Distributed optimization scheduling method, system and device for interconnected micro-grid and medium
By building a scheduling model that includes the economic losses of interaction between the microgrid and the distribution network, and using the improved Gray Wolf algorithm optimization, the problem of insufficient optimization and scheduling of the interconnected microgrid in the existing technology is solved, and a more comprehensive and accurate scheduling solution is achieved.
Patent Information
- Application Number
- CN202411563782.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-05
- Publication Date
- 2025-02-25
AI Technical Summary
The prior art fails to fully consider the interaction between the microgrid and the distribution network in the distributed optimization scheduling of the interconnected microgrid, resulting in the generated scheduling scheme being insufficiently comprehensive.
A scheduling model is built with the target variables of power generation fuel costs, maintenance and management costs, depreciation losses costs, energy storage device life costs and economic losses of the interaction between the microgrid and the distribution network. The improved gray wolf algorithm is used to optimize the model and generate the optimal scheduling solution.
By considering the bidirectional power transmission capabilities of the microgrid and the distribution network, coordinating the interactive power, reducing the grid loss of the distribution network, and improving the comprehensiveness and accuracy of the scheduling plan.
Smart Images

Figure CN119518782A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of microgrid optimization scheduling, and in particular to a distributed optimization scheduling method, system, equipment and medium for interconnected microgrids. Background Art
[0002] Microgrid refers to a small power grid that contains distributed power sources, energy storage devices, loads, and various control units. Microgrid is an effective means of accessing distributed power sources. It can effectively solve the impact of random fluctuations in wind turbines and photovoltaic power generation on the safety and stability of the power system. It is a core technology related to optimized operation. With the deepening of research on microgrid optimization and dispatching, the research object has developed from a single microgrid to an interconnected microgrid. The volatility of renewable energy output has greatly restricted the market development of microgrids.
[0003] In the prior art, the distributed optimization scheduling of interconnected microgrids is generally optimized and scheduled based on the goal of optimizing the operating state of the interconnected microgrid system itself or minimizing the cost and benefit. For example, the method and system for optimizing the energy management of an interconnected microgrid disclosed in the Chinese public invention patent application CN114792974A records: the equipment in the microgrid is divided into power-controllable equipment and power-uncontrollable equipment, and a cost function for the energy optimization management of a round of interconnected microgrids is constructed, and the optimization scheduling is performed with the goal of minimizing the operating cost. It can be seen that this invention patent uses the operating state of the system itself as a parameter for optimization, and does not consider the impact of the microgrid operation on the distribution network. The interactive power generated during the interaction between the microgrid and the distribution network may cause the renewable energy to have a certain impact on the distribution network, resulting in the problem that the scheduling scheme generated by optimization without considering the impact of the distribution network is not comprehensive enough.
[0004] Therefore, a distributed optimization scheduling method, system, equipment and medium for interconnected microgrids are needed. Summary of the invention
[0005] The embodiments of the present application provide a distributed optimization scheduling method, system, device and medium for interconnected microgrids, which are used to solve the problem that the optimization scheduling of interconnected microgrids is not comprehensive enough.
[0006] A first aspect of an embodiment of the present application provides a distributed optimization scheduling method for an interconnected microgrid, including:
[0007] The objective function of the dispatch model is constructed with the fuel cost of power generation, maintenance and management costs, depreciation loss costs, life cost of energy storage devices, and economic losses of the interaction between the microgrid and the distribution network as target variables;
[0008] Determine the constraints of the scheduling model, wherein the constraints include power balance constraints, output constraints of each power generation unit, ramp rate constraints of controllable power generation units, transmission power constraints of tie lines, charging and discharging capacity constraints of energy storage devices, and interactive power fluctuation amplitude constraints of microgrids and distribution networks;
[0009] The scheduling model is optimized by using an improved grey wolf algorithm to obtain an optimized target scheduling model;
[0010] The relevant parameters of each microgrid source acquired in real time are input into the target scheduling model to generate the optimal solution of the objective function.
