Control method of flushing system and related equipment

By using an automated flushing system control method in interventional surgery, the problem of blockage of arterial pressure measurement channels and forgetting to flush in time by manual operation is solved, and automated and precise flushing of arterial pressure measurement channels and interventional pump flushing channels is achieved, ensuring the safety of the patient.

CN119606346APending Publication Date: 2025-03-14MAGASSIST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311157460.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-09-06
Publication Date
2025-03-14

AI Technical Summary

Technical Problem

During interventional surgery, the arterial pressure measurement channel is easily blocked due to the diffusion of blood into the filling fluid. The existing manual valve control method requires manual operation, which is easy to forget to flush in time, and forget to close it will cause too much flush fluid to enter the human body, endangering life.

Method used

A control method for a flushing system is provided, including a preset flushing pump, an input tube, an arterial pressure measuring tube, an interventional pump flushing tube and a flow path control electronic device. The electronic device switches between different working states through the flow path control circuit, and controls the preset flushing pump to pump flushing fluid in different working modes, so as to realize the automatic flushing of the arterial pressure measurement channel and the interventional pump flushing channel.

Benefits of technology

Automatic flushing of the arterial pressure measuring channel and interventional pump flushing channel is realized, avoiding human operation errors, improving the degree of automation and accuracy of flushing, and ensuring the safety of patients.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119606346A_ABST
    Figure CN119606346A_ABST
Patent Text Reader

Abstract

The invention relates to a control method of a flushing system and related equipment, and the method comprises the steps: controlling a flow path control electronic device to be switched from a first working state to a preset working state under the condition that first flushing instruction information corresponding to an artery pressure measurement channel is received, a preset flushing pump is controlled to pump flushing fluid to the artery pressure measuring channel in a preset working mode; the first working state refers to the working state of the flow path control electronic device before the flushing instruction is triggered, and the flow path control electronic device controls the first flow path to be in a connected state in the preset working state. The flow path control electronic device is controlled to be switched between different working states, the preset flushing pump is controlled to pump flushing fluid in different working modes, different flushing requirements of the artery pressure measuring channel and the intervention pump flushing channel can be met at the same time, the automation degree is high, the precise flushing effect can be achieved, and the flushing efficiency is improved. And errors possibly caused by manual operation can be avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of medical device control technology, and in particular to a control method for a flushing system and related equipment. Background Art

[0002] During interventional surgery, it is usually necessary to monitor the body's arterial pressure. When measuring arterial pressure, since the arterial pressure measurement channel is connected to the blood, the blood will gradually enter the filling liquid of the pressure measurement channel due to diffusion.

[0003] At present, in order to prevent blood from staying in the pressure measuring channel for a long time and causing blockage, the conventional practice is to add a liquid bag at the entrance of the arterial pressure measuring channel, and the liquid bag and the pressure measuring channel are connected by a manual valve; by manually opening the valve, and under the pressure of the pressurized bag, the liquid in the liquid bag flows into the arterial pressure measuring channel to achieve flushing of the pressure measuring channel. This method requires manual operation and it is very easy to forget to flush in time. After the valve is opened, if it is forgotten to be closed, too much flushing fluid will continue to enter the human body, endangering the patient's life. Summary of the invention

[0004] The embodiments of the present application provide a control method and related equipment for a flushing system.

[0005] In a first aspect, an embodiment of the present application provides a control method for a flushing system, wherein the flushing system comprises a preset flushing pump, an input tube corresponding to a flushing liquid, an arterial pressure measuring tube, a flushing tube corresponding to an interventional pump, and a flow path control electronic device; the input tube is connected to the arterial pressure measuring tube to form a first flow path, the input tube is connected to the flushing tube to form a second flow path, the first flow path is used to transport flushing liquid to an arterial pressure measuring channel corresponding to the interventional pump, and the second flow path is used to transport flushing liquid to an interventional pump flushing channel corresponding to the interventional pump; the flow path control electronic device is used to control the connectivity of the first flow path and / or the second flow path; the preset flushing pump is used to pump flushing liquid to the arterial pressure measuring channel and / or the interventional pump flushing channel;

[0006] Control methods include:

[0007] When receiving the first flushing instruction information corresponding to the arterial pressure measurement channel, controlling the flow path control electronic device to switch from the first working state to the preset working state, and controlling the preset flushing pump to pump flushing liquid to the arterial pressure measurement channel in a preset working mode;

[0008] The first working state refers to the working state of the flow path control electronic device before the flushing instruction is triggered. The flow path control electronic device controls the first flow path to be in a connected state in the preset working state.

[0009] Optionally, upon receiving the first flushing instruction information corresponding to the arterial pressure measurement channel, before controlling the flow path control electronic device to switch from the first working state to the preset working state, and controlling the preset flushing pump to pump the flushing liquid to the arterial pressure measurement channel in the preset working mode, the method further includes:

[0010] When receiving the second flushing instruction information corresponding to the interventional pump flushing channel, controlling the flow control electronic device to the first working state, and controlling the preset flushing pump to pump flushing liquid to the interventional pump flushing channel in the first working mode;

[0011] Among them, the flow path control electronic device controls the second flow path to be in a connected state in the first working state, and the preset flushing pump works based on the first target flushing volume in the first working mode. The first target flushing volume refers to the flushing volume required for the flushing intervention pump to flush the channel.

[0012] Optionally, the flow path control electronic device includes an electrically controlled pipeline clamping device, and the electrically controlled pipeline clamping device includes a first clamping mechanism and a second clamping mechanism, the first clamping mechanism clamps the arterial pressure measuring tube, and the second clamping mechanism clamps the flushing tube.

[0013] Optionally, the flow path control electronic device further controls the second flow path to be in a non-connected state in a preset working state; controlling the flow path control electronic device to switch from the first working state to the preset working state includes:

[0014] The first clamping mechanism is controlled to loosen the arterial pressure measuring tube, and the second clamping mechanism is controlled to clamp the flushing tube.

[0015] Optionally, controlling a preset flushing pump to pump flushing fluid to the arterial pressure measurement channel in a preset working mode includes:

[0016] Controlling a preset flushing pump to pump flushing fluid to the arterial pressure measurement channel in a second working mode;

[0017] The preset working mode includes a second working mode, and the flushing pump is preset to work based on a second target flushing volume in the second working mode, and the second target flushing volume refers to the flushing volume required for flushing the arterial pressure measurement channel.

[0018] Optionally, the flow path control electronic device further controls the second flow path to be in a connected state in a preset working state; controlling the flow path control electronic device to switch from the first working state to the preset working state includes:

[0019] The first clamping mechanism is controlled to release the arterial pressure measuring tube, and the second clamping mechanism is controlled to clamp the flushing tube according to preset extrusion parameters.

[0020] Optionally, controlling a preset flushing pump to pump flushing fluid to the arterial pressure measurement channel in a preset working mode includes:

[0021] Controlling the preset flushing pump to pump flushing fluid to the interventional pump flushing channel and the arterial pressure measurement channel in a third working mode;

[0022] Among them, the preset working mode includes a third working mode, and the flushing pump is preset to work based on a third target flushing volume in the third working mode. The third target flushing volume refers to the flushing volume required to simultaneously flush the interventional pump flushing channel and the arterial pressure measurement channel.

[0023] Optionally, the electrically controlled pipeline clamping device comprises a two-position three-way electric pipe clamping valve, and the two-position three-way electric pipe clamping valve comprises a first clamping mechanism and a second clamping mechanism.

[0024] Optionally, the electrically controlled pipeline clamping device includes a first electric pipe clamping valve and a second electric pipe clamping valve, the first electric pipe clamping valve includes a first clamping mechanism, and the second electric pipe clamping valve includes a second clamping mechanism.

[0025] Optionally, the flow path control electronic device includes a pipeline valve device, the pipeline valve device is provided with a channel switching structure, and the input tube, the arterial pressure measuring tube and the flushing tube are connected through the pipeline valve device;

[0026] Controlling the flow path to control the electronic device to switch from a first working state to a preset working state includes:

[0027] Controlling the channel switching structure to switch from a position corresponding to a first working state to a preset position corresponding to a preset working state; wherein, when the channel switching structure is in the preset position, the first flow path is in a connected state, or both the first flow path and the second flow path are in a connected state;

[0028] Control the preset flushing pump to pump flushing fluid to the arterial pressure measurement channel in a preset working mode, including:

[0029] Controlling a preset flushing pump to pump flushing fluid to the arterial pressure measurement channel in a second working mode;

[0030] Alternatively, the preset flushing pump is controlled to pump flushing fluid to the interventional pump flushing channel and the arterial pressure measurement channel in a third working mode, and the preset working mode includes the second working mode and the third working mode.

