Structure for moving personnel in well
By designing the moving structure of personnel in the well and using closed tracks and movable platform trolleys, the problems of inconvenience of movement of personnel and small materials in the well from vertical shafts to horizontal tunnels or vice versa are solved, safe and convenient movement is achieved, and construction safety and efficiency are improved.
Patent Information
- Application Number
- CN202411747551.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-02
- Publication Date
- 2025-04-08
AI Technical Summary
The personnel and small materials in the well are turned from vertical shafts to horizontal tunnels or otherwise inconveniently moving, which has poor safety and inconvenient transportation of equipment materials.
A moving structure of personnel in the well was designed, including a bucket, an enclosed track, a movable platform trolley and a movable car guardrail. The enclosed track is laid on the bottom plate of the horizontal tunnel. The movable platform cart slides along the track, can be close to or away from the shaft shaft, and is connected to the bucket through a semicircular notch, and uses lifting wire ropes to connect personnel or equipment.
Through the installation of closed tracks and movable platform trolleys, safe and convenient movement of personnel and small materials in the well are achieved, inconvenience problems during the vertical conversion process are solved, and construction safety and efficiency are improved.
Smart Images

Figure CN119774409A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of mine construction engineering, and in particular to a structure for moving personnel in a mine. Background Art
[0002] A certain underground project is designed as a vertical shaft + double-level main structure. Specifically, the vertical shaft is 590m deep, and the double levels are at -280m and -560m levels. The vertical shaft and each horizontal tunnel are connected by a horse head door, and double buckets are used for lifting and transportation during the infrastructure construction.
[0003] The conventional construction process for this project is: first construct the vertical shaft to -280m, then start the construction of the -280m horizontal horse head gate and -280m horizontal tunnel, then construct the -280~-590m section of the vertical shaft, and finally construct the -560m horizontal horse head gate and -560m horizontal tunnel. After the construction of the -280m horizontal tunnel, there is no need for a large number of construction personnel to enter the -280m horizontal tunnel from the vertical shaft, nor is there a need to transport a large amount of materials and operating tools. During this period, only 2 operation and maintenance personnel entered the horizontal tunnel every 3 days for ventilation and drainage operations.
[0004] However, when operation and maintenance personnel enter the horizontal tunnel from the wellbore to perform operations or enter the wellbore from the horizontal tunnel to lift the bucket, they need to tie their safety belts to the safety rope on the top plate of the horse head gate here and use temporary wooden boards to pass. This method of moving from vertical to horizontal or from horizontal to vertical has problems such as poor safety of personnel movement and inconvenient transportation of scientific research equipment and materials.
[0005] Therefore, there is an urgent need for a structure for moving personnel in a well to solve the problem of inconvenience in moving personnel and small materials from vertical to horizontal or from horizontal to vertical in the well. Summary of the invention
[0006] The present invention aims at the deficiencies in the prior art and provides a structure for moving personnel in a well to solve the problem of inconvenience in moving personnel in the well from vertical to horizontal or from horizontal to vertical.
[0007] To achieve the above object, the present invention adopts the following technical solutions: A structure for moving personnel in a shaft, characterized in that it includes a bucket, a closed track, a movable platform trolley and a movable trolley guardrail, the closed track is laid and fixed on the tunnel floor of a horizontal tunnel, the movable platform trolley is slidably set on the closed track, and can move closer to or away from the vertical shaft along the closed track, the end of the movable platform trolley close to the vertical shaft is set as a semicircular notch, the semicircular notch can be fitted on the outside of the bucket, the bucket is hung at the semicircular notch by a lifting wire rope, and movable trolley guardrails are installed along the edges on both sides of the upper end of the movable platform trolley.
