Control method for debugging power distribution terminal and related device
By constructing and reviewing the debugging plan and authorizing accurate remote control permissions, the risk of remote control errors in the access debugging of distribution network automation terminals is solved, and the probability of errors is significantly reduced.
Patent Information
- Application Number
- CN202411917840.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-24
- Publication Date
- 2025-03-28
AI Technical Summary
There is a lack of effective solutions in the prior art to prevent the risk of remote control errors in the access debugging of automated terminals in distribution networks, resulting in the possibility of errors in verification due to personnel factors.
A control method for power distribution terminal debugging is proposed. By constructing a debugging plan based on debugging requirements, determining whether there are abnormalities in the planning sheet. If there is no abnormality, authorizing remote control permissions based on the information of the debugging plan sheet and debugging is carried out.
By reviewing the debugging plan, avoiding the same person remotely controlling different devices in the same time period, and the remote control permissions are accurately specified according to the debugging plan, which significantly reduces the probability of debugging personnel miscontrolling the equipment.
Smart Images

Figure CN119727130A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of control methods for power distribution terminal debugging, and in particular to a control method and related devices for power distribution terminal debugging. Background Art
[0002] With the large-scale access of distribution network automation terminals, it is necessary to frequently remotely control the newly commissioned distribution network automation terminals. However, in the existing remote control operation process, manual verification of anti-error information is required, and there is a possibility of miscontrol due to verification errors caused by human factors. At present, there is no mature solution to prevent errors in remote control operation during the debugging of distribution network automation systems, and it is impossible to fundamentally prevent the risk of remote control miscontrol during the access and debugging of distribution network automation terminals. Summary of the invention
[0003] The present invention aims to at least solve the technical problem in the prior art that there is currently no mature solution to prevent errors in remote control operation during debugging of distribution network automation systems, and that the risk of remote control errors during access debugging of distribution network automation terminals cannot be fundamentally prevented.
[0004] To this end, an object of the present invention is to provide a control method for debugging a power distribution terminal, the control method comprising:
[0005] Build a debugging plan based on debugging requirements;
[0006] Based on the first element information of the debugging plan, determining whether the debugging plan has an abnormality;
[0007] If there is no abnormality in the debugging plan, the remote control authority of the power distribution terminal is authorized based on the second element information of the debugging plan, and the power distribution terminal is debugged.
[0008] In some embodiments, based on the debugging requirements, a debugging plan is constructed, including:
[0009] The debugging plan is constructed based on at least one of the debugging device information, the debugging time, the debugging specific content and the contact information.
[0010] In some embodiments, based on the first element information of the debugging plan, determining whether the debugging plan has an abnormality includes:
[0011] Compare the debugging plan with the historical debugging plan, and if there are conflicting parts in the debugging time or the debugging equipment overlaps with each other, determine that there is an abnormality in the debugging plan;
[0012] The debugging plan is compared with the historical debugging plan. If the debugging times are independent of each other or the debugging devices are independent of each other, it is determined that there is no abnormality in the debugging plan.
[0013] In some embodiments, if there is no abnormality in the debugging plan, the remote control authority authorization of the power distribution terminal based on the second element information of the debugging plan includes:
[0014] The remote control authority of the power distribution terminal is authorized based on at least one of the debugging time, the debugging personnel and the workstation.
[0015] In some embodiments, debugging the power distribution terminal includes:
[0016] Determine whether any abnormal situation occurs during debugging;
[0017] If an abnormal situation occurs during the debugging process, determine whether an abnormal situation occurs in the current debugging plan based on the first element information;
[0018] If an abnormal situation occurs in the current debugging plan, the debugging plan is rebuilt based on the first element information.
[0019] In some embodiments, determining whether an abnormal situation occurs during the debugging process includes:
[0020] Determine whether the remote control "refuse to operate", remote control "timeout", remote control "prohibited" or remote control "denied" signals appear during the remote control debugging process.
[0021] In some embodiments, determining whether an abnormal situation occurs during the debugging process includes:
[0022] Determine whether the remote control object returns the corresponding remote control result correctly.
