Welding equipment for bridge steel structure construction

By designing a welding equipment for bridge steel structure construction, using symmetrically arranged fixed rings, limit components and ring-shaped guide components, the problems of existing welding equipment cumbersome operation and steel bar offset are solved, rapid and precise butt and circumferential welding of steel bars are achieved, and welding quality and efficiency are improved.

CN119566687APending Publication Date: 2025-03-07SUZHOU HONGSHENG SEMICON CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510007477.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-03
Publication Date
2025-03-07

AI Technical Summary

Technical Problem

The welding equipment in the construction of existing bridge steel structures is complicated to operate, making it difficult to achieve precise butt and circumferential welding of steel bars, which can easily lead to inclination of steel bars after welding.

Method used

A welding equipment for bridge steel structure construction is designed, using two symmetrically arranged fixed rings, limiting components, movable seats, clamping rings and telescopic rods. Through the linkage of electric push rods, movable rods and decks, the steel bars are quickly positioned and docked, and the circumferential rotation of the welding machine is realized through the ring guide assembly.

Benefits of technology

The rapid and precise docking of steel bars is achieved, the operation steps are simplified, the overall processing efficiency is improved, and the problem of steel bar offset during welding is avoided, which significantly improves the welding quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119566687A_ABST
    Figure CN119566687A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of steel structure construction, and discloses welding equipment for bridge steel structure construction, which comprises two fixing rings, the two fixing rings are symmetrically arranged, annular guide rails are fixedly mounted at the relatively close ends of the two fixing rings, and a top plate is fixedly mounted in the middle of the top end of each fixing ring. The front end and the rear end of the middle of the fixing ring are movably sleeved with movable rods, movable bases are fixedly installed at the ends, away from each other, of the two movable rods, and clamping rings are fixedly installed at the ends, close to each other, of the two movable rods. The two fixing rings are connected through the telescopic rod, relative approaching of the two movable seats can be rapidly achieved through the linkage effect between the limiting assemblies and the movable seats, rapid fixing of reinforcing steel bars is achieved through the clamping rings, the whole process is rapidly completed, rapid and accurate butt joint can be achieved, a complex positioning process is not needed, and the construction efficiency is improved. The operation steps are effectively simplified, and the overall machining efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of steel structure construction, in particular to welding equipment for bridge steel structure construction. Background Art

[0002] Bridge steel structure, also known as steel bridge, is a type of bridge whose main load-bearing structure is a rigid frame, and its beams and legs or piers (platforms) form a rigid connection. Due to the characteristics of pier-beam consolidation, the beams and piers are subjected to force as a whole, and the piers not only bear the vertical pressure caused by the load on the beams, but also bear the bending moment and horizontal thrust. Conventional bridge steel structures are mainly completed by steel bar welding, and special welding equipment is required for auxiliary welding.

[0003] Conventional welding equipment is mainly composed of welding machines. When butt welding two steel bars, it is usually necessary to use a clamp to fix the two steel bars and then butt the two steel bars. The butt welding process is completed manually and requires a complex positioning process to achieve accurate butt welding between the two steel bars. The entire operation process is relatively cumbersome.

[0004] At the same time, after welding, in order to perform circumferential welding of the steel bars, the steel bars often need to be rotated to achieve circumferential welding of the steel bars. However, during the rotation process, the two steel bars must rotate synchronously to avoid offset and misalignment, which can easily cause the steel bars to tilt after welding, and improvement is urgently needed. Summary of the invention

[0005] The object of the present invention is to provide a welding device for bridge steel structure construction to solve the problems raised in the above background technology.

[0006] In order to achieve the above-mentioned purpose, the present invention provides the following technical solutions: a welding equipment for bridge steel structure construction, comprising two fixed rings, the two fixed rings are symmetrically arranged, the relatively close ends of the two fixed rings are fixedly installed with annular guide rails, the middle part of the top of the fixed ring is fixedly installed with a top plate, the front and rear ends of the middle part of the fixed ring are movably sleeved with movable rods, the relatively far ends of the two movable rods are fixedly installed with movable seats, the relatively close ends of the two movable rods are fixedly installed with clamping rings, the inner side surface of the clamping ring is provided with an anti-slip groove, the top of the top plate is fixedly installed with a limiting assembly, the front and rear sides of the bottom end of the limiting assembly are connected with the movable seat, an annular guide assembly is provided between the two annular guide rails, and the left and right ends of the annular guide assembly are movably clamped with the two annular guide rails.