[0008] To optimize the above technical solutions, the specific measures taken also include: Furthermore, two fixed guardrails and one movable guardrail are provided at the upper end of the semicircular groove of the movable platform trolley, and the ends of the two fixed guardrails that are far away from each other are respectively fixed on the movable trolley guardrails at both ends of the semicircular groove, and the lower ends of the fixed guardrails are fixedly arranged along the upper edge of the semicircular groove. The other end of any fixed guardrail is hinged with the movable guardrail, and the movable guardrail can be rotated around the hinge to connect or separate from the other end of the other fixed guardrail. After connection, the two fixed guardrails and one movable guardrail can form an arc-shaped guardrail as a whole to fit the upper edge of the semicircular groove.
[0009] Furthermore, a ladder is provided inside the bucket, extending from the bottom of the bucket to the upper edge of the bucket.
[0010] Furthermore, a movable platform trolley locking mechanism is hinged at the semicircular notch, and the movable platform trolley locking mechanism can be rotated to buckle the upper edge of the bucket.
[0011] Furthermore, the locking mechanism of the movable platform trolley is a hook, which is hinged at the semicircular notch of the movable platform trolley. A fixed baffle is provided on the upper edge of the bucket near the movable platform trolley, and the hook can be hooked on the lower end of the fixed baffle after rotation.
[0012] Furthermore, a cover plate is provided on the top support of the movable trolley guardrail located on the movable platform trolley, and several sliding rods consistent with the moving direction of the movable platform trolley are provided under the cover plate. Movable safety ropes are slidably provided on the sliding rods, and the movable safety ropes are used to fasten the safety belts.
[0013] Furthermore, the movable platform trolley includes several base channel steels, patterned steel plates and movable trolley rollers, the upper end of the patterned steel plates is used to install the movable trolley guardrail, and the bottom of the patterned steel plates is installed with several base channel steels at intervals, wherein the bottoms of both ends of two base channel steels are respectively installed with movable trolley rollers through connecting angle steels, and the movable trolley rollers are clamped and slidably arranged in the closed track.
[0014] Furthermore, the movable trolley roller adopts a pulley with a T-shaped side section, and the closed track includes a closed side rail and a closed steel plate. The opposite side walls of the closed side rails on the left and right sides are respectively provided with sliding grooves for the shrinking ends of the T-shaped pulley to be clamped and slidably connected, and the opposite side walls of the closed side rails on both sides and the ends close to or away from the vertical shaft are all closed and wrapped by closed steel plates.
[0015] Furthermore, a limit device for limiting the moving range of the movable platform trolley and engaging the limit position is provided on the closed track.
[0016] Furthermore, the bottom of the closed track located at the cradle pit is connected to a track support steel beam, and both ends of the track support steel beam are respectively fixed on both sides of the cradle, and the left and right sides of the end of the closed track away from the vertical shaft are anchored by a track fixing anchor rod inserted into the bottom plate of the tunnel.
[0017] The beneficial effects of the present invention are: The present invention can utilize the closed track and the movable platform trolley to limit and allow the movable platform trolley to move toward or away from the shaft of the vertical shaft, so that when the bucket is hung at the semicircular notch by the lifting wire rope, the staff or equipment materials in the bucket can be guided, thereby solving the problem of inconvenience in the movement of personnel in the shaft from vertical to horizontal or from horizontal to vertical; the semicircular notch at the end of the movable platform trolley is designed to effectively fit the outer side of the bucket, and the bucket can be clamped in the semicircular notch with the gravity of the bucket, thereby ensuring the stability and safety of the moving process; the guardrail of the movable trolley is provided, and the personnel or equipment materials on the movable platform trolley can be effectively protected without affecting the normal entry of personnel into the movable platform trolley; the opening and closing doors are provided to facilitate personnel to leave the movable platform trolley.
