Single-pull center-pull rod curtain wall system and construction method thereof

By designing horizontal and vertical keels between the curtain wall glass in a rod-type glass curtain wall, and utilizing pre-compression blocks and sealing strips in a single-stretch through-core tie rod curtain wall system, the problem of exposed rods affecting aesthetics and safety has been solved, thus improving both aesthetics and safety.

CN119507613BActive Publication Date: 2025-11-04CHINA CONSTR EIGHT ENG DIV CORP LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411574686.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-11-06
Publication Date
2025-11-04
Estimated Expiration
2044-11-06

AI Technical Summary

Technical Problem

The existing rod (cable) glass curtain wall has exposed rods, which affects the overall aesthetics and makes it vulnerable to damage, thus affecting the safety of the curtain wall.

Method used

Design a single-stretch through-core tie rod curtain wall system, with horizontal and vertical keels located between two adjacent curtain wall glass panes. Pre-stressing blocks of the same weight as a single curtain wall glass pane are used to pre-stress the keels to ensure balance during tensioning. Adjustments are made during installation, and sealing strips and glass edge protectors are used to improve aesthetics and safety.

Benefits of technology

It reduces the space occupied by the curtain wall, improves the aesthetic appeal, and ensures the balance of the stress system after installation by using pre-compression blocks and sealing strips, avoiding large deformations and enhancing safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119507613B_ABST
    Figure CN119507613B_ABST
Patent Text Reader

Abstract

The present application relates to curtain wall installation technical field, especially to a single pull through core pull rod curtain wall system and construction method thereof. It comprises: a plurality of horizontal keels and a plurality of vertical keels which are fixed between the upper main structure and the lower main structure to form a grid, the horizontal keels are distributed at intervals and the length of the upper main structure is equal, the left and right ends of the horizontal keel are fixed with the corresponding support column, and the vertical keel is distributed at intervals between the adjacent two horizontal keels; a plurality of curtain walls, the curtain wall is distributed in the unit grid formed by the horizontal keel and the vertical keel, and the horizontal keel and the vertical keel are respectively located in the gap between the corresponding two curtain walls. Advantage: the horizontal keel and the vertical keel are located in the gap between the adjacent two curtain walls, which can not only reduce the occupation of the whole curtain wall to the building space, but also improve the observability of the appearance of the curtain wall.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the technical field of curtain wall installation, in particular to a single-pull through-core pull rod curtain wall system and a construction method thereof. BACKGROUND

[0002] The rod (cable) type glass curtain wall uses stainless steel pull rods or cables as supports, and the glass is connected with the pull rods or cables through metal fasteners and connecting pieces. This kind of rod curtain wall releases the occupation of the structural frame to the building space to a certain extent, but the rod members of this kind of rod type glass curtain wall are mostly in an exposed state, which affects the appearance on the one hand and the exposed rod members are easy to be damaged and affect the safety of the curtain wall on the other hand. In order to fully exert the advantages of the rod curtain wall and take into account the aesthetic effect of the whole curtain wall system, the present application is improved and designed and the construction process is optimized.

[0003] Therefore, the present application provides a single-pull through-core pull rod curtain wall system and a construction method thereof. SUMMARY

[0004] The present application aims to overcome the defects of the prior art, provide a single-pull through-core pull rod curtain wall and a construction method thereof, and solve the problems that the rod members of the existing rod (cable) type glass curtain wall are in an exposed state, affect the overall appearance, and the rod members are easy to be damaged and affect the safety of the curtain wall.

[0005] The present application provides a single-pull through-core pull rod curtain wall, which comprises: a plurality of horizontal keels and a plurality of vertical keels arranged in a grid shape and fixed between an upper main structure and a lower main structure, the horizontal keels are distributed at intervals up and down and have a length equal to that of the upper main structure, the left and right ends of the horizontal keel are fixedly connected with corresponding support columns, and the vertical keels are distributed at intervals left and right between adjacent two horizontal keels; a plurality of curtain wall glasses, which are distributed in unit grids formed by the horizontal keels and the vertical keels, and the horizontal keels and the vertical keels are respectively located in the gaps between the corresponding two curtain wall glasses.

