Rapid construction device and method for coal mine combined roadway
By designing a rapid construction device for coal mine joint tunnels, including anchor excavation units, reprinting units and conveyor units, and equipped with tail swing mechanisms, the problems of long turning time and low footing efficiency during excavation of coal mine tunnels have been solved, and the continuous outward transportation of coal and significant improvement in turning efficiency have been achieved.
Patent Information
- Application Number
- CN202411929195.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-25
- Publication Date
- 2025-02-25
AI Technical Summary
During the excavation process of coal mine tunnels, when the excavation equipment and reprinting equipment turn to the main tunnel to the joint tunnel, it needs to move the vehicle body and corners many times, resulting in a long turning time, low footprint efficiency, and inaccurate connection between the conveyor belt and reprinting equipment, resulting in coal accumulation at the corners, and additional equipment is needed for reprinting.
A rapid construction device for coal mine joint tunnels was designed, including anchor excavation unit, reprinting unit and conveying unit. Both the anchor excavation unit and the reprinting unit are equipped with a tail swing mechanism, which can maintain alignment during the bend to ensure the continuous transportation of coal; the conveyor unit uses a belt machine to move the tail and place it in the back of the main tunnel to ensure the continuous transportation of coal.
Through this device, the coal during the turn of the coal mine tunnel is continuously transported outward, avoiding coal accumulation and body disassembly, significantly improving the turning efficiency, and shortening the turning time to about 5-10 hours.
Smart Images

Figure CN119507917A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coal mine tunnel excavation, and in particular to a coal mine tunnel rapid construction device and method. Background Art
[0002] There are main tunnels and connecting tunnels in coal mine tunnels. Since the tunneling equipment and transfer equipment are relatively large, the tunneling equipment and transfer equipment need to move the body and turn corners many times when turning from the main tunnel to the connecting tunnel, and even need to dismantle the body and reassemble it. The time spent on turning is relatively long, such as 48 hours. When tunneling at a bend, the connection between the conveyor belt of the tunneling equipment and the transfer equipment is no longer accurate, resulting in the advance of coal piling up at the bend. Other equipment is needed to re-transfer the coal at the bend, and the overall advance efficiency is low.
[0003] In view of this, there is an urgent need to develop a coal mine joint tunnel rapid construction device and method to overcome the above-mentioned defects. Summary of the invention
[0004] The purpose of the invention is to disclose a coal mine joint tunnel rapid construction device and method.
[0005] The first object of the present invention is to provide a rapid construction device for coal mine tunnels.
[0006] The second object of the present invention is to provide a method for rapid construction of coal mine tunnels.
[0007] In order to achieve the above first invention objective, the present invention provides a coal mine tunnel fast construction device, including a digging and anchoring unit, a transfer unit and a conveying unit;
[0008] The anchor digging unit comprises an excavation part, an anchor rod part and a first conveying part. The tail of the first conveying part is provided with a first tail swing mechanism, and the left and right swing angles of the first tail swing mechanism are ±35°;
[0009] The transfer unit comprises a loading unit, a second conveying unit, a buffer container and a third conveying unit. The tail of the third conveying unit is provided with a second tail swing mechanism, and the left and right swing angles of the second tail swing mechanism are ±45°.
[0010] The conveyor unit is parallel to the main lane and close to the side of the main lane;
[0011] The coal obtained by the advancement of the excavation section is successively conveyed to the conveying unit through the first conveying section, the loading section, the second conveying section, the buffer container and the third conveying section.
[0012] Preferably, when the excavation section turns from the main tunnel to the connecting tunnel, the first tail swing mechanism swings and is always aligned with the loading section, and the second tail swing mechanism swings and is always aligned with the conveying unit.
[0013] Preferably, after the excavation section enters the connecting tunnel, the first tail swing mechanism swings 0° and is aligned with the loading section, and the second tail swing mechanism swings 0° and is perpendicular to the conveyor unit.
[0014] Preferably, the first tail swing mechanism swings 10°-35°, and the second tail swing mechanism swings 10°-45°.
[0015] Preferably, the first conveying part comprises a first middle single-chain scraper conveyor belt and a first conveying trough;
[0016] The third conveying part includes a second middle single-chain scraper conveyor belt and a second conveying trough.