[0011] Furthermore, the expression of the objective function of the scheduling model is as follows:
[0012]
[0013] Where: m is the number of time periods included in a scheduling cycle, n is the number of microgrids contained in the interconnected microgrid system, C is the comprehensive scheduling cost, C1 is the power generation fuel cost of the microgrid at time t, C2 is the maintenance and management cost of the microgrid at time t, C3 is the depreciation loss cost of the microgrid at time t, C4 is the life cost of the energy storage device of the microgrid at time t, and C5 is the economic loss of the interaction between the microgrid and the distribution network at time t.
[0014] Furthermore, the economic loss of the interaction between the microgrid and the distribution network is expressed as follows:
[0015]
[0016] Where: λ is the system economic index of the interaction between microgrid and distribution network, F l is the network loss of the interaction between the microgrid and the distribution network, L is the number of lines in the distribution network, P line,i , Q line,i are the active power and reactive power injected into the head end of line i, U line,i is the voltage at the beginning of line i, R i is the resistance of line i.
[0017] Furthermore,
[0018] Furthermore, the expressions of the constraints of the scheduling model are as follows:
[0019] Power balance constraints:
[0020]
[0021] Where: P i (t) is the power generation of the i-th power generation unit of the microgrid at time t, P bat(t) is the power generated by the energy storage device at time t, P grid (t) is the power purchased and sold from the distribution network at time t, P load (t) is the load power required by the user at time t;
[0022] Output constraints of each power generation unit:
[0023] P imin (t)≤P i (t)≤P imax (t);
[0024] Where: P imin (t) is the minimum power generation power of the i-th power generation unit of the microgrid at time t, P imax (t) is the maximum power generation power of each power generation unit of the microgrid at time t;
[0025] Controllable power generation unit ramp rate constraints:
[0026] P i (t)―P i (t―1)≤P i,up ;
[0027] P i (t―1)―P i (t)≤P i,down ;
[0028] Where: P i,up and P i,down are the upper and lower limits of the ramp rate of power generation unit i respectively;
[0029] Tie line transmission power constraints:
[0030] P line,min ≤P line ≤P line,max ;
[0031] Where: P line is the transmission capacity of the line between the microgrid and the distribution network; P line,min and P line,max are the minimum and maximum capacity of line transmission respectively;
[0032] Energy storage device charging and discharging capacity constraints:
[0033] S soc,min ≤S soc (t)≤S soc,max ;
[0034] P bat,min ≤P bat (t)≤P bat,max ;
[0035] Where: S soc (t) and P bat (t) are the current time and charge state of the energy storage device and the charge and discharge power, S soc,min and S soc,max are the upper and lower limits of the state of charge, P bat,min and P bat,max They are the upper and lower limits of charge and discharge power respectively;
[0036] Constraints on the power fluctuation amplitude of interaction between microgrid and distribution network:
[0037] min((1+γ)P mg,i (t―1),(1―γ)P mg,i (t―1))
[0038] ≤P mg,i (t)≤max((1+γ)P mg,i (t―1),(1―γ)P mg,i (t―1));
[0039] Where: P mg,i (t) is the interaction power between the i generation unit of the microgrid and the distribution network at time t, the output is positive, the input is negative, and γ is P mg,i (t) is the coefficient of fluctuation.
[0040] Furthermore, the improved grey wolf algorithm is used to optimize the scheduling model to obtain an optimized target scheduling model, including:
[0041] Determining upper and lower boundaries according to the constraints of the scheduling model and initializing the gray wolf population;
[0042] Calculate the fitness value of the gray wolf individual, and set the first three optimal solutions in the current iteration as α, β, and δ wolves respectively;
[0043] Calculate the control parameters and the randomly adjustable coefficient vectors A and C through an adaptive adjustment strategy;
[0044] Introduce a logarithmic convergence factor to update the individual positions of gray wolves;
[0045] Use the cosine fluctuation mutation strategy to update the global optimal solution;
[0046] Determine whether the maximum number of iterations has been reached. If so, the process ends and the optimal solution and its fitness value are output; if not, the fitness value of the individual gray wolf continues to be calculated.
