Lifting system of automatic building dismounting machine and using method of lifting system

By designing the lifting system of automated building demolition machinery, the problems of complexity and poor versatility of existing building demolition machinery equipment are solved, and the automatic lifting and efficient construction of the building are achieved.

CN119686565AActive Publication Date: 2025-03-25BEIJING ACAD OF BUILDING ENG
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202510126090.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-27
Publication Date
2025-03-25
Estimated Expiration
2045-01-27

AI Technical Summary

Technical Problem

The power system of existing building demolition machinery equipment is complex in design and poor in versatility, making it difficult to meet the needs of green construction and efficient demolition.

Method used

A lifting system for automated building demolition machinery is designed, including a top truss system, column combination, hoisting jack, guide wheel set, steel strand and electric rotary arms load-bearing beams. Through the coordinated work of these components, the automatic lifting of the building is achieved.

Benefits of technology

It realizes the universality of the system and the simplicity of the structure, can easily build and demolish buildings, and improves construction efficiency and operation convenience.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119686565A_ABST
    Figure CN119686565A_ABST
Patent Text Reader

Abstract

The invention discloses a lifting system of an automatic building dismantling machine and a using method of the lifting system, the lifting system comprises a top truss system, a stand column combination, a jacking jack, a guide wheel set, a steel strand, an electric rotating arm upper bearing cross beam and an electric rotating arm lower bearing cross beam, and the jacking jack is used for controlling the stand column combination and the top truss system to synchronously ascend and descend; the electric rotating arm upper bearing cross beam is fixed below the jacking jack, and the electric rotating arm lower bearing cross beam is fixed below the stand column combination. By arranging the lifting power system capable of ascending and descending, the whole system is good in universality, can be conveniently applied to different use requirements and working scenes, meanwhile, the whole system is simple in structure and stable in work, can be conveniently applied to building construction and mechanical equipment dismantling, and can be automated in the whole process; particularly, the electric rotating arm upper bearing cross beam and the electric rotating arm lower bearing cross beam can be electrically controlled to stretch into and retract into the operation hole range.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of building construction, and in particular relates to a lifting system of an automated building demolition machine and a use method thereof. Background Art

[0002] Green renovation is the main theme of urban building renewal and development. The renovation of high-rise buildings in densely populated urban areas requires higher green construction, and traditional extensive construction methods such as blasting and demolition are no longer applicable.

[0003] In this regard, the prior art adopts a method of lifting climbing frames and manually using tools to dismantle the building floor by floor, and the dismantled waste is sent out outside the floor with a tower crane or a winch. However, the power system of the current mechanical equipment for building construction or demolition is a special climbing or descending design, and the structure is complex and the versatility is poor, which needs to be improved. Summary of the invention

[0004] The present invention provides a lifting system of an automated building demolition machine and a use method thereof, which are used to solve the technical problems mentioned in the background technology.

[0005] To achieve the above purpose, the present invention adopts the following technical solution: a lifting system for an automated building demolition machine, comprising: The top truss system is located above the floor slab or top floor slab to be constructed in the building; A column assembly is fixed below the top truss system and vertically penetrates the working opening on the floor slab, and both ends of the working opening have a rotating arm matching portion turning toward the same side; A lifting jack is arranged inside the column assembly and is used to control the synchronous lifting and lowering of the column assembly and the top truss system; A guide wheel assembly is arranged on the floor slab of each layer and is used to abut against the four sides of the column assembly; The steel strand is vertically arranged in the column assembly, passes through the interior of the lifting jack, and is clamped and fixed by the upper and lower working parts of the lifting jack; The upper bearing beam of the electric tumbler is fixed below the lifting jack, and the upper bearing beam of the electric tumbler comprises a horizontally arranged upper beam mounting seat and tumblers respectively hinged at both ends of the upper beam mounting seat, and the upper beam mounting seat is provided with an opening for the steel strand to pass freely; The upper crossbeam mounting seat includes a top plate, a bottom plate and a vertical plate connected between the top plate and the bottom plate, a driving shaft is rotatably connected between the two ends of the top plate and the bottom plate, the top of the driving shaft extends out of the top plate and is connected to a motor, and a rotating arm is fixedly connected to the driving shaft; The lower bearing crossbeam of the electric rotating arm is fixed below the column assembly and has the same structure as the upper bearing crossbeam.

