Mine ventilation control method, device and equipment and storage medium

By obtaining the locations of tunnels, structures and target objects in the mine, determining the wind resistance of the air path and building a ventilation network diagram, the problem of the inability to dynamically and targeted mine ventilation control in the existing technology is solved, and higher ventilation control accuracy and real-time performance are achieved.

CN119686789APending Publication Date: 2025-03-25BUSINESS-INTELLIGENCE OF ORIENTAL NATIONS CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510078961.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-17
Publication Date
2025-03-25

AI Technical Summary

Technical Problem

The prior art cannot dynamically and targetedly perform mine ventilation control, resulting in low accuracy of ventilation control.

Method used

By obtaining the locations of tunnels, structures and target objects in the mine, the air road resistance of the combined tunnel section is determined based on this information, a ventilation network diagram is constructed, and the ventilation device is controlled according to the wind resistance to improve the accuracy of ventilation control.

Benefits of technology

Dynamic and targeted ventilation control is achieved, and the accuracy and real-time ventilation control are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119686789A_ABST
    Figure CN119686789A_ABST
Patent Text Reader

Abstract

The invention provides a mine ventilation control method and device, equipment and a storage medium. The method comprises the steps that the positions of roadways and structures in a to-be-controlled mine and the position of a target object currently located in the to-be-controlled mine are obtained; the target object comprises a person and / or a vehicle; for each combined roadway section in a plurality of combined roadway sections corresponding to the roadway, determining the wind resistance of a wind path corresponding to the combined roadway section based on the physical attribute of the combined roadway section, the position of the structure and the position of the target object; a ventilation network diagram corresponding to the to-be-controlled mine is constructed based on the positions of the air paths in the communicated state and the ventilation devices in the multiple air paths; wherein the connecting lines of the wind paths representing the connected state in the ventilation network diagram are branches; and determining the ventilation quantity corresponding to each branch in the ventilation network diagram based on the wind resistance of the plurality of wind paths, and controlling the ventilation device to ventilate the to-be-controlled mine based on the ventilation quantity corresponding to each branch. According to the technical scheme, the accuracy of ventilation control can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of mine ventilation, and in particular to a mine ventilation control method, device, equipment and storage medium. Background Art

[0002] With the development of mining technology, the production capacity of mines is getting larger and larger, the air volume required by mines is also getting larger and larger, and the requirements for the safety management of mine ventilation systems are becoming higher and higher. It plays an extremely important role in ensuring the safe production of mines.

[0003] In mine ventilation systems, mine ventilation control is currently usually carried out based on the fixed tunnel structure and underground structure information in the mine.

[0004] However, the above method cannot dynamically and specifically perform ventilation control, resulting in low accuracy of ventilation control. Summary of the invention

[0005] The present application provides a mine ventilation control method, device, equipment and storage medium to solve the problem in the prior art that ventilation control cannot be performed dynamically and specifically, thereby improving the accuracy of ventilation control.

[0006] The present application provides a mine ventilation control method, comprising: Acquire the tunnels in the mine to be controlled, the locations of structures in the mine to be controlled, and the locations of target objects currently in the mine to be controlled; wherein the target objects include personnel and / or vehicles; For each of the plurality of merged lane segments corresponding to the lane, based on the physical properties of the merged lane segment, the location of the structure, and the location of the target object, determining the wind resistance of the wind path corresponding to the merged lane segment; Based on the positions of the connected air paths and ventilation devices in the air paths corresponding to the multiple merged tunnel sections, a ventilation network diagram corresponding to the mine to be controlled is constructed; wherein the lines representing the connected air paths in the ventilation network diagram are branches; Based on the wind resistance of the wind paths corresponding to the multiple merged tunnel sections, the ventilation volume corresponding to each branch in the ventilation network diagram is determined, and based on the ventilation volume corresponding to each branch, the ventilation device is controlled to ventilate the mine to be controlled.

[0007] According to a mine ventilation control method provided by the present application, when the position of the structure and the position of the target object are both in the merged tunnel section, determining the wind resistance of the wind path corresponding to the merged tunnel section based on the physical properties of the merged tunnel section, the position of the structure and the position of the target object includes: according to , determine the wind resistance of the wind path corresponding to the merged tunnel section; in, represents the wind resistance of the wind path, represents the friction resistance coefficient of the merged tunnel section, L represents the length of the wind path, U represents the circumference of the wind path, S represents the cross-sectional area of ​​the wind path, represents the wind resistance created by the structure, Indicates the wind resistance generated by the target object.

[0008] According to a mine ventilation control method provided by the present application, the ventilation volume corresponding to each branch in the ventilation network diagram is determined based on the wind resistance of the wind paths corresponding to each of the multiple merged tunnel sections, including: For the first air inlet branch, the first return air branch and the first internal branch that are not in a connected state in the ventilation network diagram, determining that the ventilation volumes of the first air inlet branch, the first return air branch and the first internal branch are all preset ventilation volumes; For the second air inlet branch and the second air return branch in the ventilation network diagram, which are in a connected state, the internal branches in a series state or a parallel state in the second internal branch between the second air inlet branch and the second air return branch are merged to obtain a plurality of target branches; the plurality of target branches do not include branches in series or internal branches in parallel; Adding a ground-connected virtual branch between the air inlet node and the air return node in the plurality of target branches to obtain a target ventilation network diagram; wherein the ground-connected virtual branch is used to characterize the ground-connected ventilation condition in the mine to be controlled; Based on the wind resistance of the wind paths corresponding to the multiple merged tunnel sections and the target ventilation network diagram, the ventilation volume corresponding to each branch in the ventilation network diagram is determined.

[0009] According to a mine ventilation control method provided by the present application, the internal branches in the second internal branch between the second air inlet branch and the second air return branch, which are in a series state or a parallel state, are merged to obtain a plurality of target branches, including: Merging all the internal branches in series in the second internal branch between the second air inlet branch and the second air return branch to obtain a merged first branch; Merging all internal branches in a parallel state in the merged first branch to obtain a merged second branch; In the case that the merged second branch also includes internal branches in a series state or a parallel state, the above-mentioned merging operation is re-executed until there are no series branches or parallel internal branches in the new merged second branch, and the new second branch is determined as the multiple target branches.

