Lifting, supporting and erecting multifunctional integrated launching fulcrum structure
By designing a multi-functional integrated launch fulcrum structure, the launch fulcrum is moved up to the middle of the aircraft and combining support, lifting and erecting interfaces, the problems of lifting, supporting and erecting in large sections of spacecraft manufacturing are solved, and the effects of structural weight reduction and number of interfaces are reduced.
Patent Information
- Application Number
- CN202411189610.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2025-04-04
AI Technical Summary
In the existing spacecraft manufacturing process, the problems of lifting, supporting, and erecting of large sections are complicated, resulting in a large number of structural interfaces, complex tooling, long force transmission routes, and large structural weight.
A multi-functional integrated launch fulcrum structure for lifting support upright is designed, and the launch fulcrum is moved from the tail end surface to the middle of the aircraft, and the support, lifting and upright interface are integrated. Six launch fulcrums are used to connect to the spreader, support tooling and launch pad to realize lifting, support and upright actions.
The number of structural interfaces is reduced, the force transmission route is shortened, structural weight reduction is achieved, and the efficiency of process design and the performance of the aircraft is improved.
Smart Images

Figure CN119749833A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a lifting, supporting, erecting, multifunctional integrated launching fulcrum structure, which is particularly suitable for the field of aerospace equipment. Background Art
[0002] With the development of science and technology and the demand for space exploration, the functions of modern aerospace vehicles are becoming more and more diversified, and the structural size is getting larger and larger. At present, the mature aerospace vehicle manufacturing process generally adopts the form of segmented manufacturing and overall assembly. During the manufacturing process, the lifting, support, erection, and flipping of large sections of spacecraft have always been difficult problems in process design.
[0003] At present, the launch fulcrum of the aircraft is usually located at the tail end face of the aircraft, which plays the role of supporting the entire aircraft after the aircraft is erected and before launch. At this time, the erection load of the entire aircraft is transmitted from the tail end face to the nose through the aircraft body structure.
[0004] During the manufacturing process of aircraft, the support points and lifting points of large sections are mostly set separately, which increases the number of process lifting interfaces on the sections. The process lifting interfaces are numerous and require multiple sets of ground equipment and tooling to complete support and lifting work, which makes the tooling complex. In addition, the launch fulcrum is set on the tail end face, the force transmission path of the aircraft in the upright state is long, and the structure is heavy. Summary of the invention
[0005] 1. Technical issues to be resolved
[0006] In view of the above shortcomings of the prior art, the present invention proposes a multifunctional integrated launch fulcrum structure for lifting, supporting and erecting, which realizes the functions of supporting, lifting and erecting interfaces in one, reducing the number of structural interfaces. At the same time, the present invention moves the launch fulcrum from the tail end surface to the middle of the aircraft, shortens the force transmission route, and realizes structural weight reduction.
[0007] (II) Technical solution
[0008] A lifting, supporting and erecting multifunctional integrated launching fulcrum structure is provided in the middle of an aircraft and comprises six launching fulcrums; each launching fulcrum comprises a fulcrum part and a base part which fits the curved surface of the aircraft, and the fulcrum part and the base part are designed as an integrated whole for easy disassembly and operation; the fulcrum part comprises a bottom surface, a side surface and a connecting hole, the first end of the base part is fixedly connected to the fulcrum part, and the second end of the base part is fixedly connected to the aircraft.
[0009] Select two adjacent launching fulcrums at appropriate positions and connect them to the sling to realize the lifting action.
[0010] The hanger comprises a hook and a pin, the pin is passed through two ends of the hook, and the pin is adapted to the connecting hole.
[0011] During lifting, the pin of the lifting device passes through the connecting hole of the launching fulcrum, and the hook can rotate around the pin without the two being separated.
[0012] Two launching fulcrums set at relative positions are selected to be connected with the supporting tooling to realize the supporting action.
[0013] The supporting tooling comprises a supporting seat and a supporting pin shaft, the supporting pin shaft is penetrated through the supporting seat, and the supporting pin shaft is adapted to the connecting hole.
[0014] During support, the support pin of the support tool passes through the connection hole of the launch fulcrum and is connected to the support seat.
[0015] All six launch points are selected to connect to the launch pad to achieve the erection action.
[0016] The launching platform comprises a supporting arm and a locking mechanism, and the locking mechanism is adapted to the connecting hole.
[0017] When erected, the locking mechanism of the launching platform passes through the connecting hole of the launching fulcrum and is fixedly connected to the supporting arm.
[0018] (III) Beneficial effects
[0019] The lifting support erection multifunctional integrated launching fulcrum structure of the present invention has the following advantages compared with the prior art:
[0020] (1) The present invention adopts a structure that realizes the functions of supporting, lifting and erecting interfaces in one body, thereby reducing the number of structural interfaces.
[0021] (2) The present invention moves the launch fulcrum from the tail end surface to the middle of the aircraft, shortening the force transmission path and achieving structural weight reduction. BRIEF DESCRIPTION OF THE DRAWINGS
[0022] Figure 1 Layout diagram of the lifting support erection multifunctional integrated launching fulcrum structure of the present invention on the aircraft
[0023] Figure 2 Structural diagram of the lifting support erection multifunctional integrated launching fulcrum of the present invention
[0024] Figure 3 Schematic diagram of the lifting support erection multifunctional integrated launching fulcrum structure of the present invention for lifting
[0025] Figure 4 Schematic diagram of the lifting support erection multifunctional integrated launching fulcrum structure of the present invention for horizontal support
[0026] Figure 5 Schematic diagram of the lifting support erection multifunctional integrated launch fulcrum structure of the present invention used for the erection support of the launch platform DETAILED DESCRIPTION
[0027] See also Figure 1 , Figure 2 A lifting, supporting, erecting, multifunctional integrated launching fulcrum structure of the present invention is arranged in the middle of an aircraft 2, and includes 6 launching fulcrums 1; each launching fulcrum 1 includes a fulcrum portion 11 and a base portion 12 that fits the curved surface of the aircraft 2, and the fulcrum portion 11 and the base portion 12 are integrated into one design to facilitate disassembly and operation; the fulcrum portion 11 has a bottom surface, a side surface and a connecting hole 13, a first end of the base portion 12 is fixedly connected to the fulcrum portion 11, and a second end of the base portion 12 is fixedly connected to the aircraft 2.
