Buffer type reservoir dam reinforcing structure and construction method
By designing a buffer reservoir dam reinforcement structure, using main fixing plates, storage bins, winding rollers and other components, the rapid laying and winding of geotextiles is achieved, solving the problem of high labor intensity and low efficiency of dam reinforcement, and improving the reinforcement efficiency and stability of dams.
Patent Information
- Application Number
- CN202411739256.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-29
- Publication Date
- 2025-03-04
AI Technical Summary
Due to the large area of the embankment, the laying and recycling of geotextiles and protective panels is very labor-intensive and inefficient, which is not conducive to rapid response to emergencies such as floods.
A buffer-type reservoir dam reinforcement structure is designed, including the main fixing plate, storage bin, winding roller, positioning rod, hoisting assembly and storage assembly. Through the combination of these components, the rapid laying and winding of geotextiles are realized, and the installation and storage efficiency of the device is improved.
Through this structure and construction method, geotextiles can be quickly laid and retracted, which improves the efficiency and stability of dam reinforcement, reduces labor intensity and time, and is suitable for rapid response to emergencies such as floods.
Smart Images

Figure CN119553625A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of dam reinforcement, and in particular to a buffer reservoir dam reinforcement structure and a construction method. Background Art
[0002] Reservoir dams are important water conservancy engineering facilities, mainly used to prevent water from flowing and protect residents and farmland in downstream areas from floods. In the construction of small reservoir dams in towns and villages, earth-rock dams are widely used because of their low cost. However, earth-rock dams are at risk of being washed away when facing extreme weather and floods, which not only threatens people's lives and property safety, but may also cause serious economic losses. Therefore, strengthening reservoir dams and improving their impact resistance and stability are key measures to ensure regional water security.
[0003] At present, in order to reduce the impact of water flow on the slope of the dam and improve the impact resistance of the dam, geotextiles and protective plates are usually laid on the surface of the dam before the flood breaks out. Geotextiles play an important role in dam reinforcement due to their basic functions such as reinforcement and stabilization, filtration, isolation, drainage, and anti-seepage. Protective plates directly protect the surface of the dam and reduce soil erosion. These measures have improved the stability and safety of the dam to a certain extent.
[0004] However, due to the large area of the embankment, the laying and recovery of geotextiles and protective panels is labor-intensive and inefficient, which is not conducive to rapid response to emergencies such as floods. Summary of the invention
[0005] The purpose of this application is to solve the problem that due to the large area of the dam, the laying and recovery of geotextiles and protective plates are labor-intensive, inefficient, and not conducive to rapid response to emergencies such as floods. This application provides a buffer reservoir dam reinforcement structure and construction method.
[0006] In order to achieve the above-mentioned purpose, this application specifically adopts the following technical solutions: A buffer-type reservoir dam reinforcement structure comprises a main fixing plate, wherein a storage bin is symmetrically provided inside the main fixing plate, a winding roller is rotatably connected inside the storage bin, a geotextile is wound around one end of the winding roller, a through hole adapted to the geotextile is provided on one side of the storage bin, one end of the geotextile passes through the through hole and is fixedly connected to a positioning rod, a positioning hole is symmetrically provided at one end of the positioning rod, a positioning fork is inserted inside the positioning hole, a pair of L-shaped fixing plates are symmetrically fixedly connected to one end of the main fixing plate, a fixing hole is provided at one end of the L-shaped fixing plate, a connecting rib is inserted inside the fixing hole, and the One end of the connecting reinforcement is pre-buried inside the dam, one end of the connecting reinforcement passes through the fixing hole and is provided with a fixing thread groove, one end of the fixing thread groove is threadedly connected to a fixing nut, one end of the main fixing plate is symmetrically fixedly connected to a mounting plate, one end of the mounting plate is evenly slidably connected to a plurality of lifting slide rods, the tops of the plurality of lifting slide rods are fixedly connected to a plate brush, one end of the main fixing plate is installed with a winding assembly for driving the winding roller to rotate, one end of the main fixing plate is symmetrically installed with a storage assembly for adsorbing the positioning rod, and one end of the mounting plate is installed with a lifting assembly for driving the plate brush to move closer to one end of the geotextile.
