Building data monitoring device based on BIM

By designing a BIM-based building data monitoring device, using a spiral track and motor-driven monitoring mechanism to achieve comprehensive monitoring of building models, and improving monitoring accuracy and efficiency through swing and cleaning mechanisms, the problem that the existing technology mid-infrared detector cannot be fully monitored and cleaned is solved.

CN119687341APending Publication Date: 2025-03-25SHANDONG URBAN CONSTR VOCATIONAL COLLEGE +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411808505.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-10
Publication Date
2025-03-25

AI Technical Summary

Technical Problem

When the existing building data monitoring device monitors the building model, the infrared detector can only move up and down, and cannot fully monitor the surroundings of the building model, and cannot clean up dust and dirt on the surface of the building model, reducing the monitoring accuracy.

Method used

A BIM-based building data monitoring device is designed, using a spiral track and a motor-driven monitoring mechanism, so that the infrared detector can rise spirally, comprehensively monitor the building model from all heights and angles, and at the same time, a swing mechanism and cleaning mechanism are set up to realize the up and down swing of the infrared detector and the automatic cleaning of the monitoring position of the infrared detector.

Benefits of technology

Comprehensive monitoring of building models is achieved, the accuracy of monitoring data is improved, the cost of equipment production is reduced, the occlusion of the peripheral side of building models is avoided, and the efficiency of monitoring work is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119687341A_ABST
    Figure CN119687341A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of building data monitoring, and particularly relates to a BIM-based building data monitoring device, which comprises a base, a monitoring box is fixedly connected to the upper end of the base, and a transmission module is arranged at the upper end of the base and is used for transmitting monitored data to a BIM platform through an electric signal; the monitoring mechanism is used for comprehensively monitoring data of a building model, the monitoring mechanism comprises a spiral track fixedly connected to the interior of a monitoring box, a lifting ring is slidably connected to the interior of the monitoring box, a motor is fixedly connected to the upper end of the base, a screw rod is fixedly connected to the output end of the motor, and a screw rod is fixedly connected to the lower end of the screw rod. And the screw rod is in threaded connection with a lifting block fixedly connected with the lifting ring. According to the building model monitoring device, by arranging the monitoring mechanism, when the building model is monitored, the motor drives the screw rod to rotate, so that the infrared detector ascends spirally, data of the building model is monitored comprehensively from all heights and all angles, and the monitoring work of the building model is more comprehensive.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of building data monitoring, and in particular relates to a building data monitoring device based on BIM. Background Art

[0002] Building data monitoring devices are devices used to collect, monitor and analyze the internal and external environmental parameters of buildings in real time. These devices can monitor key indicators such as the structural health, environmental conditions, energy consumption, equipment operation, etc. of the building, helping to ensure the safety, comfort and efficiency of the building. In addition, building data monitoring devices can also provide important data support for the selection and design of building materials, helping to optimize the selection and application of building materials. In this process, the building data monitoring device needs to monitor the building model first, and then develop specific building materials based on the monitored data.

[0003] However, when the existing building data monitoring device monitors the building model, such as a building data detection device based on BIM technology disclosed in China Publication No. CN216846091U, there are still the following technical problems: When monitoring the building model, the infrared detector can only move up and down. This movement mode is relatively simple. In order to ensure comprehensive monitoring of the four sides of the building model, the building model needs to be driven to rotate. In order to avoid the shaking of the building model during the rotation of the building model, another clamping mechanism needs to be set to fix the building model, which not only increases unnecessary production costs, but also inevitably blocks some areas around the building model when clamping the building model, resulting in reduced comprehensiveness of monitoring the building model. When monitoring the building model, the building model cannot be cleaned, resulting in dust and dirt attached to the surface of the building model cannot be removed, reducing the monitoring accuracy of the building model. Summary of the invention

[0004] The purpose of the present invention is to address the problems raised in the above-mentioned background technology and to provide a BIM-based building data monitoring device that can enable an infrared detector to rise in a spiral shape, comprehensively monitor the building model from all heights and angles, and at the same time enable two cleaning blocks to move back and forth up and down synchronously, thereby realizing the cleaning work of the monitoring position of the building model.

