Mine laneway support digital processing method, system and platform based on 3Dmine

Through the digital processing method of mine shaft and tunnel support based on 3Dmine, a three-dimensional entity and geological model was established, which solved the shortcomings of the management of the middle shaft and tunnel support project in the existing technology, and realized the refined and efficient management of the whole process of the shaft and tunnel support project. , improve construction quality and safety management capabilities.

CN119507973AActive Publication Date: 2025-02-25YUXI DAHONGSHAN MINING
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202411542008.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-31
Publication Date
2025-02-25
Estimated Expiration
2044-10-31

AI Technical Summary

Technical Problem

The existing mine shaft and tunnel support projects have technical defects in the entire process of design, construction, acceptance, etc., including two-dimensional image management, inaccurate geological morphology reflection, fuzzy ceiling grading definition, and strong subjective quality acceptance.

Method used

Using the digital processing method of mine shaft and tunnel support based on 3Dmine, the three-dimensional vectorized point cloud data of the shaft and tunnel are generated and processed, the three-dimensional solid model and three-dimensional geological model are established, and the roof grading and support design are carried out to achieve the full support project. Digital process management.

Benefits of technology

It has improved the refined and efficient management of well and tunnel support projects, enhanced the production organization efficiency of mining enterprises and the safety management capabilities of underground projects, improved the construction quality control capabilities, and achieved accurate accounting of project volume.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119507973A_ABST
    Figure CN119507973A_ABST
Patent Text Reader

Abstract

The invention discloses a mine laneway support digital processing method, system and platform based on 3Dmine. The method comprises the following steps: generating and acquiring first data corresponding to mine laneway and to-be-supported digital processing; respectively creating a first model and a second model corresponding to the first data according to the first data in combination with 3Dmine; based on the first model and the second model, generating second data corresponding to the mine laneway support, and according to the second data, constructing a third model corresponding to the mine laneway support; the third model is a supported roadway design model; generating corresponding third data based on the third model; according to the method, the system and the platform corresponding to the method, fine, efficient and digital management of the whole process of the laneway support engineering is promoted, the production organization efficiency of mine enterprises is improved, and the safety management capacity of various underground laneway engineering and the construction quality management and control capacity of the support engineering are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of digital processing of mine shaft and tunnel support, and specifically relates to a digital processing method, system and platform for mine shaft and tunnel support based on 3Dmine. Background Art

[0002] As an important safety measure for mine construction and continuous production, support engineering has a long construction period and large investment. The shafts and tunnels of key system projects such as ventilation, water supply and drainage, power supply and distribution, hoisting and transportation, and mining sites are distributed vertically and horizontally in and around the ore body. Various types of projects are affected by geological structure, stress, mining methods, blasting disturbance, service life and other factors, and the standards and forms of support are also varied. At present, the mechanization and automation of metal and non-metal mines are getting higher and higher, but the application of digital technology in support engineering is relatively low.

[0003] At present, the main support methods used in underground metal and non-metal mines include anchor rods, anchor cables, anchor spraying, anchor mesh spraying, pouring, metal brackets, steel arch frames, steel arch frame advanced pipe shed anchor rod support, etc. The support project has technical defects in the whole process of roof classification, support form determination, support range demarcation, section measurement, support design, quality acceptance, and engineering quantity accounting: First, the two-dimensional status map drawn in CAD through the actual measurement of the sidewall contours and top and bottom plate elevations of the shaft and tunnel is extensive in the process and technical management of the shaft and tunnel support project from design, construction, acceptance, etc. Second, the previous secondary delineation of shaft and tunnel geology failed to fully reflect the distribution of geological forms such as faults, joints, and weak intrusive bodies in the bad geological section in space, nor could it reflect the degree of damage and impact range of the bad geological section on the shaft and tunnel. The classification of the top plate is vague, and the design stage of the support project has certain abstractness and limitations, and there is a lack of guidance from design to construction. Third, although the shaft and tunnel after actual excavation are generally arched in cross section, the actual top plate sidewalls are uneven. According to the specification requirements, acceptance holes are drilled every 5m during quality acceptance. The engineering quantity calculation uses a 5m section to measure the width and height of the shaft and tunnel and take the average value. The engineering quantity is calculated by a fixed formula. The quality acceptance and engineering quantity calculation are highly subjective, and the engineering quantity deviation is large.

[0004] Therefore, in view of the above technical problems and defects, it is urgent to design and develop a digital processing method, system and platform for mine shaft support based on 3Dmine. Summary of the invention

[0005] In order to overcome the shortcomings and difficulties of the above-mentioned prior art, the purpose of the present invention is to provide a digital processing method, system and platform for mine shaft and tunnel support based on 3Dmine, which is conducive to promoting the refined, efficient and digital management of the entire process of shaft and tunnel support engineering, improving the production organization efficiency of mining enterprises, and improving the safety management capabilities of various underground shaft and tunnel engineering and the construction quality control capabilities of support engineering.

[0006] The first purpose of the present invention is to provide a digital processing method for mine shaft and tunnel support based on 3Dmine; the second purpose of the present invention is to provide a digital processing system for mine shaft and tunnel support based on 3Dmine; the third purpose of the present invention is to provide a digital processing platform for mine shaft and tunnel support based on 3Dmine.

[0007] The first object of the present invention is achieved in that the method comprises the following steps: Generate and obtain first data corresponding to the mine shaft and tunnel to be supported and digitized; wherein the first data is three-dimensional vectorized point cloud data of the shaft and tunnel; Based on the first data and in combination with 3Dmine, a first model and a second model corresponding to the first data are created respectively; wherein the first model is a three-dimensional solid model; and the second model is a three-dimensional geological model; Based on the first model and the second model, second data corresponding to mine shaft and tunnel support are generated, and according to the second data, a third model corresponding to mine shaft and tunnel support is constructed; wherein the second data includes support level data, parameter data and length data; and the third model is a design model of the tunnel after support; Based on the third model, corresponding third data are generated; wherein the third data are measurement data corresponding to mine shaft and tunnel support.

