Water conservancy sewage treatment device and method

By designing a sewage treatment device including a treatment tank, a shovel adjustment component, a discharge adjustment component and a liquid delivery adjustment component, the problems of slow circulation speed and low purification efficiency caused by garbage accumulation in sewage treatment are solved, and more efficient sewage treatment is achieved.

CN119822430AActive Publication Date: 2025-04-15江西良科建设有限公司
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202510050968.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-13
Publication Date
2025-04-15
Estimated Expiration
2045-01-13

AI Technical Summary

Technical Problem

When the existing sewage treatment device filters large substances through the grid, excessive accumulation of garbage causes the sewage circulation speed to become slow, unable to be effectively purified, slow processing speed and reduced efficiency. At the same time, the precipitation method is slow to process, making it difficult to input fresh sewage, and the flocculant distribution speed is slow and cannot be evenly distributed, resulting in slowing sewage treatment speed.

Method used

A water conservancy sewage treatment device is designed, including a box, a treatment tank, a shovel material adjustment component, a discharge material adjustment component and a liquid delivery regulation component. The motor drive treatment tank swings left and right, and the cooperation of the hydraulic cylinder and hydraulic rod is used to achieve effective gathering and removal of garbage; the design of the discharge adjustment component can achieve comprehensive capture and removal of garbage; the liquid delivery adjustment component can ensure uniform distribution of flocculant and improve the purification effect of sewage.

Benefits of technology

It improves the circulation speed of sewage, reduces garbage blockage, enhances the adaptability and overall purification effect of sewage treatment, and improves the efficiency of sewage treatment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119822430A_ABST
    Figure CN119822430A_ABST
Patent Text Reader

Abstract

The invention provides a water conservancy sewage treatment device and method, and belongs to the technical field of sewage treatment. Comprising a box body, a water inlet is formed in one side of the box body, a base is installed in the box body, a motor is installed at one end of the base, a buffer supporting frame is installed at one end of the base, a treatment tank is installed at the top of the buffer supporting frame, and a pouring bin is installed at the top of the treatment tank. By arranging the discharging adjusting assembly and the liquid feeding adjusting assembly, the circulating speed of sewage is increased, and due to creation in a dynamic environment, a grating material collecting shovel is more effectively in contact with and intercepts garbage in the sewage, the blockage condition is reduced, the adaptability of sewage treatment is enhanced, the garbage is more comprehensively captured by a material stacking bin, the collecting efficiency is improved, and the environment is protected. The probability that garbage blocks a pipeline and is accumulated at equipment is reduced, and a flocculating agent is more effectively distributed in a sewage environment through the tank body which shakes left and right, so that sewage treatment is finer and more comprehensive, and removal of pollutants is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of sewage treatment, and in particular to a water conservancy sewage treatment device and method. Background Art

[0002] Sewage refers to the discharged water from life and production that is polluted to a certain extent. Water that has lost its original use function is referred to as sewage. Domestic sewage includes water generated in household, commercial and industrial activities, such as flushing water, washing water, catering sewage, etc.

[0003] A sewage treatment plant is a device used to treat sewage. It removes harmful substances in sewage through physical, chemical and biological methods to make it meet environmental emission standards or reusable water quality requirements. This device usually consists of multiple process units and is designed to gradually purify sewage and reduce pollution to the environment.

[0004] In the existing sewage treatment devices, when filtering larger substances through the grille during sewage treatment, the sewage circulation speed is often slowed down due to excessive accumulation of garbage, and it cannot be effectively purified, resulting in slow processing speed and reduced efficiency, thereby affecting the overall purification speed of sewage treatment. At the same time, garbage impurities in sewage are precipitated by sedimentation, and the processing speed is slow. In the sedimentation process, in order to maintain a balanced environment, it is difficult to input fresh sewage, resulting in limitations in purification. In addition, during the sewage treatment process, the flocculant will form a multi-nuclear complex after hydrolysis, which can aggregate the colloidal particles and tiny suspended matter in the water through adsorption, bridging and other effects to form larger flocs, which are easy to precipitate or filter out. However, the flocculant is slowly distributed in sewage treatment and cannot be evenly distributed, resulting in a slow sewage treatment speed, affecting the overall sewage filtration speed, and reducing the purification efficiency. Therefore, the present application provides a water conservancy sewage treatment device and method to meet the needs. Summary of the invention

[0005] The technical problem to be solved by the present invention is to provide a water conservancy sewage treatment device and method to solve the problem that in the existing sewage treatment, when the grid filters larger substances, garbage will accumulate too much, resulting in a slow flow rate of sewage, and it cannot be effectively purified, resulting in a slow treatment speed, thereby affecting the overall purification speed. At the same time, the sedimentation method precipitates garbage impurities, and the treatment speed is slow. During the sedimentation process, in order to maintain a balanced environment, it is difficult to input fresh sewage, which has the limitation of purification. In addition, during the sewage treatment process, the flocculant is distributed slowly in the sewage treatment and cannot be evenly distributed, resulting in a slow sewage treatment speed.

