Bridge pile foundation reinforcing device

By setting up reinforcement devices for reinforcement cages and support rods on the foundation of bridge piles, the problem of low construction efficiency of existing bridge piles is solved, and efficient reinforcement construction and cost reduction are achieved.

CN119686242APending Publication Date: 2025-03-25TAIZHOU ZHONGCHI CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411903813.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-23
Publication Date
2025-03-25

AI Technical Summary

Technical Problem

The existing bridge pile reinforcement methods have low construction efficiency, resulting in increased construction costs.

Method used

A bridge pile foundation reinforcement device is adopted, including a reinforcement cage arranged outside the pile body, with vertical support rods and transverse support rods inside, and the rock layer is inserted through the vertical support rods, and the transverse support rods are fixed to the pile body to form a temporary reinforcement structure, and the reinforcement cage is used as a cement mold for construction.

Benefits of technology

The construction efficiency of bridge pile reinforcement is improved, the time for weaving steel bars on site is reduced, the construction cost is reduced, and the service life of the support poles is extended by strengthening the protection of the cage.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119686242A_ABST
    Figure CN119686242A_ABST
Patent Text Reader

Abstract

The invention provides a bridge pile foundation reinforcing device which comprises a reinforcing cage arranged on the outer side of a pile body, a vertical supporting rod and a transverse supporting rod are arranged in the reinforcing cage, a vertical hole is annularly formed in a base in a penetrating mode, the vertical supporting rod is installed in the vertical hole and inserted into a rock stratum at the bottom of the base, and a guide sleeve is arranged on the vertical supporting rod. A guiding hole is formed in the middle of the guiding sleeve, the transverse supporting rod is arranged in the guiding hole, an inserting hole is formed in the pile body, the transverse supporting rod is inserted into the inserting hole and fixes the vertical supporting rod and the pile body, the tail of the transverse supporting rod is fixed to the reinforcing cage, a penetrating hole is formed in the reinforcing cage, and the tail of the transverse supporting rod penetrates through the penetrating hole and fixes the reinforcing cage. Through cooperation of the transverse supporting rods, the vertical supporting rods and the reinforcing cage, the supporting cage can be produced in advance in a matched mode according to the size of a pile body, the time for weaving reinforcing steel bars on site is saved, cement can be directly poured after the supporting cage is installed, the construction efficiency is improved, and the construction cost is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridge construction, and in particular to a bridge pile foundation reinforcement device. Background Art

[0002] A bridge is a structure built over water or in the air for traffic. It is generally composed of a bridge body and bridge piles. The bridge piles are used to support the bridge body. Most modern bridges are viaducts built in the air to relieve urban congestion. Their bridge piles are usually buried underground, such as Figure 1 As shown, a bridge pile includes a base 90 and a pile body 91, wherein the base 90 is arranged at the bottom of the pile body 91, and the bridge is arranged at the upper end of the pile body, and a part of the base 90 and the pile body 91 are buried underground.

[0003] With the development of science and technology and economy, the number of motor vehicles in cities has gradually increased, and traffic congestion is prone to occur. Therefore, some viaducts with traffic congestion need to widen the bridge deck, which leads to the need to reinforce and widen the bridge piles. At the same time, some early-built viaducts also need to reinforce and maintain the bridge piles. The existing reinforcement method is usually to directly weave steel bars and pour cement on the outside of the bridge frame. This method requires a large amount of manpower to carry out construction on site, and the construction efficiency is low, resulting in increased construction costs. Summary of the invention

[0004] In view of this, an object of the present invention is to provide a bridge pile foundation reinforcement device, which has the advantage of high construction efficiency.

[0005] In order to solve the above technical problems, the technical solution of the present invention is: a bridge pile foundation reinforcement device, comprising a reinforcement cage arranged on the outside of the pile body, vertical support rods and transverse support rods are arranged in the reinforcement cage, a vertical hole is opened in a ring shape on the base, the vertical support rod is installed in the vertical hole and inserted into the rock layer at the bottom of the base, a guide sleeve is provided on the vertical support rod, a guide hole is opened in the middle of the guide sleeve, the transverse support rod is arranged in the guide hole, an insertion hole is opened on the pile body, the transverse support rod is inserted into the insertion hole and fixes the vertical support rod to the pile body, the tail of the transverse support rod is fixed to the reinforcement cage, the reinforcement cage is opened with a through hole, the tail of the transverse support rod passes through the through hole and fixes the reinforcement cage.

