Electricity meter power-on-line control method, metering system, medium and processor

By introducing automated processes of self-discovery, self-identification, self-file building and self-debugging in the meter system, the meter reading time difference caused by manual entry and transmission after power on is solved, and the meter reading without inductive installation and efficient meter reading of meter is realized.

CN119603020APending Publication Date: 2025-03-11GUANGXI POWER GRID CORP
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
CN202411688740.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-25
Publication Date
2025-03-11

AI Technical Summary

Technical Problem

In the prior art, after power on, information entry and multi-process transmission are required to be manually completed in the information system, resulting in a large difference in the terminal meter reading time and poor timeliness for power on meter reading.

Method used

The control method based on the four process steps of "self-discovery, self-identification, self-file building, and self-debugging" is adopted to automatically complete the construction and debugging of the meter file through cloud edge and end collaboration to reduce manual intervention.

Benefits of technology

It realizes plug-and-play sensorless installation, improves the accuracy of files and real-time meter reading, reduces the working pressure of workers, and improves the efficiency of work.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119603020A_ABST
    Figure CN119603020A_ABST
Patent Text Reader

Abstract

The invention provides an electricity meter power-on-line control method. The electricity meter power-on-line control method comprises the following steps that an electricity meter sends a network access request to a metering automation terminal; the metering automation terminal judges whether the ammeter belongs to a white list and a black list; if not, establishing a temporary file for the electricity meter to perform network pre-access; the metering automation terminal performs zone area sensing on the electricity meter, and reports an electricity meter address to the metering master station if the electricity meter belongs to the zone area; the metering main station pushes the received ammeter address to a marketing system; the marketing system verifies the electricity meter, completes collection relation maintenance, and pushes the formal file of the electricity meter and the collection relation to the metering master station; the metering main station issues the formal files of the electricity meters to the corresponding metering automation terminals; the metering automation terminal completes formal network access of the ammeter according to the ammeter formal file; and the metering main station calls the current data of the electricity meter, triggers the metering automation terminal to carry out real-time point reading on the electricity meter, confirms the file correctness and the link connection condition, and completes the power-on, namely the online whole process if the calling is successful.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of electric meter automation, and in particular to a control method, a metering system, a medium and a processor for an electric meter to be powered on and put on line. Background Art

[0002] There are three problems with the current meter replacement business model and future development trends: First, rural power grids generally have problems with extensive meter asset management, weak basic archives in substations, and poor archive accuracy. Second, in the integration of marketing and distribution, after the meter installation and removal business is transferred from marketing to production, production professionals are unfamiliar with the meter installation and removal process on the information system, which will increase the burden of on-site operations and reduce work efficiency. Third, after the meter is connected to the power supply, it is necessary to manually complete the entry of various information and multi-process transmission in the information system before the final file can be created and the terminal can start meter reading normally. There is often a time difference of several hours to several days from the power-on of the meter to the start of meter reading at the terminal, and the timeliness of power-on meter reading is poor.

[0003] In view of this, a control method, system, medium and processor for powering on and going online of an electric meter are needed. Summary of the invention

[0004] In view of the problem of poor timeliness of power-on meter reading in the prior art, the present invention provides a control method, system, medium and processor for powering on an electric meter, which can realize the automatic file construction and debugging of the cloud-edge-end collaboration after the electric meter is connected to the power supply based on the four process steps of "self-discovery, self-identification, self-file building and self-debugging", reduce manual intervention in the process, improve the accuracy of the file, and realize plug-and-play non-sensing installation of the electric meter. The specific technical scheme is as follows:

[0005] A control method for powering on an electric meter, i.e., going online, is applied to a metering system including a marketing system, a metering master station, a metering automation terminal, and an electric meter; the metering automation terminal includes a CCO communication module; the electric meter includes an STA communication module; and specifically includes the following steps:

[0006] The electric meter sends a network access request to the metering automation terminal;

[0007] The metering automation terminal determines whether the meter belongs to the white list or the black list; if it does not belong to the black list or the white list, a temporary file is created for the meter to pre-connect to the network;

[0008] The metering automation terminal senses the meter area; if it does not belong to the current area, the temporary file is deleted and the meter is added to the blacklist; if it belongs to the current area, the meter address is reported to the metering master station;

[0009] The metering master station will receive the meter address and push it to the marketing system;

[0010] The marketing system verifies the meter; if the verification fails, an alarm is issued; if the verification is correct, the collection relationship maintenance is completed, and the meter official file and collection relationship are pushed to the metering master station;

[0011] After receiving the meter official file and collection relationship, the meter master station sends the meter official file to the corresponding metering automation terminal;

[0012] The metering automation terminal completes the formal network access of the meter according to the official file of the meter;

[0013] The metering master station calls for the current data of the meter, triggers the metering automation terminal to read the meter in real time, confirms the correctness of the file and the connectivity of the link, and completes the entire process of power-on and going online if the call is successful.