[0017] Preferably, the first tail swing mechanism and the second tail swing mechanism have the same structure;
[0018] The first tail swing mechanism includes a hinge part and a first elastic steel plate and a second elastic steel plate arranged on both sides of the hinge part, and the first elastic steel plate and the second elastic steel plate are respectively installed on two side walls of the first conveying trough;
[0019] When the hinge portion rotates, the first elastic steel plate and the second elastic steel plate bend.
[0020] Preferably, a first swing angle oil cylinder is arranged on the outer side of the first elastic steel plate, and the first swing angle oil cylinder drives the side of the first swing tail mechanism to swing with the side of the first conveying part as a fulcrum;
[0021] A second swing angle oil cylinder is arranged on the outer side of the second elastic steel plate, and the second swing angle oil cylinder drives the side side of the first swing tail mechanism to swing with the side side of the first conveying part as a fulcrum.
[0022] Preferably, the loading unit loads the coal to the second conveying unit, and the second conveying unit conveys the coal in an inclined state and stores the coal in the buffer container;
[0023] The loading and unloading part comprises a base, a pitch arm, a working arm, a crushing arm and a loading and unloading bucket;
[0024] Angle swing cylinders are respectively arranged on both sides of the base;
[0025] A first hinged plate, a second hinged plate and a telescopic cylinder are arranged on the working arm. The telescopic cylinder drives the second hinged plate to swing with the working arm as a fulcrum. The two ends of the first hinged plate are respectively hinged to the working arm and the crushing arm. The two ends of the second hinged plate are respectively hinged to the working arm and the crushing arm.
[0026] Preferably, the cache container is located between the second conveying portion and the third conveying portion;
[0027] Pitch cylinders are respectively arranged on both sides of the third conveying unit, and the pitch cylinders drive the third conveying unit to pitch with the vehicle body as a fulcrum.
[0028] Based on the same inventive principle, in order to achieve the above second invention purpose, the present invention provides a method for rapid construction of coal mine tunnels, using the rapid construction device for coal mine tunnels described in the first invention, comprising the following steps:
[0029] The excavation unit excavates in the main tunnel, and the coal obtained by the excavation unit is successively transported to the conveyor unit through the first conveyor unit, the loading unit, the second conveyor unit, the buffer container and the third conveyor unit, and the third conveyor unit is aligned with the conveyor unit in a tail-swinging posture;
[0030] The excavation unit excavates at a corner. When the excavation unit turns from the main tunnel to the connecting tunnel, the first conveying unit is aligned with the loading unit in a tail-swinging posture, and the third conveying unit is aligned with the conveying unit in a tail-swinging posture;
[0031] After the excavation unit enters the connecting tunnel, the first conveying unit is aligned with the loading unit in a non-tail-swinging posture, and the third conveying unit is aligned with the conveying unit in a non-tail-swinging posture.
[0032] Compared with the prior art, the present invention has the following beneficial effects:
[0033] (1) The conveyor unit adopts a belt conveyor to move the tail of the conveyor unit and place it on the side of the main tunnel. When the main tunnel is excavated, the coal is successively transported to the conveyor unit through the first conveying part, the loading part, the second conveying part, the buffer container and the third conveying part. The second tail swing mechanism swings 10°-45° and aligns with the conveyor unit, so that the coal can be continuously transported outward.
[0034] (2) When the excavation section turns from the main tunnel to the connecting tunnel, the coal at the corner is first excavated. During the turning process, the first tail swing mechanism swings and always aligns with the loading section, and the second tail swing mechanism swings and always aligns with the conveyor unit. The coal is continuously transported to the conveyor unit through the first tail swing mechanism and the second tail swing mechanism, thereby realizing continuous external transportation of coal. Coal is no longer accumulated at the turning, and the vehicle body is no longer disassembled, thereby greatly improving the turning efficiency.
[0035] (3) The transfer unit is provided with a buffer container, which is arranged between the second conveying part and the third conveying part. The buffer container can buffer the coal that cannot be transported in time, thus providing a basis for continuously transporting the coal outward. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 It is a schematic diagram of the three-dimensional structure of the coal mine joint lane rapid construction device of the present invention.
[0037] Figure 2It is a schematic diagram of the three-dimensional structure of the coal mine joint lane rapid construction device of the present invention.
