High-speed rail tied arch bridge arch rib concrete jacking structure and construction method

By setting up feed ports, conveying pipes and detection devices in the arch ribs of the high-speed rail arch bridge and using the exhaust mechanism to discharge gas, the problem of incomplete and out-of-synchronous concrete filling of the arch rib of the traditional arch bridge is solved, and a more efficient and stable concrete filling process is achieved.

CN119800852APending Publication Date: 2025-04-11中国水利水电第七工程局有限公司
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510080214.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-19
Publication Date
2025-04-11

AI Technical Summary

Technical Problem

The arch rib concrete of traditional tied arch bridge has problems such as not compact and out of synchronization during the filling process, resulting in unstable arch ribs.

Method used

The concrete lifting structure of the arch rib of the high-speed rail arch bridge is adopted. By setting up feed ports and conveying pipes at both ends of the arch ribs, the concrete is filled simultaneously with the conveying device; a detection device is installed on the inner wall of the arch rib to monitor the concrete filling status in real time; an exhaust hole and an exhaust mechanism are installed on the upper side of the arch ribs to exhaust gas to ensure that the concrete is fully filled.

Benefits of technology

The compactness and synchronization of concrete filling are improved, the dependence of manual inspection is reduced, the construction efficiency and quality are improved, and the problem of instability of arch ribs is avoided.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119800852A_ABST
    Figure CN119800852A_ABST
Patent Text Reader

Abstract

The invention discloses a high-speed rail tied arch bridge arch rib concrete jacking structure and a construction method, and relates to the technical field of arch bridge construction.The high-speed rail tied arch bridge arch rib concrete jacking structure comprises a tied arch bridge and arch ribs installed on the two sides of the tied arch bridge, the arch ribs comprise the upper arch rib and the lower arch rib, feeding ports are formed in the two sides of the upper arch rib and the two sides of the lower arch rib, and conveying pipes are arranged in the feeding ports; one end of the conveying pipe is positioned in the feeding hole, and the other end is provided with a conveying device; detection devices are arranged on the sides, away from the tied-arch bridge, of the inner side walls of the upper arch rib and the lower arch rib; exhaust holes are formed in the sides, away from the tied-arch bridge, of the upper arch rib and the lower arch rib, and exhaust mechanisms are arranged in the exhaust holes; the filling compactness of the concrete can be carefully detected through the detection device, and the exhaust mechanisms are mounted in the exhaust holes, so that the possibility of problems such as cavities occurring when the arch rib is filled with the concrete is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of arch bridge construction, and in particular to a high-speed railway tied arch bridge arch rib concrete jacking structure and a construction method. Background Art

[0002] A tied arch bridge is a type of bridge that combines the advantages of both arches and beams. It combines the two basic structural forms of arch and beam to jointly bear the load. A tied arch bridge uses arch ribs and installs hangers on the arch ribs to assist in stabilizing the tied arch bridge. At the same time, concrete is filled in the arch ribs to strengthen the supporting capacity of the arch ribs.

[0003] With regard to the above-mentioned related technologies, the inventors believe that the pouring progress of the arch rib concrete of the traditional tied arch bridge is relatively slow when pumped by a ground pump. The opening of holes in the arch rib to vent air and the synchronization of the concrete pouring progress on both sides need the cooperation of special personnel. The manual knocking to check the quality of the concrete pouring has low verification accuracy. There are often common quality problems such as cavities and looseness in the arch rib concrete, and there may be problems with asynchronous concrete filling, which may lead to unstable arch ribs. Summary of the invention

[0004] The first purpose of the present application is to provide a high-speed railway tied arch bridge arch rib concrete jacking structure to improve the problems of looseness and asynchronism when filling concrete in the arch rib.

[0005] The present application provides a high-speed railway tied arch bridge arch rib concrete jacking structure adopts the following technical solution: A high-speed railway tied arch bridge arch rib concrete jacking structure includes a tied arch bridge, arch ribs installed on both sides of the tied arch bridge, the arch ribs include an upper arch rib and a lower arch rib, both ends of the upper arch rib and the lower arch rib are provided with feed ports, a conveying pipe is provided in the feed port, one end of the conveying pipe is located in the feed port, and the other end is provided with a conveying device; a plurality of detection devices are provided on the side of the inner side wall of the upper arch rib and the lower arch rib away from the tied arch bridge; exhaust holes are provided on the side of the upper arch rib and the lower arch rib away from the tied arch bridge, and an exhaust mechanism is provided in the exhaust hole.

