During the rate setting process of multi-functional power meter, the initial rate setting information is directly applied without effective verification, which may lead to rate setting errors, thereby reducing the efficiency and accuracy of parameter settings.
A multifunctional power meter parameter setting method is provided, and the effectiveness verification is carried out by receiving initial rate setting information. If the verification is successful, the initial rate setting information is applied; if the verification is failed, the initial rate setting information is adjusted to obtain the target rate setting information, and applied to the parameter settings of the power meter.
Ensure that only the rate setting information that passes validation is applied, which improves the accuracy of rate setting and improves the efficiency of the multi-functional power meter when setting parameters.
Smart Images

Figure CN119511185A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of electric energy meter equipment, and in particular to a parameter setting method and related devices for a multifunctional electric energy meter. Background Art
[0002] With the rapid development of the power industry, energy meters, as key equipment in the power system, have gradually evolved from traditional mechanical meters to modern electronic and intelligent meters. In particular, the application of multifunctional energy meters enables power companies to more efficiently perform energy metering, rate management, and remote meter reading. The rate period setting, data reading, and automated and manual parameter adjustment functions of multifunctional energy meters have become an essential component for improving the efficiency of power system management.
[0003] However, in terms of meter rate setting, if the initial rate setting information is directly applied without effective verification, it may lead to rate setting errors, making the multi-function electricity meter inefficient and inaccurate in parameter setting. Summary of the invention
[0004] The embodiment of the present application provides a parameter setting method and related devices for a multi-function electric energy meter, which can verify the validity of the initial rate setting information of the multi-function electric energy meter, ensuring that only the rate setting information that passes the validity verification can be applied to the parameter setting of the electric energy meter, thereby improving the accuracy of the rate setting, and improving the efficiency of the multi-function electric energy meter when setting parameters.
[0005] A first aspect of an embodiment of the present application provides a parameter setting method for a multifunctional electric energy meter, the method comprising:
[0006] receiving initial rate setting information for the multi-function electric energy meter to be set;
[0007] Performing validity verification on the initial rate setting information to obtain a validity verification result;
[0008] If the validity verification result is successful, setting the rate parameters of the multi-function electric energy meter to be set using the initial rate setting information;
[0009] If the validity verification result is a verification failure, adjusting the initial rate setting information to obtain target rate setting information;
[0010] The target rate setting information is used to set the rate parameters of the multi-function electric energy meter to be set.
[0011] Further, the performing validity verification on the initial rate setting information to obtain a validity verification result includes:
[0012] Get the current rate information of the multi-function electric energy meter to be set;
[0013] The current rate information and the standard rate information are used to verify the validity of the initial rate setting information to obtain a validity verification result.
[0014] Further, the receiving of initial rate setting information for the multi-function electric energy meter to be set includes:
[0015] Receive input data from the target user;
[0016] Initial rate setting information for the multi-function electric energy meter to be set is extracted from the input data.
[0017] Furthermore, the method further comprises:
[0018] Receiving reading instructions for k multi-function electric energy meters;
[0019] According to the reading instruction, data to be read in the first multifunctional electric energy meter is located to obtain a data location result, wherein the first multifunctional electric energy meter is any one of the k multifunctional electric energy meters;
[0020] If the data positioning result does not locate the data to be read, then the reading of the first multi-function electric energy meter is terminated;
[0021] If the data positioning result is that the data to be copied is located, the data to be copied is read;
[0022] Performing validity verification on the data to be copied and read to obtain a validity verification result;
[0023] If the validity verification result is a verification failure, the first multi-function electric energy meter is repeatedly read n times and when the validity verification results of the read data are all verification failures, the reading of the first multi-function electric energy meter is terminated; if the validity verification result of the read data is a verification success at any time, the read data is saved, and the read data is determined as the read data of the first multi-function electric energy meter and saved;
[0024] If the validity verification result is successful, the data to be copied is saved;
[0025] Repeat the above step of locating the data to be read in the first multi-function electric energy meter according to the reading instruction to obtain a data locating result, and if the validity verification result is successful, maintaining the data to be read, until the data reading of k multi-function electric energy meters is completed to obtain the reading result.
[0026] Further, the adjusting the initial rate setting information to obtain the target rate setting information includes:
[0027] Acquire user demand information of the target user;
[0028] The initial rate setting information is adjusted according to the current rate information, the standard rate information and the user demand information to obtain the target rate setting information.
