Main tower cross beam support structure system
By designing a removable and connected main tower beam bracket structure system, the problem that the bracket structure in the prior art cannot adapt to cross beams of different heights is solved, and the effect of material saving, structural simplification and construction efficiency improvement is achieved.
Patent Information
- Application Number
- CN202411235727.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-04
- Publication Date
- 2025-03-28
- Estimated Expiration
- 2044-09-04
AI Technical Summary
In the prior art, the truss structure of the floor-standing bracket cannot adapt to the chamfer changes of the middle and upper beams, resulting in the use of three sets of bracket structures for the construction of upper, middle and lower beams, which have large material investment, complex structure, and high difficulty in installation and dismantling.
A main tower beam bracket structure system is designed, including support device, unloading device, main frame body and sub frame body. The main frame body consists of the main truss, the first matching section and the second matching section. The secondary frame body consists of the secondary truss, the first adjustment section and the second adjustment section. All parts can be detachably connected to adapt to the installation of cross beams of different heights.
Through a structural system, it can adapt to the installation and use of upper, middle and lower beams, reduce material investment, simplify the structure, reduce installation and dismantling difficulty, and improve construction efficiency.
Smart Images

Figure CN119711339A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of bridge construction, and in particular to a main tower crossbeam support structure system. Background Art
[0002] With the rapid development of bridge technology, the span of bridges is increasing, and the height of main towers is rising. In order to ensure the overall stress state of the main tower, the main tower structure is generally equipped with three beams: upper, middle and lower. At the same time, as the width of the bridge increases, the main tower beams tend to be taller and heavier.
[0003] The lower crossbeam of the main tower is heavy, and the conventional construction method uses ground-based supports. Compared with the separate pedestal, bored piles or driven piles are required as the supporting structure. In addition, the truss structure of the ground-based supports cannot adapt to the chamfer changes of the middle and upper crossbeams. Therefore, three sets of support structures are used for the construction of the upper, middle and lower crossbeams, which requires a large amount of materials, a complex structure and great difficulty in installation and disassembly. Summary of the invention
[0004] The embodiment of the present application provides a main tower beam support structure system to solve the problem in the related art that the truss structure of the ground support cannot adapt to the changes in the chamfers of the middle beam and the upper beam, so three sets of support structures are used in the construction of the upper, middle and lower beams, which requires a large amount of materials, has a relatively complex structure, and is difficult to install and disassemble.
[0005] The embodiment of the present application provides a main tower beam support structure system, including:
[0006] Support device;
[0007] An unloading device, which is arranged on the supporting device;
[0008] A main frame body, comprising a main truss and a first matching section and a second matching section detachably connected to two ends of the main truss in sequence;
[0009] A sub-frame is provided on both sides of the top of the main frame, and the sub-frame includes a sub-truss and a first adjustment section and a second adjustment section which are detachably connected to one end of the sub-truss in sequence.
[0010] In some embodiments, the main tower beam support structure system includes two support devices of different structures, one of which is a first beam support system for casting the lower beam;
[0011] Another type of support device is a second beam support system for casting the middle beam and the upper beam.
[0012] In some embodiments, the first beam support system comprises:
[0013] Steel pipe columns, located at both ends of the main frame, the steel pipe columns and the second matching section top support;
[0014] An inclined column, one end of which is fixed to the main tower cap, and the other end of which is inclined toward the main truss and supported by the main truss;
[0015] A vertical column is located between the steel pipe column and the inclined column, one end of the vertical column is fixed to the main tower pedestal, and the other end is supported by the end of the main truss.
[0016] In some embodiments, an intermediate flat joint is connected between the two steel pipe columns, the top surface of the intermediate flat joint is flush with the top surface of the steel pipe column, the top ends of the inclined columns and the vertical columns are provided with the unloading device, and the unloading device is placed on the intermediate flat joint.
[0017] In some embodiments, the second beam support system comprises:
[0018] A corbel body, wherein the corbel body is detachably connected to the inner side walls of the two main towers, and the second adjusting section is supported by the corbel body;
[0019] A mounting assembly is connected between the main tower and the corbel body.
[0020] In some embodiments, the mounting assembly includes:
[0021] Anchor plate, which is pre-buried on the main tower;
[0022] A positioning plate, which is located in front of the anchor plate and is pre-buried on the main tower;
[0023] A pre-embedded climbing cone has one end passing through the anchor plate and the anchor plate, and the other end extending to the inner side of the main tower and connected to the corbel body.
