Material inspection method and device and storage medium

By dynamically adjusting the sampling quantity and acceptance value in material inspection, the problem of fixed sampling quantity in the prior art is solved, and the accuracy and fault tolerance of material inspection are improved.

CN119721487AInactive Publication Date: 2025-03-28ZHONGKE YUNGU TECH
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202411880747.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-19
Publication Date
2025-03-28
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In the prior art, the sampling quantity is set to a fixed time during material inspection, making it difficult to cover materials with different inspection quantities, and the actual situation of material quality is not considered, which affects the inspection results.

Method used

By obtaining the inspection standards and number of inspections in the task to be inspected, match the sample size word code table to determine the appropriate sampling quantity and allowable value, and adjust the sampling plan based on the inspection results and historical data.

Benefits of technology

The sampling quantity and acceptance value are dynamically adjusted according to the actual situation of the material, and the accuracy and fault tolerance of material inspection are improved, making material inspection more rational.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119721487A_ABST
    Figure CN119721487A_ABST
Patent Text Reader

Abstract

The embodiment of the invention provides a material inspection method and device and a storage medium. The method comprises the following steps: acquiring a to-be-inspected task for a batch of materials; matching from a preset sample size word code table to obtain an inspection word code value corresponding to the inspection quantity and the sampling level value; determining the sampling number and the sampling acceptance value of the batch of materials under the target sampling scheme according to the check character code value and the sampling level value; extracting a sampling number of materials from the batch materials, and inspecting the extracted materials according to the target sampling scheme to obtain a sampling disqualification number of the batch materials; the inspection result of the batch of materials is determined according to the number of unqualified samples and the sampling acceptance value, the actual situation of incoming materials is considered, the sampling number and the sampling acceptance value are adjusted according to the inspection number and the sampling level value, defective products are allowed to appear within a controllable range, the error-tolerant rate of incoming material quality management is improved, and material inspection is reasonable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of material inspection, and specifically to a material inspection method, device and storage medium. Background Art

[0002] In the era of Internet+ and big data, quality management systems are developing towards digitalization, intelligence and informatization. The incoming material quality management system is an important management tool in modern manufacturing. It can comprehensively control and optimize the procurement process of the enterprise, realize the traceability of material quality and effectively ensure quality.

[0003] In the prior art, the sampling methods used in material inspection are fixed sampling number and fixed sampling ratio, and the same acceptance rules are adopted for all material inspections. However, for inspection tasks with different inspection quantities, the sampling quantity is set relatively fixed, and the sampling quantity is difficult to cover the inspection materials, which affects the material inspection results. The same acceptance rules are adopted for all material inspections, and the actual situation of material quality is not taken into account, which affects the material inspection results. Summary of the invention

[0004] The purpose of the embodiments of the present application is to provide a material inspection method, device and storage medium to solve the problem of unreasonable material inspection in the prior art.

[0005] In order to achieve the above-mentioned purpose, the first aspect of the present application provides a material inspection method, comprising:

[0006] Obtain the tasks to be inspected for a batch of materials. The tasks to be inspected include the inspection standards and inspection quantity of the batch of materials. The inspection standards include the sampling level value and sampling standards. The sampling standards include the target sampling plan.

[0007] Matching the inspection code value corresponding to the inspection quantity and sampling level value from the preset sample size code table;

[0008] Determine the sampling quantity and sampling acceptance value of the batch material under the target sampling plan according to the inspection code value and sampling level value;

[0009] Extract a sampling quantity of materials from the batch of materials, and inspect the extracted materials according to the target sampling plan to obtain the sampling unqualified quantity of the batch of materials;

[0010] The inspection results of the batch materials are determined based on the number of sampling failures and the sampling acceptance value.

[0011] In an embodiment of the present application, the method also includes: after determining the inspection results of the batch material, judging whether the rule transfer conditions for transferring the target sampling scheme to another sampling scheme are met; if the rule transfer conditions are met, the target sampling scheme of other uninspected batch materials of the same type as the batch material is transferred to another sampling scheme.

[0012] In an embodiment of the present application, determining whether a rule transfer condition for transferring a target sampling scheme to another sampling scheme is met includes: when the target sampling scheme is a preset sampling scheme, obtaining historical inspection results of other inspected batch materials of the same type as the batch material; and determining whether a rule transfer condition for transferring the target sampling scheme to another sampling scheme is met based on the inspection results and the historical inspection results.

[0013] In an embodiment of the present application, the preset sampling scheme includes a normal sampling scheme, and judging whether the rule transfer condition for transferring the target sampling scheme to another sampling scheme is satisfied according to the inspection results and the historical inspection results includes: when the target sampling scheme is the normal sampling scheme, judging whether there are batches of materials whose inspection results are unqualified for consecutive times reaching a first value according to the inspection results and the historical inspection results; when there are batches of materials whose inspection results are unqualified for consecutive times reaching the first value, determining that the rule transfer condition for transferring the target sampling scheme to the strict sampling scheme is satisfied; when there are batches of materials whose inspection results are unqualified for consecutive times reaching the first value, judging whether the rule transfer condition for transferring the target sampling scheme to the strict sampling scheme is satisfied according to the inspection results. Based on the historical inspection results, determine whether there are batches of materials whose inspection results are qualified for a consecutive number of times reaching the first value; if there are batches of materials whose inspection results are qualified for a consecutive number of times reaching the first value, determine whether there are batches of materials whose inspection results are qualified for a consecutive number of times reaching the second value based on the inspection results and the historical inspection results; if there are no batches of materials whose inspection results are qualified for a consecutive number reaching the second value, determine that the rule transfer conditions for transferring the target sampling scheme to the relaxed sampling scheme are met; if there are batches of materials whose inspection results are qualified for a consecutive number reaching the second value, determine that the rule transfer conditions for transferring the target sampling scheme to the inspection-exempt sampling scheme are met.

