By obtaining and analyzing power generation and electricity consumption data of the power grid, predicting trends and generating planning and scheduling plans, the problem of fewer planning and scheduling factors of pumped storage power stations is solved, and the maximum power utilization and the improvement of grid efficiency are achieved.
Patent Information
- Application Number
- CN202411549607.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-01
- Publication Date
- 2025-02-28
AI Technical Summary
The existing pumped storage power station planning and scheduling factors are few, making it difficult to optimize the utilization of electricity in the entire power grid, resulting in insufficient power utilization benefits.
By obtaining the information of power grid power generation equipment and power consumption type information, obtaining historical power generation and power consumption data, predicting power generation and power consumption trends, generating planning and scheduling plans for pumped storage power stations, and performing work scheduling.
The planning and scheduling efficiency of pumped storage power stations has been improved, the utilization of electricity has been maximized, and the overall efficiency of the power grid has been enhanced.
Smart Images

Figure CN119543235A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of electric power dispatching, and in particular to a planning and dispatching method and device for a pumped storage power station. Background Art
[0002] With the proposal and implementation of the national carbon peak and carbon neutrality policies, traditional thermal power plants are slowly being replaced by new clean energy sources. However, clean energy generation methods such as wind power, photovoltaic power generation and hydropower generation are greatly affected by natural factors, so the power generation often fluctuates greatly. In addition, the power consumption in the power market also changes with the seasons, working days and non-working days, and even the time of morning and evening. Therefore, pumped storage power stations have become very important. Pumped storage power stations can convert the potential energy of water into electrical energy. When the power consumption is at a low point, the pumped storage power station first uses the surplus electricity in the power grid to pump the water from the lower reservoir to the upper reservoir for storage. This process converts electrical energy into the potential energy of water. When the peak of power consumption comes, the water in the upper reservoir is released, and the water flows down to drive the turbine to generate electricity. This process converts the potential energy of water into electrical energy.
[0003] However, the existing pumped-storage power stations currently have few planning and scheduling considerations during operation, making it difficult to achieve optimal utilization of the entire power grid's electricity. Therefore, it is necessary to further optimize the planning and scheduling methods of pumped-storage power stations to maximize electricity utilization. Summary of the invention
[0004] The embodiment of the present application provides a planning and scheduling method for a pumped-storage power station, thereby solving the problem of insufficient efficiency of electric energy utilization in existing pumped-storage power stations due to unreasonable planning and scheduling, thereby achieving the technical effect of improving the planning and scheduling of pumped-storage power stations.
[0005] The embodiment of the present application also provides a planning and scheduling device for a pumped-storage power station, which is used to implement the above-mentioned planning and scheduling method for a pumped-storage power station.
[0006] In a first aspect, an embodiment of the present application provides a planning and scheduling method for a pumped storage power station, the method comprising:
[0007] Obtain information about power generation equipment and electricity usage types on the power grid;
[0008] Obtaining historical power generation data and historical power consumption data of the power grid within a predetermined time range;
[0009] Predicting and generating the power generation and power consumption trends of the power grid based on the historical power generation data and historical power consumption data of the power grid, wherein the power generation trend of the power grid includes the power generation trends of various types of power generation equipment, and the power consumption trend includes the power consumption trends of various types of power consumption;
[0010] Generate a planning and dispatching scheme for the pumped-storage power station according to the power generation and power consumption trends of the power grid;
[0011] The operation of the pumped-storage power station is dispatched according to the planning and dispatching scheme of the pumped-storage power station.
[0012] As a possible implementation of this embodiment, the predicting and generating the power generation and power consumption trends of the power grid according to the historical power generation data and the historical power consumption data of the power grid also includes:
[0013] The forecasted meteorological data and historical meteorological data within the predetermined time range are obtained, and the power generation data and power consumption data trends of the power grid are updated and generated.
[0014] As a possible implementation of this embodiment, the power grid power generation equipment includes: a thermal power plant, a hydropower station, a wind power station, and a photovoltaic power station.
[0015] As a possible implementation of this embodiment, the method further includes:
[0016] The historical electricity prices of the power grid in each time period are obtained, and the predicted electricity prices of the power grid within the predetermined time range are generated.
[0017] As a possible implementation of this embodiment, the method includes:
[0018] The power consumption trend of the power grid is generated according to the predicted power price and the historical power consumption data of the power grid.
