Purging device, material conveying equipment and control method of material conveying equipment

By designing a purge device for NdFeB production, the residual powder on the hydrogen-burning tank mouth flange is blown back into the tank body, solving the problems of powder oxidation and spontaneous combustion, improving the utilization rate of raw materials and reducing the risk of operation.

CN119733838APending Publication Date: 2025-04-01TIANJIN SANHUAN LUCKY NEW MATERIAL CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411780466.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-12-04
Publication Date
2025-04-01

AI Technical Summary

Technical Problem

During the production process of neodymium iron boron, the residual hydrogenated powder on the tank mouth flange of the hydrogen explosion tank is prone to oxidation or spontaneous combustion, resulting in waste of raw materials and risk of separation operations.

Method used

A purge device is designed, including a butt flange, adapter, air circuit adapter, hose, flange frame and driver, and blow the residual powder from the tank mouth flange back into the tank body through the purge gas pipe.

Benefits of technology

The powder yield in the hydrogen explosion treatment process is improved, the risk of separation of material tanks and hydrogen explosion furnaces is reduced, and raw material waste is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119733838A_ABST
    Figure CN119733838A_ABST
Patent Text Reader

Abstract

The invention relates to a purging device, material conveying equipment and a control method of the material conveying equipment. The purging device comprises a butt joint flange, a first air channel and a second air channel, the reducing sleeve comprises a first outer sleeve and a first inner sleeve, the first inner sleeve is rotationally arranged on the first outer sleeve, and the butt flange penetrates into the first inner sleeve; the gas circuit adapter comprises a second outer sleeve and a second inner sleeve, the second inner sleeve is rotationally arranged on the second outer sleeve, the second inner sleeve is provided with a second gas channel, the second gas channel is communicated with the first gas channel, and the second outer sleeve is provided with a first connector communicated with the second gas channel; the flange frame is connected with the other end of the first hose; the first driver is used for driving the flange frame to move; and the purging air pipe is connected with the flange frame, the purging air pipe penetrates through the first hose, the second air channel and the first air channel, and the end of the purging air pipe extends into the air inlet. The butt flange can be connected with the material tank, residual powder on the butt flange is blown back into the tank body, and the yield of the hydrogen explosion treatment link is increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of magnet preparation, and in particular to a purge device, a material conveying equipment and a control method thereof. Background Art

[0002] The hydrogen crushing process is an important process in the production process of NdFeB. The existing hydrogen explosion tank is movable. The hydrogen explosion tank is transported between the hydrogen explosion furnace, the cooling furnace and the loading and unloading platform to improve work efficiency.

[0003] However, when the hydrogen fragmentation reaction is completed, the main butterfly valve of the hydrogen explosion tank is closed. When the workers remove the connecting flange, a certain amount of hydrogenated powder will remain on the tank mouth flange. These powders will oxidize or even spontaneously combust when encountering air, wasting raw materials and making the separation operation dangerous.

[0004] For every batch (900kg) produced, 0.5-1.5kg of qualified hydrogenation powder will be wasted due to oxidation at the mouth of the hydrogenation tank. At full production each year, about 5-7 tons of hydrogenation powder will be wasted. If the hydrogenation powder at the mouth of the hydrogenation tank can be blown back into the tank, the yield of this production link will be improved and the production cost will be reduced. Summary of the invention

[0005] Based on the above problems, the present application provides a purging device, a feeding device and a control method thereof, which can blow the powder at the tank mouth back into the tank body, thereby improving the utilization rate of the raw materials.

[0006] In a first aspect, the present application provides a purge device, comprising:

[0007] The docking flange is provided with an air inlet and a first air passage which are interconnected;

[0008] The adapter sleeve comprises a first outer sleeve and a first inner sleeve, wherein the first inner sleeve is rotatably arranged on the first outer sleeve, and the docking flange is inserted into the first inner sleeve;

[0009] The air circuit adapter comprises a second outer sleeve and a second inner sleeve, wherein the second inner sleeve is rotatably disposed on the second outer sleeve, the second inner sleeve is provided with a second airway, the second airway is connected to the first airway, and the second outer sleeve is provided with a first interface connected to the second airway;

[0010] a first hose, one end of which is connected to the second air passage;

[0011] A flange frame connected to the other end of the first hose;

[0012] A first driver, used for driving the flange frame to move;

[0013] A purge air pipe is connected to the flange frame, the purge air pipe passes through the first hose, the second air channel and the first air channel, and an end of the purge air pipe extends into the air inlet.

[0014] According to some embodiments of the present application, the purge device further includes a purge head, which is connected to the purge air pipe and is located in the air inlet, and the purge head is provided with a plurality of air holes.

[0015] According to some embodiments of the present application, the air inlet is trumpet-shaped.

[0016] According to some embodiments of the present application, the purge head is adapted to the air inlet, and the purge head can close a port of the air inlet connected to the first air channel.

[0017] According to some embodiments of the present application, the purge device further includes a drive bracket, wherein the drive bracket is disposed on the second outer sleeve of the air circuit adapter, and the first driver is disposed on the drive bracket.