[0047] Furthermore, the introduction of a logarithmic convergence factor to update the individual positions of the gray wolves includes:
[0048] The convergence factor formula is as follows:
[0049]
[0050] Where: k is the adjustment factor, t is the current number of iterations, and Max is the maximum number of iterations set by the algorithm.
[0051] Furthermore, the method of updating the global optimal solution by using the cosine fluctuation variation strategy includes:
[0052] The formula for the cosine wave mutation strategy is as follows:
[0053]
[0054] The new gray wolf individuals are as follows:
[0055] X′(t-1)=X(t+1)W(s);
[0056] Where: h is the adjustment parameter, the value is 0.3, and s is a random number in [0,1].
[0057] A second aspect of an embodiment of the present application provides a distributed optimization scheduling system for interconnected microgrids, including:
[0058] An objective function construction unit is used to construct an objective function of a scheduling model using power generation fuel cost, maintenance and management cost, depreciation loss cost, energy storage device life cost, and economic loss of interaction between a microgrid and a distribution network as target variables;
[0059] A constraint determination unit, used to determine the constraint conditions of the scheduling model, wherein the constraint conditions include power balance constraint, output constraint of each power generation unit, ramp rate constraint of controllable power generation unit, transmission power constraint of tie line, charge and discharge capacity constraint of energy storage device, and interactive power fluctuation amplitude constraint of microgrid and distribution network;
[0060] A scheduling model optimization unit, used to optimize the scheduling model using an improved grey wolf algorithm to obtain an optimized target scheduling model;
[0061] The optimal solution generating unit is used to input the relevant parameters of each microgrid source acquired in real time into the target scheduling model to generate the optimal solution of the objective function.
[0062] A third aspect of an embodiment of the present application provides a computer device, including:
[0063] memories, transceivers, processors, and bus systems;
[0064] Wherein, the memory is used to store programs;
[0065] The processor is used to execute the program in the memory, including executing the methods of the above aspects;
[0066] The bus system is used to connect the memory and the processor so that the memory and the processor can communicate with each other.
[0067] A fourth aspect of an embodiment of the present application provides a computer-readable storage medium, comprising instructions, which, when executed on a computer, enables the computer to execute the methods provided in the above aspects.
[0068] It can be seen from the above technical solutions that the embodiments of the present application have the following advantages:
[0069] (1) The present invention fully considers the impact of the interaction between microgrids and distribution networks on the distributed optimization scheduling of interconnected microgrids. Based on the two-way power transmission capability of each microgrid and the distribution network, the interaction power of each microgrid and the distribution network is coordinated, which can reduce the network loss of the distribution network and fully reflects the comprehensiveness of the optimization scheduling of each microgrid.
[0070] (2) The present invention uses an improved gray wolf algorithm to optimize the scheduling model. Compared with the traditional gray wolf algorithm, the improved gray wolf algorithm has a higher initial population quality, faster convergence speed, and stable local search, which makes the convergence accuracy more stable and effectively improves the accuracy of the optimized scheduling strategy. BRIEF DESCRIPTION OF THE DRAWINGS
[0071] Figure 1 A schematic flow chart of an embodiment of a distributed optimization scheduling method for interconnected microgrids in the present invention;
[0072] Figure 2 It is a schematic flow chart of another embodiment of a distributed optimization scheduling method for interconnected microgrids in the present invention;
[0073] Figure 3 It is a structural block diagram of an embodiment of a distributed optimization dispatching system for interconnected microgrids in the present invention;
[0074] Figure 4 The figure is a structural block diagram of a computer device in the present invention. DETAILED DESCRIPTION
[0075] The embodiments of the present application provide a distributed optimization scheduling method, system, device and medium for interconnected microgrids, which solve the problem that the optimization scheduling of interconnected microgrids is not comprehensive enough.