[0010] According to a mine ventilation control method provided by the present application, the ventilation volume corresponding to each branch in the ventilation network diagram is determined based on the wind resistance of the wind paths corresponding to each of the multiple merged tunnel sections and the target ventilation network diagram, including: A tree is constructed based on the target ventilation network diagram, in which there is at least one path between any two nodes and some branches that do not form a loop; and a residual tree is constructed based on other branches in the target ventilation network diagram except the partial branches; wherein the weights of the branches in the tree and the residual tree are the wind resistance of the wind path corresponding to the branch; For an independent loop formed by the tree and a branch of the remaining tree, the ratio of the total air volume of the target ventilation network diagram to the number of the independent loops is determined as the initial air volume of the remaining branch; Based on the loop wind pressure balance law, the initial air volume of the remaining branches is corrected until the loop air volume of the remaining branches is within a preset accuracy range, thereby obtaining the corrected air volume; Determine the ventilation volume corresponding to each target branch based on the corrected air volume and the direction of each target branch in the independent circuit; For each of the target branches, when the target branch is a branch obtained by merging multiple first branches in a series state, it is determined that the ventilation volume corresponding to each of the first branches is the ventilation volume corresponding to the target branch; when the target branch is a branch obtained by merging multiple second branches in a parallel state, the ventilation volume corresponding to each of the second branches is determined based on the merging method of the target branches; wherein the sum of the ventilation volumes corresponding to each of the second branches is the ventilation volume corresponding to the target branch.

[0011] According to a mine ventilation control method provided by the present application, the method further includes: Dividing the lane into a plurality of lane segments based on intersection points and guide wire points within the lane; Based on the positional relationship between all the tunnels in the mine to be controlled, the multiple tunnel segments are re-merged to obtain the multiple merged tunnel segments corresponding to the tunnels; wherein each of the merged tunnel segments is a continuous tunnel segment.

[0012] The present application also provides a mine ventilation control device, comprising: An acquisition unit, used to acquire the tunnels in the mine to be controlled, the positions of the structures in the mine to be controlled, and the positions of the target objects currently in the mine to be controlled; wherein the target objects include persons and / or vehicles; a determining unit, configured to determine, for each of the plurality of merged lane segments corresponding to the lane, a wind resistance of a wind path corresponding to the merged lane segment based on a physical property of the merged lane segment, a location of the structure, and a location of the target object; A construction unit is used to construct a ventilation network diagram corresponding to the mine to be controlled based on the positions of the connected air paths and ventilation devices in the air paths corresponding to the multiple merged tunnel sections; wherein the lines representing the connected air paths in the ventilation network diagram are branches; A control unit is used to determine the ventilation volume corresponding to each branch in the ventilation network diagram based on the wind resistance of the wind path corresponding to each of the multiple merged tunnel sections, and control the ventilation device to ventilate the mine to be controlled based on the ventilation volume corresponding to each branch.

[0013] The present application also provides an electronic device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements any of the above-described mine ventilation control methods when executing the computer program.

[0014] The present application also provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the mine ventilation control method as described in any one of the above is implemented.

[0015] The present application also provides a computer program product, comprising a computer program, wherein when the computer program is executed by a processor, the mine ventilation control method as described in any one of the above is implemented.

[0016] The mine ventilation control method, device, equipment and storage medium provided in the present application obtain the positions of the tunnels in the mine to be controlled, the structures in the mine to be controlled, and the target objects currently in the mine to be controlled; wherein the target objects include personnel and / or vehicles; for each of the multiple merged tunnel sections corresponding to the tunnel, based on the physical properties of the merged tunnel section, the positions of the structures and the positions of the target objects, the wind resistance of the wind path corresponding to the merged tunnel section is determined; based on the positions of the wind paths and ventilation devices in the wind paths corresponding to the multiple merged tunnel sections, a ventilation network diagram corresponding to the mine to be controlled is constructed; wherein the lines representing the wind paths in the connected state in the ventilation network diagram are branches; based on the wind resistance of the wind paths corresponding to the multiple merged tunnel sections, the ventilation volume corresponding to each branch in the ventilation network diagram is determined, and based on the ventilation volume corresponding to each branch, the ventilation device is controlled to ventilate the mine to be controlled. In this way, the wind resistance of the wind path is determined by combining the position of the structure in the mine to be controlled and the position of the target object currently in the mine to be controlled, fully taking into account the impact of the structure and the target object on the wind resistance, so that ventilation control can be carried out dynamically and targeted based on the current wind resistance, effectively solving the problem in the prior art that ventilation control cannot be carried out dynamically and targeted, thereby improving the accuracy of ventilation control. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions in the present application or the prior art, a brief introduction will be given below to the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0018] Figure 1 A flow chart of a mine ventilation control method provided in an embodiment of the present application.

[0019] Figure 2 A schematic flow chart of a method for determining the ventilation volume corresponding to each branch in a ventilation network diagram based on the wind resistance of each wind path corresponding to a plurality of merged tunnel sections provided in an embodiment of the present application.

[0020] Figure 3 A schematic structural diagram of a mine ventilation control device provided in an embodiment of the present application.

[0021] Figure 4 A schematic diagram of the physical structure of an electronic device provided in an embodiment of the present application. DETAILED DESCRIPTION

[0022] In order to make the purpose, technical solutions and advantages of this application clearer, the technical solutions in this application will be clearly and completely described below in conjunction with the drawings in this application. Obviously, the described embodiments are part of the embodiments of this application, not all of the embodiments. Based on the embodiments in this application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0023] In the embodiments of the present application, "at least one" means one or more, and "more" means two or more. "And / or" describes the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B can mean: A exists alone, A and B exist at the same time, and B exists alone, where A and B can be singular or plural. In the text description of the present application, the character " / " generally indicates that the associated objects before and after are in an "or" relationship.

[0024] The technical solution provided in the embodiment of the present application can be adapted to the mine ventilation control scenario. Mine ventilation control plays an irreplaceable role in coal mine safety production. For example, it can effectively protect the lives of miners, reduce accident risks, and improve the working environment.

[0025] In the mine ventilation system, the mine ventilation control is usually carried out based on the fixed tunnel structure and underground structure information in the mine. However, the above method cannot dynamically and specifically carry out ventilation control, resulting in low accuracy of ventilation control.