[0006] By adopting the above technical scheme, arch ribs are installed on both sides of the tied arch bridge, and the arch ribs are divided into upper arch ribs and lower arch ribs, and feed ports are arranged at both ends of the upper arch rib and the lower arch rib, and the feed ports serve as entrances for concrete filling; at the same time, a conveying pipe is installed in the feed port, one end of the conveying pipe is inserted in the feed port, and the other end is connected to a conveying device, and concrete is conveyed into the arch rib through the conveying pipe by the conveying device, and when filling concrete, in order to avoid uneven force on the arch rib, the conveying devices at both ends need to be filled synchronously; a number of detection devices are installed in the inner side walls of the upper arch rib and the lower arch rib, and the detection devices can be used to detect the filling state of concrete in sections, so as to ensure the quality of the concrete. The situation of incomplete concrete filling is reduced, and compared with manual knocking detection, the filling situation can be understood more accurately and quickly through the detection device, thereby improving the detection accuracy and detection efficiency. At the same time, the detection device can be used to detect whether the filling of concrete is synchronized, and the synchronization situation can be accurately detected to avoid construction accidents caused by asynchrony; exhaust holes are provided on the upper sides of the upper arch rib and the lower arch rib, and an exhaust mechanism is installed in the exhaust hole. The exhaust mechanism can be used to discharge the gas in the arch rib when filling concrete, so as to avoid the gas being unable to be discharged and affecting the filling of concrete; and the exhaust mechanism is more stable than directly exhausting the exhaust through the exhaust hole, so that the concrete filling is more sufficient.

[0007] Preferably, the exhaust mechanism includes an exhaust pipe and a stop valve arranged in the exhaust pipe, and the exhaust pipe is arranged in the exhaust hole; a limiting ring is arranged on the outer wall of the exhaust pipe, and a fixing mechanism is arranged on the outer walls of the upper arch rib and the lower arch rib corresponding to the exhaust mechanism.

[0008] By adopting the above technical scheme, the exhaust mechanism includes an exhaust pipe and a stop valve. The exhaust pipe is installed in the exhaust hole, and the stop valve is installed in the exhaust pipe. The stop valve can be used to control the opening and closing of the exhaust mechanism. When the exhaust mechanism is opened, the gas in the arch rib can be discharged, and the exhaust mechanism can be closed after the concrete is fully filled, so that the exhaust hole can be temporarily blocked to make the concrete filling more sufficient. The exhaust mechanism can then be removed and the exhaust hole can be blocked. At the same time, a limit ring is provided on the outer wall of the exhaust pipe. The limit ring can be used to position the exhaust pipe to the limit ring when the exhaust mechanism is installed, and a fixing mechanism is installed on the outer walls of the upper arch rib and the lower arch rib corresponding to the exhaust mechanism, and the fixing mechanism is used to fix the exhaust mechanism in the exhaust hole through the limit ring.

[0009] Preferably, the fixing mechanism includes a fixing platform arranged on both sides of the exhaust hole, and a fixing plate rotatably connected to the fixing platform, a fixing protrusion is arranged on one side of the fixing plate which is in contact with the limiting ring, and the limiting ring is provided with a fixing groove corresponding to the fixing protrusion, and the fixing protrusion can be inserted into the fixing groove; a driving member is arranged on the fixing platform, and the driving member is connected to the fixing plate.

[0010] By adopting the above technical scheme, the fixing mechanism includes a fixing platform and a fixing plate. The fixing platform is installed on both sides of the exhaust hole. The fixing plate is rotatably connected to the fixing platform. A fixing protrusion is provided on the side of the fixing plate that is in contact with the limiting ring. A fixing groove is provided on the limiting ring. The fixing plate is stably pressed against the limiting ring by inserting the fixing protrusion into the fixing groove. At the same time, a driving member is installed on the fixing platform. The driving member is connected to the fixing plate. The driving member can be used to drive the fixing plate to rotate so that the fixing plate is pressed against the limiting ring or leaves the limiting ring, thereby controlling the fixing and loosening of the exhaust mechanism.

[0011] Preferably, a fixing hole is provided on a side of the fixing protrusion away from the fixing plate, and a magnetic member 1 that is magnetically attracted to the limiting ring is provided in the fixing hole.

[0012] By adopting the above technical solution, a fixing hole is provided on the side of the fixing protrusion away from the fixing plate, and a magnetic component 1 is installed in the fixing hole. The magnetic force of the magnetic component 1 is utilized to adsorb the limiting ring, so that the fixing plate can be more stably pressed against the limiting ring.

[0013] Preferably, the inner wall of the exhaust hole is provided with a sliding groove, and the outer wall of the exhaust pipe is provided with a sliding guide rail, and the sliding guide rail can be inserted into the sliding groove.

[0014] By adopting the above technical solution, a sliding groove is provided on the inner wall of the exhaust hole, and a sliding guide rail is provided on the outer wall of the exhaust pipe. Through the cooperation of the sliding guide rail and the sliding groove, the exhaust pipe can be moved more stably in the exhaust hole; at the same time, the cooperation of the sliding guide rail and the sliding groove can limit the rotation of the exhaust pipe, further limit the rotation of the exhaust mechanism, and make the installation of the exhaust mechanism more stable.

[0015] Preferably, a positioning groove is provided at one end of the sliding guide rail close to the limiting ring, and a second magnetic member magnetically attracted to the arch rib is provided in the positioning groove.