[0007] By adopting the above technical scheme, by setting up the coordinated use of the jacking component, the storage component and the winding component, it is convenient to drive one end of the geotextile through the through-hole by pulling the positioning rod and quickly lay it on the slope of the dam. The geotextile can also be quickly rolled up by rotating the winding component, and the jacking component can be used to clean the foreign matter adhering to the surface of the geotextile. At the same time, the storage component is used to reduce the looseness of the geotextile when it is rolled up, effectively improving the installation and storage efficiency of the device.
[0008] Furthermore, the winding assembly includes a drive groove opened inside the main fixed plate, one end of the winding roller extends into the drive groove and is fixedly connected to a drive gear, the two drive gears are meshed with each other, one end of the main fixed plate is rotatably connected to a drive handle, and one end of one of the drive gears passes through the main fixed plate and is fixedly connected to the drive handle.
[0009] By adopting the above technical solution, by setting the driving gear and the winding roller for use together, when the driving handle is rotated to drive a driving gear to pull the winding roller to wind up the geotextile, one driving gear is meshed with another driving gear, thereby driving the two winding rollers to complete the winding of the geotextile at the same time, effectively improving the winding efficiency of the device.
[0010] Furthermore, the jacking assembly includes a jacking spring sleeved on the periphery of the jacking slide rod, the jacking spring is installed between the mounting plate and the brush, one end of the main fixed plate is symmetrically fixedly connected with an L-shaped resistance plate, and the geotextile is installed between the L-shaped resistance plate and the brush.
[0011] By adopting the above technical scheme, by setting the cooperation of the lifting spring and the L-shaped resistance plate, it is convenient to utilize the elastic characteristics of the lifting spring when driving the winding roller to wind up the geotextile, so that the lifting spring rebounds and pushes the brush to move along the length direction of the lifting slide rod, and cooperates with the L-shaped resistance plate to form a clamping brush for one end of the geotextile, so as to clean the foreign matter adhering to the surface of the geotextile, and further improve the storage efficiency of the device.
[0012] Furthermore, the storage assembly includes a magnetic adsorption strip 1 fixedly connected to one side of the lifting spring, and one end of the positioning rod is fixedly connected to a magnetic adsorption strip 2, and the magnetic adsorption strip 1 is magnetically adsorbed to the magnetic adsorption strip 2.
[0013] By adopting the above technical solution, by setting up the coordinated use of magnetic adsorption strip one and magnetic adsorption strip two, it is convenient to utilize the magnetic adsorption characteristics of magnetic adsorption strip one and magnetic adsorption strip two to drive the positioning rod and the main fixing plate to form a stable connection, thereby reducing the loosening of the geotextile and improving the stability of the device.
[0014] Furthermore, a buffer cylinder is symmetrically fixedly connected to the top of the main fixed plate, a T-shaped support rod is slidably connected to the inside of the buffer cylinder, the top of the T-shaped support rod passes through the buffer cylinder and is hinged with an impact plate, and a buffer assembly is installed inside the buffer cylinder.
[0015] By adopting the above technical solution, by setting up the buffer component for use with the T-shaped support rod and the impact plate, it is convenient to use the buffer component to reduce the impact strength transmitted to the dam by the impact plate through the T-shaped support rod while the impact plate is subjected to the impact of the water flow, thereby improving the reinforcement effect of the device.
[0016] Furthermore, the buffer assembly includes an energy-absorbing spring fixedly connected to the bottom of the T-shaped support rod, a damper is fixedly connected to the inside of the buffer cylinder, and the energy-absorbing spring is sleeved on the periphery of the damper.