[0026] In order to solve the problem that ventilation control cannot be carried out dynamically and in real time in the prior art, thereby improving the accuracy and real-time performance of ventilation control, the present application proposes a mine ventilation control method, by obtaining the position of the tunnel in the mine to be controlled, the position of the structure in the mine to be controlled, and the position of the target object currently in the mine to be controlled; for each of the multiple merged tunnel sections corresponding to the tunnel, the wind resistance of the wind path corresponding to the merged tunnel section can be determined based on the physical properties of the merged tunnel section, the position of the structure and the position of the target object, so as to determine the ventilation volume corresponding to each branch in the ventilation network diagram, and based on the ventilation volume corresponding to each branch, control the ventilation device to ventilate the mine to be controlled. In this way, the wind resistance of the wind path is determined in combination with the position of the structure in the mine to be controlled and the position of the target object currently in the mine to be controlled, fully considering the influence of the structure and the target object on the wind resistance, so that ventilation control can be carried out dynamically and in a targeted manner based on the current wind resistance, effectively solving the problem that ventilation control cannot be carried out dynamically and in a targeted manner in real time in the prior art, thereby improving the accuracy and real-time performance of ventilation control.

[0027] It can be understood that the executor of the present method can be the monitoring equipment in the mine safety monitoring system, specially set up mine ventilation control equipment, computers or servers and other electronic equipment, or it can be a mine ventilation control device set in the electronic equipment. The mine ventilation control device can be implemented by software, hardware or a combination of both, and can be specifically set according to actual needs.

[0028] The mine ventilation control method provided by the present application will be described in detail below through the following specific embodiments. It is understandable that the following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be repeated in some embodiments.

[0029] Figure 1 A flow chart of a mine ventilation control method provided in an embodiment of the present application, for example, see Figure 1 As shown, the mine ventilation control method may include: S101. Acquire the locations of tunnels and structures in the mine to be controlled, and the locations of target objects currently in the mine to be controlled; wherein the target objects include personnel and / or vehicles.

[0030] The location of the structure may include the lane and coordinates to which it belongs.

[0031] For example, when obtaining the tunnels in the mine to be controlled, the tunnel positioning method, such as the wire measurement method or the step method, can be used to obtain the tunnels in the mine to be controlled; the tunnels in the mine to be controlled can also be obtained through some positioning algorithms, etc., which can be set according to actual needs.

[0032] For example, when obtaining the position of a structure in a mine to be controlled, engineering measurement, positioning algorithm, on-site investigation, or drawing data consultation and other methods can be used to obtain the position of the structure in the mine to be controlled. The specific settings can be made according to actual needs.

[0033] For example, when obtaining the position of the target object currently in the mine to be controlled, a positioning card can be equipped on the target object. The positioning card can send a signal to the mine safety monitoring system in real time, which contains the precise position information of the target object, so that the mine safety monitoring system can accurately obtain the position of the target object; it is also possible to obtain the mine substation information in the mine to be controlled, and combine the mine substation information to obtain the position of the target object. Among them, the mine substation information can include its own level, mining area, tunnel, tunnel section and coordinates. This mechanism provides great convenience for managers, allowing managers to obtain and track the specific location of the target object in the mine in real time.

[0034] In an embodiment of the present application, by obtaining the position of the structure in the mine to be controlled and the position of the target object currently in the mine to be controlled, the wind resistance of the wind path can be determined in combination with the position of the structure in the mine to be controlled and the position of the target object currently in the mine to be controlled, that is, the following S102 is executed.

[0035] S102. For each of the multiple merged lane segments corresponding to the lane, based on the physical properties of the merged lane segment, the location of the structure, and the location of the target object, determine the wind resistance of the wind path corresponding to the merged lane segment.

[0036] The merged lane segment is obtained by merging multiple lane segments in the lane, and one merged lane segment corresponds to one air path.

[0037] For example, the physical properties of the merged tunnel segment may include the length, cross-sectional area, perimeter, friction resistance coefficient, etc. of the merged tunnel segment, which may be set according to actual needs.

[0038] For example, the structure may include a wind door, a wind window, a wind curtain, a wind barrier, etc., which may be specifically configured according to actual needs.

[0039] For example, in an embodiment of the present application, when obtaining multiple merged laneway segments corresponding to a laneway, the laneway can be first divided into multiple laneway segments based on the intersection points and guide wire points in the laneway; wherein each laneway segment is relatively independent and has a small segment of a specific length and direction. These laneway segments are important spatial division units in the mine, which help to accurately describe and analyze the spatial layout inside the mine; after obtaining the multiple divided laneway segments, the multiple laneway segments can be re-merged based on the positional relationship between all lanes in the mine to be controlled to obtain multiple merged laneway segments corresponding to the laneway.

[0040] Among them, each merged tunnel section is a continuous tunnel section with a greater length. Given that each tunnel section has its own parameters such as length, direction, and cross-sectional area, which will affect the distribution of wind flow underground, in the embodiment of the present application, by re-merging multiple tunnel sections, the number of nodes in the ventilation network can be effectively reduced, the network structure can be simplified, and the ventilation control efficiency and control accuracy can be effectively improved, thereby achieving the optimization and improvement of the mine ventilation system.

[0041] The above-mentioned determination of the wind resistance of the wind path in combination with the position of the structure in the mine to be controlled and the position of the target object currently in the mine to be controlled fully takes into account the influence of the structure and the target object on the wind resistance. In addition, the ventilation network diagram corresponding to the mine to be controlled can be constructed based on the positions of the wind paths and ventilation devices in the connected state in the wind paths corresponding to the multiple merged tunnel sections, that is, the following S103 is executed, so that the ventilation volume corresponding to each branch in the ventilation network diagram can be determined based on the current wind resistance, so as to dynamically and specifically perform ventilation control based on the determined ventilation volume corresponding to each branch, which can effectively solve the problem in the prior art that ventilation control cannot be performed dynamically and specifically, thereby improving the accuracy of ventilation control.

[0042] S103. Construct a ventilation network diagram corresponding to the mine to be controlled based on the positions of the connected air paths and ventilation devices in the air paths corresponding to the multiple merged tunnel sections; wherein the lines representing the connected air paths in the ventilation network diagram are branches.

[0043] For example, the ventilation device may include ventilation equipment and ventilation facilities, etc., which may be configured according to actual needs.

[0044] For example, when determining the connected air paths from the air paths corresponding to the multiple merged tunnel segments, a graph traversal algorithm, such as Depth-First Search (DFS) or Breadth-First Search (BFS), can be used. Starting from the starting point of the air inlet tunnel in the multiple merged tunnel segments, the entire graph is traversed to mark the visited nodes and edges; during the traversal process, if some nodes or edges are not visited, it means that the air paths corresponding to these nodes or edges are not connected and are not in a connected state; since the air paths that are not in a connected state will not affect the air flow distribution of the entire ventilation network, there is no need to participate in the construction of the ventilation network graph, and for the air paths that are not in a connected state, their related ventilation parameters, such as air volume, wind speed, resistance, etc., can be directly set to 0.