[0007] When two steel bars need to be welded and butted, the two fixing rings can be respectively sleeved on the outer sides of the two steel bars, and the two fixing rings are symmetrically arranged to complete the preparation before welding the two steel bars.

[0008] As a further technical solution of the present invention, the limit assembly includes a mounting seat, an electric push rod is provided below the mounting seat, the bottom end of the electric push rod is connected to the top end of the top plate, and the output end of the electric push rod is connected to the middle part of the bottom end of the mounting seat.

[0009] As a further technical solution of the present invention, a first fixed seat is fixedly installed on both sides of the left and right sides of the bottom end of the mounting seat, the end of the first fixed seat away from the mounting seat is movably connected to a connecting rod through a rotating shaft, and the end of the connecting rod away from the first fixed seat is movably connected to a second fixed seat through a rotating shaft.

[0010] As a further technical solution of the present invention, a clamping seat is fixedly installed in the middle of the top end of the mounting seat, and the bottom end of the second fixed seat is connected to the middle of the top end of the movable seat.

[0011] When the preparation is completed, the steel bar is located between the two clamping rings. At this time, the electric push rod can be turned on and controlled to extend. At this time, the mounting seat moves upward, and the two connecting rods at the bottom of the mounting seat deflect toward the middle of the mounting seat, while applying thrust to the two movable seats at the bottom.

[0012] As a further technical solution of the present invention, inner side surfaces of the two clamping seats are movably clamped with clamping columns, and a telescopic rod is fixedly connected between the two clamping columns.

[0013] When the movable seats are both pushed inward, the two movable seats are relatively close to each other, and drive the movable rod and the clamping ring to be relatively close to each other. When the two clamping rings are relatively close to each other, they can gradually contact the outer side surface of the steel bar until the clamping ring contacts the outer side surface of the steel bar. At this time, the process of limiting and fixing the steel bar can be completed. At the same time, since the two fixed rings are symmetrically arranged, when the limiting and fixing is completed, the two steel bars also complete the positioning process. After the positioning is completed, the telescopic rod can be controlled to shorten by opening the telescopic rod. At this time, the two clamping seats are relatively close to each other, and drive the two mounting seats to be relatively close to each other. At this time, the two fixed rings can be pulled relatively close, and the two steel bars can be pulled relatively close until the two steel bars touch head to tail, and the docking process of the two steel bars can be completed.

[0014] By providing two fixing rings and arranging them symmetrically, and connecting the two fixing rings with a telescopic rod, the two movable seats can be quickly brought close to each other through the linkage between the limit assembly and the movable seat, and the steel bars can be quickly fixed through the clamping ring. The whole process is completed quickly, and fast and accurate docking can be achieved without the need for a complicated positioning process, which effectively simplifies the operating steps and improves the overall processing efficiency.

[0015] As a further technical solution of the present invention, the annular guide assembly includes two symmetrically arranged annular guide blocks, which are movably connected to two annular guide rails respectively, and the relatively close ends of the two annular guide blocks are fixedly connected to the limiting rod.

[0016] As a further technical solution of the present invention, the annular guide assembly includes a fixed tube, and limit plates are movably sleeved on both sides of the inner cavity of the fixed tube, and the relatively distant ends of the two limit plates are fixedly connected to the limit rod.

[0017] As a further technical solution of the present invention, an operating plate is fixedly sleeved on one end of the outer side surface of the limit rod located on the outer side surface of the fixed tube, and a limit spring is movably sleeved on the outer side surface of the limit rod. The left and right ends of the limit spring are respectively connected to one end of the inner cavity of the fixed tube and one end of the limit plate.

[0018] As a further technical solution of the present invention, a fixing block is fixedly sleeved on the middle portion of the outer side surface of the fixing tube, and a welding machine is fixedly connected to the bottom end of the fixing block.

