Inspection monitoring device for intelligent construction site
By designing a patrol and monitoring device for movable mounting frame and protective cover, the impact of dust and raindrops on the construction site on the monitoring components is solved, the height and angle adjustment of the monitoring components and the cleaning of the protective cover are realized, and the use of the monitoring devices is improved. Convenience and reliability.
Patent Information
- Application Number
- CN202510013277.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-06
- Publication Date
- 2025-02-18
AI Technical Summary
The existing inspection devices are easily covered by dust at the construction site, which affects the monitoring screen. Condensation of raindrops on the protective cover on rainy days will affect the use of monitoring components.
A patrol and monitoring device for smart construction sites is designed, and a movable mounting frame and protective cover are provided. The mounting frame is equipped with a drive assembly that allows the height and angle adjustment of the monitoring assembly, and can be moved to the outside of the protective cover during rainy days to prevent raindrops from affecting it. The bottom of the protective cover is open, fixed to the lower side of the mounting frame, and is equipped with an annular scraper and cleaning scraper for cleaning the protective cover.
Effectively reduce the impact of dust on the monitoring component, avoid the influence of raindrops on the protective cover on the monitoring component on the monitoring component on the rainy day. The angle and height of the monitoring component are adjustable, and can be used for cleaning of the protective cover during the adjustment process, which facilitates the monitoring device. use.
Smart Images

Figure CN119467968A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of monitoring devices, and in particular to a patrol monitoring device for a smart construction site. Background Art
[0002] Smart construction site refers to the use of information technology to accurately design and monitor construction projects, realize visual intelligent management of construction projects, and gradually realize green construction and ecological construction. In order to realize the collection of elements in smart construction sites and ensure the safety of construction sites, it is usually necessary to set up inspection devices to monitor the construction site. At present, common inspection devices are usually cameras, but cameras are exposed to the construction site environment during daily use. Affected by the construction site, the camera is easily covered with dust, which affects the camera monitoring screen, making the monitoring device in the inspection component inconvenient to use. Summary of the invention
[0003] The technical problem to be solved by the present invention is to overcome the existing defects and provide an inspection and monitoring device for a smart construction site. The device is provided with a protective cover for protecting the monitoring components, which can effectively reduce the impact of dust on the monitoring components in the construction site, and the monitoring components can be moved to the outside of the protective cover on rainy days to avoid the impact of condensation of raindrops on the protective cover on the use of the monitoring components. The angle and height of the monitoring components are both adjustable, and the protective cover can also be used for cleaning during the adjustment process, which is convenient for the use of the monitoring device and can effectively solve the problems in the background technology.
[0004] To achieve the above-mentioned objectives, the present invention provides the following technical solutions: a patrol monitoring device for a smart construction site, comprising a patrol rail, a movable mounting frame is provided on the patrol rail, and a driving assembly is provided on the side of the mounting frame, a mounting plate is provided below the mounting frame, and a telescopic assembly for adjusting the height of the mounting plate is provided on the side of the mounting frame, a monitoring assembly is provided on the lower side of the mounting plate, and a rotating assembly for adjusting the angle of the monitoring assembly is provided on the side of the mounting plate, a transparent protective cover is provided on the outer cover of the monitoring assembly, and the bottom of the protective cover is open, and the protective cover is fixed to the lower side of the mounting frame.
[0005] As a preferred technical solution of the present invention, a positioning wheel is slidably arranged in the inspection guide rail, and the positioning wheel is rotatably installed on the side of the mounting frame. The driving assembly includes a motor installed on the side of the mounting frame, and the output shaft of the motor is connected and fixed to the middle of one of the side surfaces of the positioning wheel.
[0006] As a preferred technical solution of the present invention, a mounting seat is fixed on the side of the mounting plate, the monitoring component is rotatably installed in the mounting seat, and the rotating component includes a first adjusting motor installed on the side of the mounting seat, and the output shaft of the first adjusting motor is connected to the side of the monitoring component.
[0007] As a preferred technical solution of the present invention, the telescopic assembly includes an electric telescopic rod installed on the side of the mounting frame, and the telescopic end of the electric telescopic rod is connected and fixed to the middle part of the side of the mounting plate.
[0008] As a preferred technical solution of the present invention, the rotating assembly also includes a second adjusting motor, which is installed at the telescopic end of the electric telescopic rod, and the output shaft of the second adjusting motor is connected and fixed to the middle of the side of the mounting plate.
[0009] As a preferred technical solution of the present invention, an annular scraper is installed on the side of the mounting plate, and the side of the annular scraper contacts the inner side of the protective cover. A fixing seat is fixed on the side of the mounting plate, and a cleaning scraper is installed on the side of the fixing seat, and the cleaning scraper contacts the outer side of the protective cover.
[0010] As a preferred technical solution of the present invention, a backup battery pack is arranged on the side of the mounting frame, and a protective frame and a shielding plate for protecting the backup battery pack are arranged on the side of the mounting frame.