[0029] In this example, initial rate setting information for a multi-function electric energy meter to be set is received, and validity is verified based on the initial rate setting information. When the verification succeeds, the initial rate setting information is used to set rate parameters for the multi-function electric energy meter to be set. If the verification fails, the initial rate setting information is adjusted to obtain target rate setting information. Then, the updated target rate setting information is used to set the rate parameters for the multi-function electric energy meter, ensuring that only the rate setting information that has passed the validity verification can be applied to the parameter setting of the electric energy meter, thereby improving the accuracy of the rate setting and improving the efficiency of the multi-function electric energy meter when setting parameters.
[0030] A second aspect of an embodiment of the present application provides a parameter setting device for a multifunctional electric energy meter, the device comprising:
[0031] A first acquisition unit, configured to receive initial rate setting information for the multi-function electric energy meter to be set;
[0032] A verification unit, used to verify the validity of the initial rate setting information and obtain a validity verification result;
[0033] A first processing unit, configured to use the initial rate setting information to set rate parameters for the multi-function electric energy meter to be set if the validity verification result is successful;
[0034] A second processing unit, configured to adjust the initial rate setting information to obtain target rate setting information if the validity verification result is a verification failure;
[0035] The third processing unit uses the target rate setting information to set rate parameters for the multi-function electric energy meter to be set.
[0036] Furthermore, the method further includes a fourth processing unit, wherein the fourth processing unit is configured to:
[0037] Receiving reading instructions for k multi-function electric energy meters;
[0038] According to the reading instruction, data to be read in the first multifunctional electric energy meter is located to obtain a data location result, wherein the first multifunctional electric energy meter is any one of the k multifunctional electric energy meters;
[0039] If the data positioning result does not locate the data to be read, then the reading of the first multi-function electric energy meter is terminated;
[0040] If the data positioning result is that the data to be copied is located, the data to be copied is read;
[0041] Performing validity verification on the data to be copied and read to obtain a validity verification result;
[0042] If the validity verification result is a verification failure, the first multi-function electric energy meter is repeatedly read n times and when the validity verification results of the read data are all verification failures, the reading of the first multi-function electric energy meter is terminated; if the validity verification result of the read data is a verification success at any time, the read data is saved, and the read data is determined as the read data of the first multi-function electric energy meter and saved;
[0043] If the validity verification result is successful, the data to be copied is saved;
[0044] Repeat the above step of locating the data to be read in the first multi-function electric energy meter according to the reading instruction to obtain a data locating result, and if the validity verification result is successful, maintaining the data to be read, until the data reading of k multi-function electric energy meters is completed to obtain the reading result.
[0045] Further, in the aspect of receiving the initial rate setting information for the multi-function electric energy meter to be set, the first acquisition unit is used to:
[0046] Receive input data from the target user;
[0047] Initial rate setting information for the multi-function electric energy meter to be set is extracted from the input data.
[0048] Further, in the aspect of performing validity verification on the initial rate setting information to obtain a validity verification result, the verification unit is used to:
[0049] Get the current rate information of the multi-function electric energy meter to be set;
[0050] The current rate information and the standard rate information are used to verify the validity of the initial rate setting information to obtain a validity verification result.
[0051] Further, in the aspect of adjusting the initial rate setting information to obtain the target rate setting information, the second processing unit is used to:
[0052] Acquire user demand information of the target user;
[0053] The initial rate setting information is adjusted according to the current rate information, the standard rate information and the user demand information to obtain the target rate setting information.
[0054] A third aspect of an embodiment of the present application provides a terminal, comprising a processor, an input device, an output device and a memory, wherein the processor, input device, output device and memory are interconnected, wherein the memory is used to store a computer program, and the computer program includes program instructions, and the processor is configured to call the program instructions to execute the step instructions of the parameter setting method of the multi-function electric energy meter in the first aspect of the embodiment of the present application.
[0055] The fourth aspect of the embodiments of the present application provides a computer-readable storage medium, wherein the above-mentioned computer-readable storage medium stores a computer program for electronic data exchange, wherein the above-mentioned computer program enables the computer to execute part or all of the steps described in the parameter setting method of the multi-function electric energy meter in the first aspect of the embodiments of the present application.