[0014] In an embodiment of the present application, the preset sampling scheme includes a relaxed sampling scheme, and judging whether the rule transfer condition for transferring the target sampling scheme to another sampling scheme is met according to the inspection results and the historical inspection results includes: when the target sampling scheme is a relaxed sampling scheme, judging whether there is a batch of materials whose inspection results are unqualified for a consecutive number of times reaching a first value according to the inspection results and the historical inspection results; when there is a batch of materials whose inspection results are unqualified for a consecutive number of times reaching the first value, determining whether the rule transfer condition for transferring the target sampling scheme to the normal sampling scheme is met.

[0015] In an embodiment of the present application, the preset sampling scheme includes a strict sampling scheme, and judging whether the rule transfer condition for transferring the target sampling scheme to another sampling scheme is met according to the inspection results and the historical inspection results includes: when the target sampling scheme is a strict sampling scheme, judging whether there is a batch of materials whose inspection results are qualified for a consecutive number of times reaching a first value according to the inspection results and the historical inspection results; when there is a batch of materials whose inspection results are qualified for a consecutive number of times reaching the first value, determining whether the rule transfer condition for transferring the target sampling scheme to the normal sampling scheme is met.

[0016] In an embodiment of the present application, determining whether a rule transfer condition for transferring a target sampling scheme to another sampling scheme is met includes: when the target sampling scheme is an inspection-free sampling scheme, determining whether there are historical quality complaint reports and production quality feedback reports for materials of the same type as the batch material, and obtaining a production work order scheduling report for materials of the same type as the batch material; determining whether a rule transfer condition for transferring the target sampling scheme to another sampling scheme is met based on the determination result of whether a historical quality complaint report exists, the determination result of whether a production work order scheduling report exists, and the production quality feedback report.

[0017] In an embodiment of the present application, judging whether the rule transfer conditions for transferring the target sampling scheme to another sampling scheme are met based on the judgment result of whether a historical quality complaint report exists, the judgment result of whether a production work order scheduling report exists, and the production quality feedback report includes: when the target sampling scheme is an inspection-free sampling scheme, judging whether the number of consecutive days without producing materials of the same type as the batch material reaches a third value based on the production work order scheduling report; when there are historical quality complaint reports and production quality feedback reports, and the number of consecutive days without producing materials of the same type as the batch material reaches a third value, determining that the rule transfer conditions for transferring the target sampling scheme to the normal sampling scheme are met.

[0018] In an embodiment of the present application, determining the inspection result of a batch material based on the number of unqualified sampling and the sampling acceptance value includes: when the number of unqualified sampling is greater than the sampling acceptance value, determining the inspection result of the batch material is unqualified; when the number of unqualified sampling is less than or equal to the sampling acceptance value, determining the inspection result of the batch material is qualified.

[0019] In the embodiment of the present application, the sampling standard includes the GB2828 sampling standard and / or the American standard zero-defect sampling standard.

[0020] A second aspect of the present application provides a material inspection device, comprising:

[0021] a memory configured to store instructions;

[0022] The processor is configured to call instructions from the memory and implement the above-mentioned material inspection method when executing the instructions.

[0023] A third aspect of the present application provides a machine-readable storage medium having instructions stored thereon, which, when executed by a processor, configures the processor to execute the above-mentioned material inspection method.

[0024] Through the above technical scheme, the tasks to be inspected for a batch of materials are obtained, and the inspection code values ​​corresponding to the inspection quantity and the sampling level values ​​are matched from the preset sample quantity code table; the sampling quantity and the sampling acceptance value of the batch materials under the target sampling plan are determined according to the inspection code values ​​and the sampling level values; the sampling quantity of materials is drawn from the batch materials, and the drawn materials are inspected according to the target sampling plan to obtain the sampling unqualified quantity of the batch materials; the inspection results of the batch materials are determined according to the sampling unqualified quantity and the sampling acceptance value, and the sampling quantity and the sampling acceptance value are adjusted according to the inspection quantity and the sampling level value in consideration of the actual situation of the incoming materials, and defective products are allowed to appear within a controllable range, thereby improving the fault tolerance rate of incoming material quality management and rationalizing material inspection.

[0025] Other features and advantages of the embodiments of the present application will be described in detail in the subsequent specific implementation section. BRIEF DESCRIPTION OF THE DRAWINGS

[0026] The accompanying drawings are used to provide a further understanding of the embodiments of the present application and constitute a part of the specification. Together with the following specific implementations, they are used to explain the embodiments of the present application, but do not constitute a limitation on the embodiments of the present application. In the accompanying drawings:

[0027] Figure 1 The following is a schematic diagram showing a flow chart of a material inspection method according to an embodiment of the present application;

[0028] Figure 2 The following is a schematic diagram showing a flow chart of a material inspection method according to another embodiment of the present application;

[0029] Figure 3 The internal structure diagram of a computer device according to an embodiment of the present application is schematically shown. DETAILED DESCRIPTION

[0030] In order to make the purpose, technical scheme and advantages of the embodiments of the present application clearer, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. It should be understood that the specific implementation methods described herein are only used to illustrate and explain the embodiments of the present application, and are not used to limit the embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.

[0031] It should be noted that if there are descriptions involving "first", "second", etc. in the embodiments of the present application, the descriptions of "first", "second", etc. are only used for descriptive purposes and cannot be understood as indicating or suggesting their relative importance or implicitly indicating the number of technical features indicated. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In addition, the technical solutions between the various embodiments can be combined with each other, but they must be based on the ability of ordinary technicians in the field to implement them. When the combination of technical solutions is contradictory or cannot be implemented, it should be deemed that such combination of technical solutions does not exist and is not within the scope of protection required by this application.

[0032] Figure 1 The following schematically shows a flow chart of a material inspection method according to an embodiment of the present application. Figure 1 As shown, in one embodiment of the present application, a material inspection method is provided, comprising the following steps:

[0033] Step 101: Obtain tasks to be inspected for a batch of materials. The tasks to be inspected include inspection standards and inspection quantities of the batch of materials. The inspection standards include sampling level values ​​and sampling standards. The sampling standards include target sampling plans.

