Electric flood prevention water pipe winding device
By designing the power flood control water pipe winding device, the rotatable winding assembly and pipe dismantling assembly are used to solve the problem of inefficiency in traditional water pipe winding methods, and the automatic winding and falling off of water pipes is achieved.
Patent Information
- Application Number
- CN202411672418.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-21
- Publication Date
- 2025-02-14
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The traditional water pipe winding method relies on manual operations. After the winding is completed, the water pipe needs to be manually removed, which is difficult and inefficient.
A power flood control water pipe winding device is designed, including a rotatable winding assembly and a pipe dismantling assembly. The winding assembly drives the winding roller to rotate by rotating the first cross beam and the first rotating disc, so as to realize the automatic winding of the water pipe. The pipe dismantling assembly uses the cooperation of the screw and the elastic member to achieve automatic falloff of the water pipe.
It improves the efficiency of water pipe rolling and falling off, reduces the labor intensity of manual operation, and realizes automated water pipe management.
Smart Images

Figure CN119429853A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of flood prevention equipment, and in particular to an electric flood prevention water pipe winding device. Background Art
[0002] In the field of power flood prevention, the reeling and unrolling of water pipes is an important task, especially in emergency situations. Quick and effective reeling and unrolling of water pipes is essential to ensure the normal operation of power facilities. However, the traditional reeling method of water pipes often relies on manual operation. After reeling, the water pipes need to be manually removed, which is difficult and inefficient. Summary of the invention
[0003] The present invention provides an electric flood prevention water pipe reeling device, which solves the problem in the prior art that the water pipe needs to be manually detached after reeling is completed, which makes the water pipe detachment process difficult and inefficient.
[0004] The technical solution of the present invention is as follows:
[0005] An electric flood control water pipe reeling device comprises a frame for being arranged on the ground, the frame comprises two groups of vertical poles, a first crossbeam is arranged between the vertical poles of the first group, a second crossbeam is arranged between the vertical poles of the second group, and a reeling assembly is arranged between the first crossbeam and the second crossbeam;
[0006] The first group of vertical rods has a rotation groove, the first crossbeam is rotatably arranged in the rotation groove, and after the first crossbeam rotates, it is used to drive the winding assembly to rotate;
[0007] The winding assembly includes a first rotating disk rotatably arranged in the middle of the first crossbeam, and the first rotating disk is provided with two winding rollers arranged at intervals. The two winding rollers form a winding gap, and the winding gap is used to place the water pipe. After the first rotating disk rotates, it is used to wind the water pipe around the two winding rollers.
[0008] As a further technical solution, it also includes a pipe removal assembly for removing the water pipe that has been rolled up, the pipe removal assembly includes a screw rod arranged on the first crossbeam and located in the winding gap, the screw rod has two sliding grooves and a mounting groove, the two sliding grooves are both connected to the mounting groove, a first slider is slidably arranged in each of the sliding grooves, and the sliding direction of the first slider is perpendicular to the axial direction of the screw rod, and the sliding groove has no thread on a side close to the first rotating disk;
[0009] A first elastic member is disposed between the two first sliding blocks, and the first elastic member is used to provide a force for the two first sliding blocks to approach each other;
[0010] A first guide slope is provided on one side of the two first sliders close to each other, a second slider is slidably arranged in the installation groove, and the second slider has a second guide slope. After the second slider slides in the installation groove, the second guide slope is used to abut against the first guide slope and push the first slider to slide in the sliding groove;
[0011] It also includes a second elastic member with one end disposed in the mounting groove and the other end disposed on the second slider, the second elastic member is used to provide a force for the second slider to abut against the first slider, and the gravity of the second slider is greater than the elastic force of the second elastic member;
[0012] It also includes a pushing block sleeved on the screw rod, the pushing block has a guide hole, the guide hole is used to avoid the two winding rollers, and the pushing block has an internal thread;
[0013] The pipe removal assembly has two working states. When the screw rod is in a horizontal state, the second elastic member abuts against and pushes the second slider, the second slider pushes the first slider away from each other, and the first slider abuts against the pushing block.
[0014] When the winding assembly rotates with the first beam, the screw rod is in a vertical state, the second elastic member is in a compressed state, the first elastic member is also in a compressed state, the first slider slides into the sliding groove, the first slider disengages from the pushing block, and the pushing block slides into the threaded position of the screw rod under the action of gravity.
