Information management method and system
By introducing big data modules into the information management system of new energy electric vehicles, synchronizing the attenuation related information of the power battery, and obtaining this information from the big data module when replacing the battery management system, and configuring it to the new system, the problem of inability to read damaged system information in the existing technology is solved, and the safety of the power battery and the reliability of the system are improved.
Patent Information
- Application Number
- CN202411145783.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-20
- Publication Date
- 2025-03-11
- Estimated Expiration
- 2044-08-20
AI Technical Summary
When replacing the battery management system, the existing technology cannot read the power battery attenuation related information from the damaged original system, resulting in the new system being unable to be configured, affecting the safe use of the power battery.
By introducing a big data module into the information management system of new energy electric vehicles, synchronize the attenuation related information of the power battery, and obtain this information from the big data module when replacing the battery management system and configure it into the new system.
Regardless of whether the primary battery management system is readable or not, the power battery attenuation related information can be configured to the new system to improve the safety of the power battery and the reliability of the system.
Smart Images

Figure CN119590219A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of new energy electric vehicles, and in particular to an information management method and system. Background Art
[0002] The battery management system of new energy electric vehicles stores information related to power battery attenuation. During operation, the battery management system needs to rely on the information related to power battery attenuation stored in itself. When replacing the battery management system, the information related to power battery attenuation stored in the original battery management system needs to be configured into the new battery management system. However, when the original battery management system is damaged and cannot read the information related to power battery attenuation stored in it, the prior art cannot configure the information related to power battery attenuation into the new battery management system, and the information related to power battery is very important information, which will affect the safe use of the power battery. Summary of the invention
[0003] In view of this, the purpose of the present application is to provide an information management method and system, so that in the process of replacing the original battery management system with a new battery management system, regardless of whether the power battery attenuation-related information stored in the original battery management system can be read from the original battery management system, the new battery management system can be configured to improve the safety of the power battery.
[0004] In a first aspect, an embodiment of the present application provides an information management method, which is applied to an information management system on a new energy electric vehicle, wherein the information management system includes a first battery management system, a gateway, and an on-board data transmission module that are interconnected; the on-board data transmission module is also communicatively connected to a big data module outside the new energy electric vehicle; the method includes:
[0005] The first battery management system synchronizes the power battery attenuation related information of the power battery on the new energy electric vehicle to the big data module through the on-board data transmission module, so that the big data module stores the power battery attenuation related information in a separate database corresponding to the new energy electric vehicle;
[0006] In the case where the first battery management system currently in use is replaced with the second battery management system, if the gateway receives a configuration instruction sent by the diagnostic configuration module outside the new energy electric vehicle, the gateway obtains the power battery attenuation related information of the new energy electric vehicle from the big data module through the on-board data transmission module, so as to send the power battery attenuation related information to the diagnostic configuration module;
[0007] The second battery management system receives the power battery attenuation related information sent by the diagnosis configuration module through the gateway, configures the power battery attenuation related information, and uses the second battery management system as a new first battery management system.
[0008] In combination with the first aspect, an embodiment of the present application provides a first possible implementation of the first aspect, wherein the information management system further includes a vehicle control module; the vehicle control module is connected to the first battery management system; and the method further includes:
[0009] The first battery management system collects power battery status information of the power battery;
[0010] For each first fault, the first battery management system analyzes first fault information of the first fault according to the power battery status information; the first fault information includes whether the first fault occurs and the fault level when the first fault occurs; the first fault is determined based on the computing power of the first battery management system;
[0011] When the first fault occurs, the first battery management system sends the fault level of the first fault to the vehicle control module;
[0012] The vehicle control module determines a response measure for the fault level based on the fault level of the first fault, and executes the response measure.