[0034] For a batch of materials, the processor can obtain the tasks to be inspected for the batch of materials. Among them, the tasks to be inspected include the inspection standards and inspection quantity of the batch materials, the inspection standards include the sampling level value and the sampling standards, and the sampling standards include the target sampling scheme. In an embodiment of the present application, the sampling standards include the GB2828 sampling standards and / or the American standard zero-defect sampling standards. The sampling standards may also include a fixed sampling quantity standard and a fixed sampling ratio standard. The target sampling scheme includes a normal sampling scheme, a relaxed sampling scheme, a strict sampling scheme, and an inspection-free sampling scheme. The target sampling scheme is used to characterize the severity of the sampling under the sampling standard.

[0035] Step 102: Match the inspection code value corresponding to the inspection quantity and the sampling level value from the preset sample size code table.

[0036] The processor can match the inspection code value corresponding to the inspection quantity and sampling level value from the preset sample quantity code table. Among them, the preset sample quantity code table includes multiple preset quantity intervals and multiple preset sampling level values, and each preset quantity interval and each preset sampling level value corresponds to a preset code value. Among them, the value of the sample quantity code table can be based on the GB2828 standard or the American standard zero defect standard, and the upper and lower limits of different sampling quantity intervals and the size of the sampling and acceptance values ​​can be adjusted in combination with the actual production progress and production quality of the factory. Among them, when the factory purchases a large number of raw materials and the quality inspectors have more inspection tasks, the sampling number n can be appropriately reduced to reduce the number of random inspections required by the quality inspectors. When the quality of the raw materials purchased by the factory is poor, the sampling number n can be appropriately increased while reducing the acceptance value Ac to increase the proportion of random inspections and judgment requirements to ensure the quality of the raw materials. On the contrary, the sampling number n can be reduced.

[0037] When matching the inspection word code value corresponding to the inspection quantity and the sampling level value, the processor can determine the preset number interval matching the inspection quantity and the preset sampling level value matching the sampling level value. Afterwards, the preset word code value corresponding to the matched preset number interval and the preset sampling level value can be determined as the inspection word code value.

[0038] Step 103: Determine the sampling quantity and sampling acceptance value of the batch material under the target sampling plan according to the inspection code value and the sampling level value.

[0039] Different target sampling schemes correspond to different sampling quantities and sampling acceptance values. The processor can determine the sampling quantity and sampling acceptance value of the batch material under the target sampling scheme according to the inspection code value and the sampling level value. Specifically, a relationship table under different sampling schemes can be constructed in advance, and the relationship table defines the preset code value and the preset sampling level value, and the relationship between the preset sampling quantity and the preset sampling acceptance value. Among them, different degrees of sampling schemes can be based on the GB2828 standard or the American standard zero defect standard, and the upper and lower limits of different sampling quantity intervals and the size of the sampling and acceptance values ​​can be adjusted in combination with the actual production progress and production quality of the factory. Among them, when the factory purchases a large number of raw materials and the quality inspectors have more inspection tasks, the sampling number n can be appropriately reduced to reduce the number of inspections required by the quality inspectors. When the quality of the raw materials purchased by the factory is poor, the sampling number n can be appropriately increased while the acceptance value Ac can be reduced to increase the proportion of random inspections and judgment requirements to ensure the quality of the raw materials. On the contrary, the sampling number n can be reduced.

[0040] After obtaining the inspection code value and the sampling level value, the preset code value corresponding to the inspection code value and the preset sampling level value corresponding to the sampling level value can be matched based on the relationship table corresponding to the target sampling plan. Afterwards, the preset sampling quantity and the preset sampling acceptance value corresponding to the matched preset code value and the preset sampling level value can be used as the sampling quantity and sampling acceptance value of the batch material under the target sampling plan.

[0041] Step 104: sampling a sampling quantity of materials from the batch material, and inspecting the sampled materials according to the target sampling plan to obtain the sampling unqualified quantity of the batch material.

[0042] Step 105: Determine the inspection result of the batch material based on the sampling rejection quantity and the sampling acceptance value.

[0043] The processor can extract a sampling quantity of materials from the batch material, and inspect the extracted materials according to the target sampling plan to obtain the sampling unqualified quantity of the batch material. The processor can compare the sampling unqualified quantity with the sampling acceptance value to obtain the inspection result of the batch material.

[0044] In an embodiment of the present application, determining the inspection result of a batch material based on the number of unqualified sampling and the sampling acceptance value includes: when the number of unqualified sampling is greater than the sampling acceptance value, determining the inspection result of the batch material is unqualified; when the number of unqualified sampling is less than or equal to the sampling acceptance value, determining the inspection result of the batch material is qualified.

[0045] When the number of unqualified samples is greater than the sampling acceptance value, it can be said that the number of unqualified samples in the batch is too large, and the processor can determine that the inspection result of the batch is unqualified. When the number of unqualified samples is less than or equal to the sampling acceptance value, it can be said that the number of unqualified samples in the batch is within a reasonable range, and the processor can determine that the inspection result of the batch is qualified.

[0046] In an embodiment of the present application, the method also includes: after determining the inspection results of the batch material, judging whether the rule transfer conditions for transferring the target sampling scheme to another sampling scheme are met; if the rule transfer conditions are met, the target sampling scheme of other uninspected batch materials of the same type as the batch material is transferred to another sampling scheme.

[0047] After determining the inspection result of the batch of materials, the processor can determine whether the rule transfer condition for transferring the target sampling scheme to another sampling scheme is met. If the rule transfer condition is met, the processor can transfer the target sampling scheme of other uninspected batch materials of the same type as the batch material to another sampling scheme. When inspecting other uninspected batch materials, the transferred sampling scheme, i.e., another sampling scheme, can be used to achieve flexible configuration of the sampling scheme and improve the accuracy of material inspection.