[0014] Furthermore, the electric meter sending the network access request to the metering automation terminal refers to the STA communication module of the electric meter sending the network access request to the CCO communication module of the metering automation terminal.

[0015] Furthermore, the metering automation terminal determines whether the electric meter belongs to the white list and the black list; if it does not belong to the black list or the white list, a temporary file is created for the electric meter for pre-network access, including the following steps:

[0016] The CCO communication module of the metering automation terminal determines whether the meter belongs to the white list or the black list; if it does not belong to the black list or the white list, the meter address is pushed to the metering automation terminal;

[0017] The metering automation terminal creates a temporary file for the meter and sends it to the CCO communication module;

[0018] The CCO communication module adds the meter to the whitelist, allowing the meter's STA communication module to complete pre-network access.

[0019] Furthermore, the metering automation terminal senses the meter area; if it does not belong to the current area, the temporary file is deleted and the meter is added to the blacklist; if it belongs to the current area, the meter address is reported to the metering master station, including the following steps:

[0020] After the STA communication module of the meter is pre-connected to the network, the metering automation terminal conducts point-to-point zone perception to determine whether the meter belongs to this zone; if the meter does not belong to this zone, the metering automation terminal deletes the temporary file and issues a command to the CCO communication module to delete it from the whitelist and add it to the blacklist; if the meter belongs to this zone, the metering automation terminal reports the address of the meter to the metering master station.

[0021] Furthermore, the marketing system verifies the electric meter; if the verification fails, an alarm is issued; if the verification is correct, the collection relationship maintenance is completed, and the official file of the electric meter and the collection relationship are pushed to the metering master station, including the following steps:

[0022] The marketing system compares the meter address with the asset ledger in the system to verify whether the meter is a grid asset and has been linked to the user's metering point through an installation and disassembly work order; if the verification fails multiple times, the marketing system will issue an alarm and end the process; if the verification is correct, the marketing system will complete the collection relationship maintenance based on the metering automation terminal and meter file information, and push the meter's official file and collection relationship to the metering master station.

[0023] Furthermore, the metering automation terminal completes the formal network access of the electric meter according to the official file of the electric meter, including the following steps:

[0024] After the metering automation terminal receives the formal file of the meter, it sends it to the CCO communication module to generate a whitelist, completing the formal filing of the meter in the metering automation terminal and the formal network access of the meter's STA communication module.

[0025] Furthermore, the method further comprises the following steps:

[0026] If the metering automation terminal reports the meter address to the metering master station within the set time limit and still has not received the formal file from the metering master station, the metering automation terminal will automatically delete the temporary file of the meter and the CCO whitelist.

[0027] A metering system for an electric meter to be online when powered on, used for implementing the control method for an electric meter to be online when powered on, comprising:

[0028] An electric meter, which is used to send a network access request to a metering automation terminal;

[0029] Metering automation terminal, which is used to determine whether the meter belongs to the white list or black list; if it does not belong to the black list or white list, a temporary file is created for the meter to pre-connect to the network; the meter is sensed by the station area; if it does not belong to the current station area, the temporary file is deleted and the meter is added to the black list; if it belongs to the current station area, the meter address is reported to the metering master station;

[0030] The metering master station is used to push the received meter address to the marketing system; after receiving the meter's official file and collection relationship, the meter's official file is sent to the corresponding metering automation terminal; the meter's official access to the network is completed according to the meter's official file; the meter's current data is called for testing, triggering the metering automation terminal to read the meter in real time, confirming the correctness of the file and the link connectivity. If the call is successful, the whole process of powering on and going online is completed;

[0031] The marketing system is used to calibrate the electricity meter; if the calibration fails, an alarm reminder is issued; if the calibration is correct, the collection relationship maintenance is completed, and the official file of the electricity meter and the collection relationship are pushed to the metering master station.

