Climbing cushion block for movable welding of ballast type steel rail and using method

By designing a ballast-type rail mobile welding hill climbing pad including the upper body, the lower body, the height part, the rail bottom angle block and the embedded iron seat fixing bolt, the limit fixation problem in the lifting state of the rail is solved, and the safety and reliability of the operation are improved. It is suitable for ballast-type rails of the embedded iron seat fastener type.

CN119754113AActive Publication Date: 2025-04-04BEIJING RAILWELD NEW MATERIAL TECH CO LTD +4
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202510140653.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-02-08
Publication Date
2025-04-04
Estimated Expiration
2045-02-08

AI Technical Summary

Technical Problem

It is difficult to achieve the lateral and longitudinal limit fixation of the rail in the lifted state, especially in the mobile welding of the ballast rail rail with embedded iron seat fastener type, there are safety hazards and risks of equipment falling and overturning.

Method used

A ballast-type rail mobile welding hill climbing pad is designed, including components such as upper body, lower body, height parts, rail bottom angle blocks and embedded iron seat fixing bolts. Through the combination and installation of these components, the horizontal and vertical limit fixing of the rail is realized, and is suitable for ballast-type embedded iron seat fasteners.

Benefits of technology

It effectively solves the problem of limit fixation in the rail lifting state, improves the safety and reliability of the rail mobile welding hill climbing operation, avoids the risk of welding machine falling off and overturning, and is suitable for various types of balled tracks.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119754113A_ABST
    Figure CN119754113A_ABST
Patent Text Reader

Abstract

The invention discloses a ballast type steel rail moving welding climbing cushion block and a using method, and the ballast type steel rail moving welding climbing cushion block comprises an upper main body, a lower main body, a height piece, a first rail base angle pressing block, a second rail base angle pressing block, a first embedded iron seat fixing bolt, a first embedded iron seat fixing nut, a second embedded iron seat fixing bolt, a second embedded iron seat fixing nut, a first bolt and a second bolt, the height piece comprises a first height plate and a second height plate; the first height plate and the second height plate are oppositely mounted between the upper mounting plate and the lower mounting plate; one side of the first rail base angle pressing block is provided with a first limiting inclined plane used for being attached to the inclined plane on one side of the rail base angle of the steel rail; a second limiting inclined face used for being attached to the inclined face on the other side of the rail base angle of the steel rail is arranged on one side of the second rail base angle pressing block. According to the ballast type steel rail moving welding climbing cushion block and the using method, transverse and longitudinal limiting and fixing of the steel rail in the lifting state and moving welding climbing operation of the ballast track steel rail with embedded iron base fasteners are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of rail welding, and more specifically to a movable welding climbing pad for a ballasted rail and a use method thereof. Background Art

[0002] With the increase in the operating time and transportation volume of existing lines in my country, rail wear is becoming more and more serious. In order to ensure the safe, stable, reliable and low-speed operation of railways, rail welding is an important link in laying seamless railway lines and an important guarantee for line driving safety.

[0003] At present, during on-site mobile welding, the size of the welding machine conflicts with the embedded iron seat structure of the ballasted track, so the welding machine cannot be directly placed for welding. The rails on both sides of the weld seam of the welded joint need to be raised to avoid interference with the embedded iron seat structure of the ballasted track when the welding machine is clamped. Lifting the rails on both sides of the welded joint to make the rails have a certain slope is called slope support. After the welding machine climbs the slope, the welding operation can be successfully completed.

[0004] There are two main ways to support rails along the slope in the existing technology. First, on-site personnel use wooden beams, round steel or steel plates with a certain height to support the bottom of the rails. This method is more arbitrary, the size of the support tools varies, the structural strength is unreliable, and it is difficult to achieve the horizontal and vertical limit fixation of the rails in the lifted state. There are safety hazards and the risk of the welding machine falling off the track and overturning; second, the pads in the existing technology use the sleeper bolts as a fixed reference to achieve the horizontal and vertical locking of the pads on the bearing rail groove. The pads of this technology are only suitable for ballasted track anchor bolt type line operations. Its size specifications are set based on the anchor bolts on the concrete sleeper bearing rail groove. It is not suitable for ballasted track rail mobile welding climbing operations with embedded iron seat fasteners.

[0005] Therefore, it is necessary to solve the above technical problems. Summary of the invention

[0006] In view of this, the purpose of the present invention is to propose a ballasted rail mobile welding climbing pad and a method of use, so as to realize the lateral and longitudinal limiting fixation of the rail in the lifted state and the ballasted track rail mobile welding climbing operation with embedded iron seat fasteners.

[0007] Based on the above purpose, the present invention provides a ballasted rail movable welding climbing pad, comprising an upper body, a lower body, a height piece, a first rail bottom angle pressure block, a second rail bottom angle pressure block, a first embedded iron seat fixing bolt, a first embedded iron seat fixing nut, a second embedded iron seat fixing bolt, a second embedded iron seat fixing nut, a first bolt, and a second bolt, wherein: the lower body comprises a lower mounting plate and a first fixing block and a second fixing block which are relatively arranged and installed on both outer sides of the lower mounting plate; the upper body comprises an upper mounting plate which is arranged parallel to the lower mounting plate; the height piece comprises a first height plate and a second height plate, the first height plate and the second height plate are relatively arranged and installed between the upper mounting plate and the lower mounting plate, and the length direction of the first height plate and the second height plate is parallel to the length direction of the rail; the first rail bottom angle pressure block and the second rail bottom angle pressure block are respectively located on both sides of the upper body, the top surface of the first rail bottom angle pressure block is provided with a first mounting hole, the top surface of the first fixing block is provided with a first threaded hole, the first bolt passes through the first mounting hole in sequence, The first fixing block is threadedly installed on the first fixing block after passing through the mounting hole and the first threaded hole, and a first limiting inclined surface for fitting the inclined surface on one side of the rail bottom angle of the rail is provided on one side of the first rail bottom angle pressure block; a second mounting hole is provided on the top surface of the second rail bottom angle pressure block, and a second threaded hole is provided on the top surface of the second fixing block, and the second bolt is threadedly installed on the second fixing block after passing through the second mounting hole and the second threaded hole in sequence, and a second limiting inclined surface for fitting the inclined surface on the other side of the rail bottom angle of the rail is provided on one side of the second rail bottom angle pressure block; a third mounting hole is provided on the side of the first fixing block, and the first embedded iron seat fixing bolt passes through the third mounting hole and the first hole on the first embedded iron seat, and the first embedded iron seat fixing nut is used to be fastened and installed on the first embedded iron seat fixing bolt; a fourth mounting hole is provided on the side of the second fixing block, and the second embedded iron seat fixing bolt passes through the fourth mounting hole and the second hole on the second embedded iron seat, and the second embedded iron seat fixing nut is used to be fastened and installed on the second embedded iron seat fixing bolt.

[0008] Optionally, the top surface of the first height plate is mounted on the bottom surface of the upper mounting plate, the bottom surface of the first height plate is mounted on the top surface of the lower mounting plate, the top surface of the second height plate is mounted on the bottom surface of the upper mounting plate, and the bottom surface of the second height plate is mounted on the top surface of the lower mounting plate.

[0009] Optionally, the height member further includes a first connecting plate, and two ends of the first connecting plate are respectively installed between the first height plate and the second height plate.

[0010] Optionally, a first limiting boss and a second limiting boss are respectively provided on both sides of the upper mounting plate along the length direction of the upper mounting plate, and a distance between the first limiting boss and the second limiting boss is greater than a width of the rail.

[0011] Optionally, it also includes a first flexible connector and a second flexible connector, one end of the first flexible connector is installed on the first rail bottom angle pressure block, and the other end of the first flexible connector is installed on the first fixed block; one end of the second flexible connector is installed on the second rail bottom angle pressure block, and the other end of the second flexible connector is installed on the second fixed block.

[0012] Optionally, a first fixed lifting ring and a second fixed lifting ring are respectively provided at both ends of the first flexible connector, the first fixed lifting ring is threadedly installed on the first rail bottom angle pressure block, and the second fixed lifting ring is threadedly installed on the first fixed block.

[0013] Optionally, a third fixed lifting ring and a fourth fixed lifting ring are respectively provided at both ends of the second flexible connector, the third fixed lifting ring is threadedly installed on the second rail bottom angle pressure block, and the fourth fixed lifting ring is threadedly installed on the second fixed block.