[0048] In an embodiment of the present application, determining whether a rule transfer condition for transferring a target sampling scheme to another sampling scheme is met includes: when the target sampling scheme is a preset sampling scheme, obtaining historical inspection results of other inspected batch materials of the same type as the batch material; and determining whether a rule transfer condition for transferring the target sampling scheme to another sampling scheme is met based on the inspection results and the historical inspection results.

[0049] When the target sampling scheme is a preset sampling scheme, the processor can obtain historical inspection results of other inspected batches of materials of the same type as the batch material. The preset sampling scheme includes a normal sampling scheme, a relaxed sampling scheme, and a strict sampling scheme. The sampling standards used in the historical inspection results may include but are not limited to the GB2828 sampling standard and the American standard zero defect sampling standard, as well as a fixed sampling ratio standard and a fixed sampling quantity standard.

[0050] The processor can determine whether the rule transfer condition for transferring the target sampling scheme to another sampling scheme is met based on the inspection results and historical inspection results. For example, if the target sampling scheme is a normal sampling scheme, the sampling schemes to which it can be transferred may include a strict sampling scheme, a relaxed sampling scheme, and an inspection-free sampling scheme. If the target sampling scheme is a relaxed sampling scheme, the sampling schemes to which it can be transferred may include a normal sampling scheme. If the target sampling scheme is a strict sampling scheme, the sampling schemes to which it can be transferred may include a normal sampling scheme.

[0051] In an embodiment of the present application, the preset sampling scheme includes a normal sampling scheme, and judging whether the rule transfer condition for transferring the target sampling scheme to another sampling scheme is satisfied according to the inspection results and the historical inspection results includes: when the target sampling scheme is the normal sampling scheme, judging whether there are batches of materials whose inspection results are unqualified for consecutive times reaching a first value according to the inspection results and the historical inspection results; when there are batches of materials whose inspection results are unqualified for consecutive times reaching the first value, determining that the rule transfer condition for transferring the target sampling scheme to the strict sampling scheme is satisfied; when there are batches of materials whose inspection results are unqualified for consecutive times reaching the first value, judging whether the rule transfer condition for transferring the target sampling scheme to the strict sampling scheme is satisfied according to the inspection results. Based on the historical inspection results, determine whether there are batches of materials whose inspection results are qualified for a consecutive number of times reaching the first value; if there are batches of materials whose inspection results are qualified for a consecutive number of times reaching the first value, determine whether there are batches of materials whose inspection results are qualified for a consecutive number of times reaching the second value based on the inspection results and the historical inspection results; if there are no batches of materials whose inspection results are qualified for a consecutive number reaching the second value, determine that the rule transfer conditions for transferring the target sampling scheme to the relaxed sampling scheme are met; if there are batches of materials whose inspection results are qualified for a consecutive number reaching the second value, determine that the rule transfer conditions for transferring the target sampling scheme to the inspection-exempt sampling scheme are met.

[0052] The preset sampling scheme includes a normal sampling scheme. When the target sampling scheme is a normal sampling scheme, the processor can determine whether there are batches of materials whose inspection results are unqualified for consecutive times reaching the first value based on the inspection results and historical inspection results. Among them, the first value can be set based on the actual situation. For example, the first value can be set to 5. In the case that there are batches of materials whose inspection results are unqualified for consecutive times reaching the first value, it can be explained that the supply quality of the supplier of the material has developed from good to poor at this time, and the processor can determine whether the rule transfer conditions for transferring the target sampling scheme to the strict sampling scheme are met. At this time, the target sampling scheme of other uninspected batches of materials of the same type as the batch material can be transferred to the strict sampling scheme. When inspecting other uninspected batches of materials later, the target sampling scheme adopted can be set to the strict sampling scheme.

[0053] In the case that there is no batch material whose inspection results are unqualified for consecutive times reaching the first value, the processor can determine whether there is a batch material whose inspection results are qualified for consecutive times reaching the first value according to the inspection results and historical inspection results. In the case that there is a batch material whose inspection results are qualified for consecutive times reaching the first value, for the accuracy of subsequent inspections, the processor can determine whether there is a batch material whose inspection results are qualified for consecutive times reaching the second value according to the inspection results and historical inspection results. The second value can be set based on actual conditions, and the second value can be set to be larger than the first value. For example, the second value can be set to 10.

[0054] In the case that there is no batch material whose inspection results are qualified for the consecutive times reaching the second value, it can be explained that the supply quality of the supplier of the material has developed from good to poor at this time, and the acceptance standard of the material can be appropriately relaxed. The degree of relaxation in this case is small, and the processor can determine that the rule transfer conditions for transferring the target sampling scheme to the relaxed sampling scheme are met. At this time, the target sampling scheme of other uninspected batch materials of the same type as the batch material can be transferred to the relaxed sampling scheme. When inspecting another uninspected batch material later, the target sampling scheme used can be set to the relaxed sampling scheme.

[0055] In the case where there are batches of materials whose inspection results are qualified for consecutive times reaching the second value, it can be explained that the supply quality of the supplier of the material has developed from good to excellent, and the acceptance standard of the material can be appropriately relaxed. The relaxation degree in this case is relatively large, and the processor can determine that the rule transfer conditions for transferring the target sampling scheme to the inspection-free sampling scheme are met. At this time, the target sampling scheme of other uninspected batches of materials of the same type as the batch material can be transferred to the inspection-free sampling scheme. When inspecting another uninspected batch of materials later, the target sampling scheme used can be set as the inspection-free sampling scheme.

[0056] In an embodiment of the present application, the preset sampling scheme includes a relaxed sampling scheme, and judging whether the rule transfer condition for transferring the target sampling scheme to another sampling scheme is met according to the inspection results and the historical inspection results includes: when the target sampling scheme is a relaxed sampling scheme, judging whether there is a batch of materials whose inspection results are unqualified for a consecutive number of times reaching a first value according to the inspection results and the historical inspection results; when there is a batch of materials whose inspection results are unqualified for a consecutive number of times reaching the first value, determining whether the rule transfer condition for transferring the target sampling scheme to the normal sampling scheme is met.