[0006] Further, the horizontal keel comprises: a plurality of curtain wall beams located at the first side of the curtain wall glass, the two ends of the curtain wall beam are respectively fixedly connected with corresponding support columns, the curtain wall beam comprises a horizontal section and a vertical section, the vertical section is located at the first side of the curtain wall glass, the horizontal section is located between the upper and lower adjacent two curtain wall glasses, and the side face of the horizontal section away from the vertical section is flush with the second side of the curtain wall glass; and a plurality of horizontal frames, which are located at the second side of the curtain wall glass and fixedly connected with the horizontal sections of the corresponding curtain wall beams.

[0007] Further, the vertical keel comprises: a plurality of inserts, the plurality of inserts are fixed on the horizontal section of the curtain wall beam in intervals, and the two ends are inserted out of the curtain wall beam, the insert is located between the left and right adjacent two curtain wall glasses, and the upper and lower ends of the insert are provided with first grooves; a plurality of glass pads, the first end of the glass pad is inserted into the first groove at the upper and lower ends of the corresponding insert, the second end of the glass pad is provided with a limiting groove, and the glass pad abuts against the curtain wall glass on the left and right sides thereof; a plurality of hangers, one end of the hanger is provided with a limiting block, and the limiting block is inserted into the limiting groove at the second end of the corresponding glass pad; a plurality of receiving rods, the upper and lower ends of the receiving rod are provided with second grooves, and one end of the hanger away from the limiting block is inserted into the second groove at one end of the receiving rod; a plurality of vertical pull rods, the vertical pull rod is located between the adjacent two curtain wall beams, and the two ends of the vertical pull rod are respectively inserted into the second grooves of the corresponding receiving rods.

[0008] Further, it further comprises a plurality of first sealing rubber strips, and the plurality of first sealing rubber strips are located at the connection between the curtain wall beam and the horizontal frame and the curtain wall glass.

[0009] Further, it further comprises: a plurality of glass guards connected to the left and right sides of the curtain wall glass; and a plurality of second sealing rubber strips arranged on the first side and the second side of the curtain wall glass, wherein the second sealing rubber strips are buckled to the corresponding two glass guards.

[0010] The application also provides a construction method of the single-pull center-pull rod curtain wall, and the specific steps are as follows: constructing the upper main structure, the lower main structure and the support column; arranging the horizontal keels at intervals, and fixing the two ends of the horizontal keel to the corresponding support columns; arranging the vertical keels at intervals between the adjacent two horizontal keels; and installing the curtain wall glass into the unit grid formed by the horizontal keel and the vertical keel.

[0011] Further, the specific installation steps of the horizontal keel are as follows: providing a plurality of curtain wall beams, installing the curtain wall beams at intervals between the upper main structure and the lower main structure, and fixing the two ends of the curtain wall beam to the corresponding support columns; and providing a plurality of horizontal frames, and fixing the horizontal frames to the corresponding curtain wall beams.

[0012] Further, before the horizontal frame is installed, the vertical keel is installed, and the specific installation steps of the vertical keel are as follows: a plurality of inserts are provided, the inserts are fixed on the corresponding curtain wall beams at intervals, a plurality of glass pads are provided, the glass pads are inserted into first grooves at upper and lower ends of the corresponding inserts, a plurality of hangers are provided, limiting blocks at one end of the hangers are inserted into limiting grooves at second ends of the corresponding glass pads, a plurality of receiving rods are provided, second grooves at one end of the receiving rods are sleeved on the other ends of the hangers away from the limiting blocks, and two ends of a plurality of vertical pull rods are inserted into the second grooves of the corresponding two receiving rods.

[0013] Further, after the vertical pull rods are installed, a plurality of pre-pressing blocks with the same weight as the curtain wall glass are provided, the pre-pressing blocks are hung on the curtain wall beams at intervals through ropes, one pre-pressing block is arranged in each unit grid formed by the horizontal keel and the vertical keel, the part of the vertical pull rods extending into the receiving rods is adjusted, the unit grid formed by the horizontal keel and the vertical keel is consistent with the design size of the curtain wall, the pre-pressing block in the upper left corner unit grid is removed, the curtain wall glass is installed in the unit grid, and the curtain wall glass is installed in sequence according to the sequence from left to right and from top to bottom.