[0023] In some embodiments, the method further comprises:
[0024] If there are any abnormalities in the debugging plan, the debugging plan is rebuilt based on the debugging requirements.
[0025] Another object of the present invention is to provide a control device for debugging a power distribution terminal, comprising:
[0026] The construction module is used to build a debugging plan based on debugging requirements;
[0027] A judging module, configured to judge whether the debugging plan sheet has an abnormality based on the first element information of the debugging plan sheet;
[0028] The authorization module is used to authorize the remote control authority of the distribution terminal based on the second element information of the debugging plan sheet if there is no abnormal situation in the debugging plan sheet, and debug the distribution terminal.
[0029] Another object of the present invention is to provide a storage medium storing a computer program, wherein the computer program implements the steps of the above method when executed by a processor.
[0030] Another object of the present invention is to provide an electronic device, comprising at least a memory and a processor, wherein the memory stores a computer program, and the processor implements the steps of the above method when executing the computer program on the memory.
[0031] The control method and related device for power distribution terminal debugging provided by the embodiment of the present invention have the following beneficial effects:
[0032] The control method for debugging a power distribution terminal provided in an embodiment of the present invention constructs a debugging plan based on debugging requirements; based on the first element information of the debugging plan, determines whether there is an abnormality in the debugging plan; if there is no abnormality in the debugging plan, authorizes the remote control authority of the power distribution terminal based on the second element information of the debugging plan, and debugs the power distribution terminal. By reviewing the debugging plan, it is avoided that the same person remotely controls different devices in the same time period. The remote control authority is accurately specified to the remote control object device, debugging time, debugger, and operating device according to the debugging plan, and the probability of the debugger miscontrolling the device is greatly reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0034] Figure 1 is a flowchart of the steps of a control method for debugging a power distribution terminal in an embodiment of the present invention;
[0035] Figure 2 is a flowchart of the steps of a control method for debugging a power distribution terminal in an embodiment of the present invention;
[0036] Figure 3 is a flowchart of the steps of a control method for debugging a power distribution terminal in an embodiment of the present invention;
[0037] Figure 4 It is a flow chart of the steps of a control method for debugging a power distribution terminal in an embodiment of the present invention. DETAILED DESCRIPTION
[0038] Various aspects and features of the present invention are described herein with reference to the accompanying drawings.
[0039] It should be understood that various modifications may be made to the embodiments of the present application. Therefore, the above description should not be considered as limiting, but only as an example of the embodiments. Other modifications within the scope and spirit of the present invention will occur to those skilled in the art.
[0040] The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate embodiments of the invention and, together with the general description of the invention given above and the detailed description of the embodiments given below, serve to explain the principles of the invention.
[0041] These and other characteristics of the invention will become apparent from the following description of a preferred form of embodiment given as a non-limiting example, with reference to the accompanying drawings.
[0042] It should also be understood that, although the invention has been described with reference to some specific examples, those skilled in the art will be able to realize many other equivalent forms of the invention that have the characteristics recited in the claims and are therefore within the scope of protection defined thereby.
[0043] The above and other aspects, features and advantages of the present invention will become more apparent from the following detailed description when taken in conjunction with the accompanying drawings.
[0044] Specific embodiments of the present invention are described hereinafter with reference to the accompanying drawings; however, it should be understood that the embodiments claimed are merely examples of the present invention, which may be implemented in a variety of ways. Well-known and / or repeated functions and structures are not described in detail to avoid obscuring the present invention with unnecessary or redundant details. Therefore, the specific structural and functional details claimed herein are not intended to be limiting, but merely serve as a basis and representative basis for the claims to teach those skilled in the art to use the present invention in a variety of ways with substantially any suitable detailed structure.
[0045] The first embodiment of the present invention provides a control method for debugging a power distribution terminal, such as Figure 1-Figure 4 As shown, the control method for debugging a power distribution terminal includes:
[0046] S100: Build a debugging plan based on debugging requirements.