[0018] According to some embodiments of the present application, the flange frame includes:

[0019] A first bracket, connected to the first driver;

[0020] A first flange, disposed on the first bracket;

[0021] The second flange, one end of the first hose is connected to the second flange, the other end of the first hose is connected to the first flange, and the second flange is connected to the gas circuit adapter.

[0022] In a second aspect, the present application provides a feeding device, comprising:

[0023] Tank mouth flange, used to connect material tanks;

[0024] The purge device as described above, wherein the butt flange can penetrate into the tank mouth flange;

[0025] A locking mechanism, used for locking the tank mouth flange and the docking flange;

[0026] A supporting mechanism is used to support the adapter sleeve and the gas circuit adapter.

[0027] According to some embodiments of the present application, the docking flange includes:

[0028] A large diameter portion, wherein the air inlet is arranged at the large diameter portion;

[0029] A small diameter portion, arranged on an end surface of the large diameter portion;

[0030] A first flange is arranged on the outer wall of the large diameter portion, and a positioning notch is arranged on the edge of the first flange;

[0031] The tank mouth flange comprises:

[0032] Flange body;

[0033] A second flange is provided at one end of the flange body, and the second flange is used to connect the material tank;

[0034] A positioning block is arranged at the other end of the flange body, the positioning block is matched with the positioning notch, and the positioning block can at least partially enter the positioning notch.

[0035] According to some embodiments of the present application, the locking mechanism includes:

[0036] A locking frame, rotatably arranged on the docking flange, the locking frame is provided with a guide hook, the guide hook is provided with a slide groove, and the positioning block can enter the slide groove;

[0037] A locking cylinder, hinged to the locking frame;

[0038] A rotating member, one end of which is hinged to the telescopic rod of the locking cylinder, and the other end of which is hinged to the locking frame;

[0039] A locking hook is rotatably disposed on the rotating member, and the locking hook can abut against the positioning block.

[0040] According to some embodiments of the present application, the locking mechanism further includes a rotating cylinder, a cylinder body of the rotating cylinder is hinged to the docking flange, and a telescopic rod of the rotating cylinder is hinged to the locking frame.

[0041] According to some embodiments of the present application, the supporting mechanism includes:

[0042] Second bracket;

[0043] A slide plate is slidably disposed on the second bracket along a first direction;

[0044] A third bracket is slidably disposed on the slide plate along the second direction;

[0045] A first sliding block is slidably disposed on the third bracket along a third direction, and the first sliding block is connected to the adapter sleeve;

[0046] A second slider is slidably disposed on the third bracket along a third direction, and the second slider is connected to the gas path adapter;

[0047] A second driver, used for driving the purge device to move along a first direction;

[0048] The first direction, the second direction and the third direction are perpendicular to each other.

[0049] According to some embodiments of the present application, the supporting mechanism further includes:

[0050] A first buffer structure, used for buffering vibration of the purge device along a first direction;

[0051] A second buffer structure, used for buffering vibration of the purge device along a second direction;

[0052] The third buffer structure is used for buffering the vibration of the purge device along the third direction.

[0053] In a third aspect, the present application provides a control method for the feeding device as described above, comprising:

[0054] Driving the docking flange into the tank mouth flange, and locking the tank mouth flange and the docking flange;

[0055] Delivering gas to the purge air pipe, the first driver driving the purge air pipe to reciprocate along a first direction to purge residual powder on the inner wall of the air inlet;

[0056] Unlock the tank mouth flange and the docking flange, and drive the purge device to move away from the material tank.

[0057] In the purging device of the present application, the docking flange can be connected to the material tank and the residual powder on the docking flange can be blown back into the tank body, thereby improving the powder recovery rate in the hydrogen explosion treatment link and reducing the danger when the material tank is separated from the hydrogen explosion furnace. BRIEF DESCRIPTION OF THE DRAWINGS

[0058] In order to more clearly illustrate the technical solution of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without exceeding the scope of protection required by the present application.

[0059] Figure 1 It is a schematic diagram of a material tank;

[0060] Figure 2 It is a schematic diagram of a material tank connected to a tank mouth flange in an embodiment of the present application;

[0061] Figure 3 is a schematic diagram of a purge device according to an embodiment of the present application;

[0062] Figure 4 is a cross-sectional view of a purge device according to an embodiment of the present application;

[0063] Figure 5 It is a schematic diagram of the connection between the docking flange and the tank mouth flange in the embodiment of the present application;

[0064] Figure 6 is a schematic diagram of an adapter sleeve according to an embodiment of the present application;

[0065] Figure 7 is a schematic diagram of a gas circuit adapter according to an embodiment of the present application;

[0066] Figure 8 is a schematic diagram of a purge head connected to a purge air pipe according to an embodiment of the present application;

[0067] Fig. 9 is a schematic diagram of a purge head according to an embodiment of the present application;

[0068] Fig.10 is a schematic diagram of a driving bracket according to an embodiment of the present application;

[0069] Fig.11 is a schematic diagram of a feeding device according to an embodiment of the present application;

[0070] Fig.12 It is a schematic diagram of the docking flange and the tank mouth flange of the embodiment of the present application;