[0056] A fifth aspect of the embodiments of the present application provides a computer program product, wherein the computer program product includes a non-transitory computer-readable storage medium storing a computer program, and the computer program is operable to cause a computer to execute some or all of the steps described in the parameter setting method of the multi-function electric energy meter in the first aspect of the embodiments of the present application. The computer program product may be a software installation package. BRIEF DESCRIPTION OF THE DRAWINGS
[0057] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0058] Figure 1 A flow chart of a method for setting parameters of a multifunctional electric energy meter is provided for an embodiment of the present application;
[0059] Figure 2 A schematic structural diagram of a parameter setting device for a multifunctional electric energy meter is provided for an embodiment of the present application;
[0060] Figure 3 A schematic diagram of the structure of a terminal provided in an embodiment of the present application;
[0061] Reference numerals:
[0062] First acquisition unit-1, verification unit-2 first processing unit-3, second processing unit-4, third processing unit-5, fourth processing unit-6. DETAILED DESCRIPTION
[0063] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0064] The terms "first", "second", etc. in the specification and claims of this application and the above-mentioned drawings are used to distinguish different objects, rather than to describe a specific order. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or device that includes a series of steps or units is not limited to the listed steps or units, but optionally includes steps or units that are not listed, or optionally includes other steps or units inherent to these processes, methods, products or devices.
[0065] Reference to "embodiments" in this application means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described in this application may be combined with other embodiments.
[0066] In order to better understand the parameter setting method of a multifunctional electric energy meter provided in an embodiment of the present application, the following first briefly introduces the scenario of applying the parameter setting method of the multifunctional electric energy meter. When the operator sets the rate parameters of the electric energy meter, the operator may enter an incorrect rate value due to negligence or misunderstanding when entering the rate setting information. For example, he may set the rate for a certain period of time too low or too high, or confuse the rate of a certain user type with other types. This leads to an incorrect rate setting, which in turn causes a deviation in the calculation of the electricity fee, and may cause the electricity fee paid by the user to be lower or higher than the actual amount payable. The embodiment of the present application aims to solve the problem of low accuracy in setting parameters of the multifunctional electric energy meter, and provides a parameter setting method for a multifunctional electric energy meter. The method can verify the validity of the initial rate setting information of the multifunctional electric energy meter, ensure that only the rate setting information that passes the validity verification can be applied to the parameter setting of the electric energy meter, thereby improving the accuracy of the rate setting, so that the efficiency of the multifunctional electric energy meter is improved when setting parameters.
[0067] The parameter setting method of the multifunctional electric energy meter is applied to the parameter setting device of the multifunctional electric energy meter. Figure 1 The figure shows a schematic diagram of the overall process of a parameter setting method of a multifunctional electric energy meter. Figure 1As shown, the parameter setting method of the multifunctional electric energy meter comprises:
[0068] S1. Receive initial rate setting information for the multi-function electric energy meter to be set, specifically including:
[0069] Receive input data from the target user;
[0070] Initial rate setting information for the multi-function electric energy meter to be set is extracted from the input data, wherein the initial rate setting information includes rate information and time period information.
[0071] S2. Verify the validity of the initial rate setting information to obtain a validity verification result. Specifically, it includes:
[0072] S201, obtaining the current rate information of the multifunctional electric energy meter to be set. Obtain the current rate information of the multifunctional electric energy meter and the time period of the current rate information.
[0073] S202: Use the current rate information and the standard rate information to verify the validity of the initial rate setting information, and obtain a validity verification result. The initial rate setting information is used as the preset current rate information, and the current rate information is compared with the standard rate information: if the current rate information is consistent with the standard rate information, the validity verification result is a success; if the current rate information is inconsistent with the standard rate information, the validity verification result is a failure.
[0074] In this example, the standard rate is used as the standard for validity authentication, and the initial rate setting information of the user's preset value is verified for validity, so as to avoid users entering incorrect rate setting information and ensure that the validity verification result can only be successful if the user enters rate setting information that is consistent with the standard rate, thereby improving the accuracy of the rate setting of the electricity meter.
[0075] Preferably, in this embodiment, when the validity verification result is that the verification is successful, step S3 is executed; if the validity verification result is that the verification fails, steps S4 to S5 are executed.
[0076] S3. If the validity verification result is successful, the initial rate setting information is used to set the rate parameters of the multifunctional electric energy meter to be set. In this embodiment, the method of setting the rate parameters of the multifunctional electric energy meter to be set includes:
[0077] S301. Receive input data from a target user, where the input data includes initial rate setting information set by the user and other input data for an electric energy meter.
[0078] S302, extracting the initial rate setting information of the multi-function electric energy meter to be set from the input data, adjusting the initial rate setting information of the multi-function electric energy meter to be set to the current rate information of the current multi-function electric energy meter, at this time the input rate information is consistent with the standard rate information, that is, the accurate electric energy meter rate information.