[0057] The preset sampling scheme includes a relaxed sampling scheme. When the target sampling scheme is a relaxed sampling scheme, the processor can determine whether there are batches of materials whose inspection results are unqualified for consecutive times reaching a first value based on the inspection results and historical inspection results. The first value can be set based on actual conditions, for example, the first value can be set to 5.

[0058] In the case where there are batches of materials whose inspection results are unqualified for a number of consecutive times reaching the first value, it can be indicated that the supply quality of the supplier of the material has improved from poor to good at this time, and the processor can determine that the rule transfer condition for transferring the target sampling scheme to the normal sampling scheme is satisfied. At this time, the target sampling scheme of other uninspected batches of materials of the same type as the batch material can be transferred to the normal sampling scheme. When another uninspected batch of materials is subsequently inspected, the target sampling scheme used can be set to the normal sampling scheme.

[0059] In one embodiment, when the target sampling scheme is a relaxed sampling scheme and there is no batch material whose inspection results are unqualified for a consecutive number of times reaching a first value, the target sampling scheme for other uninspected batch materials of the same type as the batch material may not be transferred to another sampling scheme.

[0060] In an embodiment of the present application, the preset sampling scheme includes a strict sampling scheme, and judging whether the rule transfer condition for transferring the target sampling scheme to another sampling scheme is met according to the inspection results and the historical inspection results includes: when the target sampling scheme is a strict sampling scheme, judging whether there is a batch of materials whose inspection results are qualified for a consecutive number of times reaching a first value according to the inspection results and the historical inspection results; when there is a batch of materials whose inspection results are qualified for a consecutive number of times reaching the first value, determining whether the rule transfer condition for transferring the target sampling scheme to the normal sampling scheme is met.

[0061] The preset sampling scheme includes a strict sampling scheme. When the target sampling scheme is a strict sampling scheme, the processor can determine whether there is a batch of materials whose inspection results are qualified for a continuous number of times reaching a first value based on the inspection results and historical inspection results. The first value can be set based on actual conditions, for example, the first value can be set to 5.

[0062] In the case where there are batches of materials whose inspection results are qualified for a continuous number of times reaching the first value, it can be indicated that the supply quality of the supplier of the material has developed from poor to good at this time, and the processor can determine that the rule transfer condition for transferring the target sampling scheme to the normal sampling scheme is satisfied. At this time, the target sampling scheme of other uninspected batches of materials of the same type as the batch material can be transferred to the normal sampling scheme. When inspecting another uninspected batch of materials later, the target sampling scheme used can be set to the normal sampling scheme.

[0063] In one embodiment, when the target sampling scheme is a strict sampling scheme and there is no qualified inspection result of batch materials that has not reached a first value for a consecutive number of times, the target sampling scheme of other uninspected batch materials of the same type as the batch material may not be transferred to another sampling scheme.

[0064] In an embodiment of the present application, determining whether a rule transfer condition for transferring a target sampling scheme to another sampling scheme is met includes: when the target sampling scheme is an inspection-free sampling scheme, determining whether there are historical quality complaint reports and production quality feedback reports for materials of the same type as the batch material, and obtaining a production work order scheduling report for materials of the same type as the batch material; determining whether a rule transfer condition for transferring the target sampling scheme to another sampling scheme is met based on the determination result of whether a historical quality complaint report exists, the determination result of whether a production work order scheduling report exists, and the production quality feedback report.

[0065] When the target sampling scheme is not a preset sampling scheme, that is, the target sampling scheme is an inspection-free sampling scheme, the processor can determine whether there are historical quality complaint reports and production quality feedback reports for materials of the same type as the batch material, and obtain a production work order scheduling report for materials of the same type as the batch material.

[0066] Among them, the historical quality complaint report defines the quality complaints of materials of the same type as the batch materials. The production quality feedback report defines the quality of the materials of the same type as the batch materials. The production work order scheduling report defines the schedule for the production of materials of the same type as the batch materials.

[0067] The processor can determine whether the rule transfer conditions for transferring the target sampling plan to another sampling plan are met based on the judgment result of whether the historical quality complaint report exists, the judgment result of whether the production work order scheduling report exists, and the production quality feedback report.

[0068] In an embodiment of the present application, judging whether the rule transfer conditions for transferring the target sampling scheme to another sampling scheme are met based on the judgment result of whether a historical quality complaint report exists, the judgment result of whether a production work order scheduling report exists, and the production quality feedback report includes: when the target sampling scheme is an inspection-free sampling scheme, judging whether the number of consecutive days without producing materials of the same type as the batch material reaches a third value based on the production work order scheduling report; when there are historical quality complaint reports and production quality feedback reports, and the number of consecutive days without producing materials of the same type as the batch material reaches a third value, determining that the rule transfer conditions for transferring the target sampling scheme to the normal sampling scheme are met.

[0069] In the case where the target sampling scheme is an inspection-free sampling scheme, the processor can determine whether the number of consecutive days reaches a third value without producing materials of the same type as the batch material based on the production work order scheduling report. Among them, the third value can be set according to the actual situation. For example, the third value can be 60, that is, 3 months. In the case where there are historical quality complaint reports and production quality feedback reports, and the number of consecutive days reaches the third value without producing materials of the same type as the batch material, it can be said that the supply quality of the supplier of the material has developed from good to good at this time, and the processor can determine that the rule transfer conditions for transferring the target sampling scheme to the normal sampling scheme are met. At this time, the target sampling scheme of other uninspected batch materials of the same type as the batch material can be transferred to the normal sampling scheme. When inspecting other uninspected batch materials later, the target sampling scheme used can be set to the normal sampling scheme.

[0070] The above technical scheme, after determining the inspection results of the batch materials, determines whether the rule transfer conditions for transferring the target sampling scheme to another sampling scheme are met; when the rule transfer conditions are met, the target sampling scheme of other uninspected batch materials of the same type as the batch materials is transferred to another sampling scheme, thereby realizing dynamic configuration of the sampling scheme and making material inspection more reasonable.