[0005] In order to achieve the above object, the present invention adopts the following technical solutions: A building data monitoring device based on BIM, comprising: A base, the upper end of which is fixedly connected to a monitoring box, and the upper end of which is provided with a transmission module for transmitting the monitored data to the BIM platform through electrical signals; A monitoring mechanism, used for comprehensively monitoring the data of the building model, the monitoring mechanism comprises a spiral track fixedly connected to the inside of the monitoring box, a lifting ring is slidably connected to the inside of the monitoring box, a motor is fixedly connected to the upper end of the base, a screw is fixedly connected to the output end of the motor, a lifting block fixedly connected to the lifting ring is threadedly connected to the screw, a rotating ring is rotatably connected to the inner wall of the lifting ring, a support block is fixedly connected to the rotating ring, an inner fixed cylinder is fixedly connected to the support block, an outer rotating cylinder is rotatably sleeved on the peripheral side wall of the inner fixed cylinder, a guide wheel is fixedly connected to the peripheral side wall of the outer rotating cylinder, the guide wheel rolls in contact with the spiral track, and an infrared detector is installed at the end of the inner fixed cylinder away from the support block; The swing mechanism is used to swing the infrared detector up and down to increase the monitoring range when the infrared detector is working; The cleaning mechanism is used to automatically clean the monitoring position when the infrared detector is working to prevent dust and dirt from reducing the monitoring accuracy.

[0006] Preferably, a limiting groove is provided on the side wall of the monitoring box, the lifting block is fixedly connected to the lifting ring through the limiting groove, and the lifting block is slidably connected to the inner wall of the limiting groove along the vertical direction.

[0007] Preferably, the swing mechanism comprises a liquid storage tank fixedly connected to the side wall of the support block, the interior of the liquid storage tank is sealed and slidably connected with a piston plate, the outer wall of the outer rotating cylinder is provided with a reciprocating threaded section, the reciprocating threaded section is threadedly connected with a threaded block, two fixing rods are fixedly connected between the threaded block and the piston plate, the inner fixed cylinder is fixedly connected with a mounting block at one end away from the support block, a rotating rod is rotatably installed on the side wall of the mounting block, the mounting plates are fixedly connected at both sides of the rotating rod, the infrared detector is fixedly connected between the two mounting plates, a gear is fixedly connected to the middle position of the rotating rod, a rack is slidably connected to the side wall of the mounting block in a vertical direction, the rack and the gear are meshed with each other, a control chamber is opened inside the mounting block, the interior of the control chamber is sealed and slidably connected with a piston block, a U-shaped rod is fixedly connected between the upper end of the piston block and the rack, and the two ends of the inner fixed cylinder are respectively connected to the control chamber and the interior of the liquid storage tank.

[0008] Preferably, the interior of the inner fixed cylinder, the space below the piston block in the control chamber, and the space on one side of the liquid storage tank close to the support block are all filled with hydraulic oil.

[0009] Preferably, the cleaning mechanism includes a first hydraulic cylinder fixedly connected to the upper end of the mounting block and a second hydraulic cylinder with a fixed connector on the lower end of the mounting block, the first hydraulic cylinder and the second hydraulic cylinder are both sealed and slidably connected with extension rods, and the ends of the extension rods close to the center of the monitoring box are fixedly connected with cleaning blocks, one of the mounting plates is provided with a cleaning cavity, a counterweight block is sealed and slidably connected to the interior of the cleaning cavity, a force spring is provided between one side wall of the counterweight block and the inner wall of the cleaning cavity, two infusion hoses are fixedly connected to the outer wall of the mounting plate, and the spaces on both sides of the counterweight block in the cleaning cavity are respectively connected to the first hydraulic cylinder and the second hydraulic cylinder through two infusion hoses.

[0010] Preferably, the spaces on both sides of the counterweight block in the cleaning chamber, the two infusion hoses, the first hydraulic cylinder and the second hydraulic cylinder are also filled with hydraulic oil.

