Switching and discharging control method of box-type mobile power supply

By grouping, setting the discharge sequence and adjusting the discharge power in the box-type mobile power switching and discharge control methods, the problem of unreasonable discharge progress differences and position relationships in the box-type mobile power switching and discharge control is solved, and the priority discharge and use balance of the box-type mobile power supply is achieved.

CN119727064AActive Publication Date: 2025-03-28SHANGHAI SHIP & SHIPPING RES INST CO LTD +1
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202411811771.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-10
Publication Date
2025-03-28
Estimated Expiration
2044-12-10

AI Technical Summary

Technical Problem

The prior art has problems such as differences in discharge progress and unreasonable position relationships in the switching and discharge control of box-type mobile power supplies, which leads to the need to reverse the box during battery replacement, and some box-type mobile power supplies have not been used for a long time.

Method used

A method for switching and discharge control of box-type mobile power is proposed. By assigning a unique identifier to each box-type mobile power supply, grouping and setting the discharge sequence, adjusting the discharge power, ensuring that the discharge progress of each set of box-type mobile power supply is basically consistent, and priority is given to the use of box-type mobile power supply that has not been used for a long time during battery replacement.

Benefits of technology

The priority discharge of box-type mobile power is realized, which avoids the box-turning phenomenon during battery replacement, and ensures the consistent discharge progress of each set of box-type mobile power supply, improving the battery swap efficiency and the balance of use of box-type mobile power supply.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119727064A_ABST
    Figure CN119727064A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of marine box-type mobile power supply switching, in particular to a box-type mobile power supply switching and discharging control method, which comprises the following steps of: S1, endowing all box-type mobile power supplies with unique identifiers; s2, grouping the box-type mobile power supplies; s3, a discharging sequence is set, and the box-type mobile power source with the discharging sequence being 1 is put into the box-type mobile power source; s4, setting initial discharge power; s5, the SOC state is checked; s6, adjusting the discharge power of the box-type mobile power supply with overlarge SOC deviation; s7, switching the box-type mobile power supply with the SOC reaching the lower limit to the next available box-type mobile power supply; s8, checking a fault alarm, and performing control according to the type of fault alarm information to eliminate the alarm; and adjusting the position of the unused power supply and the discharging sequence. According to the invention, the discharging progress of each battery pack is consistent, the box does not fall during battery replacement, and the whole box type mobile power supply which is not used for a long time is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of switching of a box-type mobile power supply for ships, and in particular to a switching and discharge control method of a box-type mobile power supply. Background Art

[0002] Pure battery-powered ships are attracting more and more attention from shipping companies due to their advantages of zero emissions, high efficiency, and low operating and maintenance costs. Compared with small ships, medium and large pure battery-powered ships have longer ranges and higher power requirements, and their battery capacity is higher. If they are charged at berth, the berthing time is difficult to meet the charging requirements. Generally, a battery replacement mode is adopted, that is, a standard box-type mobile power supply is used on board, and the box-type mobile power supply is quickly replaced during loading and unloading at the port.

[0003] According to the voyage length and power requirements of each ship, different numbers of box-type mobile power supplies are required. They are generally deployed on the main deck and arranged in a*b*c (a row, b column, c layer, the longitudinal direction of the ship is the row, the transverse direction of the ship is the column, and the vertical direction of the ship is the layer). The numbering rule of the box-type mobile power supply is "box-type mobile power supply xyz", where x represents the row, y represents the column, and z represents the layer. The arrangement is shown in the figure below: Figure 1 shown.

[0004] If a single ship has a small number of box-type mobile power supplies and all are connected to a DC distribution board, all box-type mobile power supplies do not involve switching, and the discharge strategy is controlled by the ship's energy management system (EMS system). If a single ship has a large number of box-type mobile power supplies, the box-type mobile power supplies are generally grouped first and divided into N groups on average. Each group can only put one box-type mobile power supply into operation at the same time, that is, the propulsion power and daily load power supply of the entire ship are provided by N box-type mobile power supplies. When the SOC of the N box-type mobile power supplies is lower than the preset value, it automatically switches to another N box-type mobile power supplies.

