Load instruction determination method and device, storage medium and electronic device

By obtaining automatic power generation control signals and low-frequency load signals, the actual response signal change of the pyroelectric device and coal-fired machine are determined, and the advantages of the pyroelectric machine and the pyroelectric system are combined to solve the problem of lack of a coordinated frequency solution in the existing technology, and more effective frequency control and stability of the power system are achieved.

CN119765358APending Publication Date: 2025-04-04华能张掖能源有限公司 +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411743329.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-11-29
Publication Date
2025-04-04

AI Technical Summary

Technical Problem

The existing technology lacks a coordinated frequency regulation solution that combines the capacity advantages of thermal power units and the adjustment performance advantages of hydrogen production systems, and it is difficult to effectively respond to the minute-level frequency regulation requirements of new power systems.

Method used

By obtaining the automatic power generation control signal and low-frequency load signal at the current time, the actual response signal change of the hydrogen production device and the coal-fired unit is determined, and the load command is determined based on these changes to achieve coordinated frequency regulation.

Benefits of technology

This method can effectively combine the advantages of thermal power units and hydrogen production systems to improve the overall adjustment capability of the system, and achieve more effective frequency control and power system stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119765358A_ABST
    Figure CN119765358A_ABST
Patent Text Reader

Abstract

The invention discloses a load instruction determination method and device, a storage medium and an electronic device, and the method comprises the steps: obtaining an automatic power generation control signal at a current moment, and obtaining a signal sequence corresponding to the automatic power generation control signal; filtering the signal sequence through a preset filter to obtain a low-frequency load signal corresponding to the signal sequence; determining a first actual response signal variable quantity of a hydrogen production device according to the automatic power generation control signal and the low-frequency load signal, and determining a second actual response signal variable quantity of a coal-fired unit; and determining a first load instruction of the hydrogen production device and the coal-fired unit according to the first actual response signal variable quantity and the second actual response signal variable quantity. The problem that a cooperative frequency modulation scheme combining the capacity advantage of the thermal power generating unit and the regulation performance advantage of the hydrogen production system is lacked is solved, and the load instruction determination difficulty is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of power systems, and in particular to a method and device for determining a load instruction, a storage medium, and an electronic device. Background Art

[0002] With the high proportion of new energy and power electronic equipment connected to the power system, the inertia and frequency stability of the power grid are further weakened. Traditional frequency regulation uses thermal power units as the main frequency regulation resource, but the response characteristics of thermal power units are poor and it is difficult to cope with the minute-level frequency regulation requirements of the new power system.

[0003] Research from the Pacific Northwest National Laboratory (PNNL) in the United States shows that 1MW of ideal regulation resources can replace the frequency regulation capacity of several MW of thermal power units. The water electrolysis hydrogen production system (i.e., hydrogen production device) has strong adaptability to power fluctuations and can achieve a second-level response to input power. It is coupled with a thermal power plant and, as a highly adjustable ideal flexibility resource, can participate in the peak and frequency regulation services of the thermal power plant. However, although the hydrogen production system has excellent regulation performance, its regulation range is constrained by the installed capacity and the system energy of the equipment itself, and it is an energy-limited regulation resource.

[0004] Combining the capacity advantages of thermal power units and the regulatory performance advantages of hydrogen production systems can improve the overall regulation capabilities of the system, but there is currently a lack of coordinated frequency regulation solutions that can combine the capacity advantages of thermal power units and the regulatory performance advantages of hydrogen production systems.

[0005] There is a lack of coordinated frequency regulation solutions that combine the capacity advantages of thermal power units and the regulatory performance advantages of hydrogen production systems in related technologies, and no effective solution has yet been found. Summary of the invention

[0006] The embodiments of the present application provide a method and device for determining a load instruction, a storage medium, and an electronic device to at least solve the problem in the prior art of lacking a coordinated frequency regulation solution that combines the capacity advantages of thermal power units and the regulatory performance advantages of hydrogen production systems.

[0007] According to an embodiment of the present application, a method for determining a load instruction is provided, including: obtaining an automatic power generation control signal at a current moment, and obtaining a signal sequence corresponding to the automatic power generation control signal; filtering the signal sequence through a preset filter to obtain a low-frequency load signal corresponding to the signal sequence; determining a first actual response signal change of a hydrogen production device through the automatic power generation control signal and the low-frequency load signal, and determining a second actual response signal change of a coal-fired unit; determining a first load instruction of the hydrogen production device and the coal-fired unit through the first actual response signal change and the second actual response signal change.