[0006] In a preferred example, the present invention can be further configured as follows: the two ends of the top plate are in the shape of an arc concentric with the driving shaft, the parts of the rotating arm located at the top and the bottom plate are in the shape of an arc concentric with the driving shaft, a sensor mounting seat 1 is fixed at the end of the top plate, a contact sensor 1 extending above the rotating arm is fixed on the sensor mounting seat 1, a sensor mounting seat 2 is fixed on the side end of the top plate, a contact sensor 2 extending above the rotating arm is fixed on the sensor mounting seat 2, a contact slope seat 1, a contact slope seat 2 and a baffle plate 1 located between contact sensor 1 and contact sensor 2 are fixed at the top of the rotating arm, a contact slope 1 is provided at one end of the contact slope seat 1 close to contact sensor 1, and a contact slope 1 is provided at one end of the contact slope seat 1 close to contact sensor 1, and a contact slope 2 is provided at one end of the contact slope seat 2 close to contact sensor 1. A contact slope 2 is provided at one end of the second, and a blocking bolt 1 is horizontally provided on the upper edge of the blocking seat plate 1. The blocking bolt 1 passes through the blocking seat plate, and the blocking bolt 1 is threadedly connected to the fixing nuts 1 located on both sides of the baffle seat 1. When the swing arm rotates to the length direction of the upper beam mounting seat, the contact sensor 1 is attached to the contact slope 1 and the blocking bolt 1 is attached to the sensor mounting seat 1, and the swing arm extends out of the range of the working hole; a blocking seat plate 2 is provided between the top plate and the bottom plate, the blocking seat plate 2 is located on one side of the contact sensor 2, and a blocking bolt 2 is threadedly provided on the blocking seat plate 2. When the swing arm rotates until the contact sensor 2 is attached to the contact slope 2 and the blocking bolt 2 is attached to the sensor mounting seat 2, the swing arm is located within the range of the working hole; In a preferred example, the present invention can be further configured as follows: the column combination includes left and right columns, an upper fixed connecting beam, a lower fixed connecting beam and a load-bearing connecting beam, the left and right columns are vertically and arranged side by side, the upper fixed connecting beam and the lower fixed connecting beam are distributed vertically between the left and right columns, and are used to fix the two ends of the steel strand, and the load-bearing connecting beam is arranged below the lower fixed connecting beam, and is used to install and fix the load-bearing crossbeam under the electric swing arm.

[0007] In a preferred example, the present invention can be further configured as follows: an electric hoist is provided in the column assembly, the electric hoist is located above the lifting jack, and the hook of the electric hoist can reach the upper side wall of the lifting jack for lifting.

[0008] In a preferred example, the present invention can be further configured as follows: the guide wheel group includes a mounting frame and a roller, the mounting frame is used to be fixed on the floor, and the roller is rotatably connected to the front end of the mounting frame and is used to abut against the outer side wall of the column combination.

[0009] In a preferred example, the present invention can be further configured as follows: the mounting frame includes a base, a slide, a suspension, a screw and a handle, the base is used to be fixed on the floor, the slide is horizontally slidably connected to the base, the suspension is arranged on the slide and is used for the roller to be installed and fixed, the screw is horizontally threadedly connected to the rear of the base and is rotatably connected to the rear end of the slide, and the handle is arranged at the rear end of the screw.

[0010] In a preferred example, the present invention can be further configured as follows: the suspension is rotatably connected to the slide, a circular arc-shaped guide rod is provided on the slide, a guide tube slidably connected to the guide rod is provided at the tail end of the suspension, and a screw that tightens the upper end surface of the guide rod is vertically threaded on the guide tube.

[0011] Another object of the present invention is to provide a method for using a lifting system of an automated building demolition machine, which is easy to operate and improves construction efficiency.

[0012] A method for using a lifting system of an automated building demolition machine comprises the following steps: S1, Nth floor is to be built, initial installation: the upper bearing beam is on the N-1 floor, and the lower bearing beam of the electric rotating arm is on the N-2 floor; S2, after the N-th floor is built, all the locks of the lifting jack are released. At this time, the lower load-bearing beam of the electric tumbler bears all the loads. The electric hoist installed on the upper fixed connecting beam is used to lift the lifting jack a short distance away from the N-1 floor. The electric control retracts the tumblers at both ends of the upper load-bearing beam into the working hole range; S3, use the electric hoist installed on the upper fixed connecting beam to lift the jacking jack and the upper bearing beam again until the upper bearing beam passes through the working hole and reaches a short distance from the upper surface of the N layer; S4, extend the rotating arms at both ends of the upper bearing beam from the scope of the working hole, operate the lifting jack to descend along the steel strand until the upper bearing beam reaches the upper surface of the N layer, at which time the upper bearing beam bears all the loads, and then operate the lifting jack to perform lifting movement, so that the steel strand drives the column assembly as a whole and the lower bearing beam of the electric rotating arm to leave the upper surface of the N-2 layer for a short distance through the lower fixed connecting beam, and retract the rotating arms at both ends of the lower bearing beam of the electric rotating arm into the scope of the working hole; S5, then operate the lifting jack to carry out lifting movement until the load-bearing beam under the electric rotating arm passes through the working hole of the N-1 layer and reaches a short distance from the upper surface of the N-1 layer. At this time, the column assembly as a whole and the top truss system are also lifted by about one layer; S6, extend the arms at both ends of the lower bearing beam of the electric tumbler from the working hole, operate the lifting jack to lower it, and stop when the lower bearing beam of the electric tumbler reaches the upper surface of the N-1 layer. At this time, the upper bearing beam and the lower bearing beam of the electric tumbler jointly bear the load, and wait for the N+1 construction to be completed. Repeat this process, rising layer by layer, until the overall construction is completed; In a preferred example, the present invention can be further configured to include the following steps: S7, P layer is the layer to be demolished, initial installation: the upper bearing beam is on the P layer, and the lower bearing beam of the electric rotating arm is on the P-2 layer; S8, release all the locks of the lifting jack. At this time, the load-bearing beam under the electric jib bears all the loads. Use the electric hoist installed on the upper fixed connecting beam to lift the lifting jack a short distance away from the P layer. At this time, the P layer can be removed; S9, use the electric hoist installed on the upper fixed connecting beam to lower the lifting jack and the upper bearing beam again until the upper bearing beam reaches the upper surface of the P-1 floor slab, then operate the lifting jack to lift the steel strands through the lower fixed connecting beam to drive the column assembly as a whole and the lower bearing beam of the electric tumbler to leave the upper surface of the P-2 floor for a short distance, and retract the tumblers at both ends of the lower bearing beam of the electric tumbler into the range of the working opening. At this time, the upper bearing beam bears all the loads; S10, operate the lifting jack to lower until the load-bearing beam under the electric tumbler passes through the working hole of the P-2 layer and reaches a short distance above the upper surface of the P-3 layer. At this time, the column assembly as a whole and the top truss system also descend by about one layer; S11, extend the arms at both ends of the lower bearing beam of the electric tumbler from the working hole, operate the lifting jack to lower it, and stop when the lower bearing beam of the electric tumbler reaches the upper surface of the P-3 layer. At this time, the upper bearing beam and the lower bearing beam of the electric tumbler share the load, and repeat this process, lowering layer by layer until the overall construction is completed.