[0076] The terms "first", "second", "third", "fourth", etc. (if any) in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein, for example. In addition, the terms "including" and "corresponding to" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0077] Embodiment 1
[0078] The implementation method in this embodiment can be implemented in the system, can be implemented in the server, and can also be implemented in the terminal, and the specific details are not clearly limited. The following will introduce the distributed optimization scheduling method of the interconnected microgrid in this application from the perspective of the system. Figure 1 , the method provided in this application comprises the following steps:
[0079] S11. Construct the objective function of the dispatch model with the power generation fuel cost, maintenance and management cost, depreciation loss cost, energy storage device life cost and economic loss of interaction between microgrid and distribution network as the target variables;
[0080] In this embodiment, in order to achieve the best comprehensive benefits of the interconnected microgrid operation, the goal is to optimize the economic cost. The optimal economic cost is based on the lowest operating cost, environmental cost and loss cost. For the convenience of calculation, only the economic cost and loss cost are considered here, mainly including the cost of power generation fuel, maintenance and management costs, depreciation loss costs, life cost of energy storage devices, and economic losses of the interaction between the microgrid and the distribution network. The environmental benefits generally include the emission treatment costs of pollutant gases in each unit, such as CO, CO2, SO2 and NO x Therefore, this embodiment takes the lowest economic cost and the lowest loss cost as the goal, and constructs the objective function with the power generation fuel cost, maintenance and management cost, depreciation loss cost, energy storage device life cost and the economic loss of the interaction between the microgrid and the distribution network as variables.
[0081] The expression of the objective function is as follows:
[0082]
[0083] Where: m is the number of time periods included in a scheduling cycle, n is the number of microgrids contained in the interconnected microgrid system, C is the comprehensive scheduling cost, C1 is the power generation fuel cost of the microgrid at time t, C2 is the maintenance and management cost of the microgrid at time t, C3 is the depreciation loss cost of the microgrid at time t, C4 is the life cost of the energy storage device of the microgrid at time t, and C5 is the economic loss of the interaction between the microgrid and the distribution network at time t.
[0084] Among them, the expression of the economic loss of the interaction between the microgrid and the distribution network is as follows:
[0085]
[0086] Where: λ is the system economic index of the interaction between microgrid and distribution network, F l is the network loss of the interaction between the microgrid and the distribution network, L is the number of lines in the distribution network, P line,i , Q line,i are the active power and reactive power injected into the head end of line i, U line,i is the voltage at the beginning of line i, R i is the resistance of line i.
[0087] S12. Determine the constraints of the dispatch model, including power balance constraints, output constraints of each power generation unit, ramp rate constraints of controllable power generation units, transmission power constraints of tie lines, charging and discharging capacity constraints of energy storage devices, and power fluctuation amplitude constraints of interaction between microgrids and distribution networks;
[0088] The expressions of the constraints of the scheduling model are as follows:
[0089] Power balance constraints:
[0090]
[0091] Where: P i (t) is the power generation of the i-th power generation unit of the microgrid at time t, P bat (t) is the power generated by the energy storage device at time t, P grid (t) is the power purchased and sold from the distribution network at time t, P load (t) is the load power required by the user at time t;
[0092] Output constraints of each power generation unit:
[0093] P imin (t)≤P i (t)≤P imax (t);
[0094] Where: P imin (t) is the minimum power generation power of the i-th power generation unit of the microgrid at time t, P imax(t) is the maximum power generation power of each power generation unit of the microgrid at time t;
[0095] Controllable power generation unit ramp rate constraints:
[0096] P i (t)―P i (t―1)≤P i,up ;
[0097] P i (t―1)―P i (t)≤P i,down ;
[0098] Where: P i,up and P i,down are the upper and lower limits of the ramp rate of power generation unit i respectively;