[0008] In an exemplary embodiment, a first actual response signal change amount of the hydrogen production device is determined by the automatic power generation control signal and the low-frequency load signal, including: determining a response signal that requires the hydrogen production device to respond by the automatic power generation control signal and the low-frequency load signal; determining an adjustable load range of the hydrogen production device; and determining the first actual response signal change amount by the response signal and the adjustable load range.

[0009] In an exemplary embodiment, determining the adjustable load range of the hydrogen production device includes: determining the operating load of the hydrogen production device at the current moment; and obtaining the upper load limit and the lower load limit of the hydrogen production device; determining a first difference between the upper load limit and the operating load, and determining a second difference between the operating load and the lower load limit; and determining the adjustable load range through the first difference and the second difference.

[0010] In an exemplary embodiment, the first actual response signal change amount is determined by the response signal and the adjustable load range, including: when the response signal is greater than a target value, the first actual response signal change amount is determined by the response signal and the lower limit of the adjustable load range; when the response signal is less than the target value, the first actual response signal change amount is determined by the response signal and the upper limit of the adjustable load range.

[0011] In an exemplary embodiment, determining the second actual response signal change of the coal-fired unit includes: determining a third difference between the automatic power generation control signal and the first actual response signal change; and determining the third difference as the second actual response signal change.

[0012] In an exemplary embodiment, a first load instruction for the hydrogen production device and the coal-fired unit is determined by the first actual response signal change and the second actual response signal change, including: determining a second load instruction for the hydrogen production device at a moment before the current moment, and determining a third load instruction for the coal-fired unit at the moment before the current moment; determining a first sum of the second load instruction and the first actual response signal change, and determining a second sum of the third load instruction and the second actual response signal change; and determining the first sum and the second sum as the first load instruction.

[0013] According to another embodiment of the embodiment of the present application, a load instruction determination device is also provided, including: an acquisition module, used to obtain an automatic power generation control signal at a current moment, and obtain a signal sequence corresponding to the automatic power generation control signal; a filtering module, used to filter the signal sequence through a preset filter to obtain a low-frequency load signal corresponding to the signal sequence; a first determination module, used to determine a first actual response signal change of the hydrogen production device through the automatic power generation control signal and the low-frequency load signal, and determine a second actual response signal change of the coal-fired unit; a second determination module, used to determine the first load instruction of the hydrogen production device and the coal-fired unit through the first actual response signal change and the second actual response signal change.

[0014] According to another aspect of the embodiments of the present application, a computer-readable storage medium is provided, in which a computer program is stored, wherein the computer program is configured to execute the above method when running.

[0015] According to another aspect of the embodiments of the present application, an electronic device is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor executes the method through the computer program.

[0016] According to another aspect of the embodiments of the present application, a computer program product is provided, including a computer program, and when the computer program is executed by a processor, the steps in any of the above method embodiments are implemented.

[0017] In an embodiment of the present application, the automatic power generation control signal at the current moment is obtained, and the signal sequence corresponding to the automatic power generation control signal is obtained; the signal sequence is filtered by a preset filter to obtain a low-frequency load signal corresponding to the signal sequence; the first actual response signal change of the hydrogen production device is determined by the automatic power generation control signal and the low-frequency load signal, and the second actual response signal change of the coal-fired unit is determined; the first load instruction of the hydrogen production device and the coal-fired unit is determined by the first actual response signal change and the second actual response signal change. Through the above embodiments, the problem of the lack of a coordinated frequency modulation scheme combining the capacity advantages of thermal power units and the regulation performance advantages of hydrogen production systems in related technologies is solved, and the technical effect of determining the first load instruction and then coordinated frequency modulation is achieved. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:

[0019] Figure 1 It is a hardware structure block diagram of a computer terminal of a method for determining a load instruction according to an embodiment of the present application;

[0020] Figure 2 is a flow chart of a method for determining a load instruction according to an embodiment of the present application;

[0021] Figure 3 is another flow chart of a method for determining a load instruction according to an embodiment of the present application;

[0022] Figure 4 It is a structural block diagram of a device for determining a load instruction according to an embodiment of the present application. DETAILED DESCRIPTION

[0023] In order to enable those skilled in the art to better understand the solution of the present application, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present application.

