Upright roof up-down double-drainage device and construction method

By adopting dual drainage devices on the formal roof, the problem of roof seepage caused by rainwater cannot be discharged in time, the rapid discharge of rainwater and the protection of waterproofing system are achieved, and normal living and building quality are ensured.

CN119641033APending Publication Date: 2025-03-18CHINA CONSTR EIGHTH ENG BUREAU (GANSU) CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411690236.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-25
Publication Date
2025-03-18

AI Technical Summary

Technical Problem

The existing formal roof cannot be discharged in time when rainwater is rained, causing water seepage into the waterproofing system, causing serious damage and affecting normal living.

Method used

The upper and lower double drainage devices are adopted, including the lower drain and the upper drainage. The height of the upper drainage is adjusted through the adjustment parts so that its drainage port is flush with the top surface of the roof structure layer to ensure that the rainwater can be discharged quickly.

Benefits of technology

The rapid discharge of roof rainwater is achieved, preventing rainwater from penetrating into the waterproof coil, preventing damage to the waterproof system, thereby ensuring normal living and discharging hidden rainwater through the staggered drainage space to avoid quality problems caused by long-term water accumulation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119641033A_ABST
    Figure CN119641033A_ABST
Patent Text Reader

Abstract

The invention relates to an upright roof up-down double-drainage device and a construction method, and relates to the technical field of building construction waterproofing, a roof comprises a roof panel and a roof structure layer arranged on the roof panel, the drainage device comprises a lower drainer arranged in the roof panel, the lower drainer penetrates through the roof panel, and the roof structure layer is arranged on the roof panel. A drainage opening of the lower drainer is formed in the top face of the roof panel, the adjusting pieces are connected to the top of the lower drainer, the supporting height of the adjusting pieces can be adjusted, the upper drainer is partially inserted into the lower drainer, the upper drainer is connected with the adjusting pieces, and the adjusting pieces are connected with the upper drainer. The inner sleeve drainage pipe and the first bolt column are welded to the bottom of the first connecting plate, and the inner sleeve drainage pipe, the first bolt column and the first connecting plate are connected to obtain the upper drainage body for outputting rainwater on a floor, so that rainwater on a roof can be rapidly drained, and the situation that the rainwater on the roof permeates into waterproof coiled materials to damage the waterproof coiled materials is avoided; therefore, the infiltrated rainwater is prevented from influencing normal living life.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of building waterproofing, and in particular to an upright roof up-and-down double drainage device and a construction method. Background Art

[0002] With the development of society, especially the continuous improvement of science and technology, as the construction field is inseparable from people's lives, the construction quality, construction efficiency and earthquake resistance of its buildings are also attracting more and more attention. In the existing residential building structure, the roof design is divided into two structures: upright roof and inverted roof. The upright roof is constructed with the thermal insulation layer under the waterproof layer. However, after the waterproof layer is installed, the waterproof membrane ages quickly, and rainwater cannot be discharged in time. It is easy to penetrate into the insulation layer and damage the waterproof system, resulting in serious roof water seepage and inability to live normally. Therefore, it is necessary to provide measures to solve the problem that rainwater cannot be discharged in time, causing roof water seepage into the waterproof system to cause serious damage and inability to live normally. Summary of the invention

[0003] The purpose of the present invention is to overcome the defects of the prior art and provide a positive roof upper and lower double drainage device and construction method to solve the problem that rainwater cannot be discharged in time, resulting in water seeping into the roof into the waterproof system causing serious damage and making it impossible to live normally.

[0004] The technical solution to achieve the above object is: a vertical double drainage device for a positive roof, the roof includes a roof panel and a roof structure layer arranged on the roof panel, and the drainage device includes:

[0005] A lower drainer is arranged in the roof panel, the lower drainer is arranged through the roof panel, and the drainage port of the lower drainer is arranged on the top surface of the roof panel;

[0006] A plurality of adjusting members connected to the top of the lower drainer, wherein the supporting height of the adjusting members is adjustable;

[0007] An upper drainer is partially inserted into the lower drainer, and the upper drainer is connected to the adjusting member. The drain outlet of the upper drainer can be located on the top surface of the roof structure layer by adjusting the support height of the adjusting member.

[0008] The technical solution of the present invention is further improved in that: the lower drainer comprises a second connecting plate and a jacket drain pipe installed at the bottom of the second connecting plate;

[0009] An opening is arranged on the second connecting plate at a position corresponding to the pipe opening of the outer jacket drainage pipe.