[0014] Further, before the curtain wall glass is installed, a plurality of glass guards are provided, and the glass guards are installed on the left and right sides of the curtain wall glass, after the curtain wall glass is installed, the horizontal frame is installed, a plurality of second sealing rubber strips are provided, the second sealing rubber strips are installed on the corresponding two glass guards, a plurality of first sealing rubber strips are provided, and the first sealing rubber strips are installed at the connection between the curtain wall beams and the horizontal frame and the curtain wall glass.

[0015] Compared with the prior art, the present application has the following beneficial effects:

[0016] The horizontal keel and the vertical keel are located in the gap between the adjacent two curtain wall glasses, which can not only reduce the occupation of the overall curtain wall to the building space, but also improve the observability of the appearance of the curtain wall.

[0017] The horizontal keel and the vertical keel are pre-pressed by the pre-pressing blocks with the same weight as the single curtain wall glass, so that the horizontal keel and the vertical keel reach the balance in the working state in the final tensioning process of the curtain wall, the stress system does not deform greatly during the process of installing the curtain wall glass and after the installation is completed, and the horizontal keel and the vertical keel can also be adjusted during the pre-pressing process. BRIEF DESCRIPTION OF DRAWINGS

[0018] Figure 1A side sectional view of the single-pulling through-core pull-rod curtain wall of the present application.

[0019] Figure 2 A front view of the single-pulling through-core pull-rod curtain wall of the present application.

[0020] Figure 3 A partial structure schematic diagram of the single-pulling through-core pull-rod curtain wall of the present application.

[0021] Figure 4 A transverse keel schematic diagram of the single-pulling through-core pull-rod curtain wall of the present application.

[0022] Figure 5 A vertical keel schematic diagram of the single-pulling through-core pull-rod curtain wall of the present application.

[0023] Figure 6 A pre-pressing block structure schematic diagram of the single-pulling through-core pull-rod curtain wall of the present application.

[0024] Figures 7 to 13 An installation step diagram of the single-pulling through-core pull-rod curtain wall of the present application.

[0025] Legend: 1, upper main structure; 2, lower main structure; 3, curtain wall glass; 4, transverse keel; 5, vertical keel; 6, curtain wall beam; 7, drainage hole; 8, first sealing rubber strip; 9, suspender; 10, bolt; 11, horizontal frame; 12, stainless steel cover plate; 13, glass edge protector; 14, second sealing rubber strip; 15, pre-pressing block; 16, plug-in part; 17, glass spacer; 18, receiving rod; 19, vertical pull rod; 20, foam rod; 21, support column. DETAILED DESCRIPTION

[0026] The present application will be further described below in conjunction with the drawings and specific embodiments.

[0027] Reference Figure 1 The present application provides a single-pulling through-core pull-rod curtain wall and a construction method thereof, which solves the problem that the rod member of the existing rod (cable) type glass curtain wall is in an exposed state, affecting the overall appearance, and the rod member is easily damaged, affecting the safety of the curtain wall. The transverse keel and the vertical keel are located in the gap between the adjacent two curtain wall glasses, which can not only reduce the occupation of the overall curtain wall to the building space, but also improve the observability of the appearance of the curtain wall. The transverse keel and the vertical keel are pre-pressed by using a pre-pressing block with the same weight as a single curtain wall glass, which ensures that the transverse keel and the vertical keel reach a balance in the working state during the final tensioning process of the curtain wall, ensures that the stress system does not deform too much during the process of installing the curtain wall glass and after the installation is completed, and also can adjust the transverse keel and the vertical keel during the pre-pressing process.

[0028] The present application will be further described below in conjunction with the drawings and specific embodiments.

[0029] Figure 1 shows a side sectional view of a single-pull through-tie rod curtain wall according to the present application. Figure 1 Figure 2 shows a transverse keel schematic view of a single-pull through-tie rod curtain wall according to the present application. Figure 4 Figure 3 shows a vertical keel schematic view of a single-pull through-tie rod curtain wall according to the present application. Figure 5 The present application is described below in conjunction with Figure 1 Figure 4 and Figure 5 to provide a single-pull through-tie rod curtain wall and a construction method thereof.