[0032] A computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute the above-mentioned control method for powering on an electric meter, i.e., going online.

[0033] A processor is used to run a program, wherein the program executes the control method for powering on or going online of an electric meter as described above when running.

[0034] Compared with the prior art, the present invention has the following beneficial effects:

[0035] 1. This application simplifies the information system process that requires manual intervention in the meter replacement business, changes the business model of manual file creation for newly installed meters, realizes plug-and-play contactless installation of meters, reduces the work pressure of operators and improves work efficiency, ensures the accuracy of basic files in low-voltage substations, and realizes meter reading as soon as the electricity meter is powered on, which greatly improves the real-time performance of meter reading and helps to establish lean management of substations and a global monitoring system. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the following is a brief introduction to the drawings required for the specific embodiments or the description of the prior art. In all the drawings, similar elements or parts are generally identified by similar reference numerals. In the drawings, the elements or parts are not necessarily drawn according to the actual scale.

[0037] Figure 1 A schematic diagram of a first flow chart of a control method for powering on or going online of an electric meter according to the present invention;

[0038] Figure 2 It is a schematic diagram of the structure of a metering system of the present invention when an electric meter is powered on and put online;

[0039] Figure 3 The second flow chart of the control method for powering on or going online of an electric meter according to the present invention is shown. DETAILED DESCRIPTION

[0040] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0041] It should be understood that when used in this specification and the appended claims, the terms "include" and "comprises" indicate the presence of described features, integers, steps, operations, elements and / or components, but do not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or combinations thereof.

[0042] It should also be understood that the terms used in the present specification are only for the purpose of describing specific embodiments and are not intended to limit the present invention. As used in the present specification and the appended claims, unless the context clearly indicates otherwise, the singular forms "a", "an" and "the" are intended to include plural forms.

[0043] It should be further understood that the term "and / or" used in the present description and the appended claims refers to any and all possible combinations of one or more of the associated listed items, and includes these combinations.

[0044] Embodiment 1

[0045] like Figures 1 to 3 As shown, it is a flow chart of a control method for putting an electric meter online when it is powered on, which is applied to a metering system including a marketing system, a metering master station, a metering automation terminal and an electric meter; the metering automation terminal includes a CCO communication module; the electric meter includes an STA communication module; a blacklist mechanism is designed in the communication module of the metering automation terminal (hereinafter referred to as "CCO"): the CCO communication module blacklist is used to record and save the communication address of the electric meter, and the communication module of the electric energy meter in the blacklist (hereinafter referred to as "STA") will not be able to join the network constructed by the CCO communication module; at the same time, the CCO communication module will record the communication address of the metering automation terminal to which it belongs. When the CCO communication module is separated from the original metering automation terminal and installed on another metering automation terminal, the CCO communication module recognizes that the communication address of the metering automation terminal has changed after power-on, and automatically clears the stored electric meter blacklist; the CCO blacklist can support the metering automation terminal to perform read and write operations on it; this control method specifically includes the following steps:

[0046] S1: The electric meter sends a network access request to the metering automation terminal.

[0047] Furthermore, the electric meter sends a network access request to the metering automation terminal, which means that the STA communication module of the electric meter sends a network access request to the CCO communication module of the metering automation terminal, that is, after the electric meter is powered on, its STA communication module sends an association request message to the CCO communication module to request network access.

[0048] S2: The metering automation terminal determines whether the electric meter belongs to the white list or the black list; if it does not belong to the black list or the white list, a temporary file is created for the electric meter for pre-network access.

[0049] Furthermore, the metering automation terminal determines whether the electric meter belongs to the white list and the black list; if it does not belong to the black list or the white list, a temporary file is created for the electric meter for pre-network access, including the following steps:

[0050] The CCO communication module of the metering automation terminal determines whether the meter belongs to the white list or the black list; if it does not belong to the black list or the white list, the meter address is pushed to the metering automation terminal;

[0051] The metering automation terminal creates a temporary file for the meter and sends it to the CCO communication module;

[0052] The CCO communication module adds the meter to the whitelist, allowing the meter's STA communication module to complete pre-network access.

[0053] S3: The metering automation terminal senses the meter area; if it does not belong to the current area, the temporary file is deleted and the meter is added to the blacklist; if it belongs to the current area, the meter address is reported to the metering master station.