[0011] Preferably, a conveying port is opened on the top wall of the monitoring box, and inner walls on both sides of the conveying port are rotatably connected with pressing plates.

[0012] Preferably, the internal center position of the monitoring box is fixedly connected to a fixing seat, the inner wall of the fixing seat is sealingly and slidably connected to a ejection block, the inner top wall of the monitoring box is fixedly connected to an annular liquid storage chamber, the inner wall of the annular liquid storage chamber is sealingly and slidably connected to an annular block, the lower end of the annular block is fixedly connected to a connecting rod, the parts of the two connecting rods extending below the annular liquid storage chamber are fixedly connected to an abutment ring, the lifting ring contacts the lower wall of the abutment ring after moving up to a specified position, and a connecting pipe is fixedly connected between the inside of the annular liquid storage chamber and the inside of the fixing seat.

[0013] Compared with the existing technology, the advantages of this BIM-based building data monitoring device are: 1. The present invention sets a monitoring mechanism. When monitoring the building model, the motor drives the screw to rotate, so that the lifting block can drive the lifting ring to move vertically. In this process, the infrared detector rises in a spiral shape, and the data of the building model is fully monitored from various heights and angles. There is no need to rotate the building model, and there is no need to set up an additional clamping mechanism. While reducing the manufacturing cost of the device, it avoids blocking the surrounding side of the building model, making the monitoring of the building model more comprehensive.

[0014] 2. The present invention sets a swing mechanism. When the guide wheel moves along the spiral track, the guide wheel will rotate under the action of friction, thereby driving the piston plate to move back and forth inside the liquid storage tank, so that the piston block in the control chamber can perform reciprocating vertical displacement, and under the action of the rack and the gear, the rotating rod can rotate back and forth in opposite directions, so that the mounting plate can drive the infrared detector to swing up and down back and forth, thereby improving the monitoring range of the infrared detector to the building model and improving the accuracy of the monitoring data.

[0015] 3. The present invention sets a cleaning mechanism. When the mounting plate swings back and forth, the position of the counterweight block in the cleaning chamber will change continuously, so that the two cleaning blocks can synchronously move up and down to clean the monitoring position of the building model, thereby preventing dust, dirt and other debris attached thereto from affecting the monitoring data of the building model.

[0016] 4. In the present invention, only one driving source, namely a motor, is required to realize comprehensive monitoring of the building model, improvement of the monitoring range of the building model and cleaning of the monitoring position of the building model. The overall linkage of the device is high, and the driving source used is relatively small, thus achieving the purpose of energy saving and efficiency improvement. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a three-dimensional structural schematic diagram of the present invention; Figure 2 It is a cross-sectional structural schematic diagram of the present invention; Figure 3 yes Figure 2 The enlarged view of point A in the middle; Figure 4 It is a schematic diagram of the local structure of the support block in the present invention; Figure 5 It is a schematic diagram of the local structure of the mounting plate in the present invention; Figure 6 It is a schematic diagram of the local structure of the fixing seat in the present invention.

[0018] In the figure: 1. base; 11. monitoring box; 12. transmission module; 2. monitoring mechanism; 21. spiral track; 22. lifting ring; 23. motor; 24. screw; 25. lifting block; 26. rotating ring; 27. support block; 28. inner fixed cylinder; 29. ​​outer rotating cylinder; 210. guide wheel; 211. infrared detector; 3. swing mechanism; 31. liquid storage tank; 32. piston plate; 33. reciprocating threaded section; 34. threaded block; 35. fixed rod; 36. mounting block; 37. rotating rod; 38. mounting plate ; 39. gear; 310. rack; 311. control chamber; 312. piston block; 313. U-shaped rod; 4. cleaning mechanism; 41. first hydraulic cylinder; 42. second hydraulic cylinder; 43. extension rod; 44. cleaning block; 45. cleaning chamber; 46. counterweight block; 47. force spring; 48. infusion hose; 5. limit groove; 6. delivery port; 61. pressing plate; 7. fixing seat; 71. ejection block; 72. annular liquid storage chamber; 73. annular block; 74. connecting rod; 75. abutment ring; 76. connecting pipe. DETAILED DESCRIPTION

[0019] The following examples are for illustrative purposes only and are not intended to limit the scope of the present invention.