[0016] By adopting the above technical solution, a positioning groove is provided at one end of the sliding guide rail close to the limiting ring, and a second magnetic component is installed in the positioning groove. The magnetic force of the second magnetic component is used to adsorb the arch rib, so that the exhaust mechanism can be more stably installed in the exhaust hole.

[0017] Preferably, a plurality of dovetail grooves are provided on one side of the limiting ring that is in contact with the upper arch rib and the lower arch rib, and a magnetic part three that is magnetically attracted to the upper arch rib and the lower arch rib is provided in the dovetail groove.

[0018] By adopting the above technical scheme, a plurality of dovetail grooves are provided on one side of the limiting ring which is in contact with the upper arch rib and the lower arch rib, and a magnetic component three is installed in the dovetail groove. The dovetail groove can be used to stably install the magnetic component three in the limiting ring, and at the same time, the magnetic force of the magnetic component three is used to adsorb the upper arch rib and the lower arch rib, so that the limiting ring and the exhaust pipe can be more firmly installed on the upper arch rib and the lower arch rib.

[0019] Preferably, a sealing groove is provided on the outer side wall of the exhaust pipe, and a soft rubber pad is provided in the sealing groove; an embedding protrusion is provided on one side of the soft rubber pad, and an embedding groove is provided in the sealing groove corresponding to the embedding protrusion, and the embedding protrusion can be inserted in the embedding groove.

[0020] By adopting the above technical solution, a sealing groove is provided on the outer wall of the exhaust pipe, and a soft rubber pad is installed in the sealing groove. The soft rubber pad can be used to seal the exhaust hole, so that the gas in the arch rib can be discharged from the exhaust pipe as much as possible, thereby increasing the sealing performance of the exhaust mechanism; at the same time, an embedding protrusion is provided on one side of the soft rubber pad, and an embedding groove is provided in the sealing groove corresponding to the embedding protrusion. The soft rubber pad can be more stably installed in the sealing groove by utilizing the cooperation between the embedding protrusion and the embedding groove, thereby improving the sealing effect.

[0021] The second object of the present application is to provide a construction method for the arch rib concrete jacking structure of a high-speed railway tied arch bridge, so as to improve the problem of looseness when filling concrete in the arch rib.

[0022] Preferably, S100, arch ribs are installed on both sides of the tied arch bridge, and the arch ribs are divided into upper arch ribs and lower arch ribs; S200, both sides of the installed arch rib are provided with feed ports, and a conveying pipe is provided in the feed port, one end of the conveying pipe is inserted in the feed port, and the other end is connected to the conveying device; a detection device is installed on the side of the inner side wall of the upper arch rib and the lower arch rib away from the tie rod arch bridge; and an exhaust hole is provided on the side of the upper arch rib and the lower arch rib away from the tie rod arch bridge, and an exhaust mechanism is installed in the exhaust hole; S300, use the conveying devices on both sides to simultaneously fill the arch rib with concrete. After the filling is completed, the exhaust mechanism is disassembled and the exhaust hole is sealed after inspection.

[0023] By adopting the above technical scheme, a number of detection devices are installed in the inner walls of the upper arch rib and the lower arch rib. When the arch rib is filled with concrete, the filling density can be detected, and the synchronization of the concrete filling can be detected; exhaust holes are provided on the side of the upper arch rib and the lower arch rib away from the tied arch bridge, and an exhaust mechanism is installed in the exhaust hole. The exhaust mechanism can make the concrete filling more sufficient, which is convenient for the subsequent sealing of the exhaust holes.

[0024] Preferably, S210, the exhaust mechanism includes an exhaust pipe and a stop valve, the exhaust pipe is inserted into the exhaust hole, and the stop valve is installed in the exhaust pipe; a limit ring abutting against the arch rib is arranged on the outer side wall of the exhaust pipe, and a fixing mechanism is arranged on the upper arch rib and the lower arch rib corresponding to the limit ring; S211, the fixing mechanism includes a fixing platform and a fixing plate, the fixing plate is rotatably connected to the fixing platform, a fixing protrusion is provided on one side of the fixing plate that is in contact with the limiting ring, a fixing groove is provided on the limiting ring corresponding to the fixing protrusion, and the fixing protrusion can be inserted into the fixing groove, a driving member is installed on the fixing platform, and the driving member is connected to the fixing plate; a fixing hole is provided at one end of the fixing protrusion away from the fixing plate, and a magnetic member 1 is installed in the fixing hole; S21, a sliding groove is provided on the inner side wall of the exhaust hole, and a sliding guide rail is provided on the outer side of the exhaust pipe corresponding to the sliding groove, and the sliding guide rail can be inserted into the sliding groove, and a positioning groove is provided at one end of the sliding guide rail close to the limit ring, and a second magnetic member is installed in the positioning groove; S213, a dovetail groove is provided on one side of the limiting ring that is in contact with the upper arch rib and the lower arch rib, and a magnetic component 3 is installed in the dovetail groove; S214, a sealing groove is provided on the outer wall of the exhaust pipe, and a soft rubber pad is installed in the sealing groove, and an embedding protrusion is provided on one side of the soft rubber pad, and an embedding groove is provided in the sealing groove, and the embedding protrusion can be inserted into the embedding groove.

