Intelligent mixing station device and operation method thereof

Through the design of the intelligent mixing station device, automatic ordering, automatic production scheduling and real-time monitoring are realized, which solves the problems of low efficiency and untimely information feedback in the existing technology, and improves the efficiency and quality stability of concrete production and transportation.

CN119623969APending Publication Date: 2025-03-14THE FIFTH ENGEERING OF CHINA RAILWAY 5TH BUREAU GROUP +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411682822.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-22
Publication Date
2025-03-14

AI Technical Summary

Technical Problem

In the existing mixing station technology, the efficiency of placing concrete demand and queuing for production is low, the material and time control is not timely, and the concrete transportation status cannot be effectively monitored during transportation, which affects the timeliness of information feedback.

Method used

Design an intelligent mixing station device, including concrete task order filling module, information platform module, production module, early warning module and concrete transportation and monitoring module, to realize automatic ordering and automatic production schedule, real-time monitoring and early warning, and timely feedback of transportation information.

Benefits of technology

It improves the efficiency of concrete production and transportation, reduces the probability of errors, ensures the material reliability and quality stability of the production process, and realizes real-time monitoring of transport vehicles and safety risk prevention.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119623969A_ABST
    Figure CN119623969A_ABST
Patent Text Reader

Abstract

The invention discloses an intelligent mixing station device and an operation method thereof, and the device comprises a concrete task list filling module which is used for placing an order to generate a concrete demand task for pushing; the informatization platform module is used for receiving the concrete demand task pushed by the concrete task list filling module, then generating a production scheduling plan scheme, obtaining a concrete proportion plan scheme and pushing the concrete proportion plan scheme; the production module is used for receiving the proportion plan scheme of the concrete for queuing and proportioning, and after queuing time is up, raw materials of the concrete are fed into a stirrer for stirring according to the proportion to obtain the concrete required by the concrete demand task; the early warning module is used for carrying out early warning reminding on concrete materials and production time in the production process; and the concrete transportation and monitoring module is used for transportation and monitoring of material entering and transportation and route monitoring of concrete. According to the invention, automatic ordering and automatic production scheduling in the whole process can be realized, the efficiency is greatly improved, and the error probability is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of mixing stations and relates to an intelligent mixing station device and an operating method thereof. Background Art

[0002] Railway and highway construction requires a large amount of concrete, which is met by building mixing plants. When concrete is needed for a specific highway section, the mixing plant manager usually goes to the site to coordinate with the mixing plant manager to place an order for the corresponding concrete demand. The mixing plant manager then manually plans and queues the production of the required concrete. The coordination efficiency is slow, which affects the efficiency of queue production. In addition, the material and time control in the production process cannot provide timely warnings. The transportation uses the customer's trucks for entry and delivery. The condition of the transported concrete cannot be effectively monitored during transportation, which affects the timely feedback of concrete transportation information. Summary of the invention

[0003] The technical problem to be solved by the present invention is to provide an intelligent mixing station device and an operation method thereof to solve the problems in the prior art.

[0004] The technical solution adopted by the present invention is: an intelligent mixing station device, comprising: The concrete task order filling module is used to generate concrete demand tasks for ordering the required concrete and push them. The concrete information in the concrete demand tasks includes project name, construction address, construction unit, construction distance, contact information, sand and gravel grading, concrete strength, pouring method, slump, construction location, planned volume, and planned time. The information platform module is used to generate a production scheduling plan after receiving the concrete demand task pushed by the concrete task order filling module, and obtain the concrete mix ratio plan for push; The production module is used to receive the concrete mix ratio plan and queue up for mix ratio. When the queue time is up, the concrete raw materials are sent to the mixer according to the mix ratio to obtain the concrete required by the concrete demand task; The early warning module is used to provide early warning reminders on the materials and production time of concrete during the production process; Concrete transportation and monitoring module is used for the transportation and monitoring of materials entering the site and the transportation of concrete and its route monitoring.

[0005] Furthermore, the above-mentioned mixer is installed in the mixing room, and the discharge port of the mixer extends into the material receiving port arranged on the front side of the mixing room. The feed port of the mixer is connected to the cement conveying pipe, the sand and gravel conveying device, the additive conveying pipe and the water pipe. The sand and gravel input end of the sand and gravel conveying device is provided with a weighing hopper, and the weighing hopper is arranged in the sand and gravel grading workshop arranged on the rear side of the mixing room. The cement conveying pipe and the additive conveying pipe are connected to the cement storage bin and the additive tank, and the water pipe is connected to the water pump.

[0006] Furthermore, the gravel grading workshop is provided with a crushed stone bin and a river sand bin arranged side by side at the rear side. There are multiple gravel bins for stacking gravel of different particle size ranges, and there are multiple river sand bins for stacking river sand. The multiple gravel bins and the multiple river sand bins as well as the gravel bins and the river sand bins are separated by partition walls, and heating coils are arranged in the bottom surfaces of the gravel bins and the river sand bins.

[0007] Furthermore, temperature sensors are arranged above the above-mentioned gravel bin and river sand bin. The temperature sensors are thermocouples. The temperature sensors are placed in heat conduction pipes. A spike portion is provided at the lower end of the heat conduction pipe. The upper end of the heat conduction pipe is fixedly connected to the fixed push plate. The fixed push plate is connected to the sliding plate through two guide rods and a linear bearing. After the two guide rods pass through the sliding plate, the two ends are fixedly connected to a linkage plate. A connecting ear is provided on the front side of the fixed push plate. The connecting ear is fixedly connected to the cylinder rod of the cylinder. The cylinder seat of the fixed push plate is fixedly connected to the sliding plate. The sliding plate is connected to the slider 1 of the vertical linear module. The back of the vertical linear module is fixedly connected to the transition plate. The transition plate is fixedly connected to the slider 2 of the horizontal linear moving module. The horizontal linear moving module is fixedly connected to the crossbeam. The crossbeam is fixedly connected to the track above the two partition walls at both ends through a front and rear walking mechanism. The two partition walls are the two outermost partition walls spanning multiple gravel bins or the two outermost partition walls spanning multiple river sand bins.

[0008] Furthermore, the track is fixedly connected to the partition wall via two channel steel columns, the grooves of the two channel steel columns are arranged opposite to each other, and a heightening baffle is detachably installed between the two channel steel columns.

