Protective device for wind power tower assembly

By designing a protective device for wind power tower assembly, the main frame and the top frame are used to build an operating space, and the first and second barriers are used to block wind power and rain and snow, the problem of rain and snow impact during wind power tower welding is solved, and the installation progress and safety are improved.

CN119616269APending Publication Date: 2025-03-14XINJIANG CRRC NEW ENERGY EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411941269.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-26
Publication Date
2025-03-14

AI Technical Summary

Technical Problem

The prior art cannot effectively block the impact of rain and snow during the welding of wind power tower towers, resulting in the impact of installation progress.

Method used

A protective device for assembly of a wind power tower is designed, including a body frame, a top frame, a first barrier member and a second barrier member. The first barrier member forms an operating space around the main frame for blocking the influence of wind force; the second barrier member is arranged on the top frame for blocking the top of the operating space for blocking the influence of rain and snow.

Benefits of technology

It effectively avoids the impact of wind force and rain and snow on the welding process of wind power tower tower body, and improves installation progress and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119616269A_ABST
    Figure CN119616269A_ABST
Patent Text Reader

Abstract

The invention provides a protection device for wind power tower assembly, and belongs to the technical field of wind power tower installation. The invention provides a protection device for wind power tower assembly. The protection device comprises a main body frame, a top frame, at least one first blocking piece and at least one second blocking piece. The first blocking pieces are arranged on the main body frame in an end-to-end connection mode, an operation space is defined by the first blocking pieces, at least one first blocking piece is provided with an opening for the tower body to enter and exit from the operation space, and the second blocking piece is arranged at the top of the main body frame. An operation space is jointly built on the main body frame and the top frame through the first blocking piece and the second blocking piece, the first blocking piece is arranged on the side portion of the operation space and used for blocking the influence of wind power, and the second blocking piece is arranged on the top of the operation space and used for blocking the influence of rain and snow. And the influence of wind power and rain and snow factors in the welding process of the tower body is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application belongs to the technical field of wind power tower installation, and specifically relates to a protective device for assembling a wind power tower. Background Art

[0002] Wind turbine towers are key components in wind power generation systems. Their main function is to support wind turbines and place them at an appropriate height to maximize the use of wind energy resources. Traditional wind turbine towers are usually made of steel or concrete structures, and the tower height is generally between tens of meters and more than a hundred meters. During the tower assembly process, the tower is welded from multiple cylinder sections. During the welding process, it is necessary to consider the influence of environmental factors such as wind, rain and snow, and ensure the safety and reliability of the tower assembly under various complex conditions.

[0003] The existing wind turbine tower body is assembled in an open-air environment. In order to prevent the wind from affecting the tower body assembly, a wind-blocking wall is usually installed around the assembly site.

[0004] However, wind-blocking walls can only block the impact of wind factors, but cannot block the impact of rain and snow. Summary of the invention

[0005] The embodiment of the present application provides a protective device for assembling a wind power tower, which is used to solve the problem in the prior art that rainy and snowy weather affects the welding of cylinder sections of a wind power tower.

[0006] An embodiment of the present application provides a protective device for assembling a wind tower, comprising a main frame, a top frame, at least one first blocking member and at least one second blocking member.

[0007] The first blocking members are connected end to end and arranged on the main frame, and the first blocking members surround and form an operation space. At least one of the first blocking members is provided with an opening for the tower body to enter and exit the operation space.

[0008] The top frame is arranged on the top of the main frame, and each of the second blocking members is arranged on the side of the top frame, and the second blocking members are used to close the top of the operating space.

[0009] In the embodiment of the present application, the main frame includes a first support frame and two second support frames, the two second support frames are relatively arranged at the bottom of the first support frame, and the opening is arranged on the first blocking member located between the two second support frames.

[0010] In the embodiment of the present application, the shape of the top of the opening is arc-shaped.

[0011] In an embodiment of the present application, the main frame further includes at least two reinforcing ribs, which are arranged on the first support frame around the center of the first support frame, and the reinforcing ribs are used to strengthen the tensile strength of the first support frame.

[0012] In the embodiment of the present application, movable wheels are provided at the bottom of the second supporting frame.

[0013] In an embodiment of the present application, the main frame further includes a pull ring, which is disposed on an outer side wall of the second support frame and is connected to a preset anchor point via a traction member.

[0014] In the embodiment of the present application, the rope drum is further included, and the rope drum is arranged on the outer side wall of the second support frame. The rope drum is located below the pull ring, and the rope drum is used to retract the traction member.