[0018] The present invention not only meets the requirements of -280m horizontal scientific research experiments, personnel entry and exit, and the lowering of small materials and tools, but also ensures the construction requirements of the personnel shaft without affecting the lifting efficiency of the shaft, directly saves nearly 40 days of construction time, effectively solves various concerns and safety risks in construction, greatly facilitates on-site construction organization, and has a significant effect. It can be actively promoted for use under similar construction conditions. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a side view schematic diagram of a structure for moving personnel in a well proposed by the present invention; Figure 2 This is an enlarged side view of a structure for moving personnel in a well proposed by the present invention; Figure 3 This is a schematic diagram of a top view of a structure for moving personnel in a well proposed by the present invention; Figure 4 This is an enlarged top view of a structure for moving personnel in a well proposed by the present invention; Figure 5 This is a schematic diagram of the connection between the closed track and the movable platform trolley of a structure for moving personnel in a well proposed by the present invention; Figure 6 This is a schematic structural diagram of a closed track for a structure for moving personnel in a well proposed by the present invention.
[0020] Figure numerals: 1-enclosed track, 2-movable platform trolley, 3-track fixing anchor rod, 4-bucket, 5-lifting wire rope, 6-movable platform trolley locking mechanism, 7-locking mechanism operating handle, 8-horse head door guardrail, 9-movable trolley roller, 10-movable trolley guardrail, 11-track supporting steel beam, 12-limiting device, 13-movable safety rope, 14-high skirting board, 15-base channel steel, 16-patterned steel plate, 17-connecting angle steel, 18-enclosed steel plate, 19-enclosed side rail, 20-stiffening rib plate. DETAILED DESCRIPTION
[0021] The present invention will now be described in further detail with reference to the accompanying drawings.
[0022] As attached Figure 1 , Attachment Figure 2 , Attachment Figure 3 and attached Figure 4 As shown, a structure for moving personnel in a shaft according to an embodiment of the present invention comprises a bucket 4, a closed track 1, a movable platform trolley 2 and a movable trolley guardrail 10. The closed track 1 is laid and fixed on the tunnel floor of the horizontal tunnel. The movable platform trolley 2 is slidably set on the closed track 1, and can move towards or away from the vertical shaft along the closed track 1. The end of the movable platform trolley 2 close to the vertical shaft is set as a semicircular groove, and the semicircular groove can be fitted on the outside of the bucket 4. The bucket 4 can be hung at the semicircular groove by lifting the wire rope 5. Movable trolley guardrails 10 are installed along the edges of both sides of the upper end of the movable platform trolley 2, and an opening and closing door is installed on the side of the movable trolley guardrail 10 away from the vertical shaft.
[0023] The present invention, through the arrangement of a closed track 1 and a movable platform trolley 2, can utilize the closed track 1 to limit and allow the movable platform trolley 2 to move toward or away from the shaft of the vertical shaft, so that when the bucket 4 is suspended at the semicircular notch by the lifting wire rope 5, the staff or equipment materials in the bucket 4 can be guided, solving the problem of inconvenience in the movement of personnel in the shaft from vertical to horizontal or from horizontal to vertical; through the design of the semicircular notch at the end of the movable platform trolley 2, it can effectively fit the outer side of the bucket 4, and with the gravity of the bucket 4, the bucket 4 can be snapped into the semicircular notch, thereby ensuring the stability and safety of the moving process; through the arrangement of the movable trolley guardrail 10, the personnel or equipment materials on the movable platform trolley 2 can be effectively protected, and the normal entry of personnel into the movable platform trolley 2 is not affected. Through the arrangement of the opening and closing door, it is convenient for personnel to leave the movable platform trolley 2.
[0024] In this embodiment, a driving structure can be provided as required to drive the movable platform trolley 2 to move along the closed track 1. For example, a telescopic cylinder is connected to the end of the movable platform trolley 2 away from the shaft to drive the movement of the movable platform trolley 2.