[0025] By adopting the above technical scheme, the exhaust mechanism includes an exhaust pipe and a stop valve, and the stop valve can be used to control the opening and closing of the exhaust mechanism; at the same time, the exhaust mechanism is fixed by a fixing mechanism, and the fixing mechanism includes a fixing platform and a fixing plate, and the fixing plate is rotatably connected to the fixing platform, and the fixing plate is fixed on the limit ring by pressing against it; a sliding groove is provided in the exhaust hole, and a sliding guide rail is provided on the exhaust pipe, and the cooperation of the sliding guide rail and the sliding groove makes the exhaust pipe more stably fixed and limits the rotation of the exhaust pipe; a magnetic part three is provided on the side of the limit ring that fits the arch rib, and the magnetic part three is used to absorb the arch rib, so that the exhaust mechanism is fixed more firmly; at the same time, a sealing groove is provided on the outer wall of the exhaust pipe, and a soft rubber pad is installed in the sealing groove, and the soft rubber pad can increase the sealing of the exhaust mechanism.

[0026] In summary, the present application includes at least one of the following beneficial technical effects: 1. Several detection devices are installed in the upper arch rib and the lower arch rib. The detection devices can detect the filling density of concrete in stages, and can also detect the synchronization of concrete; exhaust holes are set on the upper arch rib and the lower arch rib, and exhaust mechanisms are installed in the exhaust holes. The exhaust mechanism can flexibly control the exhaust state to make the concrete filling more sufficient; 2. The exhaust mechanism includes an exhaust pipe and a stop valve. The opening and closing of the exhaust pipe can be controlled by the stop valve, which is convenient for operation. At the same time, a limit ring is provided on the outer wall of the exhaust pipe. The limit ring can be used to position the exhaust mechanism to a specific position, which is convenient for installation and positioning of the exhaust mechanism. 3. The fixing mechanism includes a fixing platform and a fixing plate. The fixing plate is rotatably connected to the fixing platform so that the fixing plate and the limiting ring are pressed tightly to fix the exhaust mechanism in the exhaust hole. A fixing protrusion is provided on one side of the fixing plate that is in contact with the limiting ring, and a fixing groove is provided on the limiting ring. The fixing protrusion cooperates with the fixing groove to make the fixing plate more firmly pressed against the limiting ring. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a schematic diagram of the overall structure of a high-speed railway tied arch bridge arch rib concrete jacking structure of the present application.

[0028] Figure 2 It is a cross-sectional schematic diagram for showing the internal structure of the arch rib in the embodiment.

[0029] Figure 3 yes Figure 2 Enlarged view of part A in .

[0030] Figure 4 yes Figure 3 Enlarged view of part B in .

[0031] In the figure, 1, tied arch bridge; 2, arch rib; 21, upper arch rib; 22, lower arch rib; 23, exhaust hole; 3, conveying pipe; 31, feed inlet; 32, conveying device; 4, detection device; 5, exhaust mechanism; 51, stop valve; 52, exhaust pipe; 521, limit ring; 5211, fixing groove; 521, dovetail groove; 5213, magnetic part three; 522, sliding guide rail; 5221, positioning groove; 522, magnetic part two; 523, sealing groove; 5231, embedded groove; 524, soft rubber pad; 5241, embedded protrusion; 6, fixing mechanism; 61, fixing plate; 611, driving member; 62, fixing platform; 621, fixing protrusion; 6211, fixing hole; 621, magnetic part one. DETAILED DESCRIPTION

[0032] The following is combined with Figure 1 -Attached Figure 4 , further details of this application are given.

[0033] Embodiment 1: A high-speed railway tied arch bridge arch rib concrete jacking structure, referring to Figure 1 and Figure 2, including a tied arch bridge 1, and arch ribs 2 installed on both sides of the tied arch bridge 1, and the arch ribs 2 include upper arch ribs 21 and lower arch ribs 22, and feed ports 31 are provided at both ends of the upper arch ribs 21 and the lower arch ribs 22, and concrete enters the arch ribs 2 through the feed ports 31; a conveying pipe 3 is installed in the feed port 31, so that one end of the conveying pipe 3 is inserted into the feed port 31, and the other end is connected to a conveying device 32, and the conveying device 32 is a high-pressure pump. The concrete is pressed into the arch rib 2 by the conveying device 32, and the conveying devices 32 at both ends need to perform the filling work synchronously to avoid uneven force on the arch ribs 2 and easily cause construction accidents; the inner side walls of the upper arch ribs 21 and the lower arch ribs 22 are away from the tied arch bridge 1, and the concrete is pressed into the arch ribs 2 by the conveying device 32. A plurality of detection devices 4 are installed on one side of the tied arch bridge 1. The detection devices 4 are intelligent monitoring units. The detection devices 4 can be used to detect whether the concrete is sufficiently filled. At the same time, the detection devices 4 placed in stages can detect the synchronization of the concrete filling. Compared with manual knocking detection, the detection devices 4 can detect the synchronization more accurately. Exhaust holes 23 are provided on the side of the upper arch rib 21 and the lower arch rib 22 away from the tied arch bridge 1. The exhaust holes 23 are used to discharge the gas in the arch rib 2 when filling concrete, and an exhaust mechanism 5 is installed in the exhaust hole 23. The exhaust mechanism 5 can make the concrete filling more sufficient, which is convenient for the subsequent sealing of the exhaust hole 23.