[0019] As a possible implementation of this embodiment, the method includes:
[0020] The water level data of the upper reservoir and the lower reservoir are obtained, and the pumped storage power station is dispatched according to the early warning water level value.
[0021] In a second aspect, the present application provides a planning and scheduling device for a pumped storage power station, wherein the device comprises:
[0022] First acquisition unit: The first acquisition unit is used to acquire power grid power generation equipment information and power consumption type information;
[0023] A second acquisition unit, the second acquisition unit is used to acquire historical power generation data and historical power consumption data of the power grid within a predetermined time range;
[0024] First prediction unit: The first prediction unit is used to predict and generate the power generation and power consumption trends of the power grid according to the historical power generation data and historical power consumption data of the power grid, wherein the power generation trend of the power grid includes the power generation trends of various types of power generation equipment, and the power consumption trend includes the power consumption trends of various types of power consumption;
[0025] A first generating unit, the first generating unit is used to generate a planning and scheduling scheme of the pumped-storage power station according to the power generation and power consumption trends of the power grid;
[0026] A dispatching unit, wherein the dispatching unit is used to execute the planning and dispatching scheme of the pumped-storage power station and perform work dispatching of the pumped-storage power station.
[0027] In a third aspect, an embodiment of the present application also provides a planning and scheduling device for a pumped-storage power station, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the steps of the above-described method when executing the program.
[0028] One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:
[0029] By obtaining the historical power generation data of each power generation equipment in the power grid and the historical power consumption data of different types of electricity consumption, and combining with meteorological information to obtain the power generation and power consumption trends of the power grid, a planning scheme for pumped-storage power stations in the power grid is generated based on the power generation and power consumption trends, and the work of the pumped-storage power stations is dispatched according to the planning scheme.
[0030] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] Figure 1 A schematic diagram of a flow chart of a method for planning and scheduling a pumped storage power station according to an embodiment of the present application;
[0032] Figure 2 This is a schematic diagram of the structure of a planning and scheduling device for a pumped-storage power station according to an embodiment of the present application;
[0033] Figure 3 It is a schematic diagram of the structure of an exemplary electronic device according to an embodiment of the present application.
[0034] Explanation of the reference numerals: first acquisition unit 11 , second acquisition unit 12 , first prediction unit 13 , first generation unit 14 , scheduling unit 15 , bus 300 , receiver 301 , processor 302 , transmitter 303 , memory 304 , bus interface 306 . DETAILED DESCRIPTION
[0035] The embodiment of the present application provides a planning and scheduling method for a pumped-storage power station. By acquiring historical power generation data of each power generation equipment in the power grid and historical power consumption data of different power consumption types, and combining meteorological information to obtain the power generation and power consumption trends of the power grid, a planning scheme for the pumped-storage power station in the power grid is generated according to the power generation and power consumption trends, and the operation of the pumped-storage power station is scheduled according to the planning scheme.
[0036] Below, the exemplary embodiments according to the present application will be described in detail with reference to the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all the embodiments of the present application, and it should be understood that the present application is not limited to the exemplary embodiments described here.
[0037] Application Overview
[0038] As my country proposes to achieve the "dual carbon" goal by 2060, it is imperative to reduce the use of traditional fossil energy. In the field of electricity, fossil energy can ensure the stable output of electricity, so it plays an important role in the safe operation of my country's electricity. Although the installed capacity of new energy power generation equipment has grown rapidly in my country in recent years, its power generation efficiency is unstable. For example, photovoltaic power generation is limited by sunshine, wind power generation depends on wind power, and conventional hydropower generation is closely related to rainfall; at the same time, the production electricity consumption of society and the people's daily electricity consumption are related to the economy, climate, etc., and their electricity consumption also fluctuates.
[0039] Pumped-storage power stations can convert electricity into water potential energy when there is a surplus of electricity, and can convert water potential energy into electrical energy when there is a shortage of electricity. Therefore, as a facility that can both store energy and generate electricity and convert it into electrical energy, the importance of pumped-storage power stations is self-evident. However, the existing pumped-storage power stations have single scheduling considerations and simple control, and cannot maximize the efficiency of the power grid.