[0071] like Figure 2 As shown, a flow chart of another material inspection method is provided.

[0072] When inspecting incoming materials, the inspection quantity of the incoming materials can be obtained, and a row of data in the sample size code table can be matched according to the inspection quantity, and the sample size code can be obtained based on the row of data and the sampling level value configured in the inspection standard. The sampling quantity n and the acceptance number Ac of the incoming materials are determined based on the sampling plan of the incoming materials, the sample size code, and the sampling level value configured in the inspection standard. After that, the inspection is carried out based on the sampling quantity n and the acceptance number Ac to obtain the number of sampling failures of the incoming materials, and the inspection report of the incoming materials is generated based on the number of sampling failures. After that, it can be judged whether the rule transfer conditions are met according to the rule transfer plan. If so, the corresponding rule transfer is carried out, and the next sampling inspection is carried out according to the sampling plan after the transfer.

[0073] Through the above technical scheme, the tasks to be inspected for a batch of materials are obtained, and the inspection code values ​​corresponding to the inspection quantity and the sampling level values ​​are matched from the preset sample quantity code table; the sampling quantity and the sampling acceptance value of the batch materials under the target sampling plan are determined according to the inspection code values ​​and the sampling level values; the sampling quantity of materials is drawn from the batch materials, and the drawn materials are inspected according to the target sampling plan to obtain the sampling unqualified quantity of the batch materials; the inspection results of the batch materials are determined according to the sampling unqualified quantity and the sampling acceptance value, and the sampling quantity and the sampling acceptance value are adjusted according to the inspection quantity and the sampling level value in consideration of the actual situation of the incoming materials, and defective products are allowed to appear within a controllable range, thereby improving the fault tolerance rate of incoming material quality management and rationalizing material inspection.

[0074] Figure 1 and 2 FIG. 1 is a flow chart of a material inspection method in one embodiment. It should be understood that although Figure 1 and 2 The steps in the flowchart are shown in sequence as indicated by the arrows, but these steps are not necessarily executed in the order indicated by the arrows. Unless otherwise specified in this document, there is no strict order restriction for the execution of these steps, and these steps can be executed in other orders. Moreover, Figure 1 and 2 At least part of the steps may include multiple sub-steps or multiple stages. These sub-steps or stages are not necessarily executed at the same time, but can be executed at different times. The execution order of these sub-steps or stages is not necessarily sequential, but can be executed in turn or alternately with other steps or at least part of the sub-steps or stages of other steps.

[0075] In one embodiment, a material inspection device is provided, comprising:

[0076] a memory configured to store instructions;

[0077] The processor is configured to call instructions from the memory and implement the above-mentioned material inspection method when executing the instructions.

[0078] In one embodiment, a storage medium is provided, on which a program is stored, and when the program is executed by a processor, the above-mentioned material inspection method is implemented.

[0079] In one embodiment, a processor is provided, and the processor is used to run a program, wherein the above-mentioned material inspection method is executed when the program is run.

[0080] In one embodiment, a computer device is provided. The computer device may be a server, and its internal structure diagram may be as follows: Figure 3As shown. The computer device includes a processor A01, a network interface A02, a memory (not shown in the figure) and a database (not shown in the figure) connected via a system bus. Among them, the processor A01 of the computer device is used to provide computing and control capabilities. The memory of the computer device includes an internal memory A03 and a non-volatile storage medium A04. The non-volatile storage medium A04 stores an operating system B01, a computer program B02 and a database (not shown in the figure). The internal memory A03 provides an environment for the operation of the operating system B01 and the computer program B02 in the non-volatile storage medium A04. The database of the computer device is used to store data such as inspection results of batch materials. The network interface A02 of the computer device is used to communicate with an external terminal through a network connection. When the computer program B02 is executed by the processor A01, a material inspection method is implemented.

[0081] Those skilled in the art will understand that Figure 3 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0082] An embodiment of the present application provides a device, which includes a processor, a memory, and a program stored in the memory and executable on the processor. When the processor executes the program, the following steps are implemented: obtaining tasks to be inspected for a batch of materials, the tasks to be inspected including inspection standards and inspection quantities of the batch materials, the inspection standards including sampling level values ​​and sampling standards, and the sampling standards including a target sampling scheme; matching inspection code values ​​corresponding to the inspection quantity and sampling level values ​​from a preset sample quantity code table; determining the sampling quantity and sampling acceptance value of the batch materials under the target sampling scheme according to the inspection code values ​​and the sampling level values; extracting the sampling quantity of materials from the batch materials, and inspecting the extracted materials according to the target sampling scheme to obtain the sampling unqualified quantity of the batch materials; and determining the inspection results of the batch materials according to the sampling unqualified quantity and the sampling acceptance value.

[0083] In one embodiment, the method further includes: after determining the inspection results of the batch material, determining whether a rule transfer condition for transferring the target sampling scheme to another sampling scheme is met; if the rule transfer condition is met, transferring the target sampling scheme of other uninspected batch materials of the same type as the batch material to another sampling scheme.

[0084] In one embodiment, determining whether a rule transfer condition for transferring a target sampling scheme to another sampling scheme is satisfied includes: when the target sampling scheme is a preset sampling scheme, obtaining historical inspection results of other inspected batch materials of the same type as the batch material; and determining whether a rule transfer condition for transferring the target sampling scheme to another sampling scheme is satisfied based on the inspection results and the historical inspection results.