[0009] Furthermore, the water pipe is connected to a heating device of a mixing station, which includes an air energy heat pump and a hot water tank. The air energy heat pump is provided with a cold water pipe, a hot water pipe and a circulating water pump. The cold water pipe and the hot water pipe are respectively connected to the bottom and the top of the hot water tank. The circulating water pump is connected to the hot water tank. The circulating water pump is installed on the cold water pipe. The hot water tank is connected to the water inlet of the concrete mixing equipment through a concrete water pipe through a water supply pump 1 and a water supply pump 2. The water supply pump 1 is connected to the water supply inlet of the concrete mixing equipment through a concrete water pipe. The water supply pump 2 is respectively connected to the heating coil arranged on the ground of the stockpiling device and the indoor radiator through a geothermal pipe and a heating pipe.

[0010] Furthermore, a coarse steel mesh layer and a fine steel mesh layer are arranged on the upper and lower sides of the heating coil respectively. The heating coil, the coarse steel mesh layer and the fine steel mesh layer are placed in the concrete of the bottom surface to form a reinforced support layer, and a support bar is arranged between the fine steel mesh layer and the foundation.

[0011] Furthermore, the above-mentioned material receiving port is provided with a mixing station vehicle feeding monitoring device, which includes a camera, a display screen and a remote host. The camera is installed on the rear side of the hopper and faces downward, the display screen is installed on the side wall of the material receiving port and faces the side of the driver's seat after the mixer truck reverses, and is installed on the driver's seat of the mixer truck at a height of 1m-1.5m. The camera is connected to the remote host, and the remote host is connected to the display screen. The display screen is used to check whether the discharge hopper of the concrete mixing equipment is aligned with the feed hopper of the mixer truck.

[0012] Furthermore, four thumb screws are provided on the rear side of the display screen, and the four thumb screws are symmetrically arranged up and down and left and right. Two horizontal beams are fixedly connected to the side wall of the material receiving port, and two vertical beams are symmetrically fixedly connected to the front sides of the two horizontal beams. Each vertical beam is provided with two strip holes arranged up and down, and the spacing between the two strip holes corresponding to the two vertical beams is equal to the spacing between the corresponding two thumb screws. The distance between the lower ends of the two strip holes is equal to the spacing between the two thumb screws. A large circular hole is provided on the upper end of each strip hole, and the diameter of the large circular hole is larger than the outer diameter of the large head of the thumb screw. After the four thumb screws are inserted into the large circular hole, they slide into the four strip holes for positioning.

[0013] An operating method of an intelligent mixing station device, the method comprising the following steps: Step 1: The user logs in through the APP and places an order, generates a concrete task order, and pushes the concrete task order to the information platform module; Step 2: The information platform module receives the concrete task order, generates a production scheduling plan based on the concrete information in the concrete demand task, and obtains a concrete mix ratio plan; Step 3: Queue up according to the mix ratio plan. After the queuing time is up, send the raw materials of concrete into the mixer for mixing to obtain the concrete required by the concrete demand task; Step 4: Transport and monitor the prepared concrete. During transportation, dispatch corresponding vehicles according to the concrete demand task order, and monitor the real-time position, operating status, delivery point, driving speed, and operating trajectory of the vehicle. Integrate the driving recorder to monitor whether the vehicle is speeding, identify the road conditions, as well as the vehicle's operating dynamics, unloading and loading conditions.

[0014] Beneficial effects of the present invention: Compared with the prior art, the effects are as follows: (1) The present invention can realize automatic order placement and automatic production scheduling throughout the entire process, greatly improving efficiency and reducing the probability of errors. It can also provide early warning of material information and production time during the production process to replenish materials or replace mixers in time, thereby improving material reliability and production quality stability during the production process. It can also collect information and monitor transportation of vehicles in real time, realize rapid and orderly deployment of vehicles, greatly improve work efficiency, ensure orderly production, and control the real-time location, operating status, distribution work points, driving speed, and operating trajectory of transportation vehicles at any time. It can also integrate driving recorders to monitor whether vehicles are speeding, identify road conditions, and prevent driving safety risks. It can also replay driving trajectories through GPS maps. It can display the operating dynamics, unloading, loading, and driving of each transportation vehicle in real time, making scheduling easy. (2) Install heating coils on the bottom surface to heat and insulate the stacked sand and gravel. Heat the sand and gravel to a temperature that meets the requirements of concrete and then add them to the mixing equipment to mix them into concrete, thereby improving the performance of concrete at low temperatures and avoiding significant impact on the performance of concrete due to excessively low temperatures. (3) By controlling the temperature sensor to measure multiple points in each bin where sand and gravel are piled, measurements at different positions and depths can be achieved, which is conducive to taking the average of multiple values ​​of each sand and gravel bin as the evaluation value, making the measurement more accurate, the linear module moves, and the moving distance is accurate and stable. The spike part is used to guide the insertion to avoid damage to the heat pipe and increase the service life of the heat pipe. The temperature sensor of the thermocouple is protected by the heat pipe, which can also increase the service life of the thermocouple and avoid the problem of damage caused by direct insertion of sand and gravel. The fixed push plate supported by the double guide rod is pushed by the cylinder, and the thermocouple moves to achieve smooth insertion. The linear module is also convenient for the cylinder to lift, avoiding collision with the partition wall in the two sand and gravel bins due to being too low; (4) The use of two channel steel columns can greatly improve the support stability of the track, and the channel steel columns can realize the heightening operation, which is easy and convenient. The two ends of the heightening baffle 125 fit tightly in the groove, and the adjacent two heightening baffles are respectively provided with a slot and a convex splicing to improve the sealing and support stability; (5) The hot water tank is heated by an air energy heat pump, and a water pump is used to heat the geothermal heating coil and radiator, as well as to add water used in the concrete mixing process. The heating coil ensures that the temperature of the sand and gravel can reach the set temperature range for addition, and the added water can also reach the set temperature range for addition, which can ensure the performance quality of the final mixed concrete and avoid affecting the construction and final casting quality. In addition, the radiator provides heating, realizing the versatility of the heat pump. The air pump heat pump combines the cold and heat sources in one, and there is no need to set up a special refrigeration room or boiler room. The unit can be placed on the roof or the ground at will, does not occupy the effective use area of ​​the building, and is very simple to construct and install; (6) The coarse steel mesh layer and the fine steel mesh layer can better balance the load on the heating coil during use, distribute the force evenly, avoid local damage caused by stress concentration, improve the safety of the heating coil during use, prevent trucks from entering and crushing the heating coil, and set support bars to facilitate the filling and compaction of concrete onto the foundation; (7) By installing a camera on the rear side of the discharge hopper to capture whether the discharge hopper is aligned with the feed hopper of the mixer truck, and transmitting the video to the display screen installed on the side wall on the side of the driver's seat, the driver can directly observe the situation and then park or continue the reverse operation without additional instructions from others, saving time and effort, improving safety, and making parking more convenient and quick; (8) After aligning the four large round holes with the four big screws and pushing them inwards, they slide downwards and rely on the four big screws to clamp on the four strip holes to achieve positioning. The installation is convenient and quick, and the structural support is stable and reliable. The two horizontal beams play the role of supporting the suspension, which is convenient for giving space for the big heads of the big screws. On the other hand, it is also convenient to install the display screen. Together with the two vertical beams, they form the entire supporting structure, a frame structure, light weight, and stable and reliable support. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 This is a schematic diagram of the principle structure of the intelligent mixing station device; Figure 2 is a schematic diagram of a top view of a stacking device with a heating function; Figure 3 It is a schematic diagram of the front structure of a single bin of a stacking device with a heating function; Figure 4 It is a schematic diagram of the side structure of a single bin of a stacking device with a heating function; Figure 5 This is a schematic diagram of the heating connection structure for the heating coil; Figure 6 It is a schematic diagram of the cross-sectional structure of the heating coil arrangement; Figure 7 This is a schematic diagram of the heating device structure of the mixing station; Figure 8 It is a side view structural diagram of the vehicle feeding monitoring device of the mixing station; Fig. 9 This is a front view structural diagram of the vehicle feeding monitoring device of the mixing station; Fig.10 This is a schematic diagram of the structure where the display screen is installed; Fig.11 This is a schematic diagram of the vertical beam structure; Fig.12 It is a structural schematic diagram of a cement feeding port structure with a misplacement function; Fig.13 Schematic diagram of the structure installation to prevent wrong connection; Fig.14 This is a structural diagram of the cement feed port connecting to the unloading cement pipeline; Fig.15 It is a schematic diagram of the end surface structure of an annular connecting disk. DETAILED DESCRIPTION

