Intelligent inspection and report generation method based on panoramic data

Through intelligent inspection and report generation methods based on panoramic data, the problems of time-consuming and difficult to review inspection records are solved, and efficient and visual inspection dynamic monitoring and report generation are realized, which saves travel and economic costs. Video archives were created to avoid risks.

CN119477284AInactive Publication Date: 2025-02-18HUAIBEI MINING GRP ENG CONSTR

Patent Information

Application Number
CN202411702735.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-26
Publication Date
2025-02-18
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the existing technology, inspection records are sorted out a lot of time, acceptance and audit are difficult to review, and inspection efficiency is low and safety problems are prominent.

Method used

Intelligent inspection and report generation methods based on panoramic data are adopted, and highly visual inspection dynamic monitoring and report generation are achieved through steps such as virtual data entry, coordinate matching, observation point selection, real-life data acquisition, observation point comparison and report generation.

Benefits of technology

It realizes the real-time dynamics of the project in a highly visual way, track the progress of construction work, save travel time and economic costs, and establish video files to avoid risks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119477284A_ABST
    Figure CN119477284A_ABST
Patent Text Reader

Abstract

The invention discloses an intelligent inspection and report generation method based on panoramic data, and relates to the technical field of intelligent inspection. Comprising the steps that a planar graph of engineering design and a BIM data model are input into a workbench, a rectangular plane coordinate system is established according to the planar graph, the coordinate system is matched with the BIM data model, a worker selects an observation point in the planar graph and determines an actual building point location corresponding to the observation point, and an inspection worker carries a safety helmet with a camera shooting function. An actual building point position image is shot, real scene data is obtained and stored in a cloud database, a worker selects an observation point in the planar graph, the workbench calls the BIM data model position corresponding to the observation point and the real scene data and compares the BIM data model position and the real scene data, and an inspection report is generated and output after a comparison result is obtained. According to the invention, the real-time dynamic state of the project can be known in a highly visual manner, the construction period progress is ensured, and the travel time and the economic cost are saved at the same time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of intelligent inspection technology, and in particular to an intelligent inspection and report generation method based on panoramic data. Background Art

[0002] With the development of digital technology, some new park projects have continuously improved their inspection requirements during construction and operation and maintenance, and have higher requirements for inspection safety, inspection efficiency and automation. However, the current traditional inspection solutions are mainly based on manual inspections or manually operated drones, which consume a lot of labor, have low inspection efficiency, prominent safety issues, and the inspection records cannot be kept in an orderly manner.

[0003] Therefore, it is an urgent problem for technical personnel in this field to provide an intelligent inspection and report generation method based on panoramic data to solve the defects in the prior art that inspection record compilation consumes a lot of time, and acceptance and audit are difficult to review the workload. Summary of the invention

[0004] In view of this, the present invention provides an intelligent inspection and report generation method based on panoramic data, which can understand the real-time dynamics of the project in a highly visual way, ensure the progress of the construction period, and save travel time and economic costs.

[0005] In order to achieve the above object, the present invention adopts the following technical solution:

[0006] An intelligent inspection and report generation method based on panoramic data includes the following steps:

[0007] Virtual data entry step: input the floor plan and BIM data model of the engineering design into the workbench;

[0008] Coordinate matching step: Establish a plane rectangular coordinate system based on the plan, and match the coordinate system with the BIM data model;

[0009] Observation point selection steps: The staff selects the observation point in the plan and determines the actual building point corresponding to the observation point;

[0010] Real-scene data acquisition steps: The inspectors wear safety helmets with camera functions, take images of actual building locations, obtain real-scene data and store them in the cloud database;

[0011] Observation point comparison steps: The staff selects the observation point in the plan, and the workbench retrieves the BIM data model position and real-scene data corresponding to the observation point and compares them to obtain the comparison result;

[0012] Report generation steps: Generate an inspection report based on the comparison results and output it.

[0013] In the above method, optionally, in the coordinate matching step, the coordinate system matching includes converting the plane rectangular coordinates into BIM model coordinates using a coordinate conversion matrix.

[0014] In the above method, optionally, in the observation point selection step, the observation points are selected as points of important units that can cover the surveying and mapping area.