[0005] At present, a patent has been proposed to provide a box-type mobile power switching method (patent number: 202211043900.5). First, all box-type mobile power supplies are grouped and the discharge order of each box-type mobile power supply in each group is assigned. The logic of the discharge order assignment is as follows:

[0006] No other box-type mobile power supply electrical equipment is involved within 3m of each box-type mobile power supply emergency exhaust vent:

[0007] In this scenario, the discharge order of each box-type mobile power supply in each group can be customized. Each box-type mobile power supply in the group is assigned a discharge order and identified by numbers, such as 1 represents the first discharge and M represents the Mth discharge. The discharge order of each group is "1-2-...-M". Each time a switch is made, the corresponding box-type mobile power supply of each group is put into operation according to the discharge order.

[0008] There is at least one box-type mobile power supply emergency exhaust port within 3m and some box-type mobile power supply electrical equipment is involved:

[0009] First, set the discharge order of group 1. The order can be customized. According to the size of the box-type mobile power supply and the horizontal and vertical distances between the box-type mobile power supplies, design the discharge order of the M box-type mobile power supplies in group 2 to ensure that each box-type mobile power supply in group 2 is more than 3m away from the emergency exhaust vent of the box-type mobile power supply with the same discharge order as group 1. According to the discharge order of group 2, according to the above discharge order design principles, design the discharge order of group 3 until the discharge order of N groups of box-type mobile power supplies is fully set.

[0010] The discharge order of each group is "1-2-...-M". Each time the switch is made, the corresponding box-type mobile power supply of each group is put into operation according to the discharge order.

[0011] Patent 202211043900.5 gives an example. A ship is equipped with 36 box-type mobile power supplies, and every 6 box-type mobile power supplies are divided into 1 group, for a total of 6 groups. The discharge order of Group 1 to Group 6 is shown in the figure below. Each block represents a box-type mobile power supply, and the number in the block represents the discharge order of the box-type mobile power supply. The discharge order of each group is "1-2-3-4-5-6". The ship-wide energy management system (hereinafter referred to as the EM step S system) controls each group of box-type mobile power supplies with the same discharge order to be connected to the DC distribution board for discharge to provide energy for the entire ship.

[0012] At present, there is a patent that provides a box-type mobile power switching method (patent number: 202211043900.5), but this patent is applicable to the scenario where all box-type mobile power supplies are replaced after the ship arrives at the battery swap station. In general, the battery power calculation of the entire ship takes into account the worst working conditions, such as headwind, headwind, etc. During the normal operation stage of the ship, the probability of the above-mentioned severe working conditions is relatively low. When the ship arrives at the battery swap station, some box-type mobile power supplies are still fully charged and do not need to be replaced. If the switching method provided by the existing patent is adopted, the box will be reversed, that is, the fully charged box-type mobile power supply is located above the box-type mobile power supply to be replaced. During the lifting operation, the fully charged box-type mobile power supply needs to be temporarily lifted to other locations, and the box-type mobile power supply to be replaced below needs to be lifted off the ship.

[0013] According to the control method proposed in patent 202211043900.5, the grouping and discharge order of box-type mobile power supplies are as follows Figure 2 Assume that in a certain voyage, there is a box-type mobile power bank with a discharge order of 6 that is fully charged and does not need to be replaced. At this time, groups 1, 2, 4, and 5 all need to be replaced to complete the battery replacement operation, which greatly affects the battery replacement efficiency.

[0014] At the same time, the above patent cannot guarantee that the use time of all box-type mobile power supplies is as balanced as possible. If the sea and weather conditions of the ship are good for a period of time, only some box-type mobile power supplies are replaced each time they arrive at the battery swap station. In the switching logic provided by the existing patent, after each battery swap is completed, the discharge order needs to be reset, and the discharge starts from the box-type mobile power supply with a discharge order of 1. This will result in that the box-type mobile power supplies that have not been replaced will not be discharged during this period, affecting the balance of the use time of the box-type mobile power supplies.