[0015] In an embodiment of the present application, the top frame includes two third support frames.

[0016] The two third support frames are tiltedly arranged on the top of the first support frame, the top ends of the two third support frames are abutted, and the second blocking member is arranged on the third support frame so that rain and snow can slide down along the tilted second blocking member.

[0017] In the embodiment of the present application, the angle between the third support frame and the horizontal direction is 30-60 degrees.

[0018] In the embodiment of the present application, the first blocking member is a steel plate, and the second blocking member is a steel plate.

[0019] The protective device for wind tower assembly provided in the embodiment of the present application includes a main frame, a top frame, at least one first blocking member and at least one second blocking member. The first blocking members are arranged end to end on the main frame, and the first blocking members are surrounded to form an operating space. At least one first blocking member is provided with an opening for the tower body to enter and exit the operating space. The top frame is arranged on the top of the main frame, and the second blocking members are arranged on the top frame, and the second blocking member is used to close the top of the operating space. The first blocking member and the second blocking member jointly build an operating space on the main frame and the top frame. The first blocking member is arranged on the side of the operating space to block the influence of wind, and the second blocking member is arranged on the top of the operating space to block the influence of rain and snow, thereby avoiding the influence of wind and rain and snow factors during the tower body welding process. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The accompanying drawings herein are incorporated in and constitute a part of the specification, illustrate embodiments consistent with the present application, and together with the description, are used to explain the principles of the embodiments of the present application.

[0021] Figure 1 A schematic diagram of the structure of a protective device for wind power tower assembly provided in an embodiment of the present application;

[0022] Figure 2 A schematic diagram of the structure of an opening in a protective device for wind tower assembly provided in an embodiment of the present application;

[0023] Figure 3 for Figure 1 A top view of

[0024] Figure 4 for Figure 1 Side view of.

[0025] Reference numerals:

[0026] 100-main frame; 110-first support frame; 120-second support frame; 130-reinforcement ribs; 140-moving wheels; 150-pull ring; 160-rope drum; 170-storage table;

[0027] 200-top frame; 210-third support frame;

[0028] 300-first blocking member;

[0029] 400 - second blocking member;

[0030] 500-Opening.

[0031] The above drawings have shown clear embodiments of the present application, which will be described in more detail later. These drawings and text descriptions are not intended to limit the scope of the present application in any way, but to illustrate the concept of the present application to those skilled in the art by referring to specific embodiments. DETAILED DESCRIPTION

[0032] In order to make the purpose, technical solutions and advantages of this application clearer, the technical solutions in this application will be clearly and completely described below in conjunction with the drawings in this application. Obviously, the described embodiments are part of the embodiments of this application, not all of the embodiments. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0033] The terms "first", "second", "third", "fourth", etc. (if any) in the specification and claims of this application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the numbers used in this way can be interchanged where appropriate, so that the embodiments of the present application described herein can, for example, be implemented in an order other than those illustrated or described herein.

[0034] In the embodiments of the present application, the words "exemplary" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "exemplary" or "for example" in the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "exemplary" or "for example" is intended to present related concepts in a specific way.

[0035] In the description of the embodiments of the present application, it should be understood that the terms "inside", "outside", "top", "bottom", "front", "back", etc. indicating the orientation or position relationship (if any) are based on the orientation or position relationship shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application.

[0036] During the installation of a wind turbine tower, multiple cylinder sections need to be assembled into the tower body. Due to the large diameter of the cylinder sections, they usually need to be assembled outdoors. In order to avoid the influence of wind factors on site, wind-blocking walls are usually used to block the wind. However, when it rains or snows, the wind-blocking walls cannot prevent the erosion of rain and snow, which affects the assembly of the cylinder sections and seriously affects the installation progress.

[0037] The embodiment of the present application provides a protective device for wind power tower assembly, which can prevent rain and snow from affecting the assembly of cylinder sections. The present application will be further described below in conjunction with the accompanying drawings.

[0038] like Figure 1 As shown, Figure 1 A schematic diagram of the structure of a protective device for wind tower assembly provided in an embodiment of the present application.

[0039] An embodiment of the present application provides a protective device for assembling a wind tower, including a main frame 100 , a top frame 200 , at least one first blocking member 300 , and at least one second blocking member 400 .

[0040] The first blocking members 300 are arranged end to end on the main frame 100 , and the first blocking members 300 surround and form an operation space. At least one of the first blocking members 300 is provided with an opening 500 for the tower body to enter and exit the operation space.

