Mobile communication terminal performance test system and method
By designing a mobile communication terminal performance testing system, including a variety of test submodules and risk capture early warning modules, the problem of difficulty in comprehensive testing of mobile communication terminals in the prior art is solved, efficient and accurate performance testing and production quality risk assessment are achieved, and product quality and production management efficiency are significantly improved.
Patent Information
- Application Number
- CN202411680890.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-22
- Publication Date
- 2025-03-04
AI Technical Summary
The existing technology is difficult to achieve comprehensive performance testing of mobile communication terminals, and it is impossible to reasonably evaluate their quality compliance status and production quality risks, which makes it difficult to optimize production and supervise production.
A mobile communication terminal performance testing system is designed, including a test control module, a terminal performance comprehensive test module, a test report generation module and a risk capture early warning module. Through multiple test submodules, various performance items of the mobile communication terminal are tested, and detailed performance test reports are generated to gradually analyze the risk of production quality.
Comprehensive performance testing of mobile communication terminals has been achieved, testing efficiency and accuracy have been improved, production can be optimized in a timely manner, production supervision is reduced, and product quality has been improved.
Smart Images

Figure CN119562293A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of terminal testing, and in particular to a mobile communication terminal performance testing system and method. Background Art
[0002] Mobile communication terminals include various types of devices, such as mobile phones, laptops, tablet computers, etc. With the development of information technology, mobile communication terminals have evolved from simple communication tools to comprehensive information processing platforms. In addition to basic communication functions, they can also take photos, listen to music, play games, and combine various software to achieve multiple functions such as learning, shopping, and taxi hailing. They are widely used in various industries;
[0003] A Chinese invention patent with publication number CN105182111A discloses a performance test method and system for a mobile terminal. The technical solution of the invention controls the writing of multiple mobile terminal devices in a set of running scripts, and can perform performance tests on multiple mobile terminal devices at the same time;
[0004] However, in actual use, the above-mentioned technical solution of the invention is difficult to achieve comprehensive performance testing of mobile communication terminals, and cannot reasonably evaluate the quality compliance of mobile communication terminals. It is also unable to gradually and progressively reasonably analyze and accurately evaluate the production quality risks and production management performance of mobile communication terminals, which is not conducive to timely optimization and improvement of the production of mobile communication terminals and reducing the difficulty of production supervision.
[0005] In view of the above technical defects, a solution is now proposed. Summary of the invention
[0006] The purpose of the present invention is to provide a mobile communication terminal performance testing system and method, which solves the problem that the prior art is difficult to achieve comprehensive performance testing of mobile communication terminals, and cannot gradually and progressively reasonably analyze and accurately evaluate the production quality risks and production management performance of mobile communication terminals, which is not conducive to timely optimization and improvement of the production of mobile communication terminals and makes production supervision difficult.
[0007] To achieve the above object, the present invention provides the following technical solutions:
[0008] A mobile communication terminal performance test system, comprising a test control module, a terminal performance comprehensive test module, a test report generation module and a test supervision module;
[0009] The tester inputs the test parameters and instructions through the test supervision module, and the test control module receives the test parameters and instructions input by the tester, generates a test task based on them, and sends the test task to the terminal performance comprehensive test module;
[0010] The terminal performance comprehensive test module tests various performance items of the corresponding mobile communication terminal based on the test tasks, and sends the test results of each performance test to the test report generation module; the test report generation module automatically generates a performance test report of the corresponding mobile communication terminal based on the test results of each performance test, and sends the performance test report of the corresponding mobile communication terminal to the test supervision module.
[0011] Furthermore, the comprehensive performance test module includes a processor performance test submodule, a memory management test submodule, a network communication test submodule, a battery life test submodule, a screen display quality test submodule, an audio quality test submodule and a camera performance test submodule;
[0012] The processor performance test submodule evaluates the processor performance of the mobile communication terminal by running a specific processor performance test program, including single-core performance, multi-core performance and processor power consumption; the memory management test submodule tests the memory management performance of the mobile communication terminal by simulating a variety of memory usage scenarios, including memory allocation speed, memory leak detection and memory recycling efficiency;
[0013] The network communication test submodule tests the network communication performance of the mobile communication terminal by simulating different network communication environments, including data transmission rate, network delay and network stability; the battery life test submodule tests the battery life of the mobile communication terminal by simulating the daily use of users, including standby time, usage time and charging speed;
[0014] The screen display quality test submodule is used to test the screen display quality of the mobile communication terminal, including resolution, color reproduction, brightness and contrast; the audio quality test submodule is used to test the audio playback and recording quality of the mobile communication terminal, including sound clarity, volume and noise suppression; the camera performance test submodule is used to test the camera performance of the mobile communication terminal, including photo quality, video quality and autofocus speed.