[0015] As a further technical solution, the second crossbeam has a through slot, a bearing is arranged in the through slot, and the two winding rollers are used to abut against the inner wall of the bearing;
[0016] It also includes a first hinged rod and a second hinged rod, one end of which is hingedly set on the first group of vertical rods, and the second group of vertical rods has two first sliding grooves. The other ends of the first hinged rod and the second hinged rod each have a hinged protrusion, and the hinged protrusions are respectively slidably set in the two first sliding grooves, and the first hinged rod and the second hinged rod are cross-arranged. After the hinged protrusion slides in the first sliding groove, it is used to adjust the distance between the two groups of vertical rods.
[0017] As a further technical solution, the second hinged rod has a second sliding groove, the first hinged rod is slidably arranged in the second sliding groove, and after the hinged protrusion slides in the first sliding groove, it is used to drive the first hinged rod to slide in the second sliding groove.
[0018] As a further technical solution, a plurality of snap-in grooves are arranged on the first hinge rod and the second hinge rod. After the snap-in rod passes through the snap-in grooves on the first hinge rod and the second hinge rod, it is used to fix the positions of the first hinge rod and the second hinge rod.
[0019] As a further technical solution, a limiting block is arranged on the second cross beam, and the limiting block and the pushing block form a limiting gap, the limiting gap is used for the water pipe to pass through, and the limiting block and the pushing block are used to abut against both sides of the water pipe.
[0020] As a further technical solution, the first group of vertical poles has a limiting groove, and the first crossbeam has a limiting protrusion, and the limiting protrusion is used to be slidably set in the limiting groove.
[0021] As a further technical solution, the invention further comprises a second rotating disk which is arranged on the first cross beam and rotates synchronously with the first rotating disk, and a shifting rod is arranged on the second rotating disk.
[0022] The working principle and beneficial effects of the present invention are:
[0023] In the present invention, the electric flood control water pipe reeling device is placed at the position where it needs to be used, and the ground is ensured to be flat so that the vertical pole can be placed stably on the ground. One end of the water pipe to be reeled is placed in the reeling gap between the two reeling rollers. Ensure that the water pipe is placed correctly for subsequent reeling operations. The operator rotates the first crossbeam to keep the reeling roller horizontal, rotates the first rotating disk to drive the two rotating rollers to rotate, and the water pipe is gradually wound on the two reeling rollers. During the reeling process, the water pipe is evenly wound until it is completely reeled. After the reeling is completed, the first crossbeam is rotated to keep the reeling roller in a vertical state, and then the operator pushes the wound water pipe to roll the water pipe out of the reeling roller. After the water pipe is removed, it is convenient to store the water pipe. The reeling roller can be arranged vertically by the rotatable reeling roller, which is convenient for disassembling the water pipe, greatly reducing the labor intensity of manual operation and improving the efficiency of the water pipe falling off the reeling roller. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
[0025] Figure 1 This is a schematic diagram of the first viewing angle axial structure of the present invention;
[0026] Figure 2 for Figure 1 A local enlarged structural schematic diagram;
[0027] Figure 3 This is a schematic diagram of the axial structure of the present invention from a second viewing angle;
[0028] Figure 4 for Figure 3 A schematic diagram of the local enlarged structure at B;
[0029] Figure 5 It is a schematic diagram of the top view structure of the present invention;
[0030] Figure 6 It is a schematic diagram of the cross-sectional structure of the present invention;
[0031] Figure 7 for Figure 6 A schematic diagram of the local enlarged structure at C;
[0032] Figure 8 is a schematic diagram of the first crossbeam structure;
[0033] Fig. 9 This is a schematic diagram of the pole structure.