[0030] As shown in Figure 1 , Figure 4 and Figure 5 , a single-pull through-tie rod curtain wall according to the present application comprises: a plurality of transverse keels 4 and a plurality of vertical keels 5 arranged in a grid pattern between an upper main structure 1 and a lower main structure 2, the transverse keels 4 being spaced apart vertically and having a length equal to that of the upper main structure 1, the left and right ends of the transverse keels 4 being fixedly connected to corresponding support columns 21, the vertical keels 5 being spaced apart horizontally between adjacent two transverse keels 4; a plurality of curtain wall glasses 3, the curtain wall glasses 3 being arranged in unit grids formed by the transverse keels 4 and the vertical keels 5, the transverse keels 4 and the vertical keels 5 being respectively located in the gaps between corresponding two curtain wall glasses 3.

[0031] In a specific embodiment, the transverse keel 4 comprises: a plurality of curtain wall cross beams 6 located at the first side of the curtain wall glass 3, the two ends of the curtain wall cross beam 6 being respectively fixedly connected to corresponding support columns 21, the curtain wall cross beam 6 comprising a horizontal section and a vertical section, the vertical section being located at the first side of the curtain wall glass 3, the horizontal section being located between the upper and lower adjacent two curtain wall glasses 3, and the side of the horizontal section away from the vertical section being flush with the second side of the curtain wall glass 3; a plurality of horizontal frames 11, the plurality of horizontal frames 11 being located at the second side of the curtain wall glass 3 and fixedly connected to the horizontal section of the corresponding curtain wall cross beam 6. The horizontal frame 11 is made of aluminum alloy.

[0032] In a specific embodiment, a groove is formed on the horizontal frame 11, and a bolt 10 is arranged in the groove, the bolt 10 penetrating through the horizontal frame 11 and the horizontal section of the curtain wall cross beam 6, thereby achieving the fixation of the horizontal frame 11 and the curtain wall cross beam 6; further comprising a stainless steel cover plate 12, the stainless steel cover plate 12 being buckled and connected to the outside of the groove, thereby covering and sealing the bolt 10 in the groove to prevent rainwater from entering and causing corrosion of the bolt 10.

[0033] ​In an embodiment, a drainage hole 7 is formed on the vertical section of the curtain wall beam 6, and the accumulated water between the two adjacent curtain wall glasses 3 can enter the interior of the vertical section of the curtain wall beam 6 through the drainage hole 7, and then flow out from the two ends of the curtain wall beam 6, so as to ensure that the accumulated water between the two adjacent curtain wall glasses 3 can be drained in time, so as to avoid affecting the service life.

[0034] In an embodiment, the vertical keel 5 comprises: a plurality of inserts 16, which are fixed on the horizontal section of the curtain wall beam 6 at intervals and have two ends penetrating out of the curtain wall beam 6, the inserts 16 being located between the two adjacent curtain wall glasses 3, and the upper and lower ends of the inserts 16 being provided with first grooves; a plurality of glass pads 17, the first end of the glass pad 17 being inserted into the first groove at the upper and lower ends of the corresponding insert 16, and the second end of the glass pad 17 being provided with a limiting groove, and the glass pad 17 abutting against the curtain wall glasses 3 on its left and right sides; a plurality of hangers 9, one end of the hanger 9 being provided with a limiting block, and the limiting block being inserted into the limiting groove at the second end of the corresponding glass pad 17; a plurality of receiving rods 18, the upper and lower ends of the receiving rod 18 being provided with second grooves, and the end of the hanger 9 away from the limiting block being inserted into the second groove at one end of the receiving rod 18; and a plurality of vertical pull rods 19, the vertical pull rod 19 being located between the two adjacent curtain wall beams 6, and the two ends of the vertical pull rod 19 being inserted into the second grooves of the corresponding receiving rods 18. The hanger 9 is made of stainless steel. By arranging the glass pad 17, the glass pad 17 abuts against the curtain wall glasses 3 on its left and right sides, so as to fix and limit the curtain wall glasses 3 on the left and right sides.

[0035] In an embodiment, a plurality of foam rods 20 are further arranged between the glass pad 17 and the curtain wall glass 3, so as to buffer the two, thereby preventing the edge of the curtain wall glass 3 from being broken due to hard contact with the glass pad 17.