[0017] By adopting the above technical solution and arranging the energy-absorbing spring and the damper for use in combination, it is convenient to utilize the elastic characteristics of the energy-absorbing spring and the damper to buffer the water flow impact on the impact plate, thereby reducing the intensity of the water flow impact on the dam and improving the reinforcement effect of the device.
[0018] Furthermore, a locking hole is provided at the bottom of the hinged end of the impact plate, and a plurality of adjustment holes are evenly provided at one end of the T-shaped support rod. The plurality of adjustment holes are arranged in an arc shape with the hinged end of the impact plate as the center, and a locking bolt is inserted into the inside of the adjustment hole, and a locking nut is threadedly connected to one end of the locking bolt.
[0019] By adopting the above technical solution and setting the locking hole and the adjusting hole for use together, it is convenient to rotate the impact plate around the hinge axis to drive the locking hole to move to the side of the corresponding adjusting hole according to actual conditions, and then pull the locking bolt through the locking hole and the adjusting hole, and tighten the locking nut, so as to adjust the support angle of the impact plate, effectively improving the applicability of the device.
[0020] A buffer reservoir dam reinforcement construction method, the method steps are as follows: S1: First, pull the L-shaped fixing plate to drive the top of the connecting rib to pass through the fixing hole, and tighten the fixing nut. Then, before the flood comes, manually pull the positioning rod to drive one end of the geotextile to pass through the hole, lay it on the slope of the dam, and use one end of the positioning fork to pass through the positioning hole to form a fixed connection with the dam; S2: According to the predicted water flow, the impact plate is rotated around the hinge axis to adjust the support angle, and the magnetic adsorption strip is driven to rotate to the side of the corresponding adjustment hole, and then one end of the locking bolt is pulled through the locking hole and the adjustment hole, and the locking nut is tightened to complete the adjustment of the impact plate support angle; S3: When the water flow hits the impact plate, the elastic characteristics of the energy-absorbing spring and the damper are used to absorb part of the water flow impact force and push the impact plate to reset; S4: After the flood, the positioning fork is pulled out and the driving handle is rotated to drive the two driving gears to mesh with each other and drive the two winding rollers to reel the geotextile. At the same time, the characteristics of the lifting spring are used to remove foreign objects adhering to the surface of the geotextile by using the ejector brush in conjunction with the L-shaped resistance plate; S5: After the collection is completed, the magnetic adsorption strip 1 and the magnetic adsorption strip 2 are used together to drive the positioning rod and the main fixing plate to form a stable connection to reduce the loosening of the geotextile.
[0021] In summary, the present application includes at least one of the following beneficial effects: 1. By setting up the coordinated use of the jacking component, the storage component and the winding component, it is convenient to drive one end of the geotextile through the through-hole by pulling the positioning rod and quickly lay it on the slope of the dam. The geotextile can also be quickly rolled up by rotating the winding component, and the jacking component can be used to clean the foreign matter adhering to the surface of the geotextile. At the same time, the storage component is used to reduce the looseness of the geotextile when it is rolled up, effectively improving the installation and storage efficiency of the device.
[0022] 2. By setting up the coordinated use of the lifting spring and the L-shaped resistance plate, it is convenient to utilize the elastic characteristics of the lifting spring when driving the winding roller to wind up the geotextile, so that the lifting spring rebounds to push the brush along the length direction of the lifting slide rod, and cooperates with the L-shaped resistance plate to form a clamping brush for one end of the geotextile, so as to clean the foreign matter adhering to the surface of the geotextile, further improving the storage efficiency of the device.
[0023] 3. By setting up the buffer component for use with the T-shaped support rod and the impact plate, while the impact plate is subjected to the impact of the water flow, the buffer component is used to reduce the impact strength of the impact plate transmitted to the dam through the T-shaped support rod, thereby improving the reinforcement effect of the device. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a schematic diagram of the three-dimensional structure of the device body in this application.
[0025] Figure 2 It is an exploded view of the internal structure of the main fixing plate in this application.
[0026] Figure 3 It is a three-dimensional structural schematic diagram of the jacking assembly in this application.