[0045] Considering that the mine ventilation network is a complex system composed of crisscrossing shafts and tunnels, the ventilation network diagram corresponding to the mine to be controlled can be constructed based on the positions of the connected air paths and ventilation devices, so as to abstract the complex mine ventilation system into a network diagram composed of nodes and branches, which is convenient for mathematical modeling and computational analysis, making the ventilation system more intuitive and easy to understand. The constructed ventilation network diagram includes node and branch information, which is an abstract description of the mine ventilation system, turning the ventilation system into a system composed of points, lines and their attributes, becoming a ventilation network. The lines representing the connected air paths in the ventilation network diagram are branches, and the points of the connecting lines are nodes. The ventilation network diagram is a data structure containing N branches and J nodes. Nodes can be divided into three categories: starting point, end point, and ordinary node.

[0046] S104. Determine the ventilation volume corresponding to each branch in the ventilation network diagram based on the wind resistance of each wind path corresponding to the multiple merged tunnel sections, and control the ventilation device to ventilate the mine to be controlled based on the ventilation volume corresponding to each branch.

[0047] For example, when determining the ventilation volume corresponding to each branch in the ventilation network diagram based on the wind resistance of each wind path corresponding to a plurality of merged tunnel sections, the ventilation network solution algorithm can be used to accurately calculate the ventilation volume corresponding to each branch in the ventilation network diagram according to the wind volume balance law, wind pressure balance law, resistance law, etc., so as to meet the ventilation needs of the mine, and control the ventilation device to ventilate the mine to be controlled based on the ventilation volume corresponding to each branch. In addition, the ventilation network solution is also helpful to analyze and optimize the performance of the mine ventilation system and improve ventilation efficiency.

[0048] It can be seen that in the embodiment of the present application, by obtaining the tunnels in the mine to be controlled, the positions of the structures in the mine to be controlled, and the positions of the target objects currently in the mine to be controlled; wherein the target objects include personnel and / or vehicles; for each of the multiple merged tunnel sections corresponding to the tunnel, based on the physical properties of the merged tunnel section, the positions of the structures and the positions of the target objects, the wind resistance of the wind path corresponding to the merged tunnel section is determined; based on the positions of the wind paths and ventilation devices in the wind paths corresponding to each of the multiple merged tunnel sections, a ventilation network diagram corresponding to the mine to be controlled is constructed; wherein the lines representing the connected wind paths in the ventilation network diagram are branches; based on the wind resistance of the wind paths corresponding to each of the multiple merged tunnel sections, the ventilation volume corresponding to each branch in the ventilation network diagram is determined, and based on the ventilation volume corresponding to each branch, the ventilation device is controlled to ventilate the mine to be controlled. In this way, the wind resistance of the wind path is determined by combining the position of the structure in the mine to be controlled and the position of the target object currently in the mine to be controlled, and fully considering the impact of the structure and the target object on the wind resistance, so that ventilation control can be carried out dynamically and targeted based on the current wind resistance, effectively solving the problem in the prior art that ventilation control cannot be carried out dynamically and in real time in a targeted manner, thereby improving the accuracy of ventilation control.

[0049] Based on the above Figure 1 In the embodiment shown, for example, in the above S102, for any merged tunnel segment, when determining the wind resistance of its corresponding wind path based on the physical properties of the merged tunnel segment, the location of the structure and the location of the target object, the structure and the target object can be regarded as an obstacle, because their existence will reduce the actual ventilation area of ​​the tunnel, thereby increasing the resistance of the wind flow passing through.

[0050] First, based on the position of the structure and the position of the target object, determine whether the structure and the target object are currently in the merged tunnel section. When the position of the structure and the position of the target object are both in the merged tunnel section, the wind resistance of the wind path corresponding to the merged tunnel section can be determined according to the following formula 1.

[0051] Formula 1 in, Indicates the wind resistance of the wind path, represents the friction resistance coefficient of the merged tunnel section, L represents the length of the wind path, U represents the circumference of the wind path, S represents the cross-sectional area of ​​the wind path, The wind resistance generated by the structure is Indicates the wind resistance created by the target object.

[0052] It can be understood that, in the above formula 1, if the target object includes a person and a vehicle, the above formula 1 can be transformed into the following formula 2.

[0053] Formula 2 in, represents the wind resistance caused by personnel, Indicates the wind resistance created by the vehicle.

[0054] It should be noted that, when the location of the structure and the location of the target object are not in the merged tunnel section, when determining the wind resistance of the wind path corresponding to the merged tunnel section, only the physical properties of the merged tunnel section can be considered, that is, in the above formula 2, , and The value of is 0; when the location of the structure is in the merged lane segment, but the location of the target object is not in the merged lane segment, when determining the wind resistance of the wind path corresponding to the merged lane segment, the physical properties of the merged lane segment and the wind resistance caused by the structure can be considered, that is, in the above formula 2, and The value of is 0 and can be set according to actual needs.

[0055] The above-mentioned combination of the position of the structure in the mine to be controlled and the position of the target object currently in the mine to be controlled jointly determines the wind resistance of the wind path, and fully takes into account the impact of the structure and the target object on the wind resistance, so that ventilation control can be carried out dynamically and targetedly based on the current wind resistance, which effectively solves the problem in the prior art that ventilation control cannot be carried out dynamically and targetedly, thereby improving the accuracy of ventilation control.

[0056] In the embodiment of the present application, the wind path corresponding to the merged tunnel segment is constructed in order to determine the path of the wind flow, which not only saves the key attributes such as the start and end point numbers of the merged tunnel segment, but also calculates the wind resistance of the entire path. In addition, when calculating the wind resistance of the wind path corresponding to the merged tunnel segment, in addition to considering the physical properties of the merged tunnel segment, such as the length, cross-sectional area, circumference and friction resistance coefficient of the merged tunnel segment, it further combines the position of the structure in the mine to be controlled and the position of the target object currently in the mine to be controlled to jointly determine the wind resistance of the wind path, fully considering the impact of the structure and the target object on the wind resistance, so that the flow of wind in the mine ventilation system can be more accurately calculated, so that the performance and safety of the mine ventilation system can be more accurately evaluated.