[0013] The beneficial effects of the present invention are as follows: 1. By providing a lifting power system that can both rise (build a building) and fall (demolish a building), the entire system has good versatility and is convenient for application to different usage requirements and work scenarios. At the same time, the entire system has a simple structure and stable operation, and is easy to apply to building construction and demolition machinery and equipment; 2. By adopting a lifting power system that is easy to operate, the whole system can rise (build buildings) and fall (demolish buildings) more smoothly and quickly, thus achieving the effect of convenient operation and improving construction efficiency; 3. The present application achieves this by 1) reasonably designing the shape of the upper crossbeam mounting seat and the shape of the rotating arm; 2) installing a motor on the top plate to drive the rotating shaft to control the rotation of the rotating arm so that it can be extended or retracted from the working hole range, and both ends of the working hole have rotating arm matching parts that turn toward the same side; 3) contact sensor 1 and contact sensor 2 are arranged on the top plate of the upper crossbeam mounting seat, contact slope seat 1, contact slope seat 2 and stop plate 1 are arranged on the rotating arm, and stop plate 2 located between the top plate and the bottom plate, and the rotating arm can be fitted through contact sensor 1 after reaching the position where it extends out of the working hole range. On the contact slope 1 and the blocking bolt 1 is attached to the sensor mounting seat 1, the double blocking and limiting is performed, and the motor can be controlled to stop working by the contact sensor 1. When the swing arm retracts to the working opening, the swing arm rotates to the contact sensor 2 to be attached to the contact slope 2 and the blocking bolt 2 is attached to the sensor mounting seat 2 to double block and limit, and the motor can be controlled to stop working by the contact sensor 1; 4) The blocking bolt 1 and the blocking bolt 2 are respectively fixed by two nuts, and the front and rear positions can be adjusted, which is convenient for adjusting whether the swing arm can be smoothly extended into and retracted into the working opening range. The combination of the above four points can realize that the load-bearing beam on the electric swing arm can be electrically controlled to be loaded on the floor slab, without the need for manual insertion and extraction control in the form of casing and rods in the past, and has good automation and efficient task execution. This not only saves time and resources, but also completes more work in a shorter time, reduces the pressure on workers, and improves work efficiency.

[0014] Other features and advantages of the present invention will be set forth in the following description, and in part will become apparent from the description, or may be understood by practicing the present invention; the main purpose and other advantages of the present invention may be realized and obtained through the solutions particularly pointed out in the description. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 yes Figure 1 is a schematic structural diagram of an embodiment of the present invention; Figure 2 yes Figure 1 Cross-sectional view along direction C; Figure 3 It is a three-dimensional diagram of the load-bearing beam on the electric rotating arm; Figure 4 It is a partial stereogram of the bearing beam on the electric rotating arm; Figure 5 It is a top view of the rotating arm of the upper bearing crossbeam being retracted into the working opening and cooperating with the opening; Figure 6 is a side view of the guide wheel assembly; Figure 7 It is a schematic diagram of the steps of the construction process; Figure 8 This is a schematic diagram of the removal process steps.

