Assembly type bay window mounting structure and mounting method

Through the use of the prefabricated bay window installation structure, the problem of horizontal control in traditional bay window construction is solved, precise installation and efficient production are achieved, and the beauty and service life of the building are improved.

CN119825009APending Publication Date: 2025-04-15LIMING VOCATIONAL UNIV
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202510104728.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2025-01-23
Publication Date
2025-04-15

AI Technical Summary

Technical Problem

During the construction of traditional bay windows, it is difficult to control the horizontality of the floating plate and the floating plate, which may lead to offset or excessive gaps in the glass windows, affecting the sealing, safety and aesthetics.

Method used

The prefabricated bay window installation structure is adopted, and precise calibration and installation is achieved through the combination of the bottom protruding member at the first floor, the side wall, the standard top and bottom protruding member, the top floor top protruding member and the positioning frame.

Benefits of technology

It ensures that the dimensions of the bay window structure meet the accuracy standards, reduces the deviation problems during the installation process, and improves the installation smoothness of glass windows and the beauty and service life of the overall building.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119825009A_ABST
    Figure CN119825009A_ABST
Patent Text Reader

Abstract

The invention provides an assembly type bay window mounting structure and method.The assembly type bay window mounting structure is mounted at the edge of a floor slab, and the floor slab comprises a first floor slab, a standard floor slab and a top floor slab; the bay window structure comprises a first floor bottom extending component, a second floor bottom extending component and a third floor bottom extending component, each side wall comprises a first turning section and a second turning section which are perpendicular to each other, the first rotating shaft section is installed on the top of the bottom extending component, the second turning section is installed on a floor, and the side walls are installed on the two sides of the bottom extending component; the standard top extending component is mounted at the top of the side wall, and meanwhile, the standard top extending component is further connected with the standard floor slab; and the standard bottom extending component is mounted at the top end of the standard top extending component, and meanwhile, the standard bottom extending component is further connected with the standard floor slab.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of prefabricated buildings, and in particular to a prefabricated bay window installation structure and installation method. Background Art

[0002] In modern architecture, more and more new houses are beginning to adopt bay window design, which is not only beautiful, but also can add extra lighting and vision to the interior space. As shown in the figure, the traditional bay window design usually includes three main parts: the lower floating platform, the upper floating platform and the glass window. These parts are usually composed of reinforced concrete structure, and the bay window of this structure needs special attention during the construction process.

[0003] When constructing the lower and upper decks, the construction team must ensure that the positions of the two decks are accurate. They are built on the wall below the bay window sill and the outside of the structural beam. The accuracy of the construction is crucial because the levelness of the lower and upper decks must be strictly controlled. If the levelness of the two decks is not well controlled, then during the subsequent installation of glass windows, there may be problems such as inability to install or excessive gaps between the glass windows and the upper and lower decks. These problems will not only affect the sealing and safety of the windows, but may also affect the beauty and service life of the entire building. Summary of the invention

[0004] The object of the present invention is to solve the above-mentioned problems and to provide an assembled bay window installation structure and an installation method.

[0005] The technical solution of this application is implemented as follows:

[0006] In a first aspect, the present application provides an assembled bay window installation structure, wherein the bay window structure is installed at the edge of a floor slab, wherein the floor slab includes a first floor slab, a standard floor slab, and a top floor slab;

[0007] The bay window structure comprises:

[0008] The protruding member at the bottom of the first floor is installed on the first floor slab;

[0009] A side wall, the side wall comprising a first turning section and a second turning section perpendicular to each other, the first turning section being mounted on the top of the bottom extending member, the second turning section being mounted on the floor slab, and the side wall being mounted on both sides of the bottom extending member;

[0010] A standard top extension member is installed on the top of the side wall, and the standard top extension member is also connected to the standard floor slab;

[0011] A standard bottom extension member is installed on the top of the standard top extension member, and the standard bottom extension member is also connected to the standard floor slab;

[0012] The top extension member of the top floor is installed on the top of the side wall, and the top extension member of the top floor is also connected to the top floor slab;

[0013] The bay window structure further includes a positioning frame;