[0010] The technical solution of the present invention is further improved in that: the upper drainer comprises a first connecting plate and an inner sleeve drain pipe installed at the bottom of the first connecting plate;

[0011] An opening is arranged on the first connecting plate at a position corresponding to the pipe opening of the inner sleeve drainage pipe.

[0012] The technical solution of the present invention is further improved in that: the inner drain pipe portion extends into the lower drainer.

[0013] The technical solution of the present invention is further improved in that a drainage space for draining rainwater from the waterproof layer is provided between the inner drainage pipe and the outer drainage pipe.

[0014] A further improvement of the technical solution of the present invention is that the outer contours of the second connecting plate and the first connecting plate are circular.

[0015] The technical solution of the present invention is further improved in that the adjusting member includes a first bolt column connected to the bottom of the first connecting plate, a second bolt column connected to the top of the second connecting plate, and a positive and negative thread sleeve threadedly connected to the first bolt column and the second bolt column.

[0016] The technical solution of the present invention is further improved in that: the positive and negative thread sleeve drives the first bolt column and the second bolt column to move closer to or away from each other in the positive and negative thread sleeve through rotation, so that the upper drainer can be adjusted to the height of the lower drainer.

[0017] The technical solution of the present invention is further improved in that: the adjusting member is vertically arranged between the upper drainer and the lower drainer.

[0018] A vertical double drainage device for a roof and a construction method thereof, comprising the following steps:

[0019] Step 1: When constructing the roof panel, bury the lower drainer in the roof panel, make the drainage port on the top surface of the lower drainer flush with the top surface of the roof panel, and let the bottom of the lower drainer extend from the bottom of the roof panel;

[0020] Step 2: Install the upper drainer to the top of the lower drainer through the adjusting piece, and adjust the supporting height of the adjusting piece according to the height of the roof structure layer to be constructed, so that the top surface of the upper drainer is flush with the top surface of the roof structure layer to be constructed;

[0021] Step 3: Wrap the isolation net on the outside of the upper drain and the adjustment piece;

[0022] Step 4: Construct the roof structure layer on the roof panel.

[0023] By using the above technical solution, the present invention has the following technical effects compared with the prior art:

[0024] The present invention provides an upright roof upper and lower double drainage device and a construction method. An inner sleeve drainage pipe and a first bolt column are welded to the bottom of a first connecting plate, and the three are connected to obtain an upper drainage body for outputting rainwater on the floor slab. The rainwater on the roof can be quickly discharged, and the rainwater on the roof can be prevented from penetrating into the waterproof membrane to cause damage to the waterproof membrane, thereby preventing the penetrated rainwater from affecting normal living.

[0025] By setting staggered spaces between the inner drainage pipe and the outer drainage pipe, the hidden rainwater between the floor structure layer and the protective layer can be discharged through the staggered spaces, avoiding serious quality problems caused by long-term water accumulation.

[0026] The upper and lower drainage devices can be adjusted in construction height according to the roof design through the positive and negative thread sleeves. The structure is simple and the installation is convenient. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 The present invention is a schematic diagram of an upper drainer of an upright roof upper and lower double drainage device and a construction method.

[0028] Figure 2 The present invention is a schematic diagram of a lower drainer of an upright roof upper and lower double drainage device and a construction method.

[0029] Figure 3 The present invention is a plan view of an upright roof upper and lower double drainage device and a construction method.

[0030] Figure 4 The present invention is a stereoscopic diagram of an upright roof upper and lower double drainage device and a construction method.

[0031] Figure 5 The present invention is a schematic diagram of the construction position of an upright roof upper and lower double drainage device and a construction method.

[0032] In the figure: 1. upper drainer; 2. lower drainer; 3. adjusting part; 4. roof panel; 5. slope layer; 6. insulation layer; 7. leveling layer; 8. waterproof layer; 9. isolation layer; 10. concrete protective layer. DETAILED DESCRIPTION

[0033] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0034] The present invention provides a vertical double drainage device for a roof and a construction method, which can quickly drain rainwater on the roof through two layers of drainage pipes, thereby preventing rainwater from seeping into the waterproof membrane. The vertical double drainage device for a roof and a construction method are described below.