[0034] Reference Figure 3 The exhaust mechanism 5 includes an exhaust pipe 52 and a stop valve 51. The exhaust pipe 52 is installed in the exhaust hole 23, and the stop valve 51 is installed in the exhaust pipe 52. The stop valve 51 can be used to control the opening and closing of the exhaust mechanism 5. When the exhaust mechanism 5 is opened, the gas in the arch rib 2 can be discharged. After the concrete is fully filled, the exhaust mechanism 5 is closed to temporarily block the exhaust hole 23, so that the concrete is filled more fully. The exhaust mechanism 5 can then be removed, and the blocking process of the exhaust hole 23 can be more convenient. At the same time, a limiting ring 521 is provided on the outer wall of the exhaust pipe 52. The limiting ring 521 can be used to position the exhaust pipe 52 to the limiting ring 521 when the exhaust mechanism 5 is installed, and a fixing mechanism 6 is installed on the outer wall of the upper arch rib 21 and the lower arch rib 22 corresponding to the exhaust mechanism 5. The fixing mechanism 6 is used to press the limiting ring 521 to fix the exhaust mechanism 5 in the exhaust hole 23 to prevent the exhaust mechanism 5 from being squeezed out of the exhaust hole 23.

[0035] Reference Figure 4The fixing mechanism 6 includes a fixing platform 62 and a fixing plate 61. The fixing platform 62 is installed on both sides of the exhaust hole 23. The fixing plate 61 is rotatably connected to the fixing platform 62. A fixing protrusion 621 is provided on one side of the fixing plate 61 that is in contact with the limiting ring 521. A fixing groove 5211 is provided on the limiting ring 521. The fixing protrusion 621 is inserted into the fixing groove 5211 to stably press the fixing plate 61 against the limiting ring 521. At the same time, a driving member 611 is installed on the fixing platform 62. The driving member 611 is a motor. The driving member 61 1 is connected to the fixing plate 61, and the fixing plate 61 can be driven to rotate by the driving member 611, so that the fixing plate 61 is pressed against the limiting ring 521 or away from the limiting ring 521, so as to fix the exhaust mechanism 5 or release the exhaust mechanism 5; a fixing hole 6211 is provided on the side of the fixing protrusion 621 away from the fixing plate 61, and a magnetic member 1 621 is installed in the fixing hole 6211. The magnetic member 1 621 is a magnet, and the limiting ring 521 is attracted by the magnetic force of the magnetic member 1 621, so that the fixing plate 61 is pressed against the limiting ring 521 more stably.

[0036] Reference Figure 4 A sliding groove is provided on the inner wall of the exhaust hole 23, and a sliding guide rail 522 is provided on the outer wall of the exhaust pipe 52. The cooperation between the sliding guide rail 522 and the sliding groove makes the installation of the exhaust pipe 52 more stable. At the same time, the cooperation between the sliding guide rail 522 and the sliding groove can limit the rotation of the exhaust pipe 52, further limit the rotation of the exhaust mechanism 5, and make the installation of the exhaust mechanism 5 more stable. A positioning groove 5221 is provided at one end of the sliding guide rail 522 close to the limiting ring 521, and a magnetic part 522 is installed in the positioning groove 5221. The magnetic part 522 is a magnet. The magnetic force of the magnetic part 522 is used to adsorb the arch rib 2, so that the exhaust mechanism 5 is more stably installed in the exhaust hole 23.

[0037] Reference Figure 4 A plurality of dovetail grooves 521 are provided on one side of the limiting ring 521 which is in contact with the upper arch rib 21 and the lower arch rib 22, and a magnetic part 3 5213 is installed in the dovetail groove 521. The magnetic part 3 5213 is a magnet. The dovetail groove 521 can be used to stably install the magnetic part 3 5213 in the limiting ring 521. At the same time, the magnetic force of the magnetic part 3 5213 is used to absorb the upper arch rib 21 and the lower arch rib 22, so that the limiting ring 521 and the exhaust pipe 52 are more firmly installed on the upper arch rib 21 and the lower arch rib 22.