[0014] The positioning frame includes a frame body and an extension formed in the middle of the frame body, the extension extends toward the direction in which the bay window extends out of the outer wall, the bottom of the extension is fixed to the top of the bottom extending member, the top of the extension is fixed to the bottom of the bottom extending member, the two sides of the extension are respectively connected to the side walls, and the top and bottom of the frame body are both connected to the floor slab

[0015] The advantages or beneficial effects of the above technical solution include at least:

[0016] During the installation process, the extension components were continuously calibrated to ensure that the size of the bay window structure could meet the required accuracy standards. Such precise control makes the installation process of the glass windows smooth and greatly reduces the possible offset problems during the installation process. In addition, subdividing the bay window components into multiple independent components is not only conducive to the transportation of prefabricated projects, because smaller components are easier to carry and place, but this splitting method can also significantly increase the production speed of prefabricated parts, because smaller components can be produced in parallel, thereby improving overall production efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The accompanying drawings illustrate exemplary implementations of the present application of embodiments of the present invention and, together with the description, are used to explain the principles of the present application. These drawings are included to provide a further understanding of the present application, and the drawings are included in and constitute a part of this specification.

[0018] Figure 1 A schematic diagram showing a bay window after installation according to an embodiment of the present invention is shown;

[0019] Figure 2 A schematic diagram showing the position of a positioning frame according to an embodiment of the present invention is shown;

[0020] Figure 3 A first schematic diagram showing the steps of installing the first floor structure according to an embodiment of the present invention;

[0021] Figure 4 A second schematic diagram showing the steps of installing the first floor structure according to an embodiment of the present invention;

[0022] Figure 5A third schematic diagram showing the steps of installing the first floor structure according to an embodiment of the present invention;

[0023] Figure 6 A fourth schematic diagram showing the steps of installing the first floor structure according to an embodiment of the present invention;

[0024] Figure 7 A fifth schematic diagram showing the steps of installing the first floor structure according to an embodiment of the present invention;

[0025] Figure 8 A sixth schematic diagram showing the steps of installing the first floor structure according to an embodiment of the present invention;

[0026] Fig. 9 A first schematic diagram showing steps for installing a standard layer structure according to an embodiment of the present invention;

[0027] Fig.10 A second schematic diagram showing the steps of installing a standard layer structure according to an embodiment of the present invention;

[0028] Fig.11 A third schematic diagram showing the steps of installing a standard layer structure according to an embodiment of the present invention;

[0029] Fig.12 A first schematic diagram showing steps of installing a top structure according to an embodiment of the present invention;

[0030] Fig.13 A second schematic diagram showing the steps of installing the top structure of an embodiment of the present invention;

[0031] Fig.14 The figure shows a schematic diagram of the installation of the top floor slab and the top extension member of the top floor in the top floor installation structure of the embodiment of the present invention;

[0032] Fig.15 A schematic diagram showing the removal of the positioning frame according to an embodiment of the present invention is shown (it should be noted that Fig.15 It is just a schematic diagram, and does not mean that the positioning frame needs to be removed only after all bay window structures are installed);

[0033] Fig.16 A schematic diagram showing the structure of a positioning framework according to an embodiment of the present invention is shown;

[0034] Attached figures: 11, first floor bottom extending member; 12, standard top extending member; 13, standard bottom extending member; 14, top floor top extending member; 15, side wall; 151, first turning section; 152, second turning section; 101, member connection part; 102, positioning block; 103, air conditioner outdoor unit installation groove; 21, first floor slab; 22, standard floor slab; 23, top floor slab; 201, connection groove; 202, positioning groove; 203, extended support section; 30, positioning frame; 31, frame body; 32, extension part; 33, first reinforcement rib; 34, second reinforcement rib; 35, third reinforcement rib; 40, partition. DETAILED DESCRIPTION

[0035] The embodiments of the present application will be described in more detail below with reference to the accompanying drawings. Although certain embodiments of the present application are shown in the accompanying drawings, it should be understood that the present application can be implemented in various forms and should not be construed as being limited to the embodiments described herein. Instead, these embodiments are provided for a more thorough and complete understanding of the present application. It should be understood that the drawings and embodiments of the present application are only for exemplary purposes and are not intended to limit the scope of protection of the present application.