[0035] See also Figure 1, showing a schematic diagram of an upper drainer of a vertical roof double drainage device and construction method of the present invention. Figure 2 , showing a schematic diagram of a lower drainer of a vertical roof double drainage device and construction method of the present invention. Figure 3 , showing a plan view of a vertical roof double drainage device and construction method of the present invention. Figure 4 , showing a stereoscopic diagram of a vertical roof double drainage device and construction method of the present invention, see Figure 5 , showing a schematic diagram of the construction position of a vertical roof double drainage device and construction method of the present invention. Figures 1 to 5 , the structure of the upright roof upper and lower double drainage device and the construction method of the present invention are explained.

[0036] See also Figures 1 to 5 The present invention provides an upper and lower double drainage device for an upright roof and a construction method, wherein the roof includes a roof panel 4 and a roof structure layer arranged on the roof panel 4, and the drainage device includes: a lower drainer 2 arranged in the roof panel 4, the lower drainer 2 is arranged to penetrate the roof panel 4, the drainage port of the lower drainer 2 is arranged on the top surface of the roof panel 4, a plurality of adjustment members 3 connected to the top of the lower drainer 2, the support height of the adjustment member 3 is adjustable, and an upper drainer 1 is partially inserted in the lower drainer 2, the upper drainer 1 is connected to the adjustment member 3, and the support height of the adjustment member 3 is adjusted so that the drainage port of the upper drainer 1 can be located on the top surface of the roof structure layer.

[0037] Preferably, the roof structure layer includes a concrete roof panel 4, a slope layer 5, an insulation layer 6, a leveling layer 7, a waterproof layer 8, an isolation layer 9, and a concrete protective layer 10 from top to bottom. The lower drainer 2 is placed in the roof panel 4, and the bottom of the lower drainer 2 passes through the bottom of the roof panel 4. The slope layer 5 is then used to guide the rainwater that has penetrated into the structural layer to the drain port of the lower drainer 2 for discharge. The upper drainer 1 is arranged below the concrete protective layer 10, and a slope is provided above the concrete protective layer 10 at the drain port. The slope is used to input external rainwater into the drain port for drainage.

[0038] Furthermore, by setting the upper drainer 1 parallel to the roof, rainwater on the roof can be quickly drained, and then the lower drainer 3 is flush with the edge of the waterproof layer 8 to drain the rainwater that has penetrated into the waterproof layer 8, thereby solving the problem that rainwater cannot be discharged in time, causing water to seep into the waterproof layer 8 and cause damage.

[0039] In a specific embodiment of the present invention, the lower drain 3 includes a second connecting plate and a jacket drain pipe installed at the bottom of the second connecting plate, and an opening is provided on the second connecting plate at a position corresponding to the pipe opening of the jacket drain pipe.

[0040] Furthermore, the second connecting plate is a steel plate disc with an inner diameter of 115 mm, an outer diameter of 170 mm, and a thickness of 10 mm.

[0041] Furthermore, by making the diameter of the outer drain pipe larger than that of the inner drain pipe, the inner drain pipe can enter the outer drain pipe after installation. When the inner drain pipe drains water, the water flow can be directly discharged from the outer drain pipe. The drainage position is covered with wire mesh to avoid blockage. The spacing between the drainage outlets is not less than 2 cm, and the upper end of the outer drain pipe extends out to the height of the floor.

[0042] In a specific embodiment of the present invention, the upper drainer 1 includes a first connecting plate and an inner drain pipe installed at the bottom of the first connecting plate, and an opening is provided on the first connecting plate at a position corresponding to the pipe opening of the inner drain pipe.

[0043] Preferably, an opening corresponding to the inner drain pipe is provided on the first connecting plate so that rainwater on the roof can flow into the inner drain pipe from the opening to avoid rainwater accumulation on the connecting plate. The first connecting plate 1 is a steel plate disc with an inner diameter of 75 mm, an outer diameter of 160 mm and a thickness of 10 mm.

[0044] Furthermore, the first connecting plate and the second connecting plate are made of steel plates, and a wire mesh is arranged between the two. The first connecting plate and the second connecting plate are wrapped with the wire mesh to effectively prevent concrete blocks and other foreign objects from entering between the first connecting plate and the second connecting plate to cause blockage, and 2 cm pebbles are arranged around the wire mesh for filtering to further prevent the outer wire mesh of the device from being blocked. The inner drainage pipe is a 75 mm diameter iron circular pipe, and the outer drainage pipe is a 100 mm diameter iron circular pipe. There is an offset part between the inner drainage pipe and the outer drainage pipe. The purpose of the offset part is to discharge hidden water between the floor structure layer and the protective layer to avoid serious quality problems caused by long-term water accumulation.

