Fan installation system and method based on movable fan installation equipment
By adopting a fan installation system based on movable fan installation equipment in the field of offshore wind power, the problem of insufficient flexibility and adaptability of existing equipment in the offshore environment is solved, and efficient and accurate fan installation is achieved, reducing costs and improving costs Efficiency.
Patent Information
- Application Number
- CN202411819169.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-11
- Publication Date
- 2025-02-18
AI Technical Summary
Existing fan installation equipment lacks flexibility and adaptability in offshore environments, making it difficult to meet the needs of efficient and precise installation of fans. The traditional method requires different equipment, which increases costs and inefficiency.
Adopt a fan installation system based on movable fan installation equipment. Through equipment moving on the dock or between the dock and the onboard track, flexible switching between the dock and the onboard equipment can be achieved, installation efficiency and accuracy can be improved, and adapted to different maritime environments and floating foundations. .
It reduces equipment costs, improves installation efficiency and accuracy, enhances adaptability, and can efficiently and accurately install fans in different offshore environments.
Smart Images

Figure CN119467402A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of fan installation, and in particular to a fan installation system and method based on movable fan installation equipment. Background Art
[0002] In recent years, with the continuous growth of global demand for clean energy, the development of offshore wind power has continued to increase, and wind turbine towers and blades have tended to be larger in size and weight. However, traditional lifting resources are not highly compatible with current construction scenarios.
[0003] In the field of offshore wind turbine installation, existing installation equipment has many shortcomings. In traditional methods, different equipment is often required for wind turbine installation at the dock and offshore, which not only increases the equipment cost, but also makes the equipment conversion process cumbersome and inefficient. At the same time, due to the differences in operation methods and precision control of different equipment, the quality of wind turbine installation is also affected to a certain extent. In addition, some existing installation equipment has poor flexibility and adaptability when dealing with complex offshore environments and different types of floating foundations, and it is difficult to meet the needs of efficient and accurate installation of wind turbines. Summary of the invention
[0004] The main purpose of the present invention is to provide a wind turbine installation system based on a movable wind turbine installation device, by which the movable wind turbine installation device is moved on the dock or between the dock and the ship's track, so as to realize flexible switching of the equipment on the dock and the ship, improve installation efficiency, reduce costs, ensure installation accuracy, and adapt to different offshore environments and floating foundations. At the same time, the present invention also proposes a method for installing dock wind turbines and offshore wind turbines using the system.
[0005] The technical solution adopted by the present invention is:
[0006] A wind turbine installation system based on a movable wind turbine installation device comprises a track device installed on a dock and the movable wind turbine installation device; the track device comprises a first track and a second track, the first track is arranged on the dock in a longitudinal direction, the second track is arranged on the dock in a transverse direction, the first track and the second track are connected through a curve and can perform a track change operation to realize the turning of the movable wind turbine installation device between different tracks; the movable wind turbine installation device comprises a main frame, a wind turbine installation frame and a moving device, the wind turbine installation frame is installed on the main frame and is used to hold and lift the wind turbine, and the moving device is installed at the bottom of the main frame and is used to drive the movable wind turbine installation device to move along each track as a whole.
[0007] In the above solution, the wind turbine installation system also includes a wind turbine installation vessel; a third track is installed on the wind turbine installation vessel, and the third track can be docked with the first track.
[0008] In the above scheme, the fan mounting frame is installed on one side of the main frame, and includes a lifting device, a hydraulic telescopic rod and a clamp. One end of the hydraulic telescopic rod is installed on the lifting device, and the other end is installed with the clamp. The hydraulic telescopic rod can be extended and retracted. The lifting device drives the hydraulic telescopic rod to move to a suitable height and cooperates with the hydraulic telescopic rod to extend and retract itself to a suitable length, and then opens or closes the clamp to complete the lifting or lowering of the fan.
[0009] In the above solution, a counterweight plate is installed on the other side of the main frame for filling the counterweight.