[0054] Furthermore, the metering automation terminal senses the meter in the area; if it does not belong to the area, the temporary file is deleted and the meter is added to the blacklist; if it belongs to the area, the meter address is reported to the metering master station, including the following steps:

[0055] After the STA communication module of the meter is pre-connected to the network, the metering automation terminal conducts point-to-point zone perception to determine whether the meter belongs to this zone; if the meter does not belong to this zone, the metering automation terminal deletes the temporary file and issues an instruction to the CCO communication module to delete it from the whitelist and add it to the blacklist; if the meter belongs to this zone, the metering automation terminal reports the address of the meter to the metering master station and enters the following "self-identification" stage.

[0056] S4: The metering master station will receive the meter address and push it to the marketing system. After receiving the unknown meter address reported by the metering automation terminal, the metering master station will push it to the marketing system.

[0057] S5: The marketing system verifies the meter; if the verification fails, an alarm is issued; if the verification is correct, the collection relationship maintenance is completed, and the meter's official files and collection relationship are pushed to the metering master station.

[0058] Furthermore, the marketing system verifies the electric meter; if the verification fails, an alarm is issued; if the verification is correct, the collection relationship maintenance is completed, and the official file of the electric meter and the collection relationship are pushed to the metering master station, including the following steps:

[0059] The marketing system compares the meter address with the asset ledger in the system to verify whether the meter is a grid asset and has been linked to the user's metering point through an installation and disassembly work order; if the verification fails multiple times, the marketing system will issue an alarm and end the process; if the verification is correct, the marketing system will complete the collection relationship maintenance based on the metering automation terminal and meter file information, and push the meter's official file and collection relationship to the metering master station, entering the following "self-built file" stage.

[0060] S6: After receiving the meter official file and the collection relationship, the metering master station sends the meter official file to the corresponding metering automation terminal.

[0061] S7: The metering automation terminal completes the formal network access of the meter based on the official file of the meter.

[0062] Furthermore, the metering automation terminal completes the formal network access of the electric meter according to the official file of the electric meter, including the following steps:

[0063] After the metering automation terminal receives the meter's official file, it re-sends the meter's official file to the CCO communication module to generate a whitelist, completes the meter's official filing in the metering automation terminal and the meter's STA communication module's official network access, and enters the following "self-debugging" stage.

[0064] Furthermore, the method further comprises the following steps:

[0065] If the metering automation terminal reports the meter address to the metering master station for more than the set time limit (for example, 10 hours) and still has not received the formal file from the metering master station, the metering automation terminal will automatically delete the meter's temporary file and CCO whitelist.

[0066] S8: The metering master station calls for the current data of the meter, triggers the metering automation terminal to read the meter in real time, confirms the correctness of the file and the connectivity of the link, and completes the entire process of power-on and going online if the call is successful.

[0067] After the meter master station completes the distribution of the meter file and the terminal completes the meter file creation, the meter master station automatically calls for the current data of the newly installed meter, triggers the terminal to read the new meter in real time, confirms the correctness of the file and the link connectivity, and if the call is successful, the "self-debugging" stage is passed, and the newly installed meter completes the "power-on and online" process. If the call fails, the meter master station generates a meter removal failure alarm to prompt the business personnel to handle it.

[0068] This application streamlines the information system processes that require manual intervention in the meter replacement business, transforms the business model of manual file creation for newly installed meters, realizes plug-and-play contactless installation of meters, reduces the work pressure of operators and improves work efficiency, ensures the accuracy of basic files in low-voltage substations, and realizes meter reading as soon as the electricity meter is powered on, greatly improving the real-time performance of meter reading, and assists in lean management of substations and the establishment of a global substation monitoring system.

[0069] Embodiment 2

[0070] like Figure 2 The figure shows a schematic diagram of a metering system structure in which an electric meter is online when it is powered on, which is used to implement the control method for the electric meter to be online when it is powered on, including:

[0071] An electric meter, which is used to send a network access request to a metering automation terminal;

[0072] Metering automation terminal, which is used to determine whether the meter belongs to the white list or black list; if it does not belong to the black list or white list, a temporary file is created for the meter to pre-connect to the network; the meter is sensed by the station area; if it does not belong to the current station area, the temporary file is deleted and the meter is added to the black list; if it belongs to the current station area, the meter address is reported to the metering master station;

[0073] The metering master station is used to push the received meter address to the marketing system; after receiving the meter's official file and collection relationship, the meter's official file is sent to the corresponding metering automation terminal; the meter's official access to the network is completed according to the meter's official file; the meter's current data is called for testing, triggering the metering automation terminal to read the meter in real time, confirming the correctness of the file and the link connectivity. If the call is successful, the whole process of powering on and going online is completed;

[0074] The marketing system is used to calibrate the electricity meter; if the calibration fails, an alarm reminder is issued; if the calibration is correct, the collection relationship maintenance is completed, and the official file of the electricity meter and the collection relationship are pushed to the metering master station.

