Dome tent and mounting method thereof
By using technical means such as dome design, wire rope connection and photovoltaic mechanism in the tent, the problems of troubles in the construction of the tent and insufficient wind resistance are solved, rapid installation and high stability are achieved, and application effect and safety are improved.
Patent Information
- Application Number
- CN202510055827.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-14
- Publication Date
- 2025-03-25
AI Technical Summary
The existing outdoor tent is troublesome when building and the skeleton cannot guarantee support in severe weather such as strong winds, resulting in poor application effect.
The dome tent design is adopted, and the columns and embedded mounts are connected by wire ropes, supporting components and main beam components are set up, and photovoltaic mechanisms and impact buffer components are set up between the main beam and the pipe frame to improve the stability and wind resistance of the skeleton.
It realizes rapid installation of tents, saves time and effort, and improves the stability and wind resistance of tent skeletons, improves the practical application effect and use safety.
Smart Images

Figure CN119686578A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of tents, and in particular relates to a dome tent and an installation method thereof. Background Art
[0002] Tents are temporary structures commonly used in outdoor activities. Their main function is to provide users with a sheltered space to cope with various outdoor environments. Tents are temporary structures commonly used in outdoor activities. Their main function is to provide users with a sheltered space to cope with various outdoor environments. Tents are usually made of waterproof materials (such as nylon, polyester, etc.), which are specially treated to enhance their waterproofness, breathability and durability.
[0003] A Chinese patent discloses (CN111636754A) a combined push-pull tent, comprising a tarpaulin, a tent frame is arranged on the inner side of the tarpaulin in sequence, the tent frame is composed of a top frame and a bracket, the bracket is located at both ends of the top frame, a moving wheel is fixed at the bottom of the bracket, a toothed disc is fixed at one end of the moving wheel, a mounting frame is arranged on the top of the moving wheel, a slide rod is passed through one end of the mounting frame, and a slide hole is opened on the surface of the slide rod; the tent is stuck in the toothed disc through the designed magnetic slot block, and is adsorbed with the toothed disc at the same time, thereby positioning the moving wheel to ensure that it is not easy to rotate, making the use of the tent more stable and reliable, and the designed spring has good elasticity, thereby exerting a pushing effect on the slide rod to ensure that the magnetic slot block is not stuck in the toothed disc, so that the moving wheel is not easily obstructed during the pushing and pulling process of the tent. Although today's tents also have good outdoor camping functions, they are generally large in size and more troublesome to set up. In addition, since the tent is set outdoors, its frame needs to have a stable load-bearing capacity. Today's tent frames only solve this problem by using higher-strength materials. However, when used outdoors, encountering strong winds and other weather conditions, the supporting force between the frames cannot be guaranteed, and the actual application effect is not good. In order to solve the above problems, a dome tent and an installation method thereof are urgently needed. Summary of the invention
[0004] The purpose of the present invention is to solve the problem that although the current tents also have good outdoor camping functions, they are generally large in size and more troublesome to set up. In addition, since the tents are set outdoors, their frames need to have stable load-bearing capacity. The current tent frames only solve this problem by using higher-strength materials. However, when used outdoors, encountering strong winds and other weather conditions, the supporting force between the frames cannot be guaranteed, resulting in poor actual application effects. A dome tent and its installation method are proposed.
[0005] In order to achieve the above-mentioned purpose, the present invention adopts the following technical scheme: a dome tent, comprising a wire rope connecting column and a pre-embedded mounting seat, a support assembly and a main beam assembly are fixedly installed on the top surface of the pre-embedded mounting seat by bolts, a connecting wire rope is arranged on the wire rope connecting column, a tarpaulin is sheathed on the outside of the support assembly and the main beam assembly, a transparent cloth is arranged at the middle position of the top surface of the tarpaulin, and a cloth door is arranged on one side of the tarpaulin through a zipper; The main beam assembly includes a bottom connecting plate, which is fixedly installed on the top surface of the embedded mounting seat by bolts, and a main beam is fixedly installed on the top surface of the bottom connecting plate. The main beam is composed of two assembled beams of the same specification, and a structural reinforcement rib is fixedly installed on the inner side of the main beam. The support assembly includes a mounting base plate and a plurality of pipe racks, and the mounting base plate is fixedly installed on the top surface of the embedded mounting seat by bolts. A mounting piece is fixedly installed on the top surface of the mounting base plate, and a plurality of pipe racks are fixedly installed inside the mounting piece by bolts. A photovoltaic mechanism is arranged between the main beam and the pipe rack, and the photovoltaic mechanism is located below the transparent cloth.
[0006] As a further description of the above technical solution: A connecting piece is arranged outside the pipe rack, a mounting sleeve is fixedly mounted outside the connecting piece, and a fixed pulley is arranged at the bottom end of the mounting sleeve.
[0007] As a further description of the above technical solution: The photovoltaic mechanism comprises a mounting frame, a connecting buckle is fixedly mounted on the bottom surface of one side of the mounting frame, the connecting buckle is fixedly connected to the main beam by bolts, and a photovoltaic component is arranged on the top surface of the mounting frame.
