Tunnel cable trench construction device
By designing a tunnel cable trench construction device containing lifting plates and moving plates, the problem that the chiseling device in the prior art cannot adapt to different specifications and sizes is solved, and the simultaneous chiseling treatment of the side walls and trench bases of the tunnel are realized, which significantly improves the construction efficiency and chiseling quality.
Patent Information
- Application Number
- CN202411830802.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-12
- Publication Date
- 2025-02-28
AI Technical Summary
The existing tunnel cable trench chiseling device cannot adapt to cable trench of different specifications and sizes, and cannot effectively chisel the side walls and trench bases at the same time, resulting in low construction efficiency and long construction period.
A tunnel cable trench construction device including a casing and a chiseling mechanism is designed. Through a combined structure of lifting plate and moving plate, the chiseling treatment of cable trenches of different specifications is realized, and the stability of the device is improved through the reinforcement mechanism.
The device can adapt to cable trench of different specifications and sizes, significantly improves construction efficiency, shortens construction period, and improves chisel quality and device stability.
Smart Images

Figure CN119531903A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of tunnel cable trench construction equipment, and in particular relates to a tunnel cable trench construction device. Background Art
[0002] Side trenches, power cable troughs, communication and signal cable troughs are required on both sides of the tunnel, and a central drainage ditch is set in the middle of the tunnel. In order to strengthen the adhesion between the cable trough and the tunnel, the smooth base surface needs to be roughened to improve the adhesion of the mortar. Usually, the side walls and base of the tunnel need to be roughened. The traditional cable trench roughening process is to use a handheld roughening tool to perform the roughening operation, which is time-consuming and labor-intensive, and the construction period is greatly extended.
[0003] Although some existing roughening devices can roughen the tunnel sidewall and the trench base at the same time, the devices are generally only suitable for trenches of specific sizes. Due to different construction requirements of different projects and different trench specifications, the existing roughening devices are not universal and their use scenarios are severely limited. Summary of the invention
[0004] In order to overcome the deficiencies of the prior art, the present invention aims to provide a tunnel cable trench construction device, which can be adapted to the roughening of cable trenches of different specifications and sizes, and can simultaneously perform effective roughening construction on the tunnel side walls and the trench base, thereby significantly improving the construction efficiency of the cable trench and greatly shortening the construction period.
[0005] In order to achieve the above object, the technical solution adopted by the present invention is: A tunnel cable trench construction device comprises a casing and a roughening mechanism, wherein the casing is provided with openings on all sides, and a driving wheel is installed at the bottom of the casing; the roughening mechanism comprises a first roughening assembly and a second roughening assembly, and a lifting plate is installed inside the casing for sliding up and down; the first roughening assembly is installed at the bottom of the lifting plate, and a lifting drive assembly for driving the lifting plate to move up and down is installed on the casing; movable plates are symmetrically arranged on the top surface of the lifting plate, and two movable plates are horizontally slidably installed at the two side ends of the lifting plate, and a horizontal driving assembly for driving the two movable plates to move synchronously is arranged in the middle of the movable plate; a rotating plate is rotatably connected to the outer edge of the movable plate, and the second roughening assembly is installed on the outer end surface of the movable plate, and a supporting assembly for supporting and fixing the rotating plate is installed on the movable plate.
[0006] Preferably, the lifting drive assembly includes a first screw rod horizontally mounted on the casing, and the first screw rod is connected to the first motor power; corresponding first sleeves are threadedly sleeved on the positive and negative threads on the left and right sides of the first screw rod, and the first sleeve is rotatably connected to the upper end of the corresponding first connecting rod, and the first connecting rod is inclined and its lower end is rotatably connected to the lifting plate.
[0007] Preferably, a sliding groove is provided on the top surface of the lifting plate downward and through the left and right sides, and the movable plate is horizontally slidably clamped in the sliding groove.
[0008] Preferably, the horizontal drive assembly includes a gear, a second motor and two strips. The gear is horizontally rotatably installed at the bottom of the slide groove, and the gear is connected to the power of the second motor; the two parallel strips are horizontally movable and are arranged on both sides of the gear and the ends are respectively fixed to the corresponding movable plates; the sides of the two strips close to each other are provided with racks meshing with the gears.
[0009] Preferably, a long strip-shaped limiting hole is opened in the middle of the strip along its length direction, and a limiting rod fixed on the slide groove is slidably clamped in the limiting hole.