[0025] In another specific embodiment, two fixed guardrails and one movable guardrail are provided at the upper end of the semicircular notch of the movable platform trolley 2, and the ends of the two fixed guardrails that are far away are respectively fixed on the movable trolley guardrails 10 at the two ends of the semicircular notch, and the lower end of the fixed guardrail is fixedly arranged along the upper edge of the semicircular notch, and the other end of any fixed guardrail is hinged with a movable guardrail, and the movable guardrail can rotate around the hinge to connect and lock or separate with the other end of the other fixed guardrail. After connection, the two fixed guardrails and one movable guardrail can form an arc-shaped guardrail as a whole to fit the upper edge of the semicircular notch. In this way, when people pass through, the movable guardrail can be opened to provide support and protection for the people, while expanding the space for passing; when no people pass through, the movable guardrail is closed and connected and locked with the fixed guardrail, and cooperates with the two fixed guardrails to form an effective integral arc-shaped guardrail to increase the safety of the structure. In this embodiment, the above-mentioned movable guardrail can also be provided in two pieces as needed, and is hinged to the fixed guardrails on both sides respectively.
[0026] In another specific embodiment, the inside of the bucket 4 is provided with a ladder extending from the bottom of the bucket 4 to the opening at the top of the bucket 4. In this way, it is convenient for the personnel in the bucket 4 to move or carry by the ladder.
[0027] In another specific embodiment, a movable platform trolley locking mechanism 6 is hinged at the semicircular notch, and the movable platform trolley locking mechanism 6 can be rotated to fasten the side wall of the top opening of the bucket 4.
[0028] Among them, in a further specific embodiment based on the above, the movable platform trolley locking mechanism 6 is a hook, which is hinged at the semicircular groove of the movable platform trolley 2, and a fixed baffle is provided on the upper edge of the bucket 4 near the movable platform trolley 2. After the hook is rotated, it can be hooked on the lower end of the fixed baffle, so that the connection between the bucket 4 and the movable platform trolley 2 is more reliable and tight.
[0029] Wherein, the above-mentioned hook is symmetrically provided with two according to the center line of the semicircular notch. In the present embodiment, the above-mentioned hook is provided with a locking mechanism operating handle 7 which is convenient for driving the hook to rotate, so as to facilitate operation.
[0030] In another specific embodiment, the top support of the movable trolley guardrail 10 located on the movable platform trolley 2 is provided with a cover plate, and a slide bar with the same length as the movable platform trolley guardrail 10 is provided below the cover plate, and a movable safety rope 13 is provided on the slide bar, and the movable safety rope 13 is used to fasten the safety belt. In this way, the stability of the overall structure of the movable trolley guardrail 10 and the safety during use can be guaranteed by adding a slide bar. At the same time, the designed slide bar and movable safety rope 13 can further provide a protective means for users to fasten the safety belt, ensuring the safety of users passing the movable platform trolley 2.
[0031] As attached Figure 5 and attached Figure 6 As shown, in another specific embodiment, the lower side wall of the movable trolley guardrail 10 is provided with a circle of high skirting boards 14. In this way, the high skirting boards 14 can be used to increase the safety protection of the structure, prevent objects from falling into the shaft, and increase the stability of the structure.
[0032] In another specific embodiment, the movable platform trolley 2 includes several base channel steels 15, patterned steel plates 16 and movable trolley rollers 9. The upper end of the patterned steel plate 16 is used to install the movable trolley guardrail 10. Several base channel steels 15 are installed at intervals at the bottom of the patterned steel plate 16. The bottoms of both ends of two base channel steels 15 are respectively installed with movable trolley rollers 9 through connecting angle steels 17. The movable trolley rollers 9 are clamped and slidably set in the closed track 1.
[0033] In this embodiment, a stiffening rib plate 20 for reinforcement is also installed on the connecting angle steel 17. In this way, the stiffening rib plate 20 can increase the reliability of the structure.