[0075] Embodiment 3

[0076] A computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute the above-mentioned control method for powering on an electric meter, i.e., going online.

[0077] Embodiment 4

[0078] A processor is used to run a program, wherein the program executes the control method for powering on or online an electric meter as described above when running.

[0079] The present application provides a control method for powering on an electric meter, that is, going online, which is applied to a metering system including a marketing system, a metering master station, a metering automation terminal and an electric meter; the metering automation terminal includes a CCO communication module; the electric meter includes an STA communication module; specifically, the following steps are included: the electric meter sends a network access request to the metering automation terminal; the metering automation terminal determines whether the electric meter belongs to a white list or a black list; if it does not belong to either the black list or the white list, a temporary file is created for the electric meter for pre-network access; the metering automation terminal performs zone perception on the electric meter; if it does not belong to the current zone, the temporary file is deleted and the meter is added to the black list; if it belongs to the current zone, the meter address is reported to the metering master station; the metering master station will receive the meter address and push it to the marketing system; the marketing system will verify the meter; if the verification fails, an alarm will be issued; if the verification is correct, the collection relationship maintenance will be completed, and the meter formal file and collection relationship will be pushed to the metering master station; after the metering master station receives the meter formal file and collection relationship, it will send the meter formal file to the corresponding metering automation terminal; the metering automation terminal completes the formal access of the meter according to the meter formal file; the metering master station calls the current data of the meter to trigger the metering automation terminal to read the meter in real time, confirm the correctness of the file and the link connectivity, and complete the whole process of powering on and going online if the call is successful. This application simplifies the information system process that requires manual intervention in the meter replacement business, changes the business model of manual file creation for newly installed meters, realizes plug-and-play and non-sensing installation of meters, reduces the work pressure of operators and improves work efficiency, ensures the accuracy of the basic files of low-voltage substations, realizes meter reading as soon as the electric energy meter is powered on, greatly improves the real-time performance of meter reading, and helps the lean management of substations and the establishment of a global substation monitoring system.

[0080] Those of ordinary skill in the art will appreciate that the units of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition of each example has been generally described in terms of function in the above description. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.

[0081] In the embodiments provided by the present invention, it should be understood that the division of units is only a logical function division, and there may be other division methods in actual implementation, for example, multiple units can be combined into one unit, one unit can be split into multiple units, or some features can be ignored, etc.

[0082] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.

[0083] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the technical solution of the present invention, in essence, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned storage medium includes: U disk, read-only memory (ROM, Read-0nlyMemory), random access memory (RAM, RandomAccessMemory), mobile hard disk, magnetic disk or optical disk, etc., which can store program code.

[0084] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. These modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention, and they should all be included in the scope of the claims and specification of the present invention.

Claims

1. A control method for an electric meter to be online when it is powered on, characterized in that: Applicable to a metering system including a marketing system, a metering master station, a metering automation terminal and an electric meter; the metering automation terminal includes a CCO communication module; the electric meter includes a STA communication module; specifically includes the following steps: The electric meter sends a network access request to the metering automation terminal; The metering automation terminal determines whether the meter belongs to the white list or the black list; if it does not belong to the black list or the white list, a temporary file is created for the meter to pre-connect to the network; The metering automation terminal senses the meter area; if it belongs to the local area, it reports the meter address to the metering master station; The metering master station will receive the meter address and push it to the marketing system; The marketing system verifies the meter; if the verification is correct, the collection relationship maintenance is completed, and the meter's official files and collection relationship are pushed to the metering master station; After receiving the meter official file and collection relationship, the meter master station sends the meter official file to the corresponding metering automation terminal; The metering automation terminal completes the formal network access of the meter based on the official files of the meter.

