Risk management method and device for drilling engineering and electronic equipment

By determining the standard disposal costs based on the disposal costs and indicators of historical accidents in drilling projects, and calculating the optimal risk input costs based on the risk characteristics and characteristic weights in the current target operation process, the problems of low accuracy and accuracy of risk management in the existing technology are solved, and more effective risk management and safety guarantees are achieved.

CN119692635APending Publication Date: 2025-03-25RICHFIT INFORMATION TECH +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311236174.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-09-22
Publication Date
2025-03-25

AI Technical Summary

Technical Problem

The existing technology cannot effectively evaluate and manage risk accidents during drilling engineering, resulting in low accuracy and accuracy of risk management and the inability to accurately determine the cost of unhandled accidents.

Method used

The cost of disposal of historical standard elements is determined based on the disposal costs and indicators of historical accidents, and the target preset disposal costs are determined based on the disposal indicators and disposal costs of historical standard elements in the current target operation process. Combining risk characteristics and feature weights, the optimal risk input cost is calculated to achieve cost management of drilling engineering risk characteristics.

Benefits of technology

It improves the accuracy of drilling engineering risk management and the accuracy of risk control, provides more effective safety guarantees, and can effectively control economic losses after accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119692635A_ABST
    Figure CN119692635A_ABST
Patent Text Reader

Abstract

The invention provides a risk management method and device for drilling engineering and electronic equipment, and the method comprises the steps: determining the historical standard element disposal cost in a historical operation process based on the historical disposal cost of each historical accident and the historical disposal index of each historical accident in any historical operation process of the drilling engineering; determining a target preset disposal cost corresponding to the target operation according to the target disposal index and the historical standard element disposal cost of each preset target accident in the current target operation process of the drilling engineering; and determining an optimal risk input cost based on the target preset disposal cost, each risk feature of each preset target accident and the feature weight corresponding to each risk feature. According to the method and the device, the cost management of all risk characteristics of the whole drilling engineering in the current target operation process is realized, the risk management accuracy of the drilling engineering can be improved, the risk management and control precision is greatly improved, and more effective safety guarantee is provided for the drilling engineering.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of drilling engineering, and in particular to a risk management method, device and electronic equipment for drilling engineering. Background Art

[0002] Drilling engineering is a relatively concealed project carried out by oil companies. Construction is carried out underground. However, in actual construction, there are always many factors that affect construction safety, such as equipment performance, personnel experience, geological environment, construction layout, etc. These factors lead to some accidents or risks in the implementation of drilling projects.

[0003] However, in the existing technology, people cannot evaluate and analyze the risk accidents in the drilling process during actual drilling operations. Usually, only after the accident or risk occurs and is handled in the drilling project, can the actual situation and cost of the accident or risk be analyzed and summarized. It is impossible to analyze and compare the unhandled accidents or risks, determine the cost, and accurately manage the risks of the drilling project. This leads to low accuracy in determining risks. Summary of the invention

[0004] In view of this, the purpose of this application is to provide a risk management method, device and electronic equipment for drilling projects to realize cost management of all risk characteristics of the entire drilling project during the current target operation process, which can improve the accuracy of risk management of drilling projects and greatly improve the accuracy of risk control, thereby providing more effective safety protection for drilling projects.

[0005] The present application provides a risk management method for a drilling project, and the risk management method for a drilling project includes:

[0006] Based on the historical disposal costs of each historical accident in any historical operation process of the drilling project and the historical disposal indicators of each historical accident, determine the disposal costs of historical standard elements in the historical operation process;

[0007] Determine the target preset disposal cost corresponding to the target operation according to the target disposal index of each preset target accident in the current target operation process of the drilling project and the disposal cost of the historical standard element;

[0008] Based on the target preset disposal cost, each risk characteristic of each preset target accident and the characteristic weight corresponding to each risk characteristic, the optimal risk input cost in the current target operation process is determined to achieve cost management of the risk characteristics in the current target operation process.

[0009] Furthermore, the historical disposal cost of each historical accident in any historical operation process of the drilling project and the historical disposal index of each historical accident are used to determine the disposal cost of the historical standard elements in the historical operation process, including:

[0010] Obtain each historical operation process type of the drilling project in any historical operation process;

[0011] For any of the historical operation process types, determine the historical handling costs of each historical accident under the historical operation process type and the historical handling indicators of each historical accident;

[0012] The historical standard element disposal cost in the historical operation process is determined based on the historical disposal cost of each of the historical accidents and the historical disposal index of each of the historical accidents.