[0038] Figure 3 It is a three-dimensional structural schematic diagram of the anchor digging unit of the present invention.
[0039] Figure 4 It is a schematic diagram of the three-dimensional structure of the anchor digging unit of the present invention.
[0040] Figure 5 It is a three-dimensional structural schematic diagram of the transfer unit of the present invention.
[0041] Figure 6 It is a three-dimensional structural schematic diagram of the transfer unit of the present invention.
[0042] Figure 7 It is a schematic diagram of the three-dimensional structure of the first tail swing mechanism or the second tail swing mechanism of the present invention.
[0043] Figure 8 It is a schematic diagram of the three-dimensional structure of the cache container of the present invention.
[0044] Fig. 9 It is a schematic diagram of the three-dimensional structure of the mounting portion of the present invention.
[0045] Fig.10 It is a schematic diagram of the three-dimensional structure of the first tail swing mechanism or the second tail swing mechanism of the present invention.
[0046] Fig.11 It is a schematic diagram of the working principle of the first middle single-chain scraper conveyor belt or the second middle single-chain scraper conveyor belt of the present invention.
[0047] Fig.12 It is a schematic diagram of the three-dimensional structure of the anchor rod part of the present invention.
[0048] Fig.13 It is a partially enlarged schematic diagram of the second longitudinal shift assembly of the present invention.
[0049] Fig.14 The figure is a schematic diagram of the process of the rapid construction method of coal mine tunnels according to the present invention.
[0050] Among them, 1. Anchoring unit; 11. Excavation unit; 111. Head; 12. Anchor rod unit; 121. First drill arm assembly; 122. Second drill arm assembly; 123. First moving assembly; 1231. First longitudinal moving assembly; 1232. Second longitudinal moving assembly; 1233. First longitudinal moving cylinder; 1234. First slide rail; 1235. First long tooth; 1236. First base; 1237. First driving assembly; 1238. First power gear; 124. Second moving assembly; 1241. Third longitudinal moving assembly; 1242. Fourth longitudinal moving assembly; 13. First conveying unit; 131. First conveying trough; 132. First side support; 133. Second side support; 14. First tail swing mechanism; 1 41. Articulated part; 142. First elastic steel plate; 143. Second elastic steel plate; 144. First swing angle cylinder; 145. Second swing angle cylinder; 2. Transfer unit; 21. Loading unit; 211. Base; 212. Pitch arm; 213. Working arm; 214. Crushing arm; 215. Grab bucket; 216. Swing angle cylinder; 217. First hinged plate; 218. Second hinged plate; 219. Telescopic cylinder; 22. Second conveying unit; 23. Buffer container; 24. Third conveying unit; 241. Second conveying trough; 242. Pitch cylinder; 25. Second swing tail mechanism; 26. Shovel unit; 3. Conveying unit; 4. Main lane; 5. Connecting lane; 6. Corner; 7. Middle single chain; 71. Scraper. DETAILED DESCRIPTION
[0051] The present invention is described in detail below in conjunction with the various embodiments shown in the accompanying drawings, but it should be noted that these embodiments are not limitations of the present invention, and any equivalent transformations or substitutions in functions, methods, or structures made by ordinary technicians in the field based on these embodiments are all within the scope of protection of the present invention.
[0052] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0053] The specific implementation process of the present invention is described below through multiple embodiments.
[0054] Example 1
[0055] See also Figures 1 to 14This embodiment discloses a specific implementation method of a coal mine joint tunnel rapid construction device.
[0056] See also Figures 1 to 14 A coal mine joint tunnel rapid construction device, comprising an anchoring and digging unit 1, a transfer unit 2 and a conveying unit 3; the anchoring and digging unit 1 comprises an excavation part 11, an anchoring part 12 and a first conveying part 13, a first tail swing mechanism 14 is arranged at the tail of the first conveying part 13, and the left and right swing angle of the first tail swing mechanism 14 is ±35°; the transfer unit 2 comprises a loading part 21, a second conveying part 22, a buffer container 23 and a third conveying part 24, a second tail swing mechanism 25 is arranged at the tail of the third conveying part 24, and the left and right swing angle of the second tail swing mechanism 25 is ±45°; the conveying unit 3 is parallel to the main tunnel 4 and close to the side of the main tunnel 4; the coal obtained by the excavation part 11 is successively conveyed to the conveying unit 3 through the first conveying part 13, the loading part 21, the second conveying part 22, the buffer container 23 and the third conveying part 24.