[0006] In order to solve the above technical problems, the present invention provides the following technical solutions:

[0007] A water conservancy sewage treatment device comprises a box body, a water inlet is arranged on one side of the box body, a base is installed inside the box body, a motor is installed on one end of the base, a buffer support frame is installed on one end of the base, a treatment tank is installed on the top of the buffer support frame, a pouring bin is installed on the top of the treatment tank, an operating chamber is installed on the top of the pouring bin, a collecting box is installed on the bottom of the pouring bin, a water outlet is installed on one end of the treatment tank, and a filter is installed inside the treatment tank; a shoveling adjustment component, the shoveling adjustment component is installed on the top of the operating chamber The bottom of the shoveling adjustment component is used to shovel the garbage on the surface of the treatment tank into the dumping bin; the discharge adjustment component is installed at the bottom of the shoveling adjustment component, and the discharge adjustment component is used to collect the garbage in the sewage into the stacking bin, and push the garbage in the stacking bin into the dumping bin; the liquid delivery adjustment component is installed at one end of the treatment tank, and the liquid delivery adjustment component is used to inject coagulant into the sewage in the treatment tank; the shoveling adjustment component is installed on the top of the discharge adjustment component, and the discharge adjustment component is installed on the top of the liquid delivery adjustment component.

[0008] Optionally, the shoveling adjustment assembly includes a double-rod hydraulic cylinder, which is installed inside the operating chamber, a first hydraulic rod is installed at the bottom of the double-rod hydraulic cylinder, a second hydraulic rod is installed inside the first hydraulic rod, and a rotating shaft is installed at one end of the first hydraulic rod.

[0009] Optionally, an aggregate shovel is installed at one end of the rotating shaft, a bracket is installed at one side of the operating cavity, a support seat is installed at the bottom of the bracket, and an elastic push block is installed inside the support seat.

[0010] Optionally, the discharge adjustment assembly includes a contact seat, which is mounted on the surface of the second hydraulic rod, a sleeve is mounted on the bottom of the contact seat, and a stacking bin is mounted on the surface of the sleeve.

[0011] Optionally, one end of the stacking bin is rotatably connected to an elastic baffle, one end of the sleeve is installed with a first convex strip, one end of the first convex strip is rotatably connected to a connecting rod, and one end of the connecting rod is rotatably connected to a second convex strip.

[0012] Optionally, a push plate is installed at one end of the second convex strip, a sliding block is installed at one end of the push plate, a sliding groove frame is installed at the bottom of the second hydraulic rod, and the sliding block is slidably connected to the sliding groove frame.

[0013] Optionally, the liquid delivery regulating assembly comprises a coagulant injection tube, which is installed at one end of the processing tank. A nozzle is installed at one end of the coagulant injection tube, and a protective cover plate is installed on the surface of the nozzle.

[0014] Optionally, a protective shield net is installed on the surface of the protective shield plate, the protective shield net is installed on the top of the nozzle, a moving block is slidably connected inside the protective shield plate, and a moving plate is installed on the top of the moving block.

[0015] Optionally, a gravity ball is installed at one end of the movable plate, an elastic head is installed at one end of the gravity ball, the elastic head is arranged at one end of the protective cover plate, a connecting seat is installed at the bottom of the movable plate, a brush is installed at the bottom of the connecting seat, and the connecting seat is arranged above the protective cover net.

[0016] The present application also provides a method for using a water conservancy sewage treatment device, comprising the following steps:

[0017] S1: First, connect the water inlet at one end of the box body, discharge the sewage into the treatment tank through the water inlet, and then start the motor to make the treatment tank start to swing left and right on the buffer support frame at one end of the base. At this time, the liquid in the treatment tank starts to swing left and right;

[0018] S2: Then the first hydraulic rod is made to enter the swinging treatment tank, and the sewage swings left and right, so that the garbage on the surface gradually gathers into the aggregate shovel through the left and right swing of the sewage, and then the first hydraulic rod is raised by the double-rod hydraulic cylinder. At this time, the garbage on the aggregate shovel moves out of the top opening of the treatment tank together with the raising of the aggregate shovel, and then is shoveled into the dump bin, and the garbage in the dump bin is then transported to the aggregate box;

[0019] S3: The treatment tank swings left and right to flush the garbage in the sewage into the stacking bin. At this time, the second hydraulic rod drives the stacking bin to move to the opening of the treatment tank, and then pushes the garbage from the stacking bin to the dumping bin through the push plate;

[0020] S4: Then the coagulant is injected, and the sewage is purified again to obtain flocs, and then the flocs and garbage are collected again by the aggregate shovel and the stacking bin for reprocessing to obtain the treated sewage, which is discharged through the outlet.