[0013] In combination with the first possible implementation of the first aspect, the embodiment of the present application provides a second possible implementation of the first aspect, wherein the method further includes:
[0014] For each first fault, when the first fault occurs, the first battery management system sends the first fault information of the first fault to the big data module through the on-board data transmission module, so that the big data module stores each first fault information in a separate database corresponding to the new energy electric vehicle;
[0015] and the first battery management system sends the power battery safety related information in the power battery status information to the big data module through the on-board data transmission module, so that the big data module analyzes the second fault information of the second fault according to the power battery safety related information for each second fault, and stores each second fault information in a separate database corresponding to the new energy electric vehicle; wherein the second fault is determined based on the computing power of the big data module; the computing power of the big data module is greater than the computing power of the first battery management system;
[0016] If the gateway receives the fault information acquisition instruction sent by the diagnosis configuration module, the gateway acquires the first fault information and the second fault information from the big data module through the vehicle data transmission module;
[0017] The gateway sends the acquired first fault information and the second fault information to the diagnosis configuration module, so that the display screen of the diagnosis configuration module displays the first fault information and the second fault information to the maintenance personnel.
[0018] In combination with the second possible implementation of the first aspect, the embodiment of the present application provides a third possible implementation of the first aspect, wherein, after the first battery management system sends the power battery safety related information in the power battery status information to the big data module through the on-board data transmission module, the method further includes:
[0019] When the vehicle control module receives the warning information sent by the big data module through the on-board data transmission module and the first battery management system, the vehicle control module performs a fault warning based on the warning information; wherein, the warning information is judged by the big data module based on the fault development trend of the third fault; the fault development trend is obtained by the big data module through a fault analysis of the third fault based on the power battery safety-related information.
[0020] In combination with the first aspect, an embodiment of the present application provides a fourth possible implementation of the first aspect, wherein the separate database corresponding to the new energy electric vehicle is established by the big data module according to the national standard code of the power battery in the new energy electric vehicle.
[0021] In a second aspect, an embodiment of the present application further provides an information management system, wherein the information management system on the new energy electric vehicle comprises a first battery management system, a gateway, and an on-board data transmission module that are interconnected; the on-board data transmission module is also communicatively connected to a big data module outside the new energy electric vehicle;
[0022] The first battery management system is used to synchronize the power battery attenuation related information of the power battery on the new energy electric vehicle to the big data module through the on-board data transmission module, so that the big data module stores the power battery attenuation related information in a separate database corresponding to the new energy electric vehicle;
[0023] The gateway is used for, when the first battery management system currently in use is replaced with the second battery management system, if a configuration instruction sent by the diagnosis configuration module outside the new energy electric vehicle is received, obtaining the power battery attenuation related information of the new energy electric vehicle from the big data module through the on-board data transmission module, so as to send the power battery attenuation related information to the diagnosis configuration module;
[0024] The second battery management system is used to receive the power battery attenuation related information sent by the diagnostic configuration module through the gateway, configure the power battery attenuation related information, and use the second battery management system as a new first battery management system.
[0025] In combination with the second aspect, the embodiment of the present application provides a first possible implementation of the second aspect, wherein the information management system further includes a vehicle control module; the vehicle control module is connected to the first battery management system;
[0026] The first battery management system is further used to collect power battery status information of the power battery;
[0027] The first battery management system is further used to analyze first fault information of the first fault according to the power battery status information for each first fault; the first fault information includes whether the first fault occurs and the fault level when the first fault occurs; the first fault is determined based on the computing power of the first battery management system;
[0028] The first battery management system is further configured to send a fault level of the first fault to the vehicle control module when the first fault occurs;
[0029] The vehicle control module is used to determine a response measure for the fault level based on the fault level of the first fault, and execute the response measure.