[0006] Through the above-mentioned technical means, the vertical support rods are inserted into the vertical holes, so that the vertical support rods are stably inserted into the rock layer. By opening a socket on the pile body and inserting the transverse support rods into the socket, the connection strength between the transverse support rods and the pile body is guaranteed. When the transverse support rods and the vertical support rods are used as temporary reinforcements, a reinforcing cage is set to protect the internal vertical support rods and transverse support rods, reduce external corrosion, and prevent the exposed parts of the support rods from being sharp while ensuring the aesthetics, thereby protecting the support rods and pedestrians. When the transverse support rods and the vertical support rods are used as the internal steel bar structure, the reinforcing cage can be used as a cement mold. Through the cooperation of the transverse support rods, the vertical support rods and the reinforcing cage, they can be produced in advance according to the size of the pile body, saving the time of weaving steel bars on site. After the installation is completed, cement can be poured directly, which increases construction efficiency and reduces construction costs.

[0007] Preferably, the reinforcing cage includes four cages 1 of the same structure, wherein the cages 1 are arranged on a base and surround the outside of the pile body in a ring shape, and a plurality of cages 2 are arranged on the upper side of the cage 1, and the cages 2 are stacked along the Z axis and arranged on the outside of the pile body, and independent vertical support rods and transverse support rods are arranged in the cages 1 and 2.

[0008] Through the above technical means, four cages 1 are arranged to surround the base, so that the installation of the reinforcement cage is more convenient. By arranging cage 2 on the top of cage 1, it is gradually installed along the Z axis, reducing the size of the reinforcement cage, and facilitating the installation and transportation of the reinforcement cage.

[0009] Preferably, enclosure rods are provided in both enclosure cage 1 and enclosure cage 2, and the enclosure rods are welded to the upper and lower ends of the vertical support rods.

[0010] Through the above technical means, the structural strength between the vertical support rods is increased by arranging the guardrails, thereby increasing the structural strength of the vertical support rods.

[0011] Preferably, positioning holes are provided at the tops of the vertical support rods in cage one and cage two, the bottoms of the vertical support rods in cage one are inserted into the vertical holes, positioning columns are provided at the bottoms of the vertical support rods in cage two, the positioning columns are adapted to the positioning holes, and horizontal welding avoidance grooves 1 are provided at the upper and lower ends of cage two.

[0012] Through the above-mentioned technical means, the coordination between the positioning holes and the positioning columns facilitates the fixation and installation of cage one and cage two. By providing a transverse welding avoidance groove one, it is convenient to weld the upper and lower fences when gradually erecting cage two, thereby increasing the overall structural strength.

[0013] Preferably, an annular sealing plate is provided on the welding avoidance groove 1, and a mounting hole 1 is opened on the cage 1 and the cage 2, and the annular sealing plate is fixed through the mounting hole 1, and the cage 1, the cage 2 and the annular sealing plate form a mold cavity.

[0014] Through the above technical means, by setting the annular sealing plate, the annular sealing plate can connect the cage 1 and the cage 2 and keep the mold cavity in a sealed state, thereby preventing cement leakage when pouring cement.

[0015] Preferably, a vertical welding avoidance groove 2 is provided between the cage 1 and the cage 2, a vertical sealing plate is provided on the welding avoidance groove 2, and a mounting hole 2 is provided on both the cage 1 and the cage 2, and the vertical sealing plate is fixed through the mounting hole 2.

[0016] Through the above technical means, the four cages one or two of each layer are connected through the vertical sealing plate, so as to increase the connection strength of cage one and cage two of each layer, and at the same time facilitate the insertion and welding of the fence rods in the four cages one and cage two, so that the fence rods are integrated, thereby increasing the structural strength between each cage.

[0017] Preferably, the enclosure rod is provided with flow channel air holes inside, a joint is provided at one end of the enclosure rod, and a pair of insert tubes are also provided on the vertical sealing plate at the rear end of the reinforcement cage, the two insert tubes are respectively provided with air inlet holes and air outlet holes, and the two insert tubes are respectively inserted into the two ends of the flow channel air holes.

[0018] Through the above technical means, by setting flow channel air holes in the enclosure, and setting joints between the enclosures, the flow channel air holes in the enclosures are connected, and by setting insert pipes on the vertical sealing plates, hot air is transported to the flow channel air holes, thereby accelerating the solidification of cement and shortening the construction period. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a schematic diagram of the structure of the bridge pile; Figure 2 It is a structural schematic diagram of embodiment 1; Figure 3 This is a schematic diagram of the opening of the bridge pile; Figure 4 is a cross-sectional schematic diagram of embodiment 1; Figure 5 It is a structural schematic diagram of cage 2; Figure 6 is a schematic diagram of the structure of cage 1; Figure 7 It is a partial schematic diagram of the first embodiment; Figure 8 is a cross-sectional schematic diagram of embodiment 2; Fig. 9 for Figure 8 Schematic diagram of part A; Fig.10 for Figure 8 Schematic diagram of part B.