[0008] As a further description of the above technical solution: The photovoltaic assembly includes a photovoltaic panel, which is arranged on the top surface of the mounting frame. A positioning block is fixedly installed on the top surface of the photovoltaic panel, a bottom spring is fixedly installed on the bottom surface of the positioning block, positioning holes are arranged on the outer walls on both sides of the positioning block, and one end of the positioning block is embedded in a positioning groove arranged on the top surface of the mounting frame.
[0009] As a further description of the above technical solution: Two bottom grooves are arranged on the bottom surface of the mounting frame, and positioning components are arranged inside the two bottom grooves. The positioning components include two sliders, which are slidably installed inside the two bottom grooves, and a connecting spring is fixedly installed at one end of the slider.
[0010] As a further description of the above technical solution: One end of the connecting spring is fixedly connected to the inner wall of one side of the bottom groove, and the other end of the slider is laterally fixedly installed with a positioning pin shaft, one end of the positioning pin shaft is embedded in the interior of the positioning hole, and a bottom block is fixedly installed on the bottom surface of the slider.
[0011] As a further description of the above technical solution: Two shaft frames are fixedly installed on the bottom surface of the mounting frame, and rotating holes are arranged inside the two shaft frames, and bidirectional threaded shafts are rotatably installed in the rotating holes. The bidirectional threaded shafts are threadedly connected with the threaded holes arranged inside the two bottom blocks respectively, and a rotating sleeve is fixedly installed at the middle position of the bidirectional threaded shafts.
[0012] As a further description of the above technical solution: An inner mounting groove and a mounting hole are provided inside the mounting frame, and an impact buffer assembly is provided inside the inner mounting groove and the mounting hole. The impact buffer assembly includes a set spring shaft and two electric hydraulic rods. The set spring shaft is fixedly installed inside the mounting hole, and the two electric hydraulic rods are fixedly installed inside the inner mounting groove. A connecting shaft is slidably installed outside the set spring shaft, and an impact buffer sheet is fixedly installed on one end of the connecting shaft.
[0013] As a further description of the above technical solution: The impact buffer plate is located on the outside of the mounting frame, an impact resistance plate is fixedly installed at one end of the electric hydraulic rod, the impact resistance plate is slidably connected to the mounting inner groove, a clamping hole is provided at one end of the impact resistance plate, a side arc plate is fixedly installed on the outside of the connecting shaft, a plurality of clamping shafts are fixedly installed on the outer wall of one side of the side arc plate, one end of the clamping shaft is clamped into the inside of the clamping hole, the electric hydraulic rod is composed of a telescopic joint and a shaping joint, the telescopic joint of the electric hydraulic rod is slidably connected to the through hole provided inside the side arc plate, an induction switch is provided at one end of the shaping joints of the two electric hydraulic rods, and the side arc plate is located on one side of the induction switch.
[0014] The present invention also discloses a method for installing a dome tent, comprising the following steps: S1. When setting up the tent, firstly, the steel wire rope connecting column and the embedded mounting seat are embedded in the positioning pit to define the installation position of the overall frame. Then, an auxiliary tripod is temporarily built, and then the main beam is assembled. The two assembled beams are bolted together to form the main body of the main beam. S2. Install the ceiling light below the middle of the main beam, and run its electric wires through the inside of the main beam. Then install a pulling motor on one side of the auxiliary tripod, and connect the pulling rope of the pulling motor to the middle of the main beam through the pulley on the top of the auxiliary tripod. At this time, take the tarpaulin, roll it up from both sides to the middle, and after rolling it up, put it outside the main beam and bind it to the main beam with the webbing. S3, turning on the pulling motor, pulling up the main beam to a vertical state through the pulling rope, fixing the bottom connecting plate of the main beam on the top surface of the embedded mounting seat through bolts, and completing the installation of the main beam assembly; S4. Take the pipe rack and insert it into the mounting part. At this time, pull it up to a certain height through the pulling motor. At this time, use bolts to fix it to the mounting part. In this way, the positioning of multiple pipe racks on both sides of the main beam is completed. Then, steel wire ropes are inserted and connected between the pipe rack and the main beam to strengthen the structure. After the frame is built, cover the entire frame with tarpaulin to complete the installation; S5. After the overall tent is built, the photovoltaic mechanism can be installed. The photovoltaic panel can be directly installed in the positioning groove of the mounting frame through the positioning block. At this time, the rotating sleeve is rotated, and the bidirectional threaded shaft rotates as a whole, which can drive the two bottom blocks on both sides to move closer to each other, and at the same time drive the positioning pin shaft to move closer. At this time, one end of the two positioning pin shafts can be inserted into the positioning hole of the positioning block, and the photovoltaic panel can be quickly positioned and installed; S6. Install the mounting frame between the main beam and the pipe rack by bolts, and then connect the photovoltaic panel to complete the installation. When the tent is in use, the photovoltaic panel can obtain sufficient light through the transparent cloth. When the photovoltaic panel needs to be removed, directly rotate the two-way threaded shaft in the opposite direction. At this time, the positioning effect of the positioning block disappears, and the positioning block can be quickly popped out under the action of the bottom spring to complete the rapid removal of the photovoltaic panel.
