Safety construction platform for bridge diaphragm plate
By designing an adjustable bridge partition safety construction platform, the problem that existing platforms are difficult to adapt to different bridge gap sizes is solved, and higher applicability and safety are achieved.
Patent Information
- Application Number
- CN202411628776.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-14
- Publication Date
- 2025-02-25
AI Technical Summary
Due to the fixed size of the existing bridge partition construction platform, it is difficult to meet the construction needs of different gap sizes between different bridges, resulting in the need to be equipped with multiple platforms, which is cumbersome and inconvenient.
A bridge cross-dividing plate safety construction platform is designed. By setting up a third longitudinal rod to connect the second transverse rod and the fixing frame, and connecting the first transverse rod to connect the first transverse rod, the distance between the first transverse rod and the third transverse rod is adjusted, thereby adjusting the length of the second transverse rod and the first transverse rod to meet the needs of different bridge gap sizes.
The platform can be easily resized to adapt to the gap sizes of different bridges, improving the applicability and efficiency of use. At the same time, by setting up telescopic guardrails and fixed guardrails, the safety of construction personnel is improved and the risk of falling is reduced.
Smart Images

Figure CN119507333A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of construction platforms, in particular to a bridge diaphragm safety construction platform. Background Art
[0002] The bridge diaphragm safety construction platform refers to a structural platform specially designed to ensure the safety of construction workers and improve construction efficiency during the bridge construction process. These platforms are usually used for bridge diaphragm installation, welding, formwork installation and other operations. They can adapt to the special construction environment of the narrow space of the bridge.
[0003] Existing construction platforms are usually hoisted down from the bridge deck through the gaps between the bridges, and then the platform is connected to the bridge deck or embedded steel bars to fix the position of the platform. Construction workers then enter the platform and perform operations such as installation and welding of bridge diaphragms. During long-term use and observation, it is found that existing construction platforms are usually in the form of hanging basket structures, and their sizes are usually fixed. As a result, when constructing different bridges, due to the different sizes of gaps between different bridges, it is necessary to equip a variety of construction platforms, which leads to cumbersome problems.
[0004] To this end, the present invention provides a safe construction platform for a bridge diaphragm. Summary of the invention
[0005] In order to make up for the deficiencies of the prior art and solve at least one problem raised in the background technology, a bridge diaphragm safety construction platform is proposed.
[0006] The technical solution adopted by the present invention to solve its technical problems is as follows: a bridge diaphragm safety construction platform described in the present invention comprises a first longitudinal bar; a plurality of first transverse bars are fixedly connected to the side wall of the first longitudinal bar; a second longitudinal bar is fixedly connected to the end of the first transverse bar; a plurality of second transverse bars are slidably connected to the middle of the second longitudinal bar; the second transverse bar is arranged between two first transverse bars close to each other; a fixing frame is fixedly connected to the side wall of the second transverse bar; the fixing frame is slidably matched with the first transverse bar; a third longitudinal bar is fixedly connected to the end of the second transverse bar; both the first longitudinal bar and the third longitudinal bar are fixedly connected to the ends of the vertical bar; a protective assembly is provided on the side wall of the vertical bar; a connecting assembly is provided on the top of the vertical bar; a plurality of support plates are fixedly connected to the connecting assembly; the plurality of support plates are symmetrically arranged; through the above structure, a third longitudinal bar is provided to connect the second transverse bar and the fixing frame, and cooperate with the first longitudinal bar to connect the first transverse bar, so that the distance between the first longitudinal bar and the third longitudinal bar can be adjusted conveniently, and at this time, the length of the second transverse bar and the first transverse bar can be adjusted to adapt to the gap size between different bridges, so as to improve the applicability during use.
[0007] Preferably, the protection assembly includes two groups of telescopic guardrails; the two ends of the telescopic guardrails are respectively installed on a pair of side walls of the upright poles; the side walls of the upright poles are fixedly connected with fixed guardrails; the fixed guardrails are arranged vertically to the upright poles; through the above structure, telescopic guardrails and fixed guardrails are arranged, and the tops of the first cross bar and the second cross bar can be enclosed to improve the safety of construction workers during construction and reduce the occurrence of falling.
