Production method of spliced building curtain wall

By adding waterproof and anti-corrosion layer spraying steps to the production method of spliced ​​building curtain walls, the existing curtain wall quality and cumbersome maintenance problems have been solved, and the durability and application scope of the product have been improved.

CN119711681APending Publication Date: 2025-03-28JIANGSU SUYUAN CURTAIN WALL MATERIAL CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411990552.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-31
Publication Date
2025-03-28

AI Technical Summary

Technical Problem

The quality of existing spliced ​​building curtain walls is relatively poor, and it is prone to damage after use for a period of time, affecting the overall quality, and cumbersome maintenance and replacement.

Method used

A spliced ​​architectural curtain wall production method is adopted, including preliminary design, material preparation, specific processing and assembly into products. The method includes spraying a waterproof layer and a corrosion-proof layer to improve the corrosion resistance and waterproof function of the product.

Benefits of technology

It extends the service life of the product, improves the overall quality, reduces maintenance costs, and expands the application areas of the product.

✦ Generated by Eureka AI based on patent content.
Patent Text Reader

Abstract

The invention relates to a production method of a spliced building curtain wall. The method comprises the following steps: step 1, preliminary design of a product; step 2, material preparation; step 3, specific processing and manufacturing; compared with the prior art, the invention has the following advantages: (1) the technical scheme is simple in production process and easy to operate, and (2) compared with the prior art, the product has waterproof and anticorrosive functions and wide application range, and the service life of the product is prolonged; and 3) the scheme is low in cost and easy to popularize.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a production method, in particular to a spliced ​​building curtain wall production method, and belongs to the technical field of building engineering design. Background Art

[0002] Curtain wall is a commonly used external protective structure for construction projects. Common ones include glass curtain wall, metal plate curtain wall, stone curtain wall, etc. Due to its convenient transportation and replacement, it has been widely used in the construction industry in recent years. In actual application, the following technical problems are found: the quality of the splicing unit is relatively poor, and it is easy to be damaged after a period of use, which affects the overall quality. The staff must frequently repair and replace it, and the subsequent work is cumbersome, which also affects the overall quality of the product. A new solution is urgently needed to solve this technical problem. Summary of the invention

[0003] The present invention aims at the technical problems existing in the prior art and provides a method for producing a spliced ​​building curtain wall. The technical solution is simple in process and easy to operate. The product produced by the solution has the functions of corrosion resistance and waterproofing, has a wide range of applications, and prolongs the service life of the product.

[0004] In order to achieve the above object, the technical solution of the present invention is as follows: a method for producing a spliced ​​building curtain wall, the method comprising the following steps:

[0005] Step 1: Conduct preliminary design of the product.

[0006] Step 2: Material preparation,

[0007] Step 3: Specific processing and production,

[0008] Step 4: Assemble into product.

[0009] Among them, step 1 is as follows:

[0010] 1-1 Determine the requirements: Determine the type, specification, size and splicing method of the curtain wall according to the specific requirements of the construction project. 1-2 Design drawings: Draw detailed curtain wall design drawings according to the requirements, including the floor plan, elevation and node details of the curtain wall.

[0011] 1-3 Select materials: According to the design drawings, choose appropriate curtain wall materials, including aluminum alloy, steel, and glass.

[0012] Step 2 is as follows:

[0013] Step 2: Material preparation: Purchase the required curtain wall materials according to the design drawings and material list, and conduct quality inspection on the purchased materials to ensure that the quality of the materials meets the design requirements and industry standards.

[0014] Step 3: Specific processing and production, the relevant steps are as follows:

[0015] 3-1 Curtain wall panel processing: according to the design drawings, the curtain wall panels are cut, punched, and edged. 3-2 Connector production: the connectors between the curtain wall panels are produced, including plug-in plates, rubber pads, and rotating plates, to ensure the quality of the connectors.

[0016] 3-3 Surface treatment: Surface treatment of curtain wall panels and connectors, including spraying and electroplating, is carried out to improve their corrosion resistance and aesthetics.

[0017] In step 3, the surface of the curtain wall panels and connectors is treated, which also includes spraying a waterproof layer, so that the product has a waterproof function and extends the service life of the product.

[0018] In step 3, the surface of the curtain wall panels and connectors is treated, which also includes spraying an anti-corrosion layer, so that the product has an anti-corrosion function and has a wide range of applications.