[0015] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are: 1. In the present invention, a supporting assembly and a main beam assembly are matched, and a plurality of fixed pulleys are arranged on the supporting assembly. When the tent is to be erected, the steel wire rope connecting column and the embedded mounting seat are first embedded in the positioning pit to define the installation position of the overall frame. Then, an auxiliary tripod is temporarily built, and then the main beam is assembled. The two assembled beams are bolted together to form the main body of the main beam. The ceiling light is installed below the middle position of the main beam, and its wires are inserted through the inside of the main beam. Then, a pulling motor is installed on one side of the auxiliary tripod, and the pulling rope of the pulling motor is connected to the middle of the main beam through the pulley on the top of the auxiliary tripod. At this time, the tarpaulin is taken and rolled up from both sides to the middle. After rolling up, it is placed on the outside of the main beam and bound to the main beam through the webbing. Turn on the pulling motor, and use the traction rope to pull the main beam to a vertical state. Use bolts to fix the bottom connecting plate of the main beam on the top surface of the embedded mounting seat to complete the installation of the main beam assembly. Then take the pipe rack and insert it into the mounting piece. At this time, use the pulling motor to pull it to a certain height. At this time, use bolts to fix it to the mounting piece. In this way, the positioning of multiple pipe racks on both sides of the main beam is completed, and then the steel wire rope is inserted between the pipe rack and the main beam to strengthen the structure. After the frame is built, cover the tarpaulin on the overall frame to complete the installation. Through this design, using the above structure, the installation of the tent can be completed quickly, saving time and effort. At the same time, the overall frame is a dome structure, and its stability can be effectively guaranteed, which greatly improves the actual application effect of the overall tent.
[0016] 2. In the present invention, by matching with the photovoltaic mechanism, after the overall tent is built, the photovoltaic mechanism can be installed, and the photovoltaic panel can be directly installed in the positioning groove of the mounting frame through the positioning block. At this time, the rotating sleeve is rotated, and the bidirectional threaded shaft rotates as a whole, which can drive the two bottom blocks on both sides thereof to move closer to each other, and at the same time drive the positioning pin shaft to move closer. At this time, one end of the two positioning pin shafts can be inserted into the positioning hole of the positioning block, and the photovoltaic panel can be quickly positioned and installed. At this time, the mounting frame is positioned and installed between the main beam and the pipe rack by bolts, and the photovoltaic panel is connected to complete the installation. When the tent is in use, The photovoltaic panel can obtain sufficient light through the transparent cloth. When the photovoltaic panel needs to be removed, the bidirectional threaded shaft is directly rotated in the opposite direction. At this time, the positioning effect of the positioning block disappears, and the positioning block can be quickly popped out under the action of the bottom spring to complete the rapid disassembly of the photovoltaic panel. Through this design, the tent can convert solar energy when in use to provide continuous power supply to the tent, and the overall photovoltaic mechanism is very convenient to assemble, without the need for extra positioning parts and equipment. After the photovoltaic mechanism is installed between the main beam and the pipe rack, the supporting strength between the main beam and the pipe rack can be further strengthened, thereby improving the stability of the overall skeleton of the tent.
[0017] 3. In the present invention, an impact buffer component is provided in the photovoltaic mechanism. During the installation and use of the photovoltaic mechanism, if there is a strong wind in the environment, a certain amount of shaking will occur between the main beam and the pipe rack. At this time, the impact buffer sheet can contact the shaking pipe rack to achieve buffering for the pipe rack and reduce the shaking amplitude of the overall frame. As the environmental wind force increases, the shaking amplitude of the pipe rack will also deepen. At this time, the contact pressure on the impact buffer sheet will also increase. At this time, the connecting shaft can drive the side arc plate to move sideways synchronously. When the side arc plate touches the induction switch of the electric hydraulic rod, the electric hydraulic rod is controlled to open, and the impact resistance plate can be pushed out to one side, so that the impact resistance plate is stably in contact with the pipe rack, eliminating the vibration between the main beam and the pipe rack, thereby improving the stability between the pipe rack and the main beam to resist the extremely strong wind force. Through this design, not only the structural strength between the overall tent frame can be improved, but also the protection mechanism can be automatically started in bad weather, further ensuring the stability of the overall frame, greatly improving the use safety and environmental adaptability of the tent, and further improving the actual application effect of the tent. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 The present invention is a schematic diagram of the three-dimensional structure of a dome tent.
[0019] Figure 2 The present invention is a schematic diagram of the three-dimensional structure of a dome tent after the tarpaulin is disassembled.
[0020] Figure 3 The present invention is a schematic diagram of the three-dimensional structure at a first angle after the tarpaulin and photovoltaic mechanism in a dome tent are disassembled.
[0021] Figure 4 The present invention is a schematic diagram of the three-dimensional structure at a second angle after the tarpaulin and photovoltaic mechanism in a dome tent are disassembled.
[0022] Figure 5 A dome tent Figure 3 Schematic diagram of the enlarged structure at point A in the middle.
[0023] Figure 6 This is a schematic diagram of the three-dimensional structure of a photovoltaic mechanism in a dome tent from a first angle.
[0024] Figure 7 This is a second-angle three-dimensional structural schematic diagram of a photovoltaic mechanism in a dome tent.
[0025] Figure 8 The first exploded three-dimensional structural schematic diagram of a photovoltaic mechanism in a dome tent.
[0026] Fig. 9 It is a schematic diagram of a second exploded three-dimensional structure of a photovoltaic mechanism in a dome tent.
[0027] Fig.10The figure is a schematic diagram of the exploded three-dimensional structure of a mounting frame in a dome tent.