[0031] Optionally, the input tube includes a first input tube and a second input tube corresponding to the liquid storage device, the liquid storage device stores flushing liquid, the first input tube is connected to the arterial pressure measuring tube to form a first flow path, and the second input tube is connected to the flushing tube to form a second flow path;

[0032] The flow path control electronic device includes a first electrically controlled valve for controlling the communication state of the first flow path, and a second electrically controlled valve for controlling the communication state of the second flow path;

[0033] The preset flushing pump includes a first flushing pump and a second flushing pump, the first flushing pump is arranged in the flushing tube, and the second flushing pump is arranged in the arterial pressure measuring tube;

[0034] When receiving the first flushing instruction information corresponding to the arterial pressure measurement channel, controlling the flow path control electronic device to switch from the first working state to the preset working state, and controlling the preset flushing pump to pump flushing fluid to the arterial pressure measurement channel in a preset working mode, including:

[0035] When receiving the first flushing instruction information, opening the first electrically controlled valve, and controlling the second flushing pump to pump flushing liquid into the arterial pressure measuring channel;

[0036] Alternatively, when the first flushing instruction information is received, the first electrically controlled valve and the second electrically controlled valve are opened, the first flushing pump is controlled to pump flushing fluid to the interventional pump flushing channel, and the second flushing pump is controlled to pump flushing fluid to the arterial pressure measurement channel.

[0037] Optionally, the first flushing instruction information includes at least one of a timed flushing instruction generated at a preset time interval, an abnormal flushing instruction triggered when abnormal arterial pressure data is detected, and a flushing operation instruction for the arterial pressure measurement channel received by a human-computer interaction operation module.

[0038] Optionally, the first flushing instruction information includes a timed flushing instruction generated at a preset time interval; when the first flushing instruction information corresponding to the arterial pressure measurement channel is received, the flow path control electronic device is controlled to switch from the first working state to the preset working state, and the preset flushing pump is controlled to pump flushing liquid to the arterial pressure measurement channel in a preset working mode, including:

[0039] When receiving the timed flushing instruction, the flow path control electronic device is controlled to switch from the first working state to the preset working state, and the preset flushing pump is controlled to pump flushing fluid to the arterial pressure measurement channel in a preset working mode.

[0040] Optionally, the first flushing instruction information includes an abnormal flushing instruction triggered when the arterial pressure data is detected to be abnormal; when the first flushing instruction information corresponding to the arterial pressure measurement channel is received, the flow path control electronic device is controlled to switch from the first working state to the preset working state, and the preset flushing pump is controlled to pump flushing fluid to the arterial pressure measurement channel in a preset working mode, including:

[0041] In case of receiving an abnormal flushing instruction, the flow path control electronic device is controlled to switch from the first working state to the preset working state, and the preset flushing pump is controlled to pump flushing fluid to the arterial pressure measurement channel in a preset working mode.

[0042] Optionally, the first flushing instruction information includes a flushing operation instruction for the arterial pressure measurement channel received by the human-computer interaction operation module; when the first flushing instruction information corresponding to the arterial pressure measurement channel is received, the flow path control electronic device is controlled to switch from the first working state to the preset working state, and the preset flushing pump is controlled to pump flushing liquid to the arterial pressure measurement channel in a preset working mode, including:

[0043] When a flushing operation instruction is received, the flow path control electronic device is controlled to switch from the first working state to the preset working state, and the preset flushing pump is controlled to pump flushing fluid to the arterial pressure measurement channel in a preset working mode.

[0044] Optionally, the method further includes:

[0045] Under different working modes of the preset flushing pump, the preset flushing pump is controlled to pump flushing fluid to the arterial pressure measurement channel and / or the interventional pump flushing channel according to the flushing parameters corresponding to the different working modes.

[0046] Optionally, the flushing tube includes a first circulation tube and a second circulation tube, and the interventional pump includes a driving catheter handle, on which a flushing liquid inlet and a flushing liquid outlet are provided; the first circulation tube is connected to the flushing liquid inlet, and the second circulation tube is connected to the flushing liquid outlet, and the first circulation tube and the second circulation tube are connected to the input tube through a connecting structure, the first circulation tube is used to transport the flushing liquid to the flushing liquid inlet, and the second circulation tube is used to circulate the flushing liquid flowing out of the flushing liquid outlet back to the connecting structure.

[0047] Optionally, the flushing system further includes a circulation pump, which is disposed in the first circulation pipe; and the method further includes:

[0048] According to the corresponding working state of the flow path control electronic device, the circulation pump is controlled to pump the flushing liquid in the first circulation pipe into the driving catheter handle through the flushing liquid inlet;

[0049] Part of the flushing liquid in the catheter handle is driven by the circulation pump to flow into the second circulation pipe through the flushing liquid outlet, and the flushing liquid in the second circulation pipe is transported back to the connecting structure to form a partial circulation of the second flow path.

[0050] Optionally, also include:

[0051] When receiving flushing termination instruction information corresponding to the arterial pressure measurement channel, controlling the flow path control electronic device to switch from the preset working state back to the first working state, and controlling the preset flushing pump to pump flushing liquid to the interventional pump flushing channel in the first working mode;

[0052] Among them, the flow path control electronic device controls the second flow path to be in a connected state in the first working state, and the preset flushing pump works based on the first target flushing volume in the first working mode. The first target flushing volume refers to the flushing volume required for the flushing intervention pump to flush the channel.

[0053] Optionally, also include:

[0054] The timing starts from the moment when the flow path control electronic device switches to the preset working state;

[0055] When the timing meets the preset flushing time, a flushing stop instruction message is generated.

[0056] In a second aspect, an embodiment of the present application provides a flushing system, including a preset flushing pump, an input tube corresponding to a flushing liquid, an arterial pressure measuring tube, a flushing tube corresponding to an interventional pump, and a flow path control electronic device; the input tube is connected to the arterial pressure measuring tube to form a first flow path, the input tube is connected to the flushing tube to form a second flow path, the first flow path is used to transport flushing liquid to the arterial pressure measuring channel corresponding to the interventional pump, and the second flow path is used to transport flushing liquid to the interventional pump flushing channel corresponding to the interventional pump; the flow path control electronic device is used to control the connectivity of the first flow path and / or the second flow path; the preset flushing pump is used to pump flushing liquid to the arterial pressure measuring channel and / or the interventional pump flushing channel;

[0057] Among them, when receiving the first flushing instruction information corresponding to the arterial pressure measurement channel, the flow path control electronic device is configured to switch from the first working state to the preset working state, and the preset flushing pump is configured to pump flushing fluid to the arterial pressure measurement channel in a preset working mode; the first working state refers to the working state of the flow path control electronic device before the flushing instruction is triggered, and the flow path control electronic device is configured to control the first flow path to be in a connected state in the preset working state.

[0058] Optionally, the flow path control electronic device includes an electrically controlled pipeline clamping device, and the electrically controlled pipeline clamping device includes a first clamping mechanism and a second clamping mechanism, the first clamping mechanism clamps the arterial pressure measuring tube, and the second clamping mechanism clamps the flushing tube.

[0059] Optionally, the electrically controlled pipeline clamping device comprises a two-position three-way electric pipe clamping valve, and the two-position three-way electric pipe clamping valve comprises a first clamping mechanism and a second clamping mechanism.

[0060] Optionally, the electrically controlled pipeline clamping device includes a first electric pipe clamping valve and a second electric pipe clamping valve, the first electric pipe clamping valve includes a first clamping mechanism, and the second electric pipe clamping valve includes a second clamping mechanism.

[0061] Optionally, the flow path control electronic device includes a pipeline valve device, the pipeline valve device is provided with a channel switching structure, and the input tube, the arterial pressure measuring tube and the flushing tube are connected through the pipeline valve device.

[0062] Optionally, the input tube includes a first input tube and a second input tube corresponding to the liquid storage device, the liquid storage device stores flushing liquid, the first input tube is connected to the arterial pressure measuring tube to form a first flow path, and the second input tube is connected to the flushing tube to form a second flow path;

[0063] The flow path control electronic device includes a first electrically controlled valve for controlling the communication state of the first flow path, and a second electrically controlled valve for controlling the communication state of the second flow path;

[0064] The preset flushing pump includes a first flushing pump and a second flushing pump. The first flushing pump is arranged on the flushing tube, and the second flushing pump is arranged on the arterial pressure measuring tube.

[0065] Optionally, the flushing tube includes a first circulation tube and a second circulation tube, the interventional pump includes a driving catheter handle, and the driving catheter handle is provided with a flushing liquid inlet and a flushing liquid outlet; the first circulation tube is connected to the flushing liquid inlet, the second circulation tube is connected to the flushing liquid outlet, the first circulation tube and the second circulation tube are connected to the input tube through a connecting structure, the first circulation tube is used to transport the flushing liquid to the flushing liquid inlet, and the second circulation tube is used to circulate the flushing liquid flowing out of the flushing liquid outlet back to the connecting structure;

[0066] The flushing system also includes a circulation pump, which is arranged in the first circulation pipe and is used to pump the flushing liquid in the first circulation pipe into the driving catheter handle through the flushing liquid inlet;

[0067] Part of the flushing liquid in the catheter handle is driven by the circulation pump to flow into the second circulation pipe through the flushing liquid outlet, and the flushing liquid in the second circulation pipe is transported back to the connecting structure to form a partial circulation of the second flow path.