[0015] At the same time, in the existing control strategy, the discharge power of each group of box-type mobile power supplies is the same, and it cannot be dynamically adjusted according to the number of box-type mobile power supplies and the actual SOC. This may cause one or several groups of box-type mobile power supplies to have been discharged, but some groups of box-type mobile power supplies are still discharging. In this scenario, since one or more groups of box-type mobile power supplies cannot be discharged, the overall discharge power cannot meet the load requirements, which will cause the ship to slow down or prioritize the tripping of non-important loads. Summary of the invention

[0016] In order to solve the technical problems in the prior art that the discharge progress of each group of box-type mobile power supplies is different and the position relationship is unreasonable, which may result in the need to reverse the box when replacing the power and some box-type mobile power supplies have not been used for a long time, the present invention proposes a switching and discharge control method of the box-type mobile power supplies, so as to realize the priority discharge of the upper box-type mobile power supplies, and ensure that the discharge progress of each group of box-type mobile power supplies is basically consistent and the box is not reversed when replacing the power; when replacing the power, the position and discharge order of the box-type mobile power supplies are adjusted, and the whole box-type mobile power supplies that have not been used for a long time are given priority.

[0017] The technical solution of the present invention is:

[0018] A switching and discharge control method for a box-type mobile power source, comprising:

[0019] Step S1, assigning a unique identifier to all box-type mobile power supplies;

[0020] Step S2, grouping the box-type mobile power supplies according to the total number of the configured box-type mobile power supplies, the maximum output power of the box-type mobile power supplies, and the output power requirement;

[0021] Step S3, setting a discharge order according to the position of each box-type mobile power source in the group, and putting the box-type mobile power sources with a discharge order of 1 into all groups;

[0022] Step S4, setting the initial discharge power of the box-type mobile power supply in proportion to the number of each group of box-type mobile power supplies;

[0023] Step S5, regularly checking the state of charge (SOC) of all the box-type mobile power supplies that are discharging. If there is a box-type mobile power supply whose SOC deviation exceeds the set value, execute step S6; if there is a box-type mobile power supply whose SOC reaches the lower limit, execute step S7; if there is no abnormality in SOC, execute step S8;

[0024] Step S6, calculating the discharge power adjustment deviation amount according to the SOC deviation calculated in step S5 and the preset SOC deviation tolerance, and adjusting the discharge power of the box-type mobile power supply;

[0025] Step S7, check whether the group of the box-type mobile power source whose SOC reaches the lower limit has an available box-type mobile power source, if there is an available box-type mobile power source, switch to the next available box-type mobile power source, and then return to step S4; if there is no available box-type mobile power source, record the identifier of the box-type mobile power source to set B, start the standby diesel generator set, if the available power on the grid is still insufficient, limit the propulsion power, unload the daily load in stages, then cut off the box-type mobile power source in set B, and return to step S4;

[0026] Step S8, check the fault alarm of the box-type mobile power supply, and determine the alarm type, which is divided into a power reduction type alarm and a shutdown type alarm, and control different types of alarms separately; if it is a power reduction type alarm, adjust the discharge power of the box-type mobile power supply with the power reduction type alarm, and return to step S4; if it is a shutdown type alarm, switch the box-type mobile power supply with the shutdown type alarm, and return to step S4.

[0027] In step S2, the grouping method is specifically:

[0028] Step S21, according to the total number of configured box-type mobile power supplies, the maximum output power of the box-type mobile power supplies, and the required power, the number of groups N to be divided is calculated, and the calculation formula is:

[0029]

[0030] Among them, P need is the required power, K is the total number of box-type mobile power supplies, P max The maximum output power of the box-type mobile power supply;

[0031] Step S22, according to the number of groups N calculated in step S21, calculate the basic number M of the box-type mobile power supplies in each group, and the calculation formula is:

[0032] K÷N=M……P

[0033] Step S23, according to the basic number M of the box-type mobile power supplies calculated in step S22, M box-type mobile power supplies are allocated to each group, and then P groups are selected, and 1 box-type mobile power supply is allocated to each group.

[0034] In step S3, the method for setting the discharge order within the group is: the discharge order of each group of box-type mobile power supplies is numbered from the top to the bottom and from the stern to the bow.

[0035] In step S4, the calculation method of the initial discharge power of the box-type mobile power supply is:

[0036] P i =P need *X i / (X1+X2+……+X N ), i=1,2……N

[0037] Among them, P i is the initial discharge power of the box-type mobile power supply of group i, P need is the required power, X i is the number of box-type mobile power supplies contained in the i-th group of box-type mobile power supplies.

[0038] In step S5, the method for calculating the SOC deviation is:

[0039] SOC deviation = |actual SOC - theoretical SOC|

[0040] in,

[0041] Theoretical SOC = Initial SOC - P i *Discharge time

[0042] The SOC represents the state of charge of the box-type mobile power supply.