[0040] In response to the above technical problems, the overall idea of the technical solution provided by this application is as follows:
[0041] An embodiment of the present application provides a planning and scheduling method for a pumped-storage power station, the method comprising: obtaining information on power generation equipment and power consumption types of the power grid; obtaining historical power generation data and historical power consumption data of the power grid within a predetermined time range; predicting and generating power generation and power consumption trends of the power grid based on the historical power generation data and historical power consumption data of the power grid, wherein the power generation trend of the power grid includes power generation trends of various types of power generation equipment, and the power consumption trend includes power consumption trends of various types of power consumption; generating a planning and scheduling scheme for the pumped-storage power station based on the power generation and power consumption trends of the power grid; and performing work scheduling of the pumped-storage power station based on the planning and scheduling scheme of the pumped-storage power station.
[0042] In order to better understand the above technical solution, the above technical solution will be described in detail below in conjunction with the accompanying drawings and specific implementation methods.
[0043] Embodiment 1
[0044] like Figure 1 As shown, an embodiment of the present application provides a planning and scheduling method for a pumped storage power station, the method comprising:
[0045] Obtain information about power grid power generation equipment and electricity usage types.
[0046] Exemplarily, the power grid power generation equipment of this embodiment includes: thermal power plants, hydropower stations, wind power stations, and photovoltaic power stations. Of course, the power generation equipment targeted by the embodiment of the present application can also adopt other forms of power generation, such as nuclear energy, which is not limited by the embodiment of the present application. At present, the main power generation equipment of my country's power grid is mainly thermal power plants and hydropower stations, and the installed capacity of wind power stations and photovoltaic power stations is also growing rapidly, but the above equipment can only generate electricity but cannot store energy. At present, photovoltaic and wind power generation are also equipped with large-capacity energy storage batteries, but their equipment costs are high, and there is still an environmental pollution problem after long-term use of batteries. Pumped storage power stations are of great significance for electricity "peak shaving and valley filling" because they can both store energy and generate electricity, and their installed capacity has been growing rapidly. The electricity consumption type information of this embodiment simply includes industrial electricity, commercial electricity, and residential electricity. Different electricity consumption priorities can be set according to their load types, such as core loads, important loads, general loads, etc. When electricity is scarce, different electricity consumption priorities can be set according to the importance and type of loads.
[0047] Obtain historical power generation data and historical power consumption data of the power grid within a predetermined time range.
[0048] Specifically, the total historical power generation of the power grid within the predetermined time range is:
[0049]
[0050] Among them, W lf Indicates the total historical power generation of the power grid within a predetermined time range, W i It represents the total historical power generation of the i-th power generation equipment within a predetermined time range.
[0051] The total historical electricity consumption of the power grid within the predetermined time range is:
[0052]
[0053] Among them, W ly Indicates the total historical power consumption of the power grid within a predetermined time range, W j It represents the total historical electricity consumption of the jth type of electrical equipment within a predetermined time range.
[0054] According to different regions, different seasons, and different main power generation methods, a predetermined time range can be set. For example, it can be predicted by the hour every day, or it can be predicted on a daily basis, or it can be predicted on a weekly or monthly basis. Of course, it is understandable that the smaller the predetermined time range, the higher the accuracy of the final adjustment, but the more data required for calculation, and the more frequent the planning and scheduling. In addition, since the startup and operation of a pumped storage power station takes from tens of seconds to several minutes, the smaller the predetermined time range, the better. It also needs to match the actual situation of the target location. The power generation data W retrieved from the historical period of the power grid lf Including the historical data of power generation of different types of power generation equipment mentioned above i , these data include thermal power generation, hydropower generation, wind power generation and photovoltaic power generation. The power consumption data of the power grid in the historical period is retrieved ly Including power consumption data of different types and load priorities of electrical equipment W j .
[0055] It is necessary to preprocess the electricity consumption data to eliminate the impact of different data sources for unified analysis, eliminate abnormal data, and then extract key features from the preprocessed data, such as the impact of changes on electricity consumption every day, week, day, night, weekdays, holidays, different seasons, different weather, etc., and then perform trend analysis on the electricity consumption data.
[0056] According to the historical power generation data W of the power grid lf And historical electricity consumption data W ly Predict the power generation W of the power grid yf And power consumption W yy Trend, where the power generation W of the power grid yfThe trends include power generation trends of various types of power generation equipment, and the power consumption trends include power consumption trends of various types of power consumption.