[0024] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product, or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products, or devices; "plurality" means two or more.

[0025] The method embodiments provided in the embodiments of the present application can be executed in a computer terminal or similar computing device or cloud platform or independent physical server or software platform, wherein the above software platform is run through one or more servers. Taking running on a computer terminal as an example, Figure 1 FIG. 1 is a hardware structure block diagram of a computer terminal of a method for determining a load instruction according to an embodiment of the present application. Figure 1 As shown, the computer terminal may include one or more ( Figure 1Only one is shown in the figure) processor 102 and memory 104 for storing data. In an exemplary embodiment, the computer terminal may also include a transmission device 106 for communication functions and an input and output device 108, wherein the processor 102 may include but is not limited to a processing device such as a microprocessor MCU or a programmable logic device FPGA. A person skilled in the art can understand that Figure 1 The structure shown is only for illustration and does not limit the structure of the above-mentioned computer terminal. Figure 1 More or fewer components as shown, or with Figure 1 Equivalent functions or comparisons shown Figure 1 A different configuration with more features is shown.

[0026] The memory 104 can be used to store computer programs, for example, software programs and modules of application software, such as computer programs corresponding to the methods in the embodiments of the present application. The processor 102 executes various functional applications and data processing by running the computer programs stored in the memory 104, that is, the above-mentioned methods are implemented. The memory 104 may include a high-speed random access memory, and may also include a non-volatile memory, such as one or more magnetic storage devices, flash memory, or other non-volatile solid-state memory. In some examples, the memory 104 may further include a memory remotely arranged relative to the processor 102, and these remote memories may be connected to the computer terminal via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0027] The transmission device 106 is used to receive or send data via a network. The specific example of the above network may include a wireless network provided by a communication provider of a computer terminal. In one example, the transmission device 106 includes a network adapter (Network Interface Controller, referred to as NIC), which can be connected to other network devices through a base station so as to communicate with the Internet. In one example, the transmission device 106 can be a radio frequency (RF) module, which is used to communicate with the Internet wirelessly.

[0028] In this embodiment, a method for determining a load instruction is provided, which is applied to the above-mentioned computer terminal. Figure 2 is a flow chart of a method for determining a load instruction according to an embodiment of the present application, the flow chart comprising the following steps:

[0029] Step S202, obtaining an automatic power generation control signal at the current moment, and obtaining a signal sequence corresponding to the automatic power generation control signal;

[0030] It is understandable that the acquired automatic generation control signal (AGC) at the current moment and the automatic generation control signal within a preset time period before the current moment form a signal sequence. Optionally, the preset time period may be within the first 24 hours of the current moment.

[0031] Step S204, filtering the signal sequence through a preset filter to obtain a low-frequency load signal corresponding to the signal sequence;

[0032] Specifically, a first-order infinite impulse response (IIR) filter with a cutoff frequency of fc=1 / 60 Hz is used to perform low-pass filtering on the AGC signal sequence, and the low-frequency load signal after the current filtering is calculated.

[0033] Step S206, determining a first actual response signal change amount of the hydrogen production device and a second actual response signal change amount of the coal-fired unit through the automatic power generation control signal and the low-frequency load signal;

[0034] Step S208: determining a first load instruction of the hydrogen production device and the coal-fired unit according to the first actual response signal change amount and the second actual response signal change amount.

[0035] It should be noted that a hydrogen production device is a device that uses hydropower or other renewable energy to produce hydrogen. Water is decomposed into hydrogen and oxygen through electrolysis or other chemical reactions, and the generated hydrogen is then used for fuel cell power generation or directly supplied as fuel to fuel cell vehicles and other applications. The hydrogen production system plays an important role in the field of power generation. It can achieve the production and utilization of clean energy, reduce dependence on traditional fossil energy, and reduce carbon emissions and environmental pollution.