[0013] Furthermore, the optimal risk input cost in the current target operation process is determined based on the target preset disposal cost, each risk feature of each preset target accident, and the feature weight corresponding to each risk feature, including:

[0014] Determine the target accident probability corresponding to all the preset target accidents in the current target operation process according to the risk characteristics of each preset target accident and the characteristic weights corresponding to each risk characteristic;

[0015] Determine the risk input cost in the current target operation process according to the target accident probability and the target preset disposal cost;

[0016] Based on the risk input cost and the preset risk prevention costs corresponding to each preset target accident, the optimal risk input cost in the current target operation process is determined.

[0017] Furthermore, the determining of the optimal risk input cost in the current target operation process based on the risk input cost and the preset risk prevention cost corresponding to each preset target accident includes:

[0018] According to the current target operation process of the drilling project, determining the accident type of the target operation process;

[0019] According to the accident type, determine the fixed risk characteristics and fluctuating risk characteristics in the current target operation process;

[0020] Based on the fixed risk input cost corresponding to the fixed risk characteristics, the volatility risk input cost corresponding to the volatility risk characteristics, and the preset prevention risk cost corresponding to the volatility risk characteristics described in each preset target accident, the optimal risk input cost in the current target operation process is determined.

[0021] Furthermore, the optimal risk input cost in the current target operation process is determined based on the fixed risk input cost corresponding to the fixed risk characteristics, the volatility risk input cost corresponding to the volatility risk characteristics, and the preset prevention risk cost corresponding to the volatility risk characteristics in each preset target accident, including:

[0022] Determine the total risk input cost in the current target operation process according to the fixed risk input cost corresponding to the fixed risk characteristics, the volatility risk input cost corresponding to the volatility risk characteristics, the preset prevention risk cost corresponding to the volatility risk characteristics in each preset target accident, and the preset risk acceptance corresponding to each volatility risk characteristic;

[0023] The optimal risk input cost in the current target operation process is determined based on the total risk input cost and the preset risk input quantity threshold.

[0024] The embodiment of the present application further provides a risk management device for a drilling project, the risk management device for a drilling project comprising:

[0025] The first determination module is used to determine the historical standard element disposal cost in any historical operation process of the drilling project based on the historical disposal cost of each historical accident in any historical operation process and the historical disposal index of each historical accident;

[0026] The second determination module is used to determine the target preset disposal cost corresponding to the target operation according to the target disposal index of each preset target accident in the current target operation process of the drilling project and the disposal cost of the historical standard element;

[0027] The third determination module is used to determine the optimal risk input cost in the current target operation process based on the target preset disposal cost, the risk characteristics of each preset target accident and the characteristic weights corresponding to each risk characteristic, so as to realize cost management of the risk characteristics in the current target operation process.

[0028] Furthermore, the first determining module is specifically configured to:

[0029] Obtain each historical operation process type of the drilling project in any historical operation process;

[0030] For any of the historical operation process types, determine the historical handling costs of each historical accident under the historical operation process type and the historical handling indicators of each historical accident;

[0031] According to the historical handling costs of each of the historical accidents and the historical handling indicators of each of the historical accidents, the historical standard element handling costs in the historical operation process are determined. Further, the third determination module is specifically used to:

[0032] Determine the target accident probability corresponding to all the preset target accidents in the current target operation process according to the risk characteristics of each preset target accident and the characteristic weights corresponding to each risk characteristic;

[0033] Determine the risk input cost in the current target operation process according to the target accident probability and the target preset disposal cost;

[0034] Based on the risk input cost and the preset risk prevention costs corresponding to each preset target accident, the optimal risk input cost in the current target operation process is determined.

[0035] An embodiment of the present application also provides an electronic device, comprising: a processor, a memory and a bus, wherein the memory stores machine-readable instructions executable by the processor, and when the electronic device is running, the processor and the memory communicate via the bus, and when the machine-readable instructions are executed by the processor, the steps of the risk management method for drilling projects as described above are performed.

[0036] An embodiment of the present application further provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of the risk management method for drilling engineering as described above are executed.

