Building facade ceramic tile construction device and method using high-rise climbing frame

By designing the high-rise climbing frame building facade tiles construction equipment, including anti-fall, speed limit and blocking and diversion systems, the problems of tiles pollution and inability to drop in the existing construction methods are solved, and efficient secondary flushing and safe construction process are achieved.

CN119711732APending Publication Date: 2025-03-28CHINA RAILWAY GUANGZHOU ENG GRP CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411675604.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-22
Publication Date
2025-03-28

AI Technical Summary

Technical Problem

After the existing construction methods are pasted, it is difficult to perform secondary flushing, resulting in tiles contamination and the climbing frame cannot be lowered, which requires demolition and reconstruction, which is troublesome and unsafe to operate.

Method used

Design a building facade tiles construction device using high-rise climbing frames, including a fall-proof system, a speed limit system and a sealing and diversion system. The frame system can move up and down through adjustment components and tiles are flushed during the descent.

Benefits of technology

It realizes efficient secondary flushing of ceramic tiles, avoids pollution, simplifies the construction process, improves safety, and saves costs and human resources.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119711732A_ABST
    Figure CN119711732A_ABST
Patent Text Reader

Abstract

The invention discloses a building facade ceramic tile construction device and method utilizing a high-rise climbing frame, and relates to the technical field of building facade ceramic tile construction devices. The building facade ceramic tile construction device utilizing the high-rise climbing frame comprises a wall body, a frame body system, a wall attaching system and a climbing system, and further comprises an anti-falling system installed on the wall attaching system, the anti-falling system supports the frame body system, and the anti-falling system comprises an adjusting assembly. The adjusting assembly adjusts the supporting performance of the anti-falling system to the frame body system. By means of the adjusting assembly, after pouring of the outer vertical face is completed, the whole frame body system can move downwards, tiles can be washed while the whole frame body system moves downwards, and therefore cost is saved, and safety is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of devices for bored pile construction, and in particular to a device and method for constructing ceramic tiles on a building facade using a high-rise climbing frame. Background Art

[0002] The climbing frame on the building facade, also known as the lifting frame, is a special device used in construction, mainly used for the exterior wall construction of high-rise buildings. The climbing frame is mainly composed of upper and lower load-bearing beams, vertical keels, guide rails, corner columns, wall supports, lifting brackets, electric hoists, protective mesh and other components. The climbing frame is fixed to the building by a specially designed lifting mechanism, and the scaffolding is connected to the lifting mechanism to achieve the lifting or lowering of the scaffolding. This design allows the scaffolding to rise or fall along the building, thereby adapting to the construction needs of different floors.

[0003] Since the building facade is cast by supporting formwork, the building facade is relatively smooth. When pasting tiles on the facade, it needs to be roughened and then rinsed. After the dust on the facade is rinsed away, the tiles can be more firmly bonded to the external surface. The existing construction method can paste the tiles during the rising process of the climbing frame, but the surface of the tiles after pasting will be contaminated by the sewage generated during the subsequent flushing of the building facade, and the tiles need to be rinsed twice. However, the existing climbing frame generally cannot be lowered and can only be raised. Therefore, when the tiles are rinsed twice, the climbing frame needs to be dismantled and a hanging basket needs to be installed. It is troublesome to use a hanging basket for flushing and it is not as safe as using a climbing frame. Summary of the invention

[0004] The purpose of the present application is to provide a device and method for constructing ceramic tiles on the exterior facade of a building using a high-rise climbing frame, so as to improve the problem that the contact between the vibrator and the steel cage may cause displacement of the steel bars in the steel cage.

[0005] On the one hand, the present invention provides a building facade tile construction device using a high-rise climbing frame, including a wall, a frame system, a wall attachment system and a climbing system, and also includes: An anti-fall system installed on the wall-mounted system, the anti-fall system supports the frame system, the anti-fall system includes an adjustment component, the adjustment component adjusts the support of the anti-fall system to the frame system; A speed limiting system installed on the anti-fall system, the speed limiting system supports the frame system when the frame system falls rapidly; A plugging and diversion system is installed at the bottom of the frame system, and the plugging and diversion system is used to plug the gap between the frame system and the wall.