[0020] Example: Refer to Figures 1 to 6 , a BIM-based building data monitoring device, comprising: A base 1, a monitoring box 11 is fixedly connected to the upper end of the base 1, and a transmission module 12 is provided at the upper end of the base 1 for transmitting the monitored data to the BIM platform through electrical signals; Specifically, the transmission module 12 can transmit the monitoring data to the BIM platform to facilitate subsequent data modeling and information integration, so as to realize the design and development of building materials.

[0021] It is worth mentioning that a conveying port 6 is opened on the top wall of the monitoring box 11, and the inner walls on both sides of the conveying port 6 are rotatably connected with pressing plates 61. After the building model is conveyed to the inside of the monitoring box 11 through the conveying port 6, the two pressing plates 61 are changed from an upward swinging state to a downward swinging state, so that the two pressing plates 61 can be pressed on the upper wall of the building model. The pressing plates 61 are made of soft steel material, which is heavy and flexible, so they can provide sufficient weight and pressing force to fix the building model and protect the building model from damage.

[0022] The monitoring mechanism 2 is used to comprehensively monitor the data of the building model. The monitoring mechanism 2 includes a spiral track 21 fixedly connected to the inside of the monitoring box 11. The inside of the monitoring box 11 is slidably connected with a lifting ring 22. The upper end of the base 1 is fixedly connected with a motor 23. The output end of the motor 23 is fixedly connected with a screw 24. The screw 24 is threadedly connected with a lifting block 25 fixedly connected to the lifting ring 22. A rotating ring 26 is rotatably connected to the inner wall of the lifting ring 22. A supporting block 27 is fixedly connected to the rotating ring 26. An inner fixed cylinder 28 is fixedly connected to the supporting block 27. An outer rotating cylinder 29 is rotatably sleeved on the peripheral side wall of the inner fixed cylinder 28. A guide wheel 210 is fixedly connected to the peripheral side wall of the outer rotating cylinder 29. The guide wheel 210 rolls in contact with the spiral track 21. An infrared detector 211 is installed at the end of the inner fixed cylinder 28 away from the supporting block 27. Specifically, a limiting groove 5 is opened on the side wall of the monitoring box 11, and the lifting block 25 is fixedly connected to the lifting ring 22 through the limiting groove 5, and the lifting block 25 is slidably connected to the inner wall of the limiting groove 5 along the vertical direction. The limiting groove 5 can limit the lifting block 25 to prevent the lifting block 25 from rotating with the screw 24.

[0023] Specifically, the infrared detector 211 is fixedly connected to the two mounting plates 38 by pins, and only the pins need to be pulled out during disassembly, so that the infrared detector 211 can be replaced with a laser scanner or other monitoring equipment, making the monitoring data information more comprehensive.

[0024] In order to avoid the shaking of the building model during the rotation of the building model in the prior art, it is necessary to set up another clamping mechanism to fix the building model, which not only increases unnecessary production costs, but also inevitably causes obstruction of some areas around the building model when the building model is clamped, resulting in reduced comprehensiveness of monitoring the building model. In the present invention, a monitoring mechanism 2 is set up. When monitoring the building model, the motor 23 drives the screw 24 to rotate, so that the lifting block 25 can drive the lifting ring 22 to move vertically. During this process, the guide wheel 210 will rotate along the spiral track 21, so that the rotating ring 26 rotates relative to the lifting ring 22, so that the infrared detector 211 can rotate synchronously during the up and down movement, so that the infrared detector 211 can fully monitor the data of the building model from all heights and angles, without the need to rotate the building model, and at the same time, there is no need to set up another clamping mechanism. While reducing the production cost of the device, it avoids obstruction of the surrounding area of ​​the building model, making the monitoring of the building model more comprehensive.