[0015] Furthermore, the test report generation module is communicatively connected to the risk capture and warning module. The risk capture and warning module is used to set a detection period, obtain all performance test reports of the mobile communication terminals produced during the detection period, evaluate the production risk based on all performance test reports, and generate a high-risk production signal or a low-risk production signal accordingly. The high-risk production signal or the low-risk production signal is sent to the test supervision module. When the test supervision module receives the high-risk production signal, it issues a corresponding warning.
[0016] Furthermore, the specific analysis process of the risk capture and early warning module includes:
[0017] Based on the performance test report, obtain the performance items of the corresponding mobile communication terminal that do not meet the requirements, and mark the performance items that do not meet the requirements as optimization items; if the corresponding mobile communication terminal has the optimization items, mark the corresponding mobile communication terminal as a non-circulation terminal;
[0018] The number of non-circulation terminals during the detection period is obtained and the ratio is calculated with the total number of performance test reports to obtain the non-circulation detection value, and the non-circulation detection value is numerically compared with the preset non-circulation detection threshold. If the non-circulation detection value exceeds the preset non-circulation detection threshold, a high-risk production signal is generated.
[0019] Furthermore, if the non-circulation detection value does not exceed the preset non-circulation detection threshold, the corresponding performance item is marked as i, and i is a natural number greater than 1. The percentage of the number of mobile communication terminals corresponding to the performance item i marked as the optimization item during the detection period is collected and marked as the optimization detection value, and the optimization detection value is numerically compared with the corresponding preset optimization detection threshold. If the optimization detection value exceeds the corresponding preset optimization detection threshold, the performance item i is defined as a high-frequency error rate item; if there is a high-frequency error rate item during the detection period, a high-risk production signal is generated.
[0020] Furthermore, if there are no high-frequency error rate items during the detection period, the optimized detection value of performance item i is calculated by ratio with the corresponding preset optimized detection threshold to obtain the optimized risk value, and each performance item is set in advance to correspond to a set of preset risk weight values, and the product of the optimized risk value of performance item i and the corresponding preset risk weight value is marked as the optimized out-of-table value;
[0021] The optimization exception table values of all performance items are summed up to obtain the optimization emergency value, and the optimization emergency value is numerically compared with the preset optimization emergency threshold. If the optimization emergency value exceeds the preset optimization emergency threshold, a high-risk production signal is generated; if the optimization emergency value does not exceed the preset optimization emergency threshold, a low-risk production signal is generated.
[0022] Furthermore, the risk capture and early warning module is communicatively connected to the workshop management and diagnosis module. The risk capture and early warning module sends a low production risk signal to the workshop management and diagnosis module. When the workshop management and diagnosis module receives the low production risk signal, it traces the production management of the production workshop of the mobile communication terminal, generates a production management abnormality signal or a production management qualified signal through analysis, and sends the production management abnormality signal or the production management qualified signal to the test and supervision module. When the test and supervision module receives the production management abnormality signal, it issues a corresponding early warning.
[0023] Furthermore, the specific analysis process of the production management diagnosis module includes:
[0024] Acquire all production equipment for mobile communication terminal production in the production workshop, collect the failure frequency of the corresponding production equipment during the detection period, and collect all maintenance moments for the corresponding production equipment during the detection period, mark the interval between two adjacent maintenance moments as the maintenance isolation coefficient, compare the maintenance isolation coefficient with a preset maintenance isolation coefficient threshold, and mark the number of maintenance isolation coefficients that exceed the preset maintenance isolation coefficient threshold as the maintenance isolation poor inspection value, and numerically calculate the failure frequency and the maintenance isolation poor inspection value of the corresponding production equipment to obtain the production management inspection value;
[0025] The production inspection value of the corresponding production equipment is numerically compared with the corresponding preset production inspection threshold. If the production inspection value exceeds the corresponding preset production inspection threshold, the corresponding production equipment is marked as poorly managed equipment; the number of poorly managed equipment during the detection period is obtained and its ratio to the total number of production equipment in the workshop is marked as a poorly managed value, and the ratio of the production inspection values of all production equipment to the corresponding preset production inspection threshold is averaged to obtain the production condition value;
[0026] The production environment control alarm value is obtained through workshop environment management and control analysis, and the frequency of operation errors of production personnel in the workshop during the detection period is marked as the operation error value, and the production management diagnosis value is obtained by numerically calculating the management non-good value, production condition value, production environment control alarm value and operation error value. The production management diagnosis value is numerically compared with the preset production management diagnosis threshold. If the production management diagnosis value exceeds the preset production management diagnosis threshold, a production management abnormal signal is generated; if the production management diagnosis value does not exceed the preset production management diagnosis threshold, a production management qualified signal is generated.