[0085] In one embodiment, the preset sampling scheme includes a normal sampling scheme, and judging whether the rule transfer condition for transferring the target sampling scheme to another sampling scheme is satisfied according to the inspection results and the historical inspection results includes: when the target sampling scheme is the normal sampling scheme, judging whether there are batches of materials whose inspection results are unqualified for consecutive times reaching a first value according to the inspection results and the historical inspection results; when there are batches of materials whose inspection results are unqualified for consecutive times reaching the first value, determining that the rule transfer condition for transferring the target sampling scheme to the strict sampling scheme is satisfied; when there are batches of materials whose inspection results are unqualified for consecutive times reaching the first value, judging whether the rule transfer condition for transferring the target sampling scheme to the strict sampling scheme is satisfied; when there are batches of materials whose inspection results are unqualified for consecutive times reaching the first value, judging whether the rule transfer condition for transferring the target sampling scheme to the strict sampling scheme is satisfied. Based on the historical inspection results, it is determined whether there are batches of materials whose inspection results are qualified for a consecutive number of times reaching a first value. If there are batches of materials whose inspection results are qualified for a consecutive number of times reaching the first value, it is determined based on the inspection results and the historical inspection results whether there are batches of materials whose inspection results are qualified for a consecutive number of times reaching a second value. If there are no batches of materials whose inspection results are qualified for a consecutive number reaching the second value, it is determined that the rule transfer conditions for transferring the target sampling scheme to the relaxed sampling scheme are met. If there are batches of materials whose inspection results are qualified for a consecutive number reaching the second value, it is determined that the rule transfer conditions for transferring the target sampling scheme to the exemption sampling scheme are met.

[0086] In one embodiment, the preset sampling scheme includes a relaxed sampling scheme, and judging whether a rule transfer condition for transferring the target sampling scheme to another sampling scheme is satisfied based on the inspection results and the historical inspection results includes: when the target sampling scheme is a relaxed sampling scheme, judging whether there are batches of materials whose inspection results are unqualified for a consecutive number of times reaching a first value based on the inspection results and the historical inspection results; when there are batches of materials whose inspection results are unqualified for a consecutive number of times reaching the first value, determining whether the rule transfer condition for transferring the target sampling scheme to the normal sampling scheme is satisfied.

[0087] In one embodiment, the preset sampling scheme includes a strict sampling scheme, and judging whether a rule transfer condition for transferring the target sampling scheme to another sampling scheme is met according to the inspection results and the historical inspection results includes: when the target sampling scheme is a strict sampling scheme, judging whether there is a batch of materials whose inspection results reach a first value for a consecutive number of times and are qualified according to the inspection results and the historical inspection results; when there is a batch of materials whose inspection results reach the first value for a consecutive number of times and are qualified, determining that the rule transfer condition for transferring the target sampling scheme to the normal sampling scheme is met.

[0088] In one embodiment, determining whether a rule transfer condition for transferring a target sampling scheme to another sampling scheme is satisfied includes: when the target sampling scheme is an inspection-free sampling scheme, determining whether there is a historical quality complaint report and a production quality feedback report for materials of the same type as the batch material, and obtaining a production work order scheduling report for materials of the same type as the batch material; determining whether a rule transfer condition for transferring the target sampling scheme to another sampling scheme is satisfied based on a determination result of whether a historical quality complaint report exists, a determination result of whether a production work order scheduling report exists, and a production quality feedback report.

[0089] In one embodiment, judging whether a rule transfer condition for transferring a target sampling scheme to another sampling scheme is satisfied based on a judgment result of whether a historical quality complaint report exists, a judgment result of whether a production work order scheduling report exists, and a production quality feedback report includes: when the target sampling scheme is an inspection-free sampling scheme, judging whether a third value is reached for consecutive days without producing materials of the same type as the batch material based on the production work order scheduling report; when a historical quality complaint report and a production quality feedback report exist, and a third value is reached for consecutive days without producing materials of the same type as the batch material, determining whether the rule transfer condition for transferring the target sampling scheme to the normal sampling scheme is satisfied.

[0090] In one embodiment, determining the inspection result of a batch material according to the number of unqualified samples and the sampling acceptance value includes: when the number of unqualified samples is greater than the sampling acceptance value, determining the inspection result of the batch material is unqualified; when the number of unqualified samples is less than or equal to the sampling acceptance value, determining the inspection result of the batch material is qualified.

[0091] In one embodiment, the sampling standard includes the GB2828 sampling standard and / or the American Standard Zero Defect Sampling Standard.

[0092] The present application also provides a computer program product, which, when executed on a data processing device, is suitable for executing a program that initializes the steps of the material inspection method.

[0093] Those skilled in the art will appreciate that the embodiments of the present application may be provided as methods, systems, or computer program products. Therefore, the present application may adopt the form of a complete hardware embodiment, a complete software embodiment, or an embodiment in combination with software and hardware. Moreover, the present application may adopt the form of a computer program product implemented in one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) that include computer-usable program code.

[0094] The present application is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present application. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0095] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0096] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0097] In a typical configuration, a computing device includes one or more processors (CPU), input / output interfaces, network interfaces, and memory.

[0098] The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory in the form of read-only memory (ROM) or flash RAM. The memory is an example of a computer-readable medium.

[0099] Computer readable media include permanent and non-permanent, removable and non-removable media that can be implemented by any method or technology to store information. Information can be computer readable instructions, data structures, program modules or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), static random access memory (SRAM), dynamic random access memory (DRAM), other types of random access memory (RAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), flash memory or other memory technology, compact disk read-only memory (CD-ROM), digital versatile disk (DVD) or other optical storage, magnetic cassettes, magnetic tape disk storage or other magnetic storage devices or any other non-transmission media that can be used to store information that can be accessed by a computing device. As defined herein, computer readable media does not include temporary computer readable media (transitory media), such as modulated data signals and carrier waves.

[0100] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, commodity or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, commodity or device. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the process, method, commodity or device including the elements.

[0101] The above are only embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various changes and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included within the scope of the claims of the present application.

Claims

1. A material inspection method, characterized in that: The method comprises: Obtaining a task to be inspected for a batch of materials, wherein the task to be inspected includes an inspection standard and an inspection quantity for the batch of materials, wherein the inspection standard includes a sampling level value and a sampling standard, and wherein the sampling standard includes a target sampling plan; Matching and obtaining the inspection code value corresponding to the inspection quantity and the sampling level value from a preset sample size code table; Determine the sampling quantity and sampling acceptance value of the batch material under the target sampling plan according to the inspection code value and the sampling level value; Extracting the sampling quantity of materials from the batch of materials, and inspecting the extracted materials according to the target sampling plan to obtain the sampling unqualified quantity of the batch of materials; The inspection result of the batch of materials is determined according to the sampling unqualified quantity and the sampling acceptance value.