[0037] The risk management method, device and electronic equipment for drilling projects provided in the embodiments of the present application are compared with the management method for drilling projects in the prior art. The embodiments provided in the present application determine the disposal cost of historical standard elements in the historical operation process through the historical disposal cost of each historical accident and the historical disposal index of each historical accident in any historical operation process of the drilling project, and determine the target preset disposal cost corresponding to the target operation according to the target disposal index and the historical standard element disposal cost of each preset target accident in the current target operation process of the drilling project, and determine the optimal risk input cost in the current target operation process according to the target preset disposal cost, each risk feature of each preset target accident and the feature weight corresponding to each risk feature, thereby realizing the cost management of all risk features of the entire drilling project in the current target operation process, which can improve the accuracy of risk management of the drilling project and greatly improve the accuracy of risk control, thereby providing more effective safety protection for the drilling project.

[0038] In order to make the above-mentioned objects, features and advantages of the present application more obvious and easy to understand, the following is a detailed description of the preferred embodiments in conjunction with the attached drawings as follows. 。 BRIEF DESCRIPTION OF THE DRAWINGS

[0039] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.

[0040] Figure 1 One of the flowcharts of a risk management method for a drilling project provided in an embodiment of the present application is shown;

[0041] Figure 2 A second flowchart of a risk management method for a drilling project provided in an embodiment of the present application is shown;

[0042] Figure 3 A schematic diagram showing the structure of a risk management device for a drilling project provided by an embodiment of the present application is shown;

[0043] Figure 4 A schematic structural diagram of an electronic device provided in an embodiment of the present application is shown.

[0044] In the figure:

[0045] 300-Risk management device for drilling engineering; 310-First determination module; 320-Second determination module; 330-Third determination module; 400-Electronic device; 410-Processor; 420-Memory; 430-Bus 。 DETAILED DESCRIPTION

[0046] To make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only a part of the embodiments of the present application, rather than all of the embodiments. The components of the embodiments of the present application usually described and shown in the drawings here can be arranged and designed in various different configurations. Therefore, the following detailed description of the embodiments of the present application provided in the drawings is not intended to limit the scope of the application claimed for protection, but merely represents the selected embodiments of the present application. Based on the embodiments of the present application, each other embodiment obtained by those skilled in the art without making creative work belongs to the scope of protection of the present application.

[0047] First, the application scenarios to which the present application is applicable are introduced. The present application can be applied in the field of drilling engineering technology.

[0048] Research has found that people are unable to evaluate and analyze risk accidents in the drilling process during actual drilling operations. Usually, only after an accident or risk occurs and is dealt with in a drilling project can the actual situation and cost of the accident or risk be analyzed and summarized. It is impossible to analyze and compare unhandled accidents or risks, and determine the cost. It is impossible to accurately manage the risks of drilling projects, which leads to low accuracy in risk determination.

[0049] Moreover, in the existing technology, statistics and analysis can usually only be performed after the accident is handled, resulting in serious information lag. There is also a lack of unified standards and references when analyzing and evaluating the economic losses of accidents, making it impossible to perform statistical analysis and comparison on many accidents, and it is difficult to use it to estimate unhandled accidents.

[0050] Based on this, the embodiments of the present application provide a risk management method, device and electronic equipment for drilling projects, which realize the cost management of all risk characteristics of the entire drilling project during the current target operation process, can improve the accuracy of risk management of drilling projects, and greatly improve the accuracy of risk control, thereby providing more effective safety protection for drilling projects.

[0051] See also Figure 1 , Figure 1 This is one of the flowcharts of a risk management method for a drilling project provided in an embodiment of the present application. Figure 1 As shown in the figure, the risk management method for drilling engineering provided by the embodiment of the present application includes the following steps:

[0052] S101. Based on the historical disposal costs of various historical accidents in any historical operation process of the drilling project and the historical disposal indicators of each of the historical accidents, determine the historical standard element disposal costs in the historical operation process.

[0053] In this step, the embodiment provided in this application first defines various parameters in the drilling project, wherein:

[0054] The historical operation process / current target operation process W is used to characterize the process of drilling engineering construction operations and is a prerequisite for the occurrence of safety accidents.

[0055] Accident A is used to characterize the safety accidents that may occur in the operation process W and represents a specific safety accident.

[0056] The disposal process D is used to characterize the on-site disposal plan when dealing with accident event A.

[0057] Cause investigation F is used to represent the investigation of accident A after the accident occurs.

[0058] Risk event R is used to characterize the possible risk of causing accident A and the results of cause investigation F.

[0059] Safety investment (preset risk prevention cost) I is used to represent the preventive safety investment made for known risk events R to avoid accident A.

[0060] The operation process type g is used to characterize the result set of classifying the specific operation process detail collection during the operation process W. The operation process type in the embodiment provided in this application includes but is not limited to multiple process steps such as drilling equipment transportation process and drilling process.