[0036] It should be noted that, in the absence of conflict, the embodiments and features of the embodiments in the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0037] It should be understood that the term "including" and its variations used in this document are open inclusions, that is, "including but not limited to". The term "based on" means "based at least in part on". The term "one embodiment" means "at least one embodiment"; the term "another embodiment" means "at least one other embodiment"; the term "some embodiments" means "at least some embodiments". Relevant definitions of other terms will be given in the description below. It should be noted that the concepts of "first", "second", etc. mentioned in this application are only used to distinguish different devices, modules or units, and are not used to limit the order or interdependence of the functions performed by these devices, modules or units.

[0038] It should be noted that the modifications of "one" and "plurality" mentioned in the present application are illustrative rather than restrictive, and those skilled in the art should understand that unless otherwise clearly indicated in the context, it should be understood as "one or more".

[0039] The names of the messages or information exchanged between multiple devices in the embodiments of the present application are only used for illustrative purposes and are not used to limit the scope of these messages or information.

[0040] Reference Figure 1, an assembled bay window installation structure, the bay window structure is installed at the edge of the floor, specifically the edge close to the outside of the building, the floor includes a first floor slab 21, a standard floor slab 22 and a top floor slab 23, for example, the total number of floors is six, the first floor is the first floor, the second to fifth floors are standard floors, and the sixth floor is the top floor;

[0041] Specifically, the bay window structure includes:

[0042] The protruding member 11 at the bottom of the first floor is installed on the first floor slab 21;

[0043] The side wall 15 includes a first turning section 151 and a second turning section 152 which are perpendicular to each other, the first turning section is installed on the top of the bottom protruding member, the second turning section 152 is installed on the floor, and the side wall 15 is installed on both sides of the bottom protruding member;

[0044] The standard top extension member 12 is installed on the top of the side wall 15, and the standard top extension member 12 is also connected to the standard floor slab 22;

[0045] The standard bottom extension member 13 is installed on the top of the standard top extension member 12, and the standard bottom extension member 13 is also connected to the standard floor slab 22;

[0046] The top extension member 14 of the top floor is installed on the top of the side wall 15, and the top extension member 14 of the top floor is also connected to the top floor slab;

[0047] Furthermore, the bay window structure further includes a positioning frame 30;

[0048] The positioning frame 30 includes a frame body 31 and an extension portion 32 formed in the middle of the frame body 31. The extension portion 32 extends toward the direction in which the bay window extends out of the outer wall. The bottom of the extension portion 32 is fixed to the top of the bottom extending member, and the top of the extension portion 32 is fixed to the bottom of the bottom extending member. Both sides of the extension portion 32 are connected to the side walls 15, and the top and bottom of the frame body 31 are connected to the floor. Furthermore, the extension portion 32 has a first reinforcing rib 33 near the inner corner, and the first reinforcing rib 33 has an angle of 45° with the inner wall of the extension portion 32; the frame body 31 has a second reinforcing rib near the inner corner. 34, the second reinforcing rib 34 has an angle of 45° with the inner wall of the frame body 31; the frame body also has a third reinforcing rib 35 near the extension portion 32, and the third reinforcing rib 35 has an angle of 45° with the inner wall of the extension portion 32. The angle of 45° forms a triangular structure between the reinforcing ribs and the corners of the positioning frame 30, thereby enhancing the stability of the corners. The reinforcing ribs can ensure that the main body of the positioning frame and the corners of the extension portion 32 remain at 90°, and the positioning frame 30 can be reused in each layer. The reinforcing ribs can prevent the angle between the side walls from changing during repeated use, thereby avoiding errors caused by the installation of the bay window.

[0049] Furthermore, the positioning frame 30 has a simple structure, is made of steel, is strong and durable, can be transported to the site for further production, and is easy to transport.