[0036] Through the above steps, the automatic power generation control signal at the current moment is obtained, and the signal sequence corresponding to the automatic power generation control signal is obtained; the signal sequence is filtered through a preset filter to obtain a low-frequency load signal corresponding to the signal sequence; the first actual response signal change of the hydrogen production device is determined by the automatic power generation control signal and the low-frequency load signal, and the second actual response signal change of the coal-fired unit is determined; the first load instruction of the hydrogen production device and the coal-fired unit is determined by the first actual response signal change and the second actual response signal change. Through the above embodiments, the problem of the lack of a coordinated frequency regulation solution that combines the capacity advantages of thermal power units and the regulation performance advantages of hydrogen production systems in related technologies is solved, and the technical effect of determining the first load instruction and then coordinated frequency regulation is achieved.

[0037] In an exemplary embodiment, a first actual response signal change amount of the hydrogen production device is determined by the automatic power generation control signal and the low-frequency load signal, including: determining a response signal that requires the hydrogen production device to respond by the automatic power generation control signal and the low-frequency load signal; determining an adjustable load range of the hydrogen production device; and determining the first actual response signal change amount by the response signal and the adjustable load range.

[0038] The step of determining the response signal to which the hydrogen production device needs to respond by using the automatic power generation control signal and the low-frequency load signal includes: taking the difference between the automatic power generation control signal and the low-frequency load signal as the response signal to which the hydrogen production device needs to respond.

[0039] Furthermore, in some optional embodiments, determining the adjustable load range of the hydrogen production device includes: determining the operating load of the hydrogen production device at the current moment; and obtaining the upper load limit and the lower load limit of the hydrogen production device; determining a first difference between the upper load limit and the operating load, and determining a second difference between the operating load and the lower load limit; and determining the adjustable load range through the first difference and the second difference.

[0040] In some optional embodiments, the first actual response signal change amount is determined by the response signal and the adjustable load range, including: when the response signal is greater than the target value, the first actual response signal change amount is determined by the response signal and the lower limit of the adjustable load range; when the response signal is less than the target value, the first actual response signal change amount is determined by the response signal and the upper limit of the adjustable load range.

[0041] It is understandable that the response signal is compared with the target value. If the response signal is greater than the target value, the first actual response signal change is determined by the response signal and the lower limit of the adjustable load range; if the response signal is less than the target value, the first actual response signal change is determined by the response signal and the upper limit of the adjustable load range. Optionally, the target value is 0.

[0042] Furthermore, the first actual response signal change is determined by the response signal and the lower limit of the adjustable load range, including: if the response signal is greater than or equal to the lower limit of the range, the first actual response signal change is equal to the opposite of the lower limit of the range; if the response signal is less than the lower limit of the range, the first actual response signal change is equal to the opposite of the response signal.

[0043] Furthermore, the first actual response signal change is determined by the response signal and the upper limit of the adjustable load range, including: if the response signal is greater than or equal to the upper limit of the range, the first actual response signal change is equal to the upper limit of the range; if the response signal is less than the upper limit of the range, the first actual response signal change is equal to the response signal.

[0044] In an exemplary embodiment, determining the second actual response signal change of the coal-fired unit includes: determining a third difference between the automatic power generation control signal and the first actual response signal change; and determining the third difference as the second actual response signal change.

[0045] In an exemplary embodiment, a first load instruction for the hydrogen production device and the coal-fired unit is determined by the first actual response signal change and the second actual response signal change, including: determining a second load instruction for the hydrogen production device at a moment before the current moment, and determining a third load instruction for the coal-fired unit at the moment before the current moment; determining a first sum of the second load instruction and the first actual response signal change, and determining a second sum of the third load instruction and the second actual response signal change; and determining the first sum and the second sum as the first load instruction.

[0046] Therefore, the embodiment of the present application determines the latest load instruction through the load instruction of each device in the hydrogen production device and the coal-fired unit at the previous moment and the actual response signal change of each device, and sends it to the hydrogen production device and the coal-fired unit to guide their power generation or hydrogen production load at the current moment. In this way, through continuous AGC signal adjustment, the load distribution of the hydrogen production system and the coal-fired unit can be optimized in real time to achieve more effective frequency control and power system stability, so as to improve the efficiency and flexibility of power grid frequency regulation.

[0047] In order to better understand the process of the above-mentioned method for determining the load instruction, the above-mentioned method for determining the load instruction is described below in combination with an optional embodiment, but it is not used to limit the technical solution of the embodiment of the present application.