[0043] In step S6, the method for adjusting the discharge power of the box-type mobile power supply is:

[0044] Step S61, marking all the box-type mobile power supplies whose SOC deviation is greater than a preset tolerance;

[0045] Step S62, for each of the box-type mobile power supplies marked in step S61, calculate the deviation D1 between the rated discharge power and the actual discharge power of the box-type mobile power supply, and the deviation D2 between the rated power and the actual discharge power of the branch DC-DC, and calculate the discharge power adjustment deviation according to the preset proportional factor, and the calculation formula is:

[0046] Discharge power adjustment deviation = min{D1, D2}*proportional factor;

[0047] Step S63, for a box-type mobile power supply whose actual SOC is lower than the theoretical SOC, the adjusted discharge power = actual discharge power - discharge power adjustment deviation; for a box-type mobile power supply whose actual SOC is higher than the theoretical SOC, the adjusted discharge power = actual discharge power + discharge power adjustment deviation;

[0048] Step S64, real-time monitoring of the box-type mobile power supply whose discharge power is adjusted in step S63, and when the SOC deviation is less than a preset tolerance, adjusting the discharge power to the initial discharge power.

[0049] In step S8, the method for controlling different types of alarms is:

[0050] Step S81: For a power reduction type alarm, based on the required power and the maximum power that can be output by all normally operating box-type mobile power supplies, the maximum reducible power is calculated, and the discharge power of the box-type mobile power supply with a power reduction type alarm is adjusted according to the maximum reducible power; when the box-type mobile power supply with a power reduction type alarm completes the discharge, step S7 is executed;

[0051] Step S82: For a shutdown type alarm, check whether the group of the box-type mobile power supply to which the shutdown type alarm belongs has an available box-type mobile power supply. If there is an available box-type mobile power supply, switch to the next available box-type mobile power supply, and then return to step S4; if there is no available box-type mobile power supply, record the identifier of the box-type mobile power supply to set A, start the standby diesel generator set, and if the available power on the grid is still insufficient, limit the propulsion power, unload the daily load in stages, and then cut off the box-type mobile power supply in set A, and return to step S4.

[0052] In step S81, the maximum power reduction formula is:

[0053]

[0054] Where P is the maximum power that can be reduced, P max is the maximum output power of the box-type mobile power supply, n1 is the number of the box-type mobile power supplies with power reduction type alarm, and n2 is the number of the box-type mobile power supplies that are discharging and have no power reduction type alarm.

[0055] Based on the unique identifier assigned to the box-type mobile power supply in step S1, a database is established to record the identifiers of all the box-type mobile power supplies in the danger zone when the box-type mobile power supply corresponding to the identifier has thermal runaway.

[0056] When there is a box-type mobile power supply that has not been used for a long time, the box-type mobile power supply that has not been used for a long time is moved to the front position of the discharge order of the group when replacing the power, and is set to be discharged with priority.

[0057] The present invention proposes a switching and discharge control method for a box-type mobile power source, which determines the discharge order of the box-type mobile power source according to the position, thereby ensuring that all fully charged box-type mobile power sources are located below the box-type mobile power source to be replaced, thereby avoiding box overturning during the power replacement operation; the present invention sets the initial discharge power and adjusts the discharge speed according to the SOC, thereby making the discharge progress of each group of mobile power sources consistent.

[0058] If there are box-type mobile power supplies that have not been used for a long time, the present invention places the box-type mobile power supplies that have not been used for a long time on the top layer during the battery replacement operation, and sets them to be discharged first to ensure that the usage time of all box-type mobile power supplies is as balanced as possible. BRIEF DESCRIPTION OF THE DRAWINGS

[0059] Figure 1 This is a schematic diagram of the arrangement of box-type mobile power supplies.

[0060] Figure 2 This is a discharge sequence diagram of the prior art.

[0061] Figure 3 The present invention is a flow chart of a switching and discharge control method of a box-type mobile power supply.

[0062] Figure 4 The figure is a layout diagram of a box-type mobile power supply according to an embodiment of the present invention.

[0063] Figure 5 This is a schematic diagram of grouping a box-type mobile power supply according to an embodiment of the present invention.

[0064] Figure 6 This is a discharge sequence diagram of each group of box-type mobile power supplies according to an embodiment of the present invention. DETAILED DESCRIPTION

[0065] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments.