[0024] In some embodiments, the main frame is provided with two pieces, a connecting rod system is provided between the two pieces of the main frame, a traction device is provided above the unloading device, the two pieces of the main frame are movably connected to the traction device, and the two pieces of the main frame move toward the two ends of the traction device respectively.
[0025] In some embodiments, the traction device comprises:
[0026] A slide beam, wherein the slide beam is connected to the unloading device, and the axial direction of the slide beam is perpendicular to the axial direction of the main frame;
[0027] A pulling assembly is connected to both ends of the slideway beam, and the traction ends of the two pulling assemblies are respectively connected to the two main frames.
[0028] In some embodiments, the pulling assembly includes:
[0029] A reaction seat connected to the end of the slideway beam;
[0030] A through-hole jack connected to a side of the reaction seat away from the main frame, and a movable end of the through-hole jack is in contact with the reaction seat;
[0031] One end of the steel strand passes through the through-hole jack and is connected to the through-hole jack, and the other end of the steel strand is connected to the main frame.
[0032] In some embodiments, embedded parts are provided in the main tower cap, and the embedded parts are respectively connected to the steel pipe column, the inclined column and the vertical column.
[0033] The beneficial effects of the technical solution provided by this application include:
[0034] The embodiment of the present application provides a main tower beam support structure system. Since the main tower beam has a tendency to be high in height and heavy in weight, the main tower beam is provided with three beams, upper, middle and lower. In order to speed up the construction efficiency and reduce the difficulty of assembling and disassembling the beam support, the main tower beam support structure system includes a support device, a discharge device, a main frame body and a sub-frame body, wherein the main frame body includes a main truss and a first matching section and a second matching section, and the main truss and the first matching section and the second matching section are detachably connected; the sub-frame body includes a sub-truss and a first adjustment section and a second adjustment section, and the sub-truss and the first adjustment section and the second adjustment section are detachably connected. Therefore, by disassembling and assembling the main truss and the first matching section and the second matching section, the sub-truss and the first adjustment section and the second adjustment section are disassembled and assembled to adapt to the installation and use of the upper, middle and lower beams, so that a set of structures can be used repeatedly and conveniently installed. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0036] Figure 1 A schematic diagram of the overall structure provided for an embodiment of the present application;
[0037] Figure 2 A schematic diagram of the main frame structure provided in an embodiment of the present application;
[0038] Figure 3 A schematic diagram of the sub-frame structure provided in an embodiment of the present application;
[0039] Figure 4A structural schematic diagram showing the connection state of two main frames is provided for the embodiment of the present application;
[0040] Figure 5 A structural schematic diagram showing the construction status of the lower beam is provided for the embodiment of the present application;
[0041] Figure 6 A structural schematic diagram showing the construction status of the middle crossbeam is provided for the embodiment of the present application;
[0042] Figure 7 A structural schematic diagram showing the construction status of the upper beam is provided for the embodiment of the present application;
[0043] Figure 8 A schematic diagram showing the structure of a traction device is provided for an embodiment of the present application;
[0044] Reference numerals:
[0045] 1. Main tower; 10. Lower crossbeam; 11. Middle crossbeam; 12. Upper crossbeam; 13. Main tower pedestal; 2. Main frame; 20. Main truss; 200. Connecting rod system; 21. First matching section; 22. Second matching section; 3. Sub-frame; 30. Sub-truss; 31. First adjustment section; 32. Second adjustment section; 33. Bottom formwork system; 4. Unloading device; 5. First crossbeam support system; 50. Steel pipe column; 51. Oblique column; 52. Vertical column; 53. Middle flat joint; 54. Embedded parts; 6. Second crossbeam support system; 60. Corbel body; 61. Anchor plate; 62. Positioning plate; 63. Embedded climbing cone; 70. Slideway beam; 71. Pulling assembly; 710. Reaction seat; 711. Through-hole jack; 712. Steel strand. DETAILED DESCRIPTION
[0046] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0047] The embodiment of the present application provides a main tower beam support structure system, which can solve the problem in the related art that the truss structure of the ground support cannot adapt to the changes in the chamfers of the middle beam and the upper beam, so the construction of the upper, middle and lower beams adopts three sets of support structures, which requires a large amount of materials, has a relatively complex structure, and is difficult to install and disassemble.