[0068] In a third aspect, an embodiment of the present application provides a control device for a flushing system, the control device being used to control the flushing system of the second aspect of the embodiment of the present application;

[0069] A control device, configured to control the flow path control electronic device to switch from the first working state to the preset working state, and control the preset flushing pump to pump flushing liquid to the arterial pressure measurement channel in a preset working mode, upon receiving the first flushing instruction information corresponding to the arterial pressure measurement channel;

[0070] The first working state refers to the working state of the flow path control electronic device before the flushing instruction is triggered. The flow path control electronic device controls the first flow path to be in a connected state in the preset working state.

[0071] In a fourth aspect, an embodiment of the present application provides a transcatheter ventricular assist system, comprising a control device, an interventional pump, and a flushing system according to the second aspect of the embodiment of the present application, wherein the control device is used to control the flushing system and the interventional pump.

[0072] Optionally, the control device is used to control the flow path control electronic device to switch from the first working state to the preset working state when receiving the first flushing instruction information corresponding to the arterial pressure measurement channel, and control the preset flushing pump to pump flushing liquid to the arterial pressure measurement channel in a preset working mode;

[0073] The first working state refers to the working state of the flow path control electronic device before the flushing instruction is triggered. The flow path control electronic device controls the first flow path to be in a connected state in the preset working state.

[0074] Optionally, the interventional pump further comprises a driving catheter, a pump head and an interventional sheath; the driving catheter handle is further provided with an arterial pressure measuring tube interface and an interventional sheath interface, a blood pressure sensor is provided between the arterial pressure measuring tube interface and the interventional sheath interface; the arterial pressure measuring tube is connected to the arterial pressure measuring tube interface and communicated with the gap in the interventional sheath through the interventional sheath interface;

[0075] The control device is also used to control the circulation pump to pump the remaining flushing liquid in the driving catheter handle into the driving catheter and transport it to the pump head.

[0076] In a fifth aspect, an embodiment of the present application provides an electronic device, comprising a processor and a memory, wherein the memory stores at least one instruction or at least one program, and the at least one instruction or at least one program is loaded and executed by the processor to implement the control method of the flushing system of the first aspect of the embodiment of the present application.

[0077] The control method and related equipment of the flushing system provided in the embodiment of the present application have the following beneficial effects:

[0078] By controlling the flow control electronic device to switch between different working states, and controlling the preset flushing pump to pump flushing liquid in different working modes, the flow connectivity state of the arterial pressure measurement channel and the interventional pump flushing channel can be controlled, thereby realizing switching flushing between different flow paths, while meeting the different flushing requirements faced by the arterial pressure measurement channel and the interventional pump flushing channel, and being able to automatically control the flushing of the arterial pressure measurement channel without manual operation, with a high degree of automation, achieving precise flushing effects, and avoiding errors that may be caused by human operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0079] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.

[0080] Figure 1 It is a structural schematic diagram of a flushing system provided in an embodiment of the present application;

[0081] Figure 2 It is a flow chart of a control method of a flushing system provided in an embodiment of the present application;

[0082] Figure 3 It is a flow chart of a control method of a flushing system provided in an embodiment of the present application;

[0083] Figure 4 It is a structural schematic diagram of a flushing system provided in an embodiment of the present application;

[0084] Figure 5 It is a structural schematic diagram of a flushing system provided in an embodiment of the present application;

[0085] Figure 6 It is a structural schematic diagram of a flushing system provided in an embodiment of the present application;

[0086] Figure 7 It is a flow chart of a control method of a flushing system provided in an embodiment of the present application;

[0087] Figure 8 It is a structural schematic diagram of a transcatheter ventricular assist system provided in an embodiment of the present application;

[0088] Fig. 9 It is a structural schematic diagram of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0089] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.

[0090] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or server that includes a series of steps or units is not necessarily limited to those steps or units clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0091] Before introducing the control method embodiment of the flushing system of the present application, a flushing system is first introduced. Figure 1 , Figure 1 It is a structural schematic diagram of a flushing system provided in an embodiment of the present application, wherein the flushing system comprises a preset flushing pump 1, an input tube 2 corresponding to the flushing liquid, an arterial pressure measuring tube 3, a flushing tube 4 corresponding to the interventional pump, and a flow path control electronic device 5;

[0092] The input tube 2 is connected to the arterial pressure measuring tube 3 to form a first flow path, and the input tube 2 is connected to the flushing tube 4 to form a second flow path. The first flow path is used to deliver flushing fluid to the arterial pressure measuring channel corresponding to the interventional pump, and the second flow path is used to deliver flushing fluid to the interventional pump flushing channel corresponding to the interventional pump.

[0093] The flow path control electronic device 5 is used to control the connection state of the first flow path and / or the second flow path; the preset flushing pump 1 is used to pump flushing fluid to the arterial pressure measurement channel and / or the interventional pump flushing channel.

[0094] Optionally, the flushing tube 4 and the arterial pressure measuring tube 3 share a liquid storage device.

[0095] In the embodiment of the present application, the interventional pump is an interventional blood pump, which is suitable for providing temporary left ventricular circulation assistance during high-risk PCI surgery, including but not limited to the following patients: elderly, reduced heart function, and severe coronary artery disease; suitable for providing temporary or short-term left ventricular mechanical circulation assistance for patients with acute heart failure and cardiogenic shock caused by various reasons, including but not limited to those caused by acute myocardial infarction, cardiac surgery, and explosive myocarditis; suitable for patients who need left ventricular decompression during extracorporeal membrane oxygenation (ECMO) support.

[0096] The above-mentioned preset flushing pump can be a peristaltic pump or a centrifugal pump, which is not limited in the embodiment of the present application.

[0097] The flushing system of the embodiment of the present application delivers liquid through the preset flushing pump 1, so that the flushing liquid flows from the input tube 2 into the arterial pressure measuring tube 3 and / or the flushing tube 4 corresponding to the interventional pump, so as to flush the arterial pressure measuring channel and / or the interventional pump flushing channel, prevent blood from entering the driving catheter of the interventional pump to produce thrombus, and prevent blood from clotting in the arterial pressure measuring channel; according to the channel that actually needs to be flushed, the connection state of the first flow path and / or the second flow path can be controlled by the flow path control electronic device 5. Here, taking the control of the first flow path as an example, the flow path control electronic device 5 can control the first flow path to be in a connected state. In the connected state, the preset flushing pump 1 is operated, so that the flushing liquid flows from the input tube 2 into the arterial pressure measuring tube 3; the flow path control electronic device 5 can also control the first flow path to be in a blocked state. In the blocked state, even if the preset flushing pump 1 is operated, the flushing liquid will not flow from the input tube 2 into the arterial pressure measuring tube 3; the principle of controlling the second flow path is the same and will not be repeated.

[0098] The following is based on Figure 1 The flushing system of the present application introduces an embodiment of the control method of the flushing system, which can be applied to control the host. Figure 2 As shown, Figure 2 : is a flow chart of a control method of a flushing system provided in an embodiment of the present application, and the method may include the following steps:

[0099] S201: upon receiving first flushing instruction information corresponding to the arterial pressure measurement channel, controlling the flow path control electronic device to switch from the first working state to the preset working state, and controlling the preset flushing pump to pump flushing liquid to the arterial pressure measurement channel in a preset working mode;

[0100] The first working state refers to the working state of the flow path control electronic device before the flushing instruction is triggered. The flow path control electronic device controls the first flow path to be in a connected state under the preset working state.

[0101] First, in the embodiment of the present application, the first flushing instruction information corresponding to the arterial pressure measurement channel is used to instruct the arterial pressure measurement channel to be flushed. The first flushing instruction information can be automatically generated by the control host or triggered when a preset condition is met, or it can be a manual operation detected by the control host. In an exemplary embodiment, the above-mentioned first flushing instruction information includes but is not limited to: a timed flushing instruction generated at a preset time interval, an abnormal flushing instruction triggered when an abnormality is detected in the arterial pressure data, and a flushing operation instruction for the arterial pressure measurement channel received by the human-computer interaction operation module; three possible embodiments are introduced below.

[0102] In a first possible embodiment, the first flushing instruction information includes a timed flushing instruction generated at a preset time interval; then, the above S201 may include: when receiving the timed flushing instruction, controlling the flow path control electronic device to switch from the first working state to the preset working state, and controlling the preset flushing pump to pump flushing fluid to the arterial pressure measurement channel in a preset working mode.

[0103] The preset time interval can be set according to actual needs, for example, a few minutes or a few hours. In this way, by generating flushing instructions at a fixed time, flushing fluid is regularly injected into the arterial pressure measurement channel to flush the blood in the arterial pressure measurement channel; the entire process is automatically operated without manual operation, which reduces the burden on operators and avoids possible errors caused by manual operation and the impact of differences between manual operators.