[0057] Based on any of the above embodiments, for example, in the above S104, when the ventilation volume corresponding to each branch in the ventilation network diagram is determined based on the wind resistance of the wind paths corresponding to each of the multiple merged lane segments, the specific implementation thereof can be referred to as follows: Figure 2 The embodiment shown.

[0058] Figure 2A schematic flow chart of a method for determining the ventilation volume corresponding to each branch in a ventilation network diagram based on the wind resistance of each wind path corresponding to a plurality of merged tunnel sections provided in an embodiment of the present application, for example, see Figure 2 As shown, the method may include: S201. For a first air inlet branch, a first return air branch, and a first internal branch that are not in a connected state in a ventilation network diagram, determine that the ventilation volumes of the first air inlet branch, the first return air branch, and the first internal branch are all preset ventilation volumes.

[0059] For example, the preset ventilation volume can be 0 or other values, and can be set according to actual needs. In the embodiment of the present application, the preset ventilation volume can be 0.

[0060] When calculating the ventilation volume corresponding to each branch in the ventilation network diagram, it is possible to first determine whether each branch is connected. For the first air inlet branch, the first return air branch and the first internal branch that are not in a connected state, there is no need to further perform wind network solution. The first air inlet branch, the first return air branch and the first internal branch that are not in a connected state can be automatically set to 0. In this way, by pre-judging the connectivity of each branch, unnecessary calculations for disconnected wind networks can be avoided, thereby saving a lot of computing resources and time.

[0061] S202. For the second air inlet branch and the second return air branch that are in a connected state in the ventilation network diagram, the internal branches in the second internal branch between the second air inlet branch and the second return air branch that are in a series state or a parallel state are merged to obtain multiple target branches; the multiple target branches do not include branches in series or internal branches in parallel.

[0062] It is understandable that if multiple branches are connected in sequence, end to end, to form a continuous channel, these branches can be called branches in series. The characteristic of branches in series is that the wind flows through each branch in sequence, and the wind volume does not change between different branches. If multiple branches start from the same node and are connected to different nodes, these branches are called branches in parallel. The characteristic of branches in parallel is that the wind can pass through multiple branches at the same time, and the wind volume of each branch may be different.

[0063] By way of example, in an embodiment of the present application, when merging the internal branches in series or parallel in the second air intake branch and the second internal branch and the second return air branch between the second air intake branch and the second return air branch, all the internal branches in series in the second internal branch between the second air intake branch and the second return air branch may be merged first to obtain a merged first branch; all the internal branches in parallel in the merged first branch may be merged to obtain a merged second branch; when the merged second branch does not include the internal branches in series or parallel, the merged second branch is determined as a plurality of target branches; on the contrary, when the merged second branch also includes the internal branches in series or parallel, the above-mentioned merging operation is re-executed until there are no branches in series or internal branches in parallel in the new merged second branch, and the new second branch is determined as a plurality of target branches.

[0064] By merging the internal branches in series or parallel as described above, the network structure of the ventilation network diagram can be effectively simplified, the topological structure of the ventilation network diagram can be made clearer, and independent loops can be found and air volume distribution can be calculated more quickly, thereby reducing the complexity and amount of calculation. The wind resistance of the branch obtained after the internal branches in series are merged can be shown in the following formula 3, and the wind resistance of the branch obtained after the internal branches in parallel are merged can be shown in the following formula 4.

[0065] Formula 3 Formula 4 in, It represents the wind resistance of the branch obtained by merging the internal branches in series. It represents the wind resistance of the branch obtained by merging the internal branches in parallel state, and n represents the number of internal branches to be merged.

[0066] It should be noted that, when the internal branches in series or parallel state in the second internal branch between the second air inlet branch and the second return air branch are merged, the internal branches in series state are merged first and then the internal branches in parallel state are merged as an example. Of course, the internal branches in parallel state can also be merged first and then the internal branches in series state, until there are no series branches or parallel internal branches in the multiple target branches after the merger. The specific setting can be made according to actual needs.

[0067] S203, adding a virtual branch connected to the ground surface between the air intake node and the air return node in the multiple target branches to obtain a target ventilation network diagram; wherein the virtual branch connected to the ground surface is used to characterize the surface ventilation condition in the mine to be controlled.

[0068] Add a virtual branch connecting the ground surface between the air inlet node and the air return node to ensure that the wind network can be solved normally. Set a reasonable wind resistance for the virtual branch connecting the ground surface. It can be set according to the actual situation and the needs of mine ventilation to ensure that the virtual branch connecting the ground surface can truly reflect the surface ventilation conditions.

[0069] S204. Based on the wind resistance of the wind paths corresponding to the multiple merged tunnel sections and the target ventilation network diagram, determine the ventilation volume corresponding to each branch in the ventilation network diagram.

[0070] For example, in an embodiment of the present application, when determining the ventilation volume corresponding to each branch in the ventilation network diagram based on the wind resistance of the wind paths corresponding to each of the multiple merged tunnel sections and the target ventilation network diagram, a tree can be first constructed based on the target ventilation network diagram, in which there is at least one passage between any two nodes and some branches that do not form a loop; and a residual tree can be constructed based on other branches except some branches in the target ventilation network diagram; wherein the weights of the branches in the tree and the residual tree are the wind resistance of the wind path corresponding to the branch, and in order to prevent iterative divergence and improve the iterative convergence speed, a minimum spanning tree is usually selected, that is, a tree with the smallest sum of weights on all branches; for an independent loop formed based on a residual branch in the tree and the residual tree, a residual tree is determined based on the ratio of the total air volume of the target ventilation network diagram to the number of independent loops. The initial air volume of the remaining branches is corrected based on the loop wind pressure balance law until the loop air volume of the remaining branches is within the preset accuracy range to obtain the corrected air volume; based on the corrected air volume and the direction of each target branch in the independent loop, the ventilation volume corresponding to each target branch is determined; for each target branch, when the target branch is a branch obtained by merging multiple first branches in series, the ventilation volume corresponding to each first branch is determined to be the ventilation volume corresponding to the target branch; when the target branch is a branch obtained by merging multiple second branches in parallel, the ventilation volume corresponding to each second branch is determined based on the merging method of the target branches; wherein the sum of the ventilation volumes corresponding to each second branch is the ventilation volume corresponding to the target branch.