[0027] Figure 4 It is an exploded view of the internal structure of the buffer cylinder in this application.
[0028] Figure 5 It is an exploded diagram of the connection relationship between the T-shaped support rod and the impact plate in this application.
[0029] Description of reference numerals: 1. Main fixing plate; 2. Storage bin; 3. Winding roller; 4. Geotextile; 5. Positioning rod; 6. Positioning hole; 7. Positioning fork; 8. L-shaped fixing plate; 9. Fixing hole; 10. Connecting rib; 11. Fixed thread groove; 12. Fixed nut; 13. Through-hole; 14. Mounting plate; 15. Lifting slide bar; 16. Plate brush; 17. Lifting spring; 18. L-shaped resistance plate; 19. Magnetic adsorption strip 1; 20. Magnetic adsorption strip 2; 21. Driving slot; 22. Driving gear; 23. Driving handle; 24. Buffer cylinder; 25. T-shaped support rod; 26. Impact plate; 27. Energy-absorbing spring; 28. Damper; 29. Locking hole; 30. Adjustment hole; 31. Locking bolt; 32. Locking nut. DETAILED DESCRIPTION
[0030] The following is combined with Figure 1 —5 further describes this application in detail.
[0031] The embodiments of the present application disclose a buffer reservoir dam reinforcement structure and a construction method.
[0032] Reference Figure 1 - Figure 3A buffer reservoir dam reinforcement structure comprises a main fixing plate 1, a storage bin 2 is symmetrically provided inside the main fixing plate 1, a winding roller 3 is rotatably connected inside the storage bin 2, a geotextile 4 is wound around one end of the winding roller 3, a through hole 13 adapted to the geotextile 4 is provided on one side of the storage bin 2, one end of the geotextile 4 passes through the through hole 13 and is fixedly connected to a positioning rod 5, a positioning hole 6 is symmetrically provided at one end of the positioning rod 5, a positioning fork 7 is inserted inside the positioning hole 6, a pair of L-shaped fixing plates 8 are symmetrically fixedly connected to one end of the main fixing plate 1, a fixing hole 9 is provided at one end of the L-shaped fixing plate 8, a connecting rib 10 is inserted inside the fixing hole 9, and the connecting rib 10 One end of the main fixing plate 1 is embedded in the dam, one end of the connecting rib 10 passes through the fixing hole 9 and is provided with a fixing thread groove 11, one end of the fixing thread groove 11 is threadedly connected with a fixing nut 12, one end of the main fixing plate 1 is symmetrically fixedly connected with a mounting plate 14, one end of the mounting plate 14 is evenly slidably connected with a plurality of jacking slide rods 15, and the tops of the plurality of jacking slide rods 15 are fixedly connected with a plate brush 16, one end of the main fixing plate 1 is installed with a winding assembly for driving the winding roller 3 to rotate, one end of the main fixing plate 1 is symmetrically installed with a receiving assembly for adsorbing the positioning rod 5, and one end of the mounting plate 14 is installed with a lifting assembly for driving the plate brush 16 to move closer to one end of the geotextile 4; The winding assembly includes a driving groove 21 opened inside the main fixed plate 1, one end of the winding roller 3 extends into the driving groove 21 and is fixedly connected to a driving gear 22, the two driving gears 22 are meshed with each other, one end of the main fixed plate 1 is rotatably connected to a driving handle 23, one end of a driving gear 22 passes through the main fixed plate 1 and is fixedly connected to the driving handle 23; Moreover, the lifting assembly includes a lifting spring 17 sleeved on the outer periphery of the lifting slide rod 15, the lifting spring 17 is installed between the mounting plate 14 and the brush 16, one end of the main fixing plate 1 is symmetrically fixedly connected with an L-shaped contact plate 18, and the geotextile 4 is installed between the L-shaped contact plate 18 and the brush 16; Furthermore, the storage assembly includes a magnetic adsorption strip 19 fixedly connected to one side of the lifting spring 17, and one end of the positioning rod 5 is fixedly connected to a magnetic adsorption strip 20, and the magnetic adsorption strip 19 and the magnetic adsorption strip 20 are magnetically adsorbed.