[0038] Reference Figure 4A sealing groove 523 is provided on the outer wall of the exhaust pipe 52, and a soft rubber pad 524 is installed in the sealing groove 523. The material of the soft rubber pad 524 is rubber. The soft rubber pad 524 can seal the exhaust hole 23, so that the gas in the arch rib 2 can be discharged from the exhaust pipe 52 as much as possible, thereby increasing the sealing performance of the exhaust mechanism 5; at the same time, an embedding protrusion 5241 is provided on one side of the soft rubber pad 524, and an embedding groove 5231 is provided in the sealing groove 523 corresponding to the embedding protrusion 5241. The soft rubber pad 524 is more stably installed in the sealing groove 523 by the cooperation of the embedding protrusion 5241 and the embedding groove 5231, thereby improving the sealing effect.

[0039] The implementation principle of the embodiment of the present application is: Feed ports 31 are provided at both ends of the upper arch rib 21 and the lower arch rib 22, and a conveying device 32 is used to fill concrete from the feed port 31 into the interior of the arch rib 2 through the conveying pipe 3; a plurality of detection devices 4 are installed inside the upper arch rib 21 and the lower arch rib 22, and the detection devices 4 are evenly placed in stages. The detection devices 4 can be used to detect the density of the filling of concrete in the arch rib 2, and the detection devices 4 can also detect the synchronization of the concrete filling at both ends; exhaust holes 23 are provided on the upper arch rib 21 and the lower arch rib 22, and an exhaust mechanism 5 is installed in the exhaust hole 23. The exhaust mechanism 5 can make the exhaust more stable and controllable, and the filling more sufficient, which is convenient for the subsequent sealing of the exhaust hole 23; and the exhaust mechanism 5 is fixed by a fixing mechanism 6.

[0040] The exhaust mechanism 5 includes an exhaust pipe 52 and a stop valve 51. The stop valve 51 is used to control the opening and closing of the exhaust mechanism 5, which facilitates the operation of the exhaust mechanism 5. A limit ring 521 is provided on the outer wall of the exhaust pipe 52, and the limit ring 521 can be used to quickly position and install the exhaust mechanism 5. At the same time, a sliding guide rail 522 is provided on the outer wall of the exhaust pipe 52, and a sliding groove is provided on the inner side of the exhaust hole 23. The cooperation between the sliding guide rail 522 and the sliding groove makes the installation of the exhaust pipe 52 more stable, and can limit the rotation of the exhaust mechanism 5, so that the fixing of the exhaust mechanism 5 is more stable. A second magnetic component 522 is installed at one end of the sliding guide rail 522 close to the limiting ring 521 through a positioning groove 5221, and the second magnetic component 522 is used to absorb the arch rib 2, so as to further stabilize the exhaust mechanism 5; and a third magnetic component 5213 is installed on the limiting ring 521 through a dovetail groove 521, and the arch rib 2 is absorbed by the third magnetic component 5213, so that the exhaust mechanism 5 is fixed more firmly; at the same time, a sealing groove 523 is provided on the outer wall of the exhaust pipe 52, and a soft rubber pad 524 is installed in the sealing groove 523, and the soft rubber pad 524 can increase the sealing performance of the exhaust mechanism 5.

[0041] The fixing mechanism 6 includes a fixing platform 62 and a fixing plate 61. The fixing plate 61 is rotatably connected to the fixing platform 62, and a driving member 611 is installed on the fixing platform 62. The driving member 611 is connected to the fixing plate 61, and the fixing plate 61 is pressed against the limiting ring 521 to fix the exhaust mechanism 5. A fixing protrusion 621 is provided on the fixing plate 61, and a fixing groove 5211 is provided on the limiting ring 521. The fixing plate 61 is fixed more firmly by the cooperation between the fixing protrusion 621 and the fixing groove 5211. At the same time, a magnetic member 621 is provided on the fixing protrusion 621 through the fixing hole 6211 to further increase the stability of the fixing plate 61.