[0071] In the mine ventilation network solution, independent loops refer to loops in the target ventilation network diagram that do not intersect with other loops. They represent independent ventilation paths in the target ventilation network diagram. By circling independent loops, the structure and characteristics of the target ventilation network diagram can be more clearly understood, providing a basis for subsequent solution and optimization work.

[0072] The initial air volume of the remaining branches is taken as the unknown quantity, and the amount of branches is expressed by the initial air volume of the remaining branches. Consider whether the total air volume of the target ventilation network diagram is a fixed air volume, for example, use the real-time cross-sectional wind speed of the total return air shaft for solution. If a fixed air volume is used, this fixed air volume is used as the total air volume, and the air volume at the operating point of the wind resistance and the total pressure characteristic curve of the fan is calculated as the total air volume. The ratio of the total air volume to the number of independent circuits is used as the initial air volume of the remaining branches.

[0073] When correcting the initial air volume of the remaining branches based on the loop wind pressure balance law, the Scott-Hinsley method and Newton method can be used for iterative calculation. The air volume correction calculation formula can be derived based on the loop wind pressure balance law, and the initial air volume of the remaining branches can be corrected step by step. The loop air volume of each remaining branch is corrected until the wind pressure is gradually balanced, and the loop air volume of the remaining branches is within the preset accuracy range, and the air volume is close to the true value. In order to deal with the situation where the solution does not converge, the number of solution iterations is limited. If it exceeds the maximum number of iterations and has not converged, the ventilation volume corresponding to each target branch is set to 0.

[0074] When the target branch is a branch obtained by merging multiple first branches in series, the merged branch can be disassembled to determine that the ventilation volume corresponding to each first branch is the ventilation volume corresponding to the target branch, as shown in the following formula 5.

[0075] Formula 5 in, represents the ventilation volume corresponding to the target branch, Indicates the ventilation volume corresponding to the nth first branch among the n first branches.

[0076] In the case where the target branch is a branch obtained by merging multiple second branches in parallel, based on the merging method of the target branch, the merged branch can be disassembled to determine the ventilation volume corresponding to each second branch, as shown in the following formula 6.

[0077] Formula 6 in, represents the ventilation volume corresponding to the target branch, Indicates the first branch of n The ventilation volume corresponding to the second branch.

[0078] In this way, the wind resistance of the wind path is determined by combining the position of the structure in the mine to be controlled and the position of the target object currently in the mine to be controlled, fully taking into account the impact of the structure and the target object on the wind resistance, so that ventilation control can be carried out dynamically and targeted based on the current wind resistance, effectively solving the problem in the prior art that ventilation control cannot be carried out dynamically and targeted, thereby improving the accuracy of ventilation control.

[0079] The mine ventilation control device provided in the present application is described below. The mine ventilation control device described below and the mine ventilation control method described above can be referenced to each other.

[0080] Figure 3 A schematic diagram of the structure of a mine ventilation control device provided in an embodiment of the present application, for example, see Figure 3 As shown, the mine ventilation control device 30 may include: The acquisition unit 301 is used to acquire the tunnels in the mine to be controlled, the locations of the structures in the mine to be controlled, and the locations of the target objects currently in the mine to be controlled; wherein the target objects include people and / or vehicles; A determination unit 302 is used to determine, for each of the multiple merged lane segments corresponding to the lane, a wind resistance of a wind path corresponding to the merged lane segment based on the physical properties of the merged lane segment, the location of the structure, and the location of the target object; A construction unit 303 is used to construct a ventilation network diagram corresponding to the mine to be controlled based on the positions of the connected air paths and ventilation devices in the air paths corresponding to the multiple merged tunnel sections; wherein the lines representing the connected air paths in the ventilation network diagram are branches; The control unit 304 is used to determine the ventilation volume corresponding to each branch in the ventilation network diagram based on the wind resistance of the wind path corresponding to each of the multiple merged tunnel sections, and control the ventilation device to ventilate the mine to be controlled based on the ventilation volume corresponding to each branch.

[0081] For example, in an embodiment of the present application, when the location of the structure and the location of the target object are both in the merged tunnel section, the determining unit 302 is used to determine the wind resistance of the wind path corresponding to the merged tunnel section based on the physical properties of the merged tunnel section, the location of the structure and the location of the target object, including: according to , determine the wind resistance of the wind path corresponding to the merged tunnel section; in, represents the wind resistance of the wind path, represents the friction resistance coefficient of the merged tunnel section, L represents the length of the wind path, U represents the circumference of the wind path, S represents the cross-sectional area of ​​the wind path, represents the wind resistance created by the structure, Indicates the wind resistance generated by the target object.

[0082] For example, in the embodiment of the present application, the control unit 304 is used to determine the ventilation volume corresponding to each branch in the ventilation network diagram based on the wind resistance of the wind path corresponding to each of the multiple merged tunnel sections, including: For the first air inlet branch, the first return air branch and the first internal branch that are not in a connected state in the ventilation network diagram, determining that the ventilation volumes of the first air inlet branch, the first return air branch and the first internal branch are all preset ventilation volumes; For the second air inlet branch and the second air return branch in the ventilation network diagram, which are in a connected state, the internal branches in a series state or a parallel state in the second internal branch between the second air inlet branch and the second air return branch are merged to obtain a plurality of target branches; the plurality of target branches do not include branches in series or internal branches in parallel; Adding a ground-connected virtual branch between the air inlet node and the air return node in the plurality of target branches to obtain a target ventilation network diagram; wherein the ground-connected virtual branch is used to characterize the ground-connected ventilation condition in the mine to be controlled; Based on the wind resistance of the wind paths corresponding to the multiple merged tunnel sections and the target ventilation network diagram, the ventilation volume corresponding to each branch in the ventilation network diagram is determined.

[0083] For example, in the embodiment of the present application, the control unit 304 is used to merge the internal branches in the second internal branch between the second air inlet branch and the second air return branch, which are in a series state or a parallel state, to obtain multiple target branches, including: Merging all the internal branches in series in the second internal branch between the second air inlet branch and the second air return branch to obtain a merged first branch; Merging all internal branches in a parallel state in the merged first branch to obtain a merged second branch; In the case that the merged second branch also includes internal branches in a series state or a parallel state, the above-mentioned merging operation is re-executed until there are no series branches or parallel internal branches in the new merged second branch, and the new second branch is determined as the multiple target branches.