[0014] Optionally, the first rail bottom angle pressure block includes a detachable first pressure block body and a first pressure block height adjusting piece, the top surface of the first pressure block height adjusting piece is fitted on the bottom surface of the first pressure block body, the bottom surface of the first pressure block height adjusting piece is fitted on the top surface of the first fixed block, and the first limiting slope is arranged on the side surface of the first pressure block body; the second rail bottom angle pressure block includes a detachable second pressure block body and a second pressure block height adjusting piece, the top surface of the second pressure block height adjusting piece is fitted on the bottom surface of the second pressure block body, the bottom surface of the second pressure block height adjusting piece is fitted on the top surface of the second fixed block, and the second limiting slope is arranged on the side surface of the second pressure block body.

[0015] Optionally, a first weight-reducing through hole is formed on the top surface of the upper body, and a second weight-reducing through hole is formed on the top surface of the lower body.

[0016] Optionally, it also includes multiple first connecting bolts and multiple second connecting bolts, the top surface of the upper mounting plate is provided with multiple first through holes, the top surface of the lower mounting plate is provided with multiple second through holes, the top surface of the first height plate is provided with multiple first threaded through holes, and the bottom surface of the second height plate is provided with multiple second threaded through holes, the multiple first connecting bolts, the multiple second connecting bolts, the multiple first through holes, the multiple second through holes, the multiple first threaded through holes, and the multiple second threaded through holes are all arranged one by one, and the multiple first connecting bolts pass through the multiple first through holes one by one and are threadedly installed in the multiple first threaded through holes, and the multiple second connecting bolts pass through the multiple second through holes one by one and are threadedly installed in the multiple second threaded through holes.

[0017] Based on the same inventive concept, the present invention also provides a method for using a movable welded climbing pad for a ballasted rail, using any of the aforementioned movable welded climbing pads for a ballasted rail to replace rails in a straight section of a ballasted track or to replace a curved rail in a curved section, which comprises the following steps:

[0018] Step 1: Investigate the line conditions of the construction section, clarify the track type, fastener type, and determine the required support height;

[0019] Step 2: Determine the height of the height member according to the height of the support pad required. Before construction, first install the first height plate and the second height plate between the upper mounting plate and the lower mounting plate in a relatively arranged manner, and place the first rail bottom angle pressing block and the second rail bottom angle pressing block on both sides of the upper body, respectively, and place them on the top surfaces of the first fixing block and the second fixing block, respectively;

[0020] Step 3, remove the original fasteners of the supported rail, lift the supported rail in the vertical direction, use an electric hand tool to loosen the first bolt and the second bolt, so that the first limiting inclined surface and the second limiting inclined surface are set back to back, and place the corresponding ballasted rail mobile welding climbing pad on the sleeper bearing rail groove to ensure that the installation direction is correct; pass the first embedded iron seat fixing bolt through the third installation hole and the first hole on the first embedded iron seat, fasten the first embedded iron seat fixing nut to the first embedded iron seat fixing bolt, pass the second embedded iron seat fixing bolt through the fourth installation hole and the second hole on the second embedded iron seat, and fasten the second embedded iron seat fixing nut to the second embedded iron seat fixing bolt, thereby installing the ballasted rail mobile welding climbing pad on the existing first embedded iron seat and the second embedded iron seat;

[0021] Step 4: put the supported rail in place, ensure that the rail bottom of the supported rail is on the top surface of the upper mounting plate, fit the first limiting inclined surface on the first rail bottom angle pressure block and the second limiting inclined surface on the second rail bottom angle pressure block to the inclined surfaces on both sides of the rail bottom angle of the supported rail, pass the first bolt through the first mounting hole and the first threaded hole in sequence, and then thread it on the first fixing block, pass the second bolt through the second mounting hole and the second threaded hole in sequence, and then thread it on the second fixing block, tighten the first bolt and the second bolt with an electric hand tool, and the double locking mechanism of the movable welding climbing pad for the ballast type rail and the sleeper, and the rail and the movable welding climbing pad for the ballast type rail can be realized;

[0022] Step 5. At this time, the rail mobile welding equipment moves to the support area to carry out rail welding operations. After the welding operation is completed, the welding equipment leaves the ballasted rail mobile welding climbing pad section. At this time, the ballasted rail mobile welding climbing pad is removed, and the original first bolt and second bolt of the line are removed using electric hand tools, and the first rail bottom angle block and the second rail bottom angle block are removed. The supported rail is lifted, and the first embedded iron seat fixing bolt, the first embedded iron seat fixing nut, the second embedded iron seat fixing bolt, and the second embedded iron seat fixing nut are removed. The ballasted rail mobile welding climbing pad is moved out of the sleeper rail groove, and the supported rail is locked using the original fasteners of the line.

[0023] Based on the same inventive concept, the present invention also provides a method for using a movable welded climbing pad for a ballasted rail, using any of the aforementioned movable welded climbing pads for a ballasted rail to replace a curved rail in a curved section of a ballasted track line, comprising the following steps:

[0024] Step 1: Investigate the line conditions of the construction section, clarify the track type, fastener type, and determine the required support height;

[0025] Step 2: Determine the height of the height member according to the height of the support pad required. Before construction, first install the first height plate and the second height plate between the upper mounting plate and the lower mounting plate in a relatively arranged manner, and place the first rail bottom angle pressing block and the second rail bottom angle pressing block on both sides of the upper body, respectively, and place them on the top surfaces of the first fixing block and the second fixing block, respectively;

[0026] Step 3. On the side of the curved upper rail, remove the original fasteners of the curved upper rail, lift the curved upper rail in the vertical direction, use an electric hand tool to loosen the first bolt and the second bolt, so that the first limiting inclined surface and the second limiting inclined surface are set back to back, and place the corresponding first ballast rail mobile welded climbing pad on the sleeper bearing rail groove to ensure that the installation direction is correct; pass the first embedded iron seat fixing bolt through the third installation hole and the first hole on the first embedded iron seat, fasten the first embedded iron seat fixing nut to the first embedded iron seat fixing bolt, pass the second embedded iron seat fixing bolt through the fourth installation hole and the second hole on the second embedded iron seat, and fasten the second embedded iron seat fixing nut to the second embedded iron seat fixing bolt, thereby installing the first ballast rail mobile welded climbing pad on the existing first embedded iron seat and the second embedded iron seat;

[0027] Step 4: put the curved upper rail in place, ensure that the rail bottom of the curved upper rail is on the top surface of the upper mounting plate, fit the first limiting inclined surface on the first rail bottom angle pressure block and the second limiting inclined surface on the second rail bottom angle pressure block to the inclined surfaces on both sides of the rail bottom angle of the curved upper rail respectively, pass the first bolt through the first mounting hole and the first threaded hole in sequence, and then thread it on the first fixing block, pass the second bolt through the second mounting hole and the second threaded hole in sequence, and then thread it on the second fixing block, tighten the first bolt and the second bolt with an electric hand tool, and the double locking mechanism of the first ballast rail mobile welding climbing pad and the sleeper, and the rail and the first ballast rail mobile welding climbing pad can be realized;

[0028] Step 5. At this time, the rail mobile welding equipment moves to the support area to carry out rail welding operations. After the welding operation is completed, the welding equipment leaves the support section. At this time, the first ballasted rail mobile welding climbing pad is removed, and the original first bolt and second bolt of the line are removed using electric hand tools, and the first rail bottom angle pressure block and the second rail bottom angle pressure block are removed. The first ballasted rail mobile welding climbing pad is lifted, and the first embedded iron seat fixing bolt, the first embedded iron seat fixing nut, the second embedded iron seat fixing bolt, and the second embedded iron seat fixing nut are removed, and the first ballasted rail mobile welding climbing pad is moved out of the sleeper bearing groove, and the curved upper rail is locked using the original fasteners of the line.