[0048] See also Figures 1 to 8As shown, the embodiment of the present application provides a main tower beam support structure system, including: a support device, a discharge device 4, a main frame body 2 and a sub-frame body 3; wherein the support device is installed in the main tower 1, and the discharge device 4 is arranged on the support device, and the discharge device 4 includes but is not limited to a sand box; the main frame body 2 is arranged to include a main truss 20 and a first matching section 21 and a second matching section 22 which are sequentially detachably connected to both ends of the main truss 20. In the present application, the first matching section 21 and the second matching section 22 are located at each end of the main truss 20, and each of the first matching sections 21 and the second matching sections 22 are provided with at least one group, and the first matching section 21 and the second matching section 22 are provided at least one group. The first and second matching sections 21 and 22 are detachably connected to each other and the height of the first and second matching sections 21 and 22 is lower than that of the main truss 20. Then, a sub-frame body 3 is connected to both sides of the top of the main frame body 2. The sub-frame body 3 includes a sub-truss 30 and a first adjusting section 31 and a second adjusting section 32 which are detachably connected to one end of the sub-truss 30 in turn. The number of the first adjusting section 31 and the second adjusting section 32 is adapted to the first matching section 21 and the second matching section 22, and one group is provided for each of the sub-truss 30 and the sub-truss 30 and the first adjusting section 31 and the second adjusting section 32 are detachably connected by bolts.
[0049] Before the construction of the cross beam of the main tower 1, the supporting device, the unloading device 4, the main frame 2 and the auxiliary frame 3 are prefabricated in advance. Then, at the construction site of the main tower 1, before the construction of the lower cross beam 10, the middle cross beam 11 and the upper cross beam 12, the supporting device is first installed at the bottom of the main tower 1, and then the unloading device 4 is installed on the supporting device. The main truss 20, the first matching section 21 and the second matching section 22 are hoisted to the installation position on the unloading device 4 in turn, and the first matching section 21 and the second matching section 22 are connected to the two ends of the main truss 20 in turn through the pin shaft; then the auxiliary truss 30 and the first adjustment section 31 and the second adjustment section 32 are connected to both sides of the main frame 2 in turn by hoisting.
[0050] At this time, the crossbeam support of the main tower 1 is built at the bottom of the main tower 1, and the bottom formwork system 33 is installed on the top of the built main frame 2 and the auxiliary frame 3. The bottom formwork system 33 is composed of steel plate concrete. The bottom formwork system 33 pre-presses the crossbeam support of the main tower 1 to eliminate assembly gaps and inelastic deformation; then the first layer of concrete is poured on the bottom formwork system 33, and after the concrete reaches the design strength, the prestressed steel strands are temporarily tensioned, and then the second layer of formwork is erected to tie the steel bars, and concrete is poured and cured until the concrete strength reaches the design requirements. At this time, the concrete structure formed is the lower crossbeam 10, and the prestressed steel strands of the lower crossbeam 10 are tensioned to the design requirements, and the pipeline is grouted and cured to the design strength, thereby completing the construction of the lower crossbeam 10. Afterwards, the dismantling device 4 is used to dismantle the crossbeam support of the main tower 1, and the main truss 20 and the first matching section 21 and the second matching section 22, the auxiliary truss 30, the first adjustment section 31 and the second adjustment section 32 can be easily disassembled and assembled; therefore, the second matching section 22 and the second adjustment section 32 are first disassembled, and then the remaining main trusses 20 and the first matching section 21, the auxiliary trusses 30 and the first adjustment section 31 can be reused for the construction of the middle crossbeam 11. After the construction of the middle crossbeam 11 is completed, the first matching section 21 and the first adjustment section 31 are disassembled, and the remaining main trusses 20 and auxiliary trusses 30 are reused in the construction of the upper crossbeam 12.
[0051] Therefore, a set of main frame 2 and auxiliary frame 3 structures can be reused during the construction of the lower beam 10, the middle beam 11 and the upper beam 12, reducing material input and facilitating installation and disassembly.