[0042] Embodiment 2: A construction method for the arch rib concrete jacking structure of a high-speed railway tied arch bridge: S100, arch ribs 2 are installed on both sides of the tied arch bridge 1, and the arch ribs 2 are divided into an upper arch rib 21 and a lower arch rib 22; S200, both ends of the installed arch rib 2 are provided with a feed port 31, and a conveying pipe 3 is provided in the feed port 31, one end of the conveying pipe 3 is inserted in the feed port 31, and the other end is connected to the conveying device 32; a plurality of detection devices 4 are installed on the inner side wall of the upper arch rib 21 and the lower arch rib 22 away from the tie arch bridge 1; an exhaust hole 23 is provided on the side of the upper arch rib 21 and the lower arch rib 22 away from the tie arch bridge 1, and an exhaust mechanism 5 is installed in the exhaust hole 23; S210, the exhaust mechanism 5 includes an exhaust pipe 52 and a stop valve 51, the exhaust pipe 52 is inserted into the exhaust hole 23, and the stop valve 51 is installed in the exhaust pipe 52; a limit ring 521 that abuts against the arch rib 2 is arranged on the outer wall of the exhaust pipe 52, and a fixing mechanism 6 is arranged on the upper arch rib 21 and the lower arch rib 22 corresponding to the limit ring 521; S211, the fixing mechanism 6 includes a fixing platform 62 and a fixing plate 61, the fixing plate 61 is rotatably connected to the fixing platform 62, and a fixing protrusion 621 is provided on one side of the fixing plate 61 that is in contact with the limiting ring 521, a fixing groove 5211 is provided on the limiting ring 521 corresponding to the fixing protrusion 621, and the fixing protrusion 621 can be inserted into the fixing groove 5211, and a driving member 611 is installed on the fixing platform 62, and the driving member 611 is connected to the fixing plate 61; a fixing hole 6211 is provided at one end of the fixing protrusion 621 away from the fixing plate 61, and a magnetic member 621 is installed in the fixing hole 6211; S21, a sliding groove is provided on the inner side wall of the exhaust hole 23, and a sliding guide rail 522 is provided on the outer side of the exhaust pipe 52 corresponding to the sliding groove, and the sliding guide rail 522 can be inserted into the sliding groove, and a positioning groove 5221 is provided at one end of the sliding guide rail 522 close to the limiting ring 521, and a magnetic member 2 522 is installed in the positioning groove 5221; S213, a plurality of dovetail grooves 521 are provided on one side of the limiting ring 521 which is in contact with the upper arch rib 21 and the lower arch rib 22, and a third magnetic member 5213 is installed in the dovetail groove 521; S214, a sealing groove 523 is provided on the outer side wall of the exhaust pipe 52, and a soft rubber pad 524 is installed in the sealing groove 523, and a fixing protrusion 5241 is provided on one side of the soft rubber pad 524, and a fixing groove 5231 is provided in the sealing groove 523, and the fixing protrusion 5241 can be inserted into the fixing groove 5231; S300, after the conveying devices 32 at both ends synchronously fill the arch rib 2 with concrete, and after detection, the exhaust mechanism 5 is disassembled and the exhaust hole 23 is sealed.

[0043] The implementation principle of the embodiment of the present application is: A plurality of detection devices 4 are installed in the inner side walls of the upper arch rib 21 and the lower arch rib 22. When the arch rib 2 is filled with concrete, the filling density and the synchronization of the concrete filling can be detected. The detection device 4 can detect the density and synchronization more accurately. An exhaust hole 23 is provided on the side of the upper arch rib 21 and the lower arch rib 22 away from the tied arch bridge 1, and an exhaust mechanism 5 is installed in the exhaust hole 23. The exhaust mechanism 5 can make the concrete filling more sufficient, which is convenient for the subsequent sealing of the exhaust hole 23.

[0044] The embodiments of this specific implementation are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. The same components are represented by the same figure marks. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A high-speed railway tied arch bridge arch rib concrete jacking structure, characterized by: The invention comprises a tied arch bridge (1) and arch ribs (2) installed on both sides of the tied arch bridge (1), wherein the arch ribs (2) comprise upper arch ribs (21) and lower arch ribs (22), wherein both ends of the upper arch ribs (21) and lower arch ribs (22) are provided with feed ports (31), wherein a conveying pipe (3) is provided in the feed port (31), wherein one end of the conveying pipe (3) is located in the feed port (31), and the other end is provided with a conveying device (32); a plurality of detection devices (4) are provided on the side of the inner side wall of the upper arch ribs (21) and lower arch ribs (22) away from the tied arch bridge (1); and exhaust holes (23) are provided on the side of the upper arch ribs (21) and lower arch ribs (22) away from the tied arch bridge (1), wherein an exhaust mechanism (5) is provided in the exhaust hole (23).

2. The arch rib concrete jacking structure of a high-speed railway tied arch bridge according to claim 1, characterized in that: The exhaust mechanism (5) comprises an exhaust pipe (52) and a stop valve (51) arranged in the exhaust pipe (52); the exhaust pipe (52) is arranged in the exhaust hole (23); a limit ring (521) is arranged on the outer wall of the exhaust pipe (52); and a fixing mechanism (6) is arranged on the outer walls of the upper arch rib (21) and the lower arch rib (22) corresponding to the exhaust mechanism (5).

3. The arch rib concrete jacking structure of a high-speed railway tied arch bridge according to claim 2 is characterized in that: The fixing mechanism (6) comprises a fixing platform (62) arranged on both sides of the exhaust hole (23), and a fixing plate (61) rotatably connected to the fixing platform (62); a fixing protrusion (621) is arranged on one side of the fixing plate (61) that is in contact with the limiting ring (521); the limiting ring (521) is provided with a fixing groove (5211) corresponding to the fixing protrusion (621); and the fixing protrusion (621) can be inserted into the fixing groove (5211); a driving member (611) is arranged on the fixing platform (62), and the driving member (611) is connected to the fixing plate (61).

4. The arch rib concrete jacking structure of a high-speed railway tied arch bridge according to claim 3 is characterized in that: A fixing hole (6211) is provided on a side of the fixing protrusion (621) away from the fixing plate (61), and a magnetic part (621) that is magnetically attracted to the limiting ring (521) is provided in the fixing hole (6211).