[0016] The invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0017] Example 1: Figure 1 to Figure 15 As shown, an intelligent mixing station device includes: The concrete task order filling module is used to generate concrete demand tasks for ordering the required concrete and push them. The concrete information in the concrete demand tasks includes project name, construction address, construction unit, construction distance, contact information, sand and gravel grading, concrete strength, pouring method, slump, construction location, planned volume, and planned time. The information platform module is used to generate a production scheduling plan after receiving the concrete demand task pushed by the concrete task order filling module, and obtain the concrete mix ratio plan for push; The production module is used to receive the concrete mix ratio plan and queue up for mix ratio. When the queue time is up, the concrete raw materials are sent to the mixer according to the mix ratio to obtain the concrete required by the concrete demand task; The early warning module is used to provide early warning reminders on the materials and production time of concrete during the production process; Concrete transportation and monitoring module is used for the transportation and monitoring of materials entering the site and the transportation of concrete and its route monitoring.

[0018] The information platform module is also connected to an automatic bill storage and retrieval system, which collects the QR code of the concrete production task order of the integrated information platform in real time. The bills are automatically classified and archived by scanning the QR code, replacing manual sorting of bills and effectively reducing labor costs.

[0019] The concrete transportation and monitoring module is also equipped with a vehicle intelligent queuing module, which is also connected to the vehicle entry and exit. The vehicle intelligent queuing module queues the delivery vehicles required to transport concrete at each construction site according to the production tasks and the time of the production tasks. After observing the queuing time through the mobile phone APP, it waits for the right time to enter the mixing station. Concrete transportation vehicles enter the station using a scale + license plate recognition + display screen + voice prompt device. There is no need to stop, and they can automatically punch in and out. The electronic LED display screen and automatic voice prompts ensure fair and just vehicle scheduling. The key project priority sorting module set in the production module automatically prioritizes the production of key projects to ensure the supply of concrete for key projects, reducing the workload of dispatchers, and greatly improving work efficiency and quality. The concrete transportation and monitoring module is also equipped with a GPS intelligent navigation and positioning system, which can accurately determine the position of concrete transportation vehicles. The location, distribution work point, operation status and driving trajectory are clearly visible; the electronic fence and driving record are integrated to monitor the vehicle in real time and warn of violations to ensure transportation safety, improve transportation efficiency and reduce supply interruptions; the production module is also equipped with a powder intelligent monitoring system, which uses patch sensors, 4G mobile terminals and other technologies to monitor the weight of the remaining material in the silo, the material level, pipe lock and alarm status in real time and upload them to the information platform module, and automatically displays the corresponding silo material status through the human-machine material dynamic display module set in the information platform module, which can intuitively understand the status of each silo, and display the warning level through dynamic color changes (red material level is warning, yellow material level is reminder, green material level is normal status), and then remind to add materials, and can also carry out expected material planning and transportation according to the data, replacing the traditional manual knocking of cans, effectively preventing feed explosion and production interruption; automatically generate analysis reports to provide accurate data support for material management and reduce process management costs.

[0020] The information platform module can be used for concrete raw materials to enter the station after passing the vehicle inspection. After the transport vehicle enters the weighbridge, the driver scans the code on the guidance screen to enter the material information. The system intelligently distributes and displays the guidance information, automatically opens the aggregate silo gate or the powder storage control valve, and the driver self-services to accurately find the silo and unload the materials according to the guidance information. At the same time, the smart center uses the video monitoring system for real-time control to achieve automatic collection and processing of the entire process from automatic vehicle identification, accurate weighing, material distribution, and guided unloading, avoiding human intervention and ensuring data accuracy. The automatic silo access control system set up by the information platform module can only open the gate after the raw materials are inspected and qualified, to prevent the mixing of raw materials in the silo and the use of raw materials before inspection.

[0021] The mixing station actively practices the concept of green environmental protection, creates practical results with intelligence, and strives to create a model of green and low-carbon construction. The mixing station adopts fully enclosed management, and a fully automatic door-type car wash machine is installed at the entrance and exit to ensure that mud does not enter the station and dust does not leave the station; the station is equipped with an online dust monitoring system to monitor various indicators in real time; through the outdoor dust suppression system, the high-pole rotating spray pile is remotely controlled in a timed and cyclic manner to minimize dust; the silo is fully covered with automatic induction spray devices, and dust monitoring exceeds the standard, and spraying is automatically carried out to reduce dust, which greatly improves the production environment and ensures the quality of concrete entities.