[0052] The unloading device 4 and the bottom form system 33 provided in addition can also be reused, but due to the heavy weight of the lower cross beam 10, the support device used in the construction of the lower cross beam 10 is different from the support device used in the construction of the middle cross beam 11 and the upper cross beam 12. The cross beam support structure system of the main tower 1 includes two support devices with different structures, one of which is the first cross beam support system 5 for casting the lower cross beam 10; the other support device is the second cross beam support system 6 for casting the middle cross beam 11 and the upper cross beam 12.
[0053] In the present application, the first crossbeam support system 5 includes: a steel pipe column 50, an inclined column 51 and a vertical column 52, wherein the steel pipe column 50 is located at both ends of the main frame 2, and the steel pipe column 50 is supported by the second matching section 22; one end of the inclined column 51 is fixed to the main tower pedestal 13, and the other end is inclined toward the main truss 20 and supported by the main truss 20; the vertical column 52 is located between the steel pipe column 50 and the inclined column 51, one end of the vertical column 52 is fixed to the main tower pedestal 13, and the other end is supported by the end of the main truss 20.
[0054] Before constructing the supporting device, the main tower base 13 is constructed first, and embedded parts 54 are provided in the main tower base 13. Then, when installing the steel pipe columns 50, the inclined columns 51 and the vertical columns 52, the embedded parts 54 are connected to the inclined columns 51 and the vertical columns 52 respectively, thereby effectively fixing one end of the steel pipe columns 50, the inclined columns 51 and the vertical columns 52 to the main tower base 13 first.
[0055] In the present application, an intermediate flat joint 53 is connected between the two steel pipe columns 50, and the top surface of the intermediate flat joint 53 is flush with the top surface of the steel pipe column 50, and then a discharge device 4 is provided at the top of the inclined column 51 and the vertical column 52, and the discharge device 4 is placed on the intermediate flat joint 53. The provision of multiple discharge devices 4 effectively improves the support stability of the support structure at the lower cross beam 10, and is more stable during the unloading process. The intermediate flat joint 53 can also balance the upper horizontal force well, thereby further improving the overall stability of the lower cross beam 10. A discharge device 4 is also installed on the steel pipe column 50.
[0056] In the present application, the second crossbeam support system provided includes: a corbel body 60 and an installation assembly, the corbel body 60 is detachably connected to the inner walls of the two main towers 1, the second adjustment section 32 is supported by the corbel body 60, and the unloading device 4 is installed on the top of the corbel body 60; the installation assembly is connected between the main tower 1 and the corbel body 60.
[0057] During use, after the construction of the lower cross beam 10 is completed, during the process of dropping the main frame 2 and the auxiliary frame 3, the bracket body 60 and the unloading device 4 are installed at the construction position of the upper cross beam 12 through the installation assembly, wherein the unloading device 4 is disassembled and reused after the construction of the lower cross beam 10 is completed. After the construction of the middle cross connection is completed, the bracket body 60 and the unloading device 4 can be reused in the construction of the upper cross beam 12, and reused to reduce material input.
[0058] In the present application, the installation components include: an anchor plate 61, a positioning plate 62, and a pre-embedded climbing cone 63. The anchor plate 61 is pre-embedded in the main tower 1. The positioning plate 62 is located in front of the anchor plate 61 and is pre-embedded in the main tower 1. The pre-embedded climbing cone 63 has one end passing through the anchor plate 61 and the anchor plate 61, and the other end extending to the inside of the main tower 1 and connected to the corbel body 60. The corbel body 60 has a simple structure, is easy to install, and is firm. When the corbel body 60 is to be disassembled, the nut on the pre-embedded climbing cone 63 can be removed, and the remaining part can be directly cut off.
[0059] In the present application, in order to conveniently reuse the main frame 2, the auxiliary frame 3, the corbel body 60 and the unloading device 4 from the construction of the lower beam 10 to the construction of the middle beam 11 and the upper beam 12 in sequence, the main frame 2 is firstly provided with two pieces, and a connecting rod system 200 is provided between the two pieces of the main frame 2. The two pieces of the main frame 2 have a more stable structure and a better supporting effect. When disassembling and assembling, the two pieces of the main frame 2 can be carried out synchronously.
[0060] Therefore, a traction device is provided above the unloading device 4, and the two main frames 2 are movably connected to the traction device, and the two main frames 2 move toward the two ends of the traction device respectively. In the present application, the two main frames 2 are symmetrical structures, and the two main frames 2 are moved toward the two ends of the traction device on the traction device respectively, and the movement is stable, the force on the traction device is balanced, and the construction is safe and reliable.