[0019] When the welding positioning between the two steel bars is completed, the annular guide assembly is located on the outer side surface between the two steel bars. At the same time, when the telescopic rod is shortened, the two limit plates are relatively close to each other and displaced relative to the fixed tube, and the limit spring is stretched until the two annular guide blocks are relatively close to each other, completing the synchronous adjustment of the spacing between the two annular guide blocks. After the adjustment is completed, the fixed block is just located on the outer side surface of the contact point between the two steel bars. At this time, the fixed block can be pulled to make the two annular guide blocks rotate relative to the annular guide rail. At this time, the welding machine can rotate circumferentially relative to the steel bars. At this time, the welding machine can be turned on to quickly weld the two steel bars until a circle of welding is completed.

[0020] After the welding positioning between the two steel bars is achieved through the two limit assemblies, the overall length of the annular guide assembly can be quickly adjusted through the telescopic rod. At the same time, the circumferential rotation of the welding machine can be quickly achieved through the clamping positioning between the annular guide assembly and the two annular guide rails, and the rapid welding of the two steel bars after welding positioning is completed. At the same time, circumferential welding can be achieved, and the two steel bars are in a precise docking state during the entire welding process, which can significantly improve the welding efficiency, while avoiding the problem of easy offset of traditional devices during welding, thereby improving the welding quality.

[0021] The beneficial effects of the present invention are as follows: (1) The present invention provides two fixed rings and sets them symmetrically. The two fixed rings are connected by a telescopic rod. The two movable seats can be quickly brought close to each other through the linkage between the limit assembly and the movable seat. The steel bars can be quickly fixed through the clamping ring. The whole process is completed quickly, and fast and accurate docking can be achieved without complicated positioning process. The operation steps are effectively simplified and the overall processing efficiency is improved.

[0022] (2) After the present invention realizes the welding positioning between the two steel bars by means of two limit assemblies, the overall length of the annular guide assembly can be quickly adjusted by means of a telescopic rod. At the same time, the circumferential rotation of the welding machine can be quickly realized by means of the clamping positioning between the annular guide assembly and the two annular guide rails, so that the two steel bars can be quickly welded after the welding positioning is completed. At the same time, circumferential welding can be realized, and the two steel bars are in a precisely docked state during the entire welding process, which can significantly improve the welding efficiency and avoid the problem of displacement that is easy to occur in traditional devices during welding, thereby improving the welding quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] Figure 1 It is a schematic diagram of the overall structure of the present invention; Figure 2 It is an exploded schematic diagram of the fixed ring and movable rod structure of the present invention; Figure 3 It is a separate schematic diagram of the structure of the limiting component of the present invention; Figure 4 It is a schematic diagram of the coordination of the clamping column and the telescopic rod structure of the present invention; Figure 5 It is an exploded schematic diagram of the structure of the annular guide rail and the annular guide assembly of the present invention; Figure 6 It is a partial cross-sectional schematic diagram of the annular guide assembly structure of the present invention.

[0024] In the figure: 1. fixed ring; 2. top plate; 3. movable seat; 4. movable rod; 5. clamping ring; 6. limit assembly; 601. mounting seat; 602. first fixed seat; 603. second fixed seat; 604. connecting rod; 605. clamping seat; 606. electric push rod; 7. clamping column; 8. telescopic rod; 9. annular guide rail; 10. annular guide assembly; 101. annular guide block; 102. fixed tube; 103. limit rod; 104. limit plate; 105. limit spring; 106. operating panel; 11. fixed block; 12. welding machine. DETAILED DESCRIPTION

[0025] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0026] like Figures 1 to 6 As shown, in an embodiment of the present invention, a welding device for bridge steel structure construction includes two fixed rings 1, the two fixed rings 1 are symmetrically arranged, and the relatively close ends of the two fixed rings 1 are fixedly installed with annular guide rails 9, and the middle part of the top of the fixed ring 1 is fixedly installed with a top plate 2, and the front and rear ends of the middle part of the fixed ring 1 are movably sleeved with movable rods 4, and the relatively far ends of the two movable rods 4 are fixedly installed with movable seats 3, and the relatively close ends of the two movable rods 4 are fixedly installed with clamping rings 5, and the inner side surface of the clamping ring 5 is provided with an anti-slip groove, and the top of the top plate 2 is fixedly installed with a limiting component 6, and the front and rear sides of the bottom end of the limiting component 6 are connected with the movable seat 3, and an annular guide component 10 is provided between the two annular guide rails 9, and the left and right ends of the annular guide component 10 are movably clamped with the two annular guide rails 9.