[0030] In combination with the first possible implementation of the second aspect, the embodiment of the present application provides a second possible implementation of the second aspect, wherein the first battery management system is further used for:
[0031] For each first fault, when the first fault occurs, the first fault information of the first fault is sent to the big data module through the on-board data transmission module, so that the big data module stores each first fault information in a separate database corresponding to the new energy electric vehicle;
[0032] and sending the power battery safety related information in the power battery status information to the big data module through the on-board data transmission module, so that the big data module analyzes the second fault information of the second fault according to the power battery safety related information for each second fault, and stores each second fault information in a separate database corresponding to the new energy electric vehicle; wherein the second fault is determined based on the computing power of the big data module; and the computing power of the big data module is greater than the computing power of the first battery management system;
[0033] The gateway is further used for:
[0034] If a fault information acquisition instruction sent by the diagnosis configuration module is received, the first fault information and the second fault information are acquired from the big data module through the vehicle data transmission module;
[0035] The acquired first fault information and the second fault information are sent to the diagnosis configuration module, so that the display screen of the diagnosis configuration module displays the first fault information and the second fault information to the maintenance personnel.
[0036] In combination with the second possible implementation of the second aspect, an embodiment of the present application provides a third possible implementation of the second aspect, wherein the vehicle control module is also used to perform a fault warning based on the warning information when the warning information sent by the big data module is received through the on-board data transmission module and the first battery management system; wherein the warning information is judged by the big data module based on the fault development trend of the third fault; and the fault development trend is obtained by the big data module through a fault analysis of the third fault based on the power battery safety-related information.
[0037] In combination with the second aspect, an embodiment of the present application provides a fourth possible implementation of the second aspect, wherein the separate database corresponding to the new energy electric vehicle is established by the big data module according to the national standard code of the power battery in the new energy electric vehicle.
[0038] An embodiment of the present application provides an information management method and system, wherein a first battery management system synchronizes power battery attenuation-related information of a power battery to a big data module. When the first battery management system is replaced with a second battery management system due to damage or other reasons, in this embodiment, it is only necessary to obtain power battery attenuation-related information from the big data module. In this way, regardless of whether the power battery attenuation-related information can be read from the first battery management system, the power battery attenuation-related information can be configured to the second battery management system, thereby facilitating improving the safety of the power battery.
[0039] In order to make the above-mentioned objects, features and advantages of the present application more obvious and easy to understand, preferred embodiments are specifically cited below and described in detail with reference to the attached drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0040] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0041] Figure 1 A flowchart of an information management method provided by an embodiment of the present application is shown;
[0042] Figure 2 A schematic diagram of the structure of an information management system provided by an embodiment of the present application is shown;
[0043] Figure 3 A schematic diagram showing the structure of a second information management system provided in an embodiment of the present application is shown;
[0044] Figure 4 A schematic diagram of the structure of a third information management system provided in an embodiment of the present application is shown. DETAILED DESCRIPTION
[0045] To make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, rather than all of the embodiments. The components of the embodiments of the present application generally described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of the application claimed for protection, but merely represents the selected embodiments of the present application. Based on the embodiments of the present application, all other embodiments obtained by those skilled in the art without making creative work belong to the scope of protection of the present application.
[0046] Considering that in the prior art, when replacing the original battery management system with a new battery management system, if the power battery attenuation related information is read from the original battery management system, then when the original battery management system is damaged and cannot read the information, the prior art cannot configure the new battery management system. Based on this, the embodiments of the present application provide an information management method and system, which are described below through embodiments.
[0047] To facilitate understanding of this embodiment, an information management method disclosed in the embodiment of this application is first introduced in detail. The method is applied to an information management system on a new energy electric vehicle, and the information management system includes a first battery management system, a gateway, and an on-board data transmission module that are interconnected; the on-board data transmission module is also connected to a big data module outside the new energy electric vehicle.
[0048] like Figure 1 As shown, the following steps S101-S103 are included:
[0049] S101: The first battery management system synchronizes the power battery attenuation related information of the power battery on the new energy electric vehicle to the big data module through the on-board data transmission module, so that the big data module stores the power battery attenuation related information in a separate database corresponding to the new energy electric vehicle.
[0050] In this embodiment, the first battery management system stores the latest power battery attenuation-related information of the power battery, wherein the power battery attenuation-related information includes information such as the power battery service life, usage time, and charge and discharge times.