[0020] Figure numerals: 1. reinforcement cage; 2. enclosure cage 1; 3. enclosure cage 2; 4. vertical support rod; 5. transverse support rod; 6. vertical hole; 7. guide sleeve; 8. guide hole; 9. plug hole; 10. through hole; 11. positioning hole; 12. positioning column; 13. welding avoidance groove 1; 14. enclosure rod; 15. annular sealing plate; 16. mold cavity; 17. welding avoidance groove 2; 18. mounting hole 1; 19. vertical sealing plate; 20. mounting hole 2; 21. flow channel air hole; 22. joint; 23. sealing rubber; 24. insert pipe; 25. air inlet; 26. air outlet; 27. bottom mounting frame; 28. positioning groove; 29. ​​sealing screw; 90. base; 91. pile body. DETAILED DESCRIPTION

[0021] The specific implementation modes of the present invention are further described below in conjunction with the accompanying drawings to make the technical solutions of the present invention easier to understand and grasp. Embodiment 1:

[0022] A bridge pile foundation reinforcement device, including a reinforcement cage 1 arranged outside a pile body 91, the reinforcement cage 1 includes a cage 1 2 and a cage 2 3, both cage 1 2 and cage 2 3 are provided with vertical support rods 4 and horizontal support rods 5, cage 1 2 is arranged at the lowest side and fits with a base 90, a vertical hole 6 is provided in a circular shape on the base 90, the vertical support rod 4 in cage 1 2 is relatively long, one end of which is installed in the vertical hole 6 and inserted into the rock layer at the bottom of the base 90, and the other end is flush with the upper end surface of cage 1 2, and two guide sleeves are provided on the vertical support rod 4 7, a guide hole 8 is provided in the middle of the guide sleeve 7, and the transverse support rod 5 is arranged in the guide hole 8. Before installing the transverse support rod 5, a plug hole 9 needs to be provided on the pile body 91, and the transverse support rod 5 is knocked into the plug hole 9. When the transverse support rod 5 is inserted into the plug hole 9, the vertical support rod 4 can be fixed to the pile body 91. The cage 1 2 and the cage 2 3 are both provided with a through hole 10. After the cage 1 2 and the cage 2 3 are manufactured, the transverse support rod 5 is arranged in the through hole 10, so that the cage 1 2 and the cage 2 3 are positioned by the transverse support rod 5 When the reinforced cage 1 is used as a temporary support, the guide hole 8 can be used as a threaded hole, and a thread can be opened on the transverse support rod 5, so that the transverse support rod 5 can be rotated and inserted into the insertion hole 9 and tightened. At this time, the transverse support rod 5 is fixed to the vertical support rod 4, and the tail of the transverse support rod 5 can be directly fixed to the cage 1 and the cage 2 3. When the transverse support rod 5 and the vertical support rod 4 are used as temporary reinforcement, the reinforced cage 1 is set to protect the internal vertical support rod 4 and the transverse support rod 5, reduce external corrosion thereto, and at the same time, prevent the exposed part of the support rod from being sharp while ensuring the aesthetics, thereby protecting the support rod and protecting pedestrians.

[0023] When it is necessary to pour cement, there is no need to open threads on the transverse support rod 5 and the guide hole 8. When the cement solidifies, the cage 1 2 and the cage 2 3 need to be removed. Therefore, after the installation of the cage 1 2 and the cage 2 3 is completed, the transverse support rod 5 needs to be knocked inward along the axis. When the transverse support rod 5 is separated from the through hole 10, the through hole 10 needs to be sealed by the sealing screw 29 to ensure that the cement does not leak out and the steel bar does not expose the cement surface after the pouring is completed. At the same time, before pouring cement, the inner surface of the cage 1 2 and the cage 2 3 is sprayed with a release agent. The recycled cage 1 2 and the cage 2 3 can be assembled with new transverse support rods 5 and vertical support rods 4 and can be reused. Regardless of whether the reinforced cage 1 is used as a temporary support or as a reinforced cement mold, it can save on-site construction time and reduce construction costs by producing it in advance and sending it out in matching sets.