[0047] Debugging refers to the functional debugging of the distribution network automation terminal and other equipment connected to the distribution network automation system. The information of the debugging equipment itself should have been provided to the distribution network automation system operation and maintenance party in the early stage. Based on at least one of the debugging equipment information, debugging time, debugging specific content and contact information, the debugging plan is constructed to explain the debugging related information. A clear debugging plan can reduce confusion and delays in the debugging process. Accident risks can be reduced through pre-established safety measures and emergency response plans. Detailed test plans and records help ensure the quality of debugging.
[0048] The debugging equipment information here at least includes the equipment name, IP address, ID, substation, line and operation and maintenance unit. The debugging time here refers to the start time, expected completion time and debugging duration of the debugging operation. The debugging content here at least includes the signal list, data list and signal standard.
[0049] S200: Based on the first element information of the debugging plan, determine whether the debugging plan has any abnormal situation.
[0050] The first element information here refers to the debugging time and debugging equipment. Step S200 specifically includes:
[0051] The debugging plan is compared with the historical debugging plan. If the debugging time has conflicting parts or the debugging equipment overlaps with each other, it is determined that there is an abnormality in the debugging plan. The debugging plan is rebuilt based on the debugging requirements and the overlapping or conflicting parts are highlighted; if the debugging times are independent of each other or the debugging equipment are independent of each other, it is determined that there is no abnormality in the debugging plan.
[0052] Specifically, the debugging plan here refers to the debugging plan that is currently under review, and the historical debugging plan here refers to the debugging plan that has been approved. The plan review content is as follows: (1) There can be multiple debugging time periods in the same debugging plan, but two devices with adjacent numbers in the same substation cannot be controlled in one debugging time period; (2) The shortest time period for a single debugging time period is 15 minutes and the longest time period is 1 hour; (3) In the same time period, the same debugging personnel can only control a maximum of 5 devices; (4) In the same time period, the same debugging personnel can only debug 2 debugging plans, and the 2 debugging plans correspond to equipment in different substations; (5) In the same time period, the same debugging personnel can only operate on the same workstation. (6) In the same time period, the same workstation can only be operated by the same debugging personnel.
[0053] S300: If there is no abnormality in the debugging plan, the remote control authority of the distribution terminal is authorized based on the second element information of the debugging plan, and the distribution terminal is debugged.
[0054] S301: If there is no abnormality in the debugging plan, the remote control authority of the power distribution terminal is authorized based on at least one of the debugging time, the debugging personnel and the workstation.
[0055] Specifically, the second element information refers to the debugging time, debugging personnel and workstation. The approver authorizes the debugger according to the content of the debugging plan, and stipulates that the debugger can remotely operate the equipment in the plan at the specified workstation within the time range of the debugging plan.
[0056] S302: Debug the power distribution terminal.
[0057] Designated commissioning personnel can perform remote control operations on designated equipment at designated workstations within designated time according to the approved equipment commissioning plan. Other remote control operations beyond designated time, designated equipment, designated commissioning personnel and designated workstations are prohibited.
[0058] S3021: Determine whether an abnormal situation occurs during the debugging process.
[0059] Specifically, once abnormal signals such as remote control "refusal to operate", remote control "timeout", remote control "prohibited" or remote control "denied" appear during remote control debugging; or the controlled object does not correctly return the corresponding remote control result, it means that an abnormal situation has occurred during the debugging process. At this time, the system automatically revokes the remote control debugging authority and prohibits debugging remote control operations. The remote control "refusal to operate" here means that the distribution terminal does not act according to the remote control instructions, the remote control "timeout" means that the distribution terminal does not respond within the preset time, the remote control "prohibited" means that the distribution terminal is not remotely controlled, and the remote control "denied" means that the distribution terminal refuses to be remotely controlled.
[0060] S3022: If an abnormal situation occurs during the debugging process, determine whether an abnormal situation occurs in the current debugging plan based on the first element information.
[0061] S3023: If an abnormality occurs in the current debugging plan, rebuild the debugging plan based on the first element information; if no abnormality occurs in the current debugging plan, continue to debug the power distribution terminal.