[0008] Furthermore, the generating and acquiring of first data corresponding to the mine shaft and tunnel to be supported and digitally processed also includes: Combined with a three-dimensional scanner, fourth data and fifth data corresponding to the required support tunnel area are respectively generated and acquired; wherein the fourth data is the original scanning point cloud data; and the fifth data is the measurement control point data near the tunnel; Solving and processing the fourth data, and generating sixth data corresponding to the fourth data, and calibrating the sixth data based on the fifth data; wherein the sixth data is point cloud data in a required format; Delete the repeated or interfering point data in the sixth data, and thin out the sixth data; wherein the point data includes noise data caused by large dust, and point data formed by tunnel wind ducts, water pipes, and cables blocking the tunnel walls.

[0009] Furthermore, the creating a first model and a second model corresponding to the first data respectively according to the first data and in combination with 3Dmine also includes: Based on 3Dmine, a rough solid model is established, and the first model is verified and optimized by eliminating intersecting triangle edges, reorganizing invalid triangle edges, and connecting open edges; Generate and obtain seventh data, and establish a second shaft and tunnel model with spatial attributes based on the first model; wherein the seventh data is shaft and tunnel fault, layer joint, intrusion structure and lithology characteristic data.

[0010] Further, the generating of second data corresponding to mine shaft and tunnel support based on the first model and the second model, and constructing a third model corresponding to mine shaft and tunnel support according to the second data, further includes: Based on the second model and according to the roof classification specification data, roof classification is carried out to generate support form data of the poor geological section, and at the same time, corresponding support length data is generated according to the influence range of the poor geological section; According to the second data, combined with the mesh parameter data, point data and line data corresponding to the support are generated respectively.

[0011] Further, the generating of second data corresponding to mine shaft and tunnel support based on the first model and the second model, and constructing a third model corresponding to mine shaft and tunnel support according to the second data, further includes: Based on the third model, construct a first model corresponding to the shaft and lane after support; A third model corresponding to the shaft and tunnel after support is generated based on the first model corresponding to the shaft and tunnel after support.

[0012] Furthermore, the generating corresponding third data based on the third model further includes: Based on the first model corresponding to the shaft and tunnel after support, and in combination with the third model corresponding to the shaft and tunnel after support, the corresponding eighth data is generated; wherein, the eighth data is the measurement data corresponding to the mine shaft and tunnel after support.

[0013] The second object of the present invention is achieved in this way: the system is applied to the digital processing method of mine shaft support based on 3Dmine, and the system includes: A first data generating unit is used to generate and obtain first data corresponding to the mine shaft and tunnel to be supported and digitized; wherein the first data is three-dimensional vectorized point cloud data of the shaft and tunnel; The first module construction unit is used to create a first model and a second model corresponding to the first data respectively according to the first data and in combination with 3Dmine; wherein the first model is a three-dimensional solid model; and the second model is a three-dimensional geological model; A second module construction unit is used to generate second data corresponding to mine shaft and tunnel support based on the first model and the second model, and to construct a third model corresponding to mine shaft and tunnel support according to the second data; wherein the second data includes support level data, parameter data and length data; and the third model is a design model of the tunnel after support; The second data generating unit is used to generate corresponding third data based on the third model; wherein the third data is measurement data corresponding to mine shaft and tunnel support.

[0014] Furthermore, the first data generating unit further includes: The first generating module is used to generate and obtain fourth data and fifth data corresponding to the required support tunnel area in combination with the three-dimensional scanner; wherein the fourth data is the original scanning point cloud data; and the fifth data is the measurement control point data near the tunnel; A second generating module is used to solve and process the fourth data, and generate sixth data corresponding to the fourth data, and calibrate the sixth data based on the fifth data; wherein the sixth data is point cloud data in a required format; The first processing module is used to delete the repeated or interfering point data in the sixth data and to thin out the sixth data; wherein the point data includes noise point data caused by large dust, and point data formed by tunnel wind tubes, water pipes, and cables blocking the tunnel wall; And / or, the first module building unit further includes: The second processing module is used to establish a rough solid model based on 3Dmine, and verify and optimize the first model by eliminating intersecting triangle edges, reorganizing invalid triangle edges, and connecting open edges; A first establishment module is used to generate and obtain seventh data, and establish a second model of the shaft and tunnel with spatial attributes according to the first model; wherein the seventh data is the shaft and tunnel fault, layer joint, intrusion structure and lithology characteristic data; And / or, the second module building unit further includes: A third generation module is used to carry out roof classification based on the second model and in accordance with the roof classification specification data, generate support form data of the poor geological section, and generate corresponding support length data according to the influence range of the poor geological section; A fourth generating module, used to generate point data and line data corresponding to the support respectively according to the second data and in combination with the grid parameter data; And / or, the second data generating unit further includes: The fifth generation module is used to generate corresponding eighth data based on the first model corresponding to the shaft and tunnel after support and in combination with the third model corresponding to the shaft and tunnel after support; wherein the eighth data is the measurement data corresponding to the mine shaft and tunnel after support.

[0015] Furthermore, the second module construction unit further includes: A second building module is used to build a first model corresponding to the supported shaft and lane based on the third model; The sixth generation module is used to generate a third model corresponding to the supported shaft and lane based on the first model corresponding to the supported shaft and lane.

[0016] The third purpose of the present invention is achieved in this way: the platform includes a processor, a memory and a 3Dmine-based mine shaft and tunnel support digital processing platform control program; wherein, the 3Dmine-based mine shaft and tunnel support digital processing platform control program is executed on the processor, and the 3Dmine-based mine shaft and tunnel support digital processing platform control program is stored in the memory, and the 3Dmine-based mine shaft and tunnel support digital processing platform control program implements the 3Dmine-based mine shaft and tunnel support digital processing method.