[0061] Accident type c is used to characterize the result set of classifying the specific safety accident collection during the accident A process.

[0062] Risk feature k is used to characterize the result set of feature classification of risk event collection in the process of risk event R.

[0063] The target accident probability p is used to characterize the probability relationship between the risk input cost and the disposal cost obtained through calculation during the risk event R.

[0064] The risk feature weight w is used to characterize the influence coefficient of risk feature k on the target accident probability p during the risk event R.

[0065] Disposal indicator j is a set of quantifiable indicators used to characterize the on-site disposal plan in the disposal process D.

[0066] The disposal cost d is used to represent the actual cost amount incurred in the disposal process D corresponding to the disposal indicator j set.

[0067] The historical standard element disposal cost s is used to represent the unit quantity cost amount calculated corresponding to the disposal indicator j and the disposal cost d in the disposal process D.

[0068] The target preset disposal cost f is used to represent the estimated disposal cost amount calculated by corresponding disposal indicator j and historical standard element disposal cost s in the disposal process D.

[0069] The preset risk prevention cost o is used to represent the preventive risk cost for risk feature k in the safety investment process I.

[0070] The optimal risk input cost e is used to represent the optimal risk input cost obtained by solving the model in the safety investment process I.

[0071] The preset risk acceptance r is used to characterize the proportional parameter when calculating the optimal solution of risk input cost.

[0072] The embodiment provided in this application assumes that the historical disposal cost of historical accidents is represented by d, and the historical disposal index of historical accidents is represented by j, which has:

[0073]

[0074] Here, t is used to represent the number of historical accidents, and s is used to represent the historical standard factor disposal cost in the historical operation process.

[0075] Among them, in the actual production process, the impact of different historical operation processes W and accident A should also be considered. The corresponding parameters are operation process type g and accident type c. Therefore, formula ① is optimized to obtain the following formula:

[0076]

[0077] Thus, it can be seen from formula ② that the disposal costs under different operating processes and accidents may be different, so the disposal costs of historical standard elements in the historical operating process calculated by the formula should also be related to the operating process and accidents.

[0078] The optional step S101 includes the following sub-steps:

[0079] Sub-step 1011: obtaining each historical operation process type of the drilling project in any historical operation process.

[0080] Sub-step 1012: for any of the historical operation process types, determine the historical handling costs of each historical accident under the historical operation process type and the historical handling indicators of each historical accident.

[0081] In this step, the historical accidents in the embodiments provided in the present application include but are not limited to natural disasters or non-natural disasters including chemical poisoning, blowout, fire, electric shock, scald, chemical burn, object impact, stab, fall, bump, fall, dust, traffic accident, mechanical injury, noise, food poisoning, infectious disease, heat stroke, frostbite, flood, strong wind and earthquake.

[0082] Sub-step 1013: Determine the historical standard element disposal cost in the historical operation process according to the historical disposal cost of each of the historical accidents and the historical disposal index of each of the historical accidents.

[0083] In this step, the historical disposal indicators in the embodiments provided in this application include but are not limited to the number of personnel, disposal days, scale of property damage, disposal level of difficulty in resuming work, and daily planned income (project planned income / planned days).

[0084] Here, the historical standard element disposal costs in the embodiments provided in this application include but are not limited to unit personnel cost loss, unit disposal cost, unit equipment loss, unit resumption of work loss, unit disposal cost weight, and unit opportunity cost, etc.

[0085] S102, determining the target preset disposal cost corresponding to the target operation according to the target disposal index of each preset target accident in the current target operation process of the drilling project and the disposal cost of the historical standard element.

[0086] Here, the target preset disposal cost in the embodiment provided in the present application is used to characterize the estimated disposal cost of a preset target accident that has just occurred and has not been disposed of, and the embodiment provided in the present application matches the estimated cost through the processing process of the target operation and the type of the preset target accident, which is used as a budget reference for the disposal of the preset target accident.

[0087] In this step, it is assumed that the formula for determining the target preset disposal cost corresponding to the target job in the embodiment provided in this application is as follows:

[0088]

[0089] Here, it is assumed that g=x and c=y.

[0090] S103. Based on the target preset disposal cost, each risk feature of each preset target accident and the feature weight corresponding to each risk feature, determine the optimal risk input cost in the current target operation process, so as to achieve cost management of the risk features in the current target operation process.