[0048] In an optional embodiment of the present application, a method for determining a load instruction is as follows: Figure 3 As shown, including:

[0049] Step 1: Calculate the adjustable load range of the hydrogen production unit based on the current operating load.

[0050] 1) Obtaining AGC(t) up to the current moment (i.e., the automatic power generation control signal in the above embodiment), and forming a signal sequence with the AGC signal within the previous 24 hours, with a data frequency of 5S;

[0051] 2) Calculate the adjustable load range ΔPh_up(t) and ΔPh_down(t) according to the current operating load of the hydrogen production device:

[0052] ΔPh_up(t)=Ph_max-Ph(t), ΔPh_down(t)=Ph(t)-Ph_min;

[0053] Among them, Ph_max represents the upper limit of the load of the hydrogen production device, Ph_min represents the lower limit of the load of the hydrogen production device, and Ph(t) represents the current load of the hydrogen production device (that is, the operating load at the current moment in the above embodiment).

[0054] Step 2: Use a first-order infinite impulse response (IIR) filter with a cutoff frequency of fc = 1 / 60 Hz to low-pass filter the AGC signal sequence and calculate the current filtered low-frequency load P_Lowfreq(t) signal;

[0055] Step 3: Calculate the actual response signal of the hydrogen production device;

[0056] Step 4: Calculate the actual response signal of the coal-fired unit.

[0057] For the above steps 3 and 4, the specific implementation methods include:

[0058] 1) Calculate the required hydrogen production device response signal ΔPh_demand(t);

[0059] ΔPh_demand(t)=AGC(t)-P_Lowfreq(t);

[0060] 2) calculating the actual response signal change amount ΔPh(t) of the hydrogen production device (equivalent to the first actual response signal change amount in the above embodiment);

[0061] When ΔPh_demand(t)>0:

[0062] If ΔPh_demand(t)≥ΔPh_down(t), ΔPh(t)=-(ΔPh_down(t));

[0063] If ΔPh_demand(t)<ΔPh_down(t), ΔPh(t)=-(ΔPh_demand(t));

[0064] When ΔPh_demand(t)<0:

[0065] If ΔPh_demand(t)≥ΔPh_up(t), ΔPh(t)=ΔPh_up(t);

[0066] If ΔPh_demand(t)<ΔPh_up(t), ΔPh(t)=ΔPh_demand(t);

[0067] 3) Calculating the actual response signal change amount ΔPcoal(t) of the coal-fired unit (equivalent to the second actual response signal change amount in the above embodiment);

[0068] ΔPcoal(t)=AGC(t)-ΔPh(t);

[0069] 4) Output actual load instructions for hydrogen production system and coal-fired units;

[0070] Ph(t)=Ph(t-1)+ΔPh(t);

[0071] Pcoal(t)=Pcoal(t-1)+ΔPcoal(t);

[0072] Among them, Ph(t-1) represents the second load instruction of the hydrogen production device at the previous moment, and Pcoal(t-1) represents the third load instruction of the coal-fired unit at the previous moment.

[0073] Therefore, the optional embodiment of the present application provides a frequency regulation control strategy for the joint use of the water electrolysis hydrogen production system and the coal-fired unit, which decomposes the unit AGC instruction into high-frequency components and low-frequency components, and uses the coal-fired unit and the hydrogen production system to respond respectively, giving full play to the advantages of the two regulation resources. In other words, the optional embodiment of the present application decomposes the unit AGC instruction, wherein the high-frequency component is responded by the hydrogen production system and the low-frequency component is responded by the coal-fired unit, which can give full play to the rapid regulation capability of the hydrogen production system and the capacity advantage of the coal-fired unit, thereby obtaining a better frequency regulation result.

[0074] Through the description of the above implementation methods, those skilled in the art can clearly understand that the method according to the above embodiment can be implemented by means of software plus a necessary general hardware platform, and of course by hardware, but in many cases the former is a better implementation method. Based on such an understanding, the technical solution of the present application, or the part that contributes to the prior art, can be embodied in the form of a software product, which is stored in a storage medium (such as ROM / RAM, magnetic disk, optical disk), and includes a number of instructions for a terminal device (which can be a mobile phone, computer, server, or network device, etc.) to execute the methods of each embodiment of the present application.