[0071] Fig.13 is a schematic diagram of a locking mechanism according to an embodiment of the present application;

[0072] Fig.14 is a schematic diagram of a locking frame according to an embodiment of the present application;

[0073] Fig.15 It is a schematic diagram of a locking frame connected to a butt flange in an embodiment of the present application;

[0074] Fig.16 is a schematic diagram of a positioning block according to an embodiment of the present application;

[0075] Fig.17 is a schematic diagram of a locking assembly according to an embodiment of the present application;

[0076] Fig.18 is a schematic diagram of a rotary cylinder according to an embodiment of the present application;

[0077] Fig.19 is a schematic diagram of a cooling water circuit of an embodiment of the present application;

[0078] Fig. 20 is a schematic diagram of a support mechanism of an embodiment of the present application;

[0079] Fig.21 is a schematic diagram of a skateboard according to an embodiment of the present application;

[0080] Fig. 22 is a schematic diagram of a third bracket of an embodiment of the present application;

[0081] Fig.23 is a schematic diagram of a first slider and a second slider in an embodiment of the present application;

[0082] Fig.24 is a schematic diagram of a first buffer structure according to an embodiment of the present application;

[0083] Fig.25 It is a schematic diagram of the angle between the rotating cylinder and the locking cylinder in the embodiment of the present application. DETAILED DESCRIPTION

[0084] The following is a clear and complete description of the technical solution of the present application in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present application.

[0085] like Figure 1 and Figure 2 As shown, the material tank 300 includes a tank body 310 and a butterfly valve 320, and the butterfly valve 320 is arranged at the tank mouth of the tank body 310. Optionally, the material tank 300 is a hydrogen explosion treatment tank, which is used to contain NdFeB alloy sheets, and the NdFeB alloy sheets are subjected to hydrogen explosion treatment in the tank. In the prior art, in order to facilitate the connection between the material tank 300 and the hydrogen explosion furnace, a tank mouth flange 200 is arranged at the end of the butterfly valve 320. After the hydrogen explosion treatment is completed, hydrogen explosion powder will remain on the tank mouth flange 200.

[0086] like Figure 3 and Figure 4 As shown, an embodiment of the present application provides a purge device 100 , which includes a docking flange 1 , an adapter sleeve 2 , an air circuit adapter 3 , a first hose 4 , a flange frame 5 , a first driver 6 and a purge air pipe 71 .

[0087] like Figure 5 As shown, the end of the docking flange 1 can enter the tank mouth flange 200, and the docking flange 1 includes a first end 1a and a second end 1b opposite to each other. Optionally, the end face of the first end 1a of the docking flange 1 abuts against the end face of the butterfly valve 320. The docking flange 1 is provided with an air inlet 11 and a first air duct 12 that are interconnected. The air inlet 11 is provided at the first end 1a, and the air inlet 11 and the first air duct 12 both extend along the axis of the docking flange 1. The docking flange 1 is locked and connected to the tank mouth flange 200 by a locking mechanism. After the hydrogen explosion treatment is completed, the docking flange 1 is separated from the tank mouth flange 200.

[0088] like Figure 6As shown, the adapter sleeve 2 can use an existing rotating adapter sleeve, and the adapter sleeve 2 includes a first outer sleeve 21 and a first inner sleeve 22. The first inner sleeve 22 is rotatably arranged on the first outer sleeve 21, and the second end 1b of the docking flange 1 penetrates the first inner sleeve 22. Optionally, a connecting key is arranged between the docking flange 1 and the first inner sleeve 22, and the docking flange 1 and the first inner sleeve 22 can rotate synchronously around the axis. The adapter sleeve 2 can deliver cooling water to the material tank 300.

[0089] like Figure 7 As shown, the gas circuit adapter 3 can use an existing gas circuit adapter. The gas circuit adapter 3 includes a second outer sleeve 31 and a second inner sleeve 32, and the second inner sleeve 32 is rotatably arranged in the second outer sleeve 31. The second inner sleeve 32 is provided with a second gas channel 33, and the second gas channel 33 is connected to the first gas channel 12. For example, the end of the second inner sleeve 32 is inserted into the first gas channel 12 so that the second gas channel 33 is connected to the first gas channel 12. The second outer sleeve 31 is provided with a first interface connected to the second gas channel 33, and the first interface flange 34 is arranged at the first interface, and the first interface flange 34 is connected to the hydrogen explosion furnace gas circuit through a pipeline. Optionally, the second outer sleeve 31 is provided with a second interface flange 35, and the second interface flange 35 is connected to the second gas channel 33 with one end of the first hose 4. For example, the first hose 4 is connected to the second interface flange 35 so that the first hose 4 is connected to the second gas channel 33.

[0090] The flange frame 5 is connected to the other end of the first hose 4. The first driver 6 is used to drive the flange frame 5 to move along the first direction. Figure 3 The X direction is the first direction, and the first direction is parallel to the axis of the docking flange 1. Optionally, the first driver 6 is disposed on the second outer sleeve 31 of the gas circuit adapter 3.