[0036] In an embodiment, a plurality of first sealing rubber strips 8 are further arranged at the connection between the horizontal frame 11 of the curtain wall beam 6 and the curtain wall glass 3.

[0037] Specifically, the vertical section of the curtain wall beam 6 and the horizontal frame 11 close to one side of the curtain wall glass 3 are provided with a bayonet, and the first sealing rubber strip 8 is also provided with a bayonet, so that the corresponding bayonets are matched when the first sealing rubber strip 8 is installed, so as to fix the first sealing rubber strip 8 and the curtain wall beam 6 and the horizontal frame 11.

[0038] In an embodiment, further comprising: a plurality of glass edges 13 buckled on both sides of the curtain wall glass 3; a plurality of second sealing rubber strips 14 arranged on the first side and the second side of the curtain wall glass 3, and the second sealing rubber strips 14 are buckled with the corresponding two glass edges 13. The glass edges 13 are made of aluminum alloy.

[0039] In an embodiment, the curtain wall glass 3 is hollow laminated glass.

[0040] In an embodiment, the first sealing rubber strip 8 and the second sealing rubber strip 14 are both EPDM sealing rubber strips.

[0041] The application further provides a construction method of the single-pull center-pull rod curtain wall, and the specific steps are as follows: constructing the upper main structure 1, the lower main structure 2 and the support column 21; arranging the transverse keels 4 at intervals, and fixing both ends of the transverse keels 4 on the corresponding support columns 21; arranging the vertical keels 5 at intervals between two adjacent transverse keels 4; and installing the curtain wall glass 3 into the unit grid formed by the transverse keels 4 and the vertical keels 5.

[0042] In an embodiment, the specific installation steps of the transverse keel 4 are as follows: providing a plurality of curtain wall beams 6, installing the curtain wall beams 6 at intervals between the upper main structure 1 and the lower main structure 2, and fixing both ends of the curtain wall beams 6 to the corresponding support columns 21; and providing a plurality of horizontal frames 11, and fixing the horizontal frames 11 on the corresponding curtain wall beams 6.

[0043] In an embodiment, the vertical keel 5 is installed before the horizontal frame 11 is installed, and the specific installation steps of the vertical keel 5 are as follows: providing a plurality of plug-in fittings 16, and plug-in fitting and fixing the plug-in fittings 16 on the corresponding curtain wall beams 6 at intervals; providing a plurality of glass pads 17, and inserting the glass pads 17 into the first grooves on the upper and lower ends of the corresponding plug-in fittings 16; providing a plurality of hangers 9, and inserting the limiting blocks on one end of the hangers 9 into the limiting grooves on the second ends of the corresponding glass pads 17; providing a plurality of receiving rods 18, and sleeving the second grooves on one end of the receiving rods 18 on the ends of the hangers 9 away from the limiting blocks; and providing a plurality of vertical pull rods 19, and inserting both ends of the vertical pull rods 19 into the second grooves of the corresponding two receiving rods 18.

[0044] In one embodiment, after the vertical pull rod 19 is installed, a plurality of pre-pressing blocks 15 equal in weight to the curtain wall glass 3 are provided, and the pre-pressing blocks 15 are suspended on the curtain wall beam 6 at intervals by ropes, so that there is one pre-pressing block 15 in each unit grid formed by the horizontal keel 4 and the vertical keel 5; then the part of the vertical pull rod 19 extending into the receiving rod 18 is adjusted so that the unit grid formed by the horizontal keel 4 and the vertical keel 5 is consistent with the design size of the curtain wall; then the pre-pressing block 15 in the upper left corner unit grid is removed, and the curtain wall glass 3 is installed in the unit grid; then the above steps are repeated in the order from left to right and from top to bottom, and the curtain wall glass 3 is installed in sequence.

[0045] In one embodiment, before the curtain wall glass 3 is installed, a plurality of glass edges 13 are provided, and the glass edges 13 are installed on the left and right sides of the curtain wall glass 3; after the curtain wall glass 3 is installed, the horizontal frame 11 is installed; a plurality of second sealing strips 14 are provided, and the second sealing strips 14 are installed on the corresponding two glass edges 13; a plurality of first sealing strips 8 are provided, and the first sealing strips 8 are installed at the connection between the curtain wall beam 6 and the horizontal frame 11 and the curtain wall glass 3.