[0027] Furthermore, the specific analysis process of workshop environment control analysis is as follows:
[0028] Several monitoring points are set in the production workshop of mobile communication terminals, and real-time detection data of various environmental parameters of corresponding monitoring points are collected. The real-time detection data are compared with the corresponding preset data requirements. If there are environmental parameters whose real-time detection data do not meet the corresponding preset data requirements, it is judged that the corresponding monitoring point is in a state with high impact on production quality;
[0029] When it is determined that the corresponding monitoring point is in a state of high impact on production quality, the timing starts until the state of high impact on production quality ends, thereby obtaining the high impact duration; obtaining all the high impact durations of the corresponding monitoring point in the detection period and summing them up to obtain the high impact persistence value, and marking the number of high impact durations of the corresponding monitoring point in the detection period that exceeds the preset high impact duration threshold as the high impact persistence value;
[0030] The high impact analysis value is obtained by numerically calculating the high impact sustained analysis value and the high impact sustained abnormal value of the corresponding monitoring point, and the production environmental control alarm value is obtained by averaging the high impact analysis values of all monitoring points in the production workshop during the detection period.
[0031] Furthermore, the present invention also proposes a mobile communication terminal performance testing method, comprising the following steps:
[0032] Step 1: The tester inputs test parameters and instructions through the test supervision module;
[0033] Step 2: The test control module receives the test parameters and instructions and generates a test task accordingly;
[0034] Step 3: The terminal performance comprehensive test module tests various performance items of the corresponding mobile communication terminal based on the test task;
[0035] Step 4: The test report generation module automatically generates a performance test report of the corresponding mobile communication terminal based on the test results of each performance test;
[0036] Step 5: The test supervision module displays the performance test report of the corresponding mobile communication terminal.
[0037] Compared with the prior art, the present invention has the following beneficial effects:
[0038] 1. In the present invention, the terminal performance comprehensive test module is used to test various performance items of the corresponding mobile communication terminal based on the test task, and the test report generation module automatically generates a performance test report of the corresponding mobile communication terminal based on the test results of various performance tests, thereby realizing comprehensive performance testing of the mobile communication terminal, improving test efficiency and accuracy, and the risk capture and early warning module is used to gradually and progressively reasonably analyze and accurately evaluate the production quality risk of the mobile communication terminal, so as to timely conduct cause investigation and analysis and make corresponding production optimization and improvement measures, thereby significantly improving the quality of subsequent products and reducing the management difficulty of management personnel;
[0039] 2. In the present invention, the low-risk production signal is sent to the workshop management diagnosis module through the risk capture and early warning module. When the workshop management diagnosis module receives the low-risk production signal, it traces the production management of the production workshop of the mobile communication terminal, and can comprehensively analyze and accurately judge the workshop management performance of the mobile communication terminal production workshop during the detection period. When the production management abnormality signal is generated, the subsequent supervision of the mobile communication terminal production workshop is strengthened, the quality of the produced mobile communication equipment is further guaranteed, and the supervision difficulty of the management personnel is reduced. The level of intelligence and automation is high. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] In order to facilitate understanding by those skilled in the art, the present invention is further described below in conjunction with the accompanying drawings;
[0041] Figure 1 This is a system block diagram of Embodiment 1 of the present invention;
[0042] Figure 2 This is a system block diagram of Embodiment 2 of the present invention;
[0043] Figure 3 This is a flow chart of the method of Embodiment 3 of the present invention. DETAILED DESCRIPTION
[0044] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0045] Embodiment 1: Figure 1 As shown, a mobile communication terminal performance test system proposed in the present invention includes a test control module, a terminal performance comprehensive test module, a test report generation module, a risk capture warning module and a test supervision module;
[0046] The tester inputs the test parameters and instructions through the test supervision module. The test control module, as the core of the system, is responsible for coordinating the work of each module. It generates test tasks based on the test parameters and instructions input by the tester and sends the test tasks to the terminal performance comprehensive test module.