[0029] Optionally, the following steps are also included: Step 6, on the side of the curved lower rail, remove the original fasteners of the curved lower rail, lift the curved lower rail in the vertical direction, and place the corresponding second ballast rail movable welded climbing pad on the sleeper rail groove to ensure that the installation direction is correct; use an electric hand tool to loosen the first bolt and the second bolt, so that the first limiting inclined surface and the second limiting inclined surface are set back to back, and place the corresponding second ballast rail movable welded climbing pad on the sleeper rail groove to ensure that the installation direction is correct; pass the first embedded iron seat fixing bolt through the third mounting hole and the first hole on the first embedded iron seat, fasten the first embedded iron seat fixing nut to the first embedded iron seat fixing bolt, pass the second embedded iron seat fixing bolt through the fourth mounting hole and the second hole on the second embedded iron seat, and fasten the second embedded iron seat fixing nut to the second embedded iron seat fixing bolt, thereby installing the second ballast rail movable welded climbing pad on the existing first embedded iron seat and the second embedded iron seat;

[0030] Step 7, put the curved lower rail in place, ensure that the rail bottom of the curved lower rail is on the top surface of the upper mounting plate, fit the first limiting inclined surface on the first rail bottom angle pressing block and the second limiting inclined surface on the second rail bottom angle pressing block to the inclined surfaces on both sides of the rail bottom angle of the curved lower rail respectively, pass the first bolt through the first mounting hole and the first threaded hole in sequence, and then thread it on the first fixing block, pass the second bolt through the second mounting hole and the second threaded hole in sequence, and then thread it on the second fixing block, tighten the first bolt and the second bolt with an electric hand tool, and the second ballast rail movable welding climbing pad and the sleeper, and the rail and the second ballast rail movable welding climbing pad double locking mechanism can be realized;

[0031] Step 8. At this time, the rail mobile welding equipment moves to the support area to carry out rail welding operations. After the welding operation is completed, the welding equipment leaves the support section. At this time, the second ballasted rail mobile welding climbing pad is removed, and the original first bolt and second bolt of the line are removed using electric hand tools, and the first rail bottom angle pressure block and the second rail bottom angle pressure block are removed. The second ballasted rail mobile welding climbing pad is lifted, and the first embedded iron seat fixing bolt, the first embedded iron seat fixing nut, the second embedded iron seat fixing bolt, and the second embedded iron seat fixing nut are removed, and the second ballasted rail mobile welding climbing pad is moved out of the sleeper bearing groove, and the curved lower rail is locked using the original fasteners of the line.

[0032] The present invention provides a movable welding climbing pad for a ballasted rail and a method for using the same, comprising an upper main body, a lower main body, a height member, a first rail bottom angle pressure block, a second rail bottom angle pressure block, a first embedded iron seat fixing bolt, a first embedded iron seat fixing nut, a second embedded iron seat fixing bolt, a second embedded iron seat fixing nut, a first bolt, and a second bolt. First, the first height plate and the second height plate are relatively installed between the upper mounting plate and the lower mounting plate, the first rail bottom angle pressure block and the second rail bottom angle pressure block are respectively located on both sides of the upper main body, and are respectively placed on the top surfaces of the first fixing block and the second fixing block; then, the first bolt is sequentially passed through the first mounting hole and the first threaded hole and then threadedly installed on the first fixing block, and the second bolt is sequentially passed through the second mounting hole and the second threaded hole and then threadedly installed on the second fixing block; finally, the lower main body is placed in the sleeper bearing groove, the first embedded iron seat fixing bolt is passed through the third mounting hole and the first threaded hole on the first embedded iron seat, and the second bolt is passed through the third mounting hole and the first threaded hole on the first embedded iron seat. The first embedded iron seat fixing nut is fastened and installed on the first embedded iron seat fixing bolt, the second embedded iron seat fixing bolt is passed through the fourth mounting hole and the second hole on the second embedded iron seat, and the second embedded iron seat fixing nut is fastened and installed on the second embedded iron seat fixing bolt, thereby installing the ballasted rail movable welding climbing pad on the existing first embedded iron seat and the second embedded iron seat; loosen the first bolt and the second bolt, so that the first limiting inclined surface and the second limiting inclined surface are arranged back to back, the rail is placed on the top surface of the upper mounting plate, and then the first limiting inclined surface and the second limiting inclined surface are arranged opposite to each other, and the first bolt and the second bolt are tightened so that the first limiting inclined surface is attached to the inclined surface on one side of the rail bottom angle of the rail, and the second limiting inclined surface is attached to the inclined surface on the other side of the rail bottom angle of the rail, thereby limiting the rail bottom angle of the rail, realizing the transverse and longitudinal limiting fixation of the rail in the lifting state and the movable welding climbing operation of the ballasted track rail with embedded iron seat fastener type. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] The preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings, which will help to understand the objects and advantages of the present invention, wherein:

[0034] Figure 1 It is a structural schematic diagram of a movable welded climbing pad for a ballasted rail according to an embodiment of the present invention;

[0035] Figure 2 An exploded view of a movable welded climbing pad for a ballasted rail according to an embodiment of the present invention;

[0036] Figure 3 It is a schematic structural diagram of a middle height component of a movable welded climbing pad for a ballasted rail according to an embodiment of the present invention;

[0037] Figure 4 It is a schematic diagram of the installation between the movable welded climbing pad of the ballasted rail and the iron sleeper and the rail according to one embodiment of the present invention;

[0038] Figure 5 It is a schematic diagram of a method for using a movable welded climbing pad for a ballasted rail according to an embodiment of the present invention when a line has superelevation curve;

[0039] Figure 6 It is a schematic diagram of a method for using a movable welding climbing pad for a ballast rail according to an embodiment of the present invention, in which the movable welding climbing pad for a ballast rail is supported only on the curved upper rail;

[0040] Figure 7 The present invention is a schematic diagram of a method for using a movable welding climbing pad for a ballast rail according to an embodiment of the present invention, in which the movable welding climbing pad for a ballast rail is supported on both a curved upper rail and a curved lower rail at the same time.

[0041] Description of reference numerals:

[0042] 1: upper body; 2: lower body; 3: height piece; 4: first rail bottom angle block; 5: second rail bottom angle block; 6: first embedded iron seat fixing bolt; 7: first embedded iron seat fixing nut; 8: second embedded iron seat fixing bolt; 9: second embedded iron seat fixing nut; 10: first bolt; 11: second bolt; 12: lower mounting plate; 13: first fixing block; 14: second fixing block; 15: upper mounting plate; 16: first height plate; 17: second height plate; 18: first mounting hole; 19: first threaded hole; 20: first limiting inclined plane; 21: second mounting hole; 22: second threaded hole; 23: second limiting inclined plane; 24: third mounting hole; 25: fourth mounting hole; 26: first connecting plate; 27: first limiting boss; 28: second limiting boss; 29: first flexible connector; 30: second flexible connector; 31: first fixed lifting ring; 32: second fixed lifting ring; 33: third fixed lifting ring; 34: fourth fixed lifting ring; 35: first pressing block body; 36: first pressing block height adjustment member; 37: second pressing block body; 38: second pressing block height adjustment member; 39: first weight reduction through hole; 40: second weight reduction through hole; 41: first through hole; 42: second through hole; 43: first threaded through hole; 44: second threaded through hole; 45: rail; 46: sleeper; 47: sleeper bearing rail groove; 48: first embedded iron seat; 49: The second embedded iron seat; 50: upper curved rail; 51: lower curved rail; 52: first ballast rail movable welded climbing pad; 53: second ballast rail movable welded climbing pad; H1: height difference between upper curved rail and lower curved rail; H2: height difference between upper curved rail and lower curved rail after only supporting the upper curved rail; h1: height of first ballast rail movable welded climbing pad; h2: height of second ballast rail movable welded climbing pad. DETAILED DESCRIPTION

[0043] The present invention is described in detail below in conjunction with the embodiments. The same components are denoted by the same reference numerals. It should be noted that the words "front", "rear", "left", "right", "upper" and "lower" used in the following description refer to directions in the drawings, and the words "inner" and "outer" refer to directions toward or away from the geometric center of a specific component, respectively.

