Low-influence construction treatment method suitable for gobi power transmission line construction
By constructing a noise propagation model in the construction of transmission lines in the Gobi area, evaluating the impact of construction noise on the ecological environment, and adjusting the construction time or method based on real-time meteorological data, the impact of construction noise on the ecological environment is solved and the protection of the ecological environment is achieved.
Patent Information
- Application Number
- CN202411569544.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-05
- Publication Date
- 2025-03-25
AI Technical Summary
During the construction of transmission lines in the Gobi area, construction noise affects the ecological environment, especially in areas with complex or soft geological conditions, pile driving and drilling will produce strong impact noise, interfering with the ecological behavior of wild animals.
By obtaining the basic topographic data and real-time meteorological data of the construction area, a noise propagation model is constructed and the intensity of the impact of construction noise on the preset ecological area is calculated. If the noise intensity exceeds the preset threshold, the construction time or method is adjusted to reduce the impact of noise on the ecological environment.
In the construction of transmission lines in the Gobi area, through scientific noise evaluation and adjustment, the impact of construction noise on the ecological environment is reduced and the ecological behavior of wild animals is protected.