[0017] The present invention generates and obtains first data corresponding to mine shafts and tunnels to be supported and digitally processed through a method; wherein the first data is three-dimensional vectorized point cloud data of shafts and tunnels; according to the first data and in combination with 3Dmine, a first model and a second model corresponding to the first data are created respectively; wherein the first model is a three-dimensional solid model; the second model is a three-dimensional geological model; based on the first model and the second model, second data corresponding to mine shaft and tunnel support are generated, and according to the second data, a third model corresponding to mine shaft and tunnel support is constructed; wherein the second data includes support level data, parameter data and length data; the third model is a tunnel design model after support; based on the third model, corresponding third data is generated; wherein the third data is measurement data corresponding to mine shaft and tunnel support, and a system and platform corresponding to the method are conducive to promoting the refined, efficient and digital management of the entire process of shaft and tunnel support engineering, improving the production organization efficiency of mining enterprises, and improving the safety management capabilities of various underground shaft and tunnel engineering and the construction quality control capabilities of support engineering.

[0018] That is to say, through the scheme of the present invention, the three-dimensional solid model generated by collecting point cloud data through a high-precision Hovermap scanner is compared with the original two-dimensional plane data generated by the shaft coordinates measured by the full-scale measurement, which highly restores the real shape of the irregular shaft.

[0019] Second, the establishment of a three-dimensional geological model can intuitively identify the faults, layer joints, and lithology of the bad geological section, accurately determine the roof grade, and help identify the degree of damage to the shaft and tunnel by the bad geological body. According to the characteristics of the emergency, difficulty, and danger of each section of the support project, the construction priority is guided to achieve project progress control; based on the three-dimensional entity and three-dimensional geological model of the shaft and tunnel, three-dimensional support design is carried out to intuitively reflect the support effect and design engineering quantity accounting; during quality acceptance, the shaft and tunnel entity model established by scanning twice before and after support can check the support thickness of the roof side of any support section to avoid cutting corners, further constrain construction behavior, and achieve quality control. Compared with the usual manual section of 5m per section, the engineering quantity calculated by the fixed formula after averaging, the engineering quantity obtained by high-precision scanning is more accurate during the final acceptance. At the same time, the application of new digital support engineering technology has enabled the transformation of shaft and tunnel engineering from two-dimensional plane to three-dimensional digitalization, realizing the refined management of construction progress, construction quality and engineering costs. It is mainly suitable for support projects such as anchor spraying, anchor mesh spraying, grouting, and pouring commonly used by metal and non-metal mining enterprises.

[0020] Third, the implementation of this technology will help promote the digitalization, refinement and efficiency of the entire process of shaft and tunnel support engineering, improve the production organization efficiency of mining enterprises, improve the safety management capabilities of various shaft and tunnel engineering projects underground and the quality control capabilities of support engineering construction, and has a strong guiding significance for the construction of digital and intelligent mines. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0022] Figure 1 A schematic diagram of scanning point cloud data of an embodiment of a digital processing method for mine shaft and tunnel support based on 3Dmine of the present invention; Figure 2 A schematic diagram of a three-dimensional solid model of an embodiment of a digital processing method for mine shaft and tunnel support based on 3Dmine of the present invention; Figure 3 A schematic diagram of a three-dimensional geological model of a tunnel in accordance with an embodiment of a digital processing method for mine tunnel support based on 3Dmine of the present invention; Figure 4 A schematic diagram of roof grade determination and support length of an embodiment of a digital processing method for mine tunnel support based on 3Dmine of the present invention; Figure 5A schematic diagram of three-dimensional design of a support project according to an embodiment of a digital processing method for mine shaft and tunnel support based on 3Dmine of the present invention; Figure 6 This is a schematic diagram of measuring the entity volume before the mine tunnel support according to an embodiment of the digital processing method for mine tunnel support based on 3Dmine of the present invention; Figure 7 This is a schematic diagram of establishing a solid model after scanning after support according to an embodiment of a method for digital processing of mine tunnel support based on 3Dmine of the present invention; Figure 8 A schematic diagram of a solid model established by scanning after support in an embodiment of a digital processing method for mine tunnel support based on 3Dmine of the present invention; Fig. 9 A schematic diagram of thickness acceptance for creating a cross section according to an embodiment of a digital processing method for mine tunnel support based on 3Dmine of the present invention; Fig.10 This is a schematic diagram of the completion of a support project in accordance with an embodiment of a digital processing method for mine shaft and tunnel support based on 3Dmine of the present invention; Fig.11 A schematic diagram of the steps of a digital processing method for mine shaft and tunnel support based on 3Dmine of the present invention; Fig.12 The present invention is a schematic diagram of the architecture of a digital processing system for mine shaft and tunnel support based on 3Dmine; Fig.13 This is a schematic diagram of the structure of a digital processing platform for mine shaft and tunnel support based on 3Dmine in the present invention; In the figure: 1- point cloud data; 2- shaft and tunnel entity model; 3- ore body; 4- fault; 5- fault filling; 6- intrusive body; 7- marble; 8- bad land section; 9- support section length; 10- shaft and tunnel entity before support; 11- anchor rod; 12- steel mesh; 13- closed entity; 14- entity volume V1 before support; 15- scanned entity after support; 16- entity volume V2 after support; 17- create profile; 18- thickness acceptance. DETAILED DESCRIPTION

[0023] In order to better understand the purpose, technical solutions and advantages of the present invention, the present invention is further described below in conjunction with the accompanying drawings and specific implementation methods. Those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification.

[0024] The present invention may also be implemented or applied through other different specific examples, and the details in this specification may also be modified and changed in various ways based on different viewpoints and applications without departing from the spirit of the present invention.

[0025] It should be noted that if the embodiments of the present invention involve directional indications (such as up, down, left, right, front, back...), the directional indications are only used to explain the relative position relationship, movement status, etc. between the components under a certain specific posture (as shown in the accompanying drawings). If the specific posture changes, the directional indication will also change accordingly.

[0026] In addition, if there are descriptions involving "first", "second", etc. in the embodiments of the present invention, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or suggesting their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. Secondly, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such a combination of technical solutions does not exist and is not within the scope of protection required by the present invention.

[0027] Preferably, the digital processing method for mine tunnel support based on 3Dmine of the present invention is applied in one or more terminals or servers. The terminal is a device that can automatically perform numerical calculations and / or information processing according to pre-set or stored instructions, and its hardware includes but is not limited to microprocessors, application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA), digital signal processors (DSP), embedded devices, etc.