[0025] The swing mechanism 3 is used to swing the infrared detector 211 up and down to increase the monitoring range when the infrared detector 211 is working. The swing mechanism 3 includes a liquid storage tank 31 fixedly connected to the side wall of the support block 27. The internal sealing and sliding connection of the liquid storage tank 31 is connected to a piston plate 32. A reciprocating threaded section 33 is provided on the outer wall of the outer rotating cylinder 29. A threaded block 34 is threadedly connected to the reciprocating threaded section 33. Two fixed rods 35 are fixedly connected between the threaded block 34 and the piston plate 32. The end of the inner fixed cylinder 28 away from the support block 27 is fixedly connected to a mounting block 36. A rotating rod 37 is rotatably installed on the side wall of the mounting block 36. The rotating rod 3 The two sides of the mounting block 7 are fixedly connected with mounting plates 38, the infrared detector 211 is fixedly connected between the two mounting plates 38, the middle position of the rotating rod 37 is fixedly connected with a gear 39, the side wall of the mounting block 36 is slidably connected with a rack 310 in the vertical direction, the rack 310 and the gear 39 are meshed with each other, a control chamber 311 is opened inside the mounting block 36, a piston block 312 is sealed and slidably connected inside the control chamber 311, a U-shaped rod 313 is fixedly connected between the upper end of the piston block 312 and the rack 310, and the two ends of the inner fixed cylinder 28 are respectively connected with the control chamber 311 and the inside of the liquid storage tank 31; Specifically, the interior of the inner fixed cylinder 28 , the space below the piston block 312 in the control chamber 311 , and the space on one side of the liquid storage tank 31 close to the support block 27 are all filled with hydraulic oil.

[0026] In order to improve the accuracy of the monitoring data, the present invention sets a swing mechanism 3. When the guide wheel 210 moves along the spiral track 21, the guide wheel 210 will rotate under the action of friction, thereby driving the outer rotating cylinder 29 to rotate relative to the inner fixed cylinder 28, so that the thread block on the outer rotating cylinder 29 can reciprocate horizontally along the reciprocating thread section 33, thereby driving the piston plate 32 to move back and forth inside the liquid storage tank 31, continuously pumping the hydraulic oil in the control chamber 311 into the liquid storage tank 31 through the inner fixed cylinder 28, and continuously pumping the liquid storage tank 31. 1 returns to the control chamber 311, so that the piston block 312 in the control chamber 311 can perform reciprocating vertical displacement, and the rack 310 is pulled by the U-shaped rod 313 to perform reciprocating vertical displacement, so that the rotating rod 37 is reciprocated and rotated in opposite directions under the action of the gear 39, so that the mounting plate 38 can drive the infrared detector 211 to swing up and down back and forth, thereby improving the monitoring range of the infrared detector 211 on the building model, so that the same position of the building model can be detected by the infrared detector 211 multiple times, and the accuracy of the monitoring data is improved.

[0027] The cleaning mechanism 4 is used to automatically clean the monitoring position when the infrared detector 211 is working to prevent dust and dirt from reducing the monitoring accuracy. The cleaning mechanism 4 includes a first hydraulic cylinder 41 fixedly connected to the upper end of the mounting block 36 and a second hydraulic cylinder 42 fixedly connected to the lower end of the mounting block 36. The first hydraulic cylinder 41 and the second hydraulic cylinder 42 are both sealed and slidably connected with an extension rod 43, and the end of the extension rod 43 close to the center of the monitoring box 11 is fixedly connected to a cleaning block 44. A cleaning cavity 45 is opened inside one of the mounting plates 38, and a counterweight block 46 is sealed and slidably connected inside the cleaning cavity 45. A force spring 47 is provided between one side wall of the counterweight block 46 and the inner wall of the cleaning cavity 45. Two infusion hoses 48 are fixedly connected to the outer wall of the mounting plate 38. The space on both sides of the counterweight block 46 in the cleaning cavity 45 is connected to the first hydraulic cylinder 41 and the second hydraulic cylinder 42 through the two infusion hoses 48.

[0028] Specifically, the spaces on both sides of the counterweight 46 in the cleaning chamber 45 , the two infusion hoses 48 , the first hydraulic cylinder 41 and the second hydraulic cylinder 42 are also filled with hydraulic oil.