[0008] Preferably, the connecting assembly includes a sliding rod; the sliding rod is fixedly connected to the top of the vertical rod; a plurality of first fixing holes are opened in the middle of the sliding rod; a sleeve is slidably connected to the middle of the first fixing hole; a second fixing hole is opened in the side wall of the sleeve; a fixing pin is slidably matched with the second fixing hole and the first fixing hole; the two sleeve side walls close to each other are jointly fixed with a connecting rod; the side wall of the connecting rod is fixed with a support plate; through the above structure, the sliding rod and the first fixing hole and the sleeve are set, and the second fixing hole and the fixing pin are matched, so that the length between the sliding rod and the sleeve can be changed, so that the whole can adapt to the depth of different bridge diaphragm construction areas to improve applicability during use.
[0009] Preferably, a plurality of screws are threadedly connected to the top of the second longitudinal rod; the screws are correspondingly arranged with the second cross rod; a rotating rod is fixedly connected to the top of the screw; through the above structure, the screws and the rotating rod are arranged, which can facilitate the fixation of the position of the second cross rod during use, so as to improve the stability of the position of the second cross rod and reduce the shrinkage of the second cross rod during use.
[0010] Preferably, the side wall of the sleeve is fixed with a steel wire; the end of the steel wire is fixed with a lock buckle; through the above structure, the steel wire and the lock buckle are arranged, and the sleeve can be connected to the embedded steel bars of the bridge when in use, so as to improve the stability of the overall position and improve the safety during use.
[0011] Preferably, two groups of rings are fixedly connected to the top of the connecting rod; the number of the rings in each group is two; and a steel column is slidably fitted inside each group of rings; through the above structure, the rings and the steel columns are arranged, and when in use, the steel columns can be used to support both sides of the bridge gap to improve the stability of the overall position and reduce the possibility of falling.
[0012] The beneficial effects of the present invention are as follows:
[0013] 1. The bridge diaphragm safety construction platform described in the present invention can facilitate the adjustment of the distance between the first longitudinal bar and the third longitudinal bar by setting a third longitudinal bar to connect the second transverse bar and the fixed frame, and cooperate with the first longitudinal bar to connect the first transverse bar. At this time, the length of the second transverse bar and the first transverse bar can be adjusted to adapt to the gap size between different bridges to improve the applicability during use.
[0014] 2. The bridge diaphragm safety construction platform described in the present invention can enclose the top of the first cross bar and the second cross bar by setting a telescopic guardrail and a fixed guardrail, so as to improve the safety of construction workers during construction and reduce the possibility of falling. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The present invention will be further described below in conjunction with the accompanying drawings.
[0016] Figure 1 is a stereogram of the present invention;
[0017] Figure 2 It is a structural schematic diagram of the telescopic guardrail in the present invention;
[0018] Figure 3 It is a structural schematic diagram of a steel column in the present invention;
[0019] Figure 4 It is a structural schematic diagram of the first crossbar in the present invention.
[0020] Legend:
[0021] 1. First longitudinal rod; 11. Second longitudinal rod; 12. First cross rod; 13. Second cross rod; 14. Fixed frame; 15. Third longitudinal rod; 16. Support plate; 17. Vertical rod; 21. Telescopic guardrail; 22. Fixed guardrail; 3. Sliding rod; 31. First fixing hole; 32. Sleeve; 33. Second fixing hole; 34. Fixing pin; 35. Connecting rod; 4. Screw; 41. Rotating rod; 5. Steel wire; 51. Lock buckle; 6. Ring; 61. Steel column; 7. Fixing cone. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0023] Specific examples are given below.