[0033] When in use, firstly, the main fixing plate 1 is manually pulled to drive the L-shaped fixing plate 8 to approach the top of the connecting rib 10, and the top of the connecting rib 10 is passed through the fixing hole 9, and then the fixing nut 12 is tightened, so that the main fixing plate 1 forms a fixed connection with the dam slope through the connecting rib 10, and then before the flood comes, the positioning rod 5 is manually pulled to drive the geotextile 4 to pass through the hole 13 and be laid on the dam slope, and then one end of the positioning fork 7 is pulled through the positioning hole 6 and nailed into the inside of the dam to achieve a fixed connection between the positioning rod 5 and the dam, thereby achieving rapid laying of the geotextile 4 to reduce the soil and water loss caused by the impact of water flow when the water level of the dam rises; Then, after the flood, the positioning fork 7 inserted into the inside of the dam is pulled out, and then the driving handle 23 is manually turned to drive the two driving gears 22 to mesh with each other, and the two winding rollers 3 are driven to simultaneously wind up one end of the geotextile 4. When one end of the geotextile 4 is pulled by the winding roller 3 and passes through the through opening 13 for winding, the elastic characteristics of the lifting spring 17 are used to make the lifting spring 17 push the brush 16 upward along the length direction of the lifting slide rod 15, and push the brush 16 to cooperate with the L-shaped resistance plate 18 to form a clamping resistance to one end of the geotextile 4, so that the brush 16 can brush off foreign matter adhering to the surface of the geotextile 4, thereby effectively improving the winding efficiency of the geotextile 4; When the winding roller 3 drives one end of the geotextile 4 to complete winding, the one end of the geotextile 4 drives the positioning rod 5 to move closer to one side of the main fixed plate 1, and at the same time, the positioning rod 5 drives the magnetic adsorption strip 2 20 and the magnetic adsorption strip 1 19 to move closer, and utilizes the magnetic adsorption characteristics of the magnetic adsorption strip 19 and the magnetic adsorption strip 2 20, so that the magnetic adsorption strip 2 20 drives one end of the positioning rod 5 to form a fixed connection with the main fixed plate 1, thereby effectively reducing the looseness of the geotextile 4 caused by the winding roller 3, and further improving the installation and storage efficiency of the device.
[0034] Reference Figure 1 and Figure 4 , Figure 5 The top of the main fixed plate 1 is symmetrically fixedly connected with a buffer cylinder 24, the inside of the buffer cylinder 24 is slidably connected with a T-shaped support rod 25, the top of the T-shaped support rod 25 passes through the buffer cylinder 24 and is hinged with an impact plate 26, and a buffer assembly is installed inside the buffer cylinder 24; The buffer assembly includes an energy-dissipating spring 27 fixedly connected to the bottom of the T-shaped support rod 25, a damper 28 is fixedly connected to the inside of the buffer cylinder 24, and the energy-dissipating spring 27 is sleeved on the periphery of the damper 28; In addition, a locking hole 29 is provided at the bottom of the hinged end of the impact plate 26, and a plurality of adjustment holes 30 are evenly provided at one end of the T-shaped support rod 25. The plurality of adjustment holes 30 are arranged in an arc shape with the hinged end of the impact plate 26 as the center. A locking bolt 31 is inserted into the adjusting hole 30, and a locking nut 32 is threadedly connected to one end of the locking bolt 31.