[0006] By adopting the above technical solution, Optionally, the frame system includes a plurality of vertical boards and a walkway board fixedly mounted on the plurality of vertical boards, and a plurality of protective nets are fixedly mounted on one side of the plurality of vertical boards away from the wall.

[0007] By adopting the above technical solution, Optionally, the wall-mounting system includes a plurality of wall-mounting supports fixedly mounted on the wall, and a guide rail fixedly mounted on the vertical plate, wherein the guide rail is slidably connected to the wall-mounting supports.

[0008] By adopting the above technical solution, Optionally, the climbing system includes a first connecting hook fixedly installed on the walkway board at the bottom and a second connecting hook fixedly installed on the wall, and also includes an electric hoist, one end of the electric hoist is connected to the first connecting hook through a hook, and the electric hoist includes a steel cable, one end of the steel cable is connected to the second connecting hook through a hook.

[0009] By adopting the above technical solution, Optionally, the anti-fall system includes a support tube rotatably mounted on a wall-mounted support, a limit rod slidably mounted in the support tube, a plurality of limit bars are fixedly mounted on the guide rail, a first spring is fixedly mounted on the wall-mounted support, and the other end of the first spring is fixedly connected to the limit rod.

[0010] By adopting the above technical solution, Optionally, the adjusting assembly includes an oil tank arranged in the supporting cylinder, a piston is fixedly mounted on the limiting rod, the piston is slidably mounted in the oil tank, a sealing pressure ring is fixedly mounted on the piston, a valve is fixedly mounted on the supporting cylinder, an oil tank is fixedly mounted on the valve, a pressure plate is slidably mounted in the oil tank, a handle is rotatably mounted on the pressure plate, the handle passes through one side of the oil tank and extends to the outside of the oil tank, and hydraulic oil is arranged in the oil tank.

[0011] By adopting the above technical solution, Optionally, the adjustment component also includes a support column slidably mounted on the wall-mounted support, a latch is inserted into the support column, a second spring is fixedly mounted on the latch, and the other end of the second spring is detachably connected to the support column.

[0012] By adopting the above technical solution, Optionally, the speed limiting system includes a speed limiting block rotatably mounted on a wall-mounted support, a first limiting column and a second limiting column being fixedly mounted on the speed limiting block, a third spring being fixedly mounted on the second limiting column, the other end of the third spring being fixedly connected to the wall-mounted support, and a support block being fixedly mounted on the wall-mounted support.

[0013] By adopting the above technical solution, Optionally, the blocking and diversion system includes a plurality of slides fixedly mounted on the walkway board at the bottom, and a slide plate slidably mounted on the slides, a support plate fixedly mounted on the plurality of slide plates, a plurality of push rod motors fixedly mounted on the walkway board at the bottom, the output shaft of the push rod motor is fixedly connected to the support plate, a plurality of connecting columns fixedly mounted on the support plate, a guide plate fixedly mounted on the other end of the plurality of connecting columns, a through hole is provided on the guide plate, a guide pipe is fixedly mounted on the guide plate and located on the through hole, and a sealing pad is fixedly mounted on the side of the guide plate close to the wall.

[0014] By adopting the above technical solution, On the other hand, the present invention provides a method for constructing ceramic tiles on a building facade using a high-rise climbing frame, the method comprising the following steps: Step 1: Fix the wall-mounted bracket on the wall, and then connect the frame system to the wall through the wall-mounted system; Step 2: Fix the wall support and the second connecting hook on the newly poured wall, and drive the frame system to rise through the climbing system; Step 3: Formwork is carried out on the raised frame system, and then pouring is carried out to form a higher exterior wall; Step 4: After pouring is completed and solidified, remove the formwork and fill and seal the gap between the wall and the frame system through the sealing diversion system; Step 5: Roughen and wash the exterior wall, and then lay tiles on the exterior wall; Step 6: After the entire exterior wall is poured and tiled, the anti-fall system is adjusted to stop supporting the frame system. The climbing system is then used to drive the frame system down, and the tiles are washed during the descent.