[0021] Compared with the prior art, the present invention has at least the following beneficial effects:

[0022] In the above scheme, by setting up a shovel adjustment component and utilizing the cooperation between the double-rod hydraulic cylinder, the first hydraulic rod, the second hydraulic rod, the rotating shaft, the aggregate shovel, the first bevel gear and the second bevel gear, the interception of the fixed grid is reduced, thereby improving the circulation speed of the sewage. In addition, the dynamic environment created by the slow left and right swinging of the sewage in the treatment tank enables the grid aggregate shovel to more effectively contact and intercept garbage in the sewage, especially those garbage that are difficult to be captured by the fixed grid due to the influence of the water flow, thereby reducing blockages, enhancing the adaptability of sewage treatment, and improving the overall purification effect of sewage treatment.

[0023] By setting up a discharge adjustment component, utilizing a contact seat, a sleeve, a first convex strip, a connecting rod, a second convex strip, a push plate, a slider, a slide frame, a stacking bin and an elastic baffle, and by slowly shaking the tank body left and right, suspended matter, floating matter and other garbage in the sewage can be effectively gathered and moved, and then introduced into a specially designed stacking bin. Compared with traditional static treatment, it can capture garbage more comprehensively, improve collection efficiency, and reduce the probability of garbage clogging pipes and accumulating in equipment, thereby reducing the risk of blockage and improving purification efficiency. In addition, by setting up a stacking bin in the sewage, garbage that can only be removed by filtration and sedimentation can be removed during the sewage treatment process, thereby optimizing the treatment process and making the subsequent sewage treatment process smoother.

[0024] By setting up a liquid delivery adjustment component, utilizing a coagulant injection tube, a nozzle, a shield plate, a moving block, a moving plate, a gravity ball, an elastic head, a connecting seat, a brush and a shield net, and slowly shaking the tank body left and right, it is helpful for suspended matter, colloids and other impurities in the sewage to better contact and mix with the flocculant. The flocculant injection and the left and right shaking of the tank body can more effectively distribute the flocculant over a larger range, making the sewage treatment more refined and comprehensive, improving the removal of pollutants, and making the sewage treatment more flexible and efficient. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] The accompanying drawings, which are incorporated herein and constitute a part of the specification, illustrate embodiments of the invention and, together with the description, further serve to explain the principles of the invention and to enable those skilled in the relevant art to make and use the invention.

[0026] Figure 1 It is a schematic diagram of the main three-dimensional structure of the water conservancy sewage treatment device of the present invention;

[0027] Figure 2 It is a schematic diagram of the internal three-dimensional structure of the water conservancy sewage treatment device of the present invention;

[0028] Figure 3 This is a schematic diagram of the three-dimensional structure of the dump bin of the present invention;

[0029] Figure 4 This is a schematic diagram of the cross-sectional plan structure of the dump bin of the present invention;

[0030] Figure 5 This is a schematic diagram of the three-dimensional structure of the processing tank of the present invention;

[0031] Figure 6 It is a schematic diagram of the three-dimensional structure of the shoveling material adjustment component of the present invention;

[0032] Figure 7 This is a three-dimensional structural schematic diagram of the position relationship between the material storage bin and the filter screen of the present invention;

[0033] Figure 8It is a three-dimensional structural schematic diagram of the positional relationship between the second hydraulic rod and the contact seat of the present invention;

[0034] Fig. 9 This is a schematic diagram of the three-dimensional structure of the discharge adjustment component of the present invention;

[0035] Fig.10 It is a three-dimensional structural schematic diagram of the position relationship between the slider and the slide frame of the present invention;

[0036] Fig.11 This is a schematic diagram of the three-dimensional structure of the liquid delivery regulating assembly of the present invention;

[0037] Fig.12 It is a schematic diagram of the three-dimensional structure of the elastic head of the present invention;

[0038] Fig.13 For the present invention Fig.12 A is an enlarged view of the middle image.