[0044] like Figures 1 to 4 As shown, the present invention provides a ballasted rail movable welding climbing pad, including an upper body 1, a lower body 2, a height member 3, a first rail bottom angle pressing block 4, a second rail bottom angle pressing block 5, a first embedded iron seat fixing bolt 6, a first embedded iron seat fixing nut 7, a second embedded iron seat fixing bolt 8, a second embedded iron seat fixing nut 9, a first bolt 10, and a second bolt 11, wherein: the lower body 2 includes a lower mounting plate 12 and a first fixing block 13 and a second fixing block 14 that are relatively installed on both outer sides of the lower mounting plate 12; the upper body 1 includes a first fixing block 13 and a second fixing block 14 that are parallel to the lower mounting plate 12. The upper mounting plate 15 is provided; the height member 3 includes a first height plate 16 and a second height plate 17, which are relatively arranged and installed between the upper mounting plate 15 and the lower mounting plate 12, and the length direction of the first height plate 16 and the second height plate 17 is parallel to the length direction of the rail 45; the first rail bottom angle pressing block 4 and the second rail bottom angle pressing block 5 are respectively located on both sides of the upper body 1, the top surface of the first rail bottom angle pressing block 4 is provided with a first mounting hole 18, the top surface of the first fixing block 13 is provided with a first threaded hole 19, and the first bolt 10 is sequentially provided with After passing through the first mounting hole 18 and the first threaded hole 19, the first fixing block 13 is threadedly installed. One side of the first rail bottom angle pressing block 4 is provided with a first limiting inclined surface 20 for fitting the inclined surface of one side of the rail bottom angle of the rail 45; the top surface of the second rail bottom angle pressing block 5 is provided with a second mounting hole 21, and the top surface of the second fixing block 14 is provided with a second threaded hole 22. The second bolt 11 passes through the second mounting hole 21 and the second threaded hole 22 in sequence and is threadedly installed on the second fixing block 14. One side of the second rail bottom angle pressing block 5 is provided with an inclined surface for fitting the other side of the rail bottom angle of the rail 45. A second limiting inclined surface 23 of the surface; a third mounting hole 24 is opened on the side of the first fixed block 13, and the first embedded iron seat fixing bolt 6 passes through the third mounting hole 24 and the first hole on the first embedded iron seat 48, and the first embedded iron seat fixing nut 7 is used to be fastened and installed on the first embedded iron seat fixing bolt 6; a fourth mounting hole 25 is opened on the side of the second fixed block 14, and the second embedded iron seat fixing bolt 8 passes through the fourth mounting hole 25 and the second hole on the second embedded iron seat 49, and the second embedded iron seat fixing nut 9 is used to be fastened and installed on the second embedded iron seat fixing bolt 8.

[0045] The ballasted rail movable welding climbing pad provided by the present invention comprises an upper body 1, a lower body 2, a height member 3, a first rail bottom angle pressing block 4, a second rail bottom angle pressing block 5, a first embedded iron seat fixing bolt 6, a first embedded iron seat fixing nut 7, a second embedded iron seat fixing bolt 8, a second embedded iron seat fixing nut 9, a first bolt 10, and a second bolt 11. First, the first height plate 16 and the second height plate 17 are relatively installed between the upper mounting plate 15 and the lower mounting plate 12, and the first rail bottom angle pressing block 4 and the second rail bottom angle pressing block are installed. 5 are respectively located on both sides of the upper body 1, and are placed on the top surfaces of the first fixing block 13 and the second fixing block 14 respectively; then, the first bolt 10 is sequentially passed through the first mounting hole 18 and the first threaded hole 19 and then threadedly installed on the first fixing block 13, and the second bolt 11 is sequentially passed through the second mounting hole 21 and the second threaded hole 22 and then threadedly installed on the second fixing block 14; finally, the lower body 2 is placed in the sleeper bearing groove 47, and the first embedded iron seat fixing bolt 6 is passed through the third mounting hole 24 and the first embedded iron seat 48. The first hole is used to fasten the first embedded iron seat fixing nut 7 on the first embedded iron seat fixing bolt 6, and the second embedded iron seat fixing bolt 8 is passed through the fourth installation hole 25 and the second hole on the second embedded iron seat 49, and the second embedded iron seat fixing nut 9 is fastened and installed on the second embedded iron seat fixing bolt 8, so that the ballasted rail mobile welding climbing pad is installed on the existing first embedded iron seat 48 and the second embedded iron seat 49; the first bolt 10 and the second bolt 11 are loosened, so that the first limiting inclined surface 20 and the second limiting inclined surface 23 are facing away from each other. The rail 45 is placed on the top surface of the upper mounting plate 15, and the first limiting bevel 20 and the second limiting bevel 23 are arranged relatively to each other, and the first bolt 10 and the second bolt 11 are tightened to make the first limiting bevel 20 fit on the bevel on one side of the bottom angle of the rail 45, and the second limiting bevel 23 fit on the bevel on the other side of the bottom angle of the rail 45, thereby limiting the bottom angle of the rail 45, realizing the horizontal and longitudinal limiting fixation of the rail in the lifted state and the movable welding climbing operation of the ballasted track rail with embedded iron seat fasteners.

[0046] It should be noted that the first embedded iron seat 48 , the second embedded iron seat 49 , the sleeper 46 , the sleeper rail groove 47 , and the rail 45 are all existing components on site, and the sleeper rail groove 47 is arranged on the sleeper 46 .

[0047] In one embodiment of the present invention, the top surface of the first height plate 16 is mounted on the bottom surface of the upper mounting plate 15, the bottom surface of the first height plate 16 is mounted on the top surface of the lower mounting plate 12, the top surface of the second height plate 17 is mounted on the bottom surface of the upper mounting plate 15, the bottom surface of the second height plate 17 is mounted on the top surface of the lower mounting plate 12, and the first height plate 16 and the second height plate 17 are both mounted between the upper mounting plate 15 and the lower mounting plate 12, thereby increasing the structural stability of the movable welded climbing pad for the ballasted rail.

[0048] like Figure 3 As shown, the height member 3 further includes a first connecting plate 26, and both ends of the first connecting plate 26 are respectively installed between the first height plate 16 and the second height plate 17. In this embodiment, the first connecting plate 26 increases the connection strength between the first height plate 16 and the second height plate 17, thereby improving the structural stability of the movable welded climbing pad for the ballasted rail.

[0049] like Figure 1 and Figure 2 As shown, the upper mounting plate 15 is provided with a first limiting boss 27 and a second limiting boss 28 on both sides along the length direction of the upper mounting plate 15, and the distance between the first limiting boss 27 and the second limiting boss 28 is greater than the width of the rail 45. It should be noted that the length direction of the upper mounting plate 15 is perpendicular to the length direction of the rail 45. In this embodiment, when the rail 45 is mounted on the top surface of the upper mounting plate 15, the first limiting boss 27 and the second limiting boss 28 can limit the rail 45 in the horizontal direction, thereby improving the convenience of using the movable welding climbing pad for the ballasted rail.

[0050] like Figure 1 and Figure 2 As shown, it also includes a first flexible connector 29 and a second flexible connector 30, one end of the first flexible connector 29 is mounted on the first rail bottom angle block 4, and the other end of the first flexible connector 29 is mounted on the first fixed block 13; one end of the second flexible connector 30 is mounted on the second rail bottom angle block 5, and the other end of the second flexible connector 30 is mounted on the second fixed block 14. In this embodiment, the first flexible connector 29 can prevent the first rail bottom angle block 4 from being lost, and the second flexible connector 30 can prevent the second rail bottom angle block 5 from being lost, thereby improving the convenience of using the mobile welding climbing pad for ballast rail.

[0051] like Figure 1 and Figure 2 As shown, the first two ends of the first flexible connector 29 are respectively provided with a first fixed lifting ring 31 and a second fixed lifting ring 32, the first fixed lifting ring 31 is threadedly mounted on the first rail bottom angle block 4, and the second fixed lifting ring 32 is threadedly mounted on the first fixed block 13. In this embodiment, the first flexible connector 29 is threadedly mounted on the first rail bottom angle block 4 and the first fixed block 13 through the first fixed lifting ring 31 and the second fixed lifting ring 32, respectively, which improves the convenience of using the mobile welding climbing pad for the ballast rail.

[0052] like Figure 1 and Figure 2As shown, the second flexible connector 30 is provided with a third fixed lifting ring 33 and a fourth fixed lifting ring 34 at both ends, the third fixed lifting ring 33 is threadedly mounted on the second rail bottom angle pressing block 5, and the fourth fixed lifting ring 34 is threadedly mounted on the second fixed block 14. In this embodiment, the second flexible connector 30 is threadedly mounted on the second rail bottom angle pressing block 5 and the second fixed block 14 through the third fixed lifting ring 33 and the fourth fixed lifting ring 34, respectively, which improves the convenience of using the mobile welding climbing pad for the ballast rail.

[0053] like Figure 1 and Figure 2 As shown, the first rail bottom angle pressure block 4 includes a detachable first pressure block body 35 and a first pressure block height adjusting piece 36, the top surface of the first pressure block height adjusting piece 36 is fitted on the bottom surface of the first pressure block body 35, the bottom surface of the first pressure block height adjusting piece 36 is fitted on the top surface of the first fixed block 13, and the first limiting slope 20 is arranged on the side of the first pressure block body 35; the second rail bottom angle pressure block 5 includes a detachable second pressure block body 37 and a second pressure block height adjusting piece 38, the top surface of the second pressure block height adjusting piece 38 is fitted on the bottom surface of the second pressure block body 37, the bottom surface of the second pressure block height adjusting piece 38 is fitted on the top surface of the second fixed block 14, and the second limiting slope 23 is arranged on the side of the second pressure block body 37. In this embodiment, the height of the first rail bottom angle pressure block 4 can be changed by replacing the first pressure block height adjusting piece 36, and the height of the second rail bottom angle pressure block 5 can be changed by replacing the second pressure block height adjusting piece 38, so as to adapt to rails 45 of different heights and improve the adaptability of the ballasted rail mobile welding climbing pad.