[0034] In the figure:
[0035] 100, frame, 101, upright pole, 102, first beam, 103, second beam, 104, rotating groove, 105, limiting groove, 106, limiting protrusion;
[0036] 200, winding assembly, 201, first rotating disk, 202, winding roller, 203, winding gap;
[0037] 300, pipe disassembly assembly, 301, screw rod, 302, sliding groove, 303, mounting groove, 304, first slider, 305, first elastic member, 306, first guide slope, 307, second slider, 308, second guide slope, 309, second elastic member, 310, push block, 311, guide hole, 312, through groove, 313, bearing, 314, connecting rod;
[0038] 400, first hinged rod, 401, second hinged rod, 402, first slide groove, 403, hinged protrusion, 404, second slide groove, 405, clamping groove, 406, clamping rod;
[0039] 501, limit block, 502, limit gap;
[0040] 601. A second rotating disk. 602. A lever. DETAILED DESCRIPTION
[0041] The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0042] Example
[0043] An electric flood control water pipe reeling device includes a frame 100 for being set on the ground, the frame 100 includes two groups of vertical poles 101, a first crossbeam 102 is set between the vertical poles 101 of the first group, and a second crossbeam 103 is set between the vertical poles 101 of the second group, and also includes a reeling assembly 200 set between the first crossbeam 102 and the second crossbeam 103;
[0044] The first group of vertical rods 101 has a rotation groove 104, and the first crossbeam 102 is rotatably disposed in the rotation groove 104. After the first crossbeam 102 rotates, it is used to drive the winding assembly 200 to rotate;
[0045] The winding assembly 200 includes a first rotating disk 201 rotatably arranged in the middle of the first beam 102, and two winding rollers 202 are arranged at intervals on the first rotating disk 201. The two winding rollers 202 form a winding gap 203, and the winding gap 203 is used to place the water pipe. After the first rotating disk 201 rotates, it is used to wind the water pipe around the two winding rollers 202.
[0046] like Figure 1 and Figure 3 As shown, in this embodiment, first, the electric flood control water pipe winding device is placed at the position where it needs to be used, and the ground is ensured to be flat so that the vertical pole 101 can be placed stably on the ground. One end of the water pipe to be wound is placed in the winding gap 203 between the two winding rollers 202. Ensure that the water pipe is placed correctly for subsequent winding operations. The operator rotates the first crossbeam 102 to keep the winding roller 202 horizontal, and rotates the first rotating disk 201 to drive the two rotating rollers to rotate, and the water pipe is gradually wound on the two winding rollers 202. During the winding process, the water pipe is evenly wound until it is completely wound. After the winding is completed, the first crossbeam 102 is rotated so that the winding roller 202 remains in a vertical state, and then the operator pushes the wound water pipe to roll the water pipe out of the winding roller 202. After the water pipe is detached, it is convenient to store the water pipe. The rotatable winding roller 202 can be arranged in a vertical position to facilitate disassembly of the water pipe, greatly reduce the labor intensity of manual operation, and improve the efficiency of the water pipe falling off the winding roller 202.
[0047] like Figure 5 , Figure 6 and Figure 7As shown, as a further technical solution, it also includes a pipe removal component 300 for removing the wound water pipe, the pipe removal component 300 includes a screw rod 301 arranged on the first crossbeam 102 and located in the winding gap 203, the screw rod 301 has two sliding grooves 302 and an installation groove 303, the two sliding grooves 302 are connected to the installation groove 303, the sliding grooves 302 are both slidably provided with a first slider 304, and the sliding direction of the first slider 304 is perpendicular to the axial direction of the screw rod 301, and the sliding groove 302 has no thread on the side close to the first rotating disk 201,
[0048] A first elastic member 305 is disposed between the two first sliding blocks 304 , and the first elastic member 305 is used to provide a force for bringing the two first sliding blocks 304 closer to each other;
[0049] A first guide slope 306 is provided on one side where the two first sliders 304 are close to each other. A second slider 307 is slidably provided in the installation groove 303. The second slider 307 has a second guide slope 308. After the second slider 307 slides in the installation groove 303, the second guide slope 308 is used to abut against the first guide slope 306 and push the first slider 304 to slide in the sliding groove 302.
[0050] It also includes a second elastic member 309 having one end disposed in the mounting groove 303 and the other end disposed on the second slider 307, the second elastic member 309 being used to provide a force for the second slider 307 to abut against the first slider 304, and the gravity of the second slider 307 is greater than the elastic force of the second elastic member 309;
[0051] It also includes a pushing block 310 sleeved on the screw rod 301, the pushing block 310 has a guide hole 311, the guide hole 311 is used to avoid the two winding rollers 202, and the pushing block 310 has an internal thread;
[0052] The pipe removal assembly 300 has two working states. When the screw rod 301 is in a horizontal state, the second elastic member 309 abuts against and pushes the second slider 307. The second slider 307 pushes the first slider 304 away from each other. The first slider 304 abuts against the pushing block 310.