[0010] Preferably, a locking assembly for locking the horizontal driving assembly is also installed at the bottom of the slide groove.
[0011] Preferably, the locking assembly includes a telescopic cylinder, an extrusion block and two abutment blocks, the two abutment blocks are arranged between the two strips and are slidably installed on the guide rail at the bottom of the slide groove, the abutment block is provided with meshing teeth meshing with the rack on the side close to the strip, and a first spring is fixed horizontally at the bottom of the slide groove, the first spring is arranged on both sides of the abutment block and abuts with the side of the abutment block away from the strips; the telescopic cylinder is horizontally arranged on one side of the two abutment blocks, the extrusion block is fixed on the piston rod of the telescopic cylinder, the tip of the extrusion block head is arranged between the two abutment blocks and its two side inclined surfaces are slidably abutted with the two abutment blocks.
[0012] Preferably, the support assembly includes a second screw rod horizontally mounted on the movable plate, the second screw rod is connected to the power of the third motor, a second sleeve is threadedly sleeved on the second screw rod, the second sleeve is rotatably connected to the lower end of the second connecting rod, and the upper end of the second connecting rod is rotatably connected to the middle of the rotating plate.
[0013] Preferably, a reinforcement mechanism is also installed at the bottom of the lifting plate.
[0014] Preferably, the reinforcement mechanism includes a plurality of stabilizing wheels, sleeves and sliding rods. The sleeves are vertically installed at the bottom of the lifting plate. One end of the sliding rod slidingly sleeved in the sleeve is fixed with a limit block that slides with the inner wall of the sleeve. The stabilizing wheel is installed at the other end of the sliding rod. A second spring is arranged in the sleeve to abut against the limit block.
[0015] The present invention has the following beneficial effects: 1. When the first motor of the present invention drives the first screw to rotate, the first sleeves sleeved on the positive and negative threads will move away from or close to each other, and the lower lifting plate is driven to rise or fall through the first connecting rod, thereby driving the first and second chiseling assemblies on the lifting plate to move up and down, wherein the first chiseling assembly at the bottom of the lifting plate can perform chiseling construction on the bottom of the cable trench.
[0016] 2. The gear and the rack are meshed, so that the rotation of the gear can simultaneously drive the moving plates at the ends of the two strips to move away from or closer to each other. A long strip-shaped limit hole is opened in the middle of the strip along its length, and the limit block fixed at the bottom of the slide slot slides into the limit hole. The limit block can effectively limit the horizontal movement of the strip to the left and right, and improve the stability of the strip when it slides left and right.
[0017] 3. Through the extension action of the telescopic cylinder, the extrusion block is pushed to move toward the middle of the two abutment blocks. Through the cooperation of the two inclined surfaces on the abutment block, the extrusion block can be pushed to both sides to squeeze the spring and move close to the strip plate under the sliding limit of the guide rail, so that the engaging teeth on the extrusion block engage with the rack on the strip plate, and then the strip plate and the movable plate are locked to prevent the displacement and shaking of the movable plate from affecting the stability of the device during the roughening operation of the second roughening assembly on the movable plate.
[0018] 4. The third motor drives the second screw to rotate, and pushes the rotating plate to rotate around the hinge through the connecting rod, so that the inclination angle of the second chiseling assembly on the rotating plate can be adjusted, so that the second chiseling assembly can effectively cooperate with the side wall of the cable groove, thereby effectively improving the chiseling quality.
[0019] 5. When the lifting plate drives the first chiseling assembly to descend for the chiseling operation, it will drive the reinforcement mechanism to move downward, first making the stabilizing wheel contact with the bottom of the cable groove, and before the first chiseling assembly descends into place, the slide bar will shrink into the sleeve and squeeze the spring. Under the action of the spring force, the stabilizing wheel can make the contact with the bottom of the cable groove more closely. Without affecting the movement of the device, the stabilizing wheel can effectively increase the friction between the device and the ground, avoid lateral displacement of the casing when the chiseling mechanism is in action, and improve the operation stability of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a structural schematic diagram of the present invention; Figure 2 A top view of the lifting plate of the present invention; Figure 3 for Figure 2 Enlarged view of point A in the middle; Figure 4 It is a schematic diagram of the installation of the movable plate and the rotating plate of the present invention; Figure 5 It is a schematic diagram of the installation of the reinforcement assembly of the present invention; Figure 6 The figure is a schematic diagram of the installation of the stabilizing wheel of the present invention. DETAILED DESCRIPTION
[0021] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not intended to limit the scope of use of the present invention.