[0047] The terminal performance comprehensive test module tests various performance items of the corresponding mobile communication terminal based on the test tasks, and sends the test results of various performance tests to the test report generation module; it should be noted that the performance comprehensive test module mainly includes a processor performance test submodule, a memory management test submodule, a network communication test submodule, a battery life test submodule, a screen display quality test submodule, an audio quality test submodule and a camera performance test submodule;
[0048] Among them, the processor performance test submodule evaluates the processor performance of the mobile communication terminal by running a specific processor performance test program, including single-core performance, multi-core performance and processor power consumption; the memory management test submodule tests the memory management performance of the mobile communication terminal by simulating a variety of memory usage scenarios, including memory allocation speed, memory leak detection and memory recycling efficiency;
[0049] The network communication test submodule tests the network communication performance of the mobile communication terminal by simulating different network communication environments, including data transmission rate, network delay and network stability. The battery life test submodule tests the battery life of the mobile communication terminal by simulating the daily use of users, including standby time, usage time and charging speed.
[0050] The screen display quality test submodule is used to test the screen display quality of the mobile communication terminal, including resolution, color reproduction, brightness and contrast; the audio quality test submodule is used to test the audio playback and recording quality of the mobile communication terminal, including sound clarity, volume and noise suppression; the camera performance test submodule is used to test the camera performance of the mobile communication terminal, including photo quality, video quality and autofocus speed.
[0051] The test report generation module automatically generates a performance test report of the corresponding mobile communication terminal based on the test results of each performance test, and sends the performance test report of the corresponding mobile communication terminal to the test supervision module; it should be noted that the content of the performance test report includes the test results of each performance item, abnormal conditions and potential problems during the test, and improvement suggestions for the problems, etc.;
[0052] The present invention integrates multiple test sub-modules and automated test processes to achieve comprehensive performance testing of mobile communication terminals, improve test efficiency and accuracy, reduce test costs and the workload of testers, and is easy to expand and upgrade. It provides an important reference for the research and development, production, maintenance and optimization of mobile communication terminals, and is conducive to avoiding the outflow of substandard products.
[0053] The risk capture warning module is used to set a detection period, preferably, the detection period is twenty-five days; obtain all performance test reports of mobile communication terminals produced during the detection period, evaluate production risks based on all performance test reports, generate a production high risk signal or a production low risk signal accordingly, and send the production high risk signal or the production low risk signal to the test supervision module;
[0054] When the test supervision module receives a high-risk production signal, it issues a corresponding warning, which can gradually and progressively analyze and accurately evaluate the production quality risk of mobile communication terminals, and promptly remind managers to conduct cause investigation and analysis and make corresponding production optimization and improvement measures, thereby reducing the subsequent production defect rate and reducing the management difficulty of managers; the specific analysis process of the risk capture and warning module is as follows:
[0055] Based on the performance test report, the performance items of the corresponding mobile communication terminal that do not meet the requirements are obtained, and the performance items that do not meet the requirements are marked as optimization items; if the optimization items exist in the corresponding mobile communication terminal, it indicates that the quality status of the corresponding mobile communication terminal does not meet the standards, and the corresponding mobile communication terminal is marked as a non-circulation terminal;
[0056] The number of non-circulation terminals in the detection period is obtained and the ratio thereof is calculated with the total number of performance test reports to obtain a non-circulation detection value, and the non-circulation detection value is numerically compared with a preset non-circulation detection threshold. If the non-circulation detection value exceeds the preset non-circulation detection threshold, it indicates that the quality of the produced mobile communication terminals is poor, and a production high-risk signal is generated;
[0057] If the non-circulation detection value does not exceed the preset non-circulation detection threshold, the corresponding performance item is marked as i, where i is a natural number greater than 1, and the number of mobile communication terminals corresponding to the performance item i marked as the optimization item during the detection period is collected and marked as the optimization detection value, wherein the larger the value of the optimization detection value, the worse the performance of the performance item i in the produced mobile communication terminals is overall;
[0058] The optimized detection value is numerically compared with the corresponding preset optimized detection threshold. If the optimized detection value exceeds the corresponding preset optimized detection threshold, it indicates that the performance of performance item i in the produced mobile communication terminal is generally poor, and the performance item i is defined as a high-frequency error rate item; if a high-frequency error rate item exists during the detection period, a high-risk production signal is generated.