[0057] Specifically, see Figure 1 and Figure 2 When digging in the coal mine tunnel, it is necessary to dig in both the main tunnel 4 and the connecting tunnel 5. The conveyor unit 3 uses a belt conveyor to move the tail of the machine and place it on the side of the main tunnel 4. When digging in the main tunnel 4, the coal is successively transported to the conveyor unit 3 through the first conveying part 13, the loading part 21, the second conveying part 22, the buffer container 23 and the third conveying part 24. The second tail swing mechanism 25 swings 10°-45° and aligns with the conveyor unit 3, so that the coal can be continuously transported outward; in the process of turning from the main tunnel to the connecting tunnel, the coal at the corner 6 is first dug out. In the process of turning, the first tail swing mechanism 14 swings 10°-35° and always aligns with the loading part 21, and the second tail swing mechanism 25 swings 10°-45 ° and always aligns with the conveyor unit 3. Through the first tail swing mechanism 14 and the second tail swing mechanism 25, the coal is still continuously transported to the conveyor unit, so that the coal is continuously transported outward. The coal is no longer piled up at the turning point, and the vehicle body is no longer disassembled. The turning takes about 5 hours to 10 hours (the turning can be completed within one shift), and the turning efficiency is greatly improved; after the excavation part 11 enters the connecting lane 5, the first tail swing mechanism 14 swings 0° and aligns with the loading part 21, and the second tail swing mechanism 25 swings 0° and is perpendicular to the conveyor unit 3; through this embodiment, excavation and continuous coal transportation in various working conditions such as the main lane 4, the corner 6 and the connecting lane 5 can be realized, the adaptability is strong, and the footage efficiency is greatly improved.
[0058] See also Figures 3 to 10 The first conveying part 13 includes a first middle single-chain scraper conveyor belt and a first conveying trough 131; the third conveying part 24 includes a second middle single-chain scraper conveyor belt and a second conveying trough 241; see Fig.11The first middle single chain scraper conveyor belt and the second middle single chain scraper conveyor belt are both composed of a middle single chain 7 and a plurality of scrapers 71 driven by the middle single chain 7. When they swing left and right, they can still continuously convey coal. Figures 3 to 10 , the structures and working principles of the first swing tail mechanism 14 and the second swing tail mechanism 25 are the same; taking the first swing tail mechanism 14 as an example for explanation, the first swing tail mechanism 14 includes a hinge 141 and a first elastic steel plate 142 and a second elastic steel plate 143 arranged on both sides of the hinge 141, the first elastic steel plate 142 and the second elastic steel plate 143 are respectively installed on the two side walls of the first conveying trough 131, when the hinge 141 rotates, the first elastic steel plate 142 and the second elastic steel plate 143 are bent, and the first middle single-chain scraper conveyor belt is bent accordingly, and the other parts of the two side walls of the first conveying trough 131 remain unchanged in their original shapes, so that the coal is transported along the swing direction of the first swing tail mechanism 14; the two side walls are the first side wall 132 and the second side wall 133, the two ends of the first elastic steel plate 142 are respectively fixedly installed on the first side wall 132, and the two ends of the second elastic steel plate 143 are respectively fixedly installed on the second side wall 133; the first elastic steel plate 14 2 is provided with a first swing angle cylinder 144, and the first swing angle cylinder 144 drives the side of the first tail swing mechanism 14 to swing with the side of the first conveying part 13 as a fulcrum; a second swing angle cylinder 145 is provided on the outer side of the second elastic steel plate 143, and the second swing angle cylinder 145 drives the other side of the first tail swing mechanism 14 to swing with the other side of the first conveying part 13 as a fulcrum, and the first swing angle cylinder 144 and the second swing angle cylinder 145 drive the first tail swing mechanism 14 to swing left or right in the same direction; in order to further improve the flexibility of the second tail swing mechanism 25, the buffer container 23 is located between the second conveying part 22 and the third conveying part 24, and the volume of the buffer container 23 containing coal is much larger than the volume of the third conveying part 24, and can play the function of temporarily storing coal, and the two sides of the third conveying part 24 are respectively provided with pitch cylinders 242, and the pitch cylinders 242 drive the third conveying part 24 to pitch with the vehicle body as a fulcrum, so that the second tail swing mechanism 25 can achieve pitch.