[0010] In the above solution, the third track is arranged along the longitudinal direction of the wind turbine installation ship and close to the side.
[0011] In the above solution, the moving device is connected to the main frame via a steering gear.
[0012] In the above solution, the second track is arranged close to the shore of the wharf.
[0013] Correspondingly, based on the above-mentioned fan installation system based on the movable fan installation device, the present invention also proposes a method for installing a dock fan, comprising:
[0014] Complete the overall assembly of the wind turbine at the dock;
[0015] The movable fan installation equipment moves along the first track to the side of the fan, adjusts the hydraulic telescopic rod to a suitable height through the lifting device of the fan installation frame, and adjusts the clamp to a suitable position to hold the fan by extending and retracting the hydraulic telescopic rod to complete the loading of the fan;
[0016] The movable wind turbine installation device moves along the first track and then changes track through a diverter to drive into the second track;
[0017] The floating foundation is docked at the pier, and the movable wind turbine installation equipment moves along the second track to the side of the floating platform. The position of the wind turbine is adjusted by telescopic rods of the wind turbine installation frame. When the bottom of the wind turbine reaches the position directly above the floating foundation, the lifting device of the wind turbine installation frame drives the telescopic rod to descend so that the wind turbine and the floating foundation are docked.
[0018] The fan mounting bracket clamps are released from the fan, and the installation of the dock fan is completed.
[0019] Accordingly, based on the above-mentioned wind turbine installation system based on the movable wind turbine installation device, the present invention further proposes an offshore wind turbine installation method, comprising:
[0020] Complete the overall assembly of the wind turbine at the dock;
[0021] The movable fan installation equipment moves along the first track to the side of the fan, adjusts the hydraulic telescopic rod to a suitable height through the lifting device of the fan installation frame, and adjusts the clamp to a suitable position to hold the fan by extending and retracting the hydraulic telescopic rod to complete the loading of the fan;
[0022] The wind turbine installation ship is docked at the pier so that the third track is docked with the first track. The movable wind turbine installation equipment is moved along the first track to the wind turbine installation ship to complete the loading, and then moved along the third track to the mid-ship position.
[0023] The wind turbine installation ship sails to the installation sea area. When the wind turbine installation ship reaches the docking position, the movable wind turbine installation equipment moves on the third track to the side of the floating foundation. The position of the wind turbine is adjusted by telescopic rods of the wind turbine installation frame. When the bottom of the wind turbine reaches the position just above the floating foundation, the lifting device of the wind turbine installation frame drives the telescopic rod to descend so that the wind turbine and the floating foundation are docked.
[0024] The wind turbine mounting bracket clamp is released and the wind turbine is unloaded from the ship, completing the installation of the offshore wind turbine.
[0025] Further optimization: after the wind turbine is lifted, the hydraulic telescopic rod of the wind turbine mounting frame is coordinated and controlled. According to the tilt direction and degree of the movable wind turbine mounting equipment, the telescopic amount of the hydraulic telescopic rod is adjusted to maintain the overall stability of the movable wind turbine mounting equipment.
[0026] After the wind turbines are loaded on board and during the docking process of offshore wind turbines, the ballast water regulation system of the wind turbine installation ship is used to adjust the ship's buoyancy to keep the ship stable.
[0027] The beneficial effects produced by the present invention are:
[0028] 1. Reduced equipment cost: The wind turbine installation system of the present invention can meet the installation requirements of docks and offshore wind turbines based on only one movable wind turbine installation device, thereby reducing equipment cost and having good economic benefits.
[0029] 2. Improved installation efficiency: The movable fan installation equipment of the present invention can be quickly switched on the dock, or between the dock and the ship, reducing the equipment conversion time. At the same time, during the installation process, the synergistic effect of the lifting device, hydraulic telescopic rod and clamp can quickly and accurately complete the installation of the fan, greatly improving the overall installation efficiency.