2. The material inspection method according to claim 1, characterized in that: The method further comprises: After determining the inspection result of the batch of materials, determining whether a rule transfer condition for transferring the target sampling scheme to another sampling scheme is satisfied; When the rule transfer condition is met, the target sampling plan of other uninspected batch materials of the same type as the batch material is transferred to the other sampling plan.

3. The material inspection method according to claim 2, characterized in that: The determination of whether the rule transfer condition for transferring the target sampling scheme to another sampling scheme is satisfied includes: When the target sampling scheme is a preset sampling scheme, obtaining historical inspection results of other inspected batches of materials of the same type as the batch of materials; Whether a rule transfer condition for transferring the target sampling scheme to another sampling scheme is satisfied is determined based on the inspection result and the historical inspection result.

4. The material inspection method according to claim 3, characterized in that: The preset sampling scheme includes a normal sampling scheme, and the rule transfer condition for determining whether the target sampling scheme is transferred to another sampling scheme according to the inspection result and the historical inspection result is satisfied includes: In the case where the target sampling scheme is a normal sampling scheme, judging whether there is a batch of materials whose inspection results are unqualified for a consecutive number of times reaching a first value according to the inspection results and the historical inspection results; In the case where there are batches of materials whose inspection results are unqualified for a number of consecutive times reaching the first value, determining that a rule transfer condition for transferring the target sampling scheme to a strict sampling scheme is satisfied; In the case that there is no batch of materials whose inspection results are unqualified for consecutive times reaching the first value, judging whether there is a batch of materials whose inspection results are qualified for consecutive times reaching the first value according to the inspection result and the historical inspection results; In the case that the inspection results of batches of materials that have reached the first value consecutively are all qualified, judging whether the inspection results of batches of materials that have reached the second value consecutively are qualified according to the inspection results and the historical inspection results; In the case that there is no batch of materials whose inspection results are qualified for the consecutive number of times reaching the second value, determining that a rule transfer condition for transferring the target sampling scheme to the relaxed sampling scheme is satisfied; In the case that there are batches of materials whose inspection results are qualified for a consecutive number of times reaching a second value, it is determined that a rule transfer condition for transferring the target sampling scheme to an inspection-exempt sampling scheme is satisfied.

5. The material inspection method according to claim 3, characterized in that: The preset sampling scheme includes a relaxed sampling scheme, and the rule transfer condition for determining whether the target sampling scheme is transferred to another sampling scheme according to the inspection result and the historical inspection result is satisfied includes: In the case where the target sampling scheme is a relaxed sampling scheme, judging whether there is a batch of materials whose inspection results are unqualified for a consecutive number of times reaching a first value according to the inspection results and the historical inspection results; In the case that the inspection results of the batch materials are unqualified for a number of consecutive times reaching a first value, it is determined that a rule transfer condition for transferring the target sampling scheme to a normal sampling scheme is satisfied.

6. The material inspection method according to claim 3, characterized in that: The preset sampling scheme includes a strict sampling scheme, and the rule transfer condition for determining whether the target sampling scheme is transferred to another sampling scheme according to the inspection result and the historical inspection result is satisfied includes: In the case where the target sampling scheme is a strict sampling scheme, judging whether there is a batch of materials whose inspection results are qualified for a consecutive number of times reaching a first value according to the inspection results and the historical inspection results; In the case that there are batches of materials whose inspection results are qualified for a consecutive number of times reaching a first value, it is determined that a rule transfer condition for transferring the target sampling scheme to a normal sampling scheme is satisfied.

7. The material inspection method according to claim 2, characterized in that: The determination of whether the rule transfer condition for transferring the target sampling scheme to another sampling scheme is satisfied includes: In the case where the target sampling scheme is an inspection-free sampling scheme, determine whether there are historical quality complaint reports and production quality feedback reports for materials of the same type as the batch of materials, and obtain a production work order scheduling report for materials of the same type as the batch of materials; Based on the judgment result of whether the historical quality complaint report exists, the judgment result of whether the production work order scheduling report exists, and the production quality feedback report, it is judged whether the rule transfer conditions for transferring the target sampling plan to another sampling plan are met.

8. The material inspection method according to claim 7, characterized in that: The judgment result of whether the historical quality complaint report exists, the judgment result of whether the production work order scheduling report exists, and the production quality feedback report determine whether the rule transfer condition for transferring the target sampling scheme to another sampling scheme is met, including: In the case where the target sampling scheme is an inspection-free sampling scheme, judging, according to the production work order scheduling report, whether a third value is reached for consecutive days during which materials of the same type as the batch material are not produced; When the historical quality complaint report and the production quality feedback report exist, and the number of consecutive days without producing materials of the same type as the batch material reaches a third value, it is determined that the rule transfer conditions for transferring the target sampling plan to the normal sampling plan are met.

9. The material inspection method according to claim 1, characterized in that: Determining the inspection result of the batch material according to the sampling unqualified quantity and the sampling acceptance value includes: When the number of unqualified samples is greater than the sampling acceptance value, determining that the inspection result of the batch of materials is unqualified; When the number of unqualified samples is less than or equal to the sampling acceptance value, the inspection result of the batch of materials is determined to be qualified.

10. The material inspection method according to any one of claims 1 to 9, characterized in that: The sampling standards include GB2828 sampling standards and / or American standard zero defect sampling standards.

11. A material inspection device, characterized in that: The device comprises: a memory configured to store instructions; A processor is configured to call the instructions from the memory and implement the material inspection method according to any one of claims 1 to 9 when executing the instructions.

12. A machine-readable storage medium having instructions stored thereon, characterized in that: When the instruction is executed by a processor, the processor is configured to execute the material inspection method according to any one of claims 1 to 9.