[0024] like Figures 1 to 4As shown, a bridge diaphragm safety construction platform described in an embodiment of the present invention comprises a first longitudinal rod 1; a plurality of first cross bars 12 are fixedly connected to the side wall of the first longitudinal rod 1; a second longitudinal rod 11 is fixedly connected to the end of the first cross bar 12; a plurality of second cross bars 13 are slidably connected to the middle of the second longitudinal rod 11; the second cross bar 13 is arranged between two first cross bars 12 close to each other; a fixing frame 14 is fixedly connected to the side wall of the second cross bar 13; the fixing frame 14 slidably cooperates with the first cross bar 12; a third longitudinal rod 15 is fixedly connected to the end of the second cross bar 13; the ends of the first longitudinal rod 1 and the third longitudinal rod 15 are both fixedly connected to the ends of the vertical rod 17; a protective assembly is provided on the side wall of the vertical rod 17; a connecting assembly is provided on the top of the vertical rod 17; a plurality of support plates 16 are fixedly connected to the connecting assembly; the plurality of support plates 16 are symmetrically arranged; when working, when hoisting the platform, first pull the third longitudinal rod 15 away from the first longitudinal rod 12 according to the size of the gap between the bridges. A longitudinal bar 1 will cause the second cross bar 13 to slide. At this time, the distance between the first longitudinal bar 1 and the third longitudinal bar 15 can be extended. When it is extended to correspond to the bridge gap, the whole body will pass through the gap between the bridges, and then the support plates 16 will be hung on the surfaces on both sides of the bridge gap. At this time, the position of the whole body can be fixed, and then the operator will go down to the first cross bar 12 and the second cross bar 13 to construct the bridge cross diaphragm. After the construction is completed, the operator will leave and lift the whole body out from between the bridge gaps. Then, the third longitudinal bar 15 is pushed closer to the first longitudinal bar 1 to retract and reset the second cross bar 13. Through the above structure, the third longitudinal bar 15 is set to connect the second cross bar 13 and the fixed frame 14, and cooperate with the first longitudinal bar 1 to connect the first cross bar 12, which can facilitate the adjustment of the distance between the first longitudinal bar 1 and the third longitudinal bar 15. At this time, the length of the second cross bar 13 and the first cross bar 12 can be adjusted to adapt to the gap size between different bridges to improve the applicability during use.
[0025] like Figure 2 As shown, the protection component includes two groups of telescopic guardrails 21; the two ends of the telescopic guardrails 21 are respectively installed on the side walls of a pair of vertical poles 17; the side walls of the vertical poles 17 are fixedly connected with fixed guardrails 22; the fixed guardrails 22 are vertically arranged with the vertical poles 17; during operation, when the distance between the first longitudinal rod 1 and the third longitudinal rod 15 is pulled apart, the telescopic guardrail 21 will be in a stretched state, and when the first longitudinal rod 1 and the third longitudinal rod 15 are close to each other, the telescopic guardrail 21 will be in a contracted state. Through the above structure, the telescopic guardrails 21 and the fixed guardrails 22 are arranged, and the tops of the first cross bar 12 and the second cross bar 13 can be enclosed to improve the safety of construction workers during construction and reduce the possibility of falling.
[0026] like Figures 1 to 3As shown, the connecting assembly includes a slide bar 3; the slide bar 3 is fixedly connected to the top of the vertical pole 17; a plurality of first fixing holes 31 are opened in the middle of the slide bar 3; a sleeve 32 is slidably connected to the middle of the first fixing hole 31; a second fixing hole 33 is opened on the side wall of the sleeve 32; a fixing pin 34 is slidably matched in the second fixing hole 33 and the first fixing hole 31; a connecting rod 35 is fixedly connected to the side walls of the two sleeves 32 close to each other; the side wall of the connecting rod 35 is fixedly connected to the support plate 16; when working, when the depth of the bridge diaphragm construction is not At the same time, after taking out the fixing pin 34, the slide bar 3 is pulled to slide in the sleeve 32. At this time, the length between the sleeve 32 and the slide bar 3 can be changed to match the depth of construction. After aligning the first fixing hole 31 with the second fixing hole 33, the fixing pin 34 is inserted back. Through the above structure, the slide bar 3 is set with the first fixing hole 31 and the sleeve 32, and the second fixing hole 33 and the fixing pin 34 are matched. The length between the slide bar 3 and the sleeve 32 can be changed, so that the whole can adapt to the depth of different bridge diaphragm construction areas to improve applicability during use.
[0027] like Figure 4 As shown, a plurality of screw rods 4 are threadedly connected to the top of the second longitudinal rod 11; the screw rods 4 and the second cross rod 13 are correspondingly arranged; a rotating rod 41 is fixedly connected to the top of the screw rod 4; during operation, after the length between the first cross rod 12 and the second cross rod 13 is adjusted, the screw rod 4 can be driven to rotate by rotating the rotating rod 41, so that the end of the screw rod 4 moves toward the top of the second cross rod 13, and when the end of the screw rod 4 contacts the second cross rod 13, the position of the second cross rod 13 can be fixed, and after use, the rotating rod 41 can be reversely rotated to drive the screw 4 away from the second cross rod 13 to release the fixation. Through the above structure, the screw 4 and the rotating rod 41 are arranged, which can facilitate the fixation of the position of the second cross rod 13 during use, so as to improve the stability of the position of the second cross rod 13 and reduce the shrinkage of the second cross rod 13 during use.