[0099] Tie line transmission power constraints:
[0100] P line,min ≤P line ≤P line,max ;
[0101] Where: P line is the transmission capacity of the line between the microgrid and the distribution network; P line,min and P line,max are the minimum and maximum capacity of line transmission respectively;
[0102] Energy storage device charging and discharging capacity constraints:
[0103] S soc,min ≤S soc (t)≤S soc,max ;
[0104] P bat,min ≤P bat (t)≤P bat,max ;
[0105] Where: S soc (t) and P bat (t) are the current time and charge state of the energy storage device and the charge and discharge power, S soc,min and S soc,max are the upper and lower limits of the state of charge, P bat,min and P bat,max They are the upper and lower limits of charge and discharge power respectively;
[0106] Constraints on the power fluctuation amplitude of interaction between microgrid and distribution network:
[0107] min((1+γ)P mg,i (t―1),(1―γ)P mg,i (t―1))
[0108] ≤P mg,i (t)≤max((1+γ)P mg,i (t―1),(1―γ)P mg,i (t―1));
[0109] Where: P mg,i (t) is the interaction power between the i generation unit of the microgrid and the distribution network at time t, the output is positive, the input is negative, and γ is P mg,i (t) is the coefficient of fluctuation.
[0110] S13. Optimize the scheduling model using the improved grey wolf algorithm to obtain an optimized target scheduling model;
[0111] S14. Input the relevant parameters of each microgrid source obtained in real time into the target scheduling model to generate the optimal solution of the objective function.
[0112] Specifically, after constructing the objective function and determining the constraints as mentioned above, there are some uncertainties in the optimization scheduling problem. Not only does it contain multiple random variables with different probability distributions, but there are also nonlinear constraints between the variables. The convergence speed and accuracy of the traditional gray wolf algorithm for optimization cannot meet the requirements.
[0113] In this embodiment, the gray wolf algorithm is improved by introducing a logarithmic convergence factor and a cosine fluctuation variation strategy. The improved gray wolf algorithm is used to optimize the scheduling model, and then the algorithm-related parameters such as power constraints, user load demand parameters, photovoltaic and wind turbine predicted output power, and time-of-use electricity prices in each period are input into the optimized scheduling model, and finally the optimal solution of the objective function is generated, that is, the lowest scheduling cost solution.
[0114] In the process of calculating the dispatching economic cost and the lowest loss cost, the above-mentioned embodiment takes into account the network loss of the interaction between the microgrid and the distribution network, which effectively improves the comprehensiveness of the distributed dispatching.
[0115] Embodiment 2
[0116] See also Figure 2 , using the improved grey wolf algorithm to optimize the scheduling model, and obtaining the optimized target scheduling model, also includes the following steps:
[0117] S131. Determine the upper and lower boundaries according to the constraints of the scheduling model and initialize the gray wolf population;
[0118] S132. Calculate the fitness value of the gray wolf individual, and set the first three optimal solutions in the current iteration as α, β, and δ wolves respectively;
[0119] S133. Calculate the control parameters and the randomly adjustable coefficient vectors A and C through the adaptive adjustment strategy;
[0120] S134. Introduce a logarithmic convergence factor to update the individual positions of gray wolves;
[0121] S135. Update the global optimal solution using the cosine fluctuation mutation strategy;
[0122] S136. Determine whether the maximum number of iterations has been reached. If so, end the process and output the optimal solution and its fitness value. If not, continue calculating the fitness value of the individual gray wolf.
[0123] Specifically, the mathematical model of position update during the hunting process of individual gray wolves is as follows:
[0124] D=|C·X P (t) ― X(t) |;
[0125] X(t+1)=X P (t) ―A·D;
[0126] Where: D is the distance that the gray wolf will move, X P (t) is the position of the prey of the tth generation, X(t) is the position of the gray wolf of the tth generation, X(t+1) is the position of the gray wolf after the t+1th generation update, C and A are coefficient vectors that can be randomly adjusted, and the formula is as follows:
[0127] A=2a·r1―a;
[0128] C = 2r2;
[0129] Where a is the convergence factor in the iteration process, with an initial value of 2. It decreases linearly to 0 as the number of iterations increases. r1 and r2 are randomly generated numbers in [0,1].