[0028] The terminal can be a computing device such as a desktop computer, a notebook, a PDA, a cloud server, etc. The terminal can interact with the client through a keyboard, a mouse, a remote control, a touch pad, or a voice control device.

[0029] The present invention is to realize a digital processing method, system, platform and storage medium for mine shaft and tunnel support based on 3Dmine.

[0030] like Figure 1 The figure shows a flow chart of a digital processing method for mine shaft and tunnel support based on 3Dmine provided in an embodiment of the present invention.

[0031] In this embodiment, the digital processing method for mine shaft support based on 3Dmine can be applied to a terminal or a fixed terminal with a display function. The terminal is not limited to a personal computer, a smart phone, a tablet computer, a desktop computer or an all-in-one computer equipped with a camera, etc.

[0032] The digital processing method for mine shaft and tunnel support based on 3Dmine can also be applied to a hardware environment composed of a terminal and a server connected to the terminal through a network. The network includes but is not limited to: a wide area network, a metropolitan area network or a local area network. The digital processing method for mine shaft and tunnel support based on 3Dmine in the embodiment of the present invention can be executed by a server, can be executed by a terminal, or can be executed by both a server and a terminal.

[0033] For example, for a terminal that needs to perform digital processing of mine shaft and tunnel support based on 3Dmine, the digital processing function of mine shaft and tunnel support based on 3Dmine provided by the method of the present invention can be directly integrated on the terminal, or a client for implementing the method of the present invention can be installed. For another example, the method provided by the present invention can also be run on a server or other device in the form of a software development kit (SDK), and an interface for the digital processing function of mine shaft and tunnel support based on 3Dmine is provided in the form of SDK. The terminal or other device can implement the digital processing function of mine shaft and tunnel support based on 3Dmine through the provided interface. The present invention is further described below in conjunction with the accompanying drawings.

[0034] The present invention will be further described in detail below in conjunction with the accompanying drawings. Figure 1-Figure 11 As shown, the present invention provides a digital processing method for mine tunnel support based on 3Dmine, and the method comprises the following steps: S01, generating and acquiring first data corresponding to a mine shaft and lane to be supported and digitized; wherein the first data is three-dimensional vectorized point cloud data of the shaft and lane; S02. Based on the first data and in combination with 3Dmine, create a first model and a second model corresponding to the first data respectively; wherein the first model is a three-dimensional solid model; and the second model is a three-dimensional geological model; S03, based on the first model and the second model, generating second data corresponding to mine shaft and tunnel support, and constructing a third model corresponding to mine shaft and tunnel support according to the second data; wherein the second data includes support level data, parameter data and length data; the third model is a design model of the tunnel after support; S04. Generate corresponding third data based on the third model; wherein the third data is measurement data corresponding to mine shaft and tunnel support.

[0035] The generating and acquiring of first data corresponding to the mine shaft and tunnel to be supported and digitally processed also includes: S011. In combination with a three-dimensional scanner, fourth data and fifth data corresponding to the required support tunnel area are respectively generated and acquired; wherein the fourth data is original scanning point cloud data; and the fifth data is measurement control point data near the tunnel; S012, solving and processing the fourth data, and generating sixth data corresponding to the fourth data, and calibrating the sixth data based on the fifth data; wherein the sixth data is point cloud data in a required format; S013. Delete the repeated or interfering point data in the sixth data, and thin out the sixth data; wherein the point data includes noise data caused by large dust, and point data formed by tunnel wind ducts, water pipes, and cables blocking the tunnel wall.

[0036] The method of creating a first model and a second model corresponding to the first data respectively according to the first data and in combination with 3Dmine further includes: S021. Based on 3Dmine, a rough solid model is established, and the first model is verified and optimized by eliminating intersecting triangle edges, reorganizing invalid triangle edges, and connecting open edges; S022. Generate and obtain seventh data, and establish a second shaft and tunnel model with spatial attributes based on the first model; wherein the seventh data is shaft and tunnel fault, layer joint, intrusion structure and lithology characteristic data.

[0037] The method of generating second data corresponding to mine shaft and tunnel support based on the first model and the second model, and constructing a third model corresponding to mine shaft and tunnel support according to the second data, further includes: S031. Based on the second model and in accordance with the roof classification specification data, roof classification is performed to generate support form data for the poor geological section, and corresponding support length data is generated according to the influence range of the poor geological section; S032. Based on the second data and in combination with the mesh parameter data, point data and line data corresponding to the support are generated respectively.

[0038] The method of generating second data corresponding to mine shaft and tunnel support based on the first model and the second model, and constructing a third model corresponding to mine shaft and tunnel support according to the second data, further includes: S033. Based on the third model, construct a first model corresponding to the supported shaft and lane; S034. Generate a third model corresponding to the shaft and tunnel behind the support based on the first model corresponding to the shaft and tunnel behind the support.

[0039] The generating corresponding third data based on the third model further includes: S041. Based on the first model corresponding to the shaft and tunnel after support, and in combination with the third model corresponding to the shaft and tunnel after support, generate corresponding eighth data; wherein, the eighth data is the measurement data corresponding to the mine shaft and tunnel after support.

[0040] Specifically, in an embodiment of the present invention, the present invention provides a technical measure applicable to digital support of mine shafts and tunnels, which is implemented in sequence through the following method steps: (1) Point cloud data collection and organization: Scan the shafts and tunnels with a scanner to collect and organize the three-dimensional vectorized point cloud data of the shafts and tunnels.

[0041] (2) Three-dimensional solid model: A solid model is established based on three-dimensional vector point cloud data using 3Dmine mining software, which serves as the basis for geological modeling and three-dimensional design of support engineering.

[0042] (3) Three-dimensional geological modeling: Identify the structural occurrence of shaft and tunnel faults, layer joints, intrusive bodies, etc., identify lithology, stability, etc., and use 3Dmine mining software to establish a three-dimensional geological model of the shaft and tunnel.