[0022] like Figure 1-6 As shown, the present invention proposes a tunnel cable trench construction device, including a housing 1 and a chiseling mechanism, the housing 1 is provided with openings at the front, back, left and right sides, and a driving wheel 11 is installed at the bottom of the housing 1. The chiseling mechanism includes a first chiseling assembly 41 and a second chiseling assembly 42, and a slide rail (not shown in the figure) is installed in the vertical direction inside the housing 1, so that the lifting plate 2 can slide up and down in the housing 1. The first chiseling assembly 41 is installed at the bottom of the lifting plate 2, and a lifting drive assembly for driving the lifting plate 2 to move up and down is installed on the housing 1. The lifting drive assembly includes a first screw rod 31 horizontally installed on the housing 1 above the lifting plate 2, and the first screw rod 31 is connected to the power of the first motor. The positive and negative threads on the left and right sides of the first screw rod 31 are respectively threaded with corresponding first sleeves 32, and each first sleeve 32 is rotatably connected to the upper end of the corresponding first connecting rod 33, and the lower end of the first connecting rod 33 is rotatably connected to the lifting plate 2. And the two first connecting rods 33 are arranged between the lifting plate 2 and the first screw rod 31 in an inverted eight shape. When the first motor drives the first screw 31 to rotate, the first sleeves 32 sleeved on the positive and negative threads will move away from or close to each other, and the first connecting rod 33 drives the lower lifting plate 2 to rise or fall, thereby driving the first chiseling component 41 and the second chiseling component 42 on the lifting plate 2 to move up and down, wherein the first chiseling component 41 at the bottom of the lifting plate 2 can perform chiseling construction on the bottom contact of the cable trench.
[0023] The top surface of the lifting plate 2 is symmetrically provided with movable plates 5, and the two movable plates 5 are horizontally slidably installed at the two side ends of the lifting plate 2. Specifically, the top surface of the lifting plate 2 is provided with a slide groove 20 which is downward and horizontally penetrated from left to right, and the two movable plates 5 are horizontally slidably arranged on both sides of the inside of the slide groove 20. A horizontal driving assembly for driving the two movable plates 5 to move synchronously is provided in the middle of the movable plate 5. The horizontal driving assembly includes a gear 62, a second motor and two strips 61, and the gear 62 is horizontally rotatably installed at the bottom of the slide groove 20, and the gear 62 is connected to the power of the second motor. The two parallel strips 61 are horizontally movable and arranged at the front and rear sides of the gear 62, and the ends of the two strips 61 are respectively fixedly connected to the corresponding movable plates 5. The sides of the two strips 61 which are close to each other are provided with a rack 611 which meshes with the gear 62. The gear 62 meshes with the rack 611, so that the rotation of the gear 62 can simultaneously drive the movable plates 5 at the ends of the two strips 61 to move away from or close to each other. A long strip-shaped limiting hole 610 is opened in the middle of the strip plate 61 along its length direction, and the limiting rod 21 fixed at the bottom of the slide groove 20 is slidably clamped in the limiting hole 610. The limiting rod 21 can effectively limit the horizontal movement of the strip plate 61 to the left and right, thereby improving the stability of the strip plate 61 when sliding left and right.
[0024] A locking assembly for locking the horizontal driving assembly is also installed at the bottom of the slide 20. The locking assembly includes a telescopic cylinder 83, an extrusion block 84 and two abutment blocks 81. The two abutment blocks 81 are arranged between the racks 611 of the two strips 61 and are symmetrically slidably installed on the guide rail 22 at the bottom of the slide 20. The abutment blocks 81 are provided with meshing teeth 811 meshing with the racks 611 on the side close to the strip 61. A first spring 82 is fixed horizontally at the bottom of the slide 20 on both sides of each abutment block 81. The first spring 82 abuts against the side of the abutment block 81 away from the strip 61. Under the elastic force of the first spring 82, the two abutment blocks 81 are pushed to move closer to each other and away from the strip 61. The telescopic cylinder 83 is horizontally arranged on one side of the two abutment blocks 81, and the extrusion block 84 is fixed on the piston rod of the telescopic cylinder 83. The head of the extrusion block 84 is provided with a triangular tip, which is arranged between the two abutment blocks 81 and its two side inclined surfaces slide and abut against the two abutment blocks 81. Through the extension action of the telescopic cylinder 83, the extrusion block 84 is pushed to move toward the middle of the two abutment blocks 81. Through the cooperation of the two inclined surfaces on the abutment block 81, the extrusion block 84 can be pushed to both sides under the sliding limit of the guide rail 22 to squeeze the spring and move close to the strip plate 61, so that the engaging teeth 811 on the extrusion block 84 are engaged with the rack 611 on the strip plate 61, and then the strip plate 61 and the movable plate 5 are locked, so as to avoid the displacement and shaking of the movable plate 5 during the roughening operation of the second roughening assembly 42 on the movable plate 5, which affects the stability of the device.