[0041] The top frame 200 is disposed on the top of the main frame 100 , and each second blocking member 400 is disposed on the top frame 200 . The second blocking member 400 is used to close the top of the operating space.

[0042] An operating space is jointly constructed on the main frame 100 and the top frame 200 by the first blocking member 300 and the second blocking member 400. The first blocking member 300 is arranged on the side of the operating space to block the influence of wind, and the second blocking member 400 is arranged on the top of the operating space to block the influence of rain and snow, thereby avoiding the influence of wind and rain and snow factors during the tower body welding process.

[0043] It should be noted that the second blocking member 400 can also prevent debris such as leaves from entering the enclosed space.

[0044] Among them, the main frame 100 is welded with 100*100*4.5 equal-angle steels, and the top main frame 100 is welded with 50*50*3 equal-angle steels. The weight of the main frame 100 or the top frame 200 can be adjusted by the thickness of the angle steel according to actual needs.

[0045] The main frame 100 can also use square tubes and rectangular tubes as substitute materials for angle steel. For example, a square tube of 100*100*5 is used to replace an angle steel of 100*100*4.5.

[0046] Exemplarily, the area of ​​the first blocking member 300 is equal to the area of ​​the side wall on one side of the main frame 100, each first blocking member 300 covers each side wall of the main frame 100, and the first blocking members 300 on two adjacent side walls are connected to avoid the influence of wind factors.

[0047] Exemplarily, when the main frame 100 is in a cube shape or a rectangular shape, the main frame 100 has four side walls in total, and the four first blocking members 300 are welded to the four side walls respectively, and the edges of two adjacent first blocking members 300 are welded together to form a closed operating space.

[0048] For example, when the main frame 100 is a hexagonal body, the main frame 100 has six side walls, six first blocking members 300 are welded to the six side walls respectively, and the edges of two adjacent first blocking members 300 are welded together to form a closed operating space.

[0049] The main frame 100 supports the first blocking member 300 . The first blocking member 300 is made of a lightweight material. The shape of the main frame 100 can be adjusted according to actual conditions so that the first blocking member 300 forms a closed operating space.

[0050] Since the length of the existing wind power tower is 5-7 meters and the diameter is 2-4 meters, the operating space formed by the main frame 100 and the first blocking member 300 is 5-7 meters long and 3-4 meters wide. The height is 5-7 meters, and the size of the main frame 100 and the first blocking member 300 are adjusted according to the actual situation. There needs to be a gap of 0.5-1 meters between the manufactured operating space and the wind power tower section so that the staff can enter and operate.

[0051] Exemplarily, when the main frame 100 is in a cube or rectangular shape, an opening 500 is provided on one side wall of the main frame 100 or openings 500 are provided on two opposite sides, wherein the length and width of the opening 500 are greater than the diameter of the tower body, so as to facilitate the tower body to enter the operating space.

[0052] It should be noted that the shape of the top frame 200 matches the shape of the main frame 100, the top frame 200 is welded to the top of the main frame 100, and when the second blocking member 400 is installed on the top frame 200, the second blocking member 400 can completely cover the top of the operating space to prevent rain and snow from entering the operating space.

[0053] Recombination Figure 1 and Figure 2 As shown, Figure 2 A schematic structural diagram of an opening 500 in a protective device for wind tower assembly provided in an embodiment of the present application.

[0054] In the embodiment of the present application, the main frame 100 includes a first support frame 110 and two second support frames 120 . The two second support frames 120 are relatively arranged at the bottom of the first support frame 110 , and the opening 500 is arranged on the first blocking member 300 located between the two second support frames 120 .

[0055] The main frame 100 is formed into a rectangular shape by a first support frame 110 and two second support frames 120, wherein the first support frame 110 and the second support frame 120 are welded by a plurality of angle steels, and the two second support frames 120 are respectively located below the opposite ends of the first support frame 110, and the tops of the two second support frames 120 are welded to the bottom of the first support frame 110 to form a "door" structure. This support structure is simple and uses less materials.

[0056] In this embodiment, the two second support frames 120 are enclosed by four first blocking members 300 to form an operating space, wherein two first blocking members 300 are welded to the outside of the two second support members, and the other two first blocking members 300 are located between the two support frames, and the two ends of the first blocking members 300 are respectively welded to the second support frames 120, and the ends of the four first blocking members 300 are welded in sequence to form a closed space.

[0057] Among them, openings 500 are provided on the two first blocking members 300 between the two second support frames 120. Since the second support frame 120 is not provided on the inner side of the two first blocking members 300, it is only necessary to open the openings 500 on the first blocking members 300, and there is no need to customize the structure of the second support frame 120, which is convenient for production.