[0059] Furthermore, if there are no high-frequency error rate items during the detection period, the optimized detection value of performance item i is calculated by ratio with the corresponding preset optimized detection threshold to obtain the optimized risk value, and each performance item is set in advance to correspond to a set of preset risk weight values, wherein the greater the impact of the corresponding performance item i on the quality of the mobile communication terminal, the greater the value of the preset risk weight value matched therewith; the product of the optimized risk value of performance item i and the corresponding preset risk weight value is marked as the optimized out-of-table value;
[0060] The optimized abnormal table values of all performance items are summed up to obtain the optimized emergency value, and the optimized emergency value is numerically compared with the preset optimized emergency threshold. If the optimized emergency value exceeds the preset optimized emergency threshold, it indicates that the production quality risks of the mobile communication terminal during the detection period are relatively large, and a high-risk production signal is generated; if the optimized emergency value does not exceed the preset optimized emergency threshold, it indicates that the production quality risks of the mobile communication terminal during the detection period are relatively small, and a low-risk production signal is generated.
[0061] Embodiment 2: Figure 2As shown, the difference between this embodiment and the first embodiment is that the risk capture warning module is connected to the workshop management diagnosis module in communication, and the risk capture warning module sends the low-risk production signal to the workshop management diagnosis module. When the workshop management diagnosis module receives the low-risk production signal, it traces the production workshop of the mobile communication terminal for production management, and generates a production management abnormality signal or a production management qualified signal through analysis;
[0062] And the production management abnormal signal or the production management qualified signal is sent to the test supervision module. When the test supervision module receives the production management abnormal signal, it issues a corresponding warning, which can comprehensively analyze and accurately judge the workshop management performance of the mobile communication terminal production workshop during the detection period, and promptly remind the management personnel to strengthen the supervision of the mobile communication terminal production workshop in the future, further ensure the quality of the produced mobile communication equipment and reduce the supervision difficulty of the management personnel, with a high degree of intelligence; the specific analysis process of the production management diagnosis module is as follows:
[0063] All production equipment for producing mobile communication terminals in the production workshop are obtained, the failure frequency of the corresponding production equipment during the detection period is collected, and all maintenance moments for the corresponding production equipment during the detection period are collected, and the interval between two adjacent maintenance moments is marked as the maintenance isolation coefficient, wherein the larger the value of the maintenance isolation coefficient is, the more untimely the corresponding maintenance process is; the maintenance isolation coefficient is numerically compared with a preset maintenance isolation coefficient threshold, and the number of maintenance isolation coefficients exceeding the preset maintenance isolation coefficient threshold is marked as the maintenance isolation failure value of the corresponding production equipment;
[0064] By formula The failure frequency FY and the maintenance fault detection value FW of the corresponding production equipment are numerically calculated to obtain the production management inspection value FX; wherein sw1 and sw2 are preset proportional coefficients with values greater than zero, and the larger the value of the production management inspection value FX is, the worse the overall production management performance of the corresponding production equipment during the detection period is;
[0065] Compare the production management inspection value FX of the corresponding production equipment with the corresponding preset production management inspection threshold. If the production management inspection value FX exceeds the corresponding preset production management inspection threshold, it indicates that the production management performance of the corresponding production equipment during the detection period is generally poor, and the corresponding production equipment is marked as poorly managed equipment;
[0066] The number of poorly managed equipment during the detection period is obtained and its ratio to the total number of production equipment in the workshop is marked as a poorly managed value, and the production inspection value of all production equipment in the workshop is averaged to the ratio of the corresponding preset production inspection threshold to obtain the production condition value;
[0067] And obtain the production environment control alarm value through workshop environment control analysis, specifically: set up several monitoring points in the production workshop of mobile communication terminals, collect real-time detection data of various environmental parameters (such as temperature, humidity, cleanliness, etc.) of the corresponding monitoring points, compare the real-time detection data with the corresponding preset data requirements, and if there are environmental parameters where the real-time detection data does not meet the corresponding preset data requirements, it is judged that the corresponding monitoring point is in a state with high impact on production quality;