[0024] There are four cages 2, which are wrapped around the bottom layer outside the pile body 91. A bottom mounting frame 27 is fixed on the base 90 by screws. A positioning groove 28 is provided on the bottom mounting frame 27. The bottom of the cage 2 is inserted into the positioning groove 28. The cage 2 3 is arranged at the upper end of the cage 2. Four cages 2 3 form a layer. The number of layers of the cage 2 3 is related to the height of the pile body 91. The horizontal support rod 5 of the cage 2 3 has the same structure as the horizontal support rod 5 of the cage 2. The vertical support rod 4 of the cage 2 3 is the same as the vertical support rod 4 of the cage 2. The vertical support rod 4 is different. Both ends of the vertical support rod 4 in the cage 2 3 are exposed by 30MM of the cage 2. The tops of the vertical support rods 4 in the cage 1 2 and the cage 2 3 are provided with positioning holes 11. The bottoms of the vertical support rods 4 in the cage 1 2 are inserted into the vertical holes 6. The bottoms of the vertical support rods 4 in the cage 2 3 are provided with positioning columns 12. When the positioning columns 12 are plugged into the positioning holes 11, because the length of the vertical support rod 4 is greater than that of the cage 2 3, horizontal welding avoidance grooves 13 are formed at the upper and lower ends of the cage 2 3.

[0025] Both cage 1 2 and cage 2 3 are provided with enclosure rods 14, which are welded to the upper and lower ends of the vertical support rod 4. When cage 2 3 is being installed, the junction of the two cages 2 3 is at the position of welding avoidance groove 1 13, and the enclosure rods 14 in the two cages can be welded together by a welding gun, thereby increasing the connection strength of the upper and lower cages 2 3.

[0026] An annular sealing plate 15 is provided on the welding avoidance groove 13, and two annular sealing plates 15 are provided on each layer. The annular sealing plate 15 seals the welding avoidance groove 13. Both the cage 1 2 and the cage 2 3 are provided with a mounting hole 18. The annular sealing plate 15 is fixed through the mounting hole 18 and screws. The cage 1 2, the cage 2 3 and the annular sealing plate 15 form a mold cavity 16, so that there will be no leakage problem after pouring cement.

[0027] A vertical welding avoidance groove 2 17 is also provided between the enclosure 1 2 and the enclosure 2 3, and the enclosure rod 14 of each layer can be connected through the welding avoidance groove. A vertical sealing plate 19 is provided on the welding avoidance groove 27. Both the enclosure 1 2 and the enclosure 2 3 are provided with mounting holes 20, and the vertical sealing plate 19 is fixed with screws through the mounting holes 20. The four enclosures 1 2 or the enclosure 2 3 of each layer are connected through the vertical sealing plate 19, thereby increasing the connection strength of the enclosure 1 2 and the enclosure 2 3 of each layer, and at the same time, it is convenient to plug and weld the enclosure rods 14 in the four enclosures 1 2 and the enclosure 2 3, so that the enclosure rods 14 are integrated, and the structural strength between each enclosure is increased. The structural strength between the enclosure 1 2 and the enclosure 2 3 can be ensured by the vertical sealing plate 19 and the annular sealing plate 15 to prevent collapse.

[0028] The installation process of the above-mentioned bridge pile foundation reinforcement device is as follows: A hole 6 is opened on the base 90, and a socket 9 is opened on the pile body 91. When opening the hole 6 and the socket 9, it is necessary to avoid the steel bars originally in the base 90 and the pile body 91, and then the surface of the pile body 91 is roughened. Then the reinforcing cage 1 is installed. First, the cage 1 2 is transported to the installation position by a crane, and the vertical support rod 4 in the cage 1 2 is inserted into the vertical hole 6. The vertical support rod 4 is inserted into the rock layer by a pile driver, and the transverse support rod 5 is pushed into the socket 9. After all the cages 1 2 are installed in turn, the enclosure rod 14 in the cage 1 2 is welded by a welding machine, and then the vertical sealing plate 19 at the cage 1 2 is installed, and then the cage 2 3 is installed by a crane. After the transverse support rod 5 in the cage 2 3 is inserted, the enclosure rod 14 in the welding avoidance groove 1 13 is welded by a welding machine, so that the cage 2 3 is fixed to the cage 1 2, and the installation of the cage 2 3 is completed in turn. Embodiment 2:

[0029] The difference between the second embodiment and the first embodiment is that: a flow channel air hole 21 is opened inside the enclosure rod, and a joint 22 is provided at one end of the enclosure rod. The joint 22 in one enclosure 2 3 is plugged into the enclosure rod 14 in its adjacent enclosure, and a sealing rubber 23 is provided in the joint 22, so that the flow channel air hole 21 is in a sealed state. A pair of insert pipes 24 are also provided on the vertical sealing plate 19 arranged at the rear end of the enclosure, and the two insert pipes 24 are respectively provided with an air inlet hole 25 and an air outlet hole 26. The two insert pipes 24 are respectively inserted into the two ends of the flow channel air hole 21. When cement is input into the mold cavity 16, hot air is input into the flow channel air hole 21, thereby accelerating the solidification of the cement and shortening the construction period.