[0046] The construction process of a single-pull core-pull rod curtain wall of the present application is described in detail below.

[0047] The upper main structure 1, the lower main structure 2, and the support column 21 are constructed.

[0048] The curtain wall beam 6 is installed at intervals between the upper main structure 1 and the lower main structure 2, and the two ends of the curtain wall beam 6 are installed on the left and right support columns 21.

[0049] Then the plug-in piece 16 is installed at intervals on each curtain wall beam 6, and the plug-in piece 16 is installed at the gap between the design positions of the left and right curtain wall glasses 3. The plug-in piece 16 passes through the horizontal section of the curtain wall beam 6, and then the glass pad 17 is installed at both ends of the plug-in piece 16, and then the hanger 9, the receiving rod 18, and the vertical pull rod 19 are installed in sequence.

[0050] Then the pre-pressing blocks 15 are installed on the curtain wall beam 6 by ropes to pre-press the horizontal keel 4 and the vertical keel 5, and the horizontal keel 4 and the vertical keel 5 are adjusted to be consistent with the design size. Then the pre-pressing blocks 15 are removed in the order from left to right and from top to bottom, and the curtain wall glass 3 is installed at the corresponding position after each pre-pressing block 15 is removed.

[0051] Then the horizontal frame 11 is installed and fixed to the curtain wall beam 6 by means of the bolts 10 installed in the groove, and then the stainless steel cover plate 12 is installed on the inner wall of the groove to cover the bolts 10.

[0052] Finally, the first sealing strip 8 and the second sealing strip 14 are installed.

[0053] The above detailed description of the present application is made in combination with the embodiments of the drawings, and those of ordinary skill in the art can make various changes to the present application according to the above description. Thus, certain details in the embodiments should not constitute a limitation on the present application, and the scope of protection of the present application will be defined by the appended claims.

Claims

1. A single-stretch through-core tie rod curtain wall, characterized in that: include: Multiple horizontal keels (4) and multiple vertical keels (5) are fixed between the upper main structure (1) and the lower main structure (2) to form a grid. The horizontal keels (4) are distributed vertically at intervals and have the same length as the upper main structure (1). The left and right ends of the horizontal keels (4) are fixed to the corresponding support columns (21). The vertical keels (5) are distributed horizontally at intervals between two adjacent horizontal keels (4). Multiple curtain wall glass (3) are distributed within the unit grid formed by the horizontal keel (4) and the vertical keel (5), and the horizontal keel (4) and the vertical keel (5) are respectively located in the gap between two corresponding curtain wall glass (3); The transverse keel (4) includes: Multiple curtain wall beams (6) are located on the first side of the curtain wall glass (3). The two ends of the curtain wall beams (6) are respectively fixed to the corresponding support columns (21). The curtain wall beams (6) include a horizontal section and a vertical section. The vertical section is located on the first side of the curtain wall glass (3). The horizontal section is located between two adjacent curtain wall glass (3) and the side of the horizontal section away from the vertical section is flush with the second side of the curtain wall glass (3). Multiple horizontal frames (11) are located on the second side of the curtain wall glass (3) and are fixedly connected to the horizontal section of the corresponding curtain wall beam (6); The vertical keel (5) includes: Multiple connectors (16) are interlocked and fixed on the horizontal section of the curtain wall beam (6) at intervals, and both ends protrude from the curtain wall beam (6). The connectors (16) are located between two adjacent curtain wall glass (3) on the left and right sides. The upper and lower ends of the connectors (16) are provided with first grooves. Multiple glass pads (17), the first end of the glass pad (17) is inserted into the first groove at the upper and lower ends of the corresponding plug (16), the second end of the glass pad (17) is provided with a limiting groove, and the glass pad (17) abuts against the curtain wall glass (3) on its left and right sides. Multiple lifting rods (9), one end of each lifting rod (9) is provided with a limiting block, which is inserted into the limiting groove at the second end of the corresponding glass pad (17); Multiple support rods (18) are provided, and the upper and lower ends of the support rods (18) are provided with second grooves. The end of the hanging rod (9) away from the limiting block is inserted into the second groove at one end of the support rod (18). Multiple vertical tie rods (19) are located between two adjacent curtain wall beams (6), and the two ends of the vertical tie rods (19) are respectively inserted into the second groove of the corresponding support rod (18).