[0054] like Figure 1 and Figure 2 As shown, the top surface of the upper body 1 is provided with a first weight-reducing through hole 39, and the top surface of the lower body 2 is provided with a second weight-reducing through hole 40. In this embodiment, specifically, the first weight-reducing through hole 39 reduces the weight of the upper body 1, and the second weight-reducing through hole 40 reduces the weight of the lower body 2, thereby reducing the weight of the movable welding climbing pad for ballast type rails, and reducing the production cost of the movable welding climbing pad for ballast type rails. On the other hand, the opening size of the weight-reducing through hole can be ergonomically designed, so that the operator can pick up the movable welding climbing pad for ballast type rails by hand.

[0055] like Figure 1 and Figure 2As shown, it also includes multiple first connecting bolts and multiple second connecting bolts. The top surface of the upper mounting plate 15 is provided with multiple first through holes 41, the top surface of the lower mounting plate 12 is provided with multiple second through holes 42, the top surface of the first height plate 16 is provided with multiple first threaded through holes 43, and the bottom surface of the second height plate 17 is provided with multiple second threaded through holes 44. The multiple first connecting bolts, the multiple second connecting bolts, the multiple first through holes 41, the multiple second through holes 42, the multiple first threaded through holes 43, and the multiple second threaded through holes 44 are all arranged in a one-to-one correspondence. The multiple first connecting bolts pass through the multiple first through holes 41 one by one and are then threadedly installed in the multiple first threaded through holes 43. The multiple second connecting bolts pass through the multiple second through holes 42 one by one and are then threadedly installed in the multiple second threaded through holes 44. In the present embodiment, specifically, the first through hole 41 can be a countersunk hole, and the second through hole 42 can be a countersunk hole. A plurality of first connecting bolts sequentially pass through a plurality of first through holes 41 and a plurality of first threaded through holes 43 of the upper mounting plate 15 and are threadedly installed in the plurality of first threaded through holes 43. A plurality of second connecting bolts sequentially pass through a plurality of second through holes 42 and a plurality of second threaded through holes 44 of the lower mounting plate 12 and are threadedly installed in the plurality of second threaded through holes 44, thereby improving the convenience of installation or disassembly of the mobile weld climbing pad for the ballasted rail.

[0056] like Figures 1 to 7 As shown, based on the same inventive concept, the present invention also provides a method for using a movable welded climbing pad for a ballasted rail, using the movable welded climbing pad for a ballasted rail described in any of the above embodiments to replace rails in a straight section of a ballasted track line or to replace a curved rail in a curved section, comprising the following steps:

[0057] Step 1: Investigate the line conditions of the construction section, clarify the track type, fastener type, and determine the required support height;

[0058] Step 2: Determine the height of the height member 3 according to the height of the support pad required. Before construction, first install the first height plate 16 and the second height plate 17 between the upper mounting plate 15 and the lower mounting plate 12 in a relatively arranged manner, and place the first rail bottom angle pressing block 4 and the second rail bottom angle pressing block 5 on both sides of the upper body 1, and place them on the top surfaces of the first fixing block 13 and the second fixing block 14, respectively.

[0059] Step 3, remove the original fasteners of the supported rail, lift the supported rail in the vertical direction, use an electric hand tool to loosen the first bolt 10 and the second bolt 11, so that the first limiting inclined surface 20 and the second limiting inclined surface 23 are set back to back, and the corresponding ballasted rail mobile welding climbing pad is placed on the sleeper bearing rail groove 47 to ensure that the installation direction is correct; pass the first embedded iron seat fixing bolt 6 through the third installation hole 24 and the first hole on the first embedded iron seat, tighten the first embedded iron seat fixing nut 7 to the first embedded iron seat fixing bolt 6, pass the second embedded iron seat fixing bolt 8 through the fourth installation hole 25 and the second hole on the second embedded iron seat, and tighten the second embedded iron seat fixing nut 9 to the second embedded iron seat fixing bolt 8, so as to install the ballasted rail mobile welding climbing pad on the existing first embedded iron seat and the second embedded iron seat;

[0060] Step 4: put the supported rail in place, ensure that the rail bottom of the supported rail is on the top surface of the upper mounting plate 15, fit the first limiting inclined surface 20 on the first rail bottom angle pressing block 4 and the second limiting inclined surface 23 on the second rail bottom angle pressing block 5 on the inclined surfaces on both sides of the rail bottom angle of the supported rail respectively, pass the first bolt 10 through the first mounting hole 18 and the first threaded hole 19 in sequence and then threadably install it on the first fixing block 13, pass the second bolt 11 through the second mounting hole 21 and the second threaded hole 22 in sequence and then threadably install it on the second fixing block 14, tighten the first bolt 10 and the second bolt 11 with an electric hand tool, and the double locking mechanism of the movable welding climbing pad for the ballast type rail and the sleeper 46, and the rail and the movable welding climbing pad for the ballast type rail can be realized;

[0061] Step 5. At this time, the rail mobile welding equipment moves to the support area to carry out rail welding operations. After the welding operation is completed, the welding equipment leaves the ballasted rail mobile welding climbing pad section. At this time, the ballasted rail mobile welding climbing pad is removed, and the original first bolts 10 and second bolts 11 of the line are removed using electric hand tools, the first rail bottom angle pressing block 4 and the second rail bottom angle pressing block 5 are removed, the supported rail is lifted, the first embedded iron seat fixing bolt 6, the first embedded iron seat fixing nut 7, the second embedded iron seat fixing bolt 8, and the second embedded iron seat fixing nut 9 are removed, and the ballasted rail mobile welding climbing pad is moved out of the sleeper bearing groove 47, and the supported rail is locked using the original fasteners of the line.

[0062] It should be noted that: when construction work is carried out in the curved section, due to the superelevation of the curve between the two rails, the higher side is generally called the upper rail and the lower side is called the lower rail. When the sum of the height difference between the upper rail 50 and the lower rail 51 and the height of the first ballastless rail mobile welding climbing pad 52 is less than or equal to 120mm, the above operation steps are used for support, which will not affect the extension and retraction operation of the welding machine head of the rail mobile welding equipment, and can be used in conjunction with the gauge pull rod to reduce the risk of the rail mobile welding equipment falling off the track and overturning.

[0063] The present invention provides a method for using a movable welding climbing pad for a ballasted rail, comprising an upper body 1, a lower body 2, a height member 3, a first rail bottom angle pressing block 4, a second rail bottom angle pressing block 5, a first embedded iron seat fixing bolt 6, a first embedded iron seat fixing nut 7, a second embedded iron seat fixing bolt 8, a second embedded iron seat fixing nut 9, a first bolt 10, and a second bolt 11. First, a first height plate 16 and a second height plate 17 are relatively installed between an upper mounting plate 15 and a lower mounting plate 12, and the first rail bottom angle pressing block 4 and the second rail bottom angle pressing block 5 are installed. The bottom corner pressing blocks 5 are respectively located on both sides of the upper body 1, and are respectively placed on the top surfaces of the first fixing block 13 and the second fixing block 14; then, the first bolt 10 is sequentially passed through the first mounting hole 18 and the first threaded hole 19 and then threadedly installed on the first fixing block 13, and the second bolt 11 is sequentially passed through the second mounting hole 21 and the second threaded hole 22 and then threadedly installed on the second fixing block 14; finally, the lower body 2 is placed in the sleeper bearing groove 47, and the first embedded iron seat fixing bolt 6 is passed through the third mounting hole 24 and the first embedded iron seat 4 8, the first embedded iron seat fixing nut 7 is fastened and installed on the first embedded iron seat fixing bolt 6, the second embedded iron seat fixing bolt 8 is passed through the fourth installation hole 25 and the second hole on the second embedded iron seat 49, and the second embedded iron seat fixing nut 9 is fastened and installed on the second embedded iron seat fixing bolt 8, so that the ballasted rail mobile welding climbing pad is installed on the existing first embedded iron seat 48 and the second embedded iron seat 49; loosen the first bolt 10 and the second bolt 11, so that the first limiting inclined surface 20 and the second limiting inclined surface 23 The rail 45 is arranged back to back, and the rail 45 is placed on the top surface of the upper mounting plate 15. The first limiting bevel 20 and the second limiting bevel 23 are arranged relatively to each other, and the first bolt 10 and the second bolt 11 are tightened to make the first limiting bevel 20 fit on the bevel on one side of the bottom angle of the rail 45, and the second limiting bevel 23 fit on the bevel on the other side of the bottom angle of the rail 45, thereby limiting the bottom angle of the rail 45, realizing the horizontal and longitudinal limiting fixation of the rail in the lifted state and the movable welding climbing operation of the ballasted track rail with embedded iron seat fasteners.