[0091] The purge air pipe 71 is arranged on the flange frame 5, and the purge air pipe 71 passes through the flange frame 5 and enters the first hose 4. The purge air pipe 71 is fixedly connected to the flange frame 5. The purge air pipe 71 passes through the first hose 4, the second air channel 33 and the first air channel 12 in sequence, and the end of the purge air pipe 71 extends into the air inlet 11. The flange frame 5 drives the purge air pipe 71 to move along the first direction, and the end of the purge air pipe 71 away from the air inlet 11 is connected to the air pump. The gas blown out of the purge air pipe 71 can purge the powder on the inner wall of the air inlet 11, and blow the residual powder into the tank body 310. When the air inlet 11 is purged, the tank body 310 continues to rotate, which is conducive to blowing away the residual powder.

[0092] When in use, the tank mouth flange 200 is connected to the material tank 300, the purge device 100 is moved to the docking flange 1 and enters the tank mouth flange 200, and the docking flange 1 and the tank mouth flange 200 are locked. The butterfly valve 320 is opened, and hydrogen is delivered to the tank body 310 through the first interface flange 34. At the same time, the material tank 300 rotates around its own axis, and the docking flange 1, the first inner sleeve 22 and the second inner sleeve 32 rotate around the axis with the material tank 300 to complete the hydrogen explosion treatment of NdFeB.

[0093] The air pump is started to deliver gas to the purge air pipe 71. Optionally, the gas blown out of the purge air pipe 71 is an inert gas. The first driver 6 drives the flange frame 5 and the purge air pipe 71 to reciprocate along the first direction. The gas blown out of the purge air pipe 71 purges the residual powder on the inner wall of the air inlet 11 and blows the residual powder into the tank body 310.

[0094] After the residual powder is blown back, the butterfly valve 320 is closed, and the docking flange 1 and the tank mouth flange 200 are unlocked and separated.

[0095] The docking flange 1 of the purging device 100 of this embodiment can be connected to the material tank 300, and the purging air pipe 71 blows the residual powder on the docking flange 1 and the residual powder at the port of the butterfly valve 320 back into the tank body 310, thereby improving the powder recovery rate in the hydrogen explosion treatment link and reducing the danger when the material tank is separated from the hydrogen explosion furnace.

[0096] like Figure 8 and Fig. 9 As shown, in some embodiments, the purging device 100 further includes a purging head 72, which is disposed at the end of the purging air pipe 71, and the purging head 72 is located in the air inlet 11. The side wall of the purging head 72 is provided with a plurality of blowing holes 721. For example, the purging head 72 is provided with a central hole 722 and a gas delivery hole 723, the central hole 722 is connected to the purging air pipe 71, the gas delivery hole 723 extends obliquely downward from the central hole 722, and the plurality of blowing holes 721 are all connected to the gas delivery hole 723. The gas input into the purging air pipe 71 is blown out through the plurality of blowing holes 721, which is more conducive to purging the residual powder.

[0097] like Figure 5 As shown, in some embodiments, the air inlet 11 is trumpet-shaped. The large-diameter port of the air inlet 11 is located at the end surface of the first end 1a of the docking flange 1, and the small-diameter port of the air inlet 11 is connected to the first air channel 12. The air inlet 11 is set to be trumpet-shaped, which facilitates the residual powder to slide down from the inner wall of the air inlet 11, thereby improving the efficiency of purging.

[0098] In some embodiments, the purge head 72 is adapted to the air inlet 11, and the purge head 72 is roughly truncated. The purge head 72 can close the small-diameter port of the air inlet 11. After the residual powder is blown back, the purge head 72 moves toward the direction close to the first air channel 12, and the purge head 72 closes the small-diameter port of the air inlet 11. After the purge device 100 is separated from the material tank 300, the purge head 72 can reduce the pollution of the environment to the first air channel 12.

[0099] like Fig.10 As shown, in some embodiments, the purge device 100 further includes a drive bracket 8, which is disposed on the second outer sleeve 31 of the gas circuit adapter 3, for example, the second outer sleeve 31 and the drive bracket 8 are fastened and connected by bolts. The first driver 6 is disposed on the drive bracket 8, for example, the first driver 6 is a cylinder, and the first driver 6 is located above the second outer sleeve 31. The telescopic rod of the first driver 6 is connected to the flange frame 5 to drive the purge gas pipe 71 to reciprocate along the first direction.

[0100] In some embodiments, the flange frame 5 includes: a first bracket 51, a first flange 52, and a second flange 53. The first bracket 51 is connected to the telescopic rod of the first driver 6. Optionally, the first bracket 51 is substantially L-shaped. The first flange 52 is disposed at the end of the first bracket 51, and the first flange 52 is located on the side of the gas circuit adapter 3 away from the adapter sleeve 2. The second flange 53 is connected to the gas circuit adapter, for example, the second flange 53 is connected to the second interface flange 35. One end of the first hose 4 is connected to the second flange 53, and the other end of the first hose 4 is connected to the first flange 52.

[0101] Optionally, the outer wall of the purge air pipe 71 is provided with a third flange 73, and the third flange 73 is provided on the first bracket 51.