[0028] like Figure 3 As shown, the side wall of the sleeve 32 is fixedly connected with a steel wire 5; the end of the steel wire 5 is fixedly connected with a lock buckle 51; during operation, after the whole is hoisted down to the construction position, the lock buckle 51 is hung on the embedded steel bars on the bridge gap, and the sleeve 32 can be connected to the embedded steel bars of the bridge through the steel wire 5 and the lock buckle 51 at this time, and the lock buckle 51 can be removed from the embedded steel bars after use. Through the above structure, the steel wire 5 and the lock buckle 51 are arranged, and the sleeve 32 can be connected to the embedded steel bars of the bridge during use, so as to improve the stability of the overall position and improve the safety during use.
[0029] like Figure 3As shown, two groups of collars 6 are fixedly connected to the top of the connecting rod 35; each group of collars 6 has two collars; each group of collars 6 is slidably fitted with a steel column 61; during operation, after the entire structure is lowered to the construction position, the steel column 61 is passed through the collars 6, and at this time, the steel column 61 is located on both sides of the bridge gap, so the entire structure can be protected. Through the above structure, the collars 6 and the steel column 61 are arranged, and when in use, the steel column 61 can be placed on both sides of the bridge gap to improve the stability of the overall position and reduce the possibility of falling.
[0030] like Figure 3 As shown, a plurality of fixed cones 7 are fixedly connected to the bottom of the support plate 16; during operation, when the support plate 16 is hung on the bridge deck, the fixed cones 7 at the bottom of the support plate 16 will contact the bridge deck. Through the above structure, the fixed cones 7 are arranged to connect the support plate 16, which can increase the friction between the support plate 16 and the bridge deck, so as to improve the stability of the position of the support plate 16.
[0031] like Figure 1 As shown, the telescopic guardrail 21 is made of stainless steel; by setting 21 to be made of stainless steel, the wear resistance and corrosion resistance of 21 during use can be improved to reduce damage caused by friction and corrosion.
[0032] Working principle: When installing the platform, first pull the third longitudinal rod 15 away from the first longitudinal rod 1 according to the size of the gap between the bridges. At this time, the second crossbar 13 will slide. At this time, the distance between the first longitudinal rod 1 and the third longitudinal rod 15 can be extended. When it is extended to correspond to the gap between the bridges, the whole body is passed through the gap between the bridges, and then the support plate 16 is hung on the surfaces on both sides of the gap of the bridge. At this time, the position of the whole body can be fixed, and then the operator goes down to the first crossbar 12 and the second crossbar 13 to construct the bridge diaphragm. After the construction is completed, the operator leaves and the whole body is lifted out from the gap between the bridges, and then the third longitudinal rod 15 is pushed to the first longitudinal rod. When the second cross bar 13 is retracted and reset, the third longitudinal bar 15 is pulled away from the first longitudinal bar 1 according to the size of the gap between the bridges. At this time, the second cross bar 13 will slide. At this time, the distance between the first longitudinal bar 1 and the third longitudinal bar 15 can be extended. When it is extended to correspond to the gap between the bridges, the whole body is passed through the gap between the bridges, and then the support plate 16 is hung on the surfaces on both sides of the gap between the bridges. At this time, the position of the whole body can be fixed, and then the operator goes down to the first cross bar 12 and the second cross bar 13 to construct the bridge diaphragm. After the construction is completed, the operator leaves and hoists the whole body out from between the gaps of the bridges, and then Pushing the third longitudinal rod 15 toward the first longitudinal rod 1 can retract and reset the second crossbar 13. When the depth of construction of the bridge diaphragm is different, the fixing pin 34 is taken out and then the slide bar 3 is pulled to slide in the sleeve 32. At this time, the length between the sleeve 32 and the slide bar 3 can be changed to match the depth of construction. After aligning the first fixing hole 31 with the second fixing hole 33, the fixing pin 34 is inserted back. After adjusting the length between the first crossbar 12 and the second crossbar 13, the screw rod 4 can be driven to rotate by rotating the rotating rod 41 to move the end of the screw rod 4 toward the top of the second crossbar 13. When the end of the screw rod 4 contacts the second crossbar 13, the screw rod 4 can be The position of the second cross bar 13 is fixed. After use, the rotating rod 41 can be rotated in the opposite direction to drive the screw rod 4 away from the second cross bar 13 to release it. After the whole is hoisted to the construction position, the lock buckle 51 is hung on the embedded steel bars on the bridge gap. At this time, the sleeve 32 and the embedded steel bars of the bridge can be connected with the lock buckle 51 through the steel wire 5. After use, the lock buckle 51 is removed from the embedded steel bars. When the whole is lowered to the construction position, the steel column 61 is passed through the ring 6. At this time, the steel column 61 is located on both sides of the bridge gap. At this time, the whole can be protected. When the support plate 16 is hung on the bridge deck, the fixed cone 7 at the bottom of the support plate 16 will contact the bridge deck.