[0066] The present invention discloses a switching and discharge control method of a box-type mobile power source, such as Figure 3 As shown, the following steps are included:

[0067] Step S1, assigning a unique identifier to all box-type mobile power supplies, which can be identified by the IP address of each box-type mobile power supply, or by other information.

[0068] Step S2, grouping the box-type mobile power supplies according to the total number of the configured box-type mobile power supplies, the maximum output power of the box-type mobile power supplies, and the output power requirement, and the specific grouping method is:

[0069] Step S21, according to the total number of configured box-type mobile power supplies, the maximum output power of the box-type mobile power supplies, and the required power, the number of groups N to be divided is calculated, and the calculation formula is:

[0070]

[0071] Among them, P need is the required power, K is the total number of box-type mobile power supplies, P max It is the maximum output power of the box-type mobile power supply.

[0072] Step S22, according to the number of groups N calculated in step S21, calculate the basic number M of the box-type mobile power supplies in each group, and the calculation formula is:

[0073] K÷N=M……P

[0074] Step S23, according to the basic number M of the box-type mobile power supplies calculated in step S22, M box-type mobile power supplies are allocated to each group, and then P groups are selected, and 1 box-type mobile power supply is allocated to each group.

[0075] After all the box-type mobile power supplies are grouped, only one box-type mobile power supply is put into each group at the same time to ensure that the maximum output power of N box-type mobile power supplies meets the power requirements of the entire ship.

[0076] In order to facilitate the crew's later management and use, all box-type mobile power supplies in each group should be arranged as centrally as possible, in a unified vertical arrangement or a unified horizontal arrangement, and try to avoid the situation where a group of box-type mobile power supplies has both horizontal and vertical arrangements.

[0077] For example, Figure 4 As shown in the figure, a ship is equipped with 10 box-type mobile power supplies, which are stacked into 6 piles, of which 4 piles have 2 layers and the other 2 piles have 1 layer. If it is calculated that 4 groups of box-type mobile power supplies are needed to meet the required power, that is, N = 4, then one grouping method is as follows Figure 5 As shown. There are 4 groups in total, 2 groups have 3 box-type mobile power supplies, and 2 groups have 2 box-type mobile power supplies.

[0078] Step S3, setting the discharge order according to the position of each box-type mobile power source in the group, and putting the box-type mobile power sources with the discharge order of 1 into all groups.

[0079] According to the direction from top to bottom and from stern to bow, each box-type mobile power supply in the group is assigned a discharge sequence, which is identified by numbers, such as 1 represents the first discharge, M represents the Mth discharge, and the discharge sequence of each group is "1-2-...-M". Each time switching occurs, the corresponding box-type mobile power supply of each group is put into operation according to the discharge sequence.

[0080] exist Figure 4 , Figure 5 In the example, the result of setting the discharge sequence according to the method in step S3 is as follows Figure 6 As shown, it is ensured that there is no box-type mobile power supply with a higher discharge order above any box-type mobile power supply. In this way, the box-type mobile power supply at the upper position is discharged earlier, avoiding box reversal during battery replacement.

[0081] Step S4, according to the number of each group of box-type mobile power supplies, the initial discharge power of the box-type mobile power supplies is set in proportion, and the calculation method of the initial discharge power of the box-type mobile power supplies is:

[0082] P i =P need *X i / (X1+X2+……+X N ), i=1,2……N

[0083] Among them, P i is the initial discharge power of the box-type mobile power supply of the i-th group, X i is the number of box-type mobile power supplies contained in the i-th group of box-type mobile power supplies.

[0084] Step S5, regularly checking the state of charge (SOC) of all the box-type mobile power supplies that are discharging. If there is a box-type mobile power supply whose SOC deviation exceeds the set value, executing step S6, adjusting the discharge power of the box-type mobile power supply whose SOC deviation exceeds the set value; if there is a box-type mobile power supply whose SOC reaches the lower limit, executing step S7, switching the box-type mobile power supply whose SOC reaches the lower limit; if there is no abnormality in the SOC, executing step S8, regularly checking the fault alarm of the box-type mobile power supply;

[0085] The method for calculating the SOC deviation is:

[0086] SOC deviation = |actual SOC - theoretical SOC|

[0087] in,

[0088] Theoretical SOC = Initial SOC - P i *Discharge time

[0089] Step S6, after the box-type power supply has been running for a period of time, due to reasons such as control accuracy, there may be a certain deviation between the actual SOC of the box-type mobile power supply and the expected value, and the discharge power needs to be adjusted so that the actual SOC of the box-type mobile power supply meets expectations and the discharge progress of each group of box-type mobile power supplies is basically consistent. The discharge power of the box-type mobile power supply is adjusted by calculating the discharge power adjustment deviation, and the method for adjusting the discharge power of the box-type mobile power supply is as follows:

[0090] Step S61, marking all the box-type mobile power supplies whose SOC deviation is greater than a preset tolerance;

[0091] Step S62, for each of the box-type mobile power supplies marked in step S61, calculate the deviation D1 between the rated discharge power and the actual discharge power of the box-type mobile power supply, and the deviation D2 between the rated power and the actual discharge power of the branch DC-DC, and calculate the discharge power adjustment deviation according to the preset proportional factor, and the calculation formula is:

[0092] Discharge power adjustment deviation = min{D1, D2}*proportional factor;

[0093] Step S63, for a box-type mobile power supply whose actual SOC is lower than the theoretical SOC, the adjusted discharge power = actual discharge power - discharge power adjustment deviation; for a box-type mobile power supply whose actual SOC is higher than the theoretical SOC, the adjusted discharge power = actual discharge power + discharge power adjustment deviation;

[0094] Step S64, real-time monitoring of the box-type mobile power supply whose discharge power is adjusted in step S63, and when the SOC deviation is less than a preset tolerance, adjusting the discharge power to the initial discharge power.

[0095] Step S7, check whether there is an available box-type mobile power supply in the group where the box-type mobile power supply whose SOC reaches the lower limit is located. If there is an available box-type mobile power supply, manually / automatically cut off the low SOC box-type power supply, and manually / automatically put the box-type power supply in the next discharge order of the group into use, and then return to step S4; if there is no available box-type mobile power supply, skip the low SOC box-type power supply, temporarily keep it in network operation, and record the identifier of the box-type mobile power supply to set B.

[0096] After all low SOC box-type power supplies have been judged, check the length of set B. If the length of set B is 0, it means that all low SOC box-type power supplies have been replaced. If the length of set B is greater than 0, manually / automatically start the standby diesel generator set. If the available power on the grid is insufficient, limit the propulsion power and unload the daily load in stages. Then, cut off the box-type mobile power supplies in set B one by one, and return to step S4.

[0097] Step S8, regularly check the fault alarm of the box-type mobile power supply and determine the alarm type, which is divided into a power reduction type alarm and a shutdown type alarm; if it is a power reduction type alarm, execute step S81, adjust the discharge power of the box-type mobile power supply with the power reduction type alarm, and return to step S4; if it is a shutdown type alarm, execute step S82, switch the box-type mobile power supply with the shutdown type alarm, and return to step S4.

[0098] Step S81 includes: calculating the maximum power reduction based on the required power and the maximum power output of all normally operating box-type mobile power supplies, and the calculation formula is:

[0099]

[0100] Where P is the maximum power that can be reduced, P max is the maximum output power of the box-type mobile power supply, n1 is the number of the box-type mobile power supplies with power reduction type alarm, and n2 is the number of the box-type mobile power supplies that are discharging and have no power reduction type alarm.

[0101] The discharge power of the box-type mobile power supply with a power reduction type alarm is adjusted according to the maximum power reduction power; after the box-type mobile power supply with a power reduction type alarm completes the discharge, step S7 is executed.

[0102] Step S82 includes: checking whether the group of the box-type mobile power supply that has a shutdown type alarm has an available box-type mobile power supply, and if there is an available box-type mobile power supply, manually / automatically cutting off the alarm box-type power supply, and manually / automatically switching on the box-type power supply of the next discharge order in the group, and then returning to step S4 to ensure that the overall discharge progress of each group of box-type power supplies is basically consistent; if there is no available box-type mobile power supply, skip the alarm box-type power supply, temporarily keep it running on the network, and record the identifier of the box-type mobile power supply to set A.

[0103] After all shutdown type alarm judgments are completed, check the length of set A. If the length of set A is 0, it means that all shutdown alarm box-type power supplies have been replaced; if the length of set A is greater than 0, manually / automatically start the standby diesel generator set. If the available power on the grid is insufficient, limit the propulsion power and unload the daily load in stages, then cut off the box-type mobile power supplies in the set A one by one, and return to step S4.