[0043] (4) Roof classification and support engineering confirmation: Using the three-dimensional geological model as the main basis for roof classification, carry out roof classification for unfavorable geology and determine the support form, support range and support length of the unfavorable geological section.

[0044] (5) Three-dimensional design of support engineering: According to the support form, the support parameters such as steel mesh, anchor rods, and shotcrete are clarified to carry out three-dimensional design of support engineering. After the design is completed, the relevant design engineering quantity is obtained.

[0045] (6) Measuring the volume before support: Based on the support length, the volume of the support section before support is calculated using the 3Dmine software three-dimensional solid model of the shaft and tunnel, which serves as the basis for the subsequent engineering quantity calculation.

[0046] (7) 3D scanning of the shaft and tunnel after support and establishment of 3D solid model: Similar to the above (1)-(2).

[0047] (8) Measuring the volume of the shaft and tunnel after support: Similar to (6) above, volume measurement after support creates conditions for quality acceptance.

[0048] (9) Quality acceptance and engineering quantity accounting: 3Dmine software is used to import the three-dimensional solid model before and after the support, and cut to form the front and rear support sections. The thickness of the grouting can be measured at any section of the support section to complete the acceptance of the grouting thickness. The difference in the solid volume before and after the grouting is used to obtain the actual engineering quantity of the grouting or pouring, and the acceptance of the engineering quantity is completed.

[0049] Among them, Figure 1 As shown in the figure, the Hovermap scanner 3D scans and collects point cloud data that meets the accuracy requirements of the tunnel; the point cloud data is used to produce a digital vectorized 3D model of the shaft and tunnel before support, restoring the true shape of the shaft and tunnel, such as Figure 2 As shown in the figure; according to the actual situation on site, carry out three-dimensional geological cataloging, identify the occurrence and lithology of unfavorable geological bodies such as faults, layer joints, and intrusions, and use 3Dmine software to establish a three-dimensional geological model, such as Figure 3 As shown; according to the three-dimensional geological model, determine the roof grade and clarify the support form, range and length, such as Figure 4 As shown in the figure, carry out the support segment engineering design: according to the support form and various parameters, carry out three-dimensional support design for the support segment, such as Figure 5 As shown; Volume measurement before support: Through the entity function of 3Dmine software, close both ends of the support section tunnel and measure the entity volume V1 before support, as shown Figure 6 After the support, the shaft and tunnel are 3D scanned and a 3D solid model is established, as shown in Figure 7 According to the solid model after support, the volume V2 of the shaft after support is measured after closing the solid, as shown in Figure 8 The solid before and after support is cross-sectioned and the thickness is checked, as shown in Fig. 9 After the completion acceptance, the support engineering completion drawing is sorted out, as shown in Fig.10 shown.

[0050] Preferably, the specific steps are as follows: (1) Preparation before support: Mechanical prying of the shaft and tunnel is performed before scanning to ensure the safety of construction work and the accuracy of scanning data before the start of support engineering.

[0051] (2) Use the Hovermap scanner to conduct three-dimensional scanning of the shafts and tunnels, collect the original scanning point cloud data of the required support tunnel area and ≥3 measurement control points near the tunnel, with a scanning accuracy of ≤1cm; use professional point cloud processing software to solve the original data and obtain the point cloud data in the format required for point cloud processing, and calibrate the point cloud data through the scanned measurement control points to make the scanned point cloud data consistent with the mine measurement control system, with a control point calibration accuracy of ≤5mm; delete duplicate or interfering points in the point cloud (such as noise caused by large dust, points formed by tunnel wind ducts, water pipes, cables, etc. blocking the tunnel wall), thin the point cloud data, control the distance between points to ≤5cm, and organize to obtain vectorized point cloud data that matches the mine measurement control system. Figure 1 As shown: (3) Three-dimensional solid model: The solid model is established through 3Dmine mining software based on three-dimensional vectorized point cloud data. First, the rough solid model is automatically built with point cloud data through 3Dmine mining software. Then, the solid model is continuously verified and optimized by eliminating intersecting triangle edges, reorganizing invalid triangle edges, and connecting open edges. Finally, a refined solid model that meets quality requirements is formed as the basis for geological modeling and three-dimensional design of support engineering. Figure 2 As shown: (4) Three-dimensional geological modeling: Based on the physical model and geological catalog, the structural and lithological characteristics of the shaft and tunnel faults, layer joints, intrusions, etc. are obtained. According to the spatial combination of geological principles, the strike, dip, inclination and other occurrences in a three-dimensional state are made through 3Dmine software. Finally, various elements such as structure, occurrence, and lithology are integrated to establish a three-dimensional geological model of the shaft and tunnel with spatial attributes, providing a spatial digital basis for roof classification, thereby determining a scientific and reasonable support method. Figure 3 As shown: (5) Roof classification to determine support level and support length: Based on the three-dimensional geological model, according to the roof classification specifications (there are four levels of roof: Level I roof-layer joints are well developed, the bedding joint spacing is less than 0.1m, the fault is greater than 2m, and the lithology is scattered and fragmented; Level II roof-layer joints are well developed, the bedding joint spacing is 0.1-1m, the fault is 1-2m, and the lithology is layered; Level III roof-layer joints are not developed, the bedding joint spacing is less than 2- 3m, fault 0.3-1m, rock characteristics are blocky; Grade IV roof layer - joints are extremely undeveloped, bedding and joint spacing is >3m, fault <0.3m, rock characteristics are good integrity), carry out roof classification, determine the support form of the poor geological section (Grade I roof - casting or anchor mesh spraying support, Grade II roof - anchor spraying support, Grade III roof - local anchor support, Grade IV roof - no support), and determine the support length according to the impact range of the poor geological section. Figure 4 As shown: (6) Three-dimensional design of support engineering: Carry out three-dimensional design of support engineering according to the support level, parameters, and length (taking the anchor mesh spraying support commonly used in mines as an example). The mesh design is based on the mesh parameters, and the points and point connecting lines are generated through the 3Dmine software "Solid-Solid Tool-Solid Surface Mesh"; the anchor rod design uses the software to draw the anchor rod length and anchor plate size, and draws to the mesh intersection position according to the construction angle and spacing; the spraying concrete design uses the entity scaling function to obtain the tunnel design model after support, and the final measurement summary can obtain the design engineering quantity of anchor rods, meshes, and spraying concrete. Figure 5 As shown: (7) Measure the volume before support: Use the 3Dmine software to build a three-dimensional solid model of the shaft and tunnel, and use "solid-generate open edge-closed line to generate solid-merge solid" and "solid-solid volume" to obtain the closed support section volume V1, which will serve as the base for later engineering quantity calculation, such as Figure 6 shown.