[0059] See also Figure 5 , Figure 6 and Fig. 9The working principle of the transfer unit 2 is as follows: the coal obtained by the drilling and anchoring unit 1 is transported to the transfer unit 2 via the first conveying part 13; a loading part 21 is arranged above the end of the second conveying part 22, and a shovel part 26 is arranged at the end of the second conveying part 22; first transport: the first conveying part 13 transports the coal to the shovel part 26, and the loading part 21 assists in shoveling the coal to the second conveying part 22; second transport: the second conveying part 22 transports the coal in an inclined state and stores it in the buffer container 23; third transport: the buffer container 23 then transports the coal to the third conveying part 24, and the third conveying part 24 transports the coal to the conveying unit 3. Through the relay of the three conveying parts and the cooperation of their swinging mechanisms, the rapid turning and excavation of the autonomous tunnel 4 to the connecting tunnel 5 is realized, and the excavation efficiency is greatly improved. The loading part 21 includes a base 211, a pitch arm 212, a working arm 213, a crushing arm 214 and a grab bucket 215. Swing cylinders 216 are respectively arranged on both sides of the base 211, and the swing cylinders 216 drive the grab bucket 215 to swing left and right; a first hinge plate 217, a second hinge plate 218 and a telescopic cylinder 219 are arranged on the working arm 213, and the telescopic cylinder 219 drives the second hinge plate 218 to swing with the working arm 213 as a fulcrum. The two ends of the first hinged plate 217 are respectively hinged to the working arm 213 and the crushing arm 214, and the two ends of the second hinged plate 218 are respectively hinged to the working arm 213 and the crushing arm 214. The working arm 213, a hinged plate 217, a second hinged plate 218 and the crushing arm 214 form a four-bar mechanism. The large pieces of coal can be crushed by the crushing arm 214 through the telescopic cylinder 219, and the crushed coal can be more easily scooped to the second conveying part 22.
[0060] It should be noted that the cross-sectional width of the connecting tunnel 5 is usually smaller than that of the main tunnel 4. This embodiment is applicable to the cross-sectional width of the connecting tunnel 5 of 2.5m-2.8m, the width of the anchor digging unit 1 and the transfer unit 2 is ≤2.5m; the volume of the buffer container 23 is not less than 4m 3 When the anchor mining unit 1 and the transfer unit 2 both enter the joint tunnel 5, when the transfer unit 2 cannot reach the conveying unit 3, the fully loaded coal in the buffer container 23 can be transported to the conveying unit 3 through the third conveying part 24 by reversing.
[0061] See also Fig.12 and Fig.13The anchor rod part 12 includes a first drilling arm assembly 121 and a second drilling arm assembly 122 set up on both sides of the body of the anchor digging unit 1. The first drilling arm assembly 121 is driven by a first moving assembly 123 and moves forward and backward, and the second drilling arm assembly 122 is driven by a second moving assembly 124 and moves forward and backward; the first moving assembly 123 includes a first longitudinal moving assembly 1231 and a second longitudinal moving assembly 1232; the second moving assembly 124 includes a third longitudinal moving assembly 1241 and a fourth longitudinal moving assembly 1242 (the working principle of which is the same as that of the first longitudinal moving assembly 1231 and the second longitudinal moving assembly 1231); the anchor digging unit 1 digs a distance Afterwards, the progress is suspended, and the top and side of the tunnel of the excavated part are anchored by the first drill arm assembly 121 and the second drill arm assembly 122. The first drill arm assembly 121 and the second drill arm assembly 122 are respectively moved to the two sides of the excavation part 11 through their two-stage longitudinal movement assemblies (the first longitudinal movement assembly 1231 and the second longitudinal movement assembly 1231, the third longitudinal movement assembly 1241 and the fourth longitudinal movement assembly 1242) to carry out operations. The operation range is wide. After partially anchoring the tunnel, the first drill arm assembly 121 and the second drill arm assembly 122 are retracted, and then excavation is carried out, taking into account both the safety and efficiency of excavation.