[0084] For example, in the embodiment of the present application, the control unit 304 is used to determine the ventilation volume corresponding to each branch in the ventilation network diagram based on the wind resistance of the wind paths corresponding to each of the multiple merged tunnel sections and the target ventilation network diagram, including: A tree is constructed based on the target ventilation network diagram, in which there is at least one path between any two nodes and some branches that do not form a loop; and a residual tree is constructed based on other branches in the target ventilation network diagram except the partial branches; wherein the weights of the branches in the tree and the residual tree are the wind resistance of the wind path corresponding to the branch; For an independent loop formed by the tree and a branch of the remaining tree, the ratio of the total air volume of the target ventilation network diagram to the number of the independent loops is determined as the initial air volume of the remaining branch; Based on the loop wind pressure balance law, the initial air volume of the remaining branches is corrected until the loop air volume of the remaining branches is within a preset accuracy range, thereby obtaining the corrected air volume; Determine the ventilation volume corresponding to each target branch based on the corrected air volume and the direction of each target branch in the independent circuit; For each of the target branches, when the target branch is a branch obtained by merging multiple first branches in a series state, it is determined that the ventilation volume corresponding to each of the first branches is the ventilation volume corresponding to the target branch; when the target branch is a branch obtained by merging multiple second branches in a parallel state, the ventilation volume corresponding to each of the second branches is determined based on the merging method of the target branches; wherein the sum of the ventilation volumes corresponding to each of the second branches is the ventilation volume corresponding to the target branch.

[0085] For example, in the embodiment of the present application, the mine ventilation control device 30 further includes: a dividing unit, for dividing the lane into a plurality of lane segments based on intersection points and guide wire points in the lane; A merging unit is used to re-merge the multiple tunnel segments based on the positional relationship between all tunnels in the mine to be controlled, so as to obtain the multiple merged tunnel segments corresponding to the tunnels; wherein each merged tunnel segment is a continuous tunnel segment.

[0086] The mine ventilation control device 30 provided in the embodiment of the present application can execute the technical solution of the mine ventilation control method in any of the above-mentioned embodiments. Its implementation principle and beneficial effects are similar to the implementation principle and beneficial effects of the mine ventilation control method. Please refer to the implementation principle and beneficial effects of the mine ventilation control method, and no further details will be given here.

[0087] Figure 4 A schematic diagram of the physical structure of an electronic device provided in an embodiment of the present application, such as Figure 4 As shown, the electronic device may include: a processor (processor) 410 , a communication interface (Communications Interface) 420 , a memory (memory) 430 and a communication bus 440 , wherein the processor 410 , the communication interface 420 , and the memory 430 communicate with each other through the communication bus 440 . The processor 410 can call the logic instructions in the memory 430 to execute the mine ventilation control method, which includes: obtaining the tunnels in the mine to be controlled, the positions of the structures in the mine to be controlled, and the positions of the target objects currently in the mine to be controlled; wherein the target objects include personnel and / or vehicles; for each of the multiple merged tunnel sections corresponding to the tunnel, based on the physical properties of the merged tunnel section, the positions of the structures and the positions of the target objects, determining the wind resistance of the wind path corresponding to the merged tunnel section; constructing a ventilation network diagram corresponding to the mine to be controlled based on the positions of the wind paths and ventilation devices in the wind paths corresponding to each of the multiple merged tunnel sections that are in a connected state; wherein the lines representing the connected wind paths in the ventilation network diagram are branches; based on the wind resistance of the wind paths corresponding to each of the multiple merged tunnel sections, determining the ventilation volume corresponding to each of the branches in the ventilation network diagram, and based on the ventilation volume corresponding to each of the branches, controlling the ventilation device to ventilate the mine to be controlled.

[0088] In addition, the logic instructions in the above-mentioned memory 430 can be implemented in the form of a software functional unit and can be stored in a computer-readable storage medium when it is sold or used as an independent product. Based on this understanding, the technical solution of the present application can be essentially or partly embodied in the form of a software product that contributes to the prior art. The computer software product is stored in a storage medium, including several instructions to enable a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk, etc. Various media that can store program codes.

[0089] On the other hand, the present application also provides a computer program product, which includes a computer program. The computer program can be stored on a computer-readable storage medium. When the computer program is executed by a processor, the computer can execute the mine ventilation control method provided by the above methods, which includes: obtaining the tunnel in the mine to be controlled, the location of the structure in the mine to be controlled, and the location of the target object currently in the mine to be controlled; wherein the target object includes personnel and / or vehicles; for each of the multiple merged tunnel sections corresponding to the tunnel, based on the merged tunnel section The wind resistance of the wind path corresponding to the merged tunnel segment is determined based on the physical properties of the segment, the position of the structure and the position of the target object; the ventilation network diagram corresponding to the mine to be controlled is constructed based on the positions of the wind paths and ventilation devices in a connected state in the wind paths corresponding to each of the multiple merged tunnel segments; wherein the lines representing the connected wind paths in the ventilation network diagram are branches; the ventilation volume corresponding to each branch in the ventilation network diagram is determined based on the wind resistance of the wind paths corresponding to each of the multiple merged tunnel segments, and based on the ventilation volume corresponding to each branch, the ventilation device is controlled to ventilate the mine to be controlled.

[0090] On the other hand, the present application also provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, is implemented to execute the mine ventilation control method provided by the above-mentioned methods, the method comprising: obtaining a tunnel in the mine to be controlled, the location of a structure in the mine to be controlled, and the location of a target object currently in the mine to be controlled; wherein the target object includes personnel and / or vehicles; for each of the multiple merged tunnel sections corresponding to the tunnel, based on the physical properties of the merged tunnel section, the location of the structure and the location of the target object, determining the wind resistance of the wind path corresponding to the merged tunnel section; constructing a ventilation network diagram corresponding to the mine to be controlled based on the locations of the wind paths and ventilation devices in a connected state in the wind paths corresponding to each of the multiple merged tunnel sections; wherein the lines representing the connected wind paths in the ventilation network diagram are branches; determining the ventilation volume corresponding to each of the branches in the ventilation network diagram based on the wind resistance of the wind paths corresponding to each of the multiple merged tunnel sections, and controlling the ventilation device to ventilate the mine to be controlled based on the ventilation volume corresponding to each of the branches.

[0091] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0092] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0093] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present application, rather than to limit it. Although the present application has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application.