[0030] 3. Ensure installation accuracy: Through the movement of the movable fan installation equipment on each track and the precise control of the height and length of the hydraulic telescopic rod, the position accuracy and verticality of the fan during the installation process can be ensured, thereby improving the quality of the fan installation.
[0031] 4. Enhanced adaptability: Compared with the traditional lifting equipment frame, the main frame of the movable wind turbine installation equipment uses a triangular structure as the supporting unit to enhance the ability to resist deformation in all directions, effectively resist external forces at sea and reduce the possibility of shaking. Its design makes the center of gravity lower, further improves stability, and is easier to adapt to different types of floating foundations and complex offshore environments. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0033] Figure 1 is a structural schematic diagram of a fan installation system based on a movable fan installation device according to a first embodiment of the present invention;
[0034] Figure 2 This is a schematic diagram of the track installation on the dock;
[0035] Figure 3 It is the overall structural diagram of the movable fan installation equipment;
[0036] Figure 4 yes Figure 3 A structural diagram of a fan mounting frame of the movable fan mounting device shown;
[0037] Figure 5 yes Figure 3 A structural diagram of a moving device of the movable wind turbine installation device shown;
[0038] Figure 6 is a schematic diagram of the installation of a dock fan in the first embodiment of the present invention;
[0039] Figure 7 is a structural schematic diagram of a fan installation system based on a movable fan installation device according to a second embodiment of the present invention;
[0040] Figure 8 It is a schematic diagram of the installation of an offshore wind turbine in the second embodiment of the present invention.
[0041] In the figure: 10, dock; 11, first track; 12, second track;
[0042] 20. Mobile fan installation equipment; 21. Main frame; 22. Fan installation frame; 221. Lifting device; 222. Hydraulic telescopic rod; 223. Hoop; 224. Counterweight plate; 23. Moving device; 231. Steering gear;
[0043] 30. Wind turbine installation vessel; 31. Third track;
[0044] 40. Fan;
[0045] 50. Floating foundation. DETAILED DESCRIPTION
[0046] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0047] It should be noted that the illustrations provided in the embodiments of the present invention are only used to illustrate the basic concept of the present invention in a schematic manner. Therefore, the drawings only show components related to the present invention rather than being drawn according to the number, shape and size of components in actual implementation. In actual implementation, the type, quantity and proportion of each component may be changed arbitrarily, and the component layout type may also be more complicated.
[0048] In the present invention, it is also necessary to explain that, if the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present application and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. In addition, if the terms "first" and "second" appear, they are only used for description and distinction purposes, and cannot be understood as indicating or implying relative importance.
[0049] like Figure 1 As shown, a wind turbine installation system based on a movable wind turbine installation device provided in the first embodiment of the present invention includes a track device installed on a dock 10 and a movable wind turbine installation device 20. Figure 2 As shown, the track device includes a first track 11 and a second track 12. The first track 11 is arranged longitudinally on the dock 10, and the second track 12 is arranged transversely on the dock 10. The first track 11 and the second track 12 are connected by a curve and can be changed to realize smooth turning of the mobile wind turbine installation device 20 between different tracks. Figure 3 As shown, the movable fan installation equipment 20 includes a main frame 21, a fan installation frame 22 and a moving device 23. The fan installation frame 22 is installed on one side of the main frame 21 and is used to hold the fan. The moving device 23 is installed at both ends of the bottom of the main frame 21 and is used to drive the movable fan installation equipment 20 to move along each track as a whole.