[0027] When two steel bars need to be welded together, the two fixing rings 1 can be respectively sleeved on the outer sides of the two steel bars, and the two fixing rings 1 are symmetrically arranged to complete the preparation before welding the two steel bars.

[0028] like Figure 1 and Figure 3 As shown, the limit assembly 6 includes a mounting seat 601, and an electric push rod 606 is provided below the mounting seat 601. The bottom end of the electric push rod 606 is connected to the top of the top plate 2, and the output end of the electric push rod 606 is connected to the middle part of the bottom end of the mounting seat 601. The left and right sides of the bottom end of the mounting seat 601 are fixedly installed with a first fixed seat 602, and the end of the first fixed seat 602 away from the mounting seat 601 is movably connected to a connecting rod 604 through a rotating shaft, and the end of the connecting rod 604 away from the first fixed seat 602 is movably connected to a second fixed seat 603 through a rotating shaft, and a clamping seat 605 is fixedly installed in the middle part of the top end of the mounting seat 601, and the bottom end of the second fixed seat 603 is connected to the middle part of the top end of the movable seat 3.

[0029] When the preparation is completed, the steel bar is located between the two clamping rings 5. At this time, the electric push rod 606 can be turned on and controlled to extend. At this time, the mounting seat 601 moves upward, and the two connecting rods 604 at the bottom of the mounting seat 601 deflect accordingly, that is, deflect toward the middle of the mounting seat 601, and at the same time, thrust is applied to the two movable seats 3 at the bottom.

[0030] like Figure 1 and Figure 3 as well as Figure 4 As shown, the inner side surfaces of the two clamping seats 605 are movably clamped with clamping columns 7 , and a telescopic rod 8 is fixedly connected between the two clamping columns 7 .

[0031] Embodiment: When the movable seats 3 are both pushed inward, the two movable seats 3 are relatively close to each other, and drive the movable rod 4 and the clamping ring 5 to be relatively close to each other. When the two clamping rings 5 ​​are relatively close to each other, they can gradually contact the outer side surface of the steel bar until the clamping ring 5 contacts the outer side surface of the steel bar. At this time, the process of limiting and fixing the steel bar can be completed. At the same time, since the two fixed rings 1 are symmetrically arranged, when the limiting and fixing is completed, the two steel bars also complete the positioning process. After the positioning is completed, the telescopic rod 8 can be controlled to shorten by opening the telescopic rod 8. At this time, the two clamping seats 605 are relatively close to each other, and drive the two mounting seats 601 to be relatively close to each other. At this time, the two fixed rings 1 can be pulled relatively close, and the two steel bars can be pulled relatively close until the two steel bars are in contact end to end, and the docking process of the two steel bars can be completed.

[0032] By providing two fixing rings 1 and arranging them symmetrically, and connecting the two fixing rings 1 with a telescopic rod 8, the two movable seats 3 can be quickly brought into relative proximity through the linkage between the limit assembly 6 and the movable seat 3, and the steel bars can be quickly fixed through the clamping ring 5. The whole process is completed quickly, and fast and accurate docking can be achieved without the need for a complicated positioning process, which effectively simplifies the operation steps and improves the overall processing efficiency.