[0068] When it is determined that the corresponding monitoring point is in a state of high impact on production quality, the timing starts until the state of high impact on production quality ends, thereby obtaining the high impact duration; obtaining all the high impact durations of the corresponding monitoring point in the detection period and summing them up to obtain the high impact persistence value, and marking the number of high impact durations of the corresponding monitoring point in the detection period that exceeds the preset high impact duration threshold as the high impact persistence value;
[0069] The high impact analysis value XP is obtained by numerically calculating the high impact analysis value XS and the high impact abnormal value XN of the corresponding monitoring point through the formula XP=hy1*XS / hy2+hy2*XN, wherein hy1 and hy2 are preset proportional coefficients, hy2>hy1>0; and the larger the value of the high impact analysis value XP, the worse the environmental control performance of the corresponding monitoring point during the detection period;
[0070] The production environment control alarm value is obtained by averaging the high impact analysis values of all monitoring points in the production workshop during the detection period. It should be noted that the larger the value of the production environment control alarm value, the worse the overall performance of the workshop environment control for the mobile communication terminal production workshop during the detection period;
[0071] The frequency of operation errors of production personnel in the workshop during the detection period is marked as the operation error detection value (i.e., the data value of the number of operation errors of production personnel in the production workshop during the detection period);
[0072] By formula The management non-good value NY, the production condition value WF, the production environment control alarm value SY and the operation error detection value TW are numerically calculated to obtain the production management diagnosis value GL; wherein ry1, ry2, ry3 and ry4 are preset proportional coefficients whose values are greater than zero, and the larger the value of the production management diagnosis value GL is, the worse the workshop management performance of the mobile communication terminal production workshop is in general during the detection period;
[0073] The production management diagnostic value GL is numerically compared with the preset production management diagnostic threshold. If the production management diagnostic value GL exceeds the preset production management diagnostic threshold, it indicates that the workshop management performance of the mobile communication terminal production workshop during the detection period is generally poor, and a production management abnormality signal is generated; if the production management diagnostic value GL does not exceed the preset production management diagnostic threshold, it indicates that the workshop management performance of the mobile communication terminal production workshop during the detection period is generally good, and a production management qualified signal is generated.
[0074] Embodiment 3: Figure 3 As shown, the difference between this embodiment and the first and second embodiments is that a mobile communication terminal performance test method proposed in the present invention includes the following steps:
[0075] Step 1: The tester inputs test parameters and instructions through the test supervision module;
[0076] Step 2: The test control module receives the test parameters and instructions and generates a test task accordingly;
[0077] Step 3: The terminal performance comprehensive test module tests various performance items of the corresponding mobile communication terminal based on the test task;
[0078] Step 4: The test report generation module automatically generates a performance test report of the corresponding mobile communication terminal based on the test results of each performance test;
[0079] Step 5: The test supervision module displays the performance test report of the corresponding mobile communication terminal.
[0080] The working principle of the present invention is as follows: when in use, test parameters and instructions are input through the test supervision module, the test control module receives the test parameters and instructions and generates a test task, the terminal performance comprehensive test module tests various performance items of the corresponding mobile communication terminal based on the test task, and the test report generation module automatically generates a performance test report of the corresponding mobile communication terminal based on the test results of various performance tests, thereby realizing comprehensive performance testing of mobile communication terminals, improving test efficiency and accuracy, reducing test costs and the workload of testers, and evaluating production risks based on all performance test reports through the risk capture and early warning module, which can gradually and progressively reasonably analyze and accurately evaluate the production quality risks of mobile communication terminals, and promptly remind management personnel to conduct cause investigation and analysis and make corresponding production optimization and improvement measures, significantly reducing subsequent production defect rates and reducing the management difficulty of management personnel, with high levels of intelligence and automation.
[0081] The above formulas are all dimensionless and numerical calculations. The formula is a formula obtained by collecting a large amount of data and performing software simulation to obtain the most recent real situation. The preset parameters in the formula are set by technicians in this field according to actual conditions. The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the contents of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that technicians in the relevant technical field can understand and use the present invention well. The present invention is only limited by the claims and their full scope and equivalents.