[0022] The mixing station of the present invention applies mobile Internet, Internet of Things, cloud computing, big data and other technical means, and fully studies and integrates production control systems, distribution management systems, weighbridge information management systems, vehicle information management systems, monitoring systems, early warning systems, etc., in order to form a seamless integrated information management platform, comprehensively upgrade the interaction mode, working method and management mode of traditional mixing station on-site management, promote the standardization, standardization, intelligence and informatization of mixing station management, help managers break through information communication barriers, and timely and accurately grasp the operation of concrete production and distribution, raw material supply, equipment and personnel, etc., to achieve end-to-end communication, improve work efficiency and reduce production costs.

[0023] The mixing station first collected information and data based on the characteristics of the concrete mixing station on the construction site; carefully analyzed the concrete supply situation of the Xiongxin High-speed Railway Mixing Station; classified and summarized the difficulties faced by the mixing station in concrete production, mixing, transportation, material management, roads, etc., and finally formed a set of overall solutions to resolve the contradiction between supply and demand between concrete mixing station production and on-site construction, scientifically and rationally allocate concrete transport vehicles, accurately grasp the operation dynamics of vehicles on construction access roads and construction sites, and grasp the use of concrete raw materials, to ensure high-quality and efficient delivery of concrete to the construction site.

[0024] The mixing station is equipped with an information-based dispatching and command center to fully realize information management. The information-based production and distribution control technology of the concrete mixing station is based on the traditional concrete production and distribution model, with the information management system as the center, and fully studies and integrates the production control system, the weighbridge information management system, the vehicle information management system (monitoring, queuing, fuel consumption), the monitoring system, the early warning system, etc., in order to form a seamless integrated information management platform.

[0025] Information management of the whole process: 1) Realization of information-based mobile office. The corresponding functions of the APP are tailored for the mixing station at the mountain construction site, and users can download and install it through the mobile application store. From concrete application, production, transportation, to real-time monitoring of raw materials, fuel consumption, and vehicles, etc., it can all be completed on the mobile phone, truly realizing mobile office, responding to complex production scenes at any time, and improving work efficiency.

[0026] 2) Quick and orderly ordering via mobile APP. On-site construction personnel directly create a concrete application form through the mobile APP (similar to ordering food in a restaurant), which is transmitted to the computer of the dispatching command center of the mixing station and the mobile APP of relevant personnel through the network. The laboratory issues a "Concrete Construction Ingredients Notice" and pushes it to the industrial computer of the mixing plant to produce concrete.

[0027] Concrete production pre-scheduling system: According to the characteristics of concrete construction on the construction site, the concrete production pre-scheduling system can be customized to achieve priority supply for key construction sites. The system can automatically identify the "production task list" of concrete for important parts such as "jetting, underwater piles", and prioritize it to the "pending production status" without waiting in line (similar to bank VIP customers), which not only improves work efficiency, but also reduces the probability of errors, and supports real-time viewing of production progress to ensure efficient operation of concrete from planning, production, distribution and other links.

[0028] The whole process monitoring module of transport vehicles: Rapid and orderly deployment of vehicles: Using ETC vehicle identification technology and LED queuing system, transport vehicles can automatically queue and call numbers (similar to the queuing and calling system of banks), which greatly improves work efficiency and ensures orderly production; Dispatchers at the mixing station can easily deploy vehicles through the computer of the smart center or mobile phone APP. Real-time control of vehicle status: All vehicles have been installed with GPS terminals to monitor the real-time location, operation status, distribution work points, driving speed, operation trajectory, etc. of transport vehicles at any time, and integrate driving recorders to monitor whether the vehicle is speeding, identify the road conditions, and prevent driving safety risks; driving trajectories can also be replayed through GPS maps; real-time display of the operation dynamics, unloading, loading, driving, etc. of each transport vehicle, easy dispatch; set up smart ticket cabinets: The smart terminal of the "Smart Dispatching and Logistics System" designed for mixing stations has self-service ticket return and automatic sorting functions. The driver can operate it by himself throughout the process, which completely liberates manual ticket collection and sorting, and reduces the workload of statisticians.

[0029] The material human-machine interaction module allows for a clear view of the raw material inventory. Each powder tank of the mixer is equipped with a patch sensor to automatically weigh the material in the powder tank and transmit it to the material display screen. The management personnel can determine the feeding time and quantity based on the concrete demand plan of the construction site, so that production will not be interrupted due to "lack of materials" and the smooth progress of concrete construction on the construction site is guaranteed. The intelligent floor scale system is integrated with the information management system. Any area within the scope of authority can be directly connected to the network for weighing, and the quality of raw materials and vehicle license plates can be captured on site, and uploaded to the network server for storage in real time to analyze the quality and quantity of raw materials, realize traceability, and eliminate management loopholes.

[0030] The information platform module is also equipped with a production progress interaction module, which can control the production progress in real time. 1) Volume query module in the production progress interaction module: On-site personnel can query the production volume statistics table and production volume daily report through computers or mobile phone APP, easily grasp the real-time volume of each work point, and provide decision-making basis for site managers. In the past, it was necessary to query the computer through the dispatcher or statistician, and it was difficult to query the real-time volume; 2) Progress query module in the production progress interaction module: Managers at all levels can query the planned volume and completed volume of concrete at each work point through computers or mobile phone APP, understand the completion progress percentage of each concrete demand part, control the concrete construction progress in real time, and provide decision-making basis for the next step of construction production planning.

[0031] The road navigation map drawing module set in the whole process monitoring module of transport vehicles: the concrete transportation roads and construction sites of the construction site mixing station are basically newly built and not displayed on the existing GPS map, which has caused great difficulties in the dispatching and monitoring of concrete mixing transportation vehicles. In order to solve this problem, the system has specially added a map drawing function, that is, accurately drawing the location of the mixing station, the construction site road, the construction site, etc. on the existing GPS map, so that the concrete production, transportation, and construction are fully controllable.

[0032] Furthermore, the above-mentioned mixer is installed in the mixing room, and the discharge port of the mixer extends into the material receiving port arranged on the front side of the mixing room. The feed port of the mixer is connected to the cement conveying pipe, the sand and gravel conveying device, the additive conveying pipe and the water pipe. The sand and gravel input end of the sand and gravel conveying device is provided with a weighing hopper, and the weighing hopper is arranged in the sand and gravel grading workshop arranged on the rear side of the mixing room. The cement conveying pipe and the additive conveying pipe are connected to the cement storage bin and the additive tank, and the water pipe is connected to the water pump.