[0130] As a decreases, A also changes. The distance that the gray wolf needs to move to update is D to obtain the next generation of gray wolf individuals. When the value of a decreases to 0, the value of A also becomes 0. According to the above formula, no matter how D changes, the gray wolf individual will no longer be updated. Even if the gray wolf iterates, it will not get a better individual.
[0131] The change of the convergence factor a affects the convergence speed and search capability of the algorithm. Therefore, in order to improve the convergence of the algorithm, this embodiment introduces a logarithmic convergence factor to improve the local search capability. The formula is as follows:
[0132]
[0133] In the formula: k is the adjustment factor, t is the current number of iterations, and Max is the maximum number of iterations set by the algorithm.
[0134] Compared with the traditional convergence factor, the improved convergence factor using logarithmic variation speeds up the algorithm's search speed in the early stage of iteration, and performs stable local search in the later stage, making the convergence accuracy more stable.
[0135] Specifically, in the search strategy of the gray wolf algorithm, the way of searching for prey is relatively fixed and single. When updating the next generation of gray wolf individuals, invalid individuals are likely to appear, that is, they are worse than the previous generation of gray wolf individuals. This makes it difficult to find a better solution during the update process, and the number of iterations will be extended, and the local optimum cannot be found. In order to make the algorithm more capable of solving the local optimum, this embodiment introduces a cosine fluctuation mutation strategy to increase the number of valid individuals, making it easier for the algorithm to search for the optimal solution. The cosine fluctuation mutation method is as follows:
[0136]
[0137] The new gray wolf individuals are as follows:
[0138] X ′ (t-1) = X(t+1)W(s);
[0139] Where: h is the adjustment parameter, the value is 0.3, and s is a random number in [0,1].
[0140] Finally, the optimal solution of the objective function of the optimization scheduling model is updated according to the set number of iterations.
[0141] Embodiment 3
[0142] See also Figure 3 , the embodiment of the distributed optimization dispatching system of the interconnected microgrid in the present invention comprises the following steps:
[0143] An objective function construction unit is used to construct an objective function of a scheduling model using power generation fuel cost, maintenance and management cost, depreciation loss cost, energy storage device life cost, and economic loss of interaction between a microgrid and a distribution network as target variables;
[0144] A constraint determination unit is used to determine the constraint conditions of the dispatch model, which include power balance constraint, output constraint of each power generation unit, ramp rate constraint of controllable power generation unit, transmission power constraint of tie line, charging and discharging capacity constraint of energy storage device, and interactive power fluctuation amplitude constraint of microgrid and distribution network;
[0145] A scheduling model optimization unit, used to optimize the scheduling model using an improved grey wolf algorithm to obtain an optimized target scheduling model;
[0146] The optimal solution generating unit is used to input the relevant parameters of each microgrid source acquired in real time into the target scheduling model to generate the optimal solution of the objective function.
[0147] For the specific definition of the system, please refer to the definition of the method above, which will not be repeated here. Each module in the above system can be implemented in whole or in part by software, hardware and a combination thereof. The above modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory in the computer device in the form of software, so that the processor can call and execute the operations corresponding to the above modules.
[0148] Embodiment 4
[0149] See also Figure 4 The present invention provides a computer device, including a memory, a processor, and computer-readable instructions stored in the memory and executable on the processor. When the processor executes the computer-readable instructions, the steps of the above method are implemented.