[0011] Compared with the prior art, the present invention has the following beneficial effects: The patrol monitoring device for smart construction sites illustrated in the present invention is provided with a protective cover for protecting the monitoring components, which can effectively reduce the impact of dust on the monitoring components at the construction site. The monitoring components can be moved to the outside of the protective cover on rainy days to prevent condensation of raindrops on the protective cover from affecting the use of the monitoring components. The angle and height of the monitoring components are both adjustable, and the protective cover can also be used to clean the adjustment process, which facilitates the use of the monitoring device. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a structural schematic diagram of the present invention; Figure 2 for Figure 1 Another perspective structural diagram; Figure 3 for Figure 1 A schematic diagram of the cross-sectional structure of the middle protective cover; Figure 4 for Figure 3 Schematic diagram of the front view structure.
[0013] In the figure: 1 inspection guide rail, 2 mounting frame, 3 positioning wheel, 4 motor, 5 protective cover, 6 monitoring component, 7 mounting plate, 8 mounting seat, 9 first adjusting motor, 10 electric telescopic rod, 11 second adjusting motor, 12 annular scraper, 13 fixing seat, 14 cleaning scraper, 15 spare battery pack, 16 protective frame, 17 shielding plate. DETAILED DESCRIPTION
[0014] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0015] See also Figure 1-4 The present invention provides a technical solution: an inspection and monitoring device for a smart construction site, comprising an inspection guide rail 1, which is set in an area that needs to be inspected, a movable mounting frame 2 is arranged on the inspection guide rail 1, and a driving component is arranged on the side of the mounting frame 2, and a positioning wheel 3 is slidably arranged in the inspection guide rail 1. Preferably, positioning wheels 3 are arranged on both the upper and lower sides of the inspection guide rail 1, and the mounting frame 2 is supported and positioned by clamping the positioning wheels 3 arranged up and down on the outside of the inspection guide rail 1. Multiple groups of positioning wheels 3 are arranged to improve the structural strength of the installation of the mounting frame 2 and ensure the stability of the mounting frame 2 when it moves; the positioning wheel 3 is rotatably installed on the side of the mounting frame 2 through the installation shaft, and the driving component comprises a motor 4 installed on the side of the mounting frame 2, and the output shaft of the motor 4 is connected and fixed to the middle part of the side of one of the positioning wheels 3, and the motor 4 is controlled to work, and one of the positioning wheels 3 is driven by the motor 4 to rotate, so that the positioning wheel 3 is used as a driving wheel, which is convenient for the mounting frame 2 to move on the inspection guide rail 1.
[0016] A mounting plate 7 is provided below the mounting frame 2, and a telescopic assembly for adjusting the height of the mounting plate 7 is provided on the side of the mounting frame 2. The telescopic assembly includes an electric telescopic rod 10 installed on the side of the mounting frame 2. The telescopic end of the electric telescopic rod 10 is connected and fixed to the middle of the side of the mounting plate 7. The electric telescopic rod 10 includes but is not limited to a servo electric rod or an electric push rod. The electric telescopic rod 10 is controlled to work. The mounting plate 7 is driven up and down by the set electric telescopic rod 10, which is convenient for adjusting the height position of the mounting plate 7. The mounting frame 2 can also be raised and lowered by rotating the screw driven by a motor.
[0017] A monitoring component 6 is arranged on the lower side of the mounting plate 7. The driving component drives the mounting frame 2 to move, so that the mounting frame 2 drives the monitoring component 6 on the side of the mounting plate 7 to move, thereby increasing the monitoring range of the monitoring component 6 and facilitating the use of the monitoring device during inspections at the construction site. The mounting plate 7 is driven to move by the electric telescopic rod 10 to adjust the height position of the monitoring component 6, which facilitates the use of the monitoring component 6. It should be noted that the monitoring information of the monitoring component 6 is transmitted to the external terminal by wireless transmission, which adopts the existing technology.
[0018] A rotating component for adjusting the angle of the monitoring component 6 is arranged on the side of the mounting plate 7, and a mounting seat 8 is fixed on the side of the mounting plate 7. The monitoring component 6 is rotatably installed in the mounting seat 8 through the mounting shaft. The rotating component includes a first adjusting motor 9 installed on the side of the mounting seat 8. The output shaft of the first adjusting motor 9 is connected to the side of the monitoring component 6. The monitoring component 6 is driven by the first adjusting motor 9 to rotate up and down to adjust the angle of the monitoring component 6, which is convenient for the use of the monitoring component 6.
[0019] The rotating assembly also includes a second adjusting motor 11, which is installed at the telescopic end of the electric telescopic rod 10, and the output shaft of the second adjusting motor 11 is connected and fixed to the middle part of the side of the mounting plate 7. The second adjusting motor 11 is set to drive the mounting plate 7 to rotate left and right, which facilitates the use of the monitoring assembly 6.