[0016] Figure numerals: 1. top truss system; 2. column combination; 201. left and right columns; 202. upper fixed connecting beam; 203. lower fixed connecting beam; 204. load-bearing connecting beam; 3. electric hoist; 4. lifting jack; 5. guide wheel group; 501. mounting frame; 51. base; 52. slide seat; 53. suspension; 54. screw; 55. handle; 56. guide rod; 57. guide tube; 58. screw; 502. roller; 6. steel strand; 7. working opening; 8. floor; 9. load-bearing crossbeam on electric tumbler; 901. tumbler Arm; 902, upper beam mounting seat; 903, top plate; 904, bottom plate; 905, vertical plate; 906, driving shaft; 907, motor; 908, sensor mounting seat one; 909, contact sensor one; 910, sensor mounting seat two; 911, contact sensor two; 912, contact slope seat one; 913, contact slope seat two; 914, stop seat plate one; 915, contact slope one; 916, contact slope two; 917, blocking bolt one; 918, fixing nut one; 919, stop seat plate two; 920, blocking bolt two; 10, bearing beam under the electric rotating arm. DETAILED DESCRIPTION

[0017] The technical solution of the present invention is described in detail below through examples. The following examples are merely exemplary and can only be used to explain and illustrate the technical solution of the present invention, but cannot be interpreted as limiting the technical solution of the present invention.

[0018] Embodiment 1 A lifting system for an automated building demolition machine, comprising: The top truss system 1 is located above the floor slab 8 to be built or the top floor slab 8 of the building; The column assembly 2 is fixed below the top truss system 1 and vertically penetrates the working opening 7 on the floor 8. Both ends of the working opening 7 have a rotating arm 901 matching portion that turns toward the same side. A lifting jack 4 is arranged inside the column assembly 2 and is used to control the synchronous lifting and lowering of the column assembly 2 and the top truss system 1; The guide wheel group 5 is arranged on the floor 8 of each layer and is used to contact the four sides of the column assembly 2 to achieve the limit of the column assembly 2 during the lifting process, limit the column assembly 2 to stably slide along the vertical direction, and provide stability during the process; The steel strand 6 is vertically arranged in the column assembly 2 and passes through the interior of the lifting jack 4, and is clamped and fixed by the upper and lower working parts of the lifting jack 4, so that when the telescopic cylinder of the lifting jack 4 works, it can exert an action on the column assembly 2 in a positive or reverse direction, so that the column assembly 2 can be stably raised or lowered; The electric tumbler upper bearing beam 9 is fixed below the lifting jack 4. The electric tumbler upper bearing beam 9 includes a horizontally arranged upper beam mounting seat 902 and tumblers 901 respectively hinged at both ends of the upper beam mounting seat 902. The upper beam mounting seat 902 is provided with an opening for the steel strand 6 to pass freely. The upper beam mounting seat 902 includes a top plate 903, a bottom plate 904 and a vertical plate 905 connected between the top plate 903 and the bottom plate 904. Both ends of the top plate 903 and the bottom plate 904 extend beyond the vertical plate 905 and the extending portions are rotatably connected to a driving shaft 906. The top of the driving shaft 906 extends out of the top plate 903 and is connected to a motor 907. A rotating arm is fixedly connected to the driving shaft 906. The rotating arm 901 is used to press against the floor slab to achieve a supporting function.

[0019] The lower bearing crossbeam 10 of the electric tumbler is fixed below the column assembly 2 and has the same structure as the upper bearing crossbeam.

[0020] In a preferred example, the present invention can be further configured as follows: a sensor mounting seat 908 is fixed at the end of the top plate 903, and a contact sensor 909 extending above the rotating arm 901 is fixed on the sensor mounting seat 908; a sensor mounting seat 910 is fixed on the side end of the top plate 903, and a contact sensor 911 extending above the rotating arm 901 is fixed on the sensor mounting seat 910; a contact slope seat 912, a contact slope seat 913 and a stop plate 914 located between the contact sensor 909 and the contact sensor 911 are fixed on the top of the rotating arm 901; a contact slope seat 912 is provided with a contact slope 915 at one end close to the contact sensor 909, a contact slope seat 913 is provided with a contact slope 916 at one end close to the contact sensor 911, and a stop plate 914 is provided horizontally on its upper edge. A blocking bolt 917 passes through the blocking seat plate, and the blocking bolt 917 is threadedly connected to the fixing nuts 918 located on both sides of the blocking seat. When the swing arm 901 rotates to the length direction of the upper beam mounting seat 902, the contact sensor 909 is attached to the contact slope 915 and the blocking bolt 917 is attached to the sensor mounting seat 908, and the swing arm 901 extends out of the range of the working hole 7; a blocking seat plate 919 is arranged between the top plate 903 and the bottom plate 904, and the blocking seat plate 919 is located on one side of the contact sensor 911. The blocking bolt 920 is threadedly arranged on the blocking seat plate 919. When the swing arm 901 rotates until the contact sensor 911 is attached to the contact slope 916 and the blocking bolt 920 is attached to the sensor mounting seat 910, the swing arm 901 is located in the working hole 7; In a preferred example, the present invention can be further configured as follows: the column assembly 2 includes left and right columns 201, an upper fixed connecting beam 202, a lower fixed connecting beam 203 and a load-bearing connecting beam 204, the left and right columns 201 are vertically and arranged side by side, the upper fixed connecting beam 202 and the lower fixed connecting beam 203 are distributed up and down between the left and right columns 201, and are used to fix the two ends of the steel strand 6, the load-bearing connecting beam 204 is arranged below the lower fixed connecting beam 203, and is used to install and fix the lower load-bearing beam 10 of the electric jib, so as to increase the supporting stability of the structural strength of the lower load-bearing beam 10, and ensure the stability of the entire lifting system during operation.