[0091] In this step, the risk features in the embodiments provided in this application include but are not limited to operating personnel, management, materials, operating equipment, transport vehicles, operating areas, ground environment, and weather environment.

[0092] Among them, after determining the target preset disposal cost, the embodiment provided in the present application determines the target accident probability corresponding to all preset target accidents in the current target operation process according to each risk feature of each preset target accident and the feature weight corresponding to each risk feature, and based on the target accident probability and the target preset disposal cost, determines the optimal risk investment cost in the current target operation process, thereby providing support for the preventive safety investment in the drilling project, thereby improving the utilization rate of the enterprise's costs.

[0093] In this way, the embodiments provided in the present application can effectively conduct a controllable analysis of the direct economic losses and indirect economic losses after an accident occurs, thereby achieving cost management of the risk characteristics in the current target operation process.

[0094] The risk management method for drilling projects provided in the embodiments of the present application is compared with the drilling risk management method in the prior art. The embodiment provided in the present application determines the historical standard element disposal cost in the historical operation process through the historical disposal cost of each historical accident and the historical disposal index of each historical accident in any historical operation process of the drilling project, and determines the target preset disposal cost corresponding to the target operation according to the target disposal index and the historical standard element disposal cost of each preset target accident in the current target operation process of the drilling project, and determines the optimal risk input cost in the current target operation process according to the target preset disposal cost, each risk feature of each preset target accident and the feature weight corresponding to each risk feature, thereby realizing the cost management of all risk features of the entire drilling project in the current target operation process, which can improve the accuracy of risk management of the drilling project and greatly improve the accuracy of risk control, thereby providing more effective safety protection for the drilling project.

[0095] See also Figure 2 , Figure 2 This is a flowchart of the risk management method for drilling engineering provided in one embodiment of the present application. Figure 2 As shown in the figure, the risk management method for drilling engineering provided by the embodiment of the present application includes the following steps:

[0096] S201. Based on the historical disposal costs of various historical accidents in any historical operation process of the drilling project and the historical disposal indicators of each of the historical accidents, determine the disposal costs of historical standard elements in the historical operation process.

[0097] S202: Determine the target preset disposal cost corresponding to the target operation according to the target disposal index of each preset target accident in the current target operation process of the drilling project and the disposal cost of the historical standard element.

[0098] S203: Determine the target accident probability corresponding to all the preset target accidents in the current target operation process according to the risk characteristics of the preset target accidents and the characteristic weights corresponding to the risk characteristics.

[0099] In this step, the formula for determining the target accident probability in the embodiment provided by this application is specifically:

[0100]

[0101] Among them, P is used to characterize the target accident probability corresponding to the preset target accident.

[0102] S204: Determine the risk input cost in the current target operation process according to the target accident probability and the target preset disposal cost.

[0103] In this step, the formula of the risk investment cost in the current target operation process in the embodiment provided by this application can be specifically:

[0104] v = p × f;

[0105]

[0106] Among them, i is used to represent the number of risk characteristics, and f is used to represent the target preset disposal cost.

[0107] S205: Determine the optimal risk input cost in the current target operation process based on the risk input cost and the preset risk prevention cost corresponding to each preset target accident.

[0108] In this step, the embodiment provided in the present application first determines the accident type of the target operation process according to the current target operation process of the drilling project, and then determines the fixed risk characteristics and volatility risk characteristics of the current target operation process according to the accident type, and then determines the optimal risk investment cost in the current target operation process based on the fixed risk investment cost corresponding to the fixed risk characteristics, the volatility risk investment cost corresponding to the volatility risk characteristics, and the preset prevention risk cost corresponding to the volatility risk characteristics in each preset target accident.

[0109] Among them, when investing in preset risk prevention costs for risk characteristics, only some risk characteristics, namely volatility risk characteristics, can be significantly affected. Assuming that the volatility risk characteristics in the embodiments provided in the present application are k1, k2 and k3, and other risk characteristics are fixed risk characteristics, the total risk investment cost in the current target operation process is determined according to the fixed risk investment cost corresponding to the fixed risk characteristics, the volatility risk investment cost corresponding to the volatility risk characteristics, the preset prevention risk cost corresponding to the volatility risk characteristics in each preset target accident, and the preset risk acceptance corresponding to each volatility risk characteristic.

[0110] In this step, the formula of the total risk investment cost in the embodiment provided in this application can be specifically:

[0111]

[0112] v=p′1(o1)k1+p′2(o1)k2+p′3(o3)k3+ds;

[0113] ⑧o1=o×r;

[0114] ⑨

[0115] Among them, ds is used to represent the fixed risk investment cost corresponding to the fixed risk characteristics; r is used to represent the preset risk acceptance corresponding to each volatility risk characteristic.