[0015] Step 7: After the frame system is lowered to the ground, disassemble the frame system.

[0016] In summary, the present application includes at least one of the following beneficial technical effects of a building facade tile construction device and method using a high-rise climbing frame: By adjusting the components, the frame system can be moved not only upward but also downward, so that after the facade is poured, the entire frame system can be moved downward, and the tiles can be washed while moving downward, thereby avoiding the subsequent use of a hanging basket to clean the tiles, thereby saving costs and improving safety. When dismantling the frame system on the ground, a small crane can be used for dismantling, and when dismantling on the top floor, a large tower crane is required, thereby reducing the cost of dismantling, improving dismantling efficiency and saving costs.

[0017] When the upper wall is flushed, the push rod motor is started to drive the guide plate to move, so that the sealing pad is in contact with the wall, thereby sealing the gap between the wall and the guide plate through the sealing pad. At this time, the sewage on the upper layer will enter the guide plate and be discharged to the ground through the through hole and the guide pipe, preventing the tiles below from being contaminated when the upper wall is flushed, thereby preventing the tiles from being flushed twice, thereby saving costs and human resources. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the overall structure of a building facade tile construction device using a high-rise climbing frame according to an embodiment of the present application.

[0019] Figure 2 It is a structural diagram of the frame system.

[0020] Figure 3 It is a side structural diagram of the frame system.

[0021] Figure 4 It is a structural diagram of the wall-mounted system.

[0022] Figure 5 This is a diagram of the location of the latch.

[0023] Figure 6 It is a structural diagram of the regulating component.

[0024] Figure 7 It is a structural schematic diagram of the plugging and diversion system.

[0025] Figure 8 It is a structural diagram of the climbing system.

[0026] Fig. 9 yes Figure 6 A partial enlarged view of point A in the middle.

[0027] Fig.10 yes Figure 6 A partial enlarged view of point B in the middle.

[0028] In the figure, 1, wall; 2, vertical board; 201, walkway board; 202, protective net; 3, wall support; 301, guide rail; 302, support cylinder; 303, limit rod; 304, limit strip; 305, first spring; 306, support column; 307, latch; 308, second spring; 4, oil tank; 401, piston; 402, sealing pressure ring; 403, valve; 404, oil tank; 405, pressure plate; 406, rotating hand; 5. speed limit block; 501. first limit column; 502. second limit column; 503. third spring; 504. support block; 6. first connecting hook; 601. second connecting hook; 602. steel cable; 603. electric hoist; 7. slideway; 701. slide plate; 702. support plate; 703. push rod motor; 704. connecting column; 705. guide plate; 706. through hole; 707. guide pipe; 708. sealing cushion. DETAILED DESCRIPTION

[0029] The following is combined with Figure 1 -Attached Fig.10 , further details of this application are given.

[0030] On the one hand, the present invention provides a building facade tile construction device using a high-rise climbing frame, referring to Figure 1-3 , including a wall 1, and a frame system, the frame system includes a plurality of vertical panels 2 and a walkway board 201 fixedly mounted on the plurality of vertical panels 2, and a plurality of protective nets 202 are fixedly mounted on one side of the plurality of vertical panels 2 away from the wall 1. The vertical panels 2 support the entire frame system, the walkway board 201 can be used for workers to stand, thereby facilitating construction, and the protective nets 202 prevent workers from falling from a high altitude, thereby improving the safety of use.

[0031] Reference Figure 2-3 The wall-mounted system includes a plurality of wall-mounted supports 3 fixedly mounted on the wall 1, and a guide rail 301 fixedly mounted on the vertical plate 2, wherein the guide rail 301 is slidably connected to the wall-mounted supports 3. The wall-mounted supports 3 are fixedly connected to the wall 1 by through-wall bolts and support the guide rail, so that the entire frame system can be fixed on the wall 1.