[0045] In a specific embodiment of the present invention, the inner drain pipe portion extends into the lower drain 2.

[0046] Furthermore, the inner drain pipe partially extends into the lower drain 2 so that rainwater will not flow out of the lower drain 2 when discharged from the inner drain pipe, thereby preventing rainwater from overflowing from the drain pipe.

[0047] Furthermore, a wire mesh is arranged between the lower drain 2 and the inner drain pipe, which is helpful to avoid blockage of the offset part. By rotating the positive and negative wire sleeves, the distance between the inner drain pipe and the outer drain pipe structure can be adjusted according to the thickness of the construction layer.

[0048] In a specific embodiment of the present invention, a drainage space for draining rainwater from the waterproof layer is provided between the inner drainage pipe and the outer drainage pipe.

[0049] Furthermore, the drainage space provided between the inner drainage pipe and the outer drainage pipe can be used to discharge rainwater that has penetrated the waterproof layer from the drainage space, thereby reducing the problem of water accumulation in the waterproof layer and achieving the effect of reducing the rapid aging of the waterproof layer.

[0050] In a specific embodiment of the present invention, the outer contours of the second connecting plate and the first connecting plate are circular.

[0051] In a specific embodiment of the present invention, the adjusting member 2 includes a first bolt column connected to the bottom of the first connecting plate, a second bolt column connected to the top of the second connecting plate, and a positive and negative thread sleeve threadedly connected to the first bolt column and the second bolt column.

[0052] Furthermore, there are multiple first bolt columns and second bolt columns and positive and negative thread sleeves, which can be arranged according to construction requirements.

[0053] In a specific embodiment of the present invention, the positive and negative thread sleeve drives the first bolt column and the second bolt column to move closer to or away from each other in the positive and negative thread sleeve through rotation, so that the upper drainer 1 can be adjusted to a height with the lower drainer 3 .

[0054] Furthermore, the height between the upper drainer 1 and the lower drainer 3 can be adjusted by rotating the forward and reverse wire sleeves, so that after the lower drainer 3 is fixed in the placement groove, the upper drainer 1 can be adjusted in height according to the position of the roof and be parallel to the roof.

[0055] In a specific embodiment of the present invention, the adjusting member 2 is vertically arranged between the upper drainer 1 and the lower drainer 3 .

[0056] A vertical double drainage device for a roof and a construction method thereof, comprising the following steps:

[0057] Step 1: When constructing the roof panel 4, bury the lower drain 2 in the roof panel 4, make the drain port on the top surface of the lower drain 2 flush with the top surface of the roof panel 4, and let the bottom of the lower drain 2 extend from the bottom of the roof panel 4;

[0058] Step 2: Install the upper drain 1 to the top of the lower drain 2 through the adjusting member 3, and adjust the supporting height of the adjusting member 3 according to the height of the roof structure layer to be constructed, so that the top surface of the upper drain 1 is flush with the top surface of the roof structure layer to be constructed;

[0059] Step 3: Wrap the isolation net on the outer side of the upper drain 1 and the adjusting member 3;

[0060] Step 4: construct the roof structure layer on the roof panel 4.

[0061] Furthermore, a rain grate is set on the top of the upper drain 1 to cover the drain outlet. The rain grate can block external debris to prevent debris from entering the drain outlet and causing blockage. An isolation net is wrapped around the outer side of the upper drain 1 and the adjusting member 3, and then pebbles of 2 cm in size are arranged around the isolation net for filtering to further prevent the probability of the outer isolation net of the device being blocked. The top of the upper drain pipe 1 is made flush with the edge of the groove on the roof through the adjusting member 3 to achieve timely discharge of rainwater on the roof. Then, an offset part is left between the upper drain pipe 1 and the lower drain pipe 2, and the hidden water between the protective layers is quickly discharged by using the offset part. The bottom of the lower drain pipe 2 is connected to the vertical drain pipe in the middle to achieve the effect of outputting the input rainwater downward, and then the roof panel concrete is poured on the roof.