[0039] Reference numerals:

[0040] 1. Box; 2. Base; 3. Motor; 4. Buffer support frame; 5. Processing tank; 6. Shovel adjustment assembly; 61. Double-rod hydraulic cylinder; 62. First hydraulic rod; 63. Second hydraulic rod; 64. Rotating shaft; 65. Aggregate shovel; 66. Bracket; 67. Support seat; 68. Elastic push block; 7. Discharge adjustment assembly; 71. Contact seat; 72. Sleeve; 73. First convex strip; 74. Connecting rod; 75. Second convex strip; 76. Push plate; 77. Slider; 78. Slide rack; 79. Material stacking bin; 710. Elastic baffle; 8. Liquid delivery adjustment assembly; 81. Coagulant injection tube; 82. Nozzle; 83. Protective cover plate; 84. Moving block; 85. Moving plate; 86. Gravity ball; 87. Elastic head; 88. Connecting seat; 89. Brush; 810. Protective cover net; 9. Material dumping bin; 10. Material collection box; 11. Operating chamber; 12. Water inlet; 13. Water outlet; 14. Filter.

[0041] As shown in the figure, in order to clearly implement the structure of the embodiment of the present invention, specific structures and devices are marked in the figure, but this is only for illustrative purposes and is not intended to limit the present invention to the specific structure, device and environment. According to specific needs, ordinary technicians in this field can adjust or modify these devices and environments. DETAILED DESCRIPTION

[0042] The following is a detailed description of a water conservancy sewage treatment device and method provided by the present invention in conjunction with the accompanying drawings and specific embodiments. At the same time, it is explained here that in order to make the embodiments more detailed, the following embodiments are the best and preferred embodiments, and those skilled in the art may also adopt other alternative methods to implement some known technologies; and the accompanying drawings are only for a more specific description of the embodiments, and are not intended to specifically limit the present invention.

[0043] It should be noted that the references to "one embodiment", "an embodiment", "an exemplary embodiment", "some embodiments" and the like in the specification indicate that the embodiments described may include specific features, structures or characteristics, but not every embodiment may include the specific features, structures or characteristics. In addition, when a specific feature, structure or characteristic is described in conjunction with an embodiment, it should be within the knowledge of a person skilled in the art to implement such feature, structure or characteristic in conjunction with other embodiments (whether or not explicitly described).

[0044] In general, a term can be understood, at least in part, from its use in context. For example, depending, at least in part, on the context, the term "one or more" as used herein can be used to describe any feature, structure, or characteristic in the singular sense, or can be used to describe a combination of features, structures, or characteristics in the plural sense. Additionally, the term "based on" can be understood as not necessarily intended to convey an exclusive set of factors, but can instead, depending, at least in part, on the context, allow for the presence of other factors that are not necessarily explicitly described.

[0045] It will be understood that the meanings of “on,” “over,” and “above” in the present invention should be interpreted in the broadest manner, so that “on” not only means “directly on” something, but also includes the meaning of being “on” something with intervening features or layers therebetween, and “on” or “over” not only means “on” or “above” something, but also includes the meaning of being “on” or “above” something with no intervening features or layers therebetween.

[0046] Additionally, spatially relative terms such as "under," "beneath," "lower," "above," "upper," and the like may be used herein for descriptive convenience to describe the relationship of one element or feature to another element or features, as shown in the accompanying drawings. Spatially relative terms are intended to encompass different orientations of the device in use or operation in addition to the orientation depicted in the accompanying drawings. The device may be oriented in other ways, and the spatially relative descriptors used herein may be similarly interpreted accordingly.

[0047] like Figures 1 to 13As shown, an embodiment of the present invention provides a water conservancy sewage treatment device, including a box body 1, a water inlet 12 is arranged on one side of the box body 1, a base 2 is installed inside the box body 1, a motor 3 is installed at one end of the base 2, a buffer support frame 4 is installed at one end of the base 2, a treatment tank 5 is installed on the top of the buffer support frame 4, a pouring bin 9 is installed on the top of the treatment tank 5, an operating chamber 11 is installed on the top of the pouring bin 9, a collecting box 10 is installed at the bottom of the pouring bin 9, a water outlet 13 is installed at one end of the treatment tank 5, and a filter screen 14 is installed inside the treatment tank 5; a shovel adjustment component 6 is installed At the bottom of the operating chamber 11, the shoveling adjustment assembly 6 is used to shovel the garbage on the surface of the treatment tank 5 into the dumping bin 9; the discharging adjustment assembly 7 is installed at the bottom of the shoveling adjustment assembly 6, and the discharging adjustment assembly 7 is used to collect the garbage in the sewage into the stacking bin 79, and push the garbage in the stacking bin 79 into the dumping bin 9; the liquid feeding adjustment assembly 8 is installed at one end of the treatment tank 5, and the liquid feeding adjustment assembly 8 is used to inject coagulant into the sewage in the treatment tank 5; the shoveling adjustment assembly 6 is installed at the top of the discharging adjustment assembly 7, and the discharging adjustment assembly 7 is installed at the top of the liquid feeding adjustment assembly 8.