Claims
1. A mobile communication terminal performance test system, characterized in that: It includes test control module, terminal performance comprehensive test module, test report generation module and test supervision module; The tester inputs the test parameters and instructions through the test supervision module, and the test control module receives the test parameters and instructions input by the tester, generates a test task based on them, and sends the test task to the terminal performance comprehensive test module; The terminal performance comprehensive test module tests various performance items of the corresponding mobile communication terminal based on the test task, and sends the test results of various performance tests to the test report generation module; The test report generation module automatically generates a performance test report of the corresponding mobile communication terminal based on the test results of each performance test, and sends the performance test report of the corresponding mobile communication terminal to the test supervision module.
2. A mobile communication terminal performance test system according to claim 1, characterized in that: The comprehensive performance test module includes a processor performance test submodule, a memory management test submodule, a network communication test submodule, a battery life test submodule, a screen display quality test submodule, an audio quality test submodule and a camera performance test submodule.
3. A mobile communication terminal performance test system according to claim 1, characterized in that: The test report generation module is communicatively connected to the risk capture and warning module. The risk capture and warning module is used to set a detection period, obtain all performance test reports of the mobile communication terminals produced during the detection period, evaluate the production risk based on all performance test reports, and generate a high-risk production signal or a low-risk production signal accordingly, and send the high-risk production signal or the low-risk production signal to the test supervision module.
4. A mobile communication terminal performance test system according to claim 3, characterized in that: The specific analysis process of the risk capture and early warning module includes: If there is an optimization project in the corresponding mobile communication terminal, the corresponding mobile communication terminal will be marked as a non-circulation terminal; if the non-circulation detection value exceeds the preset non-circulation detection threshold, a high-risk production signal will be generated.
5. A mobile communication terminal performance test system according to claim 4, characterized in that: If the non-circulation detection value does not exceed the preset non-circulation detection threshold, the corresponding performance item will be marked as i, and i is a natural number greater than 1. If the optimization detection value exceeds the corresponding preset optimization detection threshold, the performance item i will be defined as a high-frequency error rate item; if there are high-frequency error rate items during the detection period, a high-risk production signal will be generated.
6. A mobile communication terminal performance test system according to claim 5, characterized in that: If there are no high-frequency error rate items during the detection period, the optimized detection value of performance item i is calculated by ratio with the corresponding preset optimized detection threshold to obtain the optimized risk value, and the product of the optimized risk value of performance item i and the corresponding preset risk weight value is marked as the optimized out-of-table value; The optimization table values of all performance items are summed up to obtain the optimization emergency value. If the optimization emergency value exceeds the preset optimization emergency threshold, a high-risk production signal is generated. Otherwise a low risk signal for production is generated.
7. A mobile communication terminal performance test system according to claim 3, characterized in that: The risk capture and early warning module is communicatively connected to the workshop management and diagnosis module. The risk capture and early warning module sends a low-risk production signal to the workshop management and diagnosis module. When the workshop management and diagnosis module receives the low-risk production signal, it traces the production management of the production workshop of the mobile communication terminal and generates a production management abnormality signal or a production management qualified signal through analysis.
8. A mobile communication terminal performance test system according to claim 7, characterized in that: The specific analysis process of the production management diagnosis module includes: The production environmental control alarm value is obtained through workshop environment management and control analysis, and the management non-good value, production pipe condition value, production environmental control alarm value and operation error detection value are numerically calculated to obtain the production management diagnosis value. If the production management diagnosis value exceeds the preset production management diagnosis threshold, a production management abnormal signal is generated; otherwise, a production management qualified signal is generated.
9. A mobile communication terminal performance test system according to claim 8, characterized in that: The specific analysis process of workshop environment control analysis is as follows: Several monitoring points are set in the production workshop of mobile communication terminals. The high impact analysis value is obtained by numerically calculating the high impact sustained analysis value and the high impact sustained abnormal value of the corresponding monitoring point. The high impact analysis values of all monitoring points in the production workshop during the detection period are averaged to obtain the production environment control alarm value.
10. A mobile communication terminal performance testing method, characterized in that: The testing method adopts a mobile communication terminal performance testing system as described in any one of claims 1-9.
Citation Information
Patent Citations
Mobile terminal performance test method and system
CN105182111A