[0058] In order to facilitate the tower body to enter the operating space and to ensure that the influence of wind is blocked, the top of the opening 500 is set to be an arc or semicircle in this embodiment.

[0059] In the embodiment of the present application, a storage table 170 is provided on the inner side of the second support frame 120 , and the storage table 170 is used to place tools such as welding guns.

[0060] The cross-sectional shape of the storage table 170 is L-shaped, which is more conducive to storing items.

[0061] In the embodiment of the present application, the main frame 100 further includes at least two reinforcing ribs 130 , which are arranged on the first support frame 110 around the center of the first support frame 110 , and are used to strengthen the tensile strength of the first support frame 110 .

[0062] The reinforcing rib 130 is disposed on the outer side of the first support frame 110 and located on the inner side of the first blocking member 300 . The reinforcing rib 130 is made of t10 flat steel.

[0063] Combination Figure 1 and Figure 4 As shown, Figure 4 for Figure 1 Side view of.

[0064] Exemplarily, the main frame 100 includes two reinforcing ribs 130 , and the two reinforcing ribs 130 are welded on the outer side of the first support frame 110 in a cross shape or an X shape.

[0065] Exemplarily, the main frame 100 includes four reinforcing ribs 130 , and the four reinforcing ribs 130 are arranged in a cross shape on the outside of the first support frame 110 .

[0066] In the embodiment of the present application, a moving wheel 140 is disposed at the bottom of the second support frame 120 to facilitate the movement of the main frame 100 .

[0067] The moving wheel 140 is a wheel with a brake, and the main frame 100 is fixed by the braking effect of the wheel.

[0068] Exemplarily, 2-5 moving wheels 140 are disposed at the bottom of each second support frame 120. The size of the moving wheel 140 is 10-15 inches.

[0069] In the embodiment of the present application, the main frame 100 further includes a pull ring 150 , which is disposed on the outer side wall of the second support frame 120 , and the pull ring 150 is connected to a preset anchor point through a traction member.

[0070] In order to facilitate the arrangement of the pull ring 150 , a through hole for installing the pull ring 150 may be pre-arranged on the second blocking member 400 .

[0071] Exemplarily, a pull ring 150 is disposed on the outer side of each of the two second support frames 120 , and the pull ring 150 is connected to an anchor point on the ground or the wall through a traction member to fix the main frame 100 .

[0072] In the embodiment of the present application, a rope drum 160 is further included. The rope drum 160 is disposed on the outer side wall of the second support frame 120. The rope drum 160 is located below the pull ring 150. The rope drum 160 is used to retract the traction member.

[0073] The number of the rope drums 160 corresponds to the number of the pull rings 150 , and the traction member is wound around the rope drums 160 to retract the traction member.

[0074] Exemplarily, the traction member is a rope or a steel cable.

[0075] For example, in order to facilitate the installation of the rope drum 160 , a through hole for installing the rope drum 160 may be pre-set on the second blocking member 400 .

[0076] Combination Figure 1 and Figure 3 As shown, Figure 3 for Figure 1 Top view of the .

[0077] In the embodiment of the present application, the top frame 200 includes two third support frames 210 .

[0078] The two third support frames 210 are tilted on the top of the first support frame 110 , and the top ends of the two third support frames 210 are abutted against each other. The second blocking member 400 is disposed on the third support frame 210 so that rain and snow can slide down along the tilted second blocking member 400 .

[0079] The two third support frames 210 are both arranged on the top of the first support frame 110 , and the two third support frames 210 are in a herringbone shape.

[0080] A support column is disposed below the two third support frames 210 , and the bottom of the support column is welded to the first support frame 110 . The support column is used to support the two third support frames 210 .

[0081] Exemplarily, the area of ​​the two second blocking members 400 is equal to the area of ​​the two third support frames 210 , and the two second blocking members 400 can completely cover the operating space at the bottom to prevent rain and snow from entering the operating space and affecting the welding of the tower body.

[0082] In the embodiment of the present application, the angle between the third support frame 210 and the horizontal direction is 30-60 degrees.

[0083] In the embodiment of the present application, the first blocking member 300 is a steel plate, and the second blocking member 400 is a steel plate. The steel plate is welded to the main frame 100 and the top frame 200.

[0084] Exemplarily, the first blocking member 300 and the second blocking member 400 may also be made of thinner colored steel sheets, and the colored steel sheets are riveted to the main frame 100 and the top frame 200 .