[0057] After preprocessing the data, the power generation W of different power generation equipment in the historical period can be i Similarly, the historical power consumption W of loads of different types and priorities can be used to predict the power generation trend of the power grid. j Trend forecasting can be used to obtain the subsequent power consumption trend of the power grid.
[0058] A planning and dispatching scheme for the pumped-storage power station is generated according to the power generation and power consumption trends of the power grid.
[0059] By comparing the difference between the power generation and power consumption of the power grid in the same period, it is possible to predict whether the power grid as a whole is in a power shortage or power surplus within the time range. In simple terms, if there is a power surplus, the pumped storage power station can pump the water from the lower reservoir to the upper reservoir through a water pump for storage, so that when there is a power shortage, the discharge valve of the upper reservoir can be opened to use the drop between the upper and lower reservoirs to drive the turbine to rotate, thereby converting the potential energy of the water into electrical energy for use by the power load in the power grid. In actual operation, there are many factors that affect the adjustment of the working state of the pumped storage power station. Different regions, different seasons, and even day and night have an impact on the working state of the pumped storage power station. For example: in the southwest area with abundant water resources, hydropower generation is the main source, and precipitation in different seasons has a great impact on water flow. Pumped storage power stations are mainly used for energy storage during the flood season and for power generation during the dry season. Xinjiang and coastal areas have better wind resources, and wind power generation is more important for local power supply. Pumped storage power stations need to pay attention to the wind strength. When the wind is strong, they can store energy, and when the wind is weak, they can generate electricity. In places with sufficient sunlight, photovoltaic power generation is an important source of electric energy. Different weather conditions have a great impact on the efficiency of photovoltaic power generation. Photovoltaic power generation occurs during the day, but zero at night. Pumped storage power stations in this area need to be adjusted according to the weather and day and night.
[0060] The operation of the pumped-storage power station is dispatched according to the planning and dispatching scheme of the pumped-storage power station.
[0061] Based on the generated planning and scheduling scheme, the pumped storage power station drives water pumps, sluice gates, turbines and other equipment to perform corresponding operations at the preset time according to the planning and scheduling scheme.
[0062] Further, as an optimization solution of the embodiment of the present application, the historical power generation data W of the power grid is lf And historical electricity consumption data W lyThe prediction of the power generation and power consumption trends of the power grid also includes:
[0063] The forecasted meteorological data and historical meteorological data within the predetermined time range are obtained, and the power generation data and power consumption data trends of the power grid are updated and generated.
[0064] As mentioned above, climate and weather have a great impact on local power generation and electricity consumption. For example, in the southern region, due to the high temperature in summer, people use air conditioners for a long time, which can cause summer to become the peak of electricity consumption throughout the year. For areas with more developed hydropower generation, the rainy season can keep their hydropower generation at a high level for several months. Therefore, when predicting local power generation and electricity consumption within a predetermined time range, it is necessary to consider meteorological data to make the prediction data more accurate.
[0065] Furthermore, as an optimization solution of the embodiment of the present application, the historical electricity prices of the power grid in each time period are obtained. Generate a predicted electricity price for the power grid within the predetermined time range in, represents the historical electricity price of the j-th type of electrical equipment in the k-th period, It represents the predicted electricity price of the j-th type of electrical equipment in the m-period.
[0066] By analyzing multiple groups of historical electricity prices at different time periods The predicted electricity price for each period within the predetermined time range can be obtained by fitting the fluctuation curve of the historical electricity price for each period The fitting method can be a regression curve, and of course other fitting methods can also be used.
[0067] Furthermore, according to the predicted electricity price and the historical power consumption data W of the power grid ly An electrical power usage trend of the power grid is generated.
[0068] Different regions and different power generation equipment have different electricity costs. Traditional fossil energy is also affected by energy prices, while photovoltaic equipment is affected by raw material prices. At the same time, electricity prices are different in different time periods. Generally speaking, electricity prices are expensive during the day when electricity consumption is high, and cheap at night when electricity consumption is low. In addition, electricity prices in different seasons vary greatly depending on power generation costs and electricity consumption. Therefore, when specifying the planning and scheduling plan for a pumped storage power station, it is also necessary to consider the predicted electricity price within the scheduled time range. When the power grid still has redundant energy and the energy storage electricity price is lower than the power generation electricity price, electricity is used to pump water to the upper reservoir when the electricity price is low, and when the electricity price is high, electricity is generated to supply the power grid load, thereby maximizing economic benefits.