[0029] In view of the problem that the building model cannot be cleaned in the prior art, the dust and dirt attached to the surface of the building model cannot be removed, which reduces the monitoring accuracy of the building model. In the present invention, a cleaning mechanism 4 is provided. When the mounting plate 38 swings back and forth, the position of the counterweight block 46 in the cleaning chamber 45 will continuously change: When the mounting plate 38 drives the infrared detector 211 to swing upward, the component force of the weight block 46 itself is opposite to the elastic force of the force spring 47, so that the weight block 46 is displaced to one side in the control chamber 311, and the hydraulic oil in the space on this side is transported to the first hydraulic cylinder 41, and the hydraulic oil in the second hydraulic cylinder 42 is transported to the space on the other side, so that the upper cleaning block 44 and the lower cleaning block 44 can be displaced upward synchronously; When the mounting plate 38 drives the infrared detector 211 to swing downward, the component force of the weight of the counterweight block 46 itself is in the same direction as the elastic force of the force spring 47, so that the counterweight block 46 is displaced to the other side in the control chamber 311, and the hydraulic oil in the space on the other side is transported to the second hydraulic cylinder 42, while the hydraulic oil in the first hydraulic cylinder 41 is transported to the original space, so that the upper cleaning block 44 and the lower cleaning block 44 can be displaced downward synchronously, so as to realize the cleaning work of the monitoring position of the building model, and avoid the dust, dirt and other debris attached thereto from affecting the monitoring data of the building model. At the same time, the space between the two cleaning blocks 44 swings with the swing of the infrared detector 211, so as to avoid the cleaning block 44 from blocking the monitoring work of the infrared detector 211, thereby further improving the monitoring accuracy.

[0030] In addition, in the present invention, by providing a motor 23, the motor 23 can drive the screw 24 to rotate, so that the guide wheel 210 rises along the spiral track 21, driving the infrared detector 211 to spirally rise synchronously, thereby realizing comprehensive monitoring of the building model. At the same time, during the spiral rise of the guide wheel 210, the outer rotating cylinder 29 is rotated relative to the inner fixed cylinder 28 through the action of friction, driving the infrared detector 211 to swing back and forth, thereby improving the monitoring range of the building model. In addition, during the back and forth swinging of the infrared detector 211, the counterweight block 46 and the change in the force direction of the force spring 47 are used to clean the monitoring position of the building model. The overall linkage of the device is high, and the driving source used is relatively small, thereby achieving the purpose of energy saving and efficiency improvement.

[0031] The internal center position of the monitoring box 11 is fixedly connected to the fixed seat 7, the inner wall of the fixed seat 7 is sealingly and slidably connected to the ejection block 71, the inner top wall of the monitoring box 11 is fixedly connected to an annular liquid storage chamber 72, the inner wall of the annular liquid storage chamber 72 is sealingly and slidably connected to the annular block 73, the lower end of the annular block 73 is fixedly connected to a connecting rod 74, the parts of the two connecting rods 74 extending to the bottom of the annular liquid storage chamber 72 are fixedly connected to abutment rings 75, the lifting ring 22 moves up to the specified position and contacts the lower wall of the abutment ring 75, and a connecting pipe 76 is fixedly connected between the inside of the annular liquid storage chamber 72 and the inside of the fixed seat 7.

[0032] In addition, after the screw 24 drives the lifting block 25 and the lifting ring 22 to move up to a certain height, the guide wheel 210 disengages from the spiral track 21 to complete the detection work. At this time, the pressing plate 61 is pulled from the downward swinging state to the upward swinging state to release the fixation of the building template. The continued upward movement of the lifting ring 22 will push the abutment ring 75 to move upward, and the hydraulic oil in the liquid storage tank 31 is further transported to the fixing seat 7 through the connecting pipe 76 through the upward movement of the annular block 73, so that the ejection block 71 can be extended from the fixing seat 7, and the building model is automatically pushed out of the monitoring box 11, which is convenient for the staff to take out the building model and the operation is convenient.