[0051] like Figure 2 As shown, during the use of the power battery, when the power battery attenuation related information is updated, the first battery management system sends the updated power battery attenuation related information to the vehicle data transmission module, and the vehicle data transmission module forwards the power battery attenuation related information to the big data module.
[0052] Among them, the big data module is a module set outside the new energy electric vehicle, and the big data module stores the power battery attenuation related information of multiple new energy electric vehicles. When the big data module stores the power battery attenuation related information of each new energy electric vehicle, specifically in the big data module, for each new energy electric vehicle, according to the national standard code of the power battery in the new energy electric vehicle, a separate database corresponding to the new energy electric vehicle is established, and then the power battery attenuation related information of the new energy electric vehicle is stored in the separate database corresponding to the new energy electric vehicle.
[0053] Since the national standard code of each power battery is unique, the separate database corresponding to each new energy electric vehicle is also unique.
[0054] S102: When the first battery management system currently in use is replaced with the second battery management system, if the gateway receives a configuration instruction sent by a diagnostic configuration module outside the new energy electric vehicle, the gateway obtains the power battery attenuation-related information of the new energy electric vehicle from the big data module through the on-board data transmission module, and sends the power battery attenuation-related information to the diagnostic configuration module.
[0055] In this embodiment, when the first battery management system needs to be replaced due to damage, aging, etc., the first battery management system in the new energy electric vehicle is replaced with a second battery management system, where the second battery management system can be a new battery management system.
[0056] After the first battery management system is replaced with the second battery management system, it is necessary to configure the power battery attenuation related information of the power battery in the second battery management system so that the second battery management system can replace the first battery management system to perform subsequent work.
[0057] In this embodiment, when configuring the power battery attenuation related information of the power battery in the second battery management system, a diagnostic configuration module outside the new energy electric vehicle is used to connect the gateway in the new energy electric vehicle, wherein the diagnostic configuration module can be a module used by a repair shop to diagnose new energy electric vehicles.
[0058] The diagnostic configuration module sends configuration instructions to the gateway, and the gateway sends the configuration instructions to the big data module through the on-board data transmission module. The big data module transmits the power battery attenuation information stored in itself to the diagnostic configuration module through the on-board data transmission module and the gateway according to the configuration instructions.
[0059] S103: The second battery management system receives the power battery attenuation related information sent by the diagnosis configuration module through the gateway, configures the power battery attenuation related information, and uses the second battery management system as a new first battery management system.
[0060] In this embodiment, the gateway sends the acquired information related to the power battery attenuation to the diagnostic configuration module. After the diagnostic configuration module configures the information related to the power battery attenuation into the second battery management system, the second battery management system can serve as a new first battery management system to replace the original first battery management system.
[0061] In a possible implementation, Figure 3 As shown, the information management system also includes a vehicle control module; the vehicle control module is connected to the first battery management system; the method can also be performed according to the following steps S201-S204:
[0062] S201: The first battery management system collects power battery status information of the power battery.
[0063] In this embodiment, the power battery status information includes any one or more of the following information: battery temperature, battery current, voltage of each battery cell, atmospheric pressure in the power battery (the power battery is a sealed shell. When the battery has thermal runaway, harmful gases will be ejected, which will increase the internal pressure of the power battery pack), power battery smoke concentration, insulation resistance (the positive and negative electrodes of the power battery should be insulated from the power battery shell. If the insulator ages, the insulation resistance between the positive or negative electrode of the power battery and the power battery shell will decrease), and charging mode (including AC charging and DC charging).
[0064] like Figure 4 As shown, when the first battery management system collects the power battery status information of the power battery, specifically: the sensor module collects: battery current, atmospheric pressure in the power battery, power battery smoke concentration; the collection module collects: battery temperature, voltage of each battery cell, insulation resistance, and charging mode.