[0048] As an implementation method in this embodiment, Figures 4 to 8 As shown, the shovel adjustment assembly 6 includes a double-rod hydraulic cylinder 61, which is installed inside the operating chamber 11. A first hydraulic rod 62 is installed at the bottom of the double-rod hydraulic cylinder 61, and a second hydraulic rod 63 is installed inside the first hydraulic rod 62. A rotating shaft 64 is installed at one end of the first hydraulic rod 62, and a material collecting shovel 65 is installed at one end of the rotating shaft 64. A bracket 66 is installed on one side of the operating chamber 11, and a support seat 67 is installed at the bottom of the bracket 66. An elastic push block 68 is installed inside the support seat 67. When the first hydraulic rod 62 moves upward, the material collecting shovel 65 on the rotating shaft 64 is driven to move upward together. When the first hydraulic rod 62 continues to move, the elastic push block 68 in the support seat 67 installed at the bottom of the bracket 66 on one side of the operating chamber 11 is One end of the push block 68 begins to contact the surface of the aggregate shovel 65. When the elastic push block 68 is close to the surface of the aggregate shovel 65, the first hydraulic rod 62 continues to move upward. At this time, the garbage on the aggregate shovel 65 is pushed downward by the elastic push block 68, and under the action of the arc-shaped aggregate shovel 65, the elastic push block 68 is close to the surface while moving toward the inside of the support seat 67. When the first hydraulic rod 62 moves to the bottom of the double-rod hydraulic cylinder 61 and contacts the bottom of the double-rod hydraulic cylinder 61, the first hydraulic rod 62 stops moving. At this time, the garbage on the aggregate shovel 65 will be pushed down by the elastic push block 68, and the fallen garbage will fall into the dump bin 9 along the rectangular inclined opening at the top of the processing tank 5, and the inclined dump bin 9 will transport the garbage to the aggregate box 10.

[0049] As an implementation method in this embodiment, Figures 6 to 10As shown, the discharging adjustment assembly 7 includes a contact seat 71, which is mounted on the surface of the second hydraulic rod 63, a sleeve 72 is mounted at the bottom of the contact seat 71, a stacking bin 79 is mounted on the surface of the sleeve 72, one end of the stacking bin 79 is rotatably connected to an elastic baffle 710, one end of the sleeve 72 is mounted with a first convex strip 73, one end of the first convex strip 73 is rotatably connected to a connecting rod 74, one end of the connecting rod 74 is rotatably connected to a second convex strip 75, one end of the second convex strip 75 is mounted with a push plate 76, one end of the push plate 76 is mounted with a slider 77, a slide frame 78 is mounted at the bottom of the second hydraulic rod 63, and the slider 77 is slidably connected to the slide frame 78. When the discharging adjustment assembly 7 starts to operate, the contact seat 71 moves together with the second hydraulic rod 63. When the contact seat 71 moves, it drives the sleeve 72 to move together. At the same time, the movement of the sleeve 72 drives the stacking bin 79 to move the stacking bin 79 for collecting garbage upwards. When the first hydraulic rod 62 stops After stopping movement, the second hydraulic rod 63 continues to move. When the stacking bin 79 moves out of the opening of the treatment tank 5, the contact seat 71 begins to contact the bottom of the first hydraulic rod 62. At this time, the contact seat 71 and the second hydraulic rod 63 begin to move in the opposite direction, and the contact seat 71 drives the sleeve 72 to move in the opposite direction. When the sleeve 72 moves in the opposite direction, the connecting rod 74 begins to fold on the first convex strip 73. When the connecting rod 74 flips, the second convex strip 75 connected to one end of the connecting rod 74 moves. When the second convex strip 75 moves, the push plate 76 begins to move. The movement of the push plate 76 causes the slider 77 to move synchronously in the slide slot frame 78. At this time, the push plate 76 begins to push in the stacking bin 79. When the push plate 76 moves, the garbage in the stacking bin 79 is pushed into the dumping bin 9 against the elastic baffle 710, and the collecting box 10 is discharged. Then the double-rod hydraulic cylinder 61 is started again to reset the first hydraulic rod 62 and the second hydraulic rod 63 to continue to treat the sewage.