[0032] Reference Figure 3 and Figure 8 The climbing system includes a first connection hook 6 fixedly mounted on the walkway plate 201 at the bottom and a second connection hook 601 fixedly mounted on the wall 1, and also includes an electric hoist 603, one end of the electric hoist 603 is connected to the first connection hook 6 through a hook, and the electric hoist 603 includes a steel cable 602, one end of the steel cable is connected to the second connection hook 601 through a hook. The electric hoist 603 contracts and winds the steel cable 602, which can drive the first connection hook 6 to rise, and then drive the guide rail 301 to rise along the wall support 3, so that the entire frame system continues to rise as the building continues to rise.

[0033] Reference Figure 4-6 and Fig. 9 , and also includes an anti-falling system installed on the wall-mounted system, the anti-falling system supports the frame system, and the anti-falling system includes an adjustment component, and the adjustment component adjusts the support of the anti-falling system to the frame system. The anti-falling system includes a support tube 302 rotatably installed on the wall-mounted support 3, a limit rod 303 slidably installed in the support tube 302, a plurality of limit strips 304 are fixedly installed on the guide rail 301, and a first spring 305 is fixedly installed on the wall-mounted support 3, and the other end of the first spring 305 is fixedly connected to the limit rod 303. Under the action of the first spring 305, the support tube 302 always has a tendency to rotate downward. When the guide rail 301 rises, it will drive the limit bar 304 to rise. The rising limit bar 304 will squeeze the limit rod 303, causing the limit rod 303 to rotate upward. After the limit bar 304 passes through the limit rod 303, the limit rod 303 will rotate downward under the action of the first spring 305. At this time, the limit rod 303 will support the limit bar 304, thereby preventing the guide rail 301 from descending, thereby supporting the entire frame system and preventing the frame system from falling.

[0034] Furthermore, the adjustment component includes an oil groove 4 arranged in the support cylinder 302, a piston 401 is fixedly installed on the limit rod 303, the piston 401 is slidably installed in the oil groove 4, a sealing pressure ring 402 is fixedly installed on the piston 401, a valve 403 is fixedly installed on the support cylinder 302, an oil tank 404 is fixedly installed on the valve 403, a pressure plate 405 is slidably installed in the oil tank 404, a handle 406 is rotatably installed on the pressure plate 405, the handle 406 passes through one side of the oil tank 404 and extends to the outside of the oil tank 404, and hydraulic oil is provided in the oil tank 404. When valve 403 is closed, the hydraulic oil in the oil tank 4 will not be able to flow back to the oil tank 404, and the limit rod 303 will not be able to slide in the support tube 302. At this time, the limit rod 303 and the support tube 302 are relatively fixedly connected, so the limit rod 303 can prevent the guide rail 301 from falling. After the facade of the entire building is poured and the tiles are laid, the valve 403 can be opened. At this time, the limit rod 303 can slide in the support tube 302, and the limit rod 303 can not support the guide rail 301. At this time, the steel cable 602 can be slowly released by the electric hoist 603 to lower the entire frame system, so that the tiles can be cleaned during the descent. After descending a certain distance, the handle 406 can be turned to press the hydraulic oil into the oil tank 4, so that the limit rod 303 can be reset, and the valve 403 can be closed to allow the limit rod 303 to support the frame system again.

[0035] Furthermore, the adjustment assembly also includes a support column 306 slidably mounted on the wall support 3, a latch 307 is inserted into the support column 306, a second spring 308 is fixedly mounted on the latch 307, and the other end of the second spring 308 is detachably connected to the support column 306. The support column 306 can limit the support tube 302 so that the support tube 302 cannot rotate downward, thereby allowing the limit rod 303 to support the frame system. When the latch 307 is pulled out to move the support column 306 downward, the support tube 302 can rotate downward at this time, thereby making the limit rod 303 unable to support the frame system, so that the frame system can move downward.