5. The arch rib concrete jacking structure of a high-speed railway tied arch bridge according to claim 2 is characterized in that: The inner wall of the exhaust hole (23) is provided with a sliding groove, and the outer wall of the exhaust pipe (52) is provided with a sliding guide rail (522), and the sliding guide rail (522) can be inserted into the sliding groove.

6. The arch rib concrete jacking structure of a high-speed railway tied arch bridge according to claim 5, characterized in that: A positioning groove (5221) is provided at one end of the sliding guide rail (522) close to the limiting ring (521), and a second magnetic member (522) magnetically attracted to the arch rib (2) is provided in the positioning groove (5221).

7. The arch rib concrete jacking structure of a high-speed railway tied arch bridge according to claim 2, characterized in that: A plurality of dovetail grooves (521) are provided on one side of the limiting ring (521) that is in contact with the upper arch rib (21) and the lower arch rib (22), and a magnetic part three (5213) that is magnetically attracted to the upper arch rib (21) and the lower arch rib (22) is provided in the dovetail groove (521).

8. The arch rib concrete jacking structure of a high-speed railway tied arch bridge according to claim 2, characterized in that: The outer side wall of the exhaust pipe (52) is provided with a sealing groove (523), and a soft rubber pad (524) is provided in the sealing groove (523); an embedding protrusion (5241) is provided on one side of the soft rubber pad (524), and an embedding groove (5231) is provided in the sealing groove (523) corresponding to the embedding protrusion (5241), and the embedding protrusion (5241) can be inserted into the embedding groove (5231).

9. A construction method for a high-speed railway tied arch bridge arch rib concrete jacking structure, characterized in that: S100, arch ribs (2) are installed on both sides of the tied arch bridge (1), and the arch ribs (2) are divided into upper arch ribs (21) and lower arch ribs (22); S200, both ends of the installed arch rib (2) are provided with feed ports (31), and a conveying pipe (3) is provided in the feed port (31), one end of the conveying pipe (3) is inserted into the feed port (31), and the other end is connected to the conveying device (32); a plurality of detection devices (4) are installed on the inner side wall of the upper arch rib (21) and the lower arch rib (22) away from the tie rod arch bridge (1); an exhaust hole (23) is provided on the side of the upper arch rib (21) and the lower arch rib (22) away from the tie rod arch bridge (1), and an exhaust mechanism (5) is installed in the exhaust hole (23); S300, after the arch rib (2) is filled with concrete using the conveying device (32), the exhaust mechanism (5) is disassembled after inspection and the exhaust hole (23) is blocked.

10. The construction method of the arch rib concrete jacking structure of a high-speed railway tied arch bridge according to claim 9, characterized in that: S210, the exhaust mechanism (5) comprises an exhaust pipe (52) and a stop valve (51), the exhaust pipe (52) is inserted into the exhaust hole (23), and the stop valve (51) is installed in the exhaust pipe (52); a limit ring (521) abutting against the arch rib (2) is arranged on the outer wall of the exhaust pipe (52), and a fixing mechanism (6) is arranged on the upper arch rib (21) and the lower arch rib (22) corresponding to the limit ring (521); S211, the fixing mechanism (6) comprises a fixing platform (62) and a fixing plate (61), the fixing plate (61) and the fixing platform (62) are rotatably connected, and a fixing protrusion (621) is provided on one side of the fixing plate (61) that is in contact with the limiting ring (521), and a fixing groove (5211) is provided on the limiting ring (521) corresponding to the fixing protrusion (621), and the fixing protrusion (621) can be inserted into the fixing groove (5211), and a driving member (611) is installed on the fixing platform (62), and the driving member (611) is connected to the fixing plate (61); a fixing hole (6211) is provided on one end of the fixing protrusion (621) away from the fixing plate (61), and a magnetic member 1 (621) is installed in the fixing hole (6211); S21, a sliding groove is provided on the inner side wall of the exhaust hole (23), and a sliding guide rail (522) is provided on the outer side of the exhaust pipe (52) corresponding to the sliding groove, and the sliding guide rail (522) can be inserted into the sliding groove, and a positioning groove (5221) is provided at one end of the sliding guide rail (522) close to the limiting ring (521), and a second magnetic member (522) is installed in the positioning groove (5221); S213, a plurality of dovetail grooves (521) are provided on one side of the limiting ring (521) that is in contact with the upper arch rib (21) and the lower arch rib (22), and a magnetic member three (5213) is installed in the dovetail groove (521); S214, a sealing groove (523) is provided on the outer wall of the exhaust pipe (52), and a soft rubber pad (524) is installed in the sealing groove (523), and an embedding protrusion (5241) is provided on one side of the soft rubber pad (524), and an embedding groove (5231) is provided in the sealing groove (523), and the embedding protrusion (5241) can be inserted into the embedding groove (5231).