[0033] like Figure 1 and Figure 3 as well as Figure 5 and Figure 6 As shown, the annular guide assembly 10 includes two symmetrically arranged annular guide blocks 101, which are movably connected to the two annular guide rails 9 respectively, and the relatively close ends of the two annular guide blocks 101 are fixedly connected to the limiting rod 103. The annular guide assembly 10 includes a fixed tube 102, and the left and right sides of the inner cavity of the fixed tube 102 are movably sleeved with limiting plates 104, and the relatively far ends of the two limiting plates 104 are fixedly connected to the limiting rod 103. The outer side surface of the limiting rod 103 is located at one end of the outer side surface of the fixed tube 102 and is fixedly sleeved with an operating plate 106. The outer side surface of the limiting rod 103 is movably sleeved with a limiting spring 105, and the left and right ends of the limiting spring 105 are respectively connected to one end of the inner cavity of the fixed tube 102 and one end of the limiting plate 104, and the middle part of the outer side surface of the fixed tube 102 is fixedly sleeved with a fixed block 11, and the bottom end of the fixed block 11 is fixedly connected with a welding machine 12.

[0034] Embodiment: After the welding positioning between the two steel bars is completed, the annular guide assembly 10 is located on the outer side surface between the two steel bars. At the same time, when the telescopic rod 8 is shortened, the two limit plates 104 are relatively close to each other and displaced relative to the fixed tube 102, and the limit spring 105 is stretched until the two annular guide blocks 101 are relatively close to each other, and the synchronous adjustment of the spacing between the two annular guide blocks 101 is completed. After the adjustment is completed, the fixed block 11 is just located on the outer side surface of the contact point between the two steel bars. At this time, the fixed block 11 can be pulled to make the two annular guide blocks 101 rotate relative to the annular guide rail 9. At this time, the welding machine 12 can rotate circumferentially relative to the steel bars. At this time, turning on the welding machine 12 can quickly weld the two steel bars until a circle of welding is completed.

[0035] After the welding positioning between the two steel bars is achieved through the two limit assemblies 6, the overall length of the annular guide assembly 10 can be quickly adjusted through the telescopic rod 8. At the same time, the circumferential rotation of the welding machine 12 can be quickly achieved through the clamping positioning between the annular guide assembly 10 and the two annular guide rails 9, and the rapid welding of the two steel bars after welding positioning is completed. At the same time, circumferential welding can be achieved, and the two steel bars are in a precise docking state during the entire welding process, which can significantly improve the welding efficiency, while avoiding the problem of easy offset of traditional devices during welding, thereby improving the welding quality.

[0036] Working principle and usage process: When two steel bars need to be welded together, the two fixing rings 1 can be respectively sleeved on the outer sides of the two steel bars, and the two fixing rings 1 are symmetrically arranged to complete the preparation before welding the two steel bars; When the preparation is completed, the steel bar is located between the two clamping rings 5, and the electric push rod 606 can be turned on and controlled to extend. At this time, the mounting seat 601 moves upward, and the two connecting rods 604 at the bottom of the mounting seat 601 deflect toward the middle of the mounting seat 601, and at the same time, a thrust is applied to the two movable seats 3 at the bottom. When the movable seats 3 are both pushed inward, the two movable seats 3 are relatively close to each other, and drive the movable rod 4 and the clamping ring 5 to be relatively close to each other. When the two clamping rings 5 ​​are relatively close to each other, they can gradually contact the outer side surface of the steel bar until the clamping ring 5 contacts the outer side surface of the steel bar. At this time, the process of limiting and fixing the steel bar can be completed. At the same time, since the two fixing rings 1 are symmetrically arranged, when the limiting and fixing is completed, the two steel bars also complete the positioning process. After the positioning is completed, the telescopic rod 8 can be controlled to shorten by opening the telescopic rod 8. At this time, the two clamping seats 605 are relatively close to each other, and drive the two mounting seats 601 to be relatively close to each other. At this time, the two fixing rings 1 can be pulled relatively close, and the two steel bars can be pulled relatively close until the two steel bars are in contact head to tail, and the docking process of the two steel bars can be completed. After the welding positioning between the two steel bars is completed, the annular guide assembly 10 is located on the outer side surface between the two steel bars. At the same time, when the telescopic rod 8 is shortened, the two limit plates 104 are relatively close to each other and displaced relative to the fixed tube 102, and the limit spring 105 is stretched until the two annular guide blocks 101 are relatively close to each other, and the synchronous adjustment of the spacing between the two annular guide blocks 101 is completed. After the adjustment is completed, the fixed block 11 is just located on the outer side surface of the contact point between the two steel bars. At this time, the fixed block 11 can be pulled to make the two annular guide blocks 101 rotate relative to the annular guide rail 9. At this time, the welding machine 12 can rotate circumferentially relative to the steel bars. At this time, turning on the welding machine 12 can quickly weld the two steel bars until a circle of welding is completed.