[0064] like Figures 1 to 7 As shown, based on the same inventive concept, the present invention also provides a method for using a movable welded climbing pad for a ballasted rail, using the movable welded climbing pad for a ballasted rail described in any of the above embodiments to replace the upper rail of a curved section of a ballasted track line, comprising the following steps:

[0065] Step 1: Investigate the line conditions of the construction section, clarify the track type, fastener type, and determine the required support height;

[0066] Step 2: Determine the height of the height member 3 according to the height of the support pad required. Before construction, first install the first height plate 16 and the second height plate 17 between the upper mounting plate 15 and the lower mounting plate 12 in a relatively arranged manner, and place the first rail bottom angle pressing block 4 and the second rail bottom angle pressing block 5 on both sides of the upper body 1, and place them on the top surfaces of the first fixing block 13 and the second fixing block 14, respectively.

[0067] Step 3: on the side of the curved upper rail, remove the original fasteners of the curved upper rail, lift the curved upper rail in the vertical direction, use an electric hand tool to loosen the first bolt 10 and the second bolt 11, so that the first limiting inclined surface 20 and the second limiting inclined surface 23 are set back to back, and the corresponding first ballast rail mobile welding climbing pad 52 is placed on the sleeper bearing rail groove to ensure that the installation direction is correct; pass the first embedded iron seat fixing bolt 6 through the third installation hole 24 and the first hole on the first embedded iron seat, fasten the first embedded iron seat fixing nut 7 to the first embedded iron seat fixing bolt 6, pass the second embedded iron seat fixing bolt 8 through the fourth installation hole 25 and the second hole on the second embedded iron seat, and fasten the second embedded iron seat fixing nut 9 to the second embedded iron seat fixing bolt 8, thereby installing the first ballast rail mobile welding climbing pad 52 on the existing first embedded iron seat and the second embedded iron seat;

[0068] Step 4: put the curved upper rail in place, ensure that the rail bottom of the curved upper rail is on the top surface of the upper mounting plate 15, fit the first limiting inclined surface 20 on the first rail bottom angle pressing block 4 and the second limiting inclined surface 23 on the second rail bottom angle pressing block 5 on the inclined surfaces on both sides of the rail bottom angle of the curved upper rail 50 respectively, pass the first bolt 10 through the first mounting hole 18 and the first threaded hole 19 in sequence, and then threadably install it on the first fixing block 13, pass the second bolt 11 through the second mounting hole 21 and the second threaded hole 22 in sequence, and then threadably install it on the second fixing block 14, use an electric hand tool to tighten the first bolt 10 and the second bolt 11, and the double locking mechanism of the first ballast rail movable welding climbing pad 52 and the sleeper, and the rail and the first ballast rail movable welding climbing pad 52 can be realized;

[0069] Step 5. At this time, the rail mobile welding equipment moves to the support area to carry out rail welding operations. After the welding operation is completed, the welding equipment leaves the support section. At this time, the first ballasted rail mobile welding climbing pad 52 is removed, and the original first bolts 10 and second bolts 11 of the line are removed using electric hand tools, and the first rail bottom angle pressing block 4 and the second rail bottom angle pressing block 5 are removed. The first ballasted rail mobile welding climbing pad 52 is lifted, and the first embedded iron seat fixing bolt 6, the first embedded iron seat fixing nut 7, the second embedded iron seat fixing bolt 8, and the second embedded iron seat fixing nut 9 are removed, and the first ballasted rail mobile welding climbing pad 52 is moved out of the sleeper bearing groove 47, and the curved upper rail is locked using the original fasteners of the line.

[0070] It should be noted that when the height difference between the upper curved rail 50 and the lower curved rail 51 and the height of the first ballastless rail mobile welding climbing pad 52 is less than or equal to 120 mm, the above operating steps are used for support, which will not affect the extension and retraction operation of the welding machine head of the rail mobile welding equipment. When used in conjunction with the gauge pull rod, the risk of derailment and overturning of the rail mobile welding equipment can be reduced.

[0071] In one embodiment of the present invention, the following steps are also included: Step 6, on the side of the curved lower rail 51, the original fasteners of the curved lower rail 51 are removed, the curved lower rail 51 is lifted in the vertical direction, and the corresponding second ballast rail mobile welded climbing pad 53 is placed on the sleeper bearing rail groove 47 to ensure that the installation direction is correct; use an electric hand tool to loosen the first bolt 10 and the second bolt 11, so that the first limiting inclined surface 20 and the second limiting inclined surface 23 are set back to back, and the corresponding second ballast rail mobile welded climbing pad 53 is placed on the sleeper bearing rail groove The groove 47 is placed on the bottom surface of the second embedded iron seat, and the second embedded iron seat fixing nut 9 is fixedly installed on the second embedded iron seat fixing bolt 8, thereby installing the second ballast rail mobile welding climbing pad 53 on the existing first embedded iron seat and the second embedded iron seat;

[0072] Step 7, put the curved lower rail in place, ensure that the rail bottom of the curved lower rail is on the top surface of the upper mounting plate 15, fit the first limiting inclined surface 20 on the first rail bottom angle pressing block 4 and the second limiting inclined surface 23 on the second rail bottom angle pressing block 5 on the inclined surfaces on both sides of the rail bottom angle of the curved lower rail respectively, pass the first bolt 10 through the first mounting hole 18 and the first threaded hole 19 in sequence, and then threadably install it on the first fixing block 13, pass the second bolt 11 through the second mounting hole 21 and the second threaded hole 22 in sequence, and then threadably install it on the second fixing block 14, use an electric hand tool to tighten the first bolt 10 and the second bolt 11, and then realize the double locking mechanism of the second ballast rail movable welding climbing pad 53 and the sleeper, and the rail and the second ballast rail movable welding climbing pad 53;

[0073] Step eight, at this time, the rail mobile welding equipment moves to the support area to carry out the rail welding operation. After the welding operation is completed, the welding equipment leaves the support section. At this time, the second ballasted rail mobile welding climbing pad 53 is removed, and the original first bolts 10 and second bolts 11 of the line are removed using electric hand tools, and the first rail bottom angle pressing block 4 and the second rail bottom angle pressing block 5 are removed. The second ballasted rail mobile welding climbing pad 53 is lifted, and the first embedded iron seat fixing bolt 6, the first embedded iron seat fixing nut 7, the second embedded iron seat fixing bolt 8, and the second embedded iron seat fixing nut 9 are removed, and the second ballasted rail mobile welding climbing pad 53 is moved out of the sleeper bearing groove 47, and the curved lower rail is locked using the original fasteners of the line.

[0074] It should be noted that: Figure 5 When there is superelevation on the curve, the height difference between the original upper rail and lower rail is H1. Figure 6 As shown, when the mobile welding operation is performed on the curved upper rail, the first ballastless rail mobile welding climbing pad 52 is used to support the curved upper rail 50 along the slope. After the support, the height difference between the rail heads of the curved upper rail 50 and the curved lower rail 51 is H2, H2=H1+h1, h1 is the height of the first ballastless rail mobile welding climbing pad 52, when the value of H2 is greater than 120mm, the extension and retraction of the welding machine head of the rail mobile welding equipment is limited, which is not conducive to the construction operation; Figure 7 As shown, when the mobile welding operation is performed on the curved upper rail 50, the first ballastless rail mobile welding climbing pad 52 is used to support the curved upper rail 50, and the second ballastless rail mobile welding climbing pad 53 is used to support the curved lower rail 51 along the slope at the same time. After the support, the height difference between the rail heads of the curved upper rail 50 and the curved lower rail 51 is H3, H3=H1+h1-h2, h2 is the height of the second ballastless rail mobile welding climbing pad 53, and by reasonably selecting the height of the second ballastless rail mobile welding climbing pad 53, the value of H3 is less than or equal to 120 mm, which can effectively avoid the limitation of the extension and retraction of the welding machine head of the rail mobile welding equipment, which is conducive to the construction operation.