[0052] (8) Construction and hidden inspection: After the mesh and anchor construction is completed, hidden inspection is completed, and shotcrete support is carried out after passing the inspection.

[0053] (9) 3D scanning of the tunnel after support and establishment of 3D solid model: Similar to the above (2)-(3). Figure 7 shown.

[0054] (10) Measuring the volume of the tunnel after support: Similar to (7) above, the volume after support is measured V2 to create conditions for quality acceptance. Figure 8 shown.

[0055] (11) Quality acceptance and engineering quantity accounting: Use 3Dmine software to import the three-dimensional solid models before and after support, and form the front and rear support sections through "Create-Section-Wire Cutting" or cutting sections. The shotcrete thickness can be measured for any section of the support section to complete the acceptance of the shotcrete thickness. The difference between the solid volumes V1 before support and V2 after support is used to obtain the actual engineering quantity of shotcrete or pouring, and the acceptance of engineering quantity is completed. Qualified conditions: On each section of shotcrete, more than 60% of the thickness of the sprayed layer at all inspection holes should not be less than the designed thickness; the minimum value should not be less than 50% of the designed thickness; and the average value of the thickness of the sprayed layer at the inspection hole should not be less than the designed thickness; V1-V2 ≥ the designed shotcrete engineering quantity. If Fig. 9 shown.

[0056] (12) After the completion acceptance, various acceptance projects are sorted out and drawn to obtain the completion drawings of the support projects. Fig.10 shown.

[0057] To achieve the above purpose, the present invention also provides a digital processing system for mine tunnel support based on 3Dmine, such as Fig.12 As shown, the system is applied to the digital processing method for mine tunnel support based on 3Dmine, and the system includes: A first data generating unit is used to generate and obtain first data corresponding to the mine shaft and tunnel to be supported and digitized; wherein the first data is three-dimensional vectorized point cloud data of the shaft and tunnel; The first module construction unit is used to create a first model and a second model corresponding to the first data respectively according to the first data and in combination with 3Dmine; wherein the first model is a three-dimensional solid model; and the second model is a three-dimensional geological model; A second module construction unit is used to generate second data corresponding to mine shaft and tunnel support based on the first model and the second model, and to construct a third model corresponding to mine shaft and tunnel support according to the second data; wherein the second data includes support level data, parameter data and length data; and the third model is a design model of the tunnel after support; The second data generating unit is used to generate corresponding third data based on the third model; wherein the third data is measurement data corresponding to mine shaft and tunnel support.

[0058] The first data generating unit further includes: The first generating module is used to generate and obtain fourth data and fifth data corresponding to the required support tunnel area in combination with the three-dimensional scanner; wherein the fourth data is the original scanning point cloud data; and the fifth data is the measurement control point data near the tunnel; A second generating module is used to solve and process the fourth data, and generate sixth data corresponding to the fourth data, and calibrate the sixth data based on the fifth data; wherein the sixth data is point cloud data in a required format; The first processing module is used to delete the repeated or interfering point data in the sixth data and to thin out the sixth data; wherein the point data includes noise point data caused by large dust, and point data formed by tunnel wind tubes, water pipes, and cables blocking the tunnel wall; And / or, the first module building unit further includes: The second processing module is used to establish a rough solid model based on 3Dmine, and verify and optimize the first model by eliminating intersecting triangle edges, reorganizing invalid triangle edges, and connecting open edges; A first establishment module is used to generate and obtain seventh data, and establish a second model of the shaft and tunnel with spatial attributes according to the first model; wherein the seventh data is the shaft and tunnel fault, layer joint, intrusion structure and lithology characteristic data; And / or, the second module building unit further includes: A third generation module is used to carry out roof classification based on the second model and in accordance with the roof classification specification data, generate support form data of the poor geological section, and generate corresponding support length data according to the influence range of the poor geological section; A fourth generating module, used to generate point data and line data corresponding to the support respectively according to the second data and in combination with the grid parameter data; And / or, the second data generating unit further includes: The fifth generation module is used to generate corresponding eighth data based on the first model corresponding to the shaft and tunnel after support and in combination with the third model corresponding to the shaft and tunnel after support; wherein the eighth data is the measurement data corresponding to the mine shaft and tunnel after support.

[0059] The second module building unit further includes: A second building module is used to build a first model corresponding to the supported shaft and lane based on the third model; The sixth generation module is used to generate a third model corresponding to the supported shaft and lane based on the first model corresponding to the supported shaft and lane.

[0060] In the system solution embodiment of the present invention, the method steps involved in the digital processing of mine shaft and tunnel support based on 3Dmine have been described above in detail. That is to say, the functional modules in the system are used to implement the steps or sub-steps in the above method embodiment, which will not be repeated here.

[0061] To achieve the above objectives, the present invention also provides a digital processing platform for mine tunnel support based on 3Dmine, such as Fig.13 As shown, it includes a processor, a memory and a 3Dmine-based mine shaft and tunnel support digital processing platform control program; wherein, the processor executes the 3Dmine-based mine shaft and tunnel support digital processing platform control program, the 3Dmine-based mine shaft and tunnel support digital processing platform control program is stored in the memory, and the 3Dmine-based mine shaft and tunnel support digital processing platform control program implements the 3Dmine-based mine shaft and tunnel support digital processing method steps. For example: S01, generating and acquiring first data corresponding to a mine shaft and lane to be supported and digitized; wherein the first data is three-dimensional vectorized point cloud data of the shaft and lane; S02. Based on the first data and in combination with 3Dmine, create a first model and a second model corresponding to the first data respectively; wherein the first model is a three-dimensional solid model; and the second model is a three-dimensional geological model; S03, based on the first model and the second model, generating second data corresponding to mine shaft and tunnel support, and constructing a third model corresponding to mine shaft and tunnel support according to the second data; wherein the second data includes support level data, parameter data and length data; the third model is a design model of the tunnel after support; S04. Generate corresponding third data based on the third model; wherein the third data is measurement data corresponding to mine shaft and tunnel support.