[0150] Those of ordinary skill in the art will appreciate that the units of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition of each example has been generally described in terms of function in the above description. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0151] In the embodiments provided by the present invention, it should be understood that the division of units is only a logical function division, and there may be other division methods in actual implementation, such as multiple units can be combined into one unit, one unit can be split into multiple units, or some features can be ignored. In addition, each functional unit in each embodiment of the present invention can be integrated into a processing unit, or each unit can exist physically separately, or two or more units can be integrated into one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units.
[0152] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-0nlyMemory), random access memory (RAM, RandomAccessMemory), mobile hard disk, magnetic disk or optical disk, etc., which can store program code.
[0153] It can be understood that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the above embodiments, or replace some or all of the technical features therein by equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention, and they should all be included in the scope of the claims and specification of the present invention.
Claims
1. A distributed optimization scheduling method for interconnected microgrids, characterized in that: include: The objective function of the dispatch model is constructed with the fuel cost of power generation, maintenance and management costs, depreciation loss costs, life cost of energy storage devices, and economic losses of the interaction between the microgrid and the distribution network as target variables; Determine the constraints of the scheduling model, wherein the constraints include power balance constraints, output constraints of each power generation unit, ramp rate constraints of controllable power generation units, transmission power constraints of tie lines, charging and discharging capacity constraints of energy storage devices, and interactive power fluctuation amplitude constraints of microgrids and distribution networks; The scheduling model is optimized by using an improved grey wolf algorithm to obtain an optimized target scheduling model; The relevant parameters of each microgrid source acquired in real time are input into the target scheduling model to generate the optimal solution of the objective function.
2. The distributed optimization scheduling method of interconnected microgrid according to claim 1 is characterized in that: The expression of the objective function of the scheduling model is as follows: Where: m is the number of time periods included in a scheduling cycle, n is the number of microgrids contained in the interconnected microgrid system, C is the comprehensive scheduling cost, C1 is the power generation fuel cost of the microgrid at time t, C2 is the maintenance and management cost of the microgrid at time t, C3 is the depreciation loss cost of the microgrid at time t, C4 is the life cost of the energy storage device of the microgrid at time t, and C5 is the economic loss of the interaction between the microgrid and the distribution network at time t.
3. The interconnected microgrid distributed optimization scheduling method according to claim 2, wherein the characteristic value is that the expression of the economic loss of the interaction between the microgrid and the distribution network is as follows: Where: λ is the system economic index of the interaction between microgrid and distribution network, F l is the network loss of the interaction between the microgrid and the distribution network, L is the number of lines in the distribution network, P line,i , Q line,i are the active power and reactive power injected into the head end of line i, U line,i is the voltage at the beginning of line i, R i is the resistance of line i.
4. The interconnected microgrid distributed optimization scheduling method according to claim 1 is characterized in that: The expressions of the constraints of the scheduling model are as follows: Power balance constraints: Where: P i (t) is the power generation of the i-th power generation unit of the microgrid at time t, P bat (t) is the power generated by the energy storage device at time t, P grid (t) is the power purchased and sold from the distribution network at time t, P load (t) is the load power required by the user at time t; Output constraints of each power generation unit: P imin (t)≤P i (t)≤P imax (t); Where: P imin (t) is the minimum power generation power of the i-th power generation unit of the microgrid at time t, P imax (t) is the maximum power generation power of each power generation unit of the microgrid at time t; Controllable power generation unit ramp rate constraints: P i (t)-P i (t-1)≤P i,up ; P i (t-1)-P i (t)≤P i,down ; Where: P i,up and P i,down are the upper and lower limits of the ramp rate of power generation unit i respectively; Tie line transmission power constraints: P line,min ≤P line ≤P line,max ; Where: P line is the transmission capacity of the line between the microgrid and the distribution network; P line,min and P line,max are the minimum and maximum capacity of line transmission respectively; Energy storage device charging and discharging capacity constraints: S soc,min ≤S soc (t)≤S soc,max ; P bat,min ≤P bat (t)≤P bat,max ; Where: S soc (t) and P bat (t) are the current time and charge state of the energy storage device and the charge and discharge power, S soc,min and S soc,max are the upper and lower limits of the state of charge, P bat,min and P bat,max They are the upper and lower limits of charge and discharge power respectively; Constraints on the power fluctuation amplitude of interaction between microgrid and distribution network: min((1+γ)P mg,i (t-1), (1-γ)P mg,i (t-1)) ≤P mg,i (t)≤max((1+γ)P mg,i (t-1), (1-γ)P mg,i (t-1)); Where: P mg,i (t) is the interaction power between the i generation unit of the microgrid and the distribution network at time t, the output is positive, the input is negative, and γ is P mg,i (t) is the coefficient of fluctuation.