[0015] In the above method, optionally, in the model building step, in the observation point selection step, locating the actual building point includes:

[0016] S1. Identify all entity units in the BIM model, obtain the outer rectangular frames of all entity units, obtain the vertex coordinates of each outer rectangular frame, and obtain the center point coordinates based on the vertex coordinates of the outer rectangular frame;

[0017] S2, calculating the distance between the selected coordinates of the BIM model and the coordinates of the center point of each outer rectangular frame as the first distance;

[0018] S3, selecting the minimum value among all the first distances as the unit distance, and determining the position distance between the selected coordinates and the entity unit and the first outer bounding rectangular frame;

[0019] S4, calculating the distance between all planes of the first outer rectangular frame and the selected coordinates as the second distance;

[0020] S5. Select the shortest second distance as the plane distance, determine the second plane, and finally determine the actual building point.

[0021] In the above method, optionally, a memory card and a wireless communication unit are arranged inside the safety helmet;

[0022] When a wireless signal is detected, the wireless communication unit is controlled to transmit data;

[0023] When the wireless signal strength is not enough for stable transmission, the memory card stores the video data.

[0024] In the above method, optionally, the observation point comparison step includes algorithm comparison and manual comparison.

[0025] It can be seen from the above technical solution that compared with the prior art, the present invention provides an intelligent inspection and report generation method based on panoramic data, which has the following beneficial effects; the present invention can understand the real-time dynamics of the project in a highly visual way, track the progress of work in construction, ensure the progress of the construction period, while saving travel time and economic costs, and establish video archives to avoid risks. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without paying creative work.

[0027] Figure 1 A flow chart of an intelligent inspection and report generation method based on panoramic data disclosed in the present invention;

[0028] Figure 2 The present invention is a flowchart of the method for locating actual building points disclosed in the present invention. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] In this application, relational terms such as first and second, etc. are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. The terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of more restrictions, the elements defined by the sentence "comprise one..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0031] Reference Figure 1 As shown, the present invention discloses an intelligent inspection and report generation method based on panoramic data, comprising the following steps:

[0032] Virtual data entry step: input the floor plan and BIM data model of the engineering design into the workbench;

[0033] Coordinate matching step: Establish a plane rectangular coordinate system based on the plan, and match the coordinate system with the BIM data model;

[0034] Observation point selection steps: The staff selects the observation point in the plan and determines the actual building point corresponding to the observation point;

[0035] Real-scene data acquisition steps: The inspectors wear safety helmets with camera functions, take images of actual building locations, obtain real-scene data and store them in the cloud database;

[0036] Observation point comparison steps: The staff selects the observation point in the plan, and the workbench retrieves the BIM data model position and real-scene data corresponding to the observation point and compares them to obtain the comparison result;

[0037] Report generation steps: Generate an inspection report based on the comparison results and output it.

[0038] Furthermore, in the coordinate matching step, coordinate system matching includes converting plane rectangular coordinates into BIM model coordinates using a coordinate conversion matrix.

[0039] Furthermore, the coordinate system conversion is specifically: performing three types of transformations between the plane rectangular coordinate system and the BIM model coordinate system: translation, rotation and scaling. The conversion matrix can be expressed as:

[0040]

[0041] Where (m',n') is the BIM model coordinate, k is the scaling factor, is the rotation matrix, θ is the rotation angle, and (p,q) is the displacement.

[0042] Furthermore, in the observation point selection step, the observation points are selected as points of important units that can cover the surveying and mapping area.

[0043] Specifically, when selecting observation points, try to choose those that are stable and not easily disturbed by external factors. In addition, the location of the observation point should be as far away as possible from factors that may cause interference, such as high-voltage cables, water pipes, etc.

[0044] Further, see Figure 2 As shown in the figure, in the model building step, in the observation point selection step, locating the actual building point includes:

[0045] S1. Identify all entity units in the BIM model, obtain the outer rectangular frames of all entity units, obtain the vertex coordinates of each outer rectangular frame, and obtain the center point coordinates based on the vertex coordinates of the outer rectangular frame;

[0046] S2, calculating the distance between the selected coordinates of the BIM model and the coordinates of the center point of each outer rectangular frame as the first distance;

[0047] S3, selecting the minimum value among all the first distances as the unit distance, and determining the position distance between the selected coordinates and the entity unit and the first outer bounding rectangular frame;

[0048] S4, calculating the distance between all planes of the first outer rectangular frame and the selected coordinates as the second distance;

[0049] S5. Select the shortest second distance as the plane distance, determine the second plane, and finally determine the actual building point.