[0036] Reference Fig.10 The speed limiting system is installed on the anti-falling system, and the speed limiting system supports the frame system when the frame system falls rapidly. The speed limiting system includes a speed limiting block 5 rotatably installed on the wall-mounted support 3, a first limiting column 501 and a second limiting column 502 are fixedly installed on the speed limiting block 5, a third spring 503 is fixedly installed on the second limiting column 502, the other end of the third spring 503 is fixedly connected to the wall-mounted support 3, and a support block 504 is fixedly installed on the wall-mounted support 3. When the frame system moves downward, it will drive the limit bar 304 to move downward, the limit bar 304 will contact the first limit column 501, and drive the speed limit block 5 to rotate through the first limit column 501, and the rotating speed limit block 5 will cause the second limit column 502 to rotate to the bottom of the limit bar 304, and then the speed limit block 5 will be reset under the action of the third spring 503. When the frame system descends faster, the third spring 503 has not yet pulled the second limit column 502 back, the limit bar 304 will contact the second limit column 502, and drive the speed limit block 5 to rotate downward, and the rotation angle of the speed limit block 5 is limited by the support block 504, so that the second limit column 502 can support the limit bar 304, thereby supporting the frame system when the frame system descends faster, further ensuring the stability and safety of the descent from the frame system.

[0037] Reference Figure 8, the blocking and diversion system is installed at the bottom of the frame system, and the blocking and diversion system blocks the gap between the frame system and the wall 1. The blocking and diversion system includes a plurality of slideways 7 fixedly installed on the walkway board 201 at the bottom, a slide plate 701 slidably installed on the slideway 7, a support plate 702 fixedly installed on the plurality of slide plates 701, a plurality of push rod motors 703 fixedly installed on the walkway board 201 at the bottom, the output shaft of the push rod motor 703 is fixedly connected to the support plate 702, a plurality of connecting columns 704 fixedly installed on the support plate 702, a guide plate 705 fixedly installed on the other end of the plurality of connecting columns 704, a through hole 706 is provided on the guide plate 705, a guide pipe 707 is fixedly installed on the guide plate 705 and located on the through hole 706, and a sealing cushion 708 is fixedly installed on the side of the guide plate 705 close to the wall 1. When the upper wall 1 is flushed, the push rod motor 703 is started to drive the guide plate 705 to move, so that the sealing pad 708 is in contact with the wall 1, so that the gap between the wall 1 and the guide plate 705 can be sealed by the sealing pad 708. At this time, the sewage on the upper layer will enter the guide plate 705 and be discharged to the ground through the through hole 706 and the guide pipe 707, preventing the tiles below from being contaminated when the upper wall 1 is flushed.

[0038] Another aspect of the present invention provides a method for constructing ceramic tiles on a building facade using a high-rise climbing frame, the method comprising the following steps: Step 1: Fix the wall mounting bracket 3 on the wall 1, and then connect the frame system to the wall through the wall mounting system; Step 2: Fix the wall support 3 and the second connecting hook 601 on the newly poured wall 1, and drive the frame system to rise through the climbing system; Step 3: Formwork is carried out on the raised frame system, and then pouring is carried out to form a higher exterior wall; Step 4: After pouring is completed and solidified, the formwork is removed, and the gap between the wall 1 and the frame system is filled and blocked by the blocking diversion system; Step 5: Roughen and wash the exterior wall, and then lay tiles on the exterior wall; Step 6: After the entire exterior wall is poured and tiled, the anti-fall system is adjusted to stop supporting the frame system. The climbing system is then used to drive the frame system down, and the tiles are washed during the descent.

[0039] Step 7: After the frame system is lowered to the ground, disassemble the frame system.

[0040] The implementation principle of the embodiment of the present application is: by retracting and winding the steel cable 602 through the electric hoist 603, the first connecting hook 6 can be driven to rise, and then the guide rail 301 can be driven to rise along the wall support 3, so that the entire frame system can be continuously raised as the building is continuously raised. When the guide rail 301 rises, it will drive the limit bar 304 to rise, and the rising limit bar 304 will squeeze the limit rod 303, so that the limit rod 303 rotates upward, and after the limit bar 304 passes through the limit rod 303, the limit rod 303 rotates downward under the action of the first spring 305, and the limit rod 303 at this time will support the limit bar 304, thereby preventing the guide rail 301 from falling, thereby supporting the entire frame system and preventing the frame system from falling.