[0104] In a second possible embodiment, the first flushing instruction information includes an abnormal flushing instruction triggered when the arterial pressure data detects an abnormality; then, the above S201 may include: when receiving an abnormal flushing instruction, controlling the flow path control electronic device to switch from the first working state to a preset working state, and controlling the preset flushing pump to pump flushing fluid to the arterial pressure measurement channel in a preset working mode.

[0105] In this embodiment, the control host can determine whether the arterial pressure measurement channel needs to be flushed based on the arterial pressure data; for example, the real-time collected arterial pressure data can be judged based on the standard arterial pressure data range; when the arterial pressure data drifts, is abnormal, etc., it indicates that blood may be refluxed in the arterial pressure measurement channel, and an abnormal flushing instruction is generated at this time to flush the arterial pressure measurement channel in time to avoid blood clotting in the arterial pressure measurement channel. In this way, it can be ensured that the arterial pressure measurement channel is flushed in time when it needs to be flushed. Compared with the timed flushing method, the number of times that flushing is not required can be reduced, and the frequent switching of the working state of the flow path control electronic device can be avoided.

[0106] In a third possible embodiment, the first flushing instruction information includes a flushing operation instruction for the arterial pressure measurement channel received by the human-computer interaction operation module; then, the above S201 may include: when receiving the flushing operation instruction, controlling the flow path control electronic device to switch from the first working state to the preset working state, and controlling the preset flushing pump to pump flushing fluid to the arterial pressure measurement channel in a preset working mode.

[0107] In this embodiment, the control host is provided with a human-computer interaction operation module, which can receive a flushing operation instruction for the arterial pressure measurement channel, and the flushing operation instruction can include at least one of a voice flushing instruction of the operator, a gesture flushing instruction, and a flushing instruction generated based on a display interface. Accordingly, the human-computer interaction operation module needs to be provided with corresponding interactive devices, such as a microphone, a camera, and a display screen. In this way, the operator can use any one or more of voice, gesture, and touch to manually trigger the flushing function of the arterial pressure measurement channel, and the triggering method is diverse and flexible, which can improve the convenience of the operator.

[0108] Secondly, in the embodiment of the present application, the flow path control electronic device 5 can have a variety of different working states. Under the control of the control host, the flow path control electronic device 5 can switch between different working states. The flow path control electronic device 5 can be in a first working state before the flushing instruction corresponding to the arterial pressure measurement channel is triggered. When the first flushing instruction information corresponding to the arterial pressure measurement channel is received, the control host controls the flow path control electronic device 5 to switch from the first working state to a preset working state. In the preset working state, the flow path control electronic device 5 controls the first flow path to be in a connected state to achieve flushing of the arterial pressure measurement channel.

[0109] In some possible embodiments, Figure 3 As shown, before S201, the control method of the embodiment of the present application may further include:

[0110] S200: When receiving second flushing instruction information corresponding to the interventional pump flushing channel, controlling the flow control electronic device to a first working state, and controlling a preset flushing pump to pump flushing liquid to the interventional pump flushing channel in a first working mode.

[0111] First, in the embodiment of the present application, the second flushing instruction information corresponding to the interventional pump flushing channel is used to instruct flushing the interventional pump flushing channel. The second flushing instruction information is similar to the first flushing instruction information, and can be automatically generated by the control host or triggered when a preset condition is met, or it can be a human operation detected by the control host. The specific embodiment can refer to the embodiment of the first flushing instruction information above, and will not be repeated here.

[0112] Secondly, in the embodiment of the present application, the control host controls the flow path control electronic device 5 to the first working state when receiving the second flushing instruction information corresponding to the interventional pump flushing channel. In the first working state, the flow path control electronic device 5 controls the second flow path to be in a connected state. In the first working state, the preset flushing pump 1 is operated, so that the flushing liquid flows from the input tube 2 into the flushing tube 4 corresponding to the interventional pump, and then enters the flushing liquid inlet of the interventional pump drive catheter handle to flush the interventional pump flushing channel.

[0113] Secondly, in the embodiment of the present application, the preset flushing pump 1 can have a plurality of different working modes, and different working modes can have different target flushing volumes. The preset flushing pump 1 works based on a first target flushing volume in a first working mode, and the first target flushing volume refers to the flushing volume required to flush the flushing channel of the interventional pump. The first target flushing volume can be a fixed value or a value that changes over time.

[0114] During the operation of the interventional pump, it is necessary to continuously flush the interventional pump. Therefore, the above-mentioned first working state can be the default working state that the flow path control electronic device needs to maintain after starting the interventional pump flushing. Then, when the arterial pressure measuring channel needs to be flushed, the arterial pressure measuring channel is flushed again. The switching from the conventional flushing mode to the arterial pressure measuring channel flushing mode can be realized, and at the same time, the two flushing requirements of the interventional pump during operation (one is the flushing requirement of the interventional pump lumen and catheter, and the other is the flushing requirement of the interventional pump arterial pressure measuring channel).

[0115] In some possible embodiments, the control method of the embodiment of the present application may also include: under different working modes of the preset flushing pump, according to the flushing parameters corresponding to the different working modes, controlling the preset flushing pump to pump flushing fluid to the arterial pressure measurement channel and / or the interventional pump flushing channel.

[0116] Here, the flushing parameter includes at least one of a target flushing volume, a rotation speed, and a duration. Exemplarily, in the first working mode, the flushing pump 1 can be preset to pump flushing liquid to the interventional pump flushing channel at a first target flushing volume, a first rotation speed, and a first duration.

[0117] It can be understood that in the above embodiments, the control host controls the flow path control electronic device 5 to switch to the corresponding working state according to the different flushing instruction information received, so as to flush the arterial pressure measurement channel or the interventional pump flushing channel.

[0118] A possible embodiment of the flow path control electronic device is described below. The flow path control electronic device 5 includes an electrically controlled pipeline clamping device, which includes a first clamping mechanism and a second clamping mechanism, wherein the first clamping mechanism clamps the arterial pressure measuring tube 3, and the second clamping mechanism clamps the flushing tube 4. In this embodiment, the flow path control electronic device 5 can control the connection state of the first flow path and / or the second flow path by clamping, and the first clamping mechanism and the second clamping mechanism can respectively control the clamping state of the arterial pressure measuring tube 3 and the flushing tube 4, so that the flow path control is more simple and efficient, and the structural complexity is low.

[0119] Based on this, in some possible embodiments, the flow path control electronic device 5 can control the second flow path to be in a non-connected state under a preset working state;

[0120] Then, controlling the flow path control electronic device in S201 to switch from the first working state to the preset working state may include: controlling the first clamping mechanism to release the arterial pressure measuring tube 3 , and controlling the second clamping mechanism to clamp the flushing tube 4 .

[0121] It can be understood that in this embodiment, when the arterial pressure measuring channel is flushed, the flushing of the interventional pump flushing channel is stopped, so as to isolate the flushing stages of the two and enable the arterial pressure measuring channel to be flushed better at a preset target flushing volume.

[0122] Correspondingly, controlling the preset flushing pump to pump flushing fluid to the arterial pressure measuring channel in the preset working mode in S201 may include: controlling the preset flushing pump 1 to pump flushing fluid to the arterial pressure measuring channel in the second working mode.

[0123] In an embodiment of the present application, when flushing different channels, the preset flushing pump 1 adopts different working modes. When only flushing the arterial pressure measurement channel, the control host can control the preset flushing pump 1 to pump flushing liquid to the arterial pressure measurement channel in the second working mode; the preset flushing pump 1 works based on the second target flushing volume in the second working mode, and the second target flushing volume refers to the flushing volume required to flush the arterial pressure measurement channel. Similarly, the second target flushing volume can be a fixed value or a value that changes with time. Furthermore, in the second working mode, the preset flushing pump 1 can pump flushing liquid to the arterial pressure measurement channel at the second target flushing volume, the second speed and the second duration.

[0124] Alternatively, in some other possible embodiments, the flow path control electronic device 5 can control the second flow path to be in a connected state in a preset working state;

[0125] Then, controlling the flow path control electronic device in S201 to switch from the first working state to the preset working state may include: controlling the first clamping mechanism to release the arterial pressure measuring tube 3, and controlling the second clamping mechanism to clamp the flushing tube 4 according to the preset extrusion parameters.

[0126] It can be understood that in this embodiment, when the arterial pressure measurement channel is flushed, the flushing of the interventional pump flushing channel is not stopped, but the connectivity of the interventional pump flushing channel is adjusted, that is, the second clamping mechanism is controlled to clamp the flushing tube 4 according to the preset extrusion parameter, so that the second flow path is still in a connected state but the flushing amount is reduced. The smaller the extrusion parameter, the better the connectivity of the flow path, that is, the smoother the flow path; conversely, the larger the extrusion parameter, the worse the connectivity of the flow path, that is, the flow path tends to be blocked.

[0127] In this way, the arterial pressure measurement channel and the interventional pump flushing channel can be flushed synchronously. The arterial pressure measurement channel can also be flushed without stopping the flushing of the interventional pump flushing channel. The flushing volume distribution of different channels can also be achieved by adjusting the extrusion parameters, while meeting the flushing volume requirements of the two channels.