[0102] The third flange 73 is firmly connected to the first flange 52. The purge air pipe 71 passes through the first hose 4, the second air passage 33 and the first air passage 12 in sequence and extends to the air inlet 11.

[0103] like Fig.11 As shown, an embodiment of the present application provides a material conveying device 10, which includes: the purging device 100, the tank flange 200, the locking mechanism 400 and the supporting mechanism 500 as described above.

[0104] The tank mouth flange 200 is used to connect the butterfly valve 320 of the material tank 300. For example, the tank mouth flange 200 and the butterfly valve 320 are fastened and connected by bolts. The end of the docking flange 1 of the purge device 100 can enter the tank mouth flange 200, and the end surface of the first end 1a of the docking flange 1 abuts against the end surface of the butterfly valve 320. The locking mechanism 400 is used for locking the tank mouth flange 200 and the docking flange 1. The supporting mechanism 500 is used to support the adapter sleeve 2 and the gas circuit adapter 3. The supporting mechanism 500 can push the purge device 100 to move along the first direction.

[0105] The tank mouth flange 200 is arranged at the end of the butterfly valve 320. When the purge device 100 and the material tank 300 need to be connected, the support mechanism 500 pushes the purge device 100 to move toward the material tank 300, the end of the docking flange 1 enters the tank mouth flange 200 and abuts against the end face of the butterfly valve 320, and the locking mechanism 400 locks the docking flange 1 and the tank mouth flange 200.

[0106] The material tank 300 rotates around its own axis, and the tank mouth flange 200, the docking flange 1, the first inner sleeve 22 and the second inner sleeve 32 rotate with the material tank 300. After the hydrogen crushing of the NdFeB is completed, the purge air pipe 71 reciprocates along the first direction to purge the residual powder on the inner wall of the air inlet 11 and blow the residual powder into the tank body 310. After the residual powder is blown back, the locking mechanism 400 is unlocked, and the supporting mechanism 500 pushes the purge device 100 to move away from the material tank 300, separating the docking flange 1 and the tank mouth flange 200.

[0107] like Fig.12 As shown, in some embodiments, the docking flange 1 includes: a large diameter portion 13, a small diameter portion 14 and a first flange 15. The air inlet 11 is arranged on the large diameter portion 13, and the small diameter portion 14 is arranged on the end surface of the large diameter portion 13 away from the tank mouth flange 200. The first flange 15 is arranged on the outer wall of the large diameter portion 14, and the end surface of the first flange 15 is flush with the end surface of the large diameter portion 13 away from the tank mouth flange 200. The edge of the first flange 15 is provided with a positioning notch 16, and optionally, a plurality of positioning notches 16 are evenly distributed around the axis circumference of the docking flange 1.

[0108] The tank mouth flange 200 includes: a flange body 210, a second flange 220 and a positioning block 230. The large diameter portion 13 of the docking flange 1 can enter the central through hole 240 of the flange body 210. The second flange 220 is arranged at one end of the flange body 210 close to the material tank 300, and the second flange 220 can be connected to the material tank 300 by bolts. The positioning block 230 is arranged at the other end of the flange body 210. The positioning block 230 is adapted to the positioning notch 16, and the positioning block 230 can at least partially enter the positioning notch 16 to radially position the connection between the tank mouth flange 200 and the docking flange 1.

[0109] Optionally, the side wall of the positioning notch 16 includes a first inclined surface 161 , and the side wall of the positioning block 230 is provided with a second inclined surface 2301 matched with the first inclined surface 161 , so as to facilitate the positioning block 230 to enter the positioning notch 16 .

[0110] like Fig.13 As shown, in some embodiments, the locking mechanism 400 includes: a locking frame 410 , a locking cylinder 430 , a rotating member 440 , and a locking hook 450 .

[0111] like Fig.14 As shown, the locking frame 410 includes a locking frame body 4101 and a support block 4102, wherein the support block 4102 is disposed on the side wall of the locking frame body 4101. An accommodating cavity 4103 is disposed on one end surface of the locking frame body 4101, and a through hole 4104 is disposed on the other end surface of the locking frame body 4101, wherein the through hole 4104 is connected to the accommodating cavity 4103.

[0112] like Fig.15 As shown, the locking frame 410 is rotatably arranged on the docking flange 1 through a bearing. The shoulder of the docking flange 1 abuts against the bottom surface of the accommodating cavity 4103, and the small diameter portion 14 passes through the through hole 4104. A guide hook 420 is arranged on the end surface edge of the locking frame body 4101, and the guide hook 420 is arranged with a slide groove 4201. When the locking frame 410 rotates, the positioning block 230 of the tank mouth flange 200 can slide into the slide groove 4201, so as to better align the connection between the tank mouth flange 200 and the docking flange 1.

[0113] like Fig.16 As shown, the positioning block 230 includes a positioning portion 2302 and a locking portion 2303, wherein the positioning portion 2302 is disposed on the side wall of the flange body 210, and the locking portion 2303 is disposed on the end surface of the positioning portion 2302. The locking portion 2303 is roughly arc-shaped, and the locking portion 2303 is adapted to the guide hook 420, and the locking portion 2303 can enter the slide groove 4201.