[0028] Fig.11 It is a schematic diagram of the exploded three-dimensional structure of a positioning component in a dome tent.
[0029] Fig.12 The figure is a schematic diagram of the explosion three-dimensional structure of an impact buffer component in a dome tent.
[0030] Fig.13 A dome tent Figure 4 Schematic diagram of the enlarged structure at point A in the middle.
[0031] Legend: 1. Transparent cloth; 2. Tarpaulin; 3. Zipper; 4. Cloth door; 5. Wire rope connecting column; 6. Embedded mounting seat; 7. Connecting wire rope; 8. Support assembly; 81. Pipe rack; 82. Mounting piece; 83. Mounting bottom plate; 84. Mounting sleeve; 85. Fixed pulley; 86. Connecting piece; 9. Photovoltaic mechanism; 91. Connecting buckle; 92. Mounting frame; 93. Photovoltaic assembly; 931. Photovoltaic panel; 932. Positioning hole; 933. Bottom spring; 934. Positioning block; 94. Mounting inner groove; 95. Impact buffer assembly; 951. Impact resistance plate; 9 52. Impact buffer; 953. Connecting shaft; 954. Spring shaft; 955. Side arc plate; 956. Through hole; 957. Embedded shaft; 958. Electric hydraulic rod; 959. Clamping hole; 96. Positioning assembly; 961. Sliding block; 962. Connecting spring; 963. Bottom block; 964. Positioning pin shaft; 965. Rotating sleeve; 966. Bidirectional threaded shaft; 97. Positioning groove; 98. Shaft frame; 99. Bottom groove; 910. Mounting hole; 10. Main beam assembly; 101. Structural reinforcement rib; 102. Main beam; 103. Bottom connecting plate. DETAILED DESCRIPTION
[0032] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0033] See also Figure 1-Figure 13The present invention provides a technical solution: a dome tent, comprising a wire rope connecting column 5 and a pre-embedded mounting seat 6, a support assembly 8 and a main beam assembly 10 are fixedly installed on the top surface of the pre-embedded mounting seat 6 by bolts, a connecting wire rope 7 is arranged on the wire rope connecting column 5, a tarpaulin 2 is sheathed on the outside of the support assembly 8 and the main beam assembly 10, a transparent cloth 1 is arranged at the middle position of the top surface of the tarpaulin 2, and a cloth door 4 is arranged on one side of the tarpaulin 2 through a zipper 3; The main beam assembly 10 includes a bottom connecting plate 103, which is fixedly mounted on the top surface of the embedded mounting seat 6 by bolts, and a main beam 102 is fixedly mounted on the top surface of the bottom connecting plate 103. The main beam 102 is composed of two assembled beams of the same specification, and a structural reinforcement rib 101 is fixedly mounted on the inner side of the main beam 102. The support assembly 8 includes a mounting base plate 83 and a plurality of pipe racks 81, and the mounting base plate 83 is fixedly mounted on the top surface of the embedded mounting seat 6 by bolts. A mounting member 82 is fixedly mounted on the top surface of the mounting base plate 83, and a plurality of pipe racks 81 are fixedly mounted inside the mounting member 82 by bolts. A photovoltaic mechanism 9 is arranged between the main beam 102 and the pipe rack 81, and the photovoltaic mechanism 9 is located below the transparent cloth 1. A connecting member 86 is arranged on the outside of the pipe rack 81, and a mounting sleeve 84 is fixedly mounted on the outside of the connecting member 86, and a fixed pulley 85 is arranged on the bottom end of the mounting sleeve 84.
[0034] The specific implementation method is as follows: when setting up the tent, first, the steel wire rope connecting column 5 and the embedded mounting seat 6 are embedded in the positioning pit to define the installation position of the overall frame. At this time, an auxiliary tripod is temporarily built, and then the main beam 102 is assembled. The two assembled beams are bolted together to form the main body of the main beam 102. The ceiling light is installed below the middle position of the main beam, and its wires are inserted through the inside of the main beam. Then, a traction motor is installed on one side of the auxiliary tripod, and the traction rope of the traction motor is connected to the middle of the main beam through the pulley on the top of the auxiliary tripod. At this time, the tarpaulin 2 is taken, and the tarpaulin 2 is rolled up from both sides to the middle. After rolling up, it is placed outside the main beam 102. It is bound to the main beam 102 through the webbing, and the pulling motor is turned on at this time. The main beam 102 is pulled up to a vertical state through the traction rope, and the bottom connecting plate 103 of the main beam 102 is fixedly installed on the top surface of the embedded mounting seat 6 by bolts to complete the installation of the main beam assembly 10, and then the pipe rack 81 is taken and inserted into the mounting member 82. At this time, it is pulled to a certain height by the pulling motor, and then it is fixed to the mounting member 82 by bolts. In this way, the positioning of multiple pipe racks 81 on both sides of the main beam 102 is completed, and then the steel wire rope 7 is inserted and connected between the pipe rack 81 and the main beam 102 to strengthen the structure. After the skeleton is built, the tarpaulin 2 is covered on the overall skeleton to complete the installation.
[0035] Through this design and the above structure, the installation of the tent can be completed quickly, saving time and effort. At the same time, the overall frame is a dome structure, and its stability can be effectively guaranteed, which greatly improves the actual application effect of the overall tent.