[0128] Accordingly, controlling the preset flushing pump to pump flushing fluid to the arterial pressure measurement channel in the preset working mode in S201 may include: controlling the preset flushing pump 1 to pump flushing fluid to the interventional pump flushing channel and the arterial pressure measurement channel in the third working mode.

[0129] Here, when flushing the arterial pressure measurement channel and the interventional pump flushing channel at the same time, the control host can control the preset flushing pump 1 to pump flushing liquid to the interventional pump flushing channel and the arterial pressure measurement channel in the third working mode. The preset flushing pump 1 works based on the third target flushing volume in the third working mode, and the third target flushing volume refers to the flushing volume required to flush the interventional pump flushing channel and the arterial pressure measurement channel at the same time. Similarly, the second target flushing volume can be a fixed value or a value that changes with time. Furthermore, in the third working mode, the preset flushing pump 1 can pump flushing liquid to the interventional pump flushing channel and the arterial pressure measurement channel at the same time with the third target flushing volume, third rotation speed and third duration.

[0130] In the above embodiment, based on the specific structure of the flow path control electronic device 5, the control host can control the first clamping mechanism and the second clamping mechanism to perform corresponding clamping actions, and control the preset flushing pump to work in a corresponding working mode to meet different flushing requirements.

[0131] In a specific embodiment, Figure 4 As shown, the above-mentioned electric control pipeline clamping device includes a two-position three-way electric pinch valve 51, and the two-position three-way electric pinch valve 51 includes a first clamping mechanism and a second clamping mechanism. The two-position three-way electric pinch valve 51 can squeeze the arterial pressure measuring tube 3 and / or the flushing tube 4 by electric driving, so as to achieve the purpose of switching and adjusting the arterial pressure measuring tube 3 and / or the flushing tube 4. Only one two-position three-way electric pinch valve is required to realize the control of the flow path connection state, reduce the structural complexity and system stability of the flushing system, and is more suitable for medical scenarios.

[0132] In another specific embodiment, Figure 5 As shown, the above-mentioned electric control pipeline clamping device includes a first electric pinch valve 52 and a second electric pinch valve 53. The first electric pinch valve 52 includes a first clamping mechanism, and the second electric pinch valve 53 includes a second clamping mechanism. The first electric pinch valve 52 can squeeze the arterial pressure measuring tube 3 by electric driving to achieve the purpose of switching and adjusting the arterial pressure measuring tube 3; the second electric pinch valve 53 can squeeze the flushing tube 4 by electric driving to achieve the purpose of switching and adjusting the flushing tube 4. By switching the pipelines through the two electric pinch valves, the installation position of the pipelines is not restricted, and the flushing tube and the arterial pressure measuring tube are installed independently of each other, which is convenient for the arrangement of the flushing pipelines.

[0133] In some possible embodiments, the flow path control electronic device 5 includes a pipeline valve device, which is provided with a channel switching structure, and the input tube 2, the arterial pressure measuring tube 3 and the flushing tube 4 are connected through the pipeline valve device; optionally, the above-mentioned pipeline valve device is an electrically controlled pipeline valve device.

[0134] Then, controlling the flow path control electronic device to switch from the first working state to the preset working state in S201 may include: controlling the channel switching structure to switch from a position corresponding to the first working state to a preset position corresponding to the preset working state;

[0135] It is understandable that the channel switching structure corresponds to different positions in different working states. By adjusting the position of the channel switching structure, the switching of different working states can be achieved. Among them, when the channel switching structure is in a preset position, the first flow path is in a connected state, or the first flow path and the second flow path are both in a connected state.

[0136] The pipeline valve device may be a three-way valve.

[0137] Correspondingly, controlling the preset flushing pump in S201 to pump flushing fluid to the arterial pressure measurement channel in a preset working mode may include: controlling the preset flushing pump to pump flushing fluid to the arterial pressure measurement channel in a second working mode; or controlling the preset flushing pump to pump flushing fluid to the interventional pump flushing channel and the arterial pressure measurement channel in a third working mode.

[0138] Here, regarding how the control host controls the preset flushing pump 1 to be in different working modes to meet different flushing requirements, reference may be made to the above embodiments, which will not be repeated here.

[0139] By setting the above-mentioned pipeline valve device, the flow path connectivity state control can also be achieved, which can enrich the applicable scenarios of the equipment and supplement the clinical scenarios where the pinch valve is not applicable.

[0140] In some possible embodiments, Figure 6 As shown, the input tube 2 includes a first input tube 21 and a second input tube 22 corresponding to the liquid storage device, the liquid storage device stores flushing liquid, the first input tube 21 is connected to the arterial pressure measuring tube 3 to form a first flow path, and the second input tube 22 is connected to the flushing tube 4 to form a second flow path; the flow path control electronic device 5 includes a first electrically controlled valve 54 that controls the connection state of the first flow path, and a second electrically controlled valve 55 that controls the connection state of the second flow path; the preset flushing pump 1 includes a first flushing pump 11 and a second flushing pump 12, the first flushing pump 11 is arranged on the flushing tube 4, and the second flushing pump 12 is arranged on the arterial pressure measuring tube 3;

[0141] Then, the above S201 may include: when receiving the first flushing instruction information, opening the first electrically controlled valve 54, and controlling the second flushing pump 12 to pump flushing liquid to the arterial pressure measuring channel.

[0142] Alternatively, the above S201 may include: upon receiving the first flushing instruction information, opening the first electrically controlled valve 54 and the second electrically controlled valve 55, controlling the first flushing pump 11 to pump flushing fluid into the interventional pump flushing channel, and controlling the second flushing pump 12 to pump flushing fluid into the arterial pressure measurement channel.

[0143] Understandably, in Figure 6 In the structure of the flushing system shown, the first flow path and the second flow path are controlled by different electrically controlled valves for connection status, and the interventional pump flushing channel and the arterial pressure measurement channel are pumped with flushing liquid by different flushing pumps; thus, the control host can control the two channels separately, and when the arterial pressure measurement channel needs to be flushed, only the first electrically controlled valve 54 can be opened, and the second flushing pump 12 can be controlled to pump flushing liquid to the arterial pressure measurement channel. When the arterial pressure measurement channel and the interventional pump flushing channel need to be flushed at the same time, the first electrically controlled valve 54 and the second electrically controlled valve 55 are opened, the first flushing pump 11 is controlled to pump flushing liquid to the interventional pump flushing channel, and the second flushing pump 12 is controlled to pump flushing liquid to the arterial pressure measurement channel.

[0144] Such a design allows the flushing control of the arterial pressure measurement channel and the interventional pump flushing channel to be completely independent. By controlling the two pumps and the two valves separately, the flushing volume under different requirements can be achieved without considering the factor of the flushing fluid diversion in the arterial pressure measurement channel and the interventional pump flushing channel.

[0145] In some possible embodiments, Figure 7 As shown, the control method of the embodiment of the present application may also include:

[0146] S202: When receiving flushing termination instruction information corresponding to the arterial pressure measurement channel, controlling the flow path control electronic device to switch from the preset working state back to the first working state, and controlling the preset flushing pump to pump flushing fluid to the interventional pump flushing channel in the first working mode.

[0147] The flushing stop instruction information corresponding to the arterial pressure measurement channel is used to instruct to stop flushing the arterial pressure measurement channel. Similar to the first flushing instruction information, the flushing stop instruction information can be automatically generated by the control host or triggered when a preset condition is met, or it can be a manual operation detected by the control host. A specific embodiment is provided below.

[0148] In a specific embodiment, the control host starts timing from the moment when the flow path control electronic device 5 switches to the preset working state; when the timing meets the preset flushing time, a flushing stop instruction information is generated. Here, the preset flushing time means the time sufficient to press the blood that flows back into the arterial pressure measurement channel back into the human body. For example, the preset flushing time can be a few seconds. In this way, by generating a flushing stop instruction at a fixed time, the flushing liquid is automatically stopped from being perfused into the arterial pressure measurement channel, so that the flushing process is fully automated, which can avoid the serious consequences that may be caused by forgetting to turn off the flushing liquid by manual operation.

[0149] The flushing system of the embodiment of the present application can be used to flush the interventional pump flushing channel corresponding to the interventional pump. The interventional pump and the flushing system are both important components of the transcatheter ventricular assist system.

[0150] To further illustrate the control method of the flushing system of the embodiment of the present application, Figure 8 As shown, Figure 8 It is a structural schematic diagram of a transcatheter ventricular assist system provided in an embodiment of the present application. In some possible embodiments, the flushing tube 4 includes a first circulation tube 41 and a second circulation tube 42, and the interventional pump includes a driving catheter handle 6, which is provided with a flushing liquid inlet and a flushing liquid outlet; the first circulation tube 41 is connected to the flushing liquid inlet, and the second circulation tube 42 is connected to the flushing liquid outlet. The first circulation tube 41 and the second circulation tube 42 are connected to the input tube 2 through a connecting structure 43, the first circulation tube 41 is used to transport the flushing liquid to the flushing liquid inlet, and the second circulation tube 42 is used to circulate the flushing liquid flowing out of the flushing liquid outlet back to the connecting structure 43.