5. The distributed optimization scheduling method of interconnected microgrid according to claim 1 is characterized in that: The improved grey wolf algorithm is used to optimize the scheduling model to obtain an optimized target scheduling model, including: Determining upper and lower boundaries according to the constraints of the scheduling model and initializing the gray wolf population; Calculate the fitness value of the gray wolf individual, and set the first three optimal solutions in the current iteration as α, β, and δ wolves respectively; Calculate the control parameters and the randomly adjustable coefficient vectors A and C through an adaptive adjustment strategy; Introduce a logarithmic convergence factor to update the individual positions of gray wolves; Use the cosine fluctuation mutation strategy to update the global optimal solution; Determine whether the maximum number of iterations has been reached. If so, the process ends and the optimal solution and its fitness value are output; if not, the fitness value of the individual gray wolf continues to be calculated.
6. The distributed optimization scheduling method of interconnected microgrid according to claim 5 is characterized in that: The introduction of the logarithmic convergence factor to update the individual positions of the gray wolves includes: The convergence factor formula is as follows: Where: k is the adjustment factor, t is the current number of iterations, Ma x The maximum number of iterations set for the algorithm.
7. The distributed optimization scheduling method of interconnected microgrids according to claim 5, characterized in that: The method of updating the global optimal solution by using the cosine fluctuation variation strategy includes: The formula for the cosine wave mutation strategy is as follows: The new gray wolf individuals are as follows: X′(t-1)=X(t+1)W(s); Where: h is the adjustment parameter, the value is 0.3, and s is a random number in [0, 1].
8. A distributed optimization dispatching system for interconnected microgrids, characterized in that: include: An objective function construction unit is used to construct an objective function of a scheduling model using power generation fuel cost, maintenance and management cost, depreciation loss cost, energy storage device life cost, and economic loss of interaction between a microgrid and a distribution network as target variables; A constraint determination unit, used to determine the constraint conditions of the scheduling model, wherein the constraint conditions include power balance constraint, output constraint of each power generation unit, ramp rate constraint of controllable power generation unit, transmission power constraint of tie line, charge and discharge capacity constraint of energy storage device, and interactive power fluctuation amplitude constraint of microgrid and distribution network; A scheduling model optimization unit, used to optimize the scheduling model using an improved grey wolf algorithm to obtain an optimized target scheduling model; The optimal solution generating unit is used to input the relevant parameters of each microgrid source acquired in real time into the target scheduling model to generate the optimal solution of the objective function.
9. A computer device, characterized in that: include: memories, transceivers, processors, and bus systems; Wherein, the memory is used to store programs; The processor is used to execute the program in the memory, including executing the distributed optimization scheduling method of the interconnected microgrid according to any one of claims 1 to 7; The bus system is used to connect the memory and the processor so that the memory and the processor can communicate with each other.
10. A readable storage medium, characterized in that: The method comprises instructions which, when executed on a computer, enable the computer to execute the distributed optimization scheduling method for the interconnected microgrid as claimed in any one of claims 1 to 7.
Citation Information
Patent Citations
Method and system for energy optimization management of interconnected micro-grid
CN114792974A
Cited By
Island microgrid distributed energy storage locating and sizing method and device based on data driving
CN121436316A