[0034] Among them, in a further specific embodiment based on the above, the movable trolley roller 9 adopts a pulley with a T-shaped side section, and the closed track 1 includes a closed side rail 19 and a closed steel plate 18. The opposite side walls of the closed side rails 19 on the left and right sides are respectively provided with a slide groove for the shrinking end of the T-shaped pulley to be clamped and slidably connected, and the opposite side walls of the closed side rails 19 on both sides and the ends close to or away from the shaft are all closed and wrapped by the closed steel plate 18. In this way, the slide grooves of the shrinking ends of the T-shaped pulleys on both sides of the movable platform trolley 2 are clamped and slidably connected to ensure the safe position limitation of the movable platform trolley 2, and the closed side rails 19 are closed and wrapped by the closed steel plate 18 to ensure the stability of the closed side rail 19 structure, and at the same time, it can prevent the movable trolley roller 9 from slipping off the closed side rail 19, and also prevent gravel from entering the closed side rail 19.
[0035] In another specific embodiment, a limit device 12 for limiting the moving range of the movable platform trolley 2 is provided on the closed track 1. In this way, the moving position of the movable platform trolley 2 is further limited, and the movable platform trolley is used to fix the position after the movable platform trolley stops, so as to facilitate positioning and limiting the movable platform trolley 2 according to the position requirements of the bucket 4 as needed. In this embodiment, a sealable and removable limit bolt can be set at the corresponding position of the side wall of the closed track 1, and the limit bolt is used as the limit device 12 to limit the moving range of the movable platform trolley 2, or the pulleys of the platform trolley 2 moved to the specified position are successively clamped and limited.
[0036] In another specific embodiment, the bottom of the closed track 1 located at the cradle pit is connected to a track support steel beam 11, and the two ends of the track support steel beam 11 are respectively fixed on the two sides of the cradle, and the left and right sides of the end of the closed track 1 away from the shaft are respectively anchored by a track fixing anchor rod 3 inserted into the bottom plate of the roadway. Among them, the track fixing anchor rod 3 adopts a mortar anchor rod. In this way, the end of the closed track 1 close to the shaft is supported and fixed by the track support steel beam 11, and the closed track 1 is further plugged and fixed by the track fixing anchor rod 3, which ensures the overall structural stability during the use of the platform, and is also an anti-overturning design.
[0037] The structure of the present invention is installed at the -280m horse head gate of the personnel shaft, and its functions include: after installation, it can meet the needs of personnel entering and exiting the -280m horizontal tunnel from the personnel shaft at any time, thus creating conditions for various operations in the -280m horizontal tunnel, including scientific research experiments, and the simultaneous construction of the shaft and the later -560m horizontal tunnel; after installation, it can meet the needs of loading and unloading some small tools, instruments and materials at the -280m horse head gate, ensuring that a large number of personnel can safely and reliably enter and exit the -280m horizontal tunnel from the shaft, and also ensuring that after the device is installed at the -280m horse head gate, the normal vertical transportation of the bucket 4 and other large equipment and materials in the shaft during the construction of the -560m horizontal tunnel will not be affected, and the two buckets 4 in the shaft can be vertically staggered, which will not affect the operating speed and safety status of the two buckets 4, thereby ensuring that the lifting capacity of the shaft and the production capacity of the two horizontal tunnels are not affected.
[0038] The installation position of the present invention is relatively special. This structure is installed at the horse head gate in the middle of the vertical shaft, which is 280m high from the wellhead and the well bottom. It is used for personnel to pass from the vertical shaft bucket 4 to the horizontal tunnel at the horse head gate or from the horizontal tunnel to the bucket 4 in the vertical shaft. The installation position is relatively special. The bucket 4 in the shaft can be vertically staggered without affecting the busy operation between each other.
[0039] The present invention is reliable in processing and installation, and requires very little maintenance. Due to the special installation location, great difficulty in maintenance, and high maintenance cost, relatively high requirements are placed on processing quality and installation quality. The service life is nearly four years, and very little maintenance is required during use. While ensuring the reliability of the overall wellbore anti-fall management, large maintenance amounts including disassembly, replacement, and electric welding are avoided.