[0062] The specific details of the steps have been explained above and will not be repeated here.

[0063] In the embodiment of the present invention, the built-in processor of the digital processing platform for mine shaft and tunnel support based on 3Dmine can be composed of integrated circuits, for example, it can be composed of a single packaged integrated circuit, or it can be composed of multiple integrated circuits with the same or different functions, including one or more central processing units (CPU), microprocessors, digital processing chips, graphics processors and various control chips. The processor uses various interfaces and lines to connect various components, and executes or executes programs or units stored in the memory, and calls data stored in the memory to perform various functions and process data of digital processing of mine shaft and tunnel support based on 3Dmine; The memory is used to store program codes and various data. It is installed in the digital processing platform for mine shaft support based on 3Dmine, and realizes high-speed and automatic access to programs or data during operation.

[0064] The memory includes read-only memory (ROM), random access memory (RAM), programmable read-only memory (PROM), erasable programmable read-only memory (EPROM), one-time programmable read-only memory (OTPROM), electronically erasable programmable read-only memory (EEPROM), compact disc read-only memory (CD-ROM) or other optical disc storage, magnetic disk storage, magnetic tape storage, or any other computer-readable medium that can be used to carry or store data.

[0065] The present invention generates and obtains first data corresponding to mine shafts and tunnels to be supported and digitally processed through a method; wherein the first data is three-dimensional vectorized point cloud data of shafts and tunnels; according to the first data and in combination with 3Dmine, a first model and a second model corresponding to the first data are created respectively; wherein the first model is a three-dimensional solid model; the second model is a three-dimensional geological model; based on the first model and the second model, second data corresponding to mine shaft and tunnel support are generated, and according to the second data, a third model corresponding to mine shaft and tunnel support is constructed; wherein the second data includes support level data, parameter data and length data; the third model is a tunnel design model after support; based on the third model, corresponding third data is generated; wherein the third data is measurement data corresponding to mine shaft and tunnel support, and a system and platform corresponding to the method are conducive to promoting the refined, efficient and digital management of the entire process of shaft and tunnel support engineering, improving the production organization efficiency of mining enterprises, and improving the safety management capabilities of various underground shaft and tunnel engineering and the construction quality control capabilities of support engineering.

[0066] That is to say, through the scheme of the present invention, the three-dimensional solid model generated by collecting point cloud data through a high-precision Hovermap scanner is compared with the original two-dimensional plane data generated by the shaft coordinates measured by the full-scale measurement, which highly restores the real shape of the irregular shaft.

[0067] Second, the establishment of a three-dimensional geological model can intuitively identify the faults, layer joints, and lithology of the bad geological section, accurately determine the roof grade, and help identify the degree of damage to the shaft and tunnel by the bad geological body. According to the characteristics of the emergency, difficulty, and danger of each section of the support project, the construction priority is guided to achieve project progress control; based on the three-dimensional entity and three-dimensional geological model of the shaft and tunnel, three-dimensional support design is carried out to intuitively reflect the support effect and design engineering quantity accounting; during quality acceptance, the shaft and tunnel entity model established by scanning twice before and after support can check the support thickness of the roof side of any support section to avoid cutting corners, further constrain construction behavior, and achieve quality control. Compared with the usual manual section of 5m per section, the engineering quantity calculated by the fixed formula after averaging, the engineering quantity obtained by high-precision scanning is more accurate during the final acceptance. At the same time, the application of new digital support engineering technology has enabled the transformation of shaft and tunnel engineering from two-dimensional to three-dimensional digitalization, realizing the refined management of construction progress, construction quality, and engineering costs. It is mainly suitable for support projects such as anchor spraying, anchor mesh spraying, grouting, and pouring commonly used by metal and non-metal mining enterprises.

[0068] Third, the implementation of this technology will help promote the digitalization, refinement and efficiency of the entire process of shaft and tunnel support engineering, improve the production organization efficiency of mining enterprises, improve the safety management capabilities of various shaft and tunnel engineering projects underground and the quality control capabilities of support engineering construction, and has a strong guiding significance for the construction of digital and intelligent mines.

[0069] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.

Claims

1. A digital processing method for mine tunnel support based on 3Dmine, characterized in that: The method comprises the steps of: Generate and obtain first data corresponding to the mine shaft and tunnel to be supported and digitized; wherein the first data is three-dimensional vectorized point cloud data of the shaft and tunnel; Based on the first data and in combination with 3Dmine, a first model and a second model corresponding to the first data are created respectively; wherein the first model is a three-dimensional solid model; and the second model is a three-dimensional geological model; Based on the first model and the second model, second data corresponding to mine shaft and tunnel support are generated, and according to the second data, a third model corresponding to mine shaft and tunnel support is constructed; wherein the second data includes support level data, parameter data and length data; and the third model is a design model of the tunnel after support; Based on the third model, corresponding third data are generated; wherein the third data are measurement data corresponding to mine shaft and tunnel support.

2. A digital processing method for mine tunnel support based on 3Dmine according to claim 1, characterized in that: The generating and acquiring of first data corresponding to the mine shaft and tunnel to be supported and digitally processed also includes: Combined with a three-dimensional scanner, fourth data and fifth data corresponding to the required support tunnel area are respectively generated and acquired; wherein the fourth data is the original scanning point cloud data; and the fifth data is the measurement control point data near the tunnel; Solving and processing the fourth data, and generating sixth data corresponding to the fourth data, and calibrating the sixth data based on the fifth data; wherein the sixth data is point cloud data in a required format; Delete the repeated or interfering point data in the sixth data, and thin out the sixth data; wherein the point data includes noise data caused by large dust, and point data formed by tunnel wind ducts, water pipes, and cables blocking the tunnel walls.