[0021] In a preferred example, the present invention can be further configured as follows: an electric hoist 3 is provided in the column assembly 2, the electric hoist 3 is located above the lifting jack 4, and the hook of the electric hoist 3 can reach the upper side wall of the lifting jack 4 for lifting.

[0022] Therefore, when the entire lifting jack 4 needs to be raised or lowered by a distance of one floor, the electric hoist 3 is used to quickly move the lifting jack 4 along the steel strand 6, making the construction process more convenient and improving the construction efficiency.

[0023] In a preferred example, the present invention can be further configured as follows: the guide wheel group 5 includes a mounting frame 501 and a roller 502, the mounting frame 501 is used to be fixed on the floor 8, and the roller 502 is rotatably connected to the front end of the mounting frame 501 and is used to resist the outer wall of the column assembly 2.

[0024] Therefore, when lifting operations are required, the guide wheel group 5 at the very end can be disassembled, and then the disassembled guide wheel group 5 can be installed. During installation, it is only necessary to fix the mounting frame 501 with bolts or anchor rods to achieve quick fixation of the guide wheel group 5, making the construction operation process easier and more convenient.

[0025] Embodiment 2 In a preferred example, the present invention can be further configured as follows: the mounting frame 501 includes a base 51, a slide 52, a suspension 53, a screw 54 and a handle 55; the base 51 is used to be fixed on the floor 8; the slide 52 is horizontally slidably connected to the base 51; the suspension 53 is arranged on the slide 52 and is used for the roller 502 to be installed and fixed; the screw 54 is horizontally threadedly connected to the rear of the base 51 and is rotatably connected to the rear end of the slide 52; and the handle 55 is arranged at the rear end of the screw 54.

[0026] In a preferred example, the present invention can be further configured as follows: the suspension 53 is rotatably connected to the slide 52, a circular arc-shaped guide rod 56 is provided on the slide 52, a guide tube 57 slidably connected to the guide rod 56 is provided at the tail end of the suspension 53, and a screw 58 for pressing the upper end surface of the guide rod 56 is vertically threadedly connected to the guide tube 57.

[0027] When the guide wheel group 5 needs to be fixed, the base 51 can be fixed on the ground at will, and then the suspension 53 is controlled to rotate so that the suspension 53 and the roller 502 face forward, and then the handle 55 is controlled to drive the screw 54 to rotate so that the slide 52 slides forward horizontally. At this time, the slide 52 drives the suspension 53 and the roller 502 to move synchronously.

[0028] And until the roller 502 hits the outer wall of the column assembly 2, the suspension 53 and the roller 502 are controlled to rotate synchronously, so that the roller 502 can be pressed against the outer wall of the column assembly 2, and then the screw 58 is tightened to achieve the installation and fixation of the guide wheel assembly 5.

[0029] Therefore, by setting the guide wheel group 5 with adjustable front and rear positions and rotation angles, the guide wheel group 5 can be fixed at will, and the operating requirements of the guide wheel group 5 can be met through fine-tuning. There is no need for workers to lay out lines before installation, nor is there a need for precise installation, which makes the installation process of the guide wheel group 5 more convenient and improves construction efficiency.