[0040] The movable platform trolley 2 of the present invention can be freely extended and retracted. The shaft is the only passage for personnel to go up and down, and for the lifting and transportation of various materials and equipment and waste rock underground. The two buckets 4 in the shaft are busy shuttling up and down. Due to the narrow space in the shaft, various pipelines and facilities, the invention is required to be freely extended and retracted. When in use, the movable platform trolley 2 can be extended to dock with the bucket 4 and fixed reliably; after use, the movable platform trolley 2 can be retracted so that it is no longer extended, ensuring that there is a sufficient safety distance between the bucket 4 in the shaft and various surrounding facilities during operation.
[0041] The present invention has a novel structure, and the movable platform trolley 2 will not derail. Due to the particularity of the installation position and the purpose of use, the movable platform trolley 2 is absolutely not allowed to derail during use. Therefore, the general open track design form is abandoned during the design, and instead a closed, embedded track design is adopted, so that derailment and the like will not occur under any working conditions, ensuring the safety and reliability of the movable platform trolley 2 during its entire life cycle.
[0042] The present invention is easy to operate, because the movable platform trolley 2 is frequently used, so its easy operation is good and simple. The movable platform trolley 2 adopts an integral design and a track, and only one person needs to operate it with a little effort, and the operation is relatively simple.
[0043] The present invention will not tip over. Considering that the movable platform trolley 2 forms a cantilever structure when docking with the bucket 4, and that the movable platform trolley 2 will have different temporary loads such as personnel, materials, and tools under different working conditions, anti-tipping is a major consideration in the design. During construction, in addition to reliably welding and fixing the closed track 1 to the tunnel floor, two Φ20mm, L=2000mm long resin anchors are installed at the end of the platform away from the shaft, and the closed track 1 is firmly anchored to the tunnel floor with the anchor at the end that is easy to tilt.
[0044] The present invention has a large load-bearing capacity, and the integral and embedded structure ensures the overall structural stability of the platform to the greatest extent. The selection of high-strength rail wheels with larger diameters and steel sections with larger specifications enables the platform to carry a larger load and run smoothly.
[0045] The present invention can set multiple limit devices 12 as needed. In order to ensure that the movable platform trolley 2 does not roll or extend during use and rest, multiple limit devices 12 are set on the platform to flexibly control the displacement range, and the driving structure can effectively control the start and stop.
[0046] The locking mechanism 6 of the movable platform trolley of the present invention ensures that the platform and the bucket 4 are tightly combined, so as to ensure that when personnel enter and exit the bucket 4, the bucket 4 will not rotate or there will be a large gap between the bucket 4 and the edge of the platform, which will cause the risk of falling when personnel enter and exit the bucket 4. Two movable platform trolley locking mechanisms 6 are arranged at one end of the movable platform trolley 2 near the bucket 4 side, which are used to temporarily lock the bucket 4 and the movable platform trolley 2 when the bucket 4 is docked on the platform, so as to prevent rotation and separation, and ensure the safety of personnel entering and exiting the bucket 4.
[0047] The present invention has a reliable, specially designed movable trolley guardrail 10 and a movable safety rope 13. After the bucket 4 is docked with the movable platform trolley 2, in order to prevent people from falling, in addition to the movable trolley guardrail 10 on both sides of the movable platform trolley 2, an arc-shaped guardrail is arranged at the docking part of the bucket 4 and the movable platform trolley 2, so that people will not fall out of the bucket 4 due to slipping when entering and exiting the bucket 4. The design of the arc-shaped guardrail is combined with the movable trolley guardrail 10, firstly, it is convenient for people to pass through, and secondly, when the platform is not in use, the railing is closed to form a closed structure, so as to form a reliable guardrail between the lane and the shaft. In addition, in order to ensure the safety of people entering and exiting the bucket 4, a sliding rod and a movable safety rope 13 are also designed, and a movable safety belt hanging ring can be arranged on the movable safety rope 13, so that people can conveniently hang the safety belt when entering and exiting the bucket 4.
[0048] In order to reduce the number of limit devices, the platform is designed with a nested structure, wherein the external structure is a fixed device and the internal structure is a movable rail wheel structure. The external structure is a fixed baffle structure near one end of the bucket. When the internal structure is pushed to the extreme position, i.e., the fixed baffle position, the arc guardrail is in close contact with the bucket.