[0019] Step 4: Assemble into products, as follows:

[0020] 4-1 Install the connection device. Install the connection device (such as rectangular rod, plug-in board, etc.) at the corresponding position of the curtain wall panel to ensure that the connection device can firmly connect the curtain wall panel.

[0021] 4-2 Splicing curtain wall panels: According to the design drawings, splice the curtain wall panels in the predetermined splicing method to ensure that the connection between the curtain wall panels is tight and flat.

[0022] 4-3 Install fixings, including bolts and nuts, on the edges or joints of the curtain wall panels to ensure the stability of the curtain wall.

[0023] Compared with the prior art, the present invention has the following advantages: 1) the production process of the technical solution is simple and easy to operate; 2) compared with the prior art, the product of the solution has the functions of waterproofing and anti-corrosion, has a wide range of applications, and extends the service life of the product; 3) the solution has low cost and is easy to promote. DETAILED DESCRIPTION

[0024] In order to deepen the understanding of the present invention, a detailed description is given below in conjunction with embodiments.

[0025] Embodiment 1: A method for producing a spliced ​​building curtain wall, the method comprising the following steps:

[0026] Step 1: Conduct preliminary design of the product.

[0027] Step 2: Material preparation,

[0028] Step 3: Specific processing and production,

[0029] Step 4: Assemble into product.

[0030] Among them, step 1 is as follows:

[0031] 1-1 Determine the requirements: Determine the type, specification, size and splicing method of the curtain wall according to the specific requirements of the construction project. 1-2 Design drawings: Draw detailed curtain wall design drawings according to the requirements, including the floor plan, elevation and node details of the curtain wall.

[0032] 1-3 Select materials: According to the design drawings, choose appropriate curtain wall materials, including aluminum alloy, steel, and glass.

[0033] Step 2 is as follows:

[0034] Step 2: Material preparation: Purchase the required curtain wall materials according to the design drawings and material list, and conduct quality inspection on the purchased materials to ensure that the quality of the materials meets the design requirements and industry standards.

[0035] Step 3: Specific processing and production, the relevant steps are as follows:

[0036] 3-1 Curtain wall panel processing: according to the design drawings, the curtain wall panels are cut, punched, and edged. 3-2 Connector production: the connectors between the curtain wall panels are produced, including plug-in plates, rubber pads, and rotating plates, to ensure the quality of the connectors.

[0037] 3-3 Surface treatment: Surface treatment of curtain wall panels and connectors, including spraying and electroplating, is carried out to improve their corrosion resistance and aesthetics.

[0038] In step 3, the surface treatment of the curtain wall panels and connectors also includes spraying a waterproof layer, which makes the product waterproof and extends the service life of the product, or spraying an anti-corrosion layer, which makes the product anti-corrosion and has a wide range of applications.

[0039] Step 4: Assemble into product, as follows:

[0040] 4-1 Install the connection device. Install the connection device (such as rectangular rod, plug-in board, etc.) at the corresponding position of the curtain wall panel to ensure that the connection device can firmly connect the curtain wall panel.

[0041] 4-2 Splicing curtain wall panels: According to the design drawings, splice the curtain wall panels in the predetermined splicing method to ensure that the connection between the curtain wall panels is tight and flat.

[0042] 4-3 Install fixings, including bolts and nuts, on the edges or joints of the curtain wall panels to ensure the stability of the curtain wall.

[0043] Embodiment 2: A method for producing a spliced ​​building curtain wall, the method comprising the following steps:

[0044] Step 1: Conduct preliminary design of the product.

[0045] Step 2: Material preparation,

[0046] Step 3: Specific processing and production,

[0047] Step 4: Assemble into product.

[0048] Among them, step 1 is as follows:

[0049] 1-1 Determine the requirements: Determine the type, specification, size and splicing method of the curtain wall according to the specific requirements of the construction project. 1-2 Design drawings: Draw detailed curtain wall design drawings according to the requirements, including the floor plan, elevation and node details of the curtain wall.

[0050] 1-3 Select materials: According to the design drawings, choose appropriate curtain wall materials, including aluminum alloy, steel, and glass.

[0051] Step 2 is as follows:

[0052] Step 2: Material preparation: Purchase the required curtain wall materials according to the design drawings and material list, and conduct quality inspection on the purchased materials to ensure that the quality of the materials meets the design requirements and industry standards.