[0116] Here, since the risk characteristics cannot be completely avoided, the amount invested will approach infinity, and a preset risk acceptance r needs to be used.

[0117] Sub-step 2: determining the optimal risk input cost in the current target operation process according to the total risk input cost and a preset risk input quantity threshold.

[0118] In this step, the formula for determining the optimal risk input cost in the target operation process in the embodiment provided in this application is specifically:

[0119]

[0120] Among them, e is used to represent the optimal risk input cost.

[0121] Among them, the description of S201 to S202 can refer to the description of S101 to S102, and can achieve the same technical effect, which is not repeated here.

[0122] The risk management method for drilling projects provided in the embodiments of the present application is compared with the drilling risk management method in the prior art. The embodiment provided in the present application determines the historical standard element disposal cost in the historical operation process through the historical disposal cost of each historical accident and the historical disposal index of each historical accident in any historical operation process of the drilling project, and determines the target preset disposal cost corresponding to the target operation according to the target disposal index and the historical standard element disposal cost of each preset target accident in the current target operation process of the drilling project, and determines the optimal risk input cost in the current target operation process according to the target preset disposal cost, each risk feature of each preset target accident and the feature weight corresponding to each risk feature, thereby realizing the cost management of all risk features of the entire drilling project in the current target operation process, which can improve the accuracy of risk management of the drilling project and greatly improve the accuracy of risk control, thereby providing more effective safety protection for the drilling project.

[0123] See also Figure 3 , Figure 3 This is a schematic diagram of the structure of a risk management device for drilling engineering provided in an embodiment of the present application. Figure 3 As shown in FIG. , the risk management device 300 for drilling engineering includes:

[0124] The first determination module 310 is used to determine the historical standard element disposal cost in any historical operation process of the drilling project based on the historical disposal cost of each historical accident and the historical disposal index of each historical accident.

[0125] Optionally, the first determining module 310 is specifically configured to:

[0126] Obtain each historical operation process type of the drilling project in any historical operation process.

[0127] For any of the historical operation process types, the historical handling costs of each historical accident under the historical operation process type and the historical handling indicators of each historical accident are determined.

[0128] The historical standard element disposal cost in the historical operation process is determined based on the historical disposal cost of each of the historical accidents and the historical disposal index of each of the historical accidents.

[0129] The second determination module 320 is used to determine the target preset disposal cost corresponding to the target operation according to the target disposal index of each preset target accident in the current target operation process of the drilling project and the disposal cost of the historical standard element.

[0130] The third determination module 330 is used to determine the optimal risk input cost in the current target operation process based on the target preset disposal cost, each risk characteristic of each preset target accident and the characteristic weight corresponding to each risk characteristic, so as to realize cost management of the risk characteristics in the current target operation process.

[0131] Optionally, the third determining module 330 is specifically configured to:

[0132] According to each risk feature of each preset target accident and the feature weight corresponding to each risk feature, the target accident probability corresponding to all the preset target accidents in the current target operation process is determined.

[0133] The risk input cost in the current target operation process is determined according to the target accident probability and the target preset disposal cost.

[0134] Based on the risk input cost and the preset risk prevention costs corresponding to each preset target accident, the optimal risk input cost in the current target operation process is determined.

[0135] Optionally, determining the optimal risk input cost in the current target operation process based on the risk input cost and the preset risk prevention cost corresponding to each preset target accident includes:

[0136] According to the current target operation process of the drilling project, the accident type of the target operation process is determined.

[0137] Based on the accident type, the fixed risk characteristics and fluctuating risk characteristics in the current target operation process are determined.

[0138] Based on the fixed risk input cost corresponding to the fixed risk characteristics, the volatility risk input cost corresponding to the volatility risk characteristics, and the preset prevention risk cost corresponding to the volatility risk characteristics described in each preset target accident, the optimal risk input cost in the current target operation process is determined.

[0139] Optionally, determining the optimal risk input cost in the current target operation process based on the fixed risk input cost corresponding to the fixed risk feature, the volatility risk input cost corresponding to the volatility risk feature, and the preset preventive risk cost corresponding to the volatility risk feature in each preset target accident includes:

[0140] The total risk input cost in the current target operation process is determined based on the fixed risk input cost corresponding to the fixed risk characteristics, the volatility risk input cost corresponding to the volatility risk characteristics, the preset prevention risk cost corresponding to the volatility risk characteristics in each preset target accident, and the preset risk acceptance corresponding to each volatility risk characteristic.

