 (32), the bevel gear 3 (32) is fixedly connected to one end of a rotating rod (33), the rotating rod (33) is rotatably connected to a fixing frame (34) via a bearing, the fixing frame (34) is fixedly connected to an outer wall of a workbench (17), the fixing frame (34) is rotatably connected to a rotating column (35) via a bearing, and a group of bevel gears 4 (36) are fixedly installed on one end of the rotating rod (33) away from the bevel gear 3 (32) and the top of the rotating column (35), respectively, and the two groups of bevel gears 4 (36) mesh with each other.
8. The novel building formwork secondary flute integrated equipment according to claim 7 is characterized by: The bottom end of the rotating column (35) is fixedly connected to a rotating disk (37), the rotating disk (37) is rotatably connected to a connecting plate one (38), the connecting plate one (38) is rotatably connected to a connecting plate two (39), one end of the connecting plate two (39) away from the connecting plate one (38) slides through the inner side of a material receiving frame (1501) and is fixedly connected to an L-shaped plate (1504), two groups of guide rods three (40) slide through the inner side of the material receiving frame (1501), and one end of the guide rods three (40) is fixedly connected to the L-shaped plate (1504).
9. The novel building formwork secondary flute integrated equipment according to claim 7 is characterized by: A plurality of groups of supporting legs (41) are fixedly mounted on the bottom of the workbench (17).
Citation Information
Patent Citations
Milling machine tool with blade compensation function
CN109128314A
Cutting device for metal anilox roller machining
CN117324680A
Novel building template secondary edge integrated equipment
CN118527736A
Surface treatment device for precast slab
CN118990180A
Cutting device for hot-dip galvanized steel pipe machining
CN220330096U
Cited By
Cutting device for high-precision cold-drawn steel machining
CN120228334A