[0053] When the winding assembly 200 rotates with the first beam 102, the screw rod 301 is in a vertical state, the second elastic member 309 is in a compressed state, the first elastic member 305 is also in a compressed state, the first slider 304 slides into the sliding groove 302, the first slider 304 is disengaged from the push block 310, and the push block 310 slides into the threaded position of the screw rod 301 under the action of gravity. After passing through the push block 310, the screw rod 301 is set on the first beam 102 through the connecting rod 314, and the connecting rod 314 is used to avoid the first rotating disk 201 and the winding roller 202.
[0054] As a specific implementation method, the electric flood control water pipe winding device is placed at the location where it needs to be used, and the ground is ensured to be flat so that the vertical pole 101 can be placed stably on the ground. One end of the water pipe to be wound is placed in the winding gap 203 between the two winding rollers 202 to ensure that the water pipe is correctly placed for subsequent winding operations. The operator rotates the first crossbeam 102 to keep the winding roller 202 horizontal, and rotates the first rotating disk 201 to drive the two rotating rollers to rotate, and the water pipe is gradually wound around the two winding rollers 202. During the winding process, the water pipe is evenly wound until it is completely wound. The operator drives the first rotating disk 201 to rotate through manual operation, and the two winding rollers 202 arranged on the first rotating disk 201 are respectively arranged on the pushing block 310, and the pushing block 310 will rotate with the first rotating disk 201. When the screw rod 301 is in a horizontal state, the first slider 304 abuts against the pushing block 310 under the action of the first elastic member 305, the second elastic member 309 and the second slider 307, so as to prevent the pushing block 310 from sliding onto the thread of the screw rod 301. When the water pipe needs to be disassembled, the first crossbeam 102 is rotated. At this time, the screw rod 301 In a vertical state, the second slider 307 overcomes the elastic force of the second elastic member 309 and presses down under the action of gravity, and the first slider 304 will approach each other under the action of the first elastic member 305, thereby canceling the abutment against the push block 310. The push block 310 slides down to the thread of the screw rod 301 under the action of gravity. At this time, the winding roller 202 and the push block 310 are driven to rotate by rotating the first rotating disk 201, and the push block 310 will move down on the thread, thereby pushing the wound water pipe off, further improving the convenience and efficiency of water pipe shedding.
[0055] As a further technical solution, the second cross beam 103 has a through slot 312, a bearing 313 is arranged in the through slot 312, and the two winding rollers 202 are used to abut against the inner wall of the bearing 313;
[0056] like Figure 1As shown, in this embodiment, a through groove 312 is provided on the second cross beam 103 so that the winding roller 202 can be supported when in a horizontal state, and a bearing 313 is provided in the through groove 312 so that the winding roller 202 can be smoother when rotating with the first rotating disk 201.
[0057] like Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown, it also includes a first hinged rod 400 and a second hinged rod 401, one end of which is hingedly set on the first group of vertical rods 101, and the second group of vertical rods 101 has two first sliding grooves 402, and the other ends of the first hinged rod 400 and the second hinged rod 401 each have a hinge protrusion 403, and the hinge protrusion 403 is respectively slidably set in the two first sliding grooves 402, and the first hinged rod 400 and the second hinged rod 401 are arranged crosswise, and the hinge protrusion 403 is used to adjust the distance between the two groups of vertical rods 101 after sliding in the first sliding groove 402.
[0058] In this embodiment, the distance between the two groups of vertical poles 101 can be adjusted by adjusting the first hinged rod 400 and the second hinged rod 401. This solution can move the first hinged rod 400 and the second hinged rod 401 toward the two ends of the vertical pole 101 so that the two groups of vertical poles 101 are close to each other. Conversely, the two groups of vertical poles 101 can be adjusted to move away from each other, so that the device can adapt to water pipes of different widths and can reel in the water pipes.
[0059] like Figure 2 As shown, as a further technical solution, the second hinged rod 401 has a second slide groove 404, the first hinged rod 400 is slidably set in the second slide groove 404, and after the hinged protrusion 403 slides in the first slide groove 402, it is used to drive the first hinged rod 400 to slide in the second slide groove 404.