[0050] Based on the further improvement of the above structure, the top extending member and the bottom extending member both have a member connecting portion 101, and the corresponding portion of the floor slab and the member connecting portion 101 is provided with a connecting groove 201, and the member connecting portion 101 is embedded in the connecting groove 201; there is a reserved gap between the side wall of the connecting groove 201 and the member connecting portion 101. Since there may be errors in the size of the connecting groove 201 on the floor slab, the position of the member may be offset. The reserved gap can leave enough space for the movement of the member calibration. The reserved gap is used to fill concrete. After the calibration is completed, the concrete is filled and the position of the member can be fixed by waiting for the concrete to solidify. The members on the first floor, standard floor and top floor all adopt the above installation method.

[0051] Furthermore, the part of the floor slab in the connecting groove 201 is also provided with an extended support section 203, and the extended support section 203 is located between the top protruding member and the bottom protruding member, which can enhance the contact area between the floor slab and the member and enhance the connection strength. At the same time, a plurality of positioning grooves 202 are also provided at the bottom of the connecting groove 201, and the positioning grooves 202 are equidistantly arranged along the width direction of the bay window; at the same time, the part of the protruding member corresponding to the positioning groove 202 is also provided with a positioning block 102, and the positioning block 102 can be embedded in the positioning groove 202; the connection strength is further enhanced, and there is also a gap between the positioning groove 202 and the positioning block 102, in order to leave enough space for the movement of the member calibration.

[0052] Based on the further improvement of the above structure, a first latch structure is provided between the top extending member and the bottom extending member, and the first latch structure is used for positioning the top extending member and the bottom extending member when they are installed; a second latch structure is provided between the first turning section 151 and the extending member, and the second latch structure is used for positioning when they are installed between the first turning section 151 and the extending member, and the left and right sides of the extension portion 32 are detachably connected to the side wall 15 by bolts; the upper and lower sides of the extension portion 32 are detachably connected to the top extending member and the bottom extending member by bolts respectively.

[0053] An air-conditioning outdoor unit installation groove 103 is provided on one side of each protruding member close to each other, wherein the installation grooves on the standard top protruding member 12 and the standard bottom protruding member 13 form a complete air-conditioning outdoor unit installation groove 103; the bay window structure further includes a partition 40, which is installed on the outside of the protruding member to cover the air-conditioning outdoor unit installation groove 103.

[0054] The embodiment of the present invention further provides an installation method. The bay window installation method of this embodiment is based on the above-mentioned assembled bay window installation structure;

[0055] The installation method includes first-floor structure installation, standard-floor structure installation, and top-floor structure installation in sequence;

[0056] The first floor structure installation includes the following steps:

[0057] S11, such as Figure 3 As shown, the first floor bottom extending member 11 is hoisted, the member connecting portion 101 of the first floor bottom extending member 11 is aligned with the connecting groove 201 of the first floor floor slab 21 and pushed in, and the positioning block 102 of the first floor bottom extending member 11 is aligned with the positioning groove 202 of the first floor floor slab 21 and embedded, and the position of the first floor bottom extending member 11 is calibrated. After the calibration is completed, the connecting groove 201 and the positioning groove 202 are poured with concrete until the concrete solidifies, and then the next step is entered;

[0058] S12, such as Figure 4 As shown, a contour line is drawn on the top of the protruding member 11 at the bottom of the first floor by a tool to mark the position of the extension portion 32 of the positioning frame 30 at the top of the protruding member 11 at the bottom of the first floor;

[0059] S13, hoisting the positioning frame 30, installing the extension part 32 of the positioning frame 30 between the contour lines drawn in step S12, so that the two sides of the extension part 32 of the positioning frame 30 are aligned with the contour lines, and fixing the extension part 32 to the bottom protruding member 11 of the first floor by bolts;

[0060] S14, such as Figure 5As shown, the side wall 15 is hoisted, the first turning section 151 of the side wall 15 is installed on the top of the bottom protruding member 11 of the first floor and fixed to the top of the bottom protruding member 11 of the first floor through the second latch structure, and the side wall 15 and the extension part 32 are fixed by bolts, and the second turning section 152 of the side wall 15 is installed on the floor slab, and the standard floor slab 22 of the second floor is waited for to be assembled;