[0114] like Fig.13 and Fig.17 As shown, the locking cylinder 430 is hinged to the locking frame 410, for example, the locking cylinder 430 is disposed on the support block 4102. One end of the rotating member 440 is hinged to the telescopic rod of the locking cylinder 430, and the other end of the rotating member 440 is hinged to the locking frame 410. The locking hook 450 is rotatably disposed on the rotating member 440, for example, the locking hook 450 is disposed at the middle of the rotating member 440 through a rotating shaft. The locking hook 450 can abut against the positioning block 230.

[0115] The locking cylinder 430 can drive the locking hook 450 to move up and down. The locking cylinder 430 drives the locking hook 450 to move up, and the locking hook 450 abuts against the locking portion 2303 of the positioning block 230 to lock the tank flange 200 and the docking flange 1. The locking cylinder 430 drives the locking hook 450 to move down to unlock the tank flange 200 and the docking flange 1. Optionally, the locking hook 450 is located between the two guide hooks 420.

[0116] The locking cylinder 430 , the rotating member 440 and the locking hook 450 form a group of locking components, and multiple groups of locking components are evenly distributed around the circumference of the locking frame 410 to better lock the tank mouth flange 200 and the docking flange 1 .

[0117] like Fig.18 As shown, in some embodiments, the locking mechanism 400 further includes a rotating cylinder 460. The cylinder body of the rotating cylinder 460 is hinged to the docking flange 1, for example, Fig.14 As shown, the locking frame 410 is provided with an arc-shaped avoidance hole 4105, the rotating cylinder bracket 470 is arranged on the shoulder of the docking flange 1, the rotating cylinder bracket 470 is located in the avoidance hole 4105, and the cylinder body of the rotating cylinder 460 is hinged to the rotating cylinder bracket 470. The telescopic rod of the rotating cylinder 460 is hinged to the locking frame 410. The rotating cylinder 460 can drive the locking frame 410 to rotate. Optionally, the number of the rotating cylinders 460 is two, and the two rotating cylinders 460 are symmetrically arranged. Both the locking cylinder 430 and the rotating cylinder 460 can use cylinders.

[0118] Alternatively, if Fig.19 As shown, a cooling water pipe 330 is provided on the side wall of the butterfly valve 320, and the cooling water pipe 330 is connected to the first inner sleeve 22 of the adapter sleeve 2. The first outer sleeve 21 of the adapter sleeve 2 is connected to an external water source to provide cooling water for the butterfly valve 320. The adapter sleeve 2 is a multi-channel adapter sleeve, and is also used to provide a rotary connection of the air circuit and the circuit for the locking cylinder 430 and the rotating cylinder 460.

[0119] like Fig. 20 As shown, in some embodiments, the support mechanism 500 includes: a second bracket 510 , a slide plate 520 , a third bracket 530 , a first slider 540 , a second slider 550 and a second driver 560 .

[0120] like Fig.21 As shown, the top surface of the second bracket 510 is arranged on a guide rail 5101 extending along the first direction, a slider 5102 is arranged on the guide rail 5101, and a slide plate 520 is arranged on the slider 5102 so that the slide plate 520 can slide along the first direction.

[0121] like Fig. 22As shown, the third bracket 530 is slidably disposed on the slide plate 520 along the second direction, and the second direction is the Z direction. A first guide post 5301 is disposed on the slide plate 520 , and the third bracket 530 is slidably disposed on the first guide post 5301 .

[0122] like Fig.23 As shown, the third bracket 530 is provided with a second guide column 5401 and a third guide column 5501 extending along the third direction, the third direction is the Y direction, and the first direction, the second direction and the third direction are perpendicular to each other. The first slider 540 is slidably disposed on the second guide column 5401, and the first slider 540 is connected to the adapter sleeve 2. The second slider 550 is slidably disposed on the third guide column 5501, and the second slider 550 is connected to the gas circuit adapter 3. The second driver 560 is disposed on the second bracket 510, and the second driver 560 is used to drive the purge device 100 to move along the first direction.

[0123] For example, the second driver 560 is a cylinder. The second driver 560 is connected to the third bracket 530 via the adapter 5302. The second driver 560 drives the purge device 100 to move along the first direction, so that the docking flange 1 can enter the tank flange 200, or move the docking flange 1 out of the tank flange 200.

[0124] The purging device 100 of this embodiment can move along the first direction, the second direction and the third direction, so as to facilitate the alignment of the tank mouth flange 200 and the docking flange 1 when they are connected.

[0125] The supporting mechanism 500 further includes: a first buffer structure 570 , a second buffer structure 580 and a third buffer structure 590 .

[0126] like Fig.24 As shown, the first buffer structure 570 is used to buffer the vibration of the purge device 100 along the first direction. For example, the first buffer structure 570 includes a fourth guide column 5701, and the fourth guide column 5701 is arranged at the output end of the second driver 560. The bottom end of the adapter 5302 is slidably arranged on the fourth guide column 5701, and first springs 5702 are arranged between both ends of the fourth guide column 5701 and the adapter 5302 to buffer the vibration of the adapter 5302 along the first direction.