[0075] The present application also provides a structural block diagram of a load instruction determination device. Figure 4 is a structural block diagram of a device for determining a load instruction according to an embodiment of the present application; Figure 4 As shown, including:

[0076] An acquisition module 42 is used to acquire the automatic power generation control signal at the current moment and acquire a signal sequence corresponding to the automatic power generation control signal;

[0077] Optionally, the preset duration may be within the first 24 hours of the current usage.

[0078] A filtering module 44, configured to filter the signal sequence through a preset filter to obtain a low-frequency load signal corresponding to the signal sequence;

[0079] Specifically, a first-order infinite impulse response (IIR) filter with a cutoff frequency of fc=1 / 60 Hz is used to perform low-pass filtering on the AGC signal sequence, and the low-frequency load signal after the current filtering is calculated.

[0080] A first determination module 46, used to determine a first actual response signal change amount of the hydrogen production device and a second actual response signal change amount of the coal-fired unit through the automatic power generation control signal and the low-frequency load signal;

[0081] The second determination module 48 is used to determine the first load instructions of the hydrogen production device and the coal-fired unit according to the first actual response signal change amount and the second actual response signal change amount.

[0082] Through the above device, the automatic power generation control signal at the current moment is obtained, and the signal sequence corresponding to the automatic power generation control signal is obtained; the signal sequence is filtered through a preset filter to obtain a low-frequency load signal corresponding to the signal sequence; the first actual response signal change of the hydrogen production device is determined by the automatic power generation control signal and the low-frequency load signal, and the second actual response signal change of the coal-fired unit is determined; the first load instruction of the hydrogen production device and the coal-fired unit is determined by the first actual response signal change and the second actual response signal change. Through the above embodiment, the problem of the lack of a coordinated frequency regulation solution that combines the capacity advantages of thermal power units and the regulation performance advantages of hydrogen production systems in related technologies is solved, and the technical effect of determining the first load instruction and then coordinated frequency regulation is achieved.

[0083] In an exemplary embodiment, the first determination module 46 is further used to: determine a response signal that requires the hydrogen production device to respond through the automatic power generation control signal and the low-frequency load signal; determine an adjustable load range of the hydrogen production device; and determine a change in the first actual response signal through the response signal and the adjustable load range.

[0084] The step of determining the response signal to which the hydrogen production device needs to respond by using the automatic power generation control signal and the low-frequency load signal includes: taking the difference between the automatic power generation control signal and the low-frequency load signal as the response signal to which the hydrogen production device needs to respond.

[0085] In an exemplary embodiment, the first determination module 46 is also used to: determine the operating load of the hydrogen production device at the current moment; and obtain the upper and lower load limits of the hydrogen production device; determine a first difference between the upper load limit and the operating load, and determine a second difference between the operating load and the lower load limit; determine the adjustable load range through the first difference and the second difference.

[0086] In an exemplary embodiment, the first determination module 46 is further used to: when the response signal is greater than the target value, determine the first actual response signal change amount through the response signal and the lower limit of the adjustable load range; when the response signal is less than the target value, determine the first actual response signal change amount through the response signal and the upper limit of the adjustable load range.

[0087] It is understandable that the response signal is compared with the target value. If the response signal is greater than the target value, the first actual response signal change is determined by the response signal and the lower limit of the adjustable load range; if the response signal is less than the target value, the first actual response signal change is determined by the response signal and the upper limit of the adjustable load range. Optionally, the target value is 0.

[0088] Furthermore, the first actual response signal change is determined by the response signal and the lower limit of the adjustable load range, including: if the response signal is greater than or equal to the lower limit of the range, the first actual response signal change is equal to the opposite of the lower limit of the range; if the response signal is less than the lower limit of the range, the first actual response signal change is equal to the opposite of the response signal.

[0089] Furthermore, the first actual response signal change is determined by the response signal and the upper limit of the adjustable load range, including: if the response signal is greater than or equal to the upper limit of the range, the first actual response signal change is equal to the upper limit of the range; if the response signal is less than the upper limit of the range, the first actual response signal change is equal to the response signal.

[0090] In an exemplary embodiment, the first determination module 46 is further configured to: determine a third difference between the automatic power generation control signal and the first actual response signal change; and determine the third difference as the second actual response signal change.