[0065] S202: For each first fault, the first battery management system analyzes first fault information of the first fault according to the power battery status information; the first fault information includes whether the first fault occurs and the fault level when the first fault occurs; the first fault is determined based on the computing power of the first battery management system.
[0066] In this embodiment, the computing power of the first battery management system is limited, and therefore, it is impossible to analyze all faults. The first battery management system can only analyze the first fault within the scope of its computing power.
[0067] S203: When the first fault occurs, the first battery management system sends the fault level of the first fault to the vehicle control module.
[0068] S204: The vehicle control module determines a response measure for the fault level based on the fault level of the first fault, and executes the response measure.
[0069] Exemplarily, when the first fault is that the power battery temperature is too high, the response measure for this fault level may be to stop charging the power battery. At this time, the vehicle control module may execute this response measure.
[0070] In a possible implementation manner, the method may also be performed according to the following steps S301-S304:
[0071] S301: For each first fault, when the first fault occurs, the first battery management system sends the first fault information of the first fault to the big data module through the on-board data transmission module, so that the big data module stores each first fault information in a separate database corresponding to the new energy electric vehicle.
[0072] S302: The first battery management system sends the power battery safety-related information in the power battery status information to the big data module through the on-board data transmission module, so that the big data module analyzes the second fault information of the second fault according to the power battery safety-related information for each second fault, and stores each second fault information in a separate database corresponding to the new energy electric vehicle; wherein the second fault is determined based on the computing power of the big data module; the computing power of the big data module is greater than the computing power of the first battery management system.
[0073] In this embodiment, the power battery safety related information is at least part of the power battery status information, and the power battery safety related information may be specified according to a specific application scenario.
[0074] Generally, the computing power of the big data module is greater than that of the first battery management system. Therefore, the second fault that can be analyzed by the big data module is generally not able to be analyzed by the first battery management system. In this embodiment, the first fault and the second fault are different faults.
[0075] In this embodiment, the order between step S301 and step S302 is not specified. Step S301 may be executed first and then step S302, or step S302 may be executed first and then step S301, or they may be executed simultaneously.
[0076] S303: If the gateway receives the fault information acquisition instruction sent by the diagnosis configuration module, the gateway acquires the first fault information and the second fault information from the big data module through the vehicle data transmission module.
[0077] In this embodiment, when maintenance personnel need to perform maintenance and inspection on the new energy electric vehicle, the maintenance personnel connect the diagnostic configuration module to the gateway, such as Figure 3 As shown, the diagnostic configuration module sends a fault information acquisition instruction to the gateway, and the gateway forwards the fault information acquisition instruction to the big data module through the on-board data transmission module. The big data module returns the first fault information and the second fault information of the new energy electric vehicle to the gateway through the on-board data transmission module.
[0078] S304: The gateway sends the acquired first fault information and second fault information to the diagnosis configuration module, so that a display screen of the diagnosis configuration module displays the first fault information and the second fault information to the maintenance personnel.
[0079] Through the above method, maintenance personnel can know the fault information of the new energy electric vehicle, which is convenient for maintenance personnel to perform vehicle maintenance on the new energy electric vehicle.
[0080] In a possible implementation manner, after the first battery management system sends the power battery safety related information in the power battery status information to the big data module through the vehicle-mounted data transmission module, the method may also be performed according to the following steps:
[0081] When the vehicle control module receives the warning information sent by the big data module through the on-board data transmission module and the first battery management system, it performs a fault warning based on the warning information; wherein, the warning information is judged by the big data module based on the fault development trend of the third fault; the fault development trend is obtained by the big data module through a fault analysis of the third fault based on the power battery safety-related information.
[0082] In this embodiment, after the first battery management system sends the power battery safety related information in the power battery status information to the big data module through the vehicle data transmission module, the big data module performs a fault analysis on the third fault according to the power battery safety related information for each third fault, and obtains the fault development trend of the third fault. The big data module sends the fault development trend to the vehicle control module through the vehicle data transmission module and the first battery management system in turn, and the vehicle control module performs a fault warning according to the warning information when receiving the warning information sent by the big data module.