[0033] Among them, Figure 2-6 As shown, a crushed stone bin 101 and a river sand bin 102 are arranged side by side at the rear side of the sand and gravel grading workshop. There are multiple crushed stone bins 101 for stacking crushed stones of different particle size ranges, and there are multiple river sand bins 102 for stacking river sand. The multiple crushed stone bins 101 and the multiple river sand bins 102 as well as the crushed stone bins 101 and the river sand bins 102 are isolated by partition walls 103. Heating coils 105 are arranged in the bottom surfaces of the crushed stone bins 101 and the river sand bins 102. The heating coils installed on the bottom surfaces can heat and insulate the stacked sand and gravel, heat them to a temperature range that meets the requirements of concrete, and then add them to the mixing equipment to mix them into concrete, thereby improving the performance of the concrete at low temperatures and avoiding a significant impact on the performance of the concrete due to excessively low temperatures.

[0034] In order to improve the safety of the heating coil during use and prevent trucks from entering and crushing the heating coil, a coarse steel mesh layer 128 and a fine steel mesh layer 129 are arranged on the upper and lower sides of the heating coil 105 respectively. The heating coil 105, the coarse steel mesh layer 128 and the fine steel mesh layer 129 are placed in the concrete on the bottom surface. The coarse steel mesh layer 28 and the fine steel mesh layer 129 can better balance the force during use of the heating coil, distribute the force evenly, and avoid local damage caused by stress concentration. A support bar 131 is arranged between the fine steel mesh layer 129 and the foundation 130 to facilitate the filling of concrete onto the foundation 130. The concrete poured for the heating coil 105 is a layer of concrete poured later, forming an integrated structure with the foundation 130.

[0035] After the sand and gravel are heated, in order to facilitate temperature measurement, temperature sensors 106 are arranged above the gravel bin 101 and the river sand bin 102. The temperature sensor 106 adopts a thermocouple. The temperature sensor 106 is placed in the heat conduction pipe 7. The lower end of the heat conduction pipe 107 is provided with a spike portion 108. The upper end of the heat conduction pipe 107 is fixedly connected to the fixed push plate 8. The fixed push plate 108 is connected to the L-shaped sliding plate 111 through two guide rods 109 and a linear bearing 110. The two guide rods 109 pass through the sliding plate 111. The two rear ends are fixedly connected with linkage plates 112, a connecting ear 113 is provided on the front side of the fixed push plate 108, the connecting ear 113 is fixedly connected to the cylinder rod of the cylinder 114, the cylinder seat of the fixed push plate 108 is fixedly connected to the sliding plate 111, the sliding plate 111 is connected to the slider 116 of the vertical linear module 115, the back of the vertical linear module 115 is fixedly connected to the transition plate 116, the transition plate 116 is fixedly connected to the slider 2 of the horizontal linear moving module 117, and the horizontal linear moving module 117 is fixedly connected to the slider 116 of the horizontal linear moving module 117. The crossbeam 118 is fixedly connected to the crossbeam 118 at both ends and is connected to the track 120 above the two partition walls 103 through the front and rear walking mechanism 119. The two partition walls 103 are two partition walls spanning the outermost sides of multiple gravel bins 101 or the outermost sides of multiple river sand bins 102. By controlling the temperature sensor, multiple points are measured in each bin where sand and gravel are piled, so as to realize the measurement of different positions and different depths, which is conducive to taking the average value of multiple values ​​of each sand and gravel bin as the evaluation value, and the measurement is more accurate. The linear module moves, and the moving distance is accurate and stable. The insertion is guided by the spike part to avoid damage to the heat pipe and improve the service life of the heat pipe. The temperature sensor of the thermocouple is protected by the heat pipe, which can also improve the service life of the thermocouple and avoid the problem of damage caused by direct insertion of sand and gravel. The fixed push plate supported by the double guide rod is pushed by the cylinder, and the thermocouple moves to realize smooth insertion. The linear module is also convenient for the cylinder to lift, so as to avoid collision with the partition wall in the two sand and gravel bins due to being too low.

[0036] In order to avoid waste of water resources, the heating coils 105 arranged under each gravel bin 101 and each river sand bin 102 are connected in parallel to the main pipe 121. The main pipe 121 is connected to the water pump 122 and the hot water tank 123 through a circulation pipeline. The hot water tank 123 is equipped with a heating device. The water resources are circulated back and forth through circulation to avoid waste of water resources and energy, reduce costs, and independently heat. The main pipe 121 includes an inlet main pipe and an outlet main pipe. The heating coils of each bin are connected to the main pipe 121 to realize independent circulation connection of the single bin. In order to facilitate independent control, electric valves are installed on the inlet main pipe and the outlet main pipe.

[0037] In order to simplify the supporting structure and stabilize the support, the track 120 is fixedly connected to the partition wall 125 by two channel steel columns 124. The grooves of the two channel steel columns 124 are arranged relatively to each other, and a heightening baffle 125 is detachably installed between the two channel steel columns 124. The use of two channel steel columns can greatly improve the supporting stability of the track, and the channel steel columns can realize the heightening operation, which is easy and convenient. The two ends of the heightening baffle 125 fit tightly in the grooves, and the joints of two adjacent heightening baffles are respectively provided with slots and protrusions to improve the sealing and support stability.

[0038] In order to avoid adding sand and gravel incorrectly, gate machines 126 are set on the discharge sides of the crushed stone bin 101 and the river sand bin 102. When sand and gravel from the corresponding sand and gravel bin are needed, the gate machines are opened and a forklift enters to transfer materials to avoid promoting the material site and causing incorrect sand and gravel grading of concrete.

[0039] In order to facilitate real-time and approximate assessment of the amount of sand and gravel stored, length scales and multiple height scales are set on both sides of the partition wall 103. The multiple height scales are evenly arranged along the front and rear directions. According to the height scale and the length scale, and the width of the sand and gravel bin is known, the specific cubic meter of the sand and gravel can be roughly assessed.

[0040] In order to facilitate understanding of the basic conditions of the sand and gravel bin, each crushed stone bin 101 and river sand bin 102 is equipped with a display screen 127, which is installed on the partition wall 103 and is used to display aggregate type, particle size, remaining sand and gravel amount and temperature.