[0036] The photovoltaic mechanism 9 includes a mounting frame 92 , a connecting buckle 91 is fixedly mounted on the bottom surface of one side of the mounting frame 92 , the connecting buckle 91 is fixedly connected to the main beam 102 by bolts, and a photovoltaic assembly 93 is arranged on the top surface of the mounting frame 92 .
[0037] The photovoltaic assembly 93 includes a photovoltaic panel 931, and the photovoltaic panel 931 is arranged on the top surface of the mounting frame 92. A positioning block 934 is fixedly installed on the top surface of the photovoltaic panel 931, and a bottom spring 933 is fixedly installed on the bottom surface of the positioning block 934. Positioning holes 932 are provided on the outer walls on both sides of the positioning block 934, and one end of the positioning block 934 is embedded in the positioning groove 97 provided on the top surface of the mounting frame 92.
[0038] Two bottom grooves 99 are provided on the bottom surface of the mounting frame 92, and positioning components 96 are provided inside the two bottom grooves 99. The positioning component 96 includes two sliders 961, and the two sliders 961 are slidably installed inside the two bottom grooves 99. A connecting spring 962 is fixedly installed on one end of the slider 961, and one end of the connecting spring 962 is fixedly connected to an inner wall of one side of the bottom groove 99. A positioning pin 964 is laterally fixedly installed on the other end of the slider 961, and one end of the positioning pin 964 is embedded in the interior of the positioning hole 932. A bottom block 963 is fixedly installed on the bottom surface of the slider 961. Two shaft frames 98 are fixedly installed on the bottom surface of the mounting frame 92, and rotating holes are provided inside the two shaft frames 98. A bidirectional threaded shaft 966 is rotatably installed in the rotating hole. The bidirectional threaded shaft 966 is threadedly connected to the threaded holes provided inside the two bottom blocks 963 respectively, and a rotating sleeve 965 is fixedly installed at the middle position of the bidirectional threaded shaft 966.
[0039] The specific implementation method is as follows: after the overall tent is built, the photovoltaic mechanism 9 can be installed, and the photovoltaic panel 931 can be directly installed in the positioning groove 97 of the mounting frame 92 through the positioning block 934. At this time, the rotating sleeve 965 is rotated, and the bidirectional threaded shaft 966 rotates as a whole, which can drive the two bottom blocks 963 on both sides thereof to move closer to each other, and at the same time drive the positioning pin shaft 964 to move closer. At this time, one end of the two positioning pin shafts 964 can be inserted into the positioning hole 932 of the positioning block 934, and the photovoltaic panel 931 can be quickly positioned and installed. At this time, the mounting frame 92 is positioned and installed between the main beam 102 and the pipe rack 81 by bolts, and then the photovoltaic panel 931 is connected to complete the installation. When the tent is in use, the photovoltaic panel 931 can obtain sufficient light through the transparent cloth 1. When the photovoltaic panel 931 needs to be disassembled, the bidirectional threaded shaft 966 is directly rotated in the opposite direction. At this time, the positioning effect of the positioning block 934 disappears, and the positioning block 934 can be quickly ejected under the action of the bottom spring 933, so as to complete the rapid disassembly of the photovoltaic panel 931.
[0040] Through this design, the tent can perform solar energy conversion when in use to provide continuous power supply to the tent, and the overall photovoltaic mechanism 9 is very convenient to assemble, without the need for extra positioning parts and equipment. After the photovoltaic mechanism 9 is installed between the main beam 102 and the pipe rack 81, the supporting strength between the main beam 102 and the pipe rack 81 can be further strengthened, thereby improving the stability of the overall frame of the tent.
[0041] The interior of the mounting frame 92 is provided with an inner mounting groove 94 and a mounting hole 910, and an impact buffer assembly 95 is provided inside the inner mounting groove 94 and the mounting hole 910. The impact buffer assembly 95 includes a set spring shaft 954 and two electric hydraulic rods 958. The set spring shaft 954 is fixedly installed inside the mounting hole 910, and the two electric hydraulic rods 958 are fixedly installed inside the inner mounting groove 94. A connecting shaft 953 is slidably installed on the outside of the set spring shaft 954, and an impact buffer sheet 952 is fixedly installed on one end of the connecting shaft 953. The impact buffer sheet 952 is located on the outside of the mounting frame 92, and one end of the electric hydraulic rod 958 is fixedly installed There is an impact resistance plate 951, which is slidably connected to the mounting inner groove 94, and a clamping hole 959 is set at one end of the impact resistance plate 951. A side arc plate 955 is fixedly installed on the outside of the connecting shaft 953, and a plurality of clamping shafts 957 are fixedly installed on the outer wall of one side of the side arc plate 955. One end of the clamping shaft 957 is clamped into the inside of the clamping hole 959. The electric hydraulic rod 958 is composed of an expansion joint and a shaping joint. The expansion joint of the electric hydraulic rod 958 is slidably connected to the through hole 956 set inside the side arc plate 955. An induction switch is set at one end of the shaping joint of the two electric hydraulic rods 958, and the side arc plate 955 is located on one side of the induction switch.