[0037] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A welding device for bridge steel structure construction, comprising two fixing rings (1), characterized in that: The two fixing rings (1) are symmetrically arranged, and the relatively close ends of the two fixing rings (1) are fixedly installed with an annular guide rail (9), and the middle part of the top of the fixing ring (1) is fixedly installed with a top plate (2), and the front and rear ends of the middle part of the fixing ring (1) are movably sleeved with movable rods (4), and the relatively far ends of the two movable rods (4) are fixedly installed with movable seats (3), and the relatively close ends of the two movable rods (4) are fixedly installed with clamping rings (5), and the inner side surface of the clamping ring (5) is provided with an anti-slip groove, and the top of the top plate (2) is fixedly installed with a limiting component (6), and the front and rear sides of the bottom end of the limiting component (6) are connected to the movable seat (3), and an annular guide component (10) is provided between the two annular guide rails (9), and the left and right ends of the annular guide component (10) are movably clamped with the two annular guide rails (9).

2. A welding device for bridge steel structure construction according to claim 1, characterized in that: The limit assembly (6) comprises a mounting seat (601), an electric push rod (606) is provided below the mounting seat (601), the bottom end of the electric push rod (606) is connected to the top end of the top plate (2), and the output end of the electric push rod (606) is connected to the middle part of the bottom end of the mounting seat (601).

3. A welding device for bridge steel structure construction according to claim 2, characterized in that: A first fixing seat (602) is fixedly mounted on both left and right sides of the bottom end of the mounting seat (601); one end of the first fixing seat (602) away from the mounting seat (601) is movably connected to a connecting rod (604) via a rotating shaft; and one end of the connecting rod (604) away from the first fixing seat (602) is movably connected to a second fixing seat (603) via a rotating shaft.

4. A welding device for bridge steel structure construction according to claim 3, characterized in that: A clamping seat (605) is fixedly mounted in the middle of the top of the mounting seat (601), and the bottom end of the second fixed seat (603) is connected to the middle of the top of the movable seat (3).

5. A welding device for bridge steel structure construction according to claim 4, characterized in that: The inner side surfaces of the two clamping seats (605) are both movably clamped with clamping columns (7), and a telescopic rod (8) is fixedly connected between the two clamping columns (7).

6. The welding equipment for bridge steel structure construction according to claim 1 is characterized in that: The annular guide assembly (10) comprises two symmetrically arranged annular guide blocks (101), the two annular guide blocks (101) being movably engaged with two annular guide rails (9) respectively, and relatively close ends of the two annular guide blocks (101) being fixedly connected to a limiting rod (103).

7. A welding device for bridge steel structure construction according to claim 6, characterized in that: The annular guide assembly (10) comprises a fixed tube (102), and limit plates (104) are movably sleeved on both left and right sides of the inner cavity of the fixed tube (102), and the ends of the two limit plates (104) that are relatively far away from each other are fixedly connected to the limit rod (103).

8. A welding device for bridge steel structure construction according to claim 7, characterized in that: An operating plate (106) is fixedly sleeved on one end of the outer side surface of the limit rod (103) located on the outer side surface of the fixed tube (102), and a limit spring (105) is movably sleeved on the outer side surface of the limit rod (103). The left and right ends of the limit spring (105) are respectively connected to one end of the inner cavity of the fixed tube (102) and one end of the limit plate (104).

9. A welding device for bridge steel structure construction according to claim 8, characterized in that: A fixing block (11) is fixedly sleeved in the middle of the outer side surface of the fixing tube (102), and a welding machine (12) is fixedly connected to the bottom end of the fixing block (11).