[0151] In this structure, when the flow path control device 5 controls the first flow path to be in a connected state, the first flushing pump 1 operates and delivers flushing liquid to the first circulation pipe 41, so that the first circulation pipe 41 delivers the flushing liquid from the flushing liquid inlet to the driving catheter handle 6, and then the flushing liquid flowing out of the flushing liquid outlet is circulated and delivered back to the connecting structure 43 through the second circulation pipe 42. Since the first circulation pipe 41 and the second circulation pipe 42 are connected by the connecting structure 43, the flushing liquid flowing out of the flushing liquid outlet can enter the first circulation pipe 41 again, so that the following can be formed: Figure 5 The circulation flow path is shown.

[0152] Furthermore, in order to better control the circulation flow path, such as Figure 8 As shown, the flushing system also includes a circulation pump 7, which is arranged in the first circulation pipe 41; Figure 8 The control method of the flushing system of the embodiment of the present application is further explained.

[0153] In some possible embodiments, the control method of the embodiment of the present application also includes: according to the corresponding working state of the flow path control electronic device 5, controlling the circulation pump 7 to pump the flushing liquid in the first circulation pipe 41 into the driving catheter handle 6 through the flushing liquid inlet.

[0154] In this way, the control host controls the operation of the circulation pump 7 to drive part of the flushing liquid in the catheter handle 6 to flow into the second circulation pipe 42 through the flushing liquid outlet, so that the flushing liquid in the second circulation pipe 42 is transported back to the connecting structure 43, forming a partial circulation of the second flow path. In this way, on the one hand, it can avoid pumping too much flushing liquid into the interventional pump flushing channel at one time, and it can also avoid the flushing liquid from accumulating and staying in the driving catheter handle 6, which affects the normal operation of the handle. Furthermore, the control host can adjust the flow rate of the flushing liquid in the circulating flow path by controlling the circulation pump 7 to ensure that the flow state of the circulating flow path meets actual needs.

[0155] In summary, a control method for a flushing system provided in an embodiment of the present application can control the flow path connectivity of the arterial pressure measuring channel and the interventional pump flushing channel by controlling the flow path control electronic device to switch between different working states, and controlling the preset flushing pump to pump flushing liquid in different working modes, thereby realizing switching flushing between different flow paths, while meeting the different flushing requirements faced by the arterial pressure measuring channel and the interventional pump flushing channel, and can automatically control the flushing of the arterial pressure measuring channel without manual operation, with a high degree of automation, achieving precise flushing effects, and avoiding errors that may be caused by human operation.

[0156] The present application also provides a flushing system. The structure of the flushing system can refer to the above method embodiment and the attached Figure 1 , Attachment Figure 4-6 and attached Figure 8 The structure shown in .

[0157] like Figure 1 As shown, the flushing system includes a preset flushing pump 1, an input tube 2 corresponding to the flushing liquid, an arterial pressure measuring tube 3, a flushing tube 4 corresponding to the interventional pump, and a flow path control electronic device 5; the input tube 2 is connected to the arterial pressure measuring tube 3 to form a first flow path, and the input tube 2 is connected to the flushing tube 4 to form a second flow path, the first flow path is used to transport the flushing liquid to the arterial pressure measuring channel corresponding to the interventional pump, and the second flow path is used to transport the flushing liquid to the interventional pump flushing channel corresponding to the interventional pump; the flow path control electronic device 5 is used to control the connection state of the first flow path and / or the second flow path; the preset flushing pump 1 is used to pump the flushing liquid to the arterial pressure measuring channel and / or the interventional pump flushing channel;

[0158] Among them, when receiving the first flushing instruction information corresponding to the arterial pressure measurement channel, the flow path control electronic device 5 is configured to switch from the first working state to the preset working state, and the preset flushing pump 1 is configured to pump flushing fluid to the arterial pressure measurement channel in a preset working mode; the first working state refers to the working state of the flow path control electronic device 5 before the flushing instruction is triggered, and the flow path control electronic device 5 is configured to control the first flow path to be in a connected state in the preset working state.

[0159] In some possible embodiments, the flow path control electronic device 5 includes an electrically controlled pipeline clamping device, which includes a first clamping mechanism and a second clamping mechanism. The first clamping mechanism clamps the arterial pressure measuring tube 3, and the second clamping mechanism clamps the flushing tube 4.

[0160] like Figure 4 As shown, in some possible embodiments, the electrically controlled pipeline clamping device includes a two-position three-way electric pinch valve 51, and the two-position three-way electric pinch valve 51 includes a first clamping mechanism and a second clamping mechanism.

[0161] like Figure 5 As shown, in some possible embodiments, the electrically controlled pipeline clamping device includes a first electric pinch valve 52 and a second electric pinch valve 53 , the first electric pinch valve 52 includes a first clamping mechanism, and the second electric pinch valve 53 includes a second clamping mechanism.

[0162] In some possible embodiments, the flow path control electronic device 5 includes a pipeline valve device, which is provided with a channel switching structure, and the input tube 2, the arterial pressure measuring tube 3 and the flushing tube 4 are connected through the pipeline valve device.

[0163] like Figure 6 As shown, in some possible embodiments, the input tube 2 includes a first input tube 21 and a second input tube 22 corresponding to the liquid storage device, the liquid storage device stores the flushing liquid, the first input tube 21 is connected to the arterial pressure measuring tube 3 to form a first flow path, and the second input tube 22 is connected to the flushing tube 4 to form a second flow path;

[0164] The flow path control electronic device 5 includes a first electrically controlled valve 54 for controlling the communication state of the first flow path, and a second electrically controlled valve 55 for controlling the communication state of the second flow path;

[0165] The preset flushing pump 1 includes a first flushing pump 11 and a second flushing pump 12 . The first flushing pump 11 is arranged on the flushing tube 4 , and the second flushing pump 12 is arranged on the arterial pressure measuring tube 3 .

[0166] like Figure 8 As shown, in some possible embodiments, the flushing tube 4 includes a first circulation tube 41 and a second circulation tube 42, the interventional pump includes a driving catheter handle 6, and the driving catheter handle 6 is provided with a flushing liquid inlet and a flushing liquid outlet; the first circulation tube 41 is connected to the flushing liquid inlet, the second circulation tube 42 is connected to the flushing liquid outlet, the first circulation tube 41 and the second circulation tube 42 are connected to the input tube through a connecting structure 43, the first circulation tube 41 is used to transport the flushing liquid to the flushing liquid inlet, and the second circulation tube 42 is used to circulate the flushing liquid flowing out of the flushing liquid outlet back to the connecting structure 43;

[0167] The flushing system also includes a circulation pump 7, which is arranged in the first circulation pipe 41. The circulation pump 7 is used to pump the flushing liquid in the first circulation pipe 41 into the driving catheter handle 6 through the flushing liquid inlet; wherein, part of the flushing liquid in the driving catheter handle 6 flows into the second circulation pipe 42 through the flushing liquid outlet under the drive of the circulation pump 7, and the flushing liquid in the second circulation pipe 42 is transported back to the connecting structure 43, forming a partial circulation of the second flow path.

[0168] The embodiment of the present application provides a control device for a flushing system, the control device is used to control the flushing system in the above embodiment of the present application;

[0169] A control device is used to control the flow path control electronic device to switch from a first working state to a preset working state when receiving first flushing instruction information corresponding to the arterial pressure measurement channel, and to control the preset flushing pump to pump flushing liquid to the arterial pressure measurement channel in a preset working mode; the first working state refers to the working state of the flow path control electronic device before the flushing instruction is triggered, and the flow path control electronic device controls the first flow path to be in a connected state in the preset working state.

[0170] like Figure 8 As shown, an embodiment of the present application provides a transcatheter ventricular assist system, including a control device, an interventional pump and the flushing system in the above embodiment of the present application, and the control device is used to control the flushing system and the interventional pump.

[0171] Optionally, the control device is used to control the flow path control electronic device 5 to switch from the first working state to the preset working state, and control the preset flushing pump 1 to pump flushing fluid to the arterial pressure measurement channel in a preset working mode when receiving the first flushing instruction information corresponding to the arterial pressure measurement channel; the first working state refers to the working state of the flow path control electronic device 5 before the flushing instruction is triggered, and the flow path control electronic device 5 controls the first flow path to be in a connected state in the preset working state.

[0172] Here, the control device is the control host mentioned above, and the control host includes at least a control console and a drive motor. Clinical medical staff can monitor the system status and patient physiological parameters on the control host interface, and according to the patient's needs, provide different degrees of circulatory assistance by adjusting the speed of the interventional pump, thereby temporarily maintaining the blood circulation of the patient's vital organs and unloading the heart.