[0042] The specific implementation method is as follows: during the installation and use of the photovoltaic mechanism 9, if there is a strong wind in the environment, there will be a certain amount of shaking between the main beam 102 and the pipe rack 81. At this time, the impact buffer sheet 952 can contact the shaking pipe rack 81 to achieve buffering for the pipe rack 81 and reduce the shaking amplitude of the overall skeleton. As the environmental wind force increases, the shaking amplitude of the pipe rack 81 will also deepen. At this time, the contact pressure on the impact buffer sheet 952 will also increase. At this time, the connecting shaft 953 can drive the side arc plate 955 to move sideways synchronously. When the side arc plate 955 touches the induction switch of the electric hydraulic rod 958, the electric hydraulic rod 958 is controlled to open, and the impact resistance plate 951 can be pushed out to one side, so that the impact resistance plate 951 is stably in contact with the pipe rack 81, eliminating the vibration between the main beam 102 and the pipe rack 81, thereby improving the stability between the pipe rack 81 and the main beam 102 to resist the extremely strong wind force.
[0043] Through this design, not only can the structural strength of the entire tent frame be improved, but the protection mechanism can also be automatically activated in the event of severe weather, further ensuring the stability of the overall frame, greatly improving the safety of use and environmental adaptability of the tent, and further improving the actual application effect of the tent.
[0044] The present invention also discloses a method for installing a dome tent, comprising the following steps: S1. When setting up the tent, firstly, the steel wire rope connecting column 5 and the embedded mounting seat 6 are embedded in the positioning pit to define the installation position of the overall frame. Then, an auxiliary tripod is temporarily built, and then the main beam 102 is assembled. The two assembled beams are bolted together to form the main body of the main beam 102. S2. Install the ceiling light below the middle of the main beam, and let its electric wires pass through the inside of the main beam. Then install a pulling motor on one side of the auxiliary tripod, and connect the pulling rope of the pulling motor to the middle of the main beam through the pulley on the top of the auxiliary tripod. At this time, take the tarpaulin 2, roll it up from both sides to the middle, and after rolling it up, put it outside the main beam 102 and bind it to the main beam 102 through the webbing. S3, turn on the pulling motor, pull up the main beam 102 to a vertical state through the pulling rope, and fix the bottom connecting plate 103 of the main beam 102 on the top surface of the embedded mounting seat 6 through bolts to complete the installation of the main beam assembly 10; S4, take the pipe rack 81, insert it into the mounting member 82, and pull it up to a certain height by the pulling motor, and then fix it to the mounting member 82 by bolts, so as to complete the positioning of multiple pipe racks 81 on both sides of the main beam 102, and then insert the steel wire rope 7 between the pipe rack 81 and the main beam 102 to strengthen the structure. After the frame is built, cover the tarpaulin 2 on the whole frame to complete the installation; S5. After the tent is built, the photovoltaic mechanism 9 can be installed. The photovoltaic panel 931 can be directly installed in the positioning groove 97 of the mounting frame 92 through the positioning block 934. At this time, the rotating sleeve 965 is rotated, and the bidirectional threaded shaft 966 rotates as a whole, which can drive the two bottom blocks 963 on both sides thereof to move closer to each other, and at the same time drive the positioning pin shaft 964 to move closer. At this time, one end of the two positioning pin shafts 964 can be inserted into the positioning hole 932 of the positioning block 934, and the photovoltaic panel 931 can be quickly positioned and installed. S6. Install the mounting frame 92 between the main beam 102 and the pipe rack 81 by bolts, and then connect the photovoltaic panel 931 to complete the installation. When the tent is in use, the photovoltaic panel 931 can obtain sufficient light through the transparent cloth 1. When the photovoltaic panel 931 needs to be removed, the bidirectional threaded shaft 966 is directly rotated in the opposite direction. At this time, the positioning effect of the positioning block 934 disappears, and the positioning block 934 can be quickly popped out under the action of the bottom spring 933, completing the rapid removal of the photovoltaic panel 931.