[0141] The optimal risk input cost in the current target operation process is determined based on the total risk input cost and the preset risk input quantity threshold.

[0142] The risk management device 300 for drilling projects provided in the embodiment of the present application is compared with the drilling risk management device in the prior art. The embodiment provided by the present application determines the historical standard element disposal cost in the historical operation process through the historical disposal cost of each historical accident and the historical disposal index of each historical accident in any historical operation process of the drilling project, and determines the target preset disposal cost corresponding to the target operation according to the target disposal index and the historical standard element disposal cost of each preset target accident in the current target operation process of the drilling project, and determines the optimal risk input cost in the current target operation process according to the target preset disposal cost, each risk feature of each preset target accident and the feature weight corresponding to each risk feature, thereby realizing the cost management of all risk features of the entire drilling project in the current target operation process, which can improve the accuracy of risk management of the drilling project and greatly improve the accuracy of risk control, thereby providing more effective safety protection for the drilling project.

[0143] See also Figure 4 , Figure 4 This is a schematic diagram of the structure of an electronic device provided in an embodiment of the present application. Figure 4 As shown in , the electronic device 400 includes a processor 410 , a memory 420 and a bus 430 .

[0144] The memory 420 stores machine-readable instructions executable by the processor 410. When the electronic device 400 is running, the processor 410 communicates with the memory 420 via the bus 430. When the machine-readable instructions are executed by the processor 410, the above-mentioned Figure 1 as well as Figure 2 The steps of the risk management method for drilling engineering in the method embodiment shown in the figure, and the specific implementation methods can be found in the method embodiment, which will not be repeated here.

[0145] The present application also provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by a processor, the computer program can execute the above-mentioned Figure 1 as well as Figure 2 The steps of the risk management method for drilling engineering in the method embodiment shown in the figure, and the specific implementation methods can be found in the method embodiment, which will not be repeated here.

[0146] Those skilled in the art can clearly understand that, for the convenience and brevity of description, the specific working processes of the systems, devices and units described above can refer to the corresponding processes in the aforementioned method embodiments and will not be repeated here.

[0147] In the several embodiments provided in the present application, it should be understood that the disclosed systems, devices and methods can be implemented in other ways. The device embodiments described above are merely schematic. For example, the division of the units is only a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some communication interfaces, and the indirect coupling or communication connection of devices or units can be electrical, mechanical or other forms.

[0148] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.

[0149] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit.

[0150] If the functions are implemented in the form of software functional units and sold or used as independent products, they can be stored in a non-volatile computer-readable storage medium that is executable by a processor. Based on this understanding, the technical solution of the present application can essentially be embodied in the form of a software product, or in other words, the part that contributes to the prior art or the part of the technical solution. The computer software product is stored in a storage medium, including several instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present application. The aforementioned storage medium includes: various media that can store program codes, such as a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk.

[0151] Finally, it should be noted that the above-described embodiments are only specific implementation methods of the present application, which are used to illustrate the technical solutions of the present application, rather than to limit them. The protection scope of the present application is not limited thereto. Although the present application is described in detail with reference to the above-mentioned embodiments, ordinary technicians in the field should understand that any technician familiar with the technical field can still modify the technical solutions recorded in the above-mentioned embodiments within the technical scope disclosed in the present application, or can easily think of changes, or make equivalent replacements for some of the technical features therein; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present application, and should be included in the protection scope of the present application. Therefore, the protection scope of the present application shall be based on the protection scope of the claims.

Claims

1. A risk management method for drilling engineering, characterized in that: The risk management method of the drilling project includes: Based on the historical disposal costs of each historical accident in any historical operation process of the drilling project and the historical disposal indicators of each historical accident, determine the disposal costs of historical standard elements in the historical operation process; Determine the target preset disposal cost corresponding to the target operation according to the target disposal index of each preset target accident in the current target operation process of the drilling project and the disposal cost of the historical standard element; Based on the target preset disposal cost, each risk characteristic of each preset target accident and the characteristic weight corresponding to each risk characteristic, the optimal risk input cost in the current target operation process is determined to achieve cost management of the risk characteristics in the current target operation process.