[0025] The outer edge of the movable plate 5 is rotatably connected with the rotating plate 51 in the vertical direction, the second chiseling assembly 42 is installed on the outer end surface of the movable plate 5, and a support assembly for supporting and fixing the rotating plate 51 is installed on the movable plate 5. The support assembly includes a second screw rod 71 horizontally installed on the movable plate 5, the second screw rod 71 is connected to the power of the third motor 73, a second sleeve 72 is threadedly sleeved on the second screw rod 71, the second sleeve 72 is rotatably connected to the lower end of the second connecting rod 74, and the upper end of the second connecting rod 74 is rotatably connected to the middle of the rotating plate 51. The third motor 73 drives the second screw rod 71 to rotate, and the rotating plate 51 is pushed to rotate around the hinge through the second connecting rod 74, so that the inclination angle of the second chiseling assembly 42 on the rotating plate 51 can be adjusted, so that the second chiseling assembly 42 can effectively cooperate with the side wall of the cable groove, thereby effectively improving the chiseling quality.
[0026] A reinforcement mechanism 9 is also installed at the bottom of the lifting plate 2. The reinforcement mechanism 9 includes a plurality of stabilizing wheels, a sleeve 91 and a slide bar 92. The sleeve 91 is vertically installed at the bottom of the lifting plate 2. One end of the slide bar 92 is slidably sleeved in the sleeve 91 and fixed with a limit block 93 that slides with the inner wall of the sleeve 91. The stabilizing wheel is installed at the other end of the slide bar 92. A second spring 94 is arranged in the sleeve 91 to abut against the limit block 93. When the lifting plate 2 drives the first haircutting assembly 41 to descend for haircutting operation, it will drive the reinforcement mechanism 9 to move downward, firstly making the stabilizing wheel contact with the bottom of the cable groove. Before the first haircutting assembly 41 descends to its place, the slide bar 92 will shrink into the sleeve 91 and squeeze the second spring 94. Under the elastic force of the second spring 94, the stabilizing wheel can abut against the bottom of the cable groove more closely. Without affecting the movement of the device, the stabilizing wheel can effectively increase the friction between the device and the ground, avoid the lateral displacement movement of the housing 1 when the haircutting mechanism is in action, and improve the operation stability of the device.
[0027] When using the construction device provided by the present invention, the lifting plate 2 is driven downward by the lifting drive assembly, and the first chiseling assembly 41 is driven downward to be installed in place, and the stabilizing wheel of the reinforcement mechanism 9 is abutted against the cable groove to improve the movement stability of the device; then the horizontal driving assembly is used to drive the moving plate 5 to move to both sides, and the support assembly is adjusted to drive the rotating plate 51 to rotate, so that the second chiseling assembly 42 on the rotating plate 51 cooperates with the side wall of the cable groove, and the moving plate 5 is locked by the locking assembly. Then, under the electric drive of the driving wheel 11, the device moves in the cable groove, and the bottom and side walls of the cable groove are chiseled and constructed at the same time by the chiseling mechanism.
[0028] Obviously, the embodiments described above are only some embodiments of the present application, rather than all embodiments. The preferred embodiments of the present application are given in the accompanying drawings, but they do not limit the patent scope of the present application. The present application can be implemented in many different forms. On the contrary, the purpose of providing these embodiments is to make the understanding of the disclosure of the present application more thorough and comprehensive. Although the present application is described in detail with reference to the aforementioned embodiments, for those skilled in the art, it is still possible to modify the technical solutions recorded in the aforementioned specific implementation methods, or to perform equivalent replacement of some of the technical features therein. Any equivalent structure made using the contents of the specification and drawings of this application, directly or indirectly used in other related technical fields, is similarly within the scope of patent protection of this application.