[0079] S4. If the validity verification result is a verification failure, the initial rate setting information is adjusted to obtain target rate setting information. This includes:
[0080] S401: Acquire user demand information of the target user.
[0081] S402: Adjust the initial rate setting information according to the current rate information, the standard rate information and the user demand information to obtain the target rate setting information. The adjustment process includes: retrying to read the initial rate setting information input by the user, and taking the initial rate setting information as the preset current rate information, and comparing it with the standard rate, repeating this step until the preset current rate information is consistent with the standard rate or the step of re-extracting the initial rate setting information reaches the setting upper limit, and when the step of re-extracting the initial rate setting information reaches the setting upper limit, taking the user demand information of the current target user as the current rate information and saving it.
[0082] S5, using the target rate setting information to set the rate parameters of the multifunctional electric energy meter to be set, and saving the current rate information in step S4 as the target rate setting information. The target rate setting information at this time may be the initial rate setting information consistent with the standard rate, or may be the initial rate setting information inconsistent with the standard rate that has reached the upper limit of the retry step.
[0083] In this example, initial rate setting information for a multi-function electric energy meter to be set is received, and validity is verified based on the initial rate setting information. When the verification succeeds, the initial rate setting information is used to set rate parameters for the multi-function electric energy meter to be set. If the verification fails, the initial rate setting information is adjusted to obtain target rate setting information. Then, the updated target rate setting information is used to set the rate parameters for the multi-function electric energy meter, ensuring that only the rate setting information that has passed the validity verification can be applied to the parameter setting of the electric energy meter, thereby improving the accuracy of the rate setting and improving the efficiency of the multi-function electric energy meter when setting parameters.
[0084] Preferably, in this embodiment, another parameter setting method of the multifunctional electric energy meter further includes:
[0085] A1. Receive the reading instruction for k multi-function electric energy meters, start the reading process, and prepare to read the data of the specified k multi-function electric energy meters.
[0086] A2. According to the reading instruction, data to be read in the first multifunctional electric energy meter is located to obtain a data positioning result. The first multifunctional electric energy meter is any one of the k multifunctional electric energy meters. The specific data position to be read in the multifunctional electric energy meter is determined to prepare for subsequent data reading.
[0087] A3. If the data positioning result fails to locate the data to be read, the reading of the first multi-function electric energy meter is terminated, that is, the data positioning fails, and the current erroneous data to be read is not read.
[0088] A4. If the data positioning result is that the data to be read is located, the data to be read is read, and the required data is actually read from the multifunctional electric energy meter according to the data positioning result.
[0089] A5. Verify the validity of the data to be copied and obtain a validity verification result to check whether the read data meets the expected format, range or standard to ensure the accuracy and reliability of the data.
[0090] Preferably, in this embodiment, when the validity verification result indicates that the verification is successful, step A7 is executed, otherwise step A6 is executed.
[0091] A6. If the validity verification result is a verification failure, the first multifunctional electric energy meter is repeatedly read n times and when the validity verification results of the read data are all verification failures, the reading of the first multifunctional electric energy meter is terminated. If the validity verification result of any read data is a verification success, the read data is saved, and the read data is determined as the read data of the first multifunctional electric energy meter and saved. In the case of data verification failure, multiple attempts are made to improve the success rate of data reading. If it still fails after multiple attempts, further reading of the meter is abandoned, which may be due to problems with the meter itself or communication failure.
[0092] A7. If the validity verification result is successful, the data to be copied is saved. Once the data verification is successful, the data is saved as a valid copy result to ensure the accuracy of the data.
[0093] Repeat the above step of locating the data to be read in the first multi-function electric energy meter according to the reading instruction to obtain the data locating result, and if the validity verification result is successful, keep the data to be read until the data reading of k multi-function electric energy meters is completed and the reading result is obtained, and iterate the whole process until all the data reading of k multi-function electric energy meters is completed, and ensure that the data of each meter is effectively verified and saved.
[0094] In this example, not only can the initial rate setting information be effectively verified and adjusted, but it also includes a data reading function. Through precise data positioning, multiple reading attempts and strict validity verification, it ensures that the data is accurately and reliably read from k multifunctional electric energy meters, thereby improving the efficiency and accuracy of power management. By introducing intelligent data positioning technology, the data to be read can be quickly and accurately located, thereby improving the efficiency of data reading. At the same time, the present invention also adopts a multiple reading and validity verification mechanism to ensure that the read data is saved as the final data of the electric energy meter only when the data reading is successful and the verification is passed. This mechanism effectively avoids the errors in the electricity billing system caused by data reading errors, and further improves the accuracy and reliability of power management.