[0062] See also Fig.12 and Fig.13 The working principle of the first moving assembly 123 is as follows: the first moving assembly 123 includes a first longitudinal moving assembly 1231 and a second longitudinal moving assembly 1232, the first longitudinal moving assembly 1231 includes a first longitudinal moving oil cylinder 1233 and a first slide rail 1234 driven by the first longitudinal moving oil cylinder 1233; the second longitudinal moving assembly 1232 includes a first slide rail 1234, a first long tooth 1235 and a first base 1236, the first long tooth 1235 is arranged along the top of the first slide rail 1234, the first base 1236 is provided with a first driving assembly 1237 and a first power gear 1238, the first power gear 1238 and The first long tooth 1235 cooperates with the first drill arm assembly 121 to be arranged above the first base 1236; the first longitudinal movement cylinder 1233 drives the first slide rail 1234 and drives the first base 1236 and the first drill arm assembly 121 to achieve the first level of longitudinal movement, and the first power gear 1238 cooperates with the first long tooth 1235 to drive the first base 1236 and the first drill arm assembly 121 to achieve the second level of longitudinal movement, so that the first drill arm assembly 121 can be extended to the head 111 of the excavation section 11, that is, the side and top of all the cut tunnels can be anchored, providing a safe working environment for the next step of excavation. Since the working principle of the third longitudinal movement assembly and the fourth longitudinal movement assembly is the same as that of the first longitudinal movement assembly 1231 and the second longitudinal movement assembly 1232, their purpose is to drive the second drill arm assembly 122 to be extended to the head 111 of the excavation section 11, and the details are not repeated.
[0063] Example 2
[0064] See also Fig.14 This embodiment discloses a specific implementation method of a coal mine joint tunnel rapid construction method.
[0065] See also Fig.14 The method for rapid construction of coal mine tunnels adopts the rapid construction device for coal mine tunnels described in Example 1, and comprises the following steps:
[0066] Step S1: The excavation unit excavates in the main tunnel, and the coal obtained by the excavation unit is successively conveyed to the conveying unit through the first conveying unit, the loading unit, the second conveying unit, the buffer container and the third conveying unit, and the third conveying unit is aligned with the conveying unit in a tail-swinging posture; specifically, the conveying unit 3 is placed near the side wall of the main tunnel 4 and parallel to the side wall, the anchor digging unit 1 and the transfer unit 2 cooperate to excavate in the main tunnel 4, and the third conveying unit 24 is aligned with the conveying unit 3 in a tail-swinging posture, and the conveying unit 3 follows the anchor digging unit 1 and the transfer unit 2.
[0067] Step S2: the excavation section 11 excavates at the corner 6. During the process of the excavation section 11 turning from the main tunnel 4 to the connecting tunnel 5, the first conveying section 13 is aligned with the loading section 21 in a tail-swinging posture, and the third conveying section is aligned with the conveying unit in a tail-swinging posture. Specifically, during the process of turning from the main tunnel 4 to the connecting tunnel 5, the corner 6 must be excavated first to dig out a turning space for the anchor-digging unit 1 and the transfer unit 2, and the first conveying section 13 and the third conveying section 24 both transport coal in a tail-swinging posture.
[0068] Step S3: After the excavation unit enters the tunnel, the first conveying unit is aligned with the loading unit in a non-tail swinging posture, and the third conveying unit is aligned with the conveying unit in a non-tail swinging posture. Specifically, after the anchor digging unit 1 and the transfer unit 2 enter the tunnel 5, the first conveying unit 13 and the third conveying unit 24 both transfer coal in a non-tail swinging posture; since the conveying unit 3 is a self-moving tail of the belt conveyor, after the anchor digging unit 1 and the transfer unit 2 enter the tunnel 5, the conveying unit 3 moves forward once to prepare for the subsequent excavation of the main tunnel 4 and the tunnel 5.
[0069] The coal mine joint tunnel rapid construction method of Example 2 adopts the coal mine joint tunnel rapid construction device of Example 1. For the parts in Example 2 that are the same as those in Example 1, please refer to Example 1 and will not be repeated here.