[0033] The present invention can be explained by the following operation mode: The building model is conveyed into the monitoring box 11 through the conveying port 6, and then the two pressing plates 61 are changed from an upward swinging state to a downward swinging state, so that the two pressing plates 61 can be pressed on the upper wall of the building model; The motor 23 drives the screw rod 24 to rotate, so that the lifting block 25 can drive the lifting ring 22 to move vertically. During this process, the guide wheel 210 will rotate along the spiral track 21, so that the rotating ring 26 rotates relative to the lifting ring 22, so that the infrared detector 211 can rotate synchronously during the up and down movement, so that the infrared detector 211 can fully monitor the data of the building model from all heights and angles. The transmission module 12 can transmit the monitoring data to the BIM platform for data modeling and information integration; When the guide wheel 210 moves along the spiral track 21, the guide wheel 210 will rotate under the action of friction, thereby driving the outer rotating cylinder 29 to rotate relative to the inner fixed cylinder 28, driving the piston plate 32 to move back and forth inside the liquid storage tank 31, so that the piston block 312 in the control chamber 311 can perform reciprocating vertical displacement, so that the rotating rod 37 can reciprocate and rotate in opposite directions, and the infrared detector 211 can swing up and down back and forth, thereby improving the monitoring range of the infrared detector 211 on the building model; During the process of the mounting plate 38 swinging back and forth, the position of the counterweight block 46 in the cleaning chamber 45 will constantly change. When the mounting plate 38 drives the infrared detector 211 to swing upward, the upper cleaning block 44 and the lower cleaning block 44 will move upward synchronously. When the mounting plate 38 drives the infrared detector 211 to swing downward, the upper cleaning block 44 and the lower cleaning block 44 will move downward synchronously, so that the two cleaning blocks 44 will synchronously reciprocate up and down to achieve the cleaning work of the monitoring position of the building model. After the screw rod 24 drives the lifting block 25 and the lifting ring 22 to move up to a certain height, the detection work is completed. At this time, the pressing plate 61 is pulled from the downward swinging state to the upward swinging state, and the continued upward movement of the lifting ring 22 will push the abutment ring 75 to move upward, so that the ejection block 71 can be extended from the fixing seat 7, and the building model is automatically pushed out of the monitoring box 11.

[0034] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A BIM-based building data monitoring device, characterized in that: include: A base (1), the upper end of the base (1) being fixedly connected to a monitoring box (11), and the upper end of the base (1) being provided with a transmission module (12) for transmitting the monitored data to the BIM platform via electrical signals; A monitoring mechanism (2) is used to comprehensively monitor data of a building model, the monitoring mechanism (2) comprising a spiral track (21) fixedly connected to the inside of a monitoring box (11), a lifting ring (22) being slidably connected to the inside of the monitoring box (11), a motor (23) being mounted on the base (1), a screw rod (24) being fixedly connected to the output end of the motor (23), a lifting block (25) being threadedly connected to the screw rod (24) and being fixedly connected to the lifting ring (22), and a screw rod (25) being threadedly connected to the inner wall of the lifting ring (22). A rotating ring (26) is rotatably connected to the rotating ring (26), a support block (27) is fixedly connected to the rotating ring (26), an inner fixed cylinder (28) is fixedly connected to the support block (27), an outer rotating cylinder (29) is rotatably sleeved on the peripheral side wall of the inner fixed cylinder (28), a guide wheel (210) is fixedly connected to the peripheral side wall of the outer rotating cylinder (29), the guide wheel (210) rolls in contact with the spiral track (21), and an infrared detector (211) is installed at one end of the inner fixed cylinder (28) away from the support block (27); A swing mechanism (3) is used to swing the infrared detector (211) up and down to increase the monitoring range when the infrared detector (211) is working; The cleaning mechanism (4) is used to automatically clean the monitoring position when the infrared detector (211) is working to prevent dust and dirt from reducing the monitoring accuracy.

2. The BIM-based building data monitoring device according to claim 1, characterized in that: A limiting groove (5) is provided on the side wall of the monitoring box (11), the lifting block (25) is fixedly connected to the lifting ring (22) via the limiting groove (5), and the lifting block (25) is slidably connected to the inner wall of the limiting groove (5) in the vertical direction.