[0095] As a preferred solution of this embodiment, this embodiment provides an automatic reading method for a multifunctional electric energy meter, which includes the steps of initialization, data positioning, reading, verification and error handling from the beginning to the end. Specifically: the system will reset all reading counters and check whether the data is located. If the positioning is successful and the data needs to be read, the system will read and verify the validity of the data. If the data is valid, the process will continue; if it is invalid, the system will try to read up to three times. If all three attempts fail, the system will record the error and end the process. Such a design ensures the efficiency and accuracy of the reading process, and even if errors are encountered, they can be handled in time.
[0096] In addition, this embodiment provides a single-item reading method for a single-item multifunctional electric energy meter, specifically, including: the process starts with determining whether there is data to be read, if reading is required, reading is performed, and the validity of the read data is checked. If the data is valid, the processing continues, otherwise the reading is retried until success or the retry limit is reached, and finally the data is stored and the process ends. This setting is intended to ensure the accuracy of data reading, and handle the reading failure through the retry mechanism, thereby ensuring the reliability of data processing.
[0097] In addition, the present embodiment provides an automatic parameter setting method, including: the process starts with checking whether there are unfinished setting tasks. If there are unfinished setting tasks, confirm whether the current task meets the conditions for automatic setting. If the conditions are met, the process continues to check whether the set maximum number of attempts has been reached; if not, execute the setting and verify the result. If the setting is successful, the process will check whether there are more setting tasks; if so, continue to execute the next task, otherwise end the process. If the setting fails, increase the failure count and retry until success or the number of retries reaches the upper limit. The entire process ensures that each setting task is fully verified before completion to ensure the accuracy and reliability of the setting.
[0098] In addition, this embodiment provides a manual setting process, including: the process first determines whether there are unfinished setting tasks. If there are tasks that need to be processed, the system will set them according to the data entered by the user. This includes modifications such as rates or other related parameters. After the user completes the input, the system will perform data verification to ensure that the input is correct. If the input is incorrect, the user needs to re-enter until it is correct. Once the data is verified to be correct, the system will implement the setting and check whether it is successful. If the setting is successful, the system will check whether there are other setting tasks to be performed. If so, the process is repeated; if not, the process ends. The entire manual setting process ensures that the user can accurately control each parameter, while minimizing errors through verification and retry mechanisms.
[0099] In addition, this embodiment provides a period setting process, including: the process is used to describe the setting or adjustment of the rate period of the electric energy meter based on the collected data and user input. The process starts with identifying whether the period setting is required, and after confirming the need, a series of steps (such as reviewing the existing settings, modifying the rates, and verifying the new settings) are used to adjust the rates. The process may use the data and user input provided by the automatic reading and manual setting processes to ensure the appropriateness and accuracy of the settings. Once the new rate setting is verified, the system will execute the setting changes and update the rate information in the database. If these changes cannot be verified, the system will prompt an error and require re-entry until the input is correct. At the end of the whole process, the system will confirm that all settings have been successfully updated and continue to perform other tasks or end the process. This process ensures that the setting of the rate period meets both the needs of the user and the system's requirements for data accuracy, and optimizes the setting effect through continuous verification and feedback.
[0100] The time period setting process design allows system administrators or power companies to fully manage the rate periods of the meter. This includes creating new rate periods, modifying existing periods, and deleting periods that are no longer needed. Power suppliers can flexibly adjust and implement different pricing strategies based on policy changes or market demand, and meet the specific needs of different users.
[0101] In the method provided above, the beneficial effects are as follows:
[0102] First, a rate period management mode combining automatic setting and manual setting is provided. Through the automatic setting process module, users do not need to frequently perform manual operations. The system can automatically adjust the rate according to the preset conditions to reduce human intervention; and when there is a specific need, users can also flexibly adjust the rate parameters through the manual setting process module to ensure that the system can adapt to various complex electricity price adjustment needs. This combination mode improves operational efficiency and flexibility.
[0103] Secondly, a data verification and retry mechanism is introduced to ensure that even if data fails during transmission and reading, multiple retries can be automatically performed and the transmission results can be verified. This mechanism can minimize the operation failure rate and ensure data accuracy.
[0104] Finally, a modular process design is adopted to partition the functions of single-item reading, rate period setting, automatic setting and manual setting independently. Each module can run independently, but achieve overall unity through data flow and interaction. This modular design not only makes the system functions clearer, but also facilitates later function expansion and maintenance, greatly improving the flexibility and scalability of the system.