2. A single-stretch through-core tie rod curtain wall according to claim 1, characterized in that: It also includes a plurality of first sealing strips (8), which are located at the connection between the curtain wall beam (6) and the horizontal frame (11) and the curtain wall glass (3).

3. A single-stretch through-core tie rod curtain wall according to claim 1, characterized in that: Also includes: Multiple glass guards (13) are fastened to the left and right sides of the curtain wall glass (3); Multiple second sealing strips (14) are provided on the first and second sides of the curtain wall glass (3), and the second sealing strips (14) are snap-fitted to the corresponding two glass edge protectors (13).

4. A construction method for a single-stretch through-bolt curtain wall according to claim 1, characterized in that: The specific steps are as follows: Construction is carried out on the upper main structure (1), the lower main structure (2) and the supporting column (21); The transverse keel (4) is arranged at intervals, so that the two ends of the transverse keel (4) are fixed on the corresponding support column (21); Vertical keels (5) are arranged at intervals between two adjacent horizontal keels (4); The curtain wall glass (3) is installed into the unit grid formed by assembling the horizontal keel (4) and the vertical keel (5).

5. The construction method of the single-stretch through-bolt curtain wall according to claim 4, characterized in that: The specific installation steps of the horizontal keel (4) are as follows: Multiple curtain wall beams (6) are provided and installed at intervals between the upper main structure (1) and the lower main structure (2), so that the two ends of the curtain wall beams (6) are fixed to the corresponding support columns (21); Multiple horizontal frames (11) are provided and the horizontal frames (11) are fixed on the corresponding curtain wall beams (6).

6. The construction method of the single-stretch through-bolt curtain wall according to claim 5, characterized in that: Before installing the horizontal frame (11), the vertical keel (5) is installed. The specific installation steps of the vertical keel (5) are as follows: Multiple connectors (16) are provided, and the connectors (16) are interlocked and fixed to the corresponding curtain wall beams (6); Provide multiple glass pads (17) and insert the glass pads (17) into the first grooves at the upper and lower ends of the corresponding connectors (16); Provide multiple lifting rods (9), and insert the limiting block at one end of the lifting rod (9) into the limiting groove at the second end of the corresponding glass pad (17); Provide multiple receiving rods (18), and fit the second groove at one end of the receiving rod (18) onto the end of the hanging rod (9) away from the limiting block; Multiple vertical tie rods (19) are provided, and the two ends of the vertical tie rods (19) are inserted into the second grooves of the corresponding two receiving rods (18).

7. The construction method of the single-stretch through-bolt curtain wall according to claim 6, characterized in that: After the vertical tie rod (19) is installed, a number of pre-compression blocks (15) with the same weight as the curtain wall glass (3) are provided. The pre-compression blocks (15) are suspended at intervals on the curtain wall beam (6) by ropes, so that there is a pre-compression block (15) in each unit grid formed by the horizontal keel (4) and the vertical keel (5). Then, the portion of the vertical tie rod (19) that extends into the supporting rod (18) is adjusted so that the unit grid formed by the horizontal keel (4) and the vertical keel (5) is consistent with the design dimensions of the curtain wall; Then remove the pre-compression block (15) in the upper left corner unit grid and install the curtain wall glass (3) into the unit grid; Then, repeat the above steps in the order from left to right and from top to bottom to install the curtain wall glass (3) in sequence.

8. The construction method of the single-stretch through-bolt curtain wall according to claim 7, characterized in that: Before the curtain wall glass (3) is installed, a plurality of glass guards (13) are provided and the glass guards (13) are installed on the left and right sides of the curtain wall glass (3); After the curtain wall glass (3) is installed, the horizontal frame (11) is installed; Provide multiple second sealing strips (14) and install the second sealing strips (14) onto the corresponding two glass edge protectors (13); Multiple first sealing strips (8) are provided and installed at the connection between the curtain wall beam (6) and the horizontal frame (11) and the curtain wall glass (3).

Citation Information

Patent Citations

  • Curtain wall structure with main stressed horizontal keel

    CN202611029U

  • Outdoor curtain wall structure

    CN213653913U