[0060] In this embodiment, in order to further improve the stability of the device, a second slide groove 404 is provided on the second hinged rod 401 of this scheme, and the first hinged rod 400 is slidably arranged in the second slide groove 404 of the second hinged rod 401, so that the first hinged rod 400 and the second hinged rod 401 always maintain a fit state when sliding in the first slide groove 402, and have higher adjustment stability.
[0061] like Figure 3As shown, as a further technical solution, a plurality of snap-in grooves 405 are arranged on the first hinged rod 400 and the second hinged rod 401. After the snap-in rod passes through the snap-in grooves 405 on the first hinged rod 400 and the second hinged rod 401, it is used to fix the positions of the first hinged rod 400 and the second hinged rod 401.
[0062] In this embodiment, a snap-in groove 405 is provided on the first hinge rod 400 and the second hinge rod 401. After the snap-in grooves 405 on the first hinge rod 400 and the second hinge rod 401 are aligned, a snap-in rod is inserted into the snap-in groove 405 to fix the first hinge rod 400 and the second hinge rod 401, so that the device can remain stable during operation.
[0063] like Figure 3 As shown, as a further technical solution, a limiting block 501 is provided on the second cross beam 103, and the limiting block 501 and the pushing block 310 form a limiting gap 502, and the limiting gap 502 is used for passing the water pipe, and the limiting block 501 and the pushing block 310 are used to abut against both sides of the water pipe.
[0064] In this embodiment, a limiting block 501 is provided on the second beam 103. During the winding process, the water pipe is located between the limiting gaps 502. The limiting block 501 and the pushing block 310 respectively abut against the two ends of the water pipe, ensuring that the water pipe can be wound more neatly.
[0065] like Figure 8 and Fig. 9 As shown, as a further technical solution, the first group of vertical rods 101 has a limiting groove 105 , and the first crossbeam 102 has a limiting protrusion 106 , and the limiting protrusion 106 is used to be slidably set in the limiting groove 105 .
[0066] In this embodiment, the first crossbeam 102 of this solution has a limiting protrusion 106, and the vertical rod 101 has a limiting groove 105. The arc of the limiting groove 105 corresponds to an angle of 90 degrees, so that the first crossbeam 102 of this device can only rotate 90 degrees.
[0067] like Figure 1 and Figure 3 As shown, as a further technical solution, it also includes a second rotating disk 601 arranged on the first crossbeam 102 and rotating synchronously with the first rotating disk 201 , and a lever 602 is arranged on the second rotating disk 601 .
[0068] In this embodiment, a second rotating disk 601 that rotates synchronously with the first rotating disk 201 is arranged on the first beam 102, and a lever 602 is arranged on the second rotating disk 601. By turning the lever 602 and driving the second rotating disk 601 to rotate, the water pipe can be wound up, further reducing the operating difficulty and efficiency of the operator.
[0069] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. An electric flood control water pipe reeling device, characterized in that: The invention comprises a frame (100) for being arranged on the ground, the frame (100) comprising two groups of vertical poles (101), a first crossbeam (102) being arranged between the vertical poles (101) of the first group, a second crossbeam (103) being arranged between the vertical poles (101) of the second group, and a winding assembly (200) being arranged between the first crossbeam (102) and the second crossbeam (103); The first group of vertical rods (101) is provided with a rotation groove (104), the first crossbeam (102) is rotatably arranged in the rotation groove (104), and after the first crossbeam (102) rotates, it is used to drive the winding assembly (200) to rotate; The winding assembly (200) comprises a first rotating disk (201) rotatably arranged in the middle of the first crossbeam (102); two winding rollers (202) are arranged on the first rotating disk (201) at an interval; the two winding rollers (202) form a winding gap (203); the winding gap (203) is used to place a water pipe; after the first rotating disk (201) rotates, the water pipe is wound around the two winding rollers (202).