[0028] The second end of the base portion 12 is bolted to the aircraft 2 .
[0029] See also Figure 3 , two adjacent launching fulcrums 1 are selected to be connected with the sling 3 to realize the lifting action; the sling 3 includes a hook 31 and a pin 32, the pin 32 is passed through the two ends of the hook 31, and the pin 32 is adapted to the connecting hole 13; when lifting, the pin 32 of the sling 3 passes through the connecting hole 13 of the launching fulcrum 1, and the hook 31 can rotate around the pin 32 but the two do not separate.
[0030] See also Figure 4 , two launching fulcrums 1 set at relative positions are selected to be connected with the supporting tooling 4 to realize the supporting action; the supporting tooling 4 includes a supporting seat 41 and a supporting pin 42, the supporting pin 42 is passed through the supporting seat 41, and the supporting pin 42 is adapted to the connecting hole 13; when supporting, the supporting pin 42 of the supporting tooling 4 passes through the connecting hole 13 of the launching fulcrum 1 and is connected to the supporting seat 41.
[0031] See also Figure 5 , all 6 launching fulcrums 1 are selected to be connected to the launching platform 5 to realize the erecting action; the launching platform 5 includes a supporting arm 51 and a locking mechanism 52, and the locking mechanism 52 is adapted to the connecting hole 13; when erected, the locking mechanism 52 of the launching platform 5 passes through the connecting hole 13 of the launching fulcrum 1 and is fixedly connected to the supporting arm 51.
Claims
1. A lifting support erection multifunctional integrated launching fulcrum structure, characterized in that: The launch fulcrum structure is arranged in the middle of an aircraft (2), and comprises six launch fulcrums (1); each launch fulcrum (1) comprises a fulcrum portion (11) and a base portion (12) fitted with a curved surface of the aircraft (2); the fulcrum portion (11) and the base portion (12) are designed as an integrated whole, which is convenient for disassembly and operation; the fulcrum portion (11) has a bottom surface, a side surface and a connection hole (13); a first end of the base portion (12) is fixedly connected to the fulcrum portion (11), and a second end of the base portion (12) is fixedly connected to the aircraft (2).
2. The lifting, supporting, erecting, multifunctional integrated launching fulcrum structure according to claim 1, characterized in that: Two launching fulcrums (1) adjacent to each other at appropriate positions are selected to be connected with the lifting device (3) to realize the lifting action.
3. The lifting, supporting, erecting, multifunctional integrated launching fulcrum structure according to claim 3 is characterized in that: The lifting device (3) comprises a lifting hook (31) and a pin (32), wherein the pin (32) is passed through both ends of the lifting hook (31), and the pin (32) is adapted to the connecting hole (13).
4. The lifting, supporting, erecting and multifunctional integrated launching fulcrum structure according to claim 4 is characterized in that: During lifting, the pin shaft (32) of the lifting device (3) passes through the connecting hole (13) of the launching fulcrum (1), and the hook (31) can rotate around the pin shaft (32) but the two do not separate.
5. The lifting, supporting, erecting, multifunctional integrated launching fulcrum structure according to claim 1, characterized in that: Two launching fulcrums (1) arranged at relative positions are selected and connected to a supporting tool (4) to achieve a supporting action.
6. The lifting, supporting, erecting, multifunctional integrated launching fulcrum structure according to claim 6, characterized in that: The supporting tool (4) comprises a supporting seat (41) and a supporting pin shaft (42), the supporting pin shaft (42) is passed through the supporting seat (41), and the supporting pin shaft (42) is adapted to the connecting hole (13).
7. The lifting, supporting, erecting, multifunctional integrated launching fulcrum structure according to claim 7, characterized in that: During support, the support pin (42) of the support tool (4) passes through the connection hole (13) of the launch fulcrum (1) and is connected to the support seat (41).
8. The lifting, supporting, erecting, multifunctional integrated launching fulcrum structure according to claim 1, characterized in that: All six launching fulcrums (1) are selected to be connected to the launching platform (5) to achieve the erection action.
9. The lifting, supporting, erecting, multifunctional integrated launching fulcrum structure according to claim 8, characterized in that: The launching platform (5) comprises a supporting arm (51) and a locking mechanism (52), and the locking mechanism (52) is adapted to the connecting hole (13).
10. The lifting, supporting, erecting and multifunctional integrated launching fulcrum structure according to claim 9, characterized in that: When erected, the locking mechanism (52) of the launching platform (5) passes through the connecting hole (13) of the launching fulcrum (1) and is fixedly connected to the supporting arm (51).
Citation Information
Patent Citations
Integrated multifunctional end journal
CN104555699A
Small aircraft hoisting turnover device
CN107628536A
Large-tonnage commercial rocket integral hoisting sling
CN110844762A
Constraining and releasing device and system thereof
CN113800012A
Multifunctional box lifting support structure
CN114104943A