[0041] Among them, Figure 7As shown, the water pipe is connected to the heating device of the mixing station. The heating device of the mixing station includes an air energy heat pump 201 and a hot water tank 202. The air energy heat pump 201 is provided with a cold water pipe 203, a hot water pipe 204 and a circulating water pump 205. The cold water pipe 203 and the hot water pipe 204 are respectively connected to the bottom and the top of the hot water tank 202. The circulating water pump 203 is connected to the hot water tank 202. The circulating water pump 205 is installed on the cold water pipe 203. The hot water tank 202 is connected to the water inlet of the concrete mixing equipment 209 through the concrete water pipe 208. The water supply pump 207 is respectively connected to the pile loading equipment 209 through the geothermal pipe 210 and the heating pipe 213. The heating coil 211 and indoor radiator 212 arranged on the ground are used to heat the hot water tank through the air energy heat pump, and the geothermal heating coil and radiator are heated by a water pump, as well as the water used in the concrete mixing process is added. The heating coil ensures that the temperature of the sand and gravel can reach the set temperature range for addition, and the added water can also reach the set temperature range for addition, which can ensure the performance quality of the final mixed concrete and avoid affecting the construction and final pouring and molding quality. In addition, the radiator provides heating, realizing the versatility of the heat pump. The air pump and heat pump combine the cold and heat sources in one, and there is no need to set up a special refrigeration room or boiler room. The unit can be placed on the roof or the ground at will, does not occupy the effective use area of ​​the building, and is very convenient to construct and install.

[0042] The working principle of air energy heat pump is to use the heat pump principle to consume part of the electric energy to obtain heat from the surrounding environment, transport it to the condenser through the compressor, and release it to the water in the water tank to heat it. Its energy efficiency is more than 3 times higher than that of traditional electric water heaters. It is a new type of high-efficiency, energy-saving and environmentally friendly hot water product. When the unit is running in summer, it uses refrigeration cycle to cool the water (coolant), and in winter, it uses heat pump cycle to heat the water. The cold (hot) water is pumped to various predetermined places, thereby achieving the purpose of transporting cold (heat).

[0043] A heating coil 211 is installed on the bottom surface of the silo 241 to heat and insulate the stacked sand and gravel. The sand and gravel are heated to a temperature range that meets the requirements of concrete and then added to the mixing equipment to be mixed into concrete, thereby improving the performance of the concrete at low temperatures and avoiding significant impact on the performance of the concrete due to excessively low temperatures.

[0044] In order to reduce the possibility of damage to the pipeline interface caused by long-term vibration of the circulating water pump, the circulating water pump 205 is connected to the ground through a shock-absorbing mechanism, which can reduce the vibration of the circulating water pump.

[0045] Furthermore, a water tank temperature sensor 214 is installed in the hot water tank 202 , and a water supply pipe 215 and a water level sensor 216 are installed on the top of the hot water tank 202 .

[0046] Among them, Figure 8-11 As shown, the material receiving port is provided with a mixing station vehicle feeding monitoring device, which includes a camera 301, a display screen 302 and a remote host 303. The camera 301 is installed at the rear side of the hopper 304 and faces downward. The display screen 302 is installed on the side wall of the material receiving port 314 and faces the driver's seat side after the mixer truck reverses. The height direction is 1m-1.5m installed on the driver's seat of the mixer truck. The camera 301 is connected to the remote host 303, and the remote host 303 is connected to the display screen 302. The display screen 302 is used to check whether the discharge hopper 304 of the concrete mixing equipment is aligned with the feed hopper of the mixer truck; by installing a camera at the rear side of the discharge hopper to shoot whether the discharge hopper is aligned with the feed hopper of the mixer truck, and transmitting the video to the display screen installed on the side wall on the side of the driver's seat, the driver can directly observe the situation, and then stop or continue the reverse operation without additional instructions from others, which saves time and effort, is safer, and is more convenient and quick to park.

[0047] In order to better serve as a warning, a vehicle feeding monitoring device for a mixing station also includes an alarm bell 305. The alarm bell 305 is installed on the side wall of a material receiving port 314 on one side of a display screen 302. The alarm bell 305 is connected to a remote host 303. When the background monitoring personnel finds that the vehicle has stopped in place through a camera, the alarm bell rings to give a prompt, which has a better prompt effect, double protection, and better safety.

[0048] In order to facilitate the installation of the display screen, four thumb screws 306 are arranged on the back side of the display screen 302, and the four thumb screws 306 are symmetrically arranged up and down and left and right. Two cross beams 307 are fixedly connected to the side wall of the material receiving port 314, and two vertical beams 308 are symmetrically fixedly connected to the front side of the two cross beams 307 by bolts. Each vertical beam 308 is provided with two strip holes 309 arranged up and down, and the distance between the two strip holes 309 corresponding to the two vertical beams 308 is equal to the distance between the corresponding two thumb screws 306, and the distance between the lower ends of the two strip holes 309 is equal to the distance between the two thumb screws 306. A large circular hole 310 is provided on the upper end of each strip hole 309. The diameter of the large circular hole 310 is larger than the outer diameter of the big head of the thumb screw 306. The four thumb screws 30 6 is inserted into the large circular hole 310 and then slides down to the four strip holes 309 for positioning. After the four thumb screws are aligned with the four large circular holes and pushed inwards to the position, it slides downward and is positioned by being stuck on the four strip holes with the four thumb screws. The installation is convenient and quick, and the structural support is stable and reliable. The two horizontal beams play the role of supporting the suspension, which is convenient for giving the big heads of the thumb screws a retreat space. On the other hand, it is also convenient for installing the display screen, and the two vertical beams constitute the entire supporting structure, a frame structure, which is light in weight and has stable and reliable support. The four thumb screws 306 are connected to the boss set on the back of the display screen 302. The distance between the thumb screws and the boss is controlled to meet the thickness of the vertical beam. The installation is more stable, the contact surface is reduced, and it is also more conducive to the thumb screws being stuck in the strip holes of the vertical beam.

[0049] In order to further provide safety reminders, a vehicle feeding monitoring device for a mixing station also includes two distance sensors 312 installed on the rear side wall of a material receiving port 314. The two distance sensors 312 are connected to a remote host via a signal processor. The distance sensors are used to monitor whether the mixer truck is in place. If the set distance is reached, a reminder is given. Using two distance sensors, the largest one is read, which is more conducive to monitoring without blind spots.