Claims

1. A mine ventilation control method, characterized in that: include: Acquire the tunnels in the mine to be controlled, the locations of structures in the mine to be controlled, and the locations of target objects currently in the mine to be controlled; wherein the target objects include personnel and / or vehicles; For each of the plurality of merged lane segments corresponding to the lane, based on the physical properties of the merged lane segment, the location of the structure, and the location of the target object, determining the wind resistance of the wind path corresponding to the merged lane segment; Based on the positions of the connected air paths and ventilation devices in the air paths corresponding to the multiple merged tunnel sections, a ventilation network diagram corresponding to the mine to be controlled is constructed; wherein the lines representing the connected air paths in the ventilation network diagram are branches; Based on the wind resistance of the wind paths corresponding to the multiple merged tunnel sections, the ventilation volume corresponding to each branch in the ventilation network diagram is determined, and based on the ventilation volume corresponding to each branch, the ventilation device is controlled to ventilate the mine to be controlled.

2. The mine ventilation control method according to claim 1, characterized in that: In a case where the position of the structure and the position of the target object are both located in the merged tunnel section, determining the wind resistance of the wind path corresponding to the merged tunnel section based on the physical properties of the merged tunnel section, the position of the structure and the position of the target object includes: according to , determine the wind resistance of the wind path corresponding to the merged tunnel section; in, represents the wind resistance of the wind path, represents the friction resistance coefficient of the merged tunnel section, L represents the length of the wind path, U represents the circumference of the wind path, S represents the cross-sectional area of ​​the wind path, represents the wind resistance created by the structure, Indicates the wind resistance generated by the target object.

3. The mine ventilation control method according to claim 1 or 2, characterized in that: The determining of the ventilation volume corresponding to each branch in the ventilation network diagram based on the wind resistance of each wind path corresponding to the plurality of merged tunnel sections comprises: For the first air inlet branch, the first return air branch and the first internal branch that are not in a connected state in the ventilation network diagram, determine that the ventilation volumes of the first air inlet branch, the first return air branch and the first internal branch are all preset ventilation volumes; For the second air inlet branch and the second air return branch in the ventilation network diagram, which are in a connected state, the internal branches in a series state or a parallel state in the second internal branch between the second air inlet branch and the second air return branch are merged to obtain a plurality of target branches; the plurality of target branches do not include branches in series or internal branches in parallel; Adding a ground-connected virtual branch between the air inlet node and the air return node in the plurality of target branches to obtain a target ventilation network diagram; wherein the ground-connected virtual branch is used to characterize the ground-connected ventilation condition in the mine to be controlled; Based on the wind resistance of the wind paths corresponding to the multiple merged tunnel sections and the target ventilation network diagram, the ventilation volume corresponding to each branch in the ventilation network diagram is determined.

4. The mine ventilation control method according to claim 3, characterized in that: The internal branches in the second internal branches between the second air inlet branch and the second air return branch that are in a series state or a parallel state are merged to obtain a plurality of target branches, including: Merging all the internal branches in series in the second internal branch between the second air inlet branch and the second air return branch to obtain a merged first branch; Merging all internal branches in a parallel state in the merged first branch to obtain a merged second branch; In the case that the merged second branch also includes internal branches in a series state or a parallel state, the above-mentioned merging operation is re-executed until there are no series branches or parallel internal branches in the new merged second branch, and the new second branch is determined as the multiple target branches.

5. The mine ventilation control method according to claim 3, characterized in that: The determining of the ventilation volume corresponding to each branch in the ventilation network diagram based on the wind resistance of each wind path corresponding to the plurality of merged tunnel sections and the target ventilation network diagram comprises: A tree is constructed based on the target ventilation network diagram, in which there is at least one path between any two nodes and some branches that do not form a loop; and a residual tree is constructed based on other branches in the target ventilation network diagram except the partial branches; wherein the weights of the branches in the tree and the residual tree are the wind resistance of the wind path corresponding to the branch; For an independent loop formed by the tree and a branch of the remaining tree, the ratio of the total air volume of the target ventilation network diagram to the number of the independent loops is determined as the initial air volume of the remaining branch; Based on the loop wind pressure balance law, the initial air volume of the remaining branches is corrected until the loop air volume of the remaining branches is within a preset accuracy range, thereby obtaining the corrected air volume; Determine the ventilation volume corresponding to each target branch based on the corrected air volume and the direction of each target branch in the independent circuit; For each of the target branches, when the target branch is a branch obtained by merging multiple first branches in a series state, it is determined that the ventilation volume corresponding to each of the first branches is the ventilation volume corresponding to the target branch; when the target branch is a branch obtained by merging multiple second branches in a parallel state, the ventilation volume corresponding to each of the second branches is determined based on the merging method of the target branches; wherein the sum of the ventilation volumes corresponding to each of the second branches is the ventilation volume corresponding to the target branch.

6. The mine ventilation control method according to claim 1 or 2, characterized in that: The method further comprises: Dividing the lane into a plurality of lane segments based on intersection points and guide wire points within the lane; Based on the positional relationship between all the tunnels in the mine to be controlled, the multiple tunnel segments are re-merged to obtain the multiple merged tunnel segments corresponding to the tunnels; wherein each of the merged tunnel segments is a continuous tunnel segment.

7. A mine ventilation control device, characterized in that: include: An acquisition unit, used to acquire the tunnels in the mine to be controlled, the positions of the structures in the mine to be controlled, and the positions of the target objects currently in the mine to be controlled; wherein the target objects include persons and / or vehicles; a determining unit, configured to determine, for each of the plurality of merged lane segments corresponding to the lane, a wind resistance of a wind path corresponding to the merged lane segment based on a physical property of the merged lane segment, a location of the structure, and a location of the target object; A construction unit is used to construct a ventilation network diagram corresponding to the mine to be controlled based on the positions of the connected air paths and ventilation devices in the air paths corresponding to the multiple merged tunnel sections; wherein the lines representing the connected air paths in the ventilation network diagram are branches; A control unit is used to determine the ventilation volume corresponding to each branch in the ventilation network diagram based on the wind resistance of the wind path corresponding to each of the multiple merged tunnel sections, and control the ventilation device to ventilate the mine to be controlled based on the ventilation volume corresponding to each branch.

8. An electronic device comprising a memory, a processor, and a computer program stored in the memory and running on the processor, characterized in that: When the processor executes the computer program, the mine ventilation control method according to any one of claims 1 to 6 is implemented.

9. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the mine ventilation control method according to any one of claims 1 to 6 is implemented.

10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the mine ventilation control method according to any one of claims 1 to 6 is implemented.