[0049] When the device of the present invention is used, considering the narrow space and special environment on site, in order to simplify the installation plan and reduce the safety risk of underground operations, this design minimizes the workload of underground processing and installation. The ground split processing, assembly and testing are adopted on site, and after passing the test, it is divided into several parts and transported to the underground for overall assembly and permanent fixation.
[0050] Split processing on the ground: Except for the closed steel plate 18 on the side close to the bucket 4, the closed track 1 of this structure is not permanently welded, and the whole is processed and connected (welded) on the ground. Bolts are temporarily used for connection on the ground to facilitate lifting and transportation by a hoist in the wellbore; the movable trolley guardrail 10 of the movable platform trolley 2 is processed into a whole according to the left and right sides and the arc-shaped guardrail, and the other parts except the railings and laying steel plates are processed and welded into a whole on the ground.
[0051] After the processing of each part is completed, it is assembled and tested on the ground. After the test run is passed, the closed track 1, track fixing anchor rod 3, patterned steel plate 16 and base channel steel 15 of the movable platform trolley 2, arc-shaped guardrail, movable trolley guardrail 10 are lowered in sequence and installed simultaneously underground.
[0052] Before installation, first lift the hoisting platform during shaft construction to the bottom plate of the -280m horse head gate as a working platform and safety protection facility. First measure and locate and determine the horizontal slope. After the closed track 1 and the movable platform trolley 2 are assembled underground, weld the end fixing steel plate. After the lifting bucket 4 is lowered to the working position for people to get on and off, check the relative position and horizontal state of the semicircular notch of the movable platform trolley 2 and the bucket 4, weld the closed track 1 to the track support steel beam 11, and install the track fixing anchor rod 3 at the rear end of the track.
[0053] Install the arc guardrail and the movable trolley guardrail 10, test the run again and determine and install the limit devices 12 on both sides of the closed track 1.
[0054] Laying the patterned steel plate 16 and high skirting board 14 of the movable platform trolley 2; Install the slide bar and the movable safety rope 13. When the test personnel pass through the movable platform trolley 2, they hang the safety belt into the safety rope ring of the movable safety rope 13 in advance, and then untie the safety belt after the test personnel pass through the mobile platform.
[0055] At this point, the telescopic ladder workers have completed the installation and debugging of the upper and lower platforms.
[0056] The present invention not only meets the requirements of -280m horizontal scientific research experiments, personnel entry and exit, and the lowering of small materials and tools, but also ensures the construction requirements of the personnel shaft without affecting the lifting efficiency of the shaft, directly saves nearly 40 days of construction time, effectively solves various concerns and safety risks in construction, greatly facilitates on-site construction organization, and has a significant effect. It can be actively promoted for use under similar construction conditions.
[0057] It should be noted that the terms such as "upper", "lower", "left", "right", "front", "back", etc. cited in the invention are only for the convenience of description and are not used to limit the scope of implementation of the present invention. Changes or adjustments in their relative relationships should be regarded as the scope of implementation of the present invention without substantially changing the technical content.
[0058] The above are only preferred embodiments of the present invention, and the protection scope of the present invention is not limited to the above embodiments. All technical solutions under the concept of the present invention belong to the protection scope of the present invention. It should be pointed out that for ordinary technicians in this technical field, some improvements and modifications without departing from the principle of the present invention should be regarded as the protection scope of the present invention.
Claims
1. A structure for moving personnel in a well, characterized by: The invention comprises a bucket (4), a closed track (1), a movable platform trolley (2) and a movable trolley guardrail (10), wherein the closed track (1) is laid and fixed on the tunnel floor of the horizontal tunnel, the movable platform trolley (2) is slidably arranged on the closed track (1), and can move towards or away from the shaft of the vertical shaft along the closed track (1), the end of the movable platform trolley (2) close to the shaft of the vertical shaft is provided with a semicircular notch, and the semicircular notch can be fitted on the outer side of the bucket (4), the bucket (4) is suspended at the semicircular notch by a lifting wire rope (5), and movable trolley guardrails (10) are installed along the edges of both sides of the upper end of the movable platform trolley (2).