[0035] When in use, before the flood comes, the impact plate 26 can be rotated around the hinge axis according to the water flow predicted in advance to adjust the support angle of the impact plate 26, and the impact plate 26 drives the locking hole 29 to rotate to the side of the corresponding adjustment hole 30, and then one end of the locking bolt 31 is manually pulled through the adjustment hole 30 and the locking hole 29, and the locking nut 32 is tightened to form a fixed connection between the impact plate 26 and the T-shaped support rod 25, thereby completing the adjustment of the support angle of the impact plate 26; Then, when the impact plate 26 is impacted by the water flow, the impact plate 26 is forced to push the T-shaped support rod 25 downward along the length direction of the buffer tube 24, and at the same time, the T-shaped support rod 25 squeezes the energy-absorbing spring 27 and the damper 28 to produce a contraction deformation, thereby utilizing the elastic characteristics of the energy-absorbing spring 27 and the damper 28 to absorb part of the impact force of the water flow, and rebound to push the T-shaped support rod 25 to drive the impact plate 26 to reset, thereby effectively reducing the intensity of the water flow impact on the dam and improving the reinforcement effect of the device.
[0036] A buffer reservoir dam reinforcement construction method, the method steps are as follows: S1: First, pull the L-shaped fixing plate 8 to drive the top of the connecting rib 10 to pass through the fixing hole 9, and tighten the fixing nut 12. Then, before the flood comes, manually pull the positioning rod 5 to drive one end of the geotextile 4 to pass through the hole 13 and lay it on the slope of the dam. Use one end of the positioning fork 7 to pass through the positioning hole 6 to form a fixed connection with the dam; S2: According to the predicted water flow, the impact plate 26 is rotated around the hinge axis to adjust the support angle, and the magnetic adsorption strip 19 is driven to rotate to the side of the corresponding adjustment hole 30, and then one end of the locking bolt 31 is pulled through the locking hole 29 and the adjustment hole 30, and the locking nut 32 is tightened to complete the adjustment of the support angle of the impact plate 26; S3: When the water flow impacts the impact plate 26, the elastic characteristics of the energy-absorbing spring 27 and the damper 28 are used to absorb part of the impact force of the water flow and push the impact plate 26 to reset; S4: After the flood, the positioning fork 7 is pulled out to rotate the driving handle 23, driving the two driving gears 22 to mesh with each other, and driving the two winding rollers 3 to wind up the geotextile 4. At the same time, the characteristics of the lifting spring 17 are utilized to eject the plate brush 16 and cooperate with the L-shaped contact plate 18 to brush away foreign matter adhering to the surface of the geotextile 4; S5: After the receipt is completed, the magnetic adsorption strip 19 and the magnetic adsorption strip 20 are used together to drive the positioning rod 5 to form a stable connection with the main fixing plate 1 to reduce the looseness of the geotextile 4.
[0037] The implementation principle of a buffer-type reservoir dam reinforcement structure and construction method of this embodiment is as follows: first, the main fixing plate 1 is manually pulled to drive the L-shaped fixing plate 8 to approach the top of the connecting rib 10, and the top of the connecting rib 10 is passed through the fixing hole 9, and then the fixing nut 12 is tightened to make the main fixing plate 1 form a fixed connection with the dam slope through the connecting rib 10, and then before the flood comes, the positioning rod 5 is manually pulled to drive the geotextile 4 to pass through the through-hole 13 and be laid on the dam slope, and then one end of the positioning fork 7 is pulled through the positioning hole 6 and nailed into the inside of the dam to achieve a fixed connection between the positioning rod 5 and the dam, thereby achieving rapid laying of the geotextile 4; Then, before the flood comes, the impact plate 26 can be rotated around the hinge axis according to the water flow predicted in advance to adjust the support angle of the impact plate 26, and the impact plate 26 drives the locking hole 29 to rotate to the side of the corresponding adjustment hole 30, and then one end of the locking bolt 31 is manually pulled through the adjustment hole 30 and the locking hole 29, and the locking nut 32 is tightened to form a fixed connection between the impact plate 26 and the T-shaped support rod 