[0020] A transparent protective cover 5 is provided on the outer cover of the monitoring component 6. The material of the protective cover 5 includes but is not limited to glass or plastic, and the bottom of the protective cover 5 is open. The protective cover 5 is fixed to the lower side of the mounting frame 2. During daily use, the monitoring component 6 is protected by the protective cover 5 to reduce the adhesion of dust on the outer side of the monitoring component 6, which is convenient for the use of the monitoring component 6. On rainy days, the monitoring component 6 is moved out of the protective cover 5 by driving the mounting plate 7 through the electric telescopic rod 10 to avoid water droplets adhering to the outer side of the protective cover 5 and affecting the use of the monitoring component 6. After the monitoring component 6 is moved out of the protective cover 5, the protective cover 5 is located directly above the monitoring component 6 and plays a certain role in shielding from rain.
[0021] An annular scraper 12 is installed on the side of the mounting plate 7, and the side of the annular scraper 12 contacts the inner side of the protective cover 5. When the electric telescopic rod 10 drives the mounting plate 7 to move, the annular scraper 12 installed on the side of the mounting plate 7 cleans the inside of the protective cover 5; a fixing seat 13 is fixed to the side of the mounting plate 7, and a cleaning scraper 14 is installed on the side of the fixing seat 13. The cleaning scraper 14 contacts the outer side of the protective cover 5. When the second adjusting motor 11 drives the mounting plate 7 to rotate, the fixing seat 13 installed on the side of the mounting plate 7 drives the cleaning scraper 14 to move to clean the outer side of the protective cover 5, which is convenient for the use of the protective cover 5.
[0022] A backup battery pack 15 is arranged on the side of the mounting frame 2. The backup battery pack 15 includes but is not limited to a lithium battery pack or a graphene battery pack. A protective frame 16 and a shielding plate 17 for protecting the backup battery pack 15 are arranged on the side of the mounting frame 2 to facilitate the installation and use of the backup battery pack 15.
[0023] The motor 4, monitoring component 6, first adjusting motor 9, electric telescopic rod 10, second adjusting motor 11, backup battery pack 15, etc. used in the present invention are all commonly used electronic components in the prior art, and their working methods and circuit structures are all well-known technologies. The operation of the electronic components in the present invention is controlled by a set switch group or PLC controller. This method is a commonly used technical means for technicians and will not be elaborated here.
[0024] The undisclosed parts in the present invention are all prior art, and their specific structures, materials and working principles are not described in detail. Although the embodiments of the present invention have been shown and described, it is understood by those skilled in the art that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the attached claims and their equivalents.
Claims
1. A patrol monitoring device for a smart construction site, comprising a patrol guide rail (1), characterized in that: A movable mounting frame (2) is arranged on the inspection guide rail (1), and a driving component is arranged on the side of the mounting frame (2); a mounting plate (7) is arranged below the mounting frame (2), and a telescopic component for adjusting the height of the mounting plate (7) is arranged on the side of the mounting frame (2); a monitoring component (6) is arranged on the lower side of the mounting plate (7), and a rotating component for adjusting the angle of the monitoring component (6) is arranged on the side of the mounting plate (7); a transparent protective cover (5) is arranged on the outer side of the monitoring component (6), and the bottom of the protective cover (5) is open; the protective cover (5) is fixed to the lower side of the mounting frame (2).
2. The inspection and monitoring device for a smart construction site according to claim 1, characterized in that: A positioning wheel (3) is slidably arranged in the inspection guide rail (1), and the positioning wheel (3) is rotatably mounted on the side of the mounting frame (2). The driving assembly comprises a motor (4) mounted on the side of the mounting frame (2), and the output shaft of the motor (4) is connected and fixed to the middle part of the side of one of the positioning wheels (3).
3. The inspection and monitoring device for a smart construction site according to claim 1, characterized in that: A mounting seat (8) is fixed to the side of the mounting plate (7), the monitoring component (6) is rotatably mounted in the mounting seat (8), and the rotating component comprises a first adjusting motor (9) mounted on the side of the mounting seat (8), the output shaft of the first adjusting motor (9) being connected to the side of the monitoring component (6).
4. The inspection and monitoring device for a smart construction site according to claim 1 is characterized in that: The telescopic assembly comprises an electric telescopic rod (10) mounted on a side of the mounting frame (2), the telescopic end of the electric telescopic rod (10) being connected and fixed to the middle of a side of the mounting plate (7).
5. The inspection and monitoring device for a smart construction site according to claim 4 is characterized in that: The rotating assembly further comprises a second adjusting motor (11), the second adjusting motor (11) being mounted at the telescopic end of the electric telescopic rod (10), and the output shaft of the second adjusting motor (11) being connected and fixed to the middle part of the side of the mounting plate (7).
6. The inspection and monitoring device for a smart construction site according to claim 1, characterized in that: An annular scraper (12) is mounted on the side of the mounting plate (7), and the side of the annular scraper (12) contacts the inner side of the protective cover (5). A fixing seat (13) is fixed on the side of the mounting plate (7), and a cleaning scraper (14) is mounted on the side of the fixing seat (13), and the cleaning scraper (14) contacts the outer side of the protective cover (5).
7. The inspection and monitoring device for a smart construction site according to claim 1, characterized in that: A backup battery pack (15) is arranged on the side of the mounting frame (2), and a protection frame (16) and a shielding plate (17) for protecting the backup battery pack (15) are arranged on the side of the mounting frame (2).