[0050] Further, a vertical projection of the selected coordinates on the second plane is determined, the actual building point position is determined based on the projection point position, and the building point position is sent to a cloud storage unit.

[0051] Furthermore, the safety helmet receives the observation points in the cloud storage unit, and the inspectors go to inspect. When the safety helmet detects that the inspectors have arrived at the corresponding points, the camera function is automatically turned on to take pictures of the corresponding images of the observation points.

[0052] Furthermore, a memory card and a wireless communication unit are arranged inside the safety helmet;

[0053] When a wireless signal is detected, the wireless communication unit is controlled to transmit data;

[0054] When the wireless signal strength is not enough for stable transmission, the memory card stores the video data.

[0055] Furthermore, when the video data is stored in a memory card, the inspection personnel need to use an internet-enabled terminal to read the contents of the memory card and upload it to a cloud storage unit.

[0056] Furthermore, the observation point comparison step includes algorithm comparison and manual comparison.

[0057] Specifically, the algorithm comparison includes capturing image data in the video and image data of the BIM model, respectively extracting image contours and performing comparative detection.

[0058] Furthermore, in the report generation step, the generated report is stored in a cloud storage unit according to the date to facilitate subsequent verification.

[0059] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can refer to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the system or system embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can refer to the partial description of the method embodiment. The system and system embodiments described above are merely schematic, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without creative work.

[0060] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.

Claims

1. An intelligent inspection and report generation method based on panoramic data, characterized in that: The following steps are involved: Virtual data entry step: input the floor plan and BIM data model of the engineering design into the workbench; Coordinate matching step: Establish a plane rectangular coordinate system based on the plan, and match the coordinate system with the BIM data model; Observation point selection steps: The staff selects the observation point in the plan and determines the actual building point corresponding to the observation point; Real-scene data acquisition steps: The inspectors wear safety helmets with camera functions, take images of actual building locations, obtain real-scene data and store them in the cloud database; Observation point comparison steps: The staff selects the observation point in the plan, and the workbench retrieves the BIM data model position and real-scene data corresponding to the observation point and compares them to obtain the comparison result; Report generation steps: Generate an inspection report based on the comparison results and output it.

2. The method for intelligent inspection and report generation based on panoramic data according to claim 1, characterized in that: In the coordinate matching step, coordinate system matching includes converting plane rectangular coordinates into BIM model coordinates using a coordinate conversion matrix.

3. The method for intelligent inspection and report generation based on panoramic data according to claim 1, characterized in that: In the observation point selection step, the observation points are selected as points of important units that can cover the surveying and mapping area.

4. The method for intelligent inspection and report generation based on panoramic data according to claim 1, characterized in that: In the observation point selection step, locating the actual building point includes: S1. Identify all entity units in the BIM model, obtain the outer rectangular frames of all entity units, obtain the vertex coordinates of each outer rectangular frame, and obtain the center point coordinates based on the vertex coordinates of the outer rectangular frame; S2, calculating the distance between the selected coordinates of the BIM model and the coordinates of the center point of each outer rectangular frame as the first distance; S3, selecting the minimum value among all the first distances as the unit distance, and determining the position distance between the selected coordinates and the entity unit and the first outer bounding rectangular frame; S4, calculating the distance between all planes of the first outer rectangular frame and the selected coordinates as the second distance; S5. Select the shortest second distance as the plane distance, determine the second plane, and finally determine the actual building point.

5. The method for intelligent inspection and report generation based on panoramic data according to claim 1, characterized in that: A memory card and a wireless communication unit are arranged inside the safety helmet; When a wireless signal is detected, the wireless communication unit is controlled to transmit data; When the wireless signal strength is not enough for stable transmission, the memory card stores the video data.

6. The method for intelligent inspection and report generation based on panoramic data according to claim 1, characterized in that: The observation point comparison steps include algorithm comparison and manual comparison.

Citation Information

Patent Citations

  • Bridge disease automatic positioning method and system based on unmanned aerial vehicle inspection and BIM model

    CN118134934A

  • Engineering measurement and verification method and system based on digital twinborn and depth estimation algorithm

    CN118410539A

  • Cross-image-source building construction problem automatic tracking system and method

    CN118968423A

Cited By

  • AI intelligent detection system and method based on panorama and BIM

    CN121921642A