[0062] The first element of information here refers to the debugging time and debugging equipment. After the remote control authority is revoked, the debugging plan sheet must be reviewed and confirmed before re-authorization can be made. Otherwise, the debugging plan sheet must be rolled back and filled in again.
[0063] S400: After the debugging is completed, the remote control authorization is withdrawn and the debugging plan is automatically archived.
[0064] Based on the same inventive concept as the first embodiment above, the second embodiment of the present disclosure provides a control device for debugging a power distribution terminal, comprising:
[0065] The construction module is used to build a debugging plan based on debugging requirements;
[0066] A judging module, configured to judge whether the debugging plan sheet has an abnormality based on the first element information of the debugging plan sheet;
[0067] The authorization module is used to authorize the remote control authority of the distribution terminal based on the second element information of the debugging plan sheet if there is no abnormal situation in the debugging plan sheet, and debug the distribution terminal.
[0068] Furthermore, the building blocks include:
[0069] The construction unit is used to construct the debugging plan based on at least one of the debugging device information, the debugging time, the debugging specific content and the contact information.
[0070] Furthermore, the judging module includes:
[0071] A first judgment unit is used to compare the debugging plan with the historical debugging plan, and if the debugging time has conflicting parts or the debugging equipment overlaps with each other, determine that the debugging plan has an abnormality;
[0072] The second judgment unit is used to compare the debugging plan with the historical debugging plan, and if the debugging times are independent of each other or the debugging devices are independent of each other, determine that there is no abnormality in the debugging plan.
[0073] Furthermore, the authorization module includes:
[0074] The authorization unit is used to authorize the remote control authority of the power distribution terminal based on at least one of the debugging time, the debugging personnel and the workstation.
[0075] A debugging unit is used to debug the power distribution terminal.
[0076] Furthermore, the debugging unit comprises:
[0077] The third judging unit is used to judge whether an abnormal situation occurs during the debugging process;
[0078] A fourth judgment unit, configured to judge whether an abnormal situation occurs in the current debugging plan based on the first element information when an abnormal situation occurs during the debugging process;
[0079] The reconstruction unit is used to reconstruct the debugging plan based on the first element information when an abnormal situation occurs in the current debugging plan.
[0080] In this embodiment, by reviewing the debugging plan, the possibility of the same person remotely controlling different devices in the same time period is eliminated. The remote control authority is accurately specified to the remote control target device, debugging time, debugger, and operating device according to the debugging plan, and the probability of the debugger miscontrolling the device is greatly reduced.
[0081] A third embodiment of the present disclosure provides a storage medium storing a computer program. When the computer program is executed by a processor, the steps of implementing the above method include:
[0082] S11: Build a debugging plan based on debugging requirements;
[0083] S12: Based on the first element information of the debugging plan, determining whether the debugging plan has an abnormality;
[0084] S13: If there is no abnormality in the debugging plan, the remote control authority of the power distribution terminal is authorized based on the second element information of the debugging plan, and the power distribution terminal is debugged.
[0085] Of course, other steps of the control method can also be used to implement the above embodiment.
[0086] In this embodiment, by reviewing the debugging plan, the possibility of the same person remotely controlling different devices in the same time period is eliminated. The remote control authority is accurately specified to the remote control target device, debugging time, debugger, and operating device according to the debugging plan, and the probability of the debugger miscontrolling the device is greatly reduced.
[0087] A fourth embodiment of the present disclosure provides an electronic device, the electronic device comprising at least a memory and a processor, the memory storing a computer program, and the processor implementing the steps of the above method when executing the computer program on the memory, specifically comprising:
[0088] S21: Build a debugging plan based on debugging requirements;
[0089] S22: Based on the first element information of the debugging plan, determining whether the debugging plan has an abnormality;
[0090] S23: If there is no abnormality in the debugging plan, the remote control authority of the power distribution terminal is authorized based on the second element information of the debugging plan, and the power distribution terminal is debugged.
[0091] In this embodiment, by reviewing the debugging plan, the possibility of the same person remotely controlling different devices in the same time period is eliminated. The remote control authority is accurately specified to the remote control target device, debugging time, debugger, and operating device according to the debugging plan, and the probability of the debugger miscontrolling the device is greatly reduced.