[0069] Furthermore, as an optimization solution of the embodiment of the present application, the water level data of the upper reservoir and the lower reservoir are obtained, and the pumped storage power station is dispatched according to the warning water level value. 上 , the warning water level of the upper reservoir is L 上警 , the water level of the lower reservoir is L 下 , the warning water level of the lower reservoir is L 下警 .
[0070] If there is a risk of flood disaster, when the reservoir water level is at the high warning level, that is, L 下 >L 下警 Regardless of whether the power supply of the power grid exceeds the demand or the demand exceeds the supply, flood discharge is required. In addition to opening the gates of the lower reservoir to discharge flood water, the water in the lower reservoir can also be pumped to the upper reservoir by water pumps. Of course, flood discharge and pumping can also be carried out at the same time to ensure the safety of the reservoir and its surrounding areas. Similarly, when the water level of the upper reservoir is at a high warning level, that is, L 上 >L 上警 , the gates are opened to allow water to flow into the lower reservoir through the turbines to generate electricity, and at the same time generate electricity to supply the power grid. When the water levels of both the upper and lower reservoirs are at the warning high level, the gates are opened to discharge floodwater to ensure safety.
[0071] In this embodiment, according to the historical power generation data W of different power generation equipment i and the historical power consumption data W of different power-consuming equipment j The power generation trend and power consumption trend within a predetermined time range are predicted, so as to dispatch the working state of the pumped storage power station. Moreover, this embodiment further considers the influence of factors such as weather, electricity prices in different regions and at different times, and reservoir water levels on the dispatch of the pumped storage power station, thus achieving a win-win situation in terms of social benefits and power benefits of the pumped storage power station.
[0072] Embodiment 2
[0073] Based on the same inventive concept as the planning and scheduling method of a pumped storage power station in the aforementioned embodiment, the present invention also provides a planning and scheduling device for a pumped storage power station, such as Figure 2 As shown, the device comprises:
[0074] First acquisition unit 11: The first acquisition unit 11 is used to acquire power grid power generation equipment information and power consumption type information.
[0075] The second acquisition unit 12 is used to acquire the historical power generation data and historical power consumption data of the power grid within a predetermined time range.
[0076] The first prediction unit 13: The first prediction unit 13 is used to predict and generate the power generation and power consumption trends of the power grid based on the historical power generation data and historical power consumption data of the power grid, wherein the power generation trend of the power grid includes the power generation trends of various types of power generation equipment, and the power consumption trend includes the power consumption trends of various types of power consumption.
[0077] The first generating unit 14 is used to generate a planning and scheduling scheme for the pumped-storage power station according to the power generation and power consumption trends of the power grid.
[0078] The dispatching unit 15 is used to execute the planning and dispatching scheme of the pumped-storage power station and perform work dispatching of the pumped-storage power station.
[0079] The foregoing Figure 1 The various variations and specific examples of the planning and scheduling method of a pumped-storage power station in Example 1 are also applicable to a planning and scheduling device of a pumped-storage power station in this embodiment. Through the above detailed description of the planning and scheduling method of a pumped-storage power station, those skilled in the art can clearly know the implementation method of the planning and scheduling device of a pumped-storage power station in this embodiment, so for the sake of brevity of the specification, it will not be described in detail again.
[0080] Embodiment 3
[0081] Reference below Figure 3 To describe the electronic device of the embodiment of the present application.
[0082] Figure 3 The figure shows a schematic structural diagram of an electronic device according to an embodiment of the present application.
[0083] Based on the inventive concept of a planning and scheduling method for a pumped-storage power station in the aforementioned embodiment, the present invention also provides a planning and scheduling device for a pumped-storage power station, on which a computer program is stored, and when the program is executed by a processor, the steps of any method of the planning and scheduling method for a pumped-storage power station described above are implemented.
[0084] Among them, Figure 3In the embodiment of the present invention, a bus architecture (represented by bus 300) is shown, which may include any number of interconnected buses and bridges, and bus 300 links various circuits including one or more processors represented by processor 302 and memory represented by memory 304. Bus 300 may also link various other circuits such as peripherals, voltage regulators, and power management circuits, which are well known in the art and are therefore not further described herein. Bus interface 306 provides an interface between bus 300 and receiver 301 and transmitter 303. Receiver 301 and transmitter 303 may be the same element, namely a transceiver, providing a unit for communicating with various other devices over a transmission medium. Processor 302 is responsible for managing bus 300 and general processing, while memory 304 may be used to store data used by processor 302 when performing operations.