[0050] In order to provide better directional reversing prompts, two wheel grooves 311 are set on the ground of the material receiving port 314. The wheels of the mixer truck can be retracted along the two wheel grooves 311 and reversed in a directional manner. With the help of distance sensors, the monitoring is more accurate.

[0051] The feed inlet of the feeding device connected to the cement storage bin is provided with a cement feeding inlet structure with a misplacement function, such as Figure 12-15As shown, the specific structure includes two cement feed ports 401 grouped side by side, and each cement feed port 401 is provided with an anti-wrong connection structure, and the anti-wrong connection structure includes a baffle plate 402, and the baffle plate 402 is an L-shaped structure, and one end is fixedly connected to the motor shaft 404 of the driving motor 403. After the baffle plate 402 rotates, the vertical plate at the other end can be located in front of the end of the cement feed port 401, and the driving motor 403 is fixedly connected to the base 406 set on the upper side of the pipe of the cement feed port 401 through the motor frame 405. The motor frame 405 is a "∕"-shaped structure, and its slotted side faces the end direction of the cement feed port 401. The length of the baffle plate 402 can be satisfied that it will not interfere with the pipe end of the cement feed port 401 during rotation.

[0052] In order to facilitate the direct driving of the baffle plate to rotate, the motor shaft 404 is set as a square rod, and the baffle plate 402 is provided with a square hole 407. The square hole 407 is sleeved on the motor shaft 404, and a thrust bearing 408 is arranged below the square hole 407. The thrust bearing 408 is sleeved on the small shaft at the end of the motor shaft and rests against the bottom plate of the motor frame and the bottom of the baffle plate respectively. The square shaft is matched with the square hole, and the baffle plate can be driven to rotate by direct rotation, which reduces the complexity of equipment connection. A thrust bearing is added to prevent the baffle plate from contacting the lower structure and causing poor rotation or jamming.

[0053] In order to protect the driving motor from rain, a cement feeding port structure with a misplacement function also includes a box body 409, which covers two cement feeding ports 401 arranged side by side, and is provided with a door 410 facing outward, one side of the door 410 is connected to the left side of the front end face of the door 410 by a hinge, and the other side of the door 410 is connected to the door 410 by a lock, the inner side of the box body 409 is opened and fits on the wall 419, and the bottom of the box body 409 is connected to the ground by a supporting leg 411. After the box body is installed, rainwater can be effectively prevented from flowing into the driving motor, and after the box body is installed, the surface of the box body is sprayed with red and white paint, which reduces the possibility of collision when people walk, and is safer.

[0054] In order to facilitate the connection of the unloading cement pipeline to the cement feed port 401, the pipeline of the cement feed port 401 is provided with an annular connecting plate 1 412, and the outer end surface of the annular connecting plate 1 412 is provided with two axially symmetrical L-shaped cross-section grooves 413, and the grooves 413 are an annular structure coaxial with the pipeline. The end of the cement unloading pipe 414 docking with the cement feed port 401 is provided with an annular connecting plate 2 18, and the end surface of the annular connecting plate 2 18 is provided with two L-shaped connecting tongues 415 whose axes match the grooves 413 to prevent them from falling off. A large notch 416 is provided at the starting end of the groove 413. The tongue 415 is inserted from the large notch 416 and then rotated to connect the annular connecting plate 1 412 with the annular connecting plate 2 418, such as Fig.15As shown, by docking the two tongues to the large notch and then rotating counterclockwise, the pipe can be connected to prevent it from falling off. Moreover, the inner diameter of the unloading cement pipe is slightly larger than the cement feed port 401, which can play a role in preliminary radial positioning and is more conducive to being inserted into the large notch and then rotated into the L-shaped slot to prevent it from falling off, effectively avoiding the time-consuming and labor-intensive problems caused by the existing connection through clamps or other fixing methods.

[0055] In order to improve the sealing of the connection and prevent cement dust from spraying out from the gap, a sealing rubber gasket 417 is arranged between the annular connecting plate 1 412 and the annular connecting plate 2 418. The sealing rubber gasket plays an elastic sealing role on the one hand, and on the other hand, it can also play the role of a spring to make the connection between the annular connecting plate 1 412 and the annular connecting plate 2 18 more stable.

[0056] Embodiment 2: An operation method of an intelligent mixing station device, the method comprising the following steps: Step 1: The user logs in through the APP and places an order, generates a concrete task order, and pushes the concrete task order to the information platform module; Step 2: The information platform module receives the concrete task order, generates a production scheduling plan based on the concrete information in the concrete demand task, and obtains a concrete mix ratio plan; Step 3: Queue up according to the mix ratio plan. After the queuing time is up, send the raw materials of concrete into the mixer for mixing to obtain the concrete required by the concrete demand task; Step 4: Transport and monitor the prepared concrete. During transportation, dispatch corresponding vehicles according to the concrete demand task order, and monitor the real-time position, operating status, delivery point, driving speed, and operating trajectory of the vehicle. Integrate the driving recorder to monitor whether the vehicle is speeding, identify the road conditions, as well as the vehicle's operating dynamics, unloading and loading conditions.

[0057] The above description is only a specific implementation mode of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims

1. An intelligent mixing station device, characterized in that: include, The concrete task order filling module is used to generate concrete demand tasks for ordering the required concrete and push them. The concrete information in the concrete demand tasks includes project name, construction address, construction unit, construction distance, contact information, sand and gravel grading, concrete strength, pouring method, slump, construction location, planned volume, and planned time. The information platform module is used to generate a production scheduling plan after receiving the concrete demand task pushed by the concrete task order filling module, and obtain the concrete mix ratio plan for push; The production module is used to receive the concrete mix ratio plan and queue up for mix ratio. When the queue time is up, the concrete raw materials are sent to the mixer according to the mix ratio to obtain the concrete required by the concrete demand task; The early warning module is used to provide early warning reminders on the materials and production time of concrete during the production process; Concrete transportation and monitoring module is used for the transportation and monitoring of materials entering the site and the transportation of concrete and its route monitoring.

2. The intelligent mixing station device according to claim 1, characterized in that: The mixer is installed in the mixing room, and the discharge port of the mixer extends into the receiving port set at the front side of the mixing room. The feed port of the mixer is connected to the cement conveying pipe, the sand and gravel conveying device, the additive conveying pipe and the water pipe. The sand and gravel input end of the sand and gravel conveying device is provided with a weighing hopper, and the weighing hopper is arranged in the sand and gravel grading workshop set at the rear side of the mixing room. The cement conveying pipe and the additive conveying pipe are connected to the cement storage bin and the additive tank, and the water pipe is connected to the water pump.