[0050] like Figure 4As shown, the fan mounting frame 22 is installed on the side of the main frame 21 and is located in the middle of the main frame 21. The fan mounting frame 22 includes a lifting device 221, a hydraulic telescopic rod 222 and a clamp 223; one end of the hydraulic telescopic rod 222 is installed on the lifting device 221, and when the fan needs to be lowered or lifted, the lifting device 221 can drive the hydraulic telescopic rod 222 to be lifted and lowered along the vertical direction; the other end of the hydraulic telescopic rod 222 is installed with a clamp 223, and the hydraulic telescopic rod 222 itself can be extended and retracted. The hydraulic telescopic rod 222 is driven by the lifting device 221 to move to a suitable height and cooperate with the hydraulic telescopic rod 222 to extend and retract itself to a suitable length, and then the clamp 223 is opened or closed to complete the lifting or lowering of the fan.
[0051] For further optimization, a counterweight plate 224 is provided on the other side of the main frame 21 to be filled with counterweights for balancing the movable wind turbine installation device 20 .
[0052] Further optimization, the main frame 21 is trapezoidal, including triangular structures arranged in pairs as supporting units, which can enhance the deformation resistance in all directions, effectively resist external forces at sea and reduce the possibility of shaking. Its design makes the center of gravity lower, further improves stability, and is easier to adapt to different types of floating foundations and complex offshore environments.
[0053] For further optimization, the hydraulic telescopic rods 222 are arranged in multiple groups along the height direction. In this embodiment, two hydraulic telescopic rods 222 form one group.
[0054] like Figure 5 As shown, the moving device 23 is connected to the main frame 21 through the steering gear 231, and the track change operation can be realized through the steering gear 231.
[0055] For further optimization, the second track 12 is arranged close to the shore of the dock 10 .
[0056] like Figure 6 As shown, using the wind turbine installation system based on the movable wind turbine installation device 20 of the first embodiment, the present invention also proposes a method for installing a wind turbine at the dock 10:
[0057] Complete the overall assembly of the wind turbine at Pier 10;
[0058] The movable fan installation device 20 moves along the first track 11 to the side of the fan, and appropriate counterweights are added to the main frame 21 and the counterweight plate 24 according to the weight of the fan 40. The hydraulic telescopic rod 222 is adjusted to a suitable height through the lifting device 221 of the fan installation frame 22, and the clamp 223 is adjusted to a suitable position to hold the fan 40 through the extension and retraction of the hydraulic telescopic rod 222, thereby completing the loading of the fan 40;
[0059] The movable wind turbine installation device 20 moves along the first track 11 and then changes track through the diverter 231 to drive into the second track 12;
[0060] The floating foundation 50 is docked at the pier 10, and the movable wind turbine installation device 20 is moved to the side of the floating platform along the second track 12. The position of the wind turbine is adjusted by telescopic rods of the wind turbine installation frame 22. When the bottom of the wind turbine 40 reaches the position directly above the floating foundation 50, the lifting device 221 of the wind turbine installation frame 22 drives the telescopic rod to descend so that the wind turbine 40 and the floating foundation 50 are docked.
[0061] The clamp 223 of the wind turbine mounting frame 22 releases the wind turbine 40 , and the installation of the wind turbine 40 at the dock 10 is completed.
[0062] It should be noted that after the wind turbine is lifted, the hydraulic telescopic rod 222 of the wind turbine mounting frame 22 is cooperatively controlled, and the telescopic amount of the hydraulic telescopic rod 222 is adjusted according to the tilt direction and degree of the movable wind turbine mounting equipment 20 to maintain the overall stability of the movable wind turbine mounting equipment 20.
[0063] like Figure 7 As shown, a wind turbine installation system based on a movable wind turbine installation device 20 according to the second embodiment of the present invention includes, in addition to a track device and a movable wind turbine installation device 20 installed on a dock 10, a wind turbine installation vessel 30, and the wind turbine installation vessel 30 has a self-propulsion capability; a third track 31 is installed on the wind turbine installation vessel 30, and the third track 31 can dock with the first track 11. The track device and the movable wind turbine installation device 20 in this embodiment are the same as those in the first embodiment, and will not be described in detail here.
[0064] In further optimization, the third rail 31 is arranged along the longitudinal direction of the wind turbine installation vessel 30 and close to the side.