3. The method for digital processing of mine tunnel support based on 3Dmine according to claim 1 is characterized in that: The method of creating a first model and a second model corresponding to the first data respectively according to the first data and in combination with 3Dmine further includes: Based on 3Dmine, a rough solid model is established, and the first model is verified and optimized by eliminating intersecting triangle edges, reorganizing invalid triangle edges, and connecting open edges; Generate and obtain seventh data, and establish a second shaft and tunnel model with spatial attributes based on the first model; wherein the seventh data is shaft and tunnel fault, layer joint, intrusion structure and lithology characteristic data.

4. The method for digital processing of mine shaft and tunnel support based on 3Dmine according to claim 1 is characterized in that: The method of generating second data corresponding to mine shaft and tunnel support based on the first model and the second model, and constructing a third model corresponding to mine shaft and tunnel support according to the second data, further includes: Based on the second model and according to the roof classification specification data, roof classification is carried out to generate support form data of the poor geological section, and at the same time, corresponding support length data is generated according to the influence range of the poor geological section; According to the second data, combined with the mesh parameter data, point data and line data corresponding to the support are generated respectively.

5. A 3Dmine-based digital processing method for mine tunnel support according to claim 1 or 4, characterized in that: The method of generating second data corresponding to mine shaft and tunnel support based on the first model and the second model, and constructing a third model corresponding to mine shaft and tunnel support according to the second data, further includes: Based on the third model, construct a first model corresponding to the shaft and lane after support; A third model corresponding to the shaft and tunnel after support is generated based on the first model corresponding to the shaft and tunnel after support.

6. The method for digital processing of mine tunnel support based on 3Dmine according to claim 1 is characterized in that: The generating corresponding third data based on the third model further includes: Based on the first model corresponding to the shaft and tunnel after support, and in combination with the third model corresponding to the shaft and tunnel after support, the corresponding eighth data is generated; wherein, the eighth data is the measurement data corresponding to the mine shaft and tunnel after support.

7. A digital processing system for mine tunnel support based on 3Dmine, characterized in that: The system is applied to the digital processing method for mine tunnel support based on 3Dmine as claimed in any one of claims 1 to 4, and the system comprises: A first data generating unit is used to generate and obtain first data corresponding to the mine shaft and tunnel to be supported and digitized; wherein the first data is three-dimensional vectorized point cloud data of the shaft and tunnel; The first module construction unit is used to create a first model and a second model corresponding to the first data respectively according to the first data and in combination with 3Dmine; wherein the first model is a three-dimensional solid model; and the second model is a three-dimensional geological model; A second module construction unit is used to generate second data corresponding to mine shaft and tunnel support based on the first model and the second model, and to construct a third model corresponding to mine shaft and tunnel support according to the second data; wherein the second data includes support level data, parameter data and length data; and the third model is a design model of the tunnel after support; The second data generating unit is used to generate corresponding third data based on the third model; wherein the third data is measurement data corresponding to mine shaft and tunnel support.

8. The 3Dmine-based digital processing system for mine tunnel support according to claim 7 is characterized in that: The first data generating unit further includes: The first generating module is used to generate and obtain fourth data and fifth data corresponding to the required support tunnel area in combination with the three-dimensional scanner; wherein the fourth data is the original scanning point cloud data; and the fifth data is the measurement control point data near the tunnel; A second generating module is used to solve and process the fourth data, and generate sixth data corresponding to the fourth data, and calibrate the sixth data based on the fifth data; wherein the sixth data is point cloud data in a required format; The first processing module is used to delete the repeated or interfering point data in the sixth data and to thin out the sixth data; wherein the point data includes noise point data caused by large dust, and point data formed by tunnel wind tubes, water pipes, and cables blocking the tunnel wall; And / or, the first module building unit further includes: The second processing module is used to establish a rough solid model based on 3Dmine, and verify and optimize the first model by eliminating intersecting triangle edges, reorganizing invalid triangle edges, and connecting open edges; A first establishment module is used to generate and obtain seventh data, and establish a second model of the shaft and tunnel with spatial attributes according to the first model; wherein the seventh data is the shaft and tunnel fault, layer joint, intrusion structure and lithology characteristic data; And / or, the second module building unit further includes: A third generation module is used to carry out roof classification based on the second model and in accordance with the roof classification specification data, generate support form data of the poor geological section, and generate corresponding support length data according to the influence range of the poor geological section; A fourth generating module, used to generate point data and line data corresponding to the support respectively according to the second data and in combination with the grid parameter data; And / or, the second data generating unit further includes: The fifth generation module is used to generate corresponding eighth data based on the first model corresponding to the shaft and tunnel after support and in combination with the third model corresponding to the shaft and tunnel after support; wherein the eighth data is the measurement data corresponding to the mine shaft and tunnel after support.

9. A 3Dmine-based digital processing system for mine shaft and tunnel support according to claim 7 or 8, characterized in that: The second module building unit further includes: A second building module is used to build a first model corresponding to the supported shaft and lane based on the third model; The sixth generation module is used to generate a third model corresponding to the supported shaft and lane based on the first model corresponding to the supported shaft and lane.

10. A digital processing platform for mine tunnel support based on 3Dmine, characterized in that: It includes a processor, a memory and a 3Dmine-based digital processing platform control program for mine shaft and tunnel support; wherein the 3Dmine-based digital processing platform control program for mine shaft and tunnel support is executed by the processor, and the 3Dmine-based digital processing platform control program for mine shaft and tunnel support is stored in the memory, and the 3Dmine-based digital processing platform control program for mine shaft and tunnel support implements the 3Dmine-based digital processing method for mine shaft and tunnel support as described in any one of claims 1 to 6.

Citation Information

Patent Citations

  • Method for underground tunnel drilling construction and geological information inversing

    CN103184887A

  • Data collection system for mine tunnel three-dimensional modeling

    CN203702258U

  • Mine laneway anchor rod supporting structure

    CN220769510U