[0061] In the present application, the traction device provided includes a slide beam 70 and a pulling assembly 71, wherein the slide beam 70 is connected to the unloading device 4, and the axial direction of the slide beam 70 is perpendicular to the axial direction of the main frame 2, and the pulling assembly 71 is connected to both ends of the slide beam 70, and the traction ends of the two pulling assemblies 71 are respectively connected to the two main frames 2.
[0062] During use, after the main frame 2 is dropped from the frame, the pulling assemblies 71 at both ends of the slide beam 70 respectively pull the two main frame bodies 2 toward the two ends of the slide beam 70 to slide synchronously, and the force on the slide beam 70 is balanced until the main frame 2 moves to the predetermined position. Then, the first matching section 21 or the second matching section 22, the first adjustment section 31 or the second adjustment section 32 are disassembled, and are lifted to the construction positions of the middle beam 11 and the upper beam 12 in sequence by using the tower crane as a whole.
[0063] In the present application, the pulling assembly 71 includes a reaction seat 710, a through-hole jack 711 and a steel strand 712. The reaction seat 710 is connected to the end of the slide beam 70, the through-hole jack 711 is connected to the side of the reaction seat 710 away from the main frame 2, and the movable end of the through-hole jack 711 is in contact with the reaction seat 710. One end of the steel strand 712 passes through the through-hole jack 711 and is connected to the through-hole jack 711. The other end of the steel strand 712 is connected to the main frame 2.
[0064] During use, the steel strand 712 is connected to the through-hole jack 711 and the main frame 2, and the through-hole jack 711 and the reaction seat 710 push against each other, thereby partially driving the main frame 2 to move.
[0065] The implementation principle of the embodiment of the present application is: during the construction of the main tower pedestal 13, embedded parts 54 are embedded in the main tower pedestal 13; during the construction of the main tower 1, anchor plates 61, positioning plates 62 and embedded climbing cones 63 are embedded in the main tower 1 at the construction positions of the middle beam 11 and the upper beam 12, respectively; then, the steel pipe column 50, the inclined column 51 and the vertical column 52 are installed at the construction position of the lower beam 10; the unloading device 4 is installed on the top of the steel pipe column 50, the inclined column 51 and the vertical column 52; the slide beam 70 and the pulling assembly 71 are installed on the unloading device 4; the main frame 2 and the auxiliary frame 3 are installed on the top of the slide beam 70; wherein the main frame 2 is detachably connected by the main truss 20, the first matching section 21 and the second matching section 22 in sequence through the pin shaft; the auxiliary frame 3 is detachably connected by the auxiliary truss 30, the first adjusting section 31 and the second adjusting section 32 in sequence through the pin shaft; The connection is removable by bolts. During the construction process, the main frame 2 and the auxiliary frame 3 are first installed at the construction position of the lower beam 10. After the construction of the lower beam 10 is completed, the unloading device 4 is used to unload the frame, and then the main frame 2 is moved to the predetermined position by the traction device, and the second matching section 22 and the second adjustment section 32 are disassembled and assembled. At the same time, the bracket body 60 and the unloading device 4 are installed at the construction position of the middle beam 11, and then the remaining parts of the main frame 2 and the auxiliary frame 3 are hoisted back to the middle beam 11. After the construction of the middle beam 11 is completed, the first matching section 21 and the first adjustment section 31 are disassembled and assembled by unloading and traction, and reused in the construction of the upper beam 12. After the construction of the upper, middle and lower beams 10 is completed, the overall main frame 2, auxiliary frame 3, support device, unloading device 4 and traction device are disassembled. The tooth decay beam support structure system can be reused, and a set of structures can meet the use of the upper, middle and lower beams, reducing material input.
[0066] In the description of the present application, it should be noted that the terms "upper", "lower", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. Unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present application can be understood according to the specific circumstances.
[0067] It should be noted that, in this application, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
[0068] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.