[0030] Embodiment 3 A method for using a lifting system of an automated building demolition machine comprises the following steps: Construction process: S1, Nth floor is to be built, initial installation: the upper bearing beam is on the N-1 floor, and the lower bearing beam of the electric rotating arm is on the N-2 floor; S2, after the Nth floor is built, all the locks of the lifting jack 4 are released. At this time, the lower bearing beam of the electric tumbler bears all the loads. The electric hoist 3 installed on the upper fixed connecting beam 202 is used to lift the lifting jack 4 a short distance away from the N-1th floor. The tumblers 901 at both ends of the upper bearing beam are retracted into the range of the working hole 7 by electric control; S3, the electric hoist 3 installed on the upper fixed connecting beam 202 is used again to lift the jacking jack 4 and the upper bearing beam until the upper bearing beam passes through the working opening 7 and reaches a short distance from the upper surface of the N layer; S4, extend the rotating arms 901 at both ends of the upper bearing beam from the range of the working hole 7, operate the lifting jack 4 to descend along the steel strand 6 until the upper bearing beam reaches the upper surface of the N layer, at which time the upper bearing beam bears all the loads, and then operate the lifting jack 4 to perform a lifting movement, so that the steel strand 6 drives the column assembly 2 as a whole and the lower bearing beam of the electric rotating arm to leave the upper surface of the N-2 layer for a short distance through the lower fixed connecting beam 203, and retract the rotating arms 901 at both ends of the lower bearing beam of the electric rotating arm into the range of the working hole 7; S5, then operate the lifting jack 4 to perform lifting movement until the load-bearing beam under the electric tumbler passes through the N-1 layer working opening 7 and reaches a short distance from the upper surface of the N-1 layer. At this time, the entire column assembly 2 and the top truss system 1 are also lifted by about one layer; S6, extend the arms 901 at both ends of the lower bearing beam of the electric tumbler from the working hole 7, operate the lifting jack 4 to descend, and stop when the lower bearing beam of the electric tumbler reaches the upper surface of the N-1 layer. At this time, the upper bearing beam and the lower bearing beam of the electric tumbler jointly bear the load, and wait for the N+1 construction to be completed. Repeat this process, ascending layer by layer, until the overall construction is completed; Removal process: S7, the P layer is the layer to be removed, and the initial installation is: the upper bearing beam is on the P layer, and the lower bearing beam 10 of the electric rotating arm is on the P-2 layer; S8, release all the locks of the lifting jack 4, at this time the load-bearing beam under the electric jib bears all the loads, and the lifting jack 4 is lifted a short distance away from the P layer by the electric hoist 3 installed on the upper fixed connecting beam 202, and the P layer can be removed at this time; S9, the electric hoist 3 installed on the upper fixed connecting beam 202 is used again to lower the jacking jack 4 and the upper bearing beam until the upper bearing beam reaches the upper surface of the P-1 floor slab 8, and then the jacking jack 4 is operated to perform a jacking movement, so that the steel strand 6 drives the column assembly 2 as a whole and the lower bearing beam of the electric tumbler to leave the upper surface of the P-2 floor for a short distance through the lower fixed connecting beam 203, and the tumblers 901 at both ends of the lower bearing beam of the electric tumbler are retracted into the range of the working opening 7. At this time, the upper bearing beam bears all the loads; S10, operate the lifting jack 4 to lower until the load-bearing beam under the electric tumbler passes through the P-2 layer working opening 7 and reaches a short distance from the upper surface of the P-3 layer. At this time, the entire column assembly 2 and the top truss system 1 also descend about one layer; S11, extend the arms 901 at both ends of the lower bearing beam of the electric tumbler from the range of the working hole 7, operate the lifting jack 4 to descend, and stop when the lower bearing beam of the electric tumbler reaches the upper surface of the P-3 layer. At this time, the upper bearing beam and the lower bearing beam of the electric tumbler jointly bear the load, and repeat this process, descending layer by layer, until the overall construction is completed.

[0031] The present invention: 1. By setting a lifting power system that can both rise (build a building) and fall (demolish a building), the whole system has good versatility and is convenient for application to different usage requirements and work scenarios. At the same time, the whole system has a simple structure and stable operation, and is easy to be applied to building construction and demolition machinery and equipment; 2. By adopting a lifting power system that is easy to operate, the whole system can rise (build buildings) and fall (demolish buildings) more smoothly and quickly, thus achieving the effect of convenient operation and improving construction efficiency; 3. The present application achieves this by 1) reasonably designing the shape of the upper crossbeam mounting seat 902 and the shape of the rotating arm 901; 2) installing a motor 907 on the top plate 903 to drive the rotating shaft 906 to control the rotation of the rotating arm 901 so that it can be extended or retracted from the range of the working hole 7, and both ends of the working hole 7 have a matching part of the rotating arm 901 that turns toward the same side; 3) a contact sensor 1 909 and a contact sensor 2 911 are arranged on the top plate 903 of the upper crossbeam mounting seat 902, and a contact slope seat 1 912, a contact slope seat 2 913 and a stop plate 1 914 and a stop plate 2 919 located between the top plate 903 and the bottom plate 904 are arranged on the rotating arm 901. After the rotating arm 901 reaches the position where it extends out of the working hole range, it can pass through the contact sensor 1 909 is attached to the contact slope 915 and the blocking bolt 917 is attached to the sensor mounting seat 908 for double blocking and limiting, and the motor 907 can be controlled to stop working through the contact sensor 909. When the swing arm 901 retracts to the range of the working hole 7, the swing arm 901 rotates to the contact sensor 911 to be attached to the contact slope 916 and the blocking bolt 920 is attached to the sensor mounting seat 910 for double blocking and limiting, and the motor 907 can be controlled to stop working through the contact sensor 909; 4) The blocking bolt 917 and the blocking bolt 920 are respectively fixed by two nuts, and the front and rear positions can be adjusted, which is convenient for adjusting whether the swing arm 901 can be smoothly extended into and retracted into the range of the working hole 7. The combination of the above four points can realize that the load-bearing crossbeam 9 on the electric swing arm can be electrically controlled to be loaded on the floor 8, without the need for manual insertion and control in the form of casing and plugging rods in the past, with good automation and efficient task execution. This not only saves time and resources, but also enables more work to be completed in a shorter time, reducing the stress on workers and improving work efficiency.

[0032] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that a technician familiar with the technical field can think of within the technical scope disclosed in the present invention should be covered within the protection scope of the present invention.