[0045] Working principle: when setting up the tent, first, embed the wire rope connecting column 5 and the embedded mounting seat 6 into the positioning pit, and define the installation position of the overall frame. At this time, temporarily build an auxiliary tripod, and then assemble the main beam 102, and combine the two assembled beams together through bolts to form the main body of the main beam 102; install the ceiling light below the middle of the main beam, and its wires are inserted through the inside of the main beam, and then install the pulling motor on one side of the auxiliary tripod, and connect the pulling rope of the pulling motor to the middle of the main beam through the pulley on the top of the auxiliary tripod. At this time, take the tarpaulin 2, and roll it up from both sides to the middle. After rolling it up, put it on the outside of the main beam 102. Bind it to the main beam 102 through the webbing; turn on the pulling motor, pull the main beam 102 to a vertical state through the traction rope, and fix the bottom connecting plate 103 of the main beam 102 on the top surface of the embedded mounting seat 6 through bolts to complete the installation of the main beam assembly 10; take the pipe rack 81, insert it into the mounting member 82, and then pull it to a certain height through the pulling motor, and then use bolts to fix it to the mounting member 82, so as to complete the positioning of multiple pipe racks 81 on both sides of the main beam 102, and then insert the steel wire rope 7 between the pipe rack 81 and the main beam 102 to strengthen the structure. After the skeleton is built, cover the tarpaulin 2 on the overall skeleton to complete the installation; After the overall tent is built, the photovoltaic mechanism 9 can be installed, and the photovoltaic panel 931 can be directly installed in the positioning groove 97 of the mounting frame 92 through the positioning block 934. At this time, the rotating sleeve 965 is rotated, and the bidirectional threaded shaft 966 rotates as a whole, which can drive the two bottom blocks 963 on both sides thereof to move closer to each other, and at the same time drive the positioning pin shaft 964 to move closer. At this time, one end of the two positioning pin shafts 964 can be inserted into the positioning hole 932 of the positioning block 934, and the photovoltaic panel 931 can be quickly positioned and installed. The mounting frame 92 is fixed between the main beam 102 and the pipe rack 81 by bolts, and then the photovoltaic panel 931 is connected to complete the installation. When the tent is in use, the photovoltaic panel 931 can obtain sufficient light through the transparent cloth 1. When the photovoltaic panel 931 needs to be disassembled, the bidirectional threaded shaft 966 is directly rotated in the opposite direction. At this time, the positioning effect of the positioning block 934 disappears, and the positioning block 934 can be quickly popped out under the action of the bottom spring 933, completing the rapid disassembly of the photovoltaic panel 931; During the installation and use of the photovoltaic mechanism 9, if there is a strong wind in the environment, there will be a certain amount of shaking between the main beam 102 and the pipe rack 81. At this time, the impact buffer sheet 952 can contact the shaking pipe rack 81 to achieve buffering for the pipe rack 81 and reduce the shaking amplitude of the overall skeleton. As the environmental wind force increases, the shaking amplitude of the pipe rack 81 will also deepen. At this time, the contact pressure on the impact buffer sheet 952 will also increase. At this time, the connecting shaft 953 can drive the side arc plate 955 to move sideways synchronously. When the side arc plate 955 touches the induction switch of the electric hydraulic rod 958, the electric hydraulic rod 958 is controlled to open, and the impact resistance plate 951 can be pushed out to one side, so that the impact resistance plate 951 is stably in contact with the pipe rack 81, eliminating the vibration between the main beam 102 and the pipe rack 81, thereby improving the stability between the pipe rack 81 and the main beam 102 to resist the extremely strong wind force.
[0046] The above are only preferred specific implementation modes of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solutions and inventive concepts of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A dome tent, comprising a steel wire rope connecting column (5) and a pre-buried mounting seat (6), characterized in that: A support assembly (8) and a main beam assembly (10) are fixedly mounted on the top surface of the embedded mounting seat (6) by means of bolts, a connecting steel wire rope (7) is arranged on the steel wire rope connecting column (5), a tarpaulin (2) is sheathed on the outside of the support assembly (8) and the main beam assembly (10), a transparent cloth (1) is arranged at the middle of the top surface of the tarpaulin (2), and a cloth door (4) is arranged on one side of the tarpaulin (2) via a zipper (3); The main beam assembly (10) comprises a bottom connecting plate (103), the bottom connecting plate (103) being fixedly mounted on the top surface of the embedded mounting seat (6) by means of bolts, a main beam (102) being fixedly mounted on the top surface of the bottom connecting plate (103), the main beam (102) being composed of two assembled beams of the same specification, a structural reinforcing rib (101) being fixedly mounted on the inner side of the main beam (102), the support assembly (8) comprising a mounting base plate (83) and a plurality of pipe racks (81), the mounting base plate (83) being fixedly mounted on the top surface of the embedded mounting seat (6) by means of bolts, a mounting member (82) being fixedly mounted on the top surface of the mounting base plate (83), a plurality of pipe racks (81) being fixedly mounted inside the mounting member (82) by means of bolts, a photovoltaic mechanism (9) being arranged between the main beam (102) and the pipe rack (81), the photovoltaic mechanism (9) being located below the transparent cloth (1).
2. A dome tent according to claim 1, characterized in that: A connecting piece (86) is provided on the outside of the pipe rack (81), a mounting sleeve (84) is fixedly mounted on the outside of the connecting piece (86), and a fixed pulley (85) is provided on the bottom end of the mounting sleeve (84).
3. A dome tent according to claim 2, characterized in that: The photovoltaic mechanism (9) comprises a mounting frame (92), a connecting buckle (91) being fixedly mounted on a bottom surface of one side of the mounting frame (92), the connecting buckle (91) being fixedly connected to the main beam (102) by bolts, and a photovoltaic assembly (93) being arranged on the top surface of the mounting frame (92).
4. The dome tent according to claim 3, characterized in that: The photovoltaic assembly (93) comprises a photovoltaic panel (931), the photovoltaic panel (931) being arranged on the top surface of a mounting frame (92), a positioning block (934) being fixedly mounted on the top surface of the photovoltaic panel (931), a bottom spring (933) being fixedly mounted on the bottom surface of the positioning block (934), positioning holes (932) being arranged on both side outer walls of the positioning block (934), and one end of the positioning block (934) being snap-fitted into a positioning groove (97) arranged on the top surface of the mounting frame (92).
5. The dome tent according to claim 4, characterized in that: Two bottom grooves (99) are arranged on the bottom surface of the mounting frame (92), and a positioning assembly (96) is arranged inside the two bottom grooves (99). The positioning assembly (96) comprises two sliders (961), and the two sliders (961) are slidably mounted inside the two bottom grooves (99), and a connecting spring (962) is fixedly mounted on one end of the slider (961).