[0173] Optionally, the interventional pump also includes a driving catheter 9, a pump head 10 and an interventional sheath 13. An arterial pressure measuring tube interface and an interventional sheath interface are also provided on the driving catheter handle 6, and a blood pressure sensor 14 is provided between the arterial pressure measuring tube interface and the interventional sheath interface; the arterial pressure measuring tube 3 is connected to the arterial pressure measuring tube interface and is connected to the gap in the interventional sheath 13 through the interventional sheath interface; the control device is also used to control the circulating pump 7 to pump the remaining flushing fluid in the driving catheter handle 6 into the driving catheter 9 and transport it to the pump head 10.

[0174] The interventional sheath 13 is used to dilate blood vessels and provide a path for the interventional pump to be placed in the heart. The pump head 10 will be placed between the left ventricle and the ascending aorta. The blood inlet of the pump head 10 will be placed in the left ventricle, and the blood outlet of the pump head will be placed in the ascending aorta. The drive motor can be connected to the interventional pump to drive the impeller in the pump head 10 to rotate, thereby pumping blood from the left ventricle into the ascending aorta to achieve ventricular assist function. The interventional sheath 13 will continue to exist in the patient's blood vessels until the interventional pump is removed; the gap between the interventional sheath 13 and the drive catheter 9 is connected to the arterial pressure measuring tube to form an arterial pressure measuring path; when the interventional pump is removed, the interventional sheath 13 will also play a role in folding the pump head 10.

[0175] The flushing system, control device, and control method embodiments of the transcatheter ventricular assist system and flushing system of the embodiments of the present application are based on the same application concept.

[0176] An embodiment of the present application provides an electronic device, which includes a processor and a memory, wherein the memory stores at least one instruction or at least one program, and the at least one instruction or at least one program is loaded and executed by the processor to implement a control method for a flushing system in the embodiment of the present application.

[0177] Fig. 9 is a block diagram of an electronic device for a control method of a flushing system according to an exemplary embodiment. The electronic device may be a terminal, and its internal structure diagram may be as shown in FIG. Fig. 9As shown. The electronic device includes a processor, a memory, a network interface, a display screen and an input device connected via a system bus. Among them, the processor of the electronic device is used to provide computing and control capabilities. The memory of the electronic device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system and a computer program. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The network interface of the electronic device is used to communicate with an external terminal via a network connection. When the computer program is executed by the processor, a control method for a flushing system is implemented. The display screen of the electronic device can be a liquid crystal display screen or an electronic ink display screen, and the input device of the electronic device can be a touch layer covering the display screen, or a button, trackball or touchpad set on the housing of the electronic device, or an external keyboard, touchpad or mouse, etc.

[0178] Those skilled in the art will understand that Fig. 9 The structure shown in the figure is merely a block diagram of a partial structure related to the scheme of the present disclosure, and does not constitute a limitation on the electronic device to which the scheme of the present disclosure is applied. The specific electronic device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0179] It should be noted that the above-mentioned sequence of the embodiments of the present application is for description only and does not represent the advantages and disadvantages of the embodiments. The above-mentioned specific embodiments of this specification are described. Other embodiments are within the scope of the attached claims. In some cases, the actions or steps recorded in the claims can be performed in an order different from that in the embodiments and still achieve the desired results. In addition, the processes depicted in the drawings do not necessarily require the specific order or continuous order shown to achieve the desired results. In some embodiments, multitasking and parallel processing are also possible or may be advantageous.

[0180] Each embodiment in this specification is described in a progressive manner, and the same or similar parts between the embodiments can be referred to each other, and each embodiment focuses on the differences from other embodiments. In particular, for the device embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant parts can be referred to the partial description of the method embodiment.

[0181] A person skilled in the art will understand that all or part of the steps to implement the above embodiments may be accomplished by hardware or by instructing related hardware through a program, and the program may be stored in a computer-readable storage medium, and the above-mentioned storage medium may be a read-only memory, a disk or an optical disk, etc.

[0182] The above description is only a preferred embodiment of the present application and is not intended to limit the present application. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present application should be included in the protection scope of the present application.

Claims

1. A control method for a flushing system, characterized in that: The flushing system includes a preset flushing pump, an input tube corresponding to the flushing liquid, an arterial pressure measuring tube, a flushing tube corresponding to the interventional pump, and a flow path control electronic device; the input tube is connected with the arterial pressure measuring tube to form a first flow path, the input tube is connected with the flushing tube to form a second flow path, the first flow path is used to transport flushing liquid to the arterial pressure measuring channel corresponding to the interventional pump, and the second flow path is used to transport flushing liquid to the interventional pump flushing channel corresponding to the interventional pump; the flow path control electronic device is used to control the connectivity state of the first flow path and / or the second flow path; The preset flushing pump is used to pump the flushing fluid to the arterial pressure measurement channel and / or the interventional pump flushing channel; The control method comprises: When receiving the first flushing instruction information corresponding to the arterial pressure measurement channel, controlling the flow path control electronic device to switch from the first working state to the preset working state, and controlling the preset flushing pump to pump the flushing liquid to the arterial pressure measurement channel in a preset working mode; The first working state refers to the working state of the flow path control electronic device before the flushing instruction is triggered. The flow path control electronic device controls the first flow path to be in a connected state in the preset working state.

2. The control method according to claim 1, characterized in that: Before the method controls the flow path control electronic device to switch from the first working state to the preset working state upon receiving the first flushing instruction information corresponding to the arterial pressure measurement channel, and controls the preset flushing pump to pump the flushing fluid to the arterial pressure measurement channel in the preset working mode, the method further includes: Upon receiving the second flushing instruction information corresponding to the interventional pump flushing channel, controlling the flow path control electronic device to the first working state, and controlling the preset flushing pump to pump the flushing liquid to the interventional pump flushing channel in the first working mode; Among them, the flow path control electronic device controls the second flow path to be in a connected state in the first working state, and the preset flushing pump works based on a first target flushing volume in the first working mode, and the first target flushing volume refers to the flushing volume required to flush the interventional pump flushing channel.

3. The control method according to claim 1, characterized in that: The flow path control electronic device includes an electrically controlled pipeline clamping device, and the electrically controlled pipeline clamping device includes a first clamping mechanism and a second clamping mechanism. The first clamping mechanism clamps the arterial pressure measuring tube, and the second clamping mechanism clamps the flushing tube.

4. The control method according to claim 3, characterized in that: The flow path control electronic device further controls the second flow path to be in a non-connected state in the preset working state; and the control of switching the flow path control electronic device from the first working state to the preset working state includes: Controlling the first clamping mechanism to release the arterial pressure measuring tube, and controlling the second clamping mechanism to clamp the flushing tube; The step of controlling the preset flushing pump to pump the flushing fluid to the arterial pressure measurement channel in a preset working mode comprises: Controlling the preset flushing pump to pump the flushing fluid to the arterial pressure measuring channel in a second working mode; The preset working mode includes the second working mode, and the preset flushing pump works based on a second target flushing volume in the second working mode, and the second target flushing volume refers to the flushing volume required for flushing the arterial pressure measurement channel.

5. The control method according to claim 3, characterized in that: The flow path control electronic device further controls the second flow path to be in a connected state in the preset working state; and the control of switching the flow path control electronic device from the first working state to the preset working state includes: Controlling the first clamping mechanism to release the arterial pressure measuring tube, and controlling the second clamping mechanism to clamp the flushing tube according to a preset extrusion parameter; The step of controlling the preset flushing pump to pump the flushing fluid to the arterial pressure measurement channel in a preset working mode comprises: Controlling the preset flushing pump to pump the flushing fluid to the interventional pump flushing channel and the arterial pressure measurement channel in a third working mode; Among them, the preset working mode includes the third working mode, and the preset flushing pump works based on a third target flushing volume in the third working mode. The third target flushing volume refers to the flushing volume required to simultaneously flush the interventional pump flushing channel and the arterial pressure measurement channel.

6. The control method according to any one of claims 3 to 5, characterized in that: The electrically controlled pipeline clamping device comprises a two-position three-way electric pinch valve, and the two-position three-way electric pinch valve comprises the first clamping mechanism and the second clamping mechanism.

7. The control method according to any one of claims 3 to 5, characterized in that: The electrically controlled pipeline clamping device comprises a first electric pinch valve and a second electric pinch valve, wherein the first electric pinch valve comprises the first clamping mechanism, and the second electric pinch valve comprises the second clamping mechanism.

8. The control method according to claim 1, characterized in that: The flow path control electronic device comprises a pipeline valve device, the pipeline valve device is provided with a channel switching structure, and the input tube, the arterial pressure measuring tube and the flushing tube are connected through the pipeline valve device; The controlling the flow path control electronic device to switch from the first working state to the preset working state comprises: Controlling the channel switching structure to switch from the position corresponding to the first working state to the preset position corresponding to the preset working state; wherein, when the channel switching structure is in the preset position, the first flow path is in a connected state, or both the first flow path and the second flow path are in a connected state; The step of controlling the preset flushing pump to pump the flushing fluid to the arterial pressure measurement channel in a preset working mode comprises: Controlling the preset flushing pump to pump the flushing fluid to the arterial pressure measuring channel in a second working mode; Alternatively, the preset flushing pump is controlled to pump the flushing fluid to the interventional pump flushing channel and the arterial pressure measurement channel in a third working mode, and the preset working mode includes the second working mode and the third working mode.