[0033] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments. The above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.
Claims
1. A bridge diaphragm safety construction platform, comprising a first longitudinal bar (1); characterized in that: The first longitudinal rod (1) is fixedly connected to a plurality of first cross rods (12) at its side wall; the first cross rod (12) is fixedly connected to a second longitudinal rod (11) at its end; the second longitudinal rod (11) is slidably connected to a plurality of second cross rods (13) at its middle part; the second cross rod (13) is arranged between two first cross rods (12) that are close to each other; the second cross rod (13) is fixedly connected to a fixing frame (14) at its side wall; the fixing frame (14) is slidably matched with the first cross rod (12); the end of the second cross rod (13) is fixedly connected to a third longitudinal rod (15); the ends of the first longitudinal rod (1) and the third longitudinal rod (15) are both fixedly connected to a vertical rod (17); a protective component is provided on the side wall of the vertical rod (17); a connecting component is provided on the top of the vertical rod (17); a plurality of support plates (16) are fixedly connected to the connecting component; the plurality of support plates (16) are symmetrically arranged.
2. A bridge diaphragm safety construction platform according to claim 1, characterized in that: The protection assembly comprises two groups of telescopic guardrails (21); the two ends of the telescopic guardrails (21) are respectively mounted on the side walls of a pair of upright poles (17); the side walls of the upright poles (17) are fixedly connected with fixed guardrails (22); the fixed guardrails (22) are arranged perpendicular to the upright poles (17).
3. A bridge diaphragm safety construction platform according to claim 1, characterized in that: The connecting assembly comprises a sliding rod (3); the sliding rod (3) is fixedly connected to the top of the vertical rod (17); a plurality of first fixing holes (31) are opened in the middle of the sliding rod (3); a sleeve (32) is slidably connected to the middle of the first fixing hole (31); a second fixing hole (33) is opened on the side wall of the sleeve (32); a fixing pin (34) is slidably matched in the second fixing hole (33) and the first fixing hole (31); a connecting rod (35) is fixedly connected to the side walls of the two sleeves (32) close to each other; and a supporting plate (16) is fixedly connected to the side wall of the connecting rod (35).
4. A bridge diaphragm safety construction platform according to claim 1, characterized in that: The top of the second longitudinal rod (11) is threadedly connected to a plurality of screw rods (4); the screw rods (4) are arranged correspondingly to the second cross rod (13); and a rotating rod (41) is fixedly connected to the top of the screw rod (4).
5. A bridge diaphragm safety construction platform according to claim 3, characterized in that: A steel wire (5) is fixedly connected to the side wall of the sleeve (32); and a lock buckle (51) is fixedly connected to the end of the steel wire (5).
6. A bridge diaphragm safety construction platform according to claim 3, characterized in that: Two groups of collars (6) are fixedly connected to the top of the connecting rod (35); each group of collars (6) has two collars; and each group of collars (6) is slidably fitted with a steel column (61).
7. A bridge diaphragm safety construction platform according to claim 1, characterized in that: A plurality of fixed cones (7) are fixedly connected to the bottom of the support plate (16).
8. A bridge diaphragm safety construction platform according to claim 2, characterized in that: The telescopic guardrail (21) is made of stainless steel.