[0062] The beneficial effects of the upright roof up-and-down double drainage device and construction method of the present invention are as follows:

[0063] 1. By welding the inner sleeve drainage pipe and the first bolt column to the bottom of the first connecting plate, the three are connected to obtain an upper drainage body for outputting rainwater on the floor slab, which can quickly drain the rainwater on the roof and prevent the rainwater on the roof from penetrating into the waterproof membrane and causing damage to the waterproof membrane, thereby preventing the penetrated rainwater from affecting normal living.

[0064] 2. By setting staggered spaces between the inner drainage pipe and the outer drainage pipe, the hidden rainwater between the floor structure layer and the protective layer can be discharged through the staggered spaces to avoid serious quality problems caused by long-term water accumulation.

[0065] 3. The upper and lower drainage devices can be adjusted to the construction height according to the roof design through the positive and negative thread sleeves. The structure is simple and easy to install.

[0066] The present invention is described in detail above in conjunction with the embodiments of the accompanying drawings. A person skilled in the art can make various variations of the present invention according to the above description. Therefore, certain details in the embodiments should not constitute a limitation of the present invention, and the scope of protection of the present invention shall be defined by the scope of the attached claims.

Claims

1. A vertical double drainage device for a positive roof, the roof comprising a roof panel (4) and a roof structure layer arranged on the roof panel (4), characterized in that: The drainage device comprises: A lower drainer (2) is arranged in the roof panel (4), the lower drainer (2) is arranged through the roof panel (4), and the drainage port of the lower drainer (2) is arranged on the top surface of the roof panel (4); A plurality of adjusting members (3) connected to the top of the lower drainer (2), wherein the supporting height of the adjusting members (3) is adjustable; An upper drainer (1) is partially inserted into the lower drainer (2), and the upper drainer (1) is connected to the adjusting member (3). By adjusting the support height of the adjusting member (3), the drainage outlet of the upper drainer (1) can be located on the top surface of the roof structure layer.

2. The upright roof up-and-down double drainage device according to claim 1, characterized in that: The lower drainer (2) comprises a second connecting plate and a jacket drain pipe installed at the bottom of the second connecting plate; An opening is arranged on the second connecting plate at a position corresponding to the pipe opening of the outer jacket drainage pipe.

3. The upright roof up-and-down double drainage device according to claim 1, characterized in that: The upper drainer (1) comprises a first connecting plate and an inner drain pipe installed at the bottom of the first connecting plate; An opening is arranged on the first connecting plate at a position corresponding to the pipe opening of the inner sleeve drainage pipe.

4. The upright roof up-and-down double drainage device according to claim 3, characterized in that: The inner drain pipe portion extends into the lower drain (2).

5. The upright roof up-and-down double drainage device according to claim 3, characterized in that: A drainage space for draining rainwater from the waterproof layer is provided between the inner drainage pipe and the outer drainage pipe.

6. The upright roof up-and-down double drainage device according to claim 3, characterized in that: The second connecting plate and the first connecting plate have circular outer contours.

7. The upright roof up-and-down double drainage device according to claim 1, characterized in that: The adjusting member (3) comprises a first bolt column connected to the bottom of the first connecting plate, a second bolt column connected to the top of the second connecting plate, and a positive and negative thread sleeve threadedly connected to the first bolt column and the second bolt column.

8. The vertical double drainage device for a roof according to claim 7, characterized in that: The positive and negative thread sleeve drives the first bolt column and the second bolt column to move closer to or farther away from each other in the positive and negative thread sleeve by rotating, so that the upper drainer (1) can be adjusted to a height relative to the lower drainer (2).

9. The upright roof up-and-down double drainage device according to claim 1, characterized in that: The adjusting member (3) is vertically arranged between the upper drainer (1) and the lower drainer (2).

10. The construction method of the upright roof up-and-down double drainage device according to claim 1, characterized in that: The following steps are involved: Step 1: When constructing the roof panel (4), bury the lower drain (2) in the roof panel (4), make the drainage opening on the top surface of the lower drain (2) flush with the top surface of the roof panel (4), and make the bottom of the lower drain (2) protrude from the bottom of the roof panel (4); Step 2: Install the upper drain (1) to the top of the lower drain (2) through the adjusting member (3), and adjust the support height of the adjusting member (3) according to the height of the roof structure layer to be constructed, so that the top surface of the upper drain (1) is flush with the top surface of the roof structure layer to be constructed; Step 3: Wrapping the isolation net around the outer sides of the upper drainer (1) and the adjusting member (3); Step 4: constructing the roof structure layer on the roof panel (4).