[0065] like Figure 8 As shown, using the wind turbine installation system based on the movable wind turbine installation device 20 of the second embodiment, the present invention also proposes an offshore wind turbine installation method:
[0066] Complete the overall assembly of the wind turbine 40 on the dock 10;
[0067] The movable fan installation device 20 moves along the first track 11 to the side of the fan, and according to the weight of the fan 40, appropriate counterweights are added to the main frame 21 and the counterweight plate 24. The hydraulic telescopic rod 222 is adjusted to a suitable height through the lifting device 221 of the fan installation frame 22, and the clamp 223 is adjusted to a suitable position to hold the fan 40 through the extension and retraction of the hydraulic telescopic rod 222, thereby completing the loading of the fan 40, see Figure (8-1);
[0068] The wind turbine installation ship 30 is docked at the wharf 10 so that the third track 31 is docked with the first track 11. The movable wind turbine installation equipment 20 is moved along the first track 11 to the wind turbine installation ship 30 to complete the loading, and then moved along the third track 31 to the mid-ship position, see Figure (8-2);
[0069] The wind turbine installation vessel 30 sails to the installation sea area. When the wind turbine installation vessel 30 reaches the docking position, the movable wind turbine installation equipment 20 moves on the third track 31 to the side of the floating foundation 50, and the position of the wind turbine is adjusted by telescopic rods of the wind turbine installation frame 22. When the bottom of the wind turbine 40 reaches the position directly above the floating foundation 50, the lifting device 221 of the wind turbine installation frame 22 drives the telescopic rod to descend so that the wind turbine and the floating foundation 50 are docked, see Figure (8-3);
[0070] After the docking work is completed (ie, the wind turbine weight is transferred), the clamp 223 of the wind turbine mounting frame 22 releases the wind turbine 40, and the ship-removing operation is performed, and the installation of the offshore wind turbine 40 is completed.
[0071] It should be noted that after the wind turbine is lifted, the hydraulic telescopic rod 222 of the wind turbine mounting frame 22 is cooperatively controlled, and the telescopic amount of the hydraulic telescopic rod 222 is adjusted according to the tilt direction and degree of the movable wind turbine installation equipment 20 to keep the overall stability of the movable wind turbine installation equipment 20; after the wind turbine is loaded on board and during the docking of the offshore wind turbine, the ballast water regulation system of the wind turbine installation ship 30 is used to adjust the buoyancy of the ship to keep the ship stable.
[0072] It should be pointed out that, according to the needs of implementation, the various steps / components described in this application can be split into more steps / components, and two or more steps / components or partial operations of steps / components can be combined into new steps / components to achieve the purpose of the present invention.
[0073] The order of execution of each step in the above embodiment does not mean the order of execution. The order of execution of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiment of the present application.
[0074] It should be understood that those skilled in the art can make improvements or changes based on the above description, and all these improvements and changes should fall within the scope of protection of the appended claims of the present invention.
Claims
1. A fan installation system based on a movable fan installation device, characterized in that: It comprises a track device installed on a dock and a movable wind turbine installation device; the track device comprises a first track and a second track, the first track is arranged longitudinally on the dock, the second track is arranged transversely on the dock, the first track and the second track are connected by a curve and can perform a track change operation to realize the turning of the movable wind turbine installation device between different tracks; the movable wind turbine installation device comprises a main frame, a wind turbine installation frame and a moving device, the wind turbine installation frame is installed on the main frame and is used to hold the wind turbine, and the moving device is installed at the bottom of the main frame and is used to drive the movable wind turbine installation device to move along each track as a whole.
2. The fan installation system based on the movable fan installation device according to claim 1 is characterized in that: The wind turbine installation system also includes a wind turbine installation vessel; a third track is installed on the wind turbine installation vessel, and the third track can be docked with the first track.