[0085] The planning and scheduling device of the pumped-storage power station of this embodiment can implement the planning and scheduling method of the pumped-storage power station of embodiment 1, which method includes: obtaining information on power generation equipment and electricity consumption type of the power grid. Obtaining historical power generation data and historical electricity consumption data of the power grid within a predetermined time range. Predicting and generating power generation and electricity consumption trends of the power grid based on the historical power generation data and historical electricity consumption data of the power grid, wherein the power generation trend of the power grid includes power generation trends of various types of power generation equipment, and the electricity consumption trend includes electricity consumption trends of various types of electricity consumption. Generate a planning and scheduling scheme for the pumped-storage power station based on the power generation and electricity consumption trends of the power grid. Perform work scheduling of the pumped-storage power station based on the planning and scheduling scheme of the pumped-storage power station.
[0086] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, systems or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0087] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.
[0088] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.
[0089] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.
[0090] Although the preferred embodiments of the present invention have been described, those skilled in the art may make other changes and modifications to these embodiments once they have learned the basic creative concept. Therefore, the appended claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention.
[0091] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A planning and dispatching method for a pumped storage power station, characterized in that: The method comprises: Obtain information about power generation equipment and electricity usage types on the power grid; Obtaining historical power generation data and historical power consumption data of the power grid within a predetermined time range; Predicting and generating the power generation and power consumption trends of the power grid based on the historical power generation data and historical power consumption data of the power grid, wherein the power generation trend of the power grid includes the power generation trends of various types of power generation equipment, and the power consumption trend includes the power consumption trends of various types of power consumption; Generate a planning and dispatching scheme for the pumped-storage power station according to the power generation and power consumption trends of the power grid; The operation of the pumped-storage power station is dispatched according to the planning and dispatching scheme of the pumped-storage power station.
2. The method according to claim 1, characterized in that The method of predicting and generating the power generation and power consumption trends of the power grid based on the historical power generation data and the historical power consumption data of the power grid also includes: The forecasted meteorological data and historical meteorological data within the predetermined time range are obtained, and the power generation data and power consumption data trends of the power grid are updated and generated.
3. The method of claim 1, wherein: The power grid power generation equipment includes: thermal power plants, hydropower plants, wind power plants, and photovoltaic power plants.
4. The method of claim 1, wherein: Also includes: The historical electricity prices of the power grid in each time period are obtained, and the predicted electricity prices of the power grid within the predetermined time range are generated.
5. The method of claim 4, wherein: The method comprises: The power consumption trend of the power grid is generated according to the predicted power price and the historical power consumption data of the power grid.
6. The method of claim 1, wherein: The method comprises: The water level data of the upper reservoir and the lower reservoir are obtained, and the pumped storage power station is dispatched according to the early warning water level value.
7. A planning and dispatching device for a pumped storage power station, wherein: The device comprises: First acquisition unit: The first acquisition unit is used to acquire power grid power generation equipment information and power consumption type information; A second acquisition unit, the second acquisition unit is used to acquire historical power generation data and historical power consumption data of the power grid within a predetermined time range; First prediction unit: The first prediction unit is used to predict and generate the power generation and power consumption trends of the power grid according to the historical power generation data and historical power consumption data of the power grid, wherein the power generation trend of the power grid includes the power generation trends of various types of power generation equipment, and the power consumption trend includes the power consumption trends of various types of power consumption; A first generating unit, the first generating unit is used to generate a planning and scheduling scheme of the pumped-storage power station according to the power generation and power consumption trends of the power grid; A dispatching unit, wherein the dispatching unit is used to execute the planning and dispatching scheme of the pumped-storage power station and perform work dispatching of the pumped-storage power station.
8. A planning and scheduling device for a pumped storage power station, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein: When the processor executes the program, the steps of the method according to any one of claims 1 to 6 are implemented.
Citation Information
Cited By
New energy urban power grid source storage collaborative planning method and system considering security constraints
CN121484869A
Source-storage collaborative planning method and system for new energy city power grid considering safety constraints
CN121484869B