[0083] For example, when the third fault is to detect the insulation resistance trend of the power battery, if the power battery has poor airtightness due to collisions and other reasons, water vapor enters the battery, etc., causing the insulation resistance of the power battery to continue to decrease, then the insulation resistance decrease trend can be used as a warning fault. Specifically, when the insulation resistance trend shows a decreasing trend, the vehicle control module can receive the warning information sent by the big data module that the insulation resistance trend shows a decreasing trend. At this time, the vehicle control module issues a fault warning to the driver based on the warning information.
[0084] Based on the same technical concept, the embodiment of the present application also provides an information management system, such as Figure 2 As shown, the information management system on the new energy electric vehicle includes a first battery management system, a gateway, and an on-board data transmission module that are interconnected; the on-board data transmission module is also communicatively connected with a big data module outside the new energy electric vehicle;
[0085] The first battery management system is used to synchronize the power battery attenuation related information of the power battery on the new energy electric vehicle to the big data module through the on-board data transmission module, so that the big data module stores the power battery attenuation related information in a separate database corresponding to the new energy electric vehicle;
[0086] The gateway is used for, when the first battery management system currently in use is replaced with the second battery management system, if a configuration instruction sent by the diagnosis configuration module outside the new energy electric vehicle is received, obtaining the power battery attenuation related information of the new energy electric vehicle from the big data module through the on-board data transmission module, so as to send the power battery attenuation related information to the diagnosis configuration module;
[0087] The second battery management system is used to receive the power battery attenuation related information sent by the diagnostic configuration module through the gateway, configure the power battery attenuation related information, and use the second battery management system as a new first battery management system.
[0088] Optionally, the information management system further includes a vehicle control module; the vehicle control module is connected to the first battery management system;
[0089] The first battery management system is further used to collect power battery status information of the power battery;
[0090] The first battery management system is further used to analyze first fault information of the first fault according to the power battery status information for each first fault; the first fault information includes whether the first fault occurs and the fault level when the first fault occurs; the first fault is determined based on the computing power of the first battery management system;
[0091] The first battery management system is further configured to send a fault level of the first fault to the vehicle control module when the first fault occurs;
[0092] The vehicle control module is used to determine a response measure for the fault level based on the fault level of the first fault, and execute the response measure.
[0093] Optionally, the first battery management system is further used for:
[0094] For each first fault, when the first fault occurs, the first fault information of the first fault is sent to the big data module through the on-board data transmission module, so that the big data module stores each first fault information in a separate database corresponding to the new energy electric vehicle;
[0095] and sending the power battery safety related information in the power battery status information to the big data module through the on-board data transmission module, so that the big data module analyzes the second fault information of the second fault according to the power battery safety related information for each second fault, and stores each second fault information in a separate database corresponding to the new energy electric vehicle; wherein the second fault is determined based on the computing power of the big data module; and the computing power of the big data module is greater than the computing power of the first battery management system;
[0096] The gateway is further used for:
[0097] If a fault information acquisition instruction sent by the diagnosis configuration module is received, the first fault information and the second fault information are acquired from the big data module through the vehicle data transmission module;
[0098] The acquired first fault information and the second fault information are sent to the diagnosis configuration module, so that the display screen of the diagnosis configuration module displays the first fault information and the second fault information to the maintenance personnel.
[0099] Optionally, the vehicle control module is also used to perform fault warning based on the warning information sent by the big data module when it receives the warning information through the on-board data transmission module and the first battery management system; wherein, the warning information is judged by the big data module based on the fault development trend of the third fault; and the fault development trend is obtained by the big data module through a fault analysis of the third fault based on the power battery safety-related information.
[0100] Optionally, the separate database corresponding to the new energy electric vehicle is established by the big data module according to the national standard code of the power battery in the new energy electric vehicle.
[0101] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working process of the system described above can refer to the corresponding process in the aforementioned method embodiment, and will not be repeated here.