[0127] like Fig. 22 As shown, the second buffer structure 580 is used to buffer the vibration of the purge device 100 along the second direction. For example, the second buffer structure 580 includes a second spring, and the second spring is disposed between the slide plate 520 and the third bracket 530 and between the third bracket 530 and the top of the first guide column 5301.

[0128] like Fig.23As shown, the third buffer structure 590 is used to buffer the vibration of the purge device 100 along the third direction. For example, the third buffer structure 590 includes a third spring, and the third spring is provided between the first slider 540 and the end of the second guide column 5401 and between the second slider 550 and the end of the third guide column 5501.

[0129] When the material tank 300 rotates, the purge device 100 will vibrate. The first buffer structure 570 , the second buffer structure 580 and the third buffer structure 590 are used to buffer the vibration of the purge device 100 to improve the safety of the purge device 100 .

[0130] When the material tank 300 rotates, the adapter sleeve 2 will inevitably produce tiny vibrations during the rotation process. Since each buffer structure is an elastic component, each elastic component also generates vibrations. The vibration of the rotating sleeve 2 and the vibration of the elastic component will affect the stable operation of the equipment. In order to reduce the possibility of interference between the two vibrations, the present application sets the length of the second spring of the second buffer structure 580 to 0.5 to 1.5 times the outer diameter of the adapter sleeve 2, the length of the first spring 5702 of the first buffer structure 570 is 1 to 2 times the outer diameter of the adapter sleeve 2, and the length of the third spring of the third buffer structure 590 is 0.1 to 0.5 times the outer diameter of the adapter sleeve 2. The stiffness coefficient of each spring is 50-200N / m.

[0131] This embodiment also provides a control method for the above-mentioned feeding device 10, the process includes:

[0132] The second driver 560 drives the purging device 100 to approach the material tank 300, and the docking flange 1 enters into the tank mouth flange 200. The rotating cylinder 460 drives the locking frame 410 to rotate, and the locking portion 2303 of the positioning block 230 enters into the slide groove 4201. The locking cylinder 430 drives the locking hook 450 to move upward, and the locking hook 450 abuts against the locking portion 2303 of the positioning block 230 to lock the tank mouth flange 200 and the docking flange 1.

[0133] The hydrogen gas of the hydrogen explosion furnace enters the material tank 300 through the second interface flange 35, the second gas channel 33, the first gas channel 12 and the gas inlet 11 in sequence, and performs hydrogen explosion treatment on the NdFeB alloy sheets in the hydrogen explosion furnace.

[0134] After the hydrogen crushing of NdFeB is completed, the air pump is started to deliver gas to the purge air pipe 71. The first driver 6 drives the purge air pipe 71 to reciprocate along the first direction. The gas blown out of the purge air pipe 71 purges the residual powder on the inner wall of the air inlet 11 and blows the residual powder into the tank body 310.

[0135] After the residual powder is blown back, the butterfly valve 320 is closed, the locking cylinder 430 drives the locking hook 450 to move downward, unlocking the tank mouth flange 200 and the docking flange 1, the rotating cylinder 460 drives the locking frame 410 to rotate in the opposite direction, the positioning block 230 moves out of the slide groove 4201, and the second driver 560 drives the purging device 100 to move away from the material tank 300.

[0136] After the tank mouth flange 200 is connected to the docking flange 1 , the docking flange 1 , the locking mechanism 400 , the first inner sleeve 22 and the second inner sleeve 32 rotate around the axis along with the material tank 300 .

[0137] The present application can use four locking cylinders 430 and two rotating cylinders 460 to complete the locking action. The four locking cylinders 430 are evenly distributed around the axis of the docking flange 1, and the two rotating cylinders 460 are evenly distributed around the axis of the docking flange 1.

[0138] like Fig.25 As shown, the angle between the projection L1 of the axis of the rotating cylinder 460 in the axial direction of the docking flange 1 and the projection L2 of the axis of the locking cylinder 430 closest to the rotating cylinder 460 in the axial direction of the docking flange 1 is 30 to 75 degrees, so as to reduce the eccentric torque generated by the locking mechanism 400 on the rotating shaft during rotation.

[0139] When locking the tank mouth flange 200 and the docking flange 1, the two rotating cylinders 460 first move to the first preset position, so that the locking frame 410 rotates to the first preset angle, and the two relative locking cylinders 430 pre-lock the tank mouth flange 200 and the docking flange 1, and the pre-locking force of each locking cylinder is 10-50N. However, the two rotating cylinders 460 stop after moving to the end position, and the other two locking cylinders 430 start to pre-lock for the second time, and the pre-locking force of each locking cylinder is 10-50N. Then the four locking cylinders 430 are started at the same time to make the locking force reach the final value. Pre-locking the connection between the tank mouth flange 200 and the docking flange 1 can improve the balance of the locking force around the docking flange 1 and improve the uniformity of the torque on the docking flange 1 in the circumferential direction.