Claims

1. A lifting system for an automated building demolition machine, characterized in that: include A top truss system (1) is located above the floor slab (8) to be constructed or the top floor slab (8) of the building; A column assembly (2) is fixed below the top truss system (1) and vertically penetrates the working opening (7) on the floor slab (8), and both ends of the working opening (7) have a rotating arm (901) matching portion that turns toward the same side; A lifting jack (4) is arranged inside the column assembly (2) and is used to control the synchronous lifting and lowering of the column assembly (2) and the top truss system (1); A guide wheel assembly (5) is arranged on the floor slab (8) of each layer and is used to abut against the four sides of the column assembly (2); The steel strand (6) is vertically arranged in the column assembly (2), passes through the interior of the lifting jack (4), and is clamped and fixed by the upper and lower working parts of the lifting jack (4); The electric tumbler upper bearing beam (9) is fixed below the lifting jack (4), the electric tumbler upper bearing beam (9) comprising a horizontally arranged upper beam mounting seat (902) and tumblers (901) respectively hinged at both ends of the upper beam mounting seat (902), and the upper beam mounting seat (902) is provided with an opening for the steel strand (6) to freely pass through; The upper crossbeam mounting seat (902) comprises a top plate (903), a bottom plate (904) and a vertical plate (905) connected between the top plate (903) and the bottom plate (904); a driving shaft (906) is rotatably connected between the two ends of the top plate (903) and the bottom plate (904); the top of the driving shaft (906) extends out of the top plate (903) and is connected to a motor (907); The lower bearing cross beam (10) of the electric rotating arm is fixed below the column assembly (2) and has the same structure as the upper bearing cross beam (9).

2. The lifting system of an automated building demolition machine according to claim 1, characterized in that: A sensor mounting seat 1 (908) is fixed at the end of the top plate (903), and a contact sensor 1 (909) extending above the rotating arm (901) is fixed on the sensor mounting seat 1 (908). A sensor mounting seat 2 (910) is fixed at the side end of the top plate (903), and a contact sensor 2 (911) extending above the rotating arm (901) is fixed on the sensor mounting seat 2 (910). The contact sensor 1 (909) and the contact sensor 2 (911) are connected to the motor (907) respectively. The top of the rotating arm (901) is fixed with a contact slope seat 1 (912), a contact slope seat 2 (913) and a stop plate 1 (914) located between the contact sensor 1 (909) and the contact sensor 2 (911); the contact slope seat 1 (912) is provided with a contact slope 1 (915) at one end close to the contact sensor 1 (909); the contact slope seat 2 (913) is provided with a contact slope 2 (916) at one end close to the contact sensor 2 (911); the stop plate 1 (914) is provided with a contact slope 2 (917) at one end close to the contact sensor 2 (911); A blocking bolt (917) is horizontally arranged on the upper edge, and the blocking bolt (917) passes through the blocking seat plate. The blocking bolt (917) is threadedly connected to the fixing nuts (918) located on both sides of the baffle seat. When the rotating arm (901) rotates to the length direction of the upper beam mounting seat, the contact sensor (909) is attached to the contact slope (915) and the blocking bolt (917) is attached to the sensor mounting seat (908), and the rotating arm (901) extends out of the range of the working hole (7); A second stopper plate (919) is provided between the top plate (903) and the bottom plate (904), the second stopper plate (919) being located on one side of the second contact sensor (911), and a second stopper bolt (920) is threadedly provided on the second stopper plate (919). When the rotating arm (901) rotates until the second contact sensor (911) is in contact with the second contact slope (916) and the second stopper bolt (920) is in contact with the second sensor mounting seat (910), the rotating arm (901) is located within the range of the operation hole (7).

3. The lifting system of an automated building demolition machine according to claim 2, characterized in that: The column assembly (2) comprises left and right columns (201), an upper fixed connecting beam (202), a lower fixed connecting beam (203) and a load-bearing connecting beam (204); the left and right columns (201) are arranged vertically and side by side; the upper fixed connecting beam (202) and the lower fixed connecting beam (203) are distributed vertically between the left and right columns (201) and are used to fix the two ends of the steel strand (6); the load-bearing connecting beam (204) is arranged below the lower fixed connecting beam (203) and is used to install and fix the load-bearing cross beam (10) below the electric jib.

4. The lifting system of an automated building demolition machine according to claim 3, characterized in that: An electric hoist (3) is arranged in the column assembly (2), and the electric hoist (3) is located above the lifting jack (4). The hook of the electric hoist (3) can reach the upper side wall of the lifting jack (4) for lifting.

5. The lifting system of an automated building demolition machine according to claim 4, characterized in that: The guide wheel assembly (5) comprises a mounting frame (501) and a roller (502), wherein the mounting frame (501) is used to be fixed on the floor slab (8), and the roller (502) is rotatably connected to the front end of the mounting frame (501) and is used to abut against the outer side wall of the column assembly (2).

6. The lifting system of an automated building demolition machine according to claim 5, characterized in that: The mounting frame (501) comprises a base (51), a slide (52), a suspension (53), a screw (54) and a handle (55); the base (51) is used to be fixed on the floor slab (8); the slide (52) is horizontally slidably connected to the base (51); the suspension (53) is arranged on the slide (52) and is used for the roller (502) to be installed and fixed; the screw (54) is horizontally threadedly connected to the rear of the base (51) and is rotatably connected to the rear end of the slide (52); and the handle (55) is arranged at the rear end of the screw (54).