[0105] The above mainly introduces the scheme of the embodiment of the present application from the perspective of the execution process on the method side. It is understandable that in order to realize the above functions, the terminal includes a hardware structure and / or software module corresponding to the execution of each function. Those skilled in the art should easily realize that, in combination with the units and algorithm steps of each example described in the embodiments provided herein, the present application can be implemented in the form of hardware or a combination of hardware and computer software. Whether a function is executed in the form of hardware or computer software driving hardware depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0106] The embodiment of the present application can divide the terminal into functional units according to the above method example. For example, each functional unit can be divided according to each function, or two or more functions can be integrated into one processing unit. The above integrated unit can be implemented in the form of hardware or in the form of software functional units. It should be noted that the division of units in the embodiment of the present application is schematic and is only a logical function division. There may be other division methods in actual implementation.
[0107] In line with the above, see Figure 2 , Figure 2 A parameter setting device for a multifunctional electric energy meter is provided in an embodiment of the present application. Figure 2 As shown, the device comprises:
[0108] The first acquisition unit 1 is used to receive initial rate setting information of the multi-function electric energy meter to be set.
[0109] Verification unit 2 is used to verify the validity of the initial rate setting information and obtain a validity verification result.
[0110] The first processing unit 3 is configured to, if the validity verification result is successful, use the initial rate setting information to set the rate parameters of the multi-function electric energy meter to be set.
[0111] The second processing unit 4 is configured to adjust the initial rate setting information to obtain target rate setting information if the validity verification result is verification failure.
[0112] The third processing unit 5 is used to set the rate parameters of the multi-functional electric energy meter to be set by using the target rate setting information.
[0113] The fourth processing unit 6 is used to receive reading instructions for k multi-function electric energy meters;
[0114] According to the reading instruction, data to be read in the first multifunctional electric energy meter is located to obtain a data location result, wherein the first multifunctional electric energy meter is any one of the k multifunctional electric energy meters;
[0115] If the data positioning result does not locate the data to be read, then the reading of the first multi-function electric energy meter is terminated;
[0116] If the data positioning result is that the data to be copied is located, the data to be copied is read;
[0117] Performing validity verification on the data to be copied and read to obtain a validity verification result;
[0118] If the validity verification result is a verification failure, the first multi-function electric energy meter is repeatedly read n times and when the validity verification results of the read data are all verification failures, the reading of the first multi-function electric energy meter is terminated; if the validity verification result of the read data is a verification success at any time, the read data is saved, and the read data is determined as the read data of the first multi-function electric energy meter and saved;
[0119] If the validity verification result is successful, the data to be copied is saved;
[0120] Repeat the above step of locating the data to be read in the first multi-function electric energy meter according to the reading instruction to obtain a data locating result, and if the validity verification result is successful, maintaining the data to be read, until the data reading of k multi-function electric energy meters is completed to obtain the reading result.
[0121] In a possible implementation, in the aspect of receiving the initial rate setting information for the multi-function electric energy meter to be set, the obtaining unit 1 is used to:
[0122] Receive input data from the target user;
[0123] Initial rate setting information for the multi-function electric energy meter to be set is extracted from the input data.
[0124] In a possible implementation, in the aspect of performing validity verification on the initial rate setting information to obtain a validity verification result, the verification unit 2 is used to:
[0125] Get the current rate information of the multi-function electric energy meter to be set;
[0126] The current rate information and the standard rate information are used to verify the validity of the initial rate setting information to obtain a validity verification result.
[0127] In a possible implementation, in the aspect of adjusting the initial rate setting information to obtain the target rate setting information, the second processing unit 4 is configured to:
[0128] Obtain user demand information of the target user.
[0129] The initial rate setting information is adjusted according to the current rate information, the standard rate information and the user demand information to obtain the target rate setting information.
[0130] In this example, initial rate setting information for a multi-function electric energy meter to be set is received, and validity is verified based on the initial rate setting information. When the verification succeeds, the initial rate setting information is used to set rate parameters for the multi-function electric energy meter to be set. If the verification fails, the initial rate setting information is adjusted to obtain target rate setting information. Then, the updated target rate setting information is used to set the rate parameters for the multi-function electric energy meter, ensuring that only the rate setting information that has passed the validity verification can be applied to the parameter setting of the electric energy meter, thereby improving the accuracy of the rate setting and improving the efficiency of the multi-function electric energy meter when setting parameters.