3. The BIM-based building data monitoring device according to claim 2, characterized in that: The swing mechanism (3) comprises a liquid storage box (31) fixedly connected to the side wall of the support block (27); the interior of the liquid storage box (31) is sealingly and slidably connected to a piston plate (32); a reciprocating threaded section (33) is provided on the outer wall of the outer rotating cylinder (29); a threaded block (34) is threadedly connected to the reciprocating threaded section (33); two fixed rods (35) are fixedly connected between the threaded block (34) and the piston plate (32); an end of the inner fixed cylinder (28) away from the support block (27) is fixedly connected to a mounting block (36); a rotating rod (37) is rotatably mounted on the side wall of the mounting block (36); and mounting plates (38) are fixedly connected to positions on both sides of the rotating rod (37). The infrared detector (211) is fixedly connected between two mounting plates (38); a gear (39) is fixedly connected to the middle position of the rotating rod (37); a rack (310) is slidably connected to the side wall of the mounting block (36) in the vertical direction; the rack (310) and the gear (39) are meshed with each other; a control chamber (311) is provided inside the mounting block (36); a piston block (312) is sealingly slidably connected inside the control chamber (311); a U-shaped rod (313) is fixedly connected between the upper end of the piston block (312) and the rack (310); and two ends of the internal fixed cylinder (28) are respectively connected to the control chamber (311) and the inside of the liquid storage tank (31).

4. The BIM-based building data monitoring device according to claim 3, characterized in that: The interior of the inner fixed cylinder (28), the space below the piston block (312) in the control chamber (311), and the space on one side of the liquid storage tank (31) close to the support block (27) are all filled with hydraulic oil.

5. The BIM-based building data monitoring device according to claim 3, characterized in that: The cleaning mechanism (4) comprises a first hydraulic cylinder (41) fixedly connected to the upper end of the mounting block (36) and a second hydraulic cylinder (42) fixedly connected to the lower end of the mounting block (36); an extension rod (43) is sealed and slidably connected inside the first hydraulic cylinder (41) and the second hydraulic cylinder (42); one end of the extension rod (43) close to the center of the monitoring box (11) is fixedly connected to a cleaning block (44); a cleaning cavity (45) is provided inside one of the mounting plates (38); a counterweight block (46) is sealed and slidably connected inside the cleaning cavity (45); a force spring (47) is provided between a side wall of the counterweight block (46) and an inner wall of the cleaning cavity (45); two infusion hoses (48) are fixedly connected to the outer wall of the mounting plate (38); and the spaces on both sides of the counterweight block (46) in the cleaning cavity (45) are connected to the inside of the first hydraulic cylinder (41) and the second hydraulic cylinder (42) through the two infusion hoses (48).

6. The BIM-based building data monitoring device according to claim 5, characterized in that: The spaces on both sides of the counterweight (46) in the cleaning chamber (45), the two infusion hoses (48), the first hydraulic cylinder (41) and the second hydraulic cylinder (42) are also filled with hydraulic oil.

7. The BIM-based building data monitoring device according to claim 1, characterized in that: A conveying port (6) is provided on the top wall of the monitoring box (11), and pressing plates (61) are rotatably connected to inner walls on both sides of the conveying port (6).

8. The BIM-based building data monitoring device according to claim 1, characterized in that: The inner center position of the monitoring box (11) is fixedly connected to a fixed seat (7), the inner wall of the fixed seat (7) is sealingly slidably connected to an ejection block (71), the inner top wall of the monitoring box (11) is fixedly connected to an annular liquid storage chamber (72), the inner wall of the annular liquid storage chamber (72) is sealingly slidably connected to an annular block (73), the lower end of the annular block (73) is fixedly connected to a connecting rod (74), the parts of the two connecting rods (74) extending below the annular liquid storage chamber (72) are fixedly connected to an abutment ring (75), the lifting ring (22) contacts the lower wall of the abutment ring (75) after moving up to a specified position, and a connecting pipe (76) is fixedly connected between the inside of the annular liquid storage chamber (72) and the inside of the fixed seat (7).