[0041] When the entire facade of the building is poured and the tiles are laid, the valve 403 can be opened and the limit rod 303 can slide in the support tube 302. The limit rod 303 can no longer support the guide rail 301. The electric hoist 603 can slowly release the steel cable 602 to lower the entire frame system, so that the tiles can be cleaned during the descent. After descending a certain distance, the handle 406 can be turned to press the hydraulic oil into the oil tank 4 to reset the limit rod 303. The valve 403 can be closed to allow the limit rod 303 to support the frame system again. The support column 306 can be used to limit the support tube 302, so that the support tube 302 cannot be rotated downward, and the limiting rod 303 can support the frame system. When the pin 307 is pulled out to move the support column 306 downward, the support tube 302 can be rotated downward at this time, and the limiting rod 303 can no longer support the frame system, so that the frame system can be moved downward.

[0042] When the frame system moves downward, it will drive the limit bar 304 to move downward, the limit bar 304 will contact the first limit column 501, and drive the speed limit block 5 to rotate through the first limit column 501, and the rotating speed limit block 5 will cause the second limit column 502 to rotate to the bottom of the limit bar 304, and then the speed limit block 5 will be reset under the action of the third spring 503. When the frame system descends faster, the third spring 503 has not yet pulled the second limit column 502 back, the limit bar 304 will contact the second limit column 502, and drive the speed limit block 5 to rotate downward, and the rotation angle of the speed limit block 5 is limited by the support block 504, so that the second limit column 502 can support the limit bar 304, thereby supporting the frame system when the frame system descends faster, further ensuring the stability and safety of the descent from the frame system.

[0043] When the upper wall 1 is flushed, the push rod motor 703 is started to drive the guide plate 705 to move, so that the sealing pad 708 is in contact with the wall 1, so that the gap between the wall 1 and the guide plate 705 can be sealed by the sealing pad 708. At this time, the sewage on the upper layer will enter the guide plate 705 and be discharged to the ground through the through hole 706 and the guide pipe 707, preventing the tiles below from being contaminated when the upper wall 1 is flushed.

[0044] The embodiments of this specific implementation are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. The same components are represented by the same figure marks. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A building facade tile construction device using a high-rise climbing frame, comprising a wall (1), a frame system, a wall attachment system and a climbing system, characterized in that: Also includes: An anti-fall system installed on the wall-mounted system, the anti-fall system supports the frame system, the anti-fall system includes an adjustment component, the adjustment component adjusts the support of the anti-fall system to the frame system; A speed limiting system installed on the anti-fall system, the speed limiting system supports the frame system when the frame system falls rapidly; A blocking and diversion system is installed at the bottom of the frame system, and the blocking and diversion system blocks the gap between the frame system and the wall (1).

2. A building facade tile construction device using a high-rise climbing frame according to claim 1, characterized in that: The frame system comprises a plurality of vertical panels (2) and a walkway panel (201) fixedly mounted on the plurality of vertical panels (2), and a plurality of protective nets (202) are fixedly mounted on one side of the plurality of vertical panels (2) away from the wall (1).

3. A building facade tile construction device using a high-rise climbing frame according to claim 2, characterized in that: The wall-mounted system comprises a plurality of wall-mounted supports (3) fixedly mounted on the wall (1), and a guide rail (301) fixedly mounted on the vertical plate (2), wherein the guide rail (301) is slidably connected to the wall-mounted supports (3).

4. The device for constructing ceramic tiles on the building facade using a high-rise climbing frame according to claim 3 is characterized in that: The climbing system comprises a first connecting hook (6) fixedly mounted on a walkway plate (201) at the bottom and a second connecting hook (601) fixedly mounted on a wall (1), and also comprises an electric hoist (603), one end of the electric hoist (603) being connected to the first connecting hook (6) via a hook, and the electric hoist (603) comprising a steel cable (602), one end of the steel cable being connected to the second connecting hook (601) via a hook.