[0140] The material conveying equipment of this embodiment can realize automatic docking between the purge device and the tank mouth flange, and blow the residual powder on the docking flange back to the material tank.

[0141] The embodiments of the present application are described in detail above. Specific examples are used herein to illustrate the principles and implementation methods of the present application. The description of the above embodiments is only used to help understand the technical solution and core ideas of the present application. Therefore, changes or deformations made by those skilled in the art based on the ideas of the present application, the specific implementation methods and the scope of application of the present application, all belong to the scope of protection of the present application. In summary, the contents of this specification should not be construed as limiting the present application.

Claims

1. A purge device, characterized in that: include: The docking flange is provided with an air inlet and a first air passage which are interconnected; The adapter sleeve comprises a first outer sleeve and a first inner sleeve, wherein the first inner sleeve is rotatably arranged on the first outer sleeve, and the docking flange is inserted into the first inner sleeve; The air circuit adapter comprises a second outer sleeve and a second inner sleeve, wherein the second inner sleeve is rotatably disposed on the second outer sleeve, the second inner sleeve is provided with a second airway, the second airway is connected to the first airway, and the second outer sleeve is provided with a first interface connected to the second airway; a first hose, one end of which is connected to the second air passage; A flange frame connected to the other end of the first hose; A first driver, used for driving the flange frame to move; A purge air pipe is connected to the flange frame, the purge air pipe passes through the first hose, the second air channel and the first air channel, and an end of the purge air pipe extends into the air inlet.

2. The purging device according to claim 1, characterized in that: It also includes a purge head, which is connected to the purge air pipe and located in the air inlet, and the purge head is provided with a plurality of blowing holes.

3. The purging device according to claim 2, characterized in that: The air inlet is trumpet-shaped. Optionally, the purge head is matched with the air inlet, and the purge head can close a port of the air inlet connected to the first air channel.

4. The purging device according to claim 1, characterized in that: It also includes a driving bracket, which is arranged on the second outer sleeve of the air circuit adapter, and the first driver is arranged on the driving bracket.

5. The purging device according to claim 1, characterized in that: The flange frame comprises: A first bracket, connected to the first driver; A first flange, disposed on the first bracket; The second flange, one end of the first hose is connected to the second flange, the other end of the first hose is connected to the first flange, and the second flange is connected to the gas circuit adapter.

6. A material conveying device, characterized in that: include: Tank mouth flange, used to connect material tanks; The purging device according to any one of claims 1 to 5, wherein the docking flange of the purging device can penetrate into the tank mouth flange; A locking mechanism, used for locking the tank mouth flange and the docking flange; A supporting mechanism is used to support the adapter sleeve and the gas circuit adapter.

7. The material conveying device according to claim 6, characterized in that: The docking flange comprises: A large diameter portion, wherein the air inlet is arranged at the large diameter portion; A small diameter portion, arranged on an end surface of the large diameter portion; A first flange is arranged on the outer wall of the large diameter portion, and a positioning notch is arranged on the edge of the first flange; The tank mouth flange comprises: Flange body; A second flange is provided at one end of the flange body, and the second flange is used to connect the material tank; A positioning block is arranged at the other end of the flange body, the positioning block is matched with the positioning notch, and the positioning block can at least partially enter the positioning notch. Optionally, the locking mechanism comprises: A locking frame, rotatably arranged on the docking flange, the locking frame is provided with a guide hook, the guide hook is provided with a slide groove, and the positioning block can enter the slide groove; A locking cylinder, hinged to the locking frame; A rotating member, one end of which is hinged to the telescopic rod of the locking cylinder, and the other end of which is hinged to the locking frame; A locking hook is rotatably disposed on the rotating member, and the locking hook can abut against the positioning block.

8. The material conveying device according to claim 7, characterized in that: The locking mechanism further comprises a rotating cylinder, a cylinder body of the rotating cylinder is hinged to the docking flange, and a telescopic rod of the rotating cylinder is hinged to the locking frame.

9. The material conveying device according to claim 6, characterized in that: The supporting mechanism comprises: Second bracket; A slide plate is slidably disposed on the second bracket along a first direction; A third bracket is slidably disposed on the slide plate along the second direction; A first sliding block is slidably disposed on the third bracket along a third direction, and the first sliding block is connected to the adapter sleeve; A second slider is slidably disposed on the third bracket along a third direction, and the second slider is connected to the gas path adapter; a second driver, used for driving the purge device to move along the first direction; The first direction, the second direction and the third direction are perpendicular to each other. Optionally, the supporting mechanism further comprises: A first buffer structure, used for buffering vibration of the purge device along the first direction; A second buffer structure, used for buffering vibration of the purge device along the second direction; The third buffer structure is used for buffering the vibration of the purge device along the third direction.

10. A method for controlling the material conveying equipment according to claim 6, characterized in that: include: Driving the docking flange into the tank mouth flange, and locking the tank mouth flange and the docking flange; Delivering gas to the purge air pipe, the first driver driving the purge air pipe to reciprocate along a first direction to purge residual powder on the inner wall of the air inlet; Unlock the tank mouth flange and the docking flange, and drive the purge device to move away from the material tank.