[0131] For the above embodiments, please refer to Figure 3 , Figure 3 A schematic diagram of a terminal structure provided in an embodiment of the present application is shown in FIG. Figure 3 As shown, it includes a processor, an input device, an output device and a memory, which are connected to each other, wherein the memory is used to store a computer program, the computer program includes program instructions, the processor is configured to call the program instructions, and the program includes instructions for executing the following steps;
[0132] receiving initial rate setting information for the multi-function electric energy meter to be set;
[0133] Performing validity verification on the initial rate setting information to obtain a validity verification result;
[0134] If the validity verification result is successful, setting the rate parameters of the multi-function electric energy meter to be set using the initial rate setting information;
[0135] If the validity verification result is a verification failure, adjusting the initial rate setting information to obtain target rate setting information;
[0136] The target rate setting information is used to set the rate parameters of the multi-function electric energy meter to be set.
[0137] In this example, initial rate setting information for a multi-function electric energy meter to be set is received, and validity is verified based on the initial rate setting information. When the verification succeeds, the initial rate setting information is used to set rate parameters for the multi-function electric energy meter to be set. If the verification fails, the initial rate setting information is adjusted to obtain target rate setting information. Then, the updated target rate setting information is used to set the rate parameters for the multi-function electric energy meter, ensuring that only the rate setting information that has passed the validity verification can be applied to the parameter setting of the electric energy meter, thereby improving the accuracy of the rate setting and improving the efficiency of the multi-function electric energy meter when setting parameters.
[0138] An embodiment of the present application also provides a computer storage medium, wherein the computer storage medium stores a computer program for electronic data exchange, and the computer program enables a computer to execute part or all of the steps of any method for setting parameters of a multi-function electric energy meter as recorded in the above method embodiments.
[0139] An embodiment of the present application also provides a computer program product, which includes a non-transitory computer-readable storage medium storing a computer program, and the computer program enables a computer to execute part or all of the steps of any method for setting parameters of a multi-function electric energy meter as recorded in the above method embodiments.
[0140] It should be noted that, for the aforementioned method embodiments, for the sake of simplicity, they are all expressed as a series of action combinations, but those skilled in the art should be aware that the present application is not limited by the described order of actions, because according to the present application, certain steps can be performed in other orders or simultaneously. Secondly, those skilled in the art should also be aware that the embodiments described in the specification are all preferred embodiments, and the actions and modules involved are not necessarily required by the present application.
[0141] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0142] In the several embodiments provided in the present application, it should be understood that the disclosed device can be implemented in other ways. For example, the device embodiments described above are only schematic, such as the division of the units, which is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, and the indirect coupling or communication connection of the device or unit can be electrical or other forms.
[0143] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0144] In addition, the functional units in the various embodiments of the application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated units may be implemented in the form of hardware or in the form of software program modules.
[0145] If the integrated unit is implemented in the form of a software program module and sold or used as an independent product, it can be stored in a computer-readable memory. Based on this understanding, the technical solution of the present application is essentially or the part that contributes to the prior art or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a memory, including a number of instructions to enable a computer device (which can be a personal computer, server or network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned memory includes: U disk, read-only memory (ROM), random access memory (RAM), mobile hard disk, disk or optical disk and other media that can store program codes.
[0146] A person skilled in the art can understand that all or part of the steps in the various methods of the above embodiments can be completed by instructing related hardware through a program, and the program can be stored in a computer-readable memory, which can include: a flash drive, a read-only memory, a random access memory, a magnetic disk or an optical disk, etc.
[0147] The embodiments of the present application are introduced in detail above. Specific examples are used in this article to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the method and core idea of the present application. At the same time, for general technical personnel in this field, according to the idea of the present application, there will be changes in the specific implementation method and application scope. In summary, the content of this specification should not be understood as a limitation on the present application.
Claims
1. A parameter setting method for a multifunctional electric energy meter, characterized in that: The method comprises: receiving initial rate setting information for the multi-function electric energy meter to be set; Performing validity verification on the initial rate setting information to obtain a validity verification result; If the validity verification result is successful, setting the rate parameters of the multi-function electric energy meter to be set using the initial rate setting information; If the validity verification result is a verification failure, adjusting the initial rate setting information to obtain target rate setting information; The target rate setting information is used to set the rate parameters of the multi-function electric energy meter to be set.
2. The parameter setting method of the multifunctional electric energy meter according to claim 1, characterized in that: The performing validity verification on the initial rate setting information to obtain a validity verification result includes: Get the current rate information of the multi-function electric energy meter to be set; The current rate information and the standard rate information are used to verify the validity of the initial rate setting information to obtain a validity verification result.