[0104] When there is a box-type mobile power source that has not been used for a long time, the box-type mobile power source that has not been used for a long time is moved to the front position of the discharge order of the group when replacing the power, and the discharge order is set to the highest priority discharge.

[0105] When a box-type power supply has thermal runaway, it is necessary to cut off all box-type power supplies in the danger zone. Based on the actual layout of the box-type power supplies, calculate the danger zone of each box-type power supply. Based on the unique identifier assigned to the box-type mobile power supply in step S1, establish a database to record the identifiers of all the box-type mobile power supplies in the danger zone when the box-type mobile power supply corresponding to the identifier has thermal runaway, so as to facilitate the subsequent quick query of the box-type power supply that needs to be powered off corresponding to a box-type power supply with thermal runaway.

[0106] It should be noted that the above-described specific implementations can enable those skilled in the art to more fully understand the invention, but do not limit the invention in any way. Therefore, although this specification has described the invention in detail with reference to the drawings and embodiments, those skilled in the art should understand that the invention can still be modified or replaced by equivalents. In short, all technical solutions and improvements that do not deviate from the spirit and scope of the invention should be included in the protection scope of the patent for the invention.

Claims

1. A switching and discharge control method for a box-type mobile power source, characterized in that: Step S1, assigning a unique identifier to all box-type mobile power supplies; Step S2, grouping the box-type mobile power supplies according to the total number of the configured box-type mobile power supplies, the maximum output power of the box-type mobile power supplies, and the output power requirement; Step S3, setting a discharge order according to the position of each box-type mobile power source in the group, and putting the box-type mobile power sources with a discharge order of 1 into all groups; Step S4, setting the initial discharge power of the box-type mobile power supply in proportion to the number of each group of box-type mobile power supplies; Step S5, regularly checking the state of charge (SOC) of all the box-type mobile power supplies that are discharging. If there is a box-type mobile power supply whose SOC deviation exceeds the set value, execute step S6; if there is a box-type mobile power supply whose SOC reaches the lower limit, execute step S7; if there is no abnormality in SOC, execute step S8; Step S6, calculating the discharge power adjustment deviation amount according to the SOC deviation calculated in step S5 and the preset SOC deviation tolerance, and adjusting the discharge power of the box-type mobile power supply; Step S7, check whether the group of the box-type mobile power source whose SOC reaches the lower limit has an available box-type mobile power source, if there is an available box-type mobile power source, switch to the next available box-type mobile power source, and then return to step S4; if there is no available box-type mobile power source, record the identifier of the box-type mobile power source to set B, start the standby diesel generator set, if the available power in the grid is still insufficient, limit the propulsion power, unload the daily load in stages, then cut off the box-type mobile power source in the set B, and return to step S4; Step S8, check the fault alarm of the box-type mobile power supply, and determine the alarm type, which is divided into a power reduction type alarm and a shutdown type alarm, and control different types of alarms separately; if it is a power reduction type alarm, adjust the discharge power of the box-type mobile power supply with the power reduction type alarm, and return to step S4; if it is a shutdown type alarm, switch the box-type mobile power supply with the shutdown type alarm, and return to step S4.

2. A method for switching and discharging control of a box-type mobile power source according to claim 1, characterized in that: In step S2, the grouping method is specifically: Step S21, according to the total number of configured box-type mobile power supplies, the maximum output power of the box-type mobile power supplies, and the required power, the number of groups N to be divided is calculated, and the calculation formula is: Among them, P need is the required power, K is the total number of box-type mobile power supplies, P max The maximum output power of the box-type mobile power supply; Step S22, according to the number of groups N calculated in step S21, calculate the basic number M of the box-type mobile power supplies in each group, and the calculation formula is: K÷N=M……P Step S23, according to the basic number M of the box-type mobile power supplies calculated in step S22, M box-type mobile power supplies are allocated to each group, and then P groups are selected, and 1 box-type mobile power supply is allocated to each group.

3. The switching and discharging control method of a box-type mobile power source according to claim 1, characterized in that: In step S3, the method for setting the discharge order within the group is: the discharge order of each group of box-type mobile power supplies is numbered from the top to the bottom and from the stern to the bow.