5. The device for constructing building facade tiles using a high-rise climbing frame according to claim 4 is characterized in that: The anti-falling system comprises a support tube (302) rotatably mounted on a wall-mounted support (3), a limit rod (303) slidably mounted in the support tube (302), a plurality of limit strips (304) fixedly mounted on the guide rail (301), a first spring (305) fixedly mounted on the wall-mounted support (3), and the other end of the first spring (305) is fixedly connected to the limit rod (303).

6. The device for constructing ceramic tiles on the building facade using a high-rise climbing frame according to claim 5, characterized in that: The regulating assembly comprises an oil groove (4) arranged in a supporting cylinder (302); a piston (401) is fixedly mounted on the limiting rod (303); the piston (401) is slidably mounted in the oil groove (4); a sealing pressure ring (402) is fixedly mounted on the piston (401); a valve (403) is fixedly mounted on the supporting cylinder (302); an oil tank (404) is fixedly mounted on the valve (403); a pressure plate (405) is slidably mounted in the oil tank (404); a handle (406) is rotatably mounted on the pressure plate (405); the handle (406) passes through one side of the oil tank (404) and extends to the outside of the oil tank (404); hydraulic oil is provided in the oil tank (404).

7. The device for constructing ceramic tiles on the building facade using a high-rise climbing frame according to claim 6, characterized in that: The adjustment assembly further comprises a support column (306) slidably mounted on the wall-mounted support (3), a latch (307) being plugged into the support column (306), a second spring (308) being fixedly mounted on the latch (307), and the other end of the second spring (308) being detachably connected to the support column (306).

8. The device for constructing ceramic tiles on the building facade using a high-rise climbing frame according to claim 7, characterized in that: The speed limiting system comprises a speed limiting block (5) rotatably mounted on a wall-mounted support (3); a first limiting column (501) and a second limiting column (502) are fixedly mounted on the speed limiting block (5); a third spring (503) is fixedly mounted on the second limiting column (502); the other end of the third spring (503) is fixedly connected to the wall-mounted support (3); and a support block (504) is fixedly mounted on the wall-mounted support (3).

9. The device for constructing ceramic tiles on the building facade using a high-rise climbing frame according to claim 8, characterized in that: The blocking and diversion system comprises a plurality of slideways (7) fixedly mounted on a walkway plate (201) at the bottom, and a slide plate (701) slidably mounted on the slideways (7); a support plate (702) fixedly mounted on the plurality of slide plates (701); a plurality of push rod motors (703) fixedly mounted on the walkway plate (201) at the bottom; an output shaft of the push rod motor (703) is fixedly connected to the support plate (702); a plurality of connecting columns (704) fixedly mounted on the support plate (702); a guide plate (705) fixedly mounted on the other end of the plurality of connecting columns (704); a through hole (706) provided on the guide plate (705); a guide pipe (707) fixedly mounted on the guide plate (705) and located on the through hole (706); and a sealing cushion (708) fixedly mounted on the side of the guide plate (705) close to the wall (1).

10. A method for constructing ceramic tiles on a building facade using a high-rise climbing frame is applied to the ceramic tiles construction device for a building facade using a high-rise climbing frame as claimed in any one of claims 1 to 9, the method comprising the following steps: Step 1: Fix the wall-mounted support (3) on the wall (1), and then connect the frame system to the wall through the wall-mounted system; Step 2: by fixing the wall support (3) and the second connecting hook (601) on the newly poured wall (1), the frame system is driven to rise by the climbing system; Step 3: Formwork is carried out on the raised frame system, and then pouring is carried out to form a higher exterior wall; Step 4: After pouring is completed and solidified, the formwork is removed, and the gap between the wall (1) and the frame system is filled and sealed by the sealing and diversion system; Step 5: Roughen and wash the exterior wall, and then lay tiles on the exterior wall; Step 6: After the entire exterior wall is poured and tiled, the anti-fall system is adjusted so that it no longer supports the frame system. The climbing system is then used to drive the frame system down, and the tiles are washed during the descent. Step 7: After the frame system is lowered to the ground, disassemble the frame system.