Claims
1. A tunnel cable trench construction device, comprising a housing and a roughening mechanism, characterized in that: The casing is provided with openings around it, and a driving wheel is installed at the bottom of the casing; the haircutting mechanism includes a first haircutting component and a second haircutting component, and a lifting plate is installed inside the casing for sliding up and down; the first haircutting component is installed at the bottom of the lifting plate, and a lifting driving component for driving the lifting plate to move up and down is installed on the casing; movable plates are symmetrically arranged on the top surface of the lifting plate, and the two movable plates are horizontally slidably installed at the two side ends of the lifting plate, and a horizontal driving component for driving the two movable plates to move synchronously is provided in the middle of the movable plate; a rotating plate is rotatably connected to the outer edge of the movable plate, and the second haircutting component is installed on the outer end surface of the movable plate, and a supporting component for supporting and fixing the rotating plate is installed on the movable plate.
2. The tunnel cable trench construction device according to claim 1, characterized in that: The lifting drive assembly includes a first screw rod horizontally mounted on the casing, the first screw rod being connected to the first motor power; corresponding first sleeves are threadedly sleeved on the positive and negative threads on the left and right sides of the first screw rod, the first sleeves are rotatably connected to the corresponding upper end of the first connecting rod, the first connecting rod is tilted and its lower end is rotatably connected to the lifting plate.
3. The tunnel cable trench construction device according to claim 1, characterized in that: The top surface of the lifting plate is provided with sliding grooves downward and penetrating left and right, and the movable plate is horizontally slidably clamped in the sliding grooves.
4. The tunnel cable trench construction device according to claim 3 is characterized in that: The horizontal driving assembly includes a gear, a second motor and two strips. The gear is horizontally rotatably installed at the bottom of the slide slot, and the gear is connected to the power of the second motor. The two parallel strips are horizontally movable and are arranged on both sides of the gear, and the ends are respectively fixed to the corresponding moving plates. The sides of the two strips close to each other are provided with racks meshing with the gears.
5. The tunnel cable trench construction device according to claim 4, characterized in that: A long strip-shaped limiting hole is opened in the middle of the strip plate along its length direction, and a limiting rod fixed on the slide groove is slidably clamped in the limiting hole.
6. The tunnel cable trench construction device according to claim 4, characterized in that: A locking component for locking the horizontal driving component is also installed at the bottom of the slide groove.
7. The tunnel cable trench construction device according to claim 6, characterized in that: The locking assembly includes a telescopic cylinder, an extrusion block and two abutment blocks. The two abutment blocks are arranged between the two strips and are slidably installed on the guide rail at the bottom of the slide groove. The abutment block is provided with meshing teeth meshing with the rack on the side close to the strip. A first spring is fixed horizontally at the bottom of the slide groove. The first spring is arranged on both sides of the abutment block and abuts with the side of the abutment block away from the strip. The telescopic cylinder is horizontally arranged on one side of the two abutment blocks, the extrusion block is fixed on the piston rod of the telescopic cylinder, the tip of the extrusion block head is arranged between the two abutment blocks and the inclined surfaces on both sides thereof slide and abut with the two abutment blocks.
8. The tunnel cable trench construction device according to claim 6, characterized in that: The support assembly includes a second screw rod horizontally installed on the movable plate, the second screw rod is connected to the power of the third motor, a second sleeve is threadedly sleeved on the second screw rod, the second sleeve is rotatably connected to the lower end of the second connecting rod, and the upper end of the second connecting rod is rotatably connected to the middle of the rotating plate.
9. The tunnel cable trench construction device according to claim 1, characterized in that: A reinforcement mechanism is also installed at the bottom of the lifting plate.
10. The tunnel cable trench construction device according to claim 9, characterized in that: The reinforcement mechanism includes multiple stabilizing wheels, sleeves and sliding rods. The sleeves are vertically installed at the bottom of the lifting plate. One end of the sliding rod slidingly sleeved in the sleeve is fixed with a limit block that slides with the inner wall of the sleeve. The stabilizing wheel is installed at the other end of the sliding rod. A second spring is arranged in the sleeve to abut against the limit block.