Claims
1. A rapid construction device for coal mine tunnels, characterized in that: Including anchor digging unit, transfer unit and conveying unit; The anchor digging unit comprises an excavation part, an anchor rod part and a first conveying part. The tail of the first conveying part is provided with a first tail swing mechanism, and the left and right swing angles of the first tail swing mechanism are ±35°; The transfer unit comprises a loading unit, a second conveying unit, a buffer container and a third conveying unit. The tail of the third conveying unit is provided with a second tail swing mechanism, and the left and right swing angles of the second tail swing mechanism are ±45°. The conveyor unit is parallel to the main lane and close to the side of the main lane; The coal obtained by the advancement of the excavation section is successively conveyed to the conveying unit through the first conveying section, the loading section, the second conveying section, the buffer container and the third conveying section.
2. The coal mine tunnel rapid construction device according to claim 1, characterized in that: When the excavation section turns from the main tunnel to the connecting tunnel, the first tail swing mechanism swings and is always aligned with the loading section, and the second tail swing mechanism swings and is always aligned with the conveying unit.
3. The coal mine tunnel rapid construction device according to claim 1, characterized in that: After the excavation section enters the connecting tunnel, the first tail swing mechanism swings 0° and is aligned with the loading section, and the second tail swing mechanism swings 0° and is perpendicular to the conveyor unit.
4. The coal mine tunnel rapid construction device according to claim 2, characterized in that: The first tail swing mechanism swings 10°-35°, and the second tail swing mechanism swings 10°-45°.
5. The coal mine tunnel rapid construction device according to any one of claims 1 to 4, characterized in that: The first conveying part includes a first middle single chain scraper conveyor belt and a first conveying trough; The third conveying part includes a second middle single-chain scraper conveyor belt and a second conveying trough.
6. The coal mine tunnel rapid construction device according to claim 5, characterized in that: The first tail swing mechanism and the second tail swing mechanism have the same structure; The first tail swing mechanism includes a hinge part and a first elastic steel plate and a second elastic steel plate arranged on both sides of the hinge part, and the first elastic steel plate and the second elastic steel plate are respectively installed on two side walls of the first conveying trough; When the hinge portion rotates, the first elastic steel plate and the second elastic steel plate bend.
7. The coal mine tunnel rapid construction device according to claim 6, characterized in that: A first swing angle oil cylinder is arranged on the outer side of the first elastic steel plate, and the first swing angle oil cylinder drives the side of the first swing tail mechanism to swing with the side of the first conveying part as a fulcrum; A second swing angle oil cylinder is arranged on the outer side of the second elastic steel plate, and the second swing angle oil cylinder drives the side side of the first swing tail mechanism to swing with the side side of the first conveying part as a fulcrum.
8. The coal mine tunnel rapid construction device according to any one of claims 1 to 4, characterized in that: The loading unit loads the coal to the second conveying unit, and the second conveying unit conveys the coal in an inclined state and stores the coal in the buffer container; The loading and unloading part comprises a base, a pitch arm, a working arm, a crushing arm and a loading and unloading bucket; Angle swing cylinders are respectively arranged on both sides of the base; A first hinged plate, a second hinged plate and a telescopic cylinder are arranged on the working arm. The telescopic cylinder drives the second hinged plate to swing with the working arm as a fulcrum. The two ends of the first hinged plate are respectively hinged to the working arm and the crushing arm. The two ends of the second hinged plate are respectively hinged to the working arm and the crushing arm.
9. The coal mine tunnel rapid construction device according to claim 8, characterized in that: The cache container is located between the second conveying portion and the third conveying portion; Pitch cylinders are respectively arranged on both sides of the third conveying unit, and the pitch cylinders drive the third conveying unit to pitch with the vehicle body as a fulcrum.
10. A rapid construction method for coal mine tunnels, characterized in that: The coal mine tunnel rapid construction device according to any one of claims 1 to 9 comprises the following steps: The excavation unit excavates in the main tunnel, and the coal obtained by the excavation unit is successively transported to the conveyor unit through the first conveyor unit, the loading unit, the second conveyor unit, the buffer container and the third conveyor unit, and the third conveyor unit is aligned with the conveyor unit in a tail-swinging posture; The excavation unit excavates at a corner. When the excavation unit turns from the main tunnel to the connecting tunnel, the first conveying unit is aligned with the loading unit in a tail-swinging posture, and the third conveying unit is aligned with the conveying unit in a tail-swinging posture; After the excavation unit enters the connecting tunnel, the first conveying unit is aligned with the loading unit in a non-tail-swinging posture, and the third conveying unit is aligned with the conveying unit in a non-tail-swinging posture.