[0075] The present invention provides a movable welding climbing pad for ballasted rail and a method for using the same, comprising an upper body 1, a lower body 2, a height member 3, a first rail bottom angle pressing block 4, a second rail bottom angle pressing block 5, a first embedded iron seat fixing bolt 6, a first embedded iron seat fixing nut 7, a second embedded iron seat fixing bolt 8, a second embedded iron seat fixing nut 9, a first bolt 10, and a second bolt 11. First, a first height plate 16 and a second height plate 17 are relatively installed between an upper mounting plate 15 and a lower mounting plate 12, and the first rail bottom angle pressing block 4 and the second The rail bottom angle pressing blocks 5 are respectively located on both sides of the upper body 1, and are respectively placed on the top surfaces of the first fixing block 13 and the second fixing block 14; then, the first bolt 10 is sequentially passed through the first mounting hole 18 and the first threaded hole 19 and then threadedly installed on the first fixing block 13, and the second bolt 11 is sequentially passed through the second mounting hole 21 and the second threaded hole 22 and then threadedly installed on the second fixing block 14; finally, the lower body 2 is placed in the sleeper bearing rail groove 47, and the first embedded iron seat fixing bolt 6 is passed through the third mounting hole 24 and the first embedded iron seat 48, the first embedded iron seat fixing nut 7 is fastened and installed on the first embedded iron seat fixing bolt 6, the second embedded iron seat fixing bolt 8 is passed through the fourth installation hole 25 and the second hole on the second embedded iron seat 49, and the second embedded iron seat fixing nut 9 is fastened and installed on the second embedded iron seat fixing bolt 8, so that the ballasted rail mobile welding climbing pad is installed on the existing first embedded iron seat 48 and the second embedded iron seat 49; loosen the first bolt 10 and the second bolt 11, so that the first limiting inclined surface 20 and the second limiting inclined surface 2 3 are arranged back to back, the rail 45 is placed on the top surface of the upper body 1, and then the first limiting inclined surface 20 and the second limiting inclined surface 23 are arranged opposite to each other, and the first bolt 10 and the second bolt 11 are tightened, so that the first limiting inclined surface 20 is attached to the inclined surface on one side of the rail bottom angle of the rail 45, and the second limiting inclined surface 23 is attached to the inclined surface on the other side of the rail bottom angle of the rail 45, thereby limiting the rail bottom angle of the rail 45, realizing the horizontal and vertical limiting fixation of the rail in the lifting state and the rail moving welding climbing operation of the ballasted track with embedded iron seat fasteners.

[0076] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.

Claims

1. A ballasted rail mobile welding climbing pad, characterized in that: It includes an upper body, a lower body, a height piece, a first rail bottom angle pressing block, a second rail bottom angle pressing block, a first embedded iron seat fixing bolt, a first embedded iron seat fixing nut, a second embedded iron seat fixing bolt, a second embedded iron seat fixing nut, a first bolt, and a second bolt, wherein: The lower body comprises a lower mounting plate and a first fixing block and a second fixing block which are relatively mounted on two outer sides of the lower mounting plate; The upper body comprises an upper mounting plate arranged parallel to the lower mounting plate; The height member comprises a first height plate and a second height plate, the first height plate and the second height plate are installed between the upper mounting plate and the lower mounting plate in an opposite manner, and the length direction of the first height plate and the second height plate is parallel to the length direction of the rail; The first rail bottom angle pressing block and the second rail bottom angle pressing block are respectively located on both sides of the upper body, the top surface of the first rail bottom angle pressing block is provided with a first mounting hole, the top surface of the first fixing block is provided with a first threaded hole, the first bolt passes through the first mounting hole and the first threaded hole in sequence and is threadedly installed on the first fixing block, and one side of the first rail bottom angle pressing block is provided with a first limiting inclined surface for fitting the inclined surface of one side of the rail bottom angle of the rail; A second mounting hole is provided on the top surface of the second rail bottom angle pressing block, a second threaded hole is provided on the top surface of the second fixing block, the second bolt passes through the second mounting hole and the second threaded hole in sequence and is threadedly installed on the second fixing block, and a second limiting inclined surface for fitting the inclined surface on the other side of the rail bottom angle of the steel rail is provided on one side of the second rail bottom angle pressing block; A third mounting hole is formed on the side of the first fixing block, the first embedded iron seat fixing bolt passes through the third mounting hole and the first hole on the first embedded iron seat, and the first embedded iron seat fixing nut is used to be fastened and installed on the first embedded iron seat fixing bolt; A fourth mounting hole is provided on the side of the second fixing block, the second embedded iron seat fixing bolt passes through the fourth mounting hole and the second hole on the second embedded iron seat, and the second embedded iron seat fixing nut is used for fastening and mounting on the second embedded iron seat fixing bolt.

2. The ballasted rail movable welding climbing pad according to claim 1 is characterized in that: The top surface of the first height plate is mounted on the bottom surface of the upper mounting plate, the bottom surface of the first height plate is mounted on the top surface of the lower mounting plate, the top surface of the second height plate is mounted on the bottom surface of the upper mounting plate, and the bottom surface of the second height plate is mounted on the top surface of the lower mounting plate.

3. The movable welding climbing pad for ballasted rail according to claim 1, characterized in that: The height member further includes a first connecting plate, and two ends of the first connecting plate are respectively installed between the first height plate and the second height plate.

4. The ballasted rail movable welding climbing pad according to claim 1, characterized in that: A first limiting boss and a second limiting boss are respectively arranged on both sides of the upper mounting plate along the length direction of the upper mounting plate, and a distance between the first limiting boss and the second limiting boss is greater than a width of the rail.

5. The movable welding climbing pad for ballasted rail according to claim 1, characterized in that: It also includes a first flexible connector and a second flexible connector, one end of the first flexible connector is installed on the first rail bottom angle pressure block, and the other end of the first flexible connector is installed on the first fixed block; one end of the second flexible connector is installed on the second rail bottom angle pressure block, and the other end of the second flexible connector is installed on the second fixed block.

6. The movable welding climbing pad for ballasted rail according to claim 5, characterized in that: A first fixed lifting ring and a second fixed lifting ring are respectively provided at two ends of the first flexible connector. The first fixed lifting ring is threadedly installed on the first rail bottom angle pressure block, and the second fixed lifting ring is threadedly installed on the first fixed block.

7. The movable welding climbing pad for ballasted rail according to claim 5, characterized in that: A third fixed lifting ring and a fourth fixed lifting ring are respectively provided at both ends of the second flexible connector. The third fixed lifting ring is threadedly mounted on the second rail bottom angle pressure block, and the fourth fixed lifting ring is threadedly mounted on the second fixed block.

8. The movable welding climbing pad for ballasted rail according to claim 1, characterized in that: The first rail bottom angle pressure block includes a detachable first pressure block body and a first pressure block height adjusting piece, the top surface of the first pressure block height adjusting piece is fitted on the bottom surface of the first pressure block body, the bottom surface of the first pressure block height adjusting piece is fitted on the top surface of the first fixed block, and the first limiting inclined surface is arranged on the side surface of the first pressure block body; the second rail bottom angle pressure block includes a detachable second pressure block body and a second pressure block height adjusting piece, the top surface of the second pressure block height adjusting piece is fitted on the bottom surface of the second pressure block body, the bottom surface of the second pressure block height adjusting piece is fitted on the top surface of the second fixed block, and the second limiting inclined surface is arranged on the side surface of the second pressure block body.

9. The movable welding climbing pad for ballasted rail according to claim 1, characterized in that: A first weight-reducing through hole is formed on the top surface of the upper body, and a second weight-reducing through hole is formed on the top surface of the lower body.

10. The movable welding climbing pad for ballasted rail according to claim 2, characterized in that: It also includes multiple first connecting bolts and multiple second connecting bolts, the top surface of the upper mounting plate is provided with multiple first through holes, the top surface of the lower mounting plate is opened with multiple second through holes, the top surface of the first height plate is provided with multiple first threaded through holes, and the bottom surface of the second height plate is provided with multiple second threaded through holes, multiple first connecting bolts, multiple second connecting bolts, multiple first through holes, multiple second through holes, multiple first threaded through holes, and multiple second threaded through holes are all arranged one by one, and multiple first connecting bolts pass through multiple first through holes one by one and are threadedly installed in multiple first threaded through holes, and multiple second connecting bolts pass through multiple second through holes one by one and are threadedly installed in multiple second threaded through holes.