6. The dome tent according to claim 5, characterized in that: One end of the connecting spring (962) is fixedly connected to an inner wall of one side of the bottom groove (99), and a positioning pin shaft (964) is transversely fixedly installed on the other end of the sliding block (961), one end of the positioning pin shaft (964) is embedded in the interior of the positioning hole (932), and a bottom block (963) is fixedly installed on the bottom surface of the sliding block (961).
7. The dome tent according to claim 6, characterized in that: Two shaft frames (98) are fixedly mounted on the bottom surface of the mounting frame (92), and a rotating hole is provided inside the two shaft frames (98), and a bidirectional threaded shaft (966) is rotatably mounted in the rotating hole. The bidirectional threaded shaft (966) is threadedly connected to the threaded holes provided inside the two bottom blocks (963), respectively, and a rotating sleeve (965) is fixedly mounted at the middle position of the bidirectional threaded shaft (966).
8. The dome tent according to claim 7, characterized in that: The mounting frame (92) is provided with an inner mounting groove (94) and a mounting hole (910) inside, and an impact buffer assembly (95) is provided inside the inner mounting groove (94) and the mounting hole (910), and the impact buffer assembly (95) comprises a sleeve spring shaft (954) and two electric hydraulic rods (958), the sleeve spring shaft (954) is fixedly mounted inside the mounting hole (910), and the two electric hydraulic rods (958) are fixedly mounted inside the inner mounting groove (94), and a connecting shaft (953) is slidably mounted outside the sleeve spring shaft (954), and an impact buffer sheet (952) is fixedly mounted on one end of the connecting shaft (953).
9. The dome tent according to claim 8, characterized in that: The impact buffer sheet (952) is located on the outside of the mounting frame (92); an impact resistance plate (951) is fixedly installed on one end of the electric hydraulic rod (958); the impact resistance plate (951) is slidably connected to the mounting inner groove (94); a clamping hole (959) is provided on one end of the impact resistance plate (951); a side arc plate (955) is fixedly installed on the outside of the connecting shaft (953); a plurality of clamping shafts (957) are fixedly installed on the outer wall of one side of the side arc plate (955); one end of the clamping shaft (957) is clamped into the inside of the clamping hole (959); the electric hydraulic rod (958) is composed of an expansion joint and a shaping joint; the expansion joint of the electric hydraulic rod (958) is slidably connected to a through hole (956) provided inside the side arc plate (955); one end of the shaping joint of the two electric hydraulic rods (958) is provided with an induction switch; and the side arc plate (955) is located on one side of the induction switch.
10. A method for installing a dome tent according to any one of claims 1 to 9, characterized in that: The steps include: S1. When constructing the tent, firstly, the steel wire rope connecting column (5) and the embedded mounting seat (6) are embedded in the positioning pit to define the installation position of the overall frame, and then an auxiliary tripod is temporarily built, and then the main beam (102) is assembled, and the two assembled beams are bolted together to form the main body of the main beam (102); S2. Install the ceiling light below the middle of the main beam, and run its electric wires through the inside of the main beam. Then install a pulling motor on one side of the auxiliary tripod, and connect the pulling rope of the pulling motor to the middle of the main beam through the pulley on the top of the auxiliary tripod. At this time, take the tarpaulin (2), roll it up from both sides to the middle, and after rolling it up, place it outside the main beam 102 and bind it to the main beam 102 through the webbing. S3, turning on the pulling motor, pulling up the main beam 102 to a vertical state by means of the pulling rope, and fixing the bottom connecting plate (103) of the main beam 102 on the top surface of the embedded mounting seat (6) by means of bolts, thereby completing the installation of the main beam assembly (10); S4, take the pipe rack (81), insert it into the mounting member (82), and then pull it up to a certain height by a pulling motor, and then fix it to the mounting member (82) by bolts, so as to complete the positioning of multiple pipe racks (81) on both sides of the main beam 102, and then insert the steel wire rope (7) between the pipe rack (81) and the main beam 102 to strengthen the structure. After the frame is built, cover the tarpaulin (2) on the whole frame to complete the installation; S5. After the tent is built, the photovoltaic mechanism (9) can be installed. The photovoltaic panel (931) can be directly installed in the positioning groove (97) of the mounting frame (92) through the positioning block (934). At this time, the rotating sleeve (965) is rotated, and the bidirectional threaded shaft (966) rotates as a whole, which can drive the two bottom blocks (963) on both sides thereof to move closer to each other, and at the same time drive the positioning pin shaft (964) to move closer. At this time, one end of the two positioning pin shafts (964) can be inserted into the positioning hole (932) of the positioning block (934), and the photovoltaic panel (931) can be quickly positioned and installed. S6. The mounting frame (92) is fixed between the main beam (102) and the pipe frame (81) by bolts, and then the photovoltaic panel (931) is connected to complete the installation. When the tent is in use, the photovoltaic panel (931) can obtain sufficient light through the transparent cloth (1). When the photovoltaic panel (931) needs to be removed, the bidirectional threaded shaft (966) is directly rotated in the opposite direction. At this time, the positioning effect of the positioning block (934) disappears, and the positioning block (934) can be quickly ejected under the action of the bottom spring (933), completing the rapid removal of the photovoltaic panel (931).
Citation Information
Patent Citations
Combined type push-pull tent
CN111636754A
Cited By
Bidirectional full-opening-closing type semicircular tent and opening method thereof
CN120425935A