[0091] In an exemplary embodiment, the second determination module 48 is also used to: determine the second load instruction of the hydrogen production device at the previous moment before the current moment, and determine the third load instruction of the coal-fired unit at the previous moment; determine the first sum of the second load instruction and the first actual response signal change, and determine the second sum of the third load instruction and the second actual response signal change; determine the first sum and the second sum as the first load instruction.

[0092] Therefore, the embodiment of the present application determines the latest load instruction through the load instruction of each device in the hydrogen production device and the coal-fired unit at the previous moment and the actual response signal change of each device, and sends it to the hydrogen production device and the coal-fired unit to guide their power generation or hydrogen production load at the current moment. In this way, through continuous AGC signal adjustment, the load distribution of the hydrogen production system and the coal-fired unit can be optimized in real time to achieve more effective frequency control and power system stability, so as to improve the efficiency and flexibility of power grid frequency regulation.

[0093] An embodiment of the present application further provides a storage medium, which includes a stored program, wherein the program executes any of the above methods when it is run.

[0094] Optionally, in this embodiment, the storage medium may be configured to store program codes for executing the following steps:

[0095] S1, obtaining an automatic power generation control signal at the current moment, and obtaining a signal sequence corresponding to the automatic power generation control signal;

[0096] S2, filtering the signal sequence through a preset filter to obtain a low-frequency load signal corresponding to the signal sequence;

[0097] S3, determining a first actual response signal change amount of the hydrogen production device and a second actual response signal change amount of the coal-fired unit through the automatic power generation control signal and the low-frequency load signal;

[0098] S4, determining a first load instruction for the hydrogen production device and the coal-fired unit according to the first actual response signal change amount and the second actual response signal change amount.

[0099] An embodiment of the present application further provides an electronic device, including a memory and a processor, wherein a computer program is stored in the memory, and the processor is configured to run the computer program to execute the steps in any one of the above method embodiments.

[0100] Optionally, the electronic device may further include a transmission device and an input / output device, wherein the transmission device is connected to the processor, and the input / output device is connected to the processor.

[0101] Optionally, in this embodiment, the processor may be configured to perform the following steps through a computer program:

[0102] S1, obtaining an automatic power generation control signal at the current moment, and obtaining a signal sequence corresponding to the automatic power generation control signal;

[0103] S2, filtering the signal sequence through a preset filter to obtain a low-frequency load signal corresponding to the signal sequence;

[0104] S3, determining a first actual response signal change amount of the hydrogen production device and a second actual response signal change amount of the coal-fired unit through the automatic power generation control signal and the low-frequency load signal;

[0105] S4, determining a first load instruction for the hydrogen production device and the coal-fired unit according to the first actual response signal change amount and the second actual response signal change amount.

[0106] Optionally, in this embodiment, the above-mentioned storage medium may include but is not limited to: a USB flash drive, a read-only memory (ROM), a random access memory (RAM), a mobile hard disk, a magnetic disk or an optical disk, and other media that can store program codes.

[0107] An embodiment of the present application further provides a computer program product, which includes a computer program. When the computer program is executed by a processor, the steps in any one of the above method embodiments are implemented.

[0108] Optionally, in this embodiment, the processor may be configured to perform the following steps through a computer program:

[0109] S1, obtaining an automatic power generation control signal at the current moment, and obtaining a signal sequence corresponding to the automatic power generation control signal;

[0110] S2, filtering the signal sequence through a preset filter to obtain a low-frequency load signal corresponding to the signal sequence;

[0111] S3, determining a first actual response signal change amount of the hydrogen production device and a second actual response signal change amount of the coal-fired unit through the automatic power generation control signal and the low-frequency load signal;

[0112] S4, determining a first load instruction for the hydrogen production device and the coal-fired unit according to the first actual response signal change amount and the second actual response signal change amount.

[0113] An embodiment of the present application further provides another computer program product, including a non-volatile computer-readable storage medium, wherein the non-volatile computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps in any of the above method embodiments are implemented.

[0114] An embodiment of the present application also provides a computer program, which includes computer instructions stored in a computer-readable storage medium; a processor of a computer device reads the computer instructions from the computer-readable storage medium, and the processor executes the computer instructions, so that the computer device performs the steps in any one of the above method embodiments.

[0115] Optionally, the specific examples in this embodiment may refer to the examples described in the above embodiments and optional implementation modes, and this embodiment will not be described in detail here.