[0085] The protective device for wind power tower assembly provided by the embodiment of the present application includes a main frame 100, a top frame 200, at least one first blocking member 300 and at least one second blocking member 400. Each first blocking member 300 is arranged end to end on the main frame 100, each first blocking member 300 surrounds to form an operation space, and at least one first blocking member 300 is provided with an opening 500 for the tower body to enter the operation space. The top frame 200 is arranged at the top of the main frame 100, each second blocking member 400 is arranged on the top frame 200, and the second blocking member 400 is used to prevent rain and snow from falling into the operation space. The first blocking member 300 and the second blocking member 400 jointly build an operation space on the main frame 100 and the top frame 200, the first blocking member 300 is arranged on the side of the operation space to block the influence of wind force, and the second blocking member 400 is arranged on the top of the operation space to block the influence of rain and snow, thereby avoiding the influence of wind force and rain and snow factors during the tower body welding process.

[0086] So far, the technical solution of the present application has been described in conjunction with the preferred embodiments shown in the accompanying drawings. However, it is easy for those skilled in the art to understand that the protection scope of the present application is obviously not limited to these specific embodiments, and the above embodiments are only used to illustrate the technical solution of the present application rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present application.

[0087] In general, terms should be understood, at least in part, by the context in which they are used. For example, the terms "one or more" as used herein may be used to describe any feature, structure, or characteristic in a singular sense, or may be used to describe a combination of features, structures, or characteristics in a plural sense, depending, at least in part, on the context. Similarly, terms such as "one" or "a plurality of" may also be understood to convey singular usage or to convey plural usage, depending, at least in part, on the context.

[0088] It should be easily understood that “on,” “above,” and “over” in the present disclosure should be interpreted in the broadest manner, so that “on” not only means “directly on something,” but also includes the meaning of “on something” with intervening features or layers therebetween, and “above” or “over” not only includes the meaning of “above” or “over,” but also may include the meaning of “above” or “over something” with no intervening features or layers therebetween (i.e., directly on something).

Claims

1. A protective device for wind power tower assembly, characterized in that: It comprises a main frame (100), a top frame (200), at least one first blocking member (300) and at least one second blocking member (400); The first blocking members (300) are arranged end to end on the side of the main frame (100), and the first blocking members (300) are surrounded to form an operation space. The first blocking members (300) are provided with an opening (500) for the tower body to enter and exit the operation space. The top frame (200) is arranged on the top of the main frame (100), and each of the second blocking members (400) is arranged on the top frame (200), and the second blocking members (400) are used to close the top of the operating space.

2. The protective device for wind power tower assembly according to claim 1, characterized in that: The main frame (100) comprises a first support frame (110) and two second support frames (120), wherein the two second support frames (120) are arranged relatively at the bottom of the first support frame (110), and the opening (500) is arranged on the first blocking member (300) located between the two second support frames (120).

3. The protective device for wind power tower assembly according to claim 2, characterized in that: The top of the opening (500) is in an arc shape.

4. The protective device for wind power tower assembly according to claim 2, characterized in that: The main frame (100) further comprises at least two reinforcing ribs (130), each of the reinforcing ribs (130) being arranged on the first supporting frame (110) around the center of the first supporting frame (110).

5. The protective device for wind power tower assembly according to claim 2, characterized in that: The main frame (100) further comprises a moving wheel (140), and the moving wheel (140) is arranged at the bottom of the second supporting frame (120).

6. The protective device for wind power tower assembly according to claim 2, characterized in that: The main frame (100) further comprises a pull ring (150), wherein the pull ring (150) is arranged on the outer side wall of the second support frame (120), and the pull ring (150) is connected to a preset anchor point via a traction member.

7. The protective device for wind power tower assembly according to claim 6, characterized in that: The main frame (100) further comprises a rope drum (160), wherein the rope drum (160) is arranged on the outer side wall of the second support frame (120), the rope drum (160) is located below the pull ring (150), and the rope drum (160) is used to retract the traction member.

8. The protective device for wind power tower assembly according to any one of claims 1 to 7, characterized in that: The top frame (200) comprises a third support frame (210) and two fourth support frames; The two third support frames (210) are arranged obliquely on the top of the first support frame (110), the top ends of the two third support frames (210) are abutted, and the second blocking member (400) is arranged on the third support frame (210) so that rain and snow slide down along the inclined second blocking member (400).

9. The protective device for wind power tower assembly according to claim 8, characterized in that: The angle between the third support frame (210) and the horizontal direction is 30-60 degrees.