2. The risk management method for drilling engineering according to claim 1, characterized in that: The historical disposal cost of each historical accident in any historical operation process of the drilling project and the historical disposal index of each historical accident are used to determine the disposal cost of the historical standard elements in the historical operation process, including: Obtain each historical operation process type of the drilling project in any historical operation process; For any of the historical operation process types, determine the historical handling costs of each historical accident under the historical operation process type and the historical handling indicators of each historical accident; The historical standard element disposal cost in the historical operation process is determined based on the historical disposal cost of each of the historical accidents and the historical disposal index of each of the historical accidents.

3. The risk management method for drilling engineering according to claim 1, characterized in that: The determining of the optimal risk input cost in the current target operation process based on the target preset disposal cost, each risk feature of each preset target accident, and the feature weight corresponding to each risk feature includes: Determine the target accident probability corresponding to all the preset target accidents in the current target operation process according to the risk characteristics of each preset target accident and the characteristic weights corresponding to each risk characteristic; Determine the risk input cost in the current target operation process according to the target accident probability and the target preset disposal cost; Based on the risk input cost and the preset risk prevention costs corresponding to each preset target accident, the optimal risk input cost in the current target operation process is determined.

4. The risk management method for drilling engineering according to claim 3, characterized in that: The determining of the optimal risk input cost in the current target operation process based on the risk input cost and the preset risk prevention cost corresponding to each preset target accident includes: According to the current target operation process of the drilling project, determining the accident type of the target operation process; According to the accident type, determine the fixed risk characteristics and fluctuating risk characteristics in the current target operation process; Based on the fixed risk input cost corresponding to the fixed risk characteristics, the volatility risk input cost corresponding to the volatility risk characteristics, and the preset prevention risk cost corresponding to the volatility risk characteristics described in each preset target accident, the optimal risk input cost in the current target operation process is determined.

5. The risk management method for drilling engineering according to claim 4, characterized in that: The optimal risk input cost in the current target operation process is determined based on the fixed risk input cost corresponding to the fixed risk characteristics, the volatility risk input cost corresponding to the volatility risk characteristics, and the preset preventive risk cost corresponding to the volatility risk characteristics in each preset target accident, including: Determine the total risk input cost in the current target operation process according to the fixed risk input cost corresponding to the fixed risk characteristics, the volatility risk input cost corresponding to the volatility risk characteristics, the preset prevention risk cost corresponding to the volatility risk characteristics in each preset target accident, and the preset risk acceptance corresponding to each volatility risk characteristic; The optimal risk input cost in the current target operation process is determined based on the total risk input cost and the preset risk input quantity threshold.

6. A risk management device for drilling engineering, characterized in that: The risk management device for drilling engineering comprises: The first determination module is used to determine the historical standard element disposal cost in any historical operation process of the drilling project based on the historical disposal cost of each historical accident in any historical operation process and the historical disposal index of each historical accident; The second determination module is used to determine the target preset disposal cost corresponding to the target operation according to the target disposal index of each preset target accident in the current target operation process of the drilling project and the disposal cost of the historical standard element; The third determination module is used to determine the optimal risk input cost in the current target operation process based on the target preset disposal cost, the risk characteristics of each preset target accident and the characteristic weights corresponding to each risk characteristic, so as to realize cost management of the risk characteristics in the current target operation process.

7. The risk management device for drilling engineering according to claim 6, characterized in that: The first determining module is specifically configured to: Obtain each historical operation process type of the drilling project in any historical operation process; For any of the historical operation process types, determine the historical handling costs of each historical accident under the historical operation process type and the historical handling indicators of each historical accident; The historical standard element disposal cost in the historical operation process is determined based on the historical disposal cost of each of the historical accidents and the historical disposal index of each of the historical accidents.

8. The risk management device for drilling engineering according to claim 6, characterized in that: The third determination module is specifically used to: Determine the target accident probability corresponding to all the preset target accidents in the current target operation process according to the risk characteristics of each preset target accident and the characteristic weights corresponding to each risk characteristic; Determine the risk input cost in the current target operation process according to the target accident probability and the target preset disposal cost; Based on the risk input cost and the preset risk prevention costs corresponding to each preset target accident, the optimal risk input cost in the current target operation process is determined.

9. An electronic device, characterized in that: include: A processor, a memory and a bus, wherein the memory stores machine-readable instructions executable by the processor, and when the electronic device is running, the processor and the memory communicate via the bus, and the machine-readable instructions are executed by the processor as the steps of the risk management method for drilling engineering described in any one of claims 1 to 5.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the risk management method for drilling engineering as described in any one of claims 1 to 5 are executed.