3. The fan installation system based on the movable fan installation device according to claim 1 or 2, characterized in that: The fan mounting frame is installed on one side of the main frame, and includes a lifting device, a hydraulic telescopic rod and a clamp. One end of the hydraulic telescopic rod is installed on the lifting device, and the clamp is installed on the other end. The hydraulic telescopic rod can be extended and retracted. The lifting device drives the hydraulic telescopic rod to move to a suitable height and cooperates with the hydraulic telescopic rod to extend and retract itself to a suitable length, and then the clamp is opened or closed to complete the lifting or lowering of the fan.
4. The fan installation system based on the movable fan installation device according to claim 3 is characterized in that: A counterweight plate is installed on the other side of the main frame for filling the counterweight.
5. The fan installation system based on the movable fan installation device according to claim 2, characterized in that: The third rail is arranged along the longitudinal direction of the wind turbine installation ship and close to the side.
6. The fan installation system based on the movable fan installation device according to claim 1, characterized in that: The moving device is connected to the main frame through a steering gear.
7. The fan installation system based on the movable fan installation device according to claim 1, characterized in that: The second track is arranged close to the shore of the pier.
8. A method for installing a dock fan, characterized in that: The fan installation system based on the movable fan installation device according to claim 1 comprises: Complete the overall assembly of the wind turbine at the dock; The movable fan installation equipment moves along the first track to the side of the fan, adjusts the hydraulic telescopic rod to a suitable height through the lifting device of the fan installation frame, and adjusts the clamp to a suitable position to hold the fan by extending and retracting the hydraulic telescopic rod to complete the loading of the fan; The movable wind turbine installation device moves along the first track and then changes track through a diverter to drive into the second track; The floating foundation is docked at the pier, and the movable wind turbine installation equipment moves along the second track to the side of the floating platform. The position of the wind turbine is adjusted by telescopic rods of the wind turbine installation frame. When the bottom of the wind turbine reaches the position directly above the floating foundation, the lifting device of the wind turbine installation frame drives the telescopic rod to descend so that the wind turbine and the floating foundation are docked. The fan mounting bracket clamps are released from the fan, and the installation of the dock fan is completed.
9. A method for installing an offshore wind turbine, characterized in that: The fan installation system based on the movable fan installation device according to claim 2 comprises: Complete the overall assembly of the wind turbine at the dock; The movable fan installation equipment moves along the first track to the side of the fan, adjusts the hydraulic telescopic rod to a suitable height through the lifting device of the fan installation frame, and adjusts the clamp to a suitable position to hold the fan by extending and retracting the hydraulic telescopic rod to complete the loading of the fan; The wind turbine installation ship is docked at the pier so that the third track is docked with the first track. The movable wind turbine installation equipment is moved along the first track to the wind turbine installation ship to complete the loading, and then moved along the third track to the mid-ship position. The wind turbine installation ship sails to the installation sea area. When the wind turbine installation ship reaches the docking position, the movable wind turbine installation equipment moves on the third track to the side of the floating foundation. The position of the wind turbine is adjusted by telescopic rods of the wind turbine installation frame. When the bottom of the wind turbine reaches the position just above the floating foundation, the lifting device of the wind turbine installation frame drives the telescopic rod to descend so that the wind turbine and the floating foundation are docked. The wind turbine mounting bracket clamp is released and the wind turbine is unloaded from the ship, completing the installation of the offshore wind turbine.
10. The fan installation method according to claim 8 or 9, characterized in that: After the wind turbine is lifted, the hydraulic telescopic rod of the wind turbine installation frame is controlled in a coordinated manner. According to the tilt direction and degree of the movable wind turbine installation equipment, the telescopic amount of the hydraulic telescopic rod is adjusted to keep the overall stability of the movable wind turbine installation equipment. After the wind turbines are loaded on board and during the docking process of offshore wind turbines, the ballast water regulation system of the wind turbine installation ship is used to adjust the ship's buoyancy to keep the ship stable.