2. The control method for powering on and going online of an electric meter according to claim 1, characterized in that: The electric meter sending a network access request to the metering automation terminal refers to the STA communication module of the electric meter sending a network access request to the CCO communication module of the metering automation terminal.

3. The control method for powering on and going online of an electric meter according to claim 2, characterized in that: The metering automation terminal determines whether the electric meter belongs to the white list and the black list; if it does not belong to the black list or the white list, a temporary file is created for the electric meter for pre-network access, including the following steps: The CCO communication module of the metering automation terminal determines whether the meter belongs to the white list or the black list; if it does not belong to the black list or the white list, the meter address is pushed to the metering automation terminal; The metering automation terminal creates a temporary file for the meter and sends it to the CCO communication module; The CCO communication module adds the meter to the whitelist, allowing the meter's STA communication module to complete pre-network access.

4. The control method for powering on and going online of an electric meter according to claim 3, characterized in that: The metering automation terminal senses the meter area; if the meter area belongs to the meter area, the meter address is reported to the metering master station, including the following steps: After the STA communication module of the meter is pre-connected to the network, the metering automation terminal conducts point-to-point zone perception to determine whether the meter belongs to this zone; if the meter does not belong to this zone, the metering automation terminal deletes the temporary file and issues a command to the CCO communication module to delete it from the whitelist and add it to the blacklist; if the meter belongs to this zone, the metering automation terminal reports the address of the meter to the metering master station.

5. The control method for powering on and going online of an electric meter according to claim 1, characterized in that: The marketing system verifies the electric meter; if the verification is correct, the collection relationship maintenance is completed, and the official file of the electric meter and the collection relationship are pushed to the metering master station, including the following steps: The marketing system compares the meter address with the asset ledger in the system to verify whether the meter is a grid asset and has been linked to the user's metering point through an installation and disassembly work order; if the verification fails multiple times, the marketing system will issue an alarm and end the process; if the verification is correct, the marketing system will complete the collection relationship maintenance based on the metering automation terminal and meter file information, and push the meter's official file and collection relationship to the metering master station.

6. The method for controlling an electric meter to be online when powered on according to claim 1, characterized in that: The metering automation terminal completes the formal network access of the electric meter according to the official file of the electric meter, including the following steps: After the metering automation terminal receives the formal file of the meter, it sends it to the CCO communication module to generate a whitelist, completing the formal filing of the meter in the metering automation terminal and the formal network access of the meter's STA communication module.

7. The control method for online powering of an electric meter according to any one of claims 1 to 6, characterized in that: The following steps are also included: If the metering automation terminal reports the meter address to the metering master station within the set time limit and still has not received the formal file from the metering master station, the metering automation terminal will automatically delete the temporary file of the meter and the CCO whitelist.

8. A metering system that is online as soon as the meter is powered on, characterized in that: The control method for implementing the electric meter power-on and online control method according to any one of claims 1 to 7 comprises: An electric meter, which is used to send a network access request to a metering automation terminal; Metering automation terminal, which is used to determine whether the meter belongs to the white list or black list; if it does not belong to the black list or white list, a temporary file is created for the meter to pre-connect to the network; the meter is sensed in the substation area; if it belongs to the substation area, the meter address is reported to the metering master station; The metering master station is used to push the received meter address to the marketing system; after receiving the meter formal file and collection relationship, the meter formal file is sent to the corresponding metering automation terminal; the meter formally joins the network according to the meter formal file; The marketing system is used to calibrate the electricity meter; if the calibration is correct, the collection relationship maintenance is completed, and the official file of the electricity meter and the collection relationship are pushed to the metering master station.

9. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored program, wherein when the program is executed, the device where the computer-readable storage medium is located is controlled to execute the method for controlling an electric meter to be powered on and online as described in any one of claims 1 to 7.

10. A processor, characterized in that: The processor is used to run a program, wherein the program, when running, executes the control method for powering on and going online of an electric meter as described in any one of claims 1 to 7.

Citation Information

Patent Citations

  • Automatic control method and device for realizing install-and-collection effect of smart electric meter

    CN110111556A

  • Power utilization monitoring terminal equipment and installation and acquisition method thereof

    CN113970893A

  • Bidirectional checking method for topological relation of low-voltage transformer area

    CN115131165A

  • Method for realizing plug-and-play function of fusion terminal

    CN116896159A