[0053] Step 3: Specific processing and production, the relevant steps are as follows:

[0054] 3-1 Curtain wall panel processing: according to the design drawings, the curtain wall panels are cut, punched, and edged. 3-2 Connector production: the connectors between the curtain wall panels are produced, including plug-in plates, rubber pads, and rotating plates, to ensure the quality of the connectors.

[0055] 3-3 Surface treatment: Surface treatment of curtain wall panels and connectors, including spraying and electroplating, is carried out to improve their corrosion resistance and aesthetics.

[0056] In step 3, the surface treatment of the curtain wall panels and connectors also includes spraying a waterproof layer, which makes the product waterproof and extends the service life of the product; and spraying an anti-corrosion layer, which makes the product anti-corrosion and has a wide range of applications.

[0057] Step 4: Assemble into product, as follows:

[0058] 4-1 Install the connection device. Install the connection device (such as rectangular rod, plug-in board, etc.) at the corresponding position of the curtain wall panel to ensure that the connection device can firmly connect the curtain wall panel.

[0059] 4-2 Splicing curtain wall panels: According to the design drawings, splice the curtain wall panels in the predetermined splicing method to ensure that the connection between the curtain wall panels is tight and flat.

[0060] 4-3 Install fixings, including bolts and nuts, on the edges or joints of the curtain wall panels to ensure the stability of the curtain wall.

[0061] It should be noted that the above embodiments are not intended to limit the protection scope of the present invention, and equivalent changes or substitutions made on the basis of the above technical solutions all fall within the protection scope of the claims of the present invention.

Claims

1. A method for producing a spliced ​​building curtain wall, characterized in that: The method comprises the following steps: Step 1: Conduct preliminary design of the product. Step 2: Material preparation, Step 3: Specific processing and production, Step 4: Assemble into product.

2. The method for producing a spliced ​​building curtain wall according to claim 1, characterized in that: Step 1 is as follows: 1-1 Determine the needs. According to the specific needs of the construction project, determine the type, specification, size and splicing method of the curtain wall. 1-2 Design drawings: Draw detailed curtain wall design drawings according to requirements, including curtain wall floor plan, elevation, and node details. 1-3 Select materials. According to the design drawings, choose appropriate curtain wall materials, including aluminum alloy, steel, and glass.

3. The method for producing a spliced ​​building curtain wall according to claim 1, characterized in that: Step 2 is as follows: Step 2: Material preparation: Purchase the required curtain wall materials according to the design drawings and material list, and conduct quality inspection on the purchased materials to ensure that the quality of the materials meets the design requirements and industry standards.

4. The method for producing a spliced ​​building curtain wall according to claim 1, characterized in that: Step 3: Specific processing and production, the relevant steps are as follows: 3-1 Curtain wall panel processing: cutting, punching and edge grinding of curtain wall panels according to design drawings. 3-2 Connector production: Make connectors between curtain wall panels, including plug-in plates, rubber pads, and rotating plates to ensure the quality of the connectors. 3-3 Surface treatment: Surface treatment of curtain wall panels and connectors, including spraying and electroplating.

5. The method for producing a spliced ​​building curtain wall according to claim 4, characterized in that: In step 3, the surface of the curtain wall panels and connectors is treated, which also includes spraying a waterproof layer.

6. The method for producing a spliced ​​building curtain wall according to claim 5, characterized in that: In step 3, the surface of the curtain wall panels and connectors is treated, including spraying an anti-corrosion layer.

7. The method for producing a spliced ​​building curtain wall according to claim 5, characterized in that: Step 4: Assemble into products, as follows: 4-1 Install the connecting device and install it at the corresponding position of the curtain wall panel to ensure that the connecting device can be firmly connected to the curtain wall panel. 4-2 Splicing curtain wall panels: According to the design drawings, splice the curtain wall panels in the predetermined splicing method to ensure that the connection between the curtain wall panels is tight and flat. 4-3 Install fixings, including bolts and nuts, on the edges or joints of the curtain wall panels to ensure the stability of the curtain wall.

8. The method for producing a spliced ​​building curtain wall according to claim 7, characterized in that: The connecting device in step 4 includes one or more of a rectangular rod and a plug-in board.