[0050] As an implementation method in this embodiment, Figures 7 to 13As shown, the liquid delivery regulating assembly 8 includes a coagulant injection tube 81, which is installed at one end of the treatment tank 5, and a nozzle 82 is installed at one end of the coagulant injection tube 81. A shield plate 83 is installed on the surface of the nozzle 82, and a shield net 810 is installed on the surface of the shield plate 83. The shield net 810 is installed on the top of the nozzle 82. A moving block 84 is slidably connected inside the shield plate 83, and a moving plate 85 is installed on the top of the moving block 84. A gravity ball 86 is installed at one end of the moving plate 85, and an elastic head 87 is installed at one end of the gravity ball 86. The elastic head 87 is arranged at one end of the shield plate 83, and a connecting seat 88 is installed at the bottom of the moving plate 85. A brush 89 is installed at the bottom of the connecting seat 88, and the connecting seat 88 is arranged above the shield net 810. When sewage enters the treatment tank 5, the liquid delivery regulating assembly 8 starts to operate, and at this time, the coagulant injection tube 81 starts to pass through the nozzle 82 to the treatment tank. The sewage in the treatment tank 5 is injected with flocculant. At this time, the shield net 810 on the shield plate 83 protects the nozzle 82 to prevent the pollutants in the sewage from clogging the nozzle 82. Then, the sewage swinging left and right drives the movable plate 85 to shake left and right. When the movable plate 85 shakes left and right, the movable plate 85 is limited in the shield plate 83 by the movable block 84. When the movable plate 85 moves, the gravity ball 86 provides assistance to the movable plate 85 while driving the elastic head 87 to move. After each movement of the gravity ball 86, the elastic head 87 contacts the shield plate 83 to relieve the force of the gravity ball 86 and drive the movable plate 85 to swing left and right. When the movable plate 85 moves, the connecting seat 88 installed at the bottom of the movable plate 85 drives the brush 89 to brush the surface of the shield net 810 to prevent the accumulation of garbage on the surface of the shield net 810. The addition of flocculant makes the sewage in the treatment tank 5 be treated faster.

[0051] The working principle of the technical solution provided by the present invention is as follows:

[0052] When using the device, first connect the sewage to the water inlet 12 at one end of the box body 1 to facilitate the rapid entry of the sewage, and then discharge the sewage into the treatment tank 5 through the water inlet 12, and then start the motor 3 to make the treatment tank 5 start to slowly swing left and right on the base 2. During the swinging of the treatment tank 5, the buffer support frame 4 supports the treatment tank 5 while buffering its stress, and then the operating chamber 11 starts to operate.

[0053] When the operating chamber 11 starts to operate, the shovel adjustment assembly 6 starts to operate. At this time, the sewage has entered the treatment tank 5, and the double-rod hydraulic cylinder 61 starts to drive the first hydraulic rod 62 and the second hydraulic rod 63 to enter the swinging treatment tank 5. At this time, the sewage in the treatment tank 5 drives the garbage to swing left and right. The left and right swinging sewage makes the garbage gather more effectively. When the gathered garbage follows the swing of the sewage and accumulates on the aggregate shovel 65, the first hydraulic rod 62 starts to move upward. When the first hydraulic rod 62 moves upward, it drives the aggregate shovel 65 on the rotating shaft 64 to move upward together. When the first hydraulic rod 62 continues to move, the elastic push block 68 in the support seat 67 installed at the bottom of the bracket 66 on one side of the operating chamber 11 One end begins to contact the surface of the aggregate shovel 65. When the elastic push block 68 is close to the surface of the aggregate shovel 65, the first hydraulic rod 62 continues to move upward. At this time, the garbage on the aggregate shovel 65 is pushed downward by the elastic push block 68, and under the action of the arc-shaped aggregate shovel 65, the elastic push block 68 is close to the surface while moving toward the inside of the support seat 67. When the first hydraulic rod 62 moves to the bottom of the double-rod hydraulic cylinder 61 and contacts the bottom of the double-rod hydraulic cylinder 61, the first hydraulic rod 62 stops moving. At this time, the garbage on the aggregate shovel 65 will be pushed down by the elastic push block 68, and the fallen garbage will fall into the dumping bin 9 along the rectangular inclined opening at the top of the processing tank 5, and the inclined dumping bin 9 will transport the garbage to the aggregate box 10.

[0054] When the second hydraulic rod 63 moves upward, the second hydraulic rod 63 drives the filter screen 14 to move together, and the discharge adjustment component 7 starts to operate. When the discharge adjustment component 7 starts to operate, the contact seat 71 moves together with the second hydraulic rod 63. When the contact seat 71 moves, it drives the sleeve 72 to move together. At the same time, the movement of the sleeve 72 drives the stacking bin 79 to move the garbage stacking bin 79 upward together. When the first hydraulic rod 62 stops moving, the second hydraulic rod 63 continues to move. When the stacking bin 79 moves out of the opening of the processing tank 5, the contact seat 71 starts to contact with the bottom of the first hydraulic rod 62. At this time, the contact seat 71 and the second hydraulic rod 63 start to move in the opposite direction. The contact seat 71 It drives the sleeve 72 to move in the opposite direction. When the sleeve 72 moves in the opposite direction, the connecting rod 74 begins to fold on the first convex strip 73. When the connecting rod 74 flips over, the second convex strip 75 connected to one end of the connecting rod 74 moves. When the second convex strip 75 moves, the push plate 76 begins to move. The movement of the push plate 76 causes the slider 77 to move synchronously in the slide frame 78. At this time, the push plate 76 begins to push in the stacking bin 79. When the push plate 76 moves, the garbage in the stacking bin 79 is pushed into the dumping bin 9 against the elastic baffle 710, and the collecting box 10 is discharged. Then the double-rod hydraulic cylinder 61 is started to reset the first hydraulic rod 62 and the second hydraulic rod 63 to continue to treat the sewage.