9. The control method according to claim 1, characterized in that: The input tube includes a first input tube and a second input tube corresponding to the liquid storage device, the liquid storage device stores the flushing liquid, the first input tube is connected to the arterial pressure measuring tube to form the first flow path, and the second input tube is connected to the flushing tube to form the second flow path; The flow path control electronic device includes a first electrically controlled valve for controlling the communication state of the first flow path, and a second electrically controlled valve for controlling the communication state of the second flow path; The preset flushing pump includes a first flushing pump and a second flushing pump, wherein the first flushing pump is arranged on the flushing tube, and the second flushing pump is arranged on the arterial pressure measuring tube; When receiving the first flushing instruction information corresponding to the arterial pressure measurement channel, controlling the flow path control electronic device to switch from the first working state to the preset working state, and controlling the preset flushing pump to pump the flushing fluid to the arterial pressure measurement channel in a preset working mode, comprises: When receiving the first flushing instruction information, opening the first electrically controlled valve, and controlling the second flushing pump to pump the flushing liquid into the arterial pressure measuring channel; Alternatively, when the first flushing instruction information is received, the first electrically controlled valve and the second electrically controlled valve are opened, the first flushing pump is controlled to pump the flushing fluid to the interventional pump flushing channel, and the second flushing pump is controlled to pump the flushing fluid to the arterial pressure measurement channel.

10. The control method according to claim 1, characterized in that: The first flushing instruction information includes at least one of a timed flushing instruction generated at a preset time interval, an abnormal flushing instruction triggered when abnormal arterial pressure data is detected, and a flushing operation instruction for the arterial pressure measurement channel received by a human-computer interaction operation module.

11. The control method according to claim 1, characterized in that: The flushing pipe includes a first circulation pipe and a second circulation pipe, the interventional pump includes a driving catheter handle, and the driving catheter handle is provided with a flushing liquid inlet and a flushing liquid outlet; the first circulation pipe is connected to the flushing liquid inlet, the second circulation pipe is connected to the flushing liquid outlet, the first circulation pipe and the second circulation pipe are connected to the input pipe through a connecting structure, the first circulation pipe is used to transport the flushing liquid to the flushing liquid inlet, and the second circulation pipe is used to circulate the flushing liquid flowing out of the flushing liquid outlet back to the connecting structure; The flushing system further includes a circulation pump, and the circulation pump is arranged in the first circulation pipe; the method further includes: According to the corresponding working state of the flow path control electronic device, the circulation pump is controlled to pump the flushing liquid in the first circulation pipe into the driving catheter handle through the flushing liquid inlet; Part of the flushing liquid in the driving catheter handle flows into the second circulation pipe through the flushing liquid outlet under the drive of the circulation pump, and the flushing liquid in the second circulation pipe is transported back to the connecting structure to form a partial circulation of the second flow path.

12. The control method according to claim 1, characterized in that: Also includes: When receiving the flushing termination instruction information corresponding to the arterial pressure measurement channel, controlling the flow path control electronic device to switch from the preset working state back to the first working state, and controlling the preset flushing pump to pump the flushing liquid to the interventional pump flushing channel in the first working mode; Among them, the flow path control electronic device controls the second flow path to be in a connected state in the first working state, and the preset flushing pump works based on a first target flushing volume in the first working mode, and the first target flushing volume refers to the flushing volume required to flush the interventional pump flushing channel.

13. A flushing system, characterized in that: It comprises a preset flushing pump, an input tube corresponding to the flushing liquid, an arterial pressure measuring tube, a flushing tube corresponding to the interventional pump and a flow path control electronic device; the input tube is connected with the arterial pressure measuring tube to form a first flow path, the input tube is connected with the flushing tube to form a second flow path, the first flow path is used to transport flushing liquid to the arterial pressure measuring channel corresponding to the interventional pump, and the second flow path is used to transport flushing liquid to the interventional pump flushing channel corresponding to the interventional pump; the flow path control electronic device is used to control the connectivity of the first flow path and / or the second flow path; the preset flushing pump is used to pump the flushing liquid to the arterial pressure measuring channel and / or the interventional pump flushing channel; Among them, when receiving the first flushing instruction information corresponding to the arterial pressure measurement channel, the flow path control electronic device is configured to switch from the first working state to the preset working state, and the preset flushing pump is configured to pump the flushing fluid to the arterial pressure measurement channel in a preset working mode; the first working state refers to the working state of the flow path control electronic device before the flushing instruction is triggered, and the flow path control electronic device is configured to control the first flow path to be in a connected state in the preset working state.

14. The flushing system according to claim 13, characterized in that The flow path control electronic device includes an electrically controlled pipeline clamping device, and the electrically controlled pipeline clamping device includes a first clamping mechanism and a second clamping mechanism. The first clamping mechanism clamps the arterial pressure measuring tube, and the second clamping mechanism clamps the flushing tube.

15. The flushing system according to claim 14, characterized in that The electrically controlled pipeline clamping device comprises a two-position three-way electric pinch valve, and the two-position three-way electric pinch valve comprises the first clamping mechanism and the second clamping mechanism.

16. The flushing system according to claim 14, characterized in that The electrically controlled pipeline clamping device comprises a first electric pinch valve and a second electric pinch valve, wherein the first electric pinch valve comprises the first clamping mechanism, and the second electric pinch valve comprises the second clamping mechanism.

17. The flushing system according to claim 13, characterized in that The flow path control electronic device comprises a pipeline valve device, the pipeline valve device is provided with a channel switching structure, and the input tube, the arterial pressure measuring tube and the flushing tube are connected through the pipeline valve device.

18. The flushing system according to claim 13, characterized in that The input tube includes a first input tube and a second input tube corresponding to the liquid storage device, the liquid storage device stores the flushing liquid, the first input tube is connected to the arterial pressure measuring tube to form the first flow path, and the second input tube is connected to the flushing tube to form the second flow path; The flow path control electronic device includes a first electrically controlled valve for controlling the communication state of the first flow path, and a second electrically controlled valve for controlling the communication state of the second flow path; The preset flushing pump includes a first flushing pump and a second flushing pump, wherein the first flushing pump is arranged on the flushing tube, and the second flushing pump is arranged on the arterial pressure measuring tube.

19. The flushing system according to claim 13, characterized in that: The flushing pipe includes a first circulation pipe and a second circulation pipe, the interventional pump includes a driving catheter handle, and the driving catheter handle is provided with a flushing liquid inlet and a flushing liquid outlet; the first circulation pipe is connected to the flushing liquid inlet, the second circulation pipe is connected to the flushing liquid outlet, the first circulation pipe and the second circulation pipe are connected to the input pipe through a connecting structure, the first circulation pipe is used to transport the flushing liquid to the flushing liquid inlet, and the second circulation pipe is used to circulate the flushing liquid flowing out of the flushing liquid outlet back to the connecting structure; The flushing system further comprises a circulation pump, which is arranged in the first circulation pipe and is used to pump the flushing liquid in the first circulation pipe into the driving catheter handle through the flushing liquid inlet; Part of the flushing liquid in the driving catheter handle flows into the second circulation pipe through the flushing liquid outlet under the drive of the circulation pump, and the flushing liquid in the second circulation pipe is transported back to the connecting structure to form a partial circulation of the second flow path.

20. A control device for a flushing system, characterized in that: The control device is used to control the flushing system according to any one of claims 13 to 19; The control device is used to control the flow path control electronic device to switch from the first working state to the preset working state, and control the preset flushing pump to pump the flushing liquid to the arterial pressure measurement channel in a preset working mode when receiving the first flushing instruction information corresponding to the arterial pressure measurement channel; The first working state refers to the working state of the flow path control electronic device before the flushing instruction is triggered. The flow path control electronic device controls the first flow path to be in a connected state in the preset working state.

21. A transcatheter ventricular assist system, characterized in that: comprising a control device, an interventional pump and a flushing system according to any one of claims 13 to 19, wherein the control device is used to control the flushing system and the interventional pump; The control device is used to control the flow path control electronic device to switch from the first working state to the preset working state, and control the preset flushing pump to pump the flushing liquid to the arterial pressure measurement channel in a preset working mode when receiving the first flushing instruction information corresponding to the arterial pressure measurement channel; The first working state refers to the working state of the flow path control electronic device before the flushing instruction is triggered. The flow path control electronic device controls the first flow path to be in a connected state in the preset working state.

22. An electronic device, characterized in that: The electronic device includes a processor and a memory, wherein the memory stores at least one instruction or at least one program, and the at least one instruction or the at least one program is loaded and executed by the processor to implement the control method of the flushing system as described in any one of claims 1-12.