[0061] S15, such as Figure 6 and Figure 7 As shown, after the standard floor slab 22 of the second floor is assembled, the standard top extending member 12 is installed, and the member connecting portion 101 of the standard top extending member 12 is extended into the connecting groove 201 of the standard floor slab 22 of the second floor. At the same time, the positioning block 102 of the standard top extending member 12 is aligned with the connecting groove 201 and embedded, and fixed to the top of the bottom extending member 11 of the first floor through the second latch structure, and the position of the standard top extending member 12 is calibrated. After the calibration is completed, the connecting groove 201 and the positioning groove 202 are poured with concrete until the concrete solidifies;

[0062] S16, such as Figure 8 As shown, the standard top extension member 12 is fixed to the extension 32 by bolts;

[0063] S17, calibrate the positions of the bottom protruding member 11 of the first floor and the standard top protruding member 12. After the calibration is completed, remove the bolts and remove the positioning frame 30 to complete the installation of the first floor components. At this time, the positioning frame 30 can be moved to the second floor to continue installation. Since the prefabricated building floor also adopts prefabricated construction, the positioning frame 30 can be moved in and out of the building by hoisting.

[0064] The installation of a standard layer structure includes the following steps:

[0065] S21, such as Fig. 9 As shown, the standard bottom extending member 13 is hoisted, the member connection portion 101 of the standard bottom extending member 13 is aligned with the connection groove 201 of the standard floor slab 22 and embedded, and the positioning block 102 of the standard bottom extending member 13 is aligned with the positioning groove 202 of the standard floor slab 22 and embedded, and the standard bottom extending member 13 is fixed to the standard bottom extending member 13 through the first latch structure, and the position of the standard bottom extending member 13 is calibrated. After the calibration is completed, the connection groove 201 and the positioning groove 202 are poured with concrete until the concrete solidifies, and then the next step is entered;

[0066] S22, using a tool to draw a contour line on the top of the standard bottom extension member 13 to mark the position of the extension portion 32 of the positioning frame 30 on the top of the standard top extension member 12;

[0067] S23, such as Fig.10 As shown, the positioning frame 30 is hoisted, and the extension portion 32 of the positioning frame 30 is installed between the contour lines drawn in step S22, so that the two sides of the extension portion 32 of the positioning frame 30 are aligned with the contour lines, and the extension portion 32 is fixed to the standard bottom extension member 13 by bolts;

[0068] S24, such as Fig.11 As shown, the side wall 15 is hoisted, the first turning section 151 of the side wall 15 is installed on the top of the standard floor bottom extension member and fixed to the top of the standard bottom extension member 13 through the second latch structure, and the side wall 15 is fixed to the extension part 32 through bolts, and the second turning section 152 of the side wall 15 is installed on the floor slab, and the standard floor slab 22 of the N+1th floor is waited for to be assembled;

[0069] S25. After the standard floor slab 22 is assembled, the standard top extending member 12 is installed, and the member connecting portion 101 of the standard top extending member 12 is extended into the connecting groove 201 of the standard floor slab 22. At the same time, the positioning block 102 of the standard top extending member 12 is aligned with the connecting groove 201 and inserted, and the position of the standard top extending member 12 is calibrated. After the calibration is completed, the connecting groove 201 and the positioning groove 202 are poured with concrete until the concrete solidifies;

[0070] S26, fixing the standard top extension member 12 to the frame body 31 by means of bolts;

[0071] S27, the position of the standard bottom extension member 13 and the standard top extension member 12, after calibration, remove the bolts and remove the positioning frame 30; the installation method of each standard layer is the same

[0072] The installation method of the top floor is different from that of the first floor and standard floor. The top floor structure installation includes the following steps:

[0073] S31, hoisting the standard bottom protruding member 13, aligning the member connecting portion 101 of the standard bottom protruding member 13 with the connecting groove 201 of the standard floor slab 22 and pushing it in, and aligning the positioning block 102 of the standard bottom protruding member 13 with the positioning groove 202 of the standard floor slab 22 and inserting it, calibrating the position of the standard bottom protruding member 13, after the calibration is completed, pouring the connecting groove 