[0102] In the several embodiments provided in the present application, it should be understood that the disclosed systems and methods can be implemented in other ways. The system embodiments described above are merely schematic. For example, the division of the modules is only a logical function division. There may be other division methods in actual implementation. For example, multiple modules or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be an indirect coupling or communication connection through some communication interface, device or unit, which can be electrical, mechanical or other forms.
[0103] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0104] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.
[0105] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a non-volatile computer-readable storage medium that is executable by a processor. Based on this understanding, the technical solution of the present application can essentially be embodied in the form of a software product, or in other words, the part that contributes to the prior art or the part of the technical solution. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.
[0106] Finally, it should be noted that the above-described embodiments are only specific implementation methods of the present application, which are used to illustrate the technical solutions of the present application, rather than to limit them. The protection scope of the present application is not limited thereto. Although the present application is described in detail with reference to the above-described embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-described embodiments within the technical scope disclosed in the present application, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present application, and should be included in the protection scope of the present application. Therefore, the protection scope of the present application shall be based on the protection scope of the claims.
Claims
1. An information management method, characterized in that: The method is applied to an information management system on a new energy electric vehicle, wherein the information management system comprises a first battery management system, a gateway, and an on-board data transmission module connected to each other; The vehicle-mounted data transmission module is also connected to the big data module outside the new energy electric vehicle in communication; the method includes: The first battery management system synchronizes the power battery attenuation related information of the power battery on the new energy electric vehicle to the big data module through the on-board data transmission module, so that the big data module stores the power battery attenuation related information in a separate database corresponding to the new energy electric vehicle; In the case where the first battery management system currently in use is replaced with the second battery management system, if the gateway receives a configuration instruction sent by the diagnostic configuration module outside the new energy electric vehicle, the gateway obtains the power battery attenuation related information of the new energy electric vehicle from the big data module through the on-board data transmission module, so as to send the power battery attenuation related information to the diagnostic configuration module; The second battery management system receives the power battery attenuation related information sent by the diagnosis configuration module through the gateway, configures the power battery attenuation related information, and uses the second battery management system as a new first battery management system.
2. The method according to claim 1, characterized in that: The information management system further includes a vehicle control module; the vehicle control module is connected to the first battery management system; the method further includes: The first battery management system collects power battery status information of the power battery; For each first fault, the first battery management system analyzes first fault information of the first fault according to the power battery status information; the first fault information includes whether the first fault occurs and the fault level when the first fault occurs; the first fault is determined based on the computing power of the first battery management system; When the first fault occurs, the first battery management system sends the fault level of the first fault to the vehicle control module; The vehicle control module determines a response measure for the fault level based on the fault level of the first fault, and executes the response measure.
3. The method according to claim 2, characterized in that: The method further comprises: For each first fault, when the first fault occurs, the first battery management system sends the first fault information of the first fault to the big data module through the on-board data transmission module, so that the big data module stores each first fault information in a separate database corresponding to the new energy electric vehicle; and the first battery management system sends the power battery safety related information in the power battery status information to the big data module through the on-board data transmission module, so that the big data module analyzes the second fault information of the second fault according to the power battery safety related information for each second fault, and stores each second fault information in a separate database corresponding to the new energy electric vehicle; wherein the second fault is determined based on the computing power of the big data module; the computing power of the big data module is greater than the computing power of the first battery management system; If the gateway receives the fault information acquisition instruction sent by the diagnosis configuration module, the gateway acquires the first fault information and the second fault information from the big data module through the vehicle data transmission module; The gateway sends the acquired first fault information and the second fault information to the diagnosis configuration module, so that the display screen of the diagnosis configuration module displays the first fault information and the second fault information to the maintenance personnel.