2. A structure for moving personnel in a well according to claim 1, characterized in that: Two fixed guardrails and one movable guardrail are provided at the upper end of the semicircular notch of the movable platform trolley (2), and the ends of the two fixed guardrails that are away from each other are respectively fixed to the movable trolley guardrails (10) at the two ends of the semicircular notch, and the lower ends of the fixed guardrails are fixedly arranged along the upper edge of the semicircular notch. The other end of any fixed guardrail is hinged to the movable guardrail, and the movable guardrail can be rotated around the hinge to connect with or separate from the other end of the other fixed guardrail. After connection, the two fixed guardrails and one movable guardrail can form an arc-shaped guardrail as a whole and fit the upper edge of the semicircular notch.
3. A structure for moving personnel in a well according to claim 1, characterized in that: The interior of the bucket (4) is provided with a ladder extending from the bottom of the bucket (4) to the upper edge of the bucket (4).
4. The structure for moving personnel in a well according to claim 1, characterized in that: A movable platform trolley locking mechanism (6) is hinged at the semicircular notch, and the movable platform trolley locking mechanism (6) can be rotated to buckle the upper edge of the bucket (4).
5. The structure for moving personnel in a well according to claim 4, characterized in that: The movable platform trolley locking mechanism (6) is a hook, which is hinged at a semicircular notch of the movable platform trolley (2). The bucket (4) is provided with a fixed baffle at the upper edge close to the movable platform trolley (2), and the hook can be hooked on the lower end of the fixed baffle after rotation.
6. The structure for moving personnel in a well according to claim 1, characterized in that: A cover plate is provided on the top support of the movable trolley guardrail (10) located on the movable platform trolley (2), and a plurality of slide bars which are consistent with the moving direction of the movable platform trolley (2) are provided below the cover plate. A movable safety rope (13) is slidably provided on each of the slide bars. The movable safety rope (13) is used for fastening a safety belt.
7. The structure for moving personnel in a well according to claim 1, characterized in that: The movable platform trolley (2) comprises a plurality of base channel steels (15), a patterned steel plate (16) and a movable trolley roller (9), wherein the upper end of the patterned steel plate (16) is used to mount the movable trolley guardrail (10), and the bottom of the patterned steel plate (16) is provided with a plurality of base channel steels (15) at intervals, wherein the bottoms of both ends of two base channel steels (15) are provided with movable trolley rollers (9) respectively via connecting angle steels (17), and the movable trolley rollers (9) are clamped and slidably arranged in the closed track (1).
8. The structure for moving personnel in a well according to claim 7, characterized in that: The movable trolley roller (9) is a pulley with a T-shaped side section. The closed track (1) includes a closed side rail (19) and a closed steel plate (18). The opposite side walls of the closed side rails (19) on the left and right sides are respectively provided with sliding grooves for the shrinking ends of the T-shaped pulley to be clamped and slidably connected. The opposite side walls of the closed side rails (19) on both sides and the ends close to or away from the shaft of the vertical shaft are all closed and wrapped by the closed steel plate (18).
9. The structure for moving personnel in a well according to claim 1, characterized in that: The closed track (1) is provided with a limit device (12) for limiting the movement range of the movable platform trolley (2) and engaging the limit position.
10. The structure for moving personnel in a well according to claim 1, characterized in that: The bottom of the closed track (1) located at the cradle pit is connected to a track support steel beam (11), and the two ends of the track support steel beam (11) are respectively fixed to the two sides of the cradle. The left and right sides of the end of the closed track (1) away from the shaft are anchored by a track fixing anchor rod (3) inserted into the bottom plate of the tunnel.