2. The electric flood control water pipe reeling device according to claim 1 is characterized in that: It also includes a pipe removal assembly (300) for removing the wound water pipe, the pipe removal assembly (300) including a screw rod (301) arranged on the first crossbeam (102) and located in the winding gap (203), the screw rod (301) having two sliding grooves (302) and a mounting groove (303), the two sliding grooves (302) are both connected to the mounting groove (303), a first slider (304) is slidably arranged in each of the sliding grooves (302), the sliding direction of the first slider (304) is perpendicular to the axial direction of the screw rod (301), and the sliding groove (302) has no thread on the side close to the first rotating disk (201); A first elastic member (305) is arranged between the two first sliding blocks (304), and the first elastic member (305) is used to provide a force for bringing the two first sliding blocks (304) closer to each other; A first guide slope (306) is provided on one side of the two first sliding blocks (304) close to each other, a second sliding block (307) is slidably arranged in the installation groove (303), the second sliding block (307) has a second guide slope (308), and after the second sliding block (307) slides in the installation groove (303), the second guide slope (308) is used to abut against the first guide slope (306) and push the first sliding block (304) to slide in the sliding groove (302); It also includes a second elastic member (309) having one end arranged in the installation groove (303) and the other end arranged on the second sliding block (307), the second elastic member (309) being used to provide a force for the second sliding block (307) to abut against the first sliding block (304), and the gravity of the second sliding block (307) is greater than the elastic force of the second elastic member (309); It also includes a pushing block (310) sleeved on the screw rod (301), the pushing block (310) having a guide hole (311), the guide hole (311) being used to avoid the two winding rollers (202), and the pushing block (310) having an internal thread; The pipe removal assembly (300) has two working states. When the screw rod (301) is in a horizontal state, the second elastic member (309) abuts against and pushes the second slider (307). The second slider (307) pushes the first slider (304) away from each other. The first slider (304) abuts against the pushing block (310). When the winding assembly (200) rotates with the first crossbeam (102), the screw rod (301) is in a vertical state, the second elastic member (309) is in a compressed state, the first elastic member (305) is also in a compressed state, the first sliding block (304) slides into the sliding groove (302), the first sliding block (304) is disengaged from the abutment with the pushing block (310), and the pushing block (310) slides into the threaded position of the screw rod (301) under the action of gravity.
3. The electric flood control water pipe reeling device according to claim 1 is characterized in that: The second cross beam (103) has a through groove (312), a bearing (313) is arranged in the through groove (312), and the two winding rollers (202) are used to abut against the inner wall of the bearing (313); It also includes a first hinged rod (400) and a second hinged rod (401), one end of which is hingedly arranged on the first group of vertical rods (101); the second group of vertical rods (101) has two first sliding grooves (402); the other ends of the first hinged rod (400) and the second hinged rod (401) each have a hinged protrusion (403); the hinged protrusions (403) are respectively slidably arranged in the two first sliding grooves (402); the first hinged rod (400) and the second hinged rod (401) are arranged crosswise; the hinged protrusions (403) are used to adjust the distance between the two groups of vertical rods (101) after sliding in the first sliding grooves (402).
4. The electric flood control water pipe reeling device according to claim 3 is characterized in that: The second hinged rod (401) has a second sliding groove (404), and the first hinged rod (400) is slidably arranged in the second sliding groove (404). After the hinged protrusion (403) slides in the first sliding groove (402), it is used to drive the first hinged rod (400) to slide in the second sliding groove (404).
5. The electric flood control water pipe reeling device according to claim 3 is characterized in that: A plurality of snap-in grooves (405) are arranged on the first hinge rod (400) and the second hinge rod (401); and a snap-in rod (406) passes through the snap-in grooves (405) on the first hinge rod (400) and the second hinge rod (401) to fix the positions of the first hinge rod (400) and the second hinge rod (401).
6. The electric flood control water pipe reeling device according to claim 2, characterized in that: A limiting block (501) is arranged on the second cross beam (103), the limiting block (501) and the pushing block (310) form a limiting gap (502), the limiting gap (502) is used for the water pipe to pass through, and the limiting block (501) and the pushing block (310) are used to abut against two sides of the water pipe.
7. The electric flood control water pipe reeling device according to claim 1 is characterized in that: The first group of vertical rods (101) is provided with a limiting groove (105), and the first crossbeam (102) is provided with a limiting protrusion (106), and the limiting protrusion (106) is used for being slidably arranged in the limiting groove (105).
8. The electric flood control water pipe reeling device according to claim 1, characterized in that: It also comprises a second rotating disk (601) arranged on the first crossbeam (102) and rotating synchronously with the first rotating disk (201), and a shifting rod (602) is arranged on the second rotating disk (601).