[0030] Of course, the above are only typical examples of the present invention. In addition, the present invention may also have many other specific implementations. All technical solutions formed by equivalent replacement or equivalent transformation fall within the scope of protection required by the present invention.

Claims

1. A bridge pile foundation reinforcement device, characterized in that: The invention comprises a reinforcing cage (1) arranged outside a pile body (91), wherein a vertical support rod (4) and a transverse support rod (5) are arranged inside the reinforcing cage (1), a vertical hole (6) is formed in an annular shape and penetrates through the base (90), the vertical support rod (4) is installed in the vertical hole (6) and inserted into the rock layer at the bottom of the base (90), a guide sleeve (7) is provided on the vertical support rod (4), a guide hole (8) is formed in the middle of the guide sleeve (7), the transverse support rod (5) is arranged in the guide hole (8), an insertion hole (9) is formed on the pile body (91), the transverse support rod (5) is inserted into the insertion hole (9) and fixes the vertical support rod (4) to the pile body (91), the tail of the transverse support rod (5) is fixed to the reinforcing cage (1), the reinforcing cage (1) is formed with a through hole (10), the tail of the transverse support rod (5) passes through the through hole (10) and fixes the reinforcing cage (1).

2. A bridge pile foundation reinforcement device according to claim 1, characterized in that: The reinforcing cage (1) comprises four cages 1 (2) of the same structure. The cages 1 (2) are arranged on a base (90) and surround the outside of a pile body (91) in a ring shape. A plurality of cages 2 (3) are arranged on the upper side of the cages 1 (2). The cages 2 (3) are stacked along the Z axis and arranged outside the pile body (91). Independent vertical support rods (4) and horizontal support rods (5) are arranged inside the cages 1 (2) and 2 (3).

3. A bridge pile foundation reinforcement device according to claim 2, characterized in that: The enclosure cage 1 (2) and the enclosure cage 2 (3) are both provided with enclosure rods (14), and the enclosure rods (14) are welded to the upper and lower ends of the vertical support rods (4).

4. A bridge pile foundation reinforcement device according to claim 3, characterized in that: The tops of the vertical support rods (4) in the cage one (2) and the cage two (3) are provided with positioning holes (11), the bottoms of the vertical support rods (4) in the cage one (2) are inserted into the vertical holes (6), the bottoms of the vertical support rods (4) in the cage two (3) are provided with positioning columns (12), the positioning columns (12) are adapted to the positioning holes (11), and the upper and lower ends of the cage two (3) are provided with transverse welding avoidance grooves one (13).

5. A bridge pile foundation reinforcement device according to claim 4, characterized in that: An annular sealing plate (15) is provided on the welding avoidance groove 1 (13), and a mounting hole 1 (18) is provided on the enclosure cage 1 (2) and the enclosure cage 2 (3), and the annular sealing plate (15) is fixed through the mounting hole 1 (18), and the enclosure cage 1 (2), the enclosure cage 2 (3) and the annular sealing plate (15) form a mold cavity (16).

6. A bridge pile foundation reinforcement device according to claim 4, characterized in that: A vertical welding avoidance groove (17) is provided between the enclosure (2) and the enclosure (3), and a vertical sealing plate (19) is provided on the welding avoidance groove (17). Both the enclosure (2) and the enclosure (3) are provided with a mounting hole (20), and the vertical sealing plate (19) is fixed through the mounting hole (20).

7. A bridge pile foundation reinforcement device according to claim 6, characterized in that: The enclosure rod (14) is provided with a flow channel air hole (21) inside, and a joint (22) is provided at one end of the enclosure rod. A pair of inserting tubes (24) is also provided on the vertical sealing plate (19) at the rear end of the reinforcing cage (1), and the two inserting tubes (24) are respectively provided with an air inlet hole (25) and an air outlet hole (26). The two inserting tubes (24) are respectively inserted into the two ends of the flow channel air hole (21).