[0092] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0093] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0094] Those of ordinary skill in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0095] In the embodiments provided in the present application, it should be understood that the disclosed devices / terminal equipment and methods can be implemented in other ways. For example, the device / terminal equipment embodiments described above are only schematic. For example, the division of the modules or units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0096] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0097] In addition, each functional unit in each embodiment of the present application may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0098] If the integrated module is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present application implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium. When the computer program is executed by the processor, the steps of the above-mentioned motor torque control method embodiments can be implemented. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium. It should be noted that the content contained in the computer-readable medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, computer-readable media do not include electric carrier signals and telecommunication signals.
[0099] In addition, the features of the embodiments shown in the drawings of the present application or the various embodiments mentioned in this specification are not necessarily understood as independent embodiments. Instead, each feature described in one example of an embodiment can be combined with one or more other desired features from other embodiments to produce other embodiments not described in words or with reference to the drawings.
[0100] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, a person skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.
Claims
1. A control method for debugging a power distribution terminal, characterized in that: include: Build a debugging plan based on debugging requirements; Based on the first element information of the debugging plan, determining whether the debugging plan has an abnormality; If there is no abnormality in the debugging plan, the remote control authority of the power distribution terminal is authorized based on the second element information of the debugging plan, and the power distribution terminal is debugged.
2. The control method for power distribution terminal debugging according to claim 1, characterized in that: Based on the debugging requirements, build a debugging plan, including: The debugging plan is constructed based on at least one of the debugging device information, the debugging time, the debugging specific content and the contact information.
3. The control method for debugging a power distribution terminal according to claim 1, characterized in that: Based on the first element information of the debugging plan, judging whether the debugging plan has an abnormality includes: Compare the debugging plan with the historical debugging plan, and if there are conflicting parts in the debugging time or the debugging equipment overlaps with each other, determine that there is an abnormality in the debugging plan; The debugging plan is compared with the historical debugging plan. If the debugging times are independent of each other or the debugging devices are independent of each other, it is determined that there is no abnormality in the debugging plan.
4. The control method for debugging a power distribution terminal according to claim 1, characterized in that: If there is no abnormality in the debugging plan, the remote control authority authorization of the power distribution terminal based on the second element information of the debugging plan includes: The remote control authority of the power distribution terminal is authorized based on at least one of the debugging time, the debugging personnel and the workstation.
5. The control method for debugging a power distribution terminal according to claim 1, characterized in that: Debugging the power distribution terminal includes: Determine whether any abnormal situation occurs during debugging; If an abnormal situation occurs during the debugging process, determine whether an abnormal situation occurs in the current debugging plan based on the first element information; If an abnormal situation occurs in the current debugging plan, the debugging plan is rebuilt based on the first element information.
6. The control method for debugging a power distribution terminal according to claim 5, characterized in that: Determine whether any abnormal situation occurs during the debugging process, including: Determine whether there is a remote control "refusal to operate", remote control "timeout", remote control "prohibited" or remote control "denied" signal during remote control debugging; or Determine whether the remote control object returns the corresponding remote control result correctly.
7. The control method for debugging a power distribution terminal according to claim 3 or 5, characterized in that: The method further comprises: If there are any abnormalities in the debugging plan, the debugging plan is rebuilt based on the debugging requirements.
8. A control device for debugging a power distribution terminal, characterized in that: include: The construction module is used to build a debugging plan based on debugging requirements; A judging module, configured to judge whether the debugging plan sheet has an abnormality based on the first element information of the debugging plan sheet; The authorization module is used to authorize the remote control authority of the distribution terminal based on the second element information of the debugging plan sheet if there is no abnormal situation in the debugging plan sheet, and debug the distribution terminal.
9. A storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 7 are implemented.
10. An electronic device, comprising at least a memory and a processor, wherein a computer program is stored in the memory, wherein: The processor implements the steps of the method of any one of claims 1 to 7 when executing the computer program on the memory.