4. The switching and discharging control method of a box-type mobile power source according to claim 1, characterized in that: In step S4, the calculation method of the initial discharge power of the box-type mobile power supply is: P i =P need *X i / (X1+X2+……+X N ),i=1,2......N Among them, P i is the initial discharge power of the box-type mobile power supply of group i, P need is the required power, X i is the number of box-type mobile power supplies contained in the i-th group of box-type mobile power supplies.

5. The switching and discharging control method of a box-type mobile power source according to claim 1, characterized in that: In step S5, the method for calculating the SOC deviation is: SOC deviation = |actual SOC - theoretical SOC| in, Theoretical SOC = Initial SOC - P i *Discharge time The SOC represents the state of charge of the box-type mobile power supply.

6. The switching and discharging control method of a box-type mobile power source according to claim 1, characterized in that: In step S6, the method for adjusting the discharge power of the box-type mobile power supply is: Step S61, marking all the box-type mobile power supplies whose SOC deviation is greater than a preset tolerance; Step S62, for each of the box-type mobile power supplies marked in step S61, calculate the deviation D1 between the rated discharge power and the actual discharge power of the box-type mobile power supply, and the deviation D2 between the rated power and the actual discharge power of the branch DC-DC, and calculate the discharge power adjustment deviation according to the preset proportional factor, and the calculation formula is: Discharge power adjustment deviation = min{D1, D2}*proportional factor; Step S63, for a box-type mobile power supply whose actual SOC is lower than the theoretical SOC, the adjusted discharge power = actual discharge power - discharge power adjustment deviation; for a box-type mobile power supply whose actual SOC is higher than the theoretical SOC, the adjusted discharge power = actual discharge power + discharge power adjustment deviation; Step S64, real-time monitoring of the box-type mobile power supply whose discharge power is adjusted in step S63, and when the SOC deviation is less than a preset tolerance, adjusting the discharge power to the initial discharge power.

7. The switching and discharging control method of a box-type mobile power source according to claim 1, characterized in that: In step S8, the method for controlling different types of alarms is: Step S81: For a power reduction type alarm, based on the required power and the maximum power that can be output by all normally operating box-type mobile power supplies, the maximum reducible power is calculated, and the discharge power of the box-type mobile power supply with a power reduction type alarm is adjusted according to the maximum reducible power; when the box-type mobile power supply with a power reduction type alarm completes the discharge, step S7 is executed; Step S82: For a shutdown type alarm, check whether the group of the box-type mobile power supply to which the shutdown type alarm belongs has an available box-type mobile power supply. If there is an available box-type mobile power supply, switch to the next available box-type mobile power supply, and then return to step S4; if there is no available box-type mobile power supply, record the identifier of the box-type mobile power supply to set A, start the standby diesel generator set, and if the available power in the grid is still insufficient, limit the propulsion power, unload the daily load in stages, and then cut off the box-type mobile power supply in set A, and return to step S4.

8. A method for switching and discharging control of a box-type mobile power source according to claim 7, characterized in that: In step S81, the maximum power reduction formula is: Where P is the maximum power that can be reduced, P max is the maximum output power of the box-type mobile power supply, n1 is the number of the box-type mobile power supplies with power reduction type alarm, and n2 is the number of the box-type mobile power supplies that are discharging and have no power reduction type alarm.

9. The switching and discharging control method of a box-type mobile power source according to claim 1, characterized in that: Based on the unique identifier assigned to the box-type mobile power supply in step S1, a database is established to record the identifiers of all the box-type mobile power supplies in the danger zone when the box-type mobile power supply corresponding to the identifier has thermal runaway.

10. The switching and discharging control method of a box-type mobile power source according to claim 1, characterized in that: When there is a box-type mobile power supply that has not been used for a long time, the box-type mobile power supply that has not been used for a long time is moved to the front position of the discharge order of the group when replacing the power, and is set to be discharged with priority.

Citation Information

Patent Citations

  • Switching control method and system for realizing safety isolation of marine box-type power supply

    CN115117982A

  • State monitoring method of mobile power supply, mobile power supply and storage medium

    CN117811156A

  • Movable power supply equipment and battery management method thereof

    CN119010236A

  • Power supply device

    WO2020187321A1

  • Method, system and device for controlling charging at battery swapping station, and storage medium

    WO2024077882A1