4. The method according to claim 3, characterized in that: After the first battery management system sends the power battery safety related information in the power battery status information to the big data module through the vehicle-mounted data transmission module, the method further includes: When the vehicle control module receives the warning information sent by the big data module through the on-board data transmission module and the first battery management system, the vehicle control module performs a fault warning based on the warning information; wherein, the warning information is judged by the big data module based on the fault development trend of the third fault; the fault development trend is obtained by the big data module through a fault analysis of the third fault based on the power battery safety-related information.
5. The method according to claim 1, characterized in that: The separate database corresponding to the new energy electric vehicle is established by the big data module according to the national standard code of the power battery in the new energy electric vehicle.
6. An information management system, characterized in that: The information management system on the new energy electric vehicle includes a first battery management system, a gateway, and an on-board data transmission module that are interconnected; the on-board data transmission module is also communicatively connected with a big data module outside the new energy electric vehicle; The first battery management system is used to synchronize the power battery attenuation related information of the power battery on the new energy electric vehicle to the big data module through the on-board data transmission module, so that the big data module stores the power battery attenuation related information in a separate database corresponding to the new energy electric vehicle; The gateway is used for, when the first battery management system currently in use is replaced with the second battery management system, if a configuration instruction sent by the diagnosis configuration module outside the new energy electric vehicle is received, obtaining the power battery attenuation related information of the new energy electric vehicle from the big data module through the on-board data transmission module, so as to send the power battery attenuation related information to the diagnosis configuration module; The second battery management system is used to receive the power battery attenuation related information sent by the diagnostic configuration module through the gateway, configure the power battery attenuation related information, and use the second battery management system as a new first battery management system.
7. The system according to claim 6, characterized in that: The information management system further includes a vehicle control module; the vehicle control module is connected to the first battery management system; The first battery management system is further used to collect power battery status information of the power battery; The first battery management system is further used to analyze first fault information of the first fault according to the power battery status information for each first fault; the first fault information includes whether the first fault occurs and the fault level when the first fault occurs; the first fault is determined based on the computing power of the first battery management system; The first battery management system is further configured to send a fault level of the first fault to the vehicle control module when the first fault occurs; The vehicle control module is used to determine a response measure for the fault level based on the fault level of the first fault, and execute the response measure.
8. The system according to claim 7, characterized in that: The first battery management system is further used for: For each first fault, when the first fault occurs, the first fault information of the first fault is sent to the big data module through the on-board data transmission module, so that the big data module stores each first fault information in a separate database corresponding to the new energy electric vehicle; and sending the power battery safety related information in the power battery status information to the big data module through the on-board data transmission module, so that the big data module analyzes the second fault information of the second fault according to the power battery safety related information for each second fault, and stores each second fault information in a separate database corresponding to the new energy electric vehicle; wherein the second fault is determined based on the computing power of the big data module; and the computing power of the big data module is greater than the computing power of the first battery management system; The gateway is further used for: If a fault information acquisition instruction sent by the diagnosis configuration module is received, the first fault information and the second fault information are acquired from the big data module through the vehicle data transmission module; The acquired first fault information and the second fault information are sent to the diagnosis configuration module, so that the display screen of the diagnosis configuration module displays the first fault information and the second fault information to the maintenance personnel.
9. The system according to claim 8, characterized in that: The vehicle control module is also used to perform fault warning based on the warning information sent by the big data module when it is received through the on-board data transmission module and the first battery management system; wherein the warning information is judged by the big data module based on the fault development trend of the third fault; the fault development trend is obtained by the big data module through fault analysis of the third fault based on the power battery safety-related information.
10. The system according to claim 6, characterized in that: The separate database corresponding to the new energy electric vehicle is established by the big data module according to the national standard code of the power battery in the new energy electric vehicle.
Citation Information
Patent Citations
Battery management method and device, battery management system, vehicle and storage medium
CN111873853A
Fault diagnosis method and electronic equipment
CN116125320A
Power battery fault diagnosis method and system and computer readable storage medium
CN116278758A
Battery management system parameter backup synchronization method and system and storage medium
CN117194098A
Remote diagnosis system for reliability of power battery and new energy automobile
CN117665624A