[0055] When the sewage enters the treatment tank 5, the liquid delivery regulating assembly 8 starts to operate. At this time, the coagulant injection tube 81 starts to inject flocculant into the sewage in the treatment tank 5 through the nozzle 82. At this time, the protective cover net 810 on the protective cover plate 83 protects the nozzle 82 to prevent the pollutants in the sewage from clogging the nozzle 82. Then, the sewage swinging left and right drives the moving plate 85 to shake left and right. When the moving plate 85 shakes left and right, the moving plate 85 is limited in the protective cover plate 83 by the moving block 84. When the moving plate 85 moves, the gravity ball 86 provides assistance to the moving plate 85 while driving the elastic head 87 to move. The elastic head 87 contacts the shield plate 83 after each movement of the gravity ball 86, relieves the force of the gravity ball 86, and drives the movable plate 85 to swing left and right. When the movable plate 85 moves, the connecting seat 88 installed at the bottom of the movable plate 85 drives the brush 89 to brush the surface of the shield net 810 to prevent the accumulation of garbage on the surface of the shield net 810. The addition of flocculant makes the sewage treatment in the treatment tank 5 faster, and the garbage in the sewage is cleaned up by the aggregate shovel 65 and the stacking bin 79. After the sewage is treated, the treated sewage is discharged through the outlet 13.

[0056] The present application also provides a method for using a water conservancy sewage treatment device, comprising the following steps:

[0057] S1: First, connect the water inlet 12 at one end of the box body 1, discharge the sewage into the treatment tank 5 through the water inlet 12, and then start the motor 3 to make the treatment tank 5 start to swing left and right on the buffer support frame 4 at one end of the base 2, and then the liquid in the treatment tank 5 starts to swing left and right;

[0058] S2: Then the first hydraulic rod 62 is made to enter the swinging treatment tank 5, and the sewage swings left and right, so that the garbage on the surface is gradually gathered to the collecting shovel 65 through the swinging of the sewage left and right, and then the first hydraulic rod 62 is raised by the double-rod hydraulic cylinder 61. At this time, the garbage on the collecting shovel 65 is moved out of the top opening of the treatment tank 5 together with the raising of the collecting shovel 65, and then shoveled into the dumping bin 9, and the garbage in the dumping bin 9 is then transported to the collecting box 10;

[0059] S3: The treatment tank 5 swings left and right to flush the garbage in the sewage into the stacking bin 79. At this time, the second hydraulic rod 63 drives the stacking bin 79 to move to the opening of the treatment tank 5, and then the garbage is pushed from the stacking bin 79 to the dumping bin 9 through the push plate 76;

[0060] S4: Then the coagulant is injected, and the sewage is purified again to obtain flocs, and then the flocs and garbage are collected again by the collecting shovel 65 and the stacking bin 79 for reprocessing to obtain treated sewage, which is discharged through the outlet 13.

[0061] The present invention covers any substitution, modification, equivalent method and scheme made on the essence and scope of the present invention. In order to make the public have a thorough understanding of the present invention, specific details are described in detail in the following preferred embodiments of the present invention, but those skilled in the art can fully understand the present invention without the description of these details. In addition, in order to avoid unnecessary confusion about the essence of the present invention, well-known methods, processes, procedures, components and circuits are not described in detail.

[0062] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.

Claims

1. A water conservancy sewage treatment device, characterized in that: It comprises a box body, a water inlet is arranged on one side of the box body, a base is installed inside the box body, a motor is installed on one end of the base, a buffer support frame is installed on one end of the base, a processing tank is installed on the top of the buffer support frame, a material dumping bin is installed on the top of the processing tank, an operating chamber is installed on the top of the material dumping bin, a collecting box is installed on the bottom of the material dumping bin, a water outlet is installed on one end of the processing tank, and a filter is installed inside the processing tank; A shoveling adjustment assembly, which is installed at the bottom of the operating chamber and is used to shovel garbage on the surface of the processing tank into the dumping bin; A discharge adjustment component, which is installed at the bottom of the shoveling adjustment component and is used to collect garbage in the sewage into the stacking bin and push the garbage in the stacking bin into the dumping bin; A liquid delivery regulating assembly, the liquid delivery regulating assembly being installed at one end of the treatment tank and being used for injecting a coagulant into the sewage in the treatment tank; The shoveling adjustment component is installed on the top of the discharging adjustment component, and the discharging adjustment component is installed on the top of the liquid feeding adjustment component.