3. The parameter setting method of the multifunctional electric energy meter according to claim 2, characterized in that: The receiving of initial rate setting information for the multi-function electric energy meter to be set includes: Receive input data from the target user; Initial rate setting information for the multi-function electric energy meter to be set is extracted from the input data.
4. The parameter setting method of the multifunctional electric energy meter according to any one of claims 1 to 3, characterized in that: The method further comprises: Receiving reading instructions for k multi-function electric energy meters; According to the reading instruction, data to be read in the first multifunctional electric energy meter is located to obtain a data location result, wherein the first multifunctional electric energy meter is any one of the k multifunctional electric energy meters; If the data positioning result does not locate the data to be read, then the reading of the first multi-function electric energy meter is terminated; If the data positioning result is that the data to be copied is located, the data to be copied is read; Performing validity verification on the data to be copied and read to obtain a validity verification result; If the validity verification result is a verification failure, the first multi-function electric energy meter is repeatedly read n times and when the validity verification results of the read data are all verification failures, the reading of the first multi-function electric energy meter is terminated; if the validity verification result of the read data is a verification success at any time, the read data is saved, and the read data is determined as the read data of the first multi-function electric energy meter and saved; If the validity verification result is successful, the data to be copied is saved; Repeat the above step of locating the data to be read in the first multi-function electric energy meter according to the reading instruction to obtain a data locating result, and if the validity verification result is successful, maintaining the data to be read, until the data reading of k multi-function electric energy meters is completed to obtain the reading result.
5. The parameter setting method of the multifunctional electric energy meter according to claim 3, characterized in that: The adjusting the initial rate setting information to obtain the target rate setting information includes: Acquire user demand information of the target user; The initial rate setting information is adjusted according to the current rate information, the standard rate information and the user demand information to obtain the target rate setting information.
6. A parameter setting device for a multifunctional electric energy meter, characterized in that: include: A first acquisition unit, configured to receive initial rate setting information for the multi-function electric energy meter to be set; A verification unit, used to verify the validity of the initial rate setting information and obtain a validity verification result; A first processing unit, configured to use the initial rate setting information to set rate parameters for the multi-function electric energy meter to be set if the validity verification result is successful; A second processing unit, configured to adjust the initial rate setting information to obtain target rate setting information if the validity verification result is a verification failure; The third processing unit uses the target rate setting information to set rate parameters for the multi-function electric energy meter to be set.
7. The parameter setting device of the multifunctional electric energy meter according to claim 6, characterized in that: In the aspect of performing validity verification on the initial rate setting information to obtain a validity verification result, the verification unit is used to: Get the current rate information of the multi-function electric energy meter to be set; The current rate information and the standard rate information are used to verify the validity of the initial rate setting information to obtain a validity verification result.
8. The parameter setting device of the multifunctional electric energy meter according to claim 7, characterized in that: Also included is a fourth processing unit, the fourth processing unit being configured to: Receiving reading instructions for k multi-function electric energy meters; According to the reading instruction, data to be read in the first multifunctional electric energy meter is located to obtain a data location result, wherein the first multifunctional electric energy meter is any one of the k multifunctional electric energy meters; If the data positioning result does not locate the data to be read, then the reading of the first multi-function electric energy meter is terminated; If the data positioning result is that the data to be copied is located, the data to be copied is read; Performing validity verification on the data to be copied and read to obtain a validity verification result; If the validity verification result is a verification failure, the first multi-function electric energy meter is repeatedly read n times and when the validity verification results of the read data are all verification failures, the reading of the first multi-function electric energy meter is terminated; if the validity verification result of the read data is a verification success at any time, the read data is saved, and the read data is determined as the read data of the first multi-function electric energy meter and saved; If the validity verification result is successful, the data to be copied is saved; Repeat the above step of locating the data to be read in the first multi-function electric energy meter according to the reading instruction to obtain a data locating result, and if the validity verification result is successful, maintaining the data to be read, until the data reading of k multi-function electric energy meters is completed to obtain the reading result.
9. A terminal, characterized in that: It includes a processor, an input device, an output device and a memory, which are interconnected, wherein the memory is used to store a computer program, the computer program includes program instructions, and the processor is configured to call the program instructions to execute the parameter setting method of the multifunctional electric energy meter as described in any one of claims 1-5.
10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, which includes program instructions. When the program instructions are executed by a processor, the processor executes the parameter setting method for the multifunctional electric energy meter as described in any one of claims 1 to 5.