Claims
1. A main tower beam support structure system, characterized in that: include: Support device; A discharge device (4), which is arranged on the supporting device; A main frame body (2), comprising a main truss (20) and a first matching section (21) and a second matching section (22) which are detachably connected to two ends of the main truss (20) in sequence; A sub-frame (3), wherein the sub-frame (3) is provided on both sides of the top of the main frame (2), and the sub-frame (3) comprises a sub-truss (30) and a first adjustment section (31) and a second adjustment section (32) which are detachably connected to one end of the sub-truss (30) in sequence.
2. A main tower beam support structure system as claimed in claim 1, characterized in that: The main tower (1) crossbeam support structure system comprises two support devices with different structures, one of which is a first crossbeam support system (5) for casting the lower crossbeam (10); Another supporting device is a second beam supporting system (6) for casting the middle beam (11) and the upper beam (12).
3. A main tower beam support structure system as claimed in claim 2, characterized in that: The first beam support system (5) comprises: Steel pipe columns (50) are located at two ends of the main frame (2), and the steel pipe columns (50) are supported by the second matching section (22); An inclined column (51), one end of which is fixed to the main tower support (13), and the other end of which is inclined toward the main truss (20) and supported by the main truss (20); A vertical column (52) is located between the steel pipe column (50) and the inclined column (51), one end of the vertical column (52) is fixed to the main tower support (13), and the other end is supported by the end of the main truss (20).
4. A main tower beam support structure system as claimed in claim 3, characterized in that: An intermediate flat joint (53) is connected between the two steel pipe columns (50), and the top surface of the intermediate flat joint (53) is flush with the top surface of the steel pipe column (50). The top ends of the inclined columns (51) and the vertical columns (52) are both provided with the unloading device (4), and the unloading device (4) is placed on the intermediate flat joint (53).
5. A main tower beam support structure system as claimed in claim 2, characterized in that: The second beam support system comprises: A corbel body (60), the corbel body (60) being detachably connected to the inner side walls of the two main towers (1), the second adjustment section (32) being supported by the corbel body (60); A mounting assembly is connected between the main tower (1) and the bracket body (60).
6. A main tower crossbeam support structure system as claimed in claim 5, characterized in that: The installation assembly includes: An anchor plate (61) pre-buried in the main tower (1); A positioning plate (62), which is located in front of the anchor plate (61) and is pre-buried in the main tower (1); A pre-buried climbing cone (63) has one end passing through the anchor plate (61) and the anchor plate (61), and the other end extending to the inside of the main tower (1) to be connected to the corbel body (60).
7. A main beam support structure system as claimed in claim 1, characterized in that: The main frame (2) is provided with two pieces, a connecting rod system (200) is provided between the two pieces of the main frame (2), a traction device is provided above the unloading device (4), the two pieces of the main frame (2) are movably connected to the traction device, and the two pieces of the main frame (2) move toward the two ends of the traction device respectively.
8. A main tower beam support structure system as claimed in claim 7, characterized in that: The traction device comprises: A slide beam (70), wherein the slide beam (70) is connected to the unloading device (4), and the axial direction of the slide beam (70) is perpendicular to the axial direction of the main frame (2); A pulling assembly (71), wherein the pulling assembly (71) is connected to both ends of the slideway beam (70), and the pulling ends of the two pulling assemblies (71) are respectively connected to the two main frame bodies (2).
9. A main tower cross-connected support structure system as claimed in claim 8, characterized in that: The pulling assembly (71) comprises: A reaction seat (710) connected to the end of the slideway beam (70); A through-hole jack (711) connected to a side of the reaction seat (710) away from the main frame (2), and a movable end of the through-hole jack (711) is in contact with the reaction seat (710); One end of the steel strand (712) passes through the through-hole jack (711) and is connected to the through-hole jack (711), and the other end of the steel strand (712) is connected to the main frame (2).
10. A main tower beam support structure system as claimed in claim 3, characterized in that: The main tower support (13) is provided with embedded parts (54), and the embedded parts (54) are respectively connected to the steel pipe column (50), the inclined column (51) and the vertical column (52).
Citation Information
Patent Citations
High-pier cast-in-place beam support and construction method thereof
CN114086473A
Construction method for cast-in-place steel truss girder support of high-altitude large-span upper cross beam of cable bent tower
CN115305817A
Template system for lower cross beam of ultrahigh rhombic tower pier and construction method
CN115387234A
Assembly type buttress-free support mounting method
CN117418465A
Bridge main tower cross beam construction method
CN117449215A