11. A method for using a movable welded climbing pad for a ballasted rail, using the movable welded climbing pad for a ballasted rail as claimed in any one of claims 1 to 10 to replace rails in a straight section of a ballasted track or replace a lower rail in a curved section, characterized in that: The following steps are involved: Step 1: Investigate the line conditions of the construction section, clarify the track type, fastener type, and determine the required support height; Step 2: Determine the height of the height member according to the height of the support pad required. Before construction, first install the first height plate and the second height plate between the upper mounting plate and the lower mounting plate in a relatively arranged manner, and place the first rail bottom angle pressing block and the second rail bottom angle pressing block on both sides of the upper body, respectively, and place them on the top surfaces of the first fixing block and the second fixing block, respectively; Step 3, remove the original fasteners of the supported rail, lift the supported rail in the vertical direction, use an electric hand tool to loosen the first bolt and the second bolt, so that the first limiting inclined surface and the second limiting inclined surface are set back to back, and place the corresponding ballasted rail mobile welding climbing pad on the sleeper bearing rail groove to ensure that the installation direction is correct; pass the first embedded iron seat fixing bolt through the third installation hole and the first hole on the first embedded iron seat, fasten the first embedded iron seat fixing nut to the first embedded iron seat fixing bolt, pass the second embedded iron seat fixing bolt through the fourth installation hole and the second hole on the second embedded iron seat, and fasten the second embedded iron seat fixing nut to the second embedded iron seat fixing bolt, thereby installing the ballasted rail mobile welding climbing pad on the existing first embedded iron seat and the second embedded iron seat; Step 4: put the supported rail in place, ensure that the rail bottom of the supported rail is on the top surface of the upper mounting plate, fit the first limiting inclined surface on the first rail bottom angle pressure block and the second limiting inclined surface on the second rail bottom angle pressure block to the inclined surfaces on both sides of the rail bottom angle of the supported rail, pass the first bolt through the first mounting hole and the first threaded hole in sequence, and then thread it on the first fixing block, pass the second bolt through the second mounting hole and the second threaded hole in sequence, and then thread it on the second fixing block, tighten the first bolt and the second bolt with an electric hand tool, and the double locking mechanism of the movable welding climbing pad for the ballast type rail and the sleeper, and the rail and the movable welding climbing pad for the ballast type rail can be realized; Step 5. At this time, the rail mobile welding equipment moves to the support area to carry out rail welding operations. After the welding operation is completed, the welding equipment leaves the ballasted rail mobile welding climbing pad section. At this time, the ballasted rail mobile welding climbing pad is removed, and the original first bolt and second bolt of the line are removed using electric hand tools, and the first rail bottom angle block and the second rail bottom angle block are removed. The supported rail is lifted, and the first embedded iron seat fixing bolt, the first embedded iron seat fixing nut, the second embedded iron seat fixing bolt, and the second embedded iron seat fixing nut are removed. The ballasted rail mobile welding climbing pad is moved out of the sleeper rail groove, and the supported rail is locked using the original fasteners of the line.

12. A method for using a movable welded climbing pad for a ballasted rail, using the movable welded climbing pad for a ballasted rail as claimed in any one of claims 1 to 10 to replace the upper rail in a curved section of a ballasted track, characterized in that: The following steps are involved: Step 1: Investigate the line conditions of the construction section, clarify the track type, fastener type, and determine the required support height; Step 2: Determine the height of the height member according to the height of the support pad required. Before construction, first install the first height plate and the second height plate between the upper mounting plate and the lower mounting plate in a relatively arranged manner, and place the first rail bottom angle pressing block and the second rail bottom angle pressing block on both sides of the upper body, respectively, and place them on the top surfaces of the first fixing block and the second fixing block, respectively; Step 3. On the side of the curved upper rail, remove the original fasteners of the curved upper rail, lift the curved upper rail in the vertical direction, use an electric hand tool to loosen the first bolt and the second bolt, so that the first limiting inclined surface and the second limiting inclined surface are set back to back, and place the corresponding first ballast rail mobile welded climbing pad on the sleeper bearing rail groove to ensure that the installation direction is correct; pass the first embedded iron seat fixing bolt through the third installation hole and the first hole on the first embedded iron seat, fasten the first embedded iron seat fixing nut to the first embedded iron seat fixing bolt, pass the second embedded iron seat fixing bolt through the fourth installation hole and the second hole on the second embedded iron seat, and fasten the second embedded iron seat fixing nut to the second embedded iron seat fixing bolt, thereby installing the first ballast rail mobile welded climbing pad on the existing first embedded iron seat and the second embedded iron seat; Step 4: put the curved upper rail in place, ensure that the rail bottom of the curved upper rail is on the top surface of the upper mounting plate, fit the first limiting inclined surface on the first rail bottom angle pressure block and the second limiting inclined surface on the second rail bottom angle pressure block to the inclined surfaces on both sides of the rail bottom angle of the curved upper rail respectively, pass the first bolt through the first mounting hole and the first threaded hole in sequence, and then thread it on the first fixing block, pass the second bolt through the second mounting hole and the second threaded hole in sequence, and then thread it on the second fixing block, tighten the first bolt and the second bolt with an electric hand tool, and the double locking mechanism of the first ballast rail mobile welding climbing pad and the sleeper, and the rail and the first ballast rail mobile welding climbing pad can be realized; Step 5. At this time, the rail mobile welding equipment moves to the support area to carry out rail welding operations. After the welding operation is completed, the welding equipment leaves the support section. At this time, the first ballasted rail mobile welding climbing pad is removed, and the original first bolt and second bolt of the line are removed using electric hand tools, and the first rail bottom angle pressure block and the second rail bottom angle pressure block are removed. The first ballasted rail mobile welding climbing pad is lifted, and the first embedded iron seat fixing bolt, the first embedded iron seat fixing nut, the second embedded iron seat fixing bolt, and the second embedded iron seat fixing nut are removed, and the first ballasted rail mobile welding climbing pad is moved out of the sleeper bearing groove, and the curved upper rail is locked using the original fasteners of the line.

13. The method for using the ballasted rail mobile welding climbing pad according to claim 12, characterized in that: The following steps are also included: Step 6. On the side of the curved lower rail, remove the original fasteners of the curved lower rail, lift the curved lower rail in the vertical direction, and place the corresponding second ballast rail mobile welded climbing pad on the sleeper rail groove to ensure the correct installation direction; use an electric hand tool to loosen the first bolt and the second bolt, so that the first limiting inclined surface and the second limiting inclined surface are set back to back, and place the corresponding second ballast rail mobile welded climbing pad on the sleeper rail groove to ensure the correct installation direction; pass the first embedded iron seat fixing bolt through the third mounting hole and the first hole on the first embedded iron seat, fasten the first embedded iron seat fixing nut to the first embedded iron seat fixing bolt, pass the second embedded iron seat fixing bolt through the fourth mounting hole and the second hole on the second embedded iron seat, and fasten the second embedded iron seat fixing nut to the second embedded iron seat fixing bolt, thereby installing the second ballast rail mobile welded climbing pad on the existing first embedded iron seat and the second embedded iron seat; Step 7, put the curved lower rail in place, ensure that the rail bottom of the curved lower rail is on the top surface of the upper mounting plate, fit the first limiting inclined surface on the first rail bottom angle pressing block and the second limiting inclined surface on the second rail bottom angle pressing block to the inclined surfaces on both sides of the rail bottom angle of the curved lower rail respectively, pass the first bolt through the first mounting hole and the first threaded hole in sequence, and then thread it on the first fixing block, pass the second bolt through the second mounting hole and the second threaded hole in sequence, and then thread it on the second fixing block, tighten the first bolt and the second bolt with an electric hand tool, and the second ballast rail movable welding climbing pad and the sleeper, and the rail and the second ballast rail movable welding climbing pad double locking mechanism can be realized; Step 8. At this time, the rail mobile welding equipment moves to the support area to carry out rail welding operations. After the welding operation is completed, the welding equipment leaves the support section. At this time, the second ballasted rail mobile welding climbing pad is removed, and the original first bolt and second bolt of the line are removed using electric hand tools, and the first rail bottom angle pressure block and the second rail bottom angle pressure block are removed. The second ballasted rail mobile welding climbing pad is lifted, and the first embedded iron seat fixing bolt, the first embedded iron seat fixing nut, the second embedded iron seat fixing bolt, and the second embedded iron seat fixing nut are removed, and the second ballasted rail mobile welding climbing pad is moved out of the sleeper bearing groove, and the curved lower rail is locked using the original fasteners of the line.

Citation Information

Patent Citations

  • Steel rail fastener mounting method

    CN119194922A

  • Metal sleeper cushion

    CN203602974U

  • Rail heightening fastener

    CN204325825U

  • Metal rail sleeper bolster special for rail line welding composition construction

    CN204455729U

  • Shoulder-free fastener for urban rail transit

    CN212505646U