25, thereby completing the adjustment of the support angle of the impact plate 26; When the impact plate 26 is impacted by the water flow, the impact plate 26 is forced to push the T-shaped support rod 25 to move downward along the length direction of the buffer tube 24, and at the same time, the T-shaped support rod 25 squeezes the energy-absorbing spring 27 and the damper 28 to produce contraction deformation, thereby utilizing the elastic characteristics of the energy-absorbing spring 27 and the damper 28 to absorb part of the impact force of the water flow, and rebound to push the T-shaped support rod 25 to drive the impact plate 26 to reset; Then, after the flood, the positioning fork 7 inserted into the inside of the dam is pulled out, and the two driving gears 22 are driven to mesh with each other by manually turning the driving handle 23, and the two winding rollers 3 are driven to simultaneously wind up one end of the geotextile 4. When one end of the geotextile 4 is pulled by the winding roller 3 and passes through the through opening 13 for winding, the elastic characteristics of the lifting spring 17 are used to make the lifting spring 17 push the brush 16 upward along the length direction of the lifting slide rod 15, and push the brush 16 to cooperate with the L-shaped resistance plate 18 to form a clamping resistance to one end of the geotextile 4, so that the brush 16 can brush away foreign matter adhering to the surface of the geotextile 4; When the winding roller 3 drives one end of the geotextile 4 to complete winding, the one end of the geotextile 4 drives the positioning rod 5 to move closer to one side of the main fixed plate 1, and at the same time, the positioning rod 5 drives the magnetic adsorption strip 2 20 and the magnetic adsorption strip 1 19 to move closer, and utilizes the magnetic adsorption characteristics of the magnetic adsorption strip 19 and the magnetic adsorption strip 2 20, so that the magnetic adsorption strip 2 20 drives one end of the positioning rod 5 to form a fixed connection with the main fixed plate 1, thereby effectively reducing the looseness of the geotextile 4 caused by the winding roller 3.
Claims
1. A buffer reservoir dam reinforcement structure, comprising a main fixing plate (1), characterized in that: A storage bin (2) is symmetrically provided inside the main fixing plate (1), a winding roller (3) is rotatably connected inside the storage bin (2), a geotextile (4) is wound around one end of the winding roller (3), a through hole (13) adapted to the geotextile (4) is provided on one side of the storage bin (2), one end of the geotextile (4) passes through the through hole (13) and is fixedly connected to a positioning rod (5), one end of the positioning rod (5) is symmetrically provided with a positioning hole (6), a positioning fork (7) is inserted into the inside of the positioning hole (6), one end of the main fixing plate (1) is symmetrically fixedly connected to a pair of L-shaped fixing plates (8), one end of the L-shaped fixing plate (8) is provided with a fixing hole (9), a connecting rib (10) is inserted into the inside of the fixing hole (9), one end of the connecting rib (10) is pre- Buried inside the dam, one end of the connecting rib (10) passes through the fixing hole (9) and is provided with a fixing thread groove (11), one end of the fixing thread groove (11) is threadedly connected to a fixing nut (12), one end of the main fixing plate (1) is symmetrically fixedly connected to a mounting plate (14), one end of the mounting plate (14) is evenly slidably connected to a plurality of lifting slide bars (15), the tops of the plurality of lifting slide bars (15) are fixedly connected to a plate brush (16), one end of the main fixing plate (1) is installed with a winding assembly for driving the winding roller (3) to rotate, one end of the main fixing plate (1) is symmetrically installed with a storage assembly for adsorbing the positioning rod (5), and one end of the mounting plate (14) is installed with a lifting assembly for driving the plate brush (16) to move closer to one end of the geotextile (4).
2. The buffer reservoir dam reinforcement structure according to claim 1, characterized in that: The winding assembly comprises a driving groove (21) formed inside the main fixed plate (1); one end of the winding roller (3) extends into the driving groove (21) and is fixedly connected to a driving gear (22); two driving gears (22) are meshed with each other; one end of the main fixed plate (1) is rotatably connected to a driving handle (23); one end of one driving gear (22) passes through the main fixed plate (1) and is fixedly connected to the driving handle (23).