3. The intelligent mixing station device according to claim 2, characterized in that: A crushed stone bin (101) and a river sand bin (102) arranged side by side are arranged at the rear side of the gravel grading workshop. A plurality of crushed stone bins (101) are used to stack crushed stones of different particle size ranges. A plurality of river sand bins (102) are used to stack river sand. The plurality of crushed stone bins (101) and the plurality of river sand bins (102) as well as the crushed stone bins (1) and the river sand bins (2) are separated by partition walls (103). Heating coils (105) are arranged on the bottom surfaces of the crushed stone bins (101) and the river sand bins (102).

4. The intelligent mixing station device according to claim 3, characterized in that: A coarse steel mesh layer (28) and a fine steel mesh layer (29) are arranged on the upper side and the lower side of the heating coil (5), respectively. The heating coil (5), the coarse steel mesh layer (28) and the fine steel mesh layer (29) are placed in the concrete of the bottom surface to form a reinforced support layer. A support bar (31) is arranged between the fine steel mesh layer (29) and the foundation (30).

5. The intelligent mixing station device according to claim 3 is characterized in that: Temperature sensors (106) are arranged above the gravel bin (101) and the river sand bin (102). The temperature sensors (106) are thermocouples. The temperature sensors (106) are placed in a heat conducting pipe (107). A spike portion (108) is provided at the lower end of the heat conducting pipe (107). The upper end of the heat conducting pipe (107) is fixedly connected to a fixed push plate (108). The fixed push plate (108) is connected to a sliding plate (111) via two guide rods (109) and a linear bearing (110). After the two guide rods (109) pass through the sliding plate (111), the two ends of the two guide rods (109) are fixedly connected to a linkage plate (112). A connecting ear (113) is provided on the front side of the fixed push plate (108). The connecting ear (113) is fixedly connected to the cylinder rod of the cylinder (114). The cylinder seat of the fixed push plate (108) is fixedly connected to the sliding plate (111), the sliding plate (111) is connected to the slider 1 (116) of the vertical linear module (115), the back of the vertical linear module (115) is fixedly connected to the transition plate (116), the transition plate (116) is fixedly connected to the slider 2 of the horizontal linear moving module (117), the horizontal linear moving module (117) is fixedly connected to the crossbeam (118), the crossbeam (118) is fixedly connected at both ends to the track (120) above the two partition walls (103) through the front and rear walking mechanism (119), and the two partition walls (103) are the two outermost partition walls spanning the multiple crushed stone bins (101) or the two outermost partition walls spanning the multiple river sand bins (102).

6. The intelligent mixing station device according to claim 5, characterized in that: The track (120) is fixedly connected to the partition wall (125) via two channel steel columns (124). The grooves of the two channel steel columns (124) are arranged opposite to each other. A heightening baffle (125) is detachably mounted between the two channel steel columns (124).

7. The intelligent mixing station device according to claim 3 is characterized in that: The water pipe is connected to a heating device of the mixing station. The heating device of the mixing station includes an air energy heat pump (201) and a hot water tank (202). The air energy heat pump (201) is provided with a cold water pipe (203), a hot water pipe (204) and a circulating water pump (205). The cold water pipe (203) and the hot water pipe (204) are respectively connected to the bottom and the top of the hot water tank (202). The circulating water pump (203) is connected to the hot water tank (202). The circulating water pump (205) is installed On the cold water pipe (203), the hot water tank (202) is connected to the water supply pump 1 (206) and the water supply pump 2 (207). The water supply pump 1 (206) is connected to the water inlet of the concrete mixing equipment (209) through the concrete water pipe (208). The water supply pump 2 (207) is connected to the heating coil (211) arranged on the ground of the stockpiling device and the indoor radiator (235) through the geothermal pipe (210) and the heating pipe (236).

8. The intelligent mixing station device according to claim 2, characterized in that: The material receiving port is provided with a mixing station vehicle feeding monitoring device, which comprises a camera (301), a display screen (302) and a remote host (303). The camera (301) is installed at the rear side of the hopper (304) and the camera (301) faces downward. The display screen (302) is installed on the side wall of the material receiving port (314) and faces the driver's seat side after the mixer truck reverses. The display screen (302) is installed on the driver's seat of the mixer truck at a height of 1m-1.5m. The camera (301) is connected to the remote host (303), and the remote host (303) is connected to the display screen (302). The display screen (302) is used to check whether the discharge hopper (304) of the concrete mixing equipment is aligned with the feed hopper of the mixer truck.

9. The intelligent mixing station device according to claim 8, characterized in that: Four thumb screws (306) are arranged on the rear side of the display screen (302), and the four thumb screws (306) are symmetrically arranged in the upper and lower left and right directions. Two horizontal beams (307) are fixedly connected to the side wall of the material receiving port (314), and two vertical beams (308) are symmetrically fixedly connected to the front sides of the two horizontal beams (307). Each vertical beam (308) is provided with two strip holes (309) arranged in the upper and lower directions. The distance between the two strip holes 309 corresponding to the two vertical beams (308) is equal to the distance between the two thumb screws (306). The distance between the lower ends of the two strip holes (309) is equal to the distance between the two thumb screws (306). A large circular hole (310) is arranged on the upper end of each strip hole (309). The diameter of the large circular hole (310) is larger than the outer diameter of the large head of the thumb screw (306). The four thumb screws (306) are inserted into the large circular hole (310) and then slide into the four strip holes (309) for positioning.

10. The method for operating an intelligent mixing station device according to claim 1, characterized in that: The method comprises the following steps: Step 1: The user logs in through the APP and places an order, generates a concrete task order, and pushes the concrete task order to the information platform module; Step 2: The information platform module receives the concrete task order, generates a production scheduling plan based on the concrete information in the concrete demand task, and obtains a concrete mix ratio plan; Step 3: Queue up according to the mix ratio plan. After the queuing time is up, send the raw materials of concrete into the mixer for mixing to obtain the concrete required by the concrete demand task; Step 4: Transport and monitor the prepared concrete. During transportation, dispatch corresponding vehicles according to the concrete demand task order, and monitor the real-time position, operating status, delivery point, driving speed, and operating trajectory of the vehicle. Integrate the driving recorder to monitor whether the vehicle is speeding, identify the road conditions, as well as the vehicle's operating dynamics, unloading and loading conditions.