[0116] Obviously, those skilled in the art should understand that the above modules or steps of the present application can be implemented by a general computing device, they can be concentrated on a single computing device, or distributed on a network composed of multiple computing devices, and optionally, they can be implemented by a program code executable by a computing device, so that they can be stored in a storage device and executed by the computing device, and in some cases, the steps shown or described can be executed in a different order from that herein, or they can be made into individual integrated circuit modules, or multiple modules or steps therein can be made into a single integrated circuit module for implementation. Thus, the present application is not limited to any specific combination of hardware and software.

[0117] The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the principles of the present application shall be included in the protection scope of the present application.

Claims

1. A method for determining a load instruction, characterized in that: include: Obtaining an automatic power generation control signal at the current moment, and obtaining a signal sequence corresponding to the automatic power generation control signal; Filtering the signal sequence through a preset filter to obtain a low-frequency load signal corresponding to the signal sequence; Determine a first actual response signal change amount of the hydrogen production device and a second actual response signal change amount of the coal-fired unit through the automatic power generation control signal and the low-frequency load signal; The first load instructions of the hydrogen production device and the coal-fired unit are determined according to the first actual response signal change amount and the second actual response signal change amount.

2. The method for determining a load instruction according to claim 1, characterized in that: Determining a first actual response signal variation of a hydrogen production device by using the automatic power generation control signal and the low-frequency load signal includes: Determining a response signal requiring the hydrogen production device to respond through the automatic power generation control signal and the low-frequency load signal; Determining an adjustable load range of the hydrogen production device; The first actual response signal change amount is determined according to the response signal and the adjustable load range.

3. The method for determining a load instruction according to claim 2, characterized in that: Determining the adjustable load range of the hydrogen production device includes: determining the operating load of the hydrogen production device at the current moment; and Obtaining an upper load limit and a lower load limit of the hydrogen production device; determining a first difference between the upper load limit and the operating load, and determining a second difference between the operating load and the lower load limit; The adjustable load range is determined by the first difference and the second difference.

4. The method for determining a load instruction according to claim 2, characterized in that: Determining the first actual response signal change amount by using the response signal and the adjustable load range includes: In the case where the response signal is greater than the target value, determining the first actual response signal change amount by using the response signal and the lower limit of the range of the adjustable load; When the response signal is smaller than the target value, the first actual response signal change amount is determined by the response signal and an upper limit of the upwardly adjustable load range.

5. The method for determining a load instruction according to claim 1, characterized in that: Determining the second actual response signal change amount of the coal-fired unit includes: Determine a third difference between the automatic power generation control signal and the change in the first actual response signal; The third difference is determined as the second actual response signal change amount.

6. The method for determining a load instruction according to claim 1, characterized in that: Determining a first load instruction for the hydrogen production device and the coal-fired unit according to the first actual response signal change amount and the second actual response signal change amount includes: Determine a second load instruction of the hydrogen production device at a moment before the current moment, and determine a third load instruction of the coal-fired unit at the moment before the current moment; Determine a first sum of the second load instruction and the first actual response signal change amount, and determine a second sum of the third load instruction and the second actual response signal change amount; The first sum value and the second sum value are determined as the first load instruction.

7. A load instruction determination device, characterized in that: include: An acquisition module, used to acquire the automatic power generation control signal at the current moment, and acquire a signal sequence corresponding to the automatic power generation control signal; A filtering module, used for filtering the signal sequence through a preset filter to obtain a low-frequency load signal corresponding to the signal sequence; A first determination module, used to determine a first actual response signal change amount of the hydrogen production device and a second actual response signal change amount of the coal-fired unit through the automatic power generation control signal and the low-frequency load signal; The second determination module is used to determine the first load instructions of the hydrogen production device and the coal-fired unit according to the first actual response signal change amount and the second actual response signal change amount.

8. A computer-readable storage medium, characterized in that: The computer-readable storage medium includes a stored program, wherein the program executes the method described in any one of claims 1 to 6 when executed.

9. An electronic device comprising a memory and a processor, characterized in that: A computer program is stored in the memory, and the processor is configured to execute the method according to any one of claims 1 to 6 through the computer program.

10. A computer program product, comprising a computer program, characterized in that When the computer program is executed by a processor, the steps of the method according to any one of claims 1 to 6 are implemented.