2. The water conservancy sewage treatment device according to claim 1, characterized in that: The shoveling adjustment assembly includes a double-rod hydraulic cylinder, which is installed inside an operating chamber. A first hydraulic rod is installed at the bottom of the double-rod hydraulic cylinder, a second hydraulic rod is installed inside the first hydraulic rod, and a rotating shaft is installed at one end of the first hydraulic rod.

3. The water conservancy sewage treatment device according to claim 2 is characterized in that: An aggregate shovel is installed at one end of the rotating shaft, a bracket is installed at one side of the operating cavity, a support seat is installed at the bottom of the bracket, and an elastic push block is installed inside the support seat.

4. The water conservancy sewage treatment device according to claim 3 is characterized in that: The material discharging adjustment assembly comprises a contact seat, which is mounted on the surface of the second hydraulic rod, a sleeve is mounted on the bottom of the contact seat, and a material stacking bin is mounted on the surface of the sleeve.

5. The water conservancy sewage treatment device according to claim 4, characterized in that: One end of the stacking bin is rotatably connected to an elastic baffle, one end of the sleeve is installed with a first convex strip, one end of the first convex strip is rotatably connected to a connecting rod, and one end of the connecting rod is rotatably connected to a second convex strip.

6. The water conservancy sewage treatment device according to claim 5, characterized in that: A push plate is installed at one end of the second convex strip, a sliding block is installed at one end of the push plate, a sliding slot frame is installed at the bottom of the second hydraulic rod, and the sliding block is slidably connected to the sliding slot frame.

7. The water conservancy sewage treatment device according to claim 6, characterized in that: The liquid delivery regulating assembly comprises a coagulant injection tube, which is installed at one end of the processing tank. A nozzle is installed at one end of the coagulant injection tube, and a protective cover plate is installed on the surface of the nozzle.

8. The water conservancy sewage treatment device according to claim 7, characterized in that: A protective shield net is installed on the surface of the protective shield plate, and the protective shield net is installed on the top of the nozzle. A moving block is slidably connected inside the protective shield plate, and a moving plate is installed on the top of the moving block.

9. The water conservancy sewage treatment device according to claim 8, characterized in that: A gravity ball is installed at one end of the movable plate, an elastic head is installed at one end of the gravity ball, the elastic head is arranged at one end of the protective cover plate, a connecting seat is installed at the bottom of the movable plate, a brush is installed at the bottom of the connecting seat, and the connecting seat is arranged above the protective cover net.

10. The method for using the water conservancy and sewage treatment device according to claim 9, characterized in that: The method for using the water conservancy sewage treatment device comprises the following steps: S1: First, connect the water inlet at one end of the box body, discharge the sewage into the treatment tank through the water inlet, and then start the motor to make the treatment tank start to swing left and right on the buffer support frame at one end of the base. At this time, the liquid in the treatment tank starts to swing left and right; S2: Then the first hydraulic rod is made to enter the swinging treatment tank, and the sewage swings left and right, so that the garbage on the surface gradually gathers into the aggregate shovel through the left and right swing of the sewage, and then the first hydraulic rod is raised by the double-rod hydraulic cylinder. At this time, the garbage on the aggregate shovel moves out of the top opening of the treatment tank together with the raising of the aggregate shovel, and then is shoveled into the dump bin, and the garbage in the dump bin is then transported to the aggregate box; S3: The treatment tank swings left and right to flush the garbage in the sewage into the stacking bin. At this time, the second hydraulic rod drives the stacking bin to move to the opening of the treatment tank, and then pushes the garbage from the stacking bin to the dumping bin through the push plate; S4: Then the coagulant is injected, and the sewage is purified again to obtain flocs, and then the flocs and garbage are collected again by the aggregate shovel and the stacking bin for reprocessing to obtain the treated sewage, which is discharged through the outlet.

Citation Information

Patent Citations

  • Whole type garbage compression box with multifunctional pushing device

    CN111469469A

  • Papermaking wastewater filtering treatment device

    CN115738414A

  • Domestic sewage treatment equipment with purification function and method

    CN116850678A

  • Online precise oil filter

    CN213853488U

  • A split-flow rainwater and sewage treatment device

    CN220953758U