7. The lifting system of an automated building demolition machine according to claim 6, characterized in that: The suspension (53) is rotatably connected to the slide seat (52), and an arc-shaped guide rod (56) is provided on the slide seat (52). The tail end of the suspension (53) is provided with a guide tube (57) slidably connected to the guide rod (56), and a screw (58) for pressing the upper end surface of the guide rod (56) is vertically threadedly connected to the guide tube (57).

8. The method for using the lifting system of an automated building demolition machine according to any one of claims 1 to 7, characterized in that: The steps include: S1, Nth floor is the floor to be built, initial installation: the upper bearing beam (9) is on the N-1 floor, and the lower bearing beam (10) of the electric rotating arm is on the N-2 floor; S2, the Nth floor is constructed, and all the locks of the lifting jack (4) are released. At this time, the lower bearing beam (10) of the electric rotating arm bears all the loads. The electric hoist (3) installed on the upper fixed connecting beam (202) is used to lift the lifting jack (4) a short distance away from the N-1th floor, and the rotating arms (901) at both ends of the upper bearing beam (9) are retracted into the range of the working hole (7) by electric control; S3, again using the electric hoist (3) installed on the upper fixed connecting beam (202) to lift the jacking jack (4) and the upper bearing beam (9) until the upper bearing beam (9) passes through the working hole (7) and reaches a short distance from the upper surface of the N layer; S4, extend the rotating arms (901) at both ends of the upper bearing beam (9) from the range of the working hole (7), operate the lifting jack (4) to descend along the steel strand (6) until the upper bearing beam (9) reaches the upper surface of the N layer. At this time, the upper bearing beam (9) bears all the loads. Then operate the lifting jack (4) to perform a lifting movement, so that the steel strand (6) drives the column assembly (2) as a whole and the lower bearing beam (10) of the electric rotating arm to leave the upper surface of the N-2 layer for a short distance through the lower fixed connecting beam (203), and retract the rotating arms (901) at both ends of the lower bearing beam (10) of the electric rotating arm into the range of the working hole (7); S5, then operate the lifting jack (4) to perform lifting movement until the lower bearing beam (10) of the electric rotating arm passes through the N-1 layer working hole (7) and reaches a short distance from the upper surface of the N-1 layer. At this time, the entire column assembly (2) and the top truss system (1) are also lifted by about one layer; S6, the arms (901) at both ends of the lower bearing beam (10) of the electric tumbler are extended from the range of the working hole (7), and the lifting jack (4) is operated to descend until the lower bearing beam (10) of the electric tumbler reaches the upper surface of the N-1 layer and stops. At this time, the upper bearing beam (9) and the lower bearing beam (10) of the electric tumbler jointly bear the load, and wait for the N+1 construction to be completed. This is repeated, rising layer by layer, until the overall construction is completed.

9. The method for using the lifting system of an automated building demolition machine according to claim 8, characterized in that: The following steps are also included: S7, the P layer is the layer to be removed, and the initial installation is: the upper bearing beam (9) is at the P layer, and the lower bearing beam (10) of the electric rotating arm is at the P-2 layer; S8, release all the locks of the lifting jack (4), at which time the load-bearing crossbeam (10) under the electric jib bears all the loads, and the lifting jack (4) is lifted a short distance away from the P layer by using the electric hoist (3) installed on the upper fixed connecting beam (202), and the P layer can be removed at this time; S9, the electric hoist (3) installed on the upper fixed connecting beam (202) is used again to lower the lifting jack (4) and the upper bearing beam (9) until the upper bearing beam (9) reaches the upper surface of the P-1 floor slab (8), and then the lifting jack (4) is operated to perform a lifting movement, so that the steel strand (6) drives the column assembly (2) as a whole and the lower bearing beam (10) of the electric rotating arm to leave the upper surface of the P-2 floor by a short distance through the lower fixed connecting beam (203), and the rotating arms (901) at both ends of the lower bearing beam (10) of the electric rotating arm are retracted into the range of the working hole (7). At this time, the upper bearing beam (9) bears all the loads; S10, operate the lifting jack (4) to lower until the lower bearing beam (10) of the electric rotating arm passes through the P-2 layer working hole (7) and reaches a short distance from the upper surface of the P-3 layer. At this time, the entire column assembly (2) and the top truss system (1) also descend by about one layer; S11, the arms (901) at both ends of the lower bearing beam (10) of the electric tumbler are extended from the range of the working hole (7), and the lifting jack (4) is operated to lower the lower bearing beam (10) until it reaches the upper surface of the P-3 layer. At this time, the upper bearing beam (9) and the lower bearing beam (10) of the electric tumbler jointly bear the load, and this is repeated, descending layer by layer, until the overall construction is completed.

Citation Information

Patent Citations

  • Combined type telescopic sleeve jacking device and method

    CN111058618A

  • High-rise building demolition equipment and high-rise building demolition method

    CN115807562A

  • Mutual climbing type steel stand column horizontal beam plate construction platform and construction method

    CN117248714A

  • Lifting system of building demolition machine and using method of lifting system

    CN118008002A

  • Automatic reinforcing device of beam loaded with weight in temporarily installed machine

    JP1994017544A