3. The buffer reservoir dam reinforcement structure according to claim 1, characterized in that: The lifting assembly comprises a lifting spring (17) sleeved on the periphery of a lifting slide rod (15); the lifting spring (17) is installed between a mounting plate (14) and a brush (16); one end of the main fixing plate (1) is symmetrically fixedly connected to an L-shaped resistance plate (18); and the geotextile (4) is installed between the L-shaped resistance plate (18) and the brush (16).
4. The buffer reservoir dam reinforcement structure according to claim 1, characterized in that: The storage assembly comprises a magnetic adsorption strip 1 (19) fixedly connected to one side of the lifting spring (17), and one end of the positioning rod (5) is fixedly connected to a magnetic adsorption strip 2 (20), and the magnetic adsorption strip 1 (19) is magnetically adsorbed to the magnetic adsorption strip 2 (20).
5. The buffer reservoir dam reinforcement structure according to claim 1, characterized in that: A buffer cylinder (24) is symmetrically fixedly connected to the top of the main fixed plate (1), a T-shaped support rod (25) is slidably connected to the inside of the buffer cylinder (24), the top of the T-shaped support rod (25) passes through the buffer cylinder (24) and is hinged to an impact plate (26), and a buffer assembly is installed inside the buffer cylinder (24).
6. The buffer reservoir dam reinforcement structure according to claim 5, characterized in that: The buffer assembly comprises an energy-dissipating spring (27) fixedly connected to the bottom of the T-shaped support rod (25); a damper (28) is fixedly connected to the interior of the buffer cylinder (24); and the energy-dissipating spring (27) is sleeved on the periphery of the damper (28).
7. The buffer reservoir dam reinforcement structure according to claim 5, characterized in that: A locking hole (29) is provided at the bottom of the hinged end of the impact plate (26), and a plurality of adjustment holes (30) are evenly provided at one end of the T-shaped support rod (25). The plurality of adjustment holes (30) are arranged in an arc shape with the hinged end of the impact plate (26) as the center of the circle. A locking bolt (31) is inserted into the interior of the adjustment hole (30), and a locking nut (32) is threadedly connected to one end of the locking bolt (31).
8. A buffer reservoir dam reinforcement construction method, characterized in that: The method is applicable to a buffer reservoir dam reinforcement structure as described in any one of claims 1 to 7, and the steps of the method are as follows: S1: First, the L-shaped fixing plate (8) is pulled to drive the top of the connecting rib (10) to pass through the fixing hole (9), and the fixing nut (12) is tightened. Then, before the flood comes, the positioning rod (5) is manually pulled to drive one end of the geotextile (4) to pass through the hole (13), and the geotextile is laid on the slope of the dam. One end of the positioning fork (7) is used to pass through the positioning hole (6) to form a fixed connection with the dam. S2: According to the predicted water flow, the impact plate (26) is rotated around the hinge axis to adjust the support angle, and the magnetic adsorption strip (19) is driven to rotate to the side of the corresponding adjustment hole (30), and then one end of the locking bolt (31) is pulled through the locking hole (29) and the adjustment hole (30), and the locking nut (32) is tightened to complete the adjustment of the support angle of the impact plate (26); S3: When the water flow impacts the impact plate (26), the elastic characteristics of the energy-absorbing spring (27) and the damper (28) are used to absorb part of the impact force of the water flow, and the impact plate (26) is pushed to reset; S4: After the flood, the positioning fork (7) is pulled out and the driving handle (23) is rotated to drive the two driving gears (22) to mesh with each other and drive the two reeling rollers (3) to reel the geotextile (4). At the same time, the characteristics of the lifting spring (17) are utilized to push out the plate brush (16) in conjunction with the L-shaped resistance plate (18) to brush away foreign matter adhering to the surface of the geotextile (4); S5: After receipt is completed, the magnetic adsorption strip 1 (19) and the magnetic adsorption strip 2 (20) are used together to drive the positioning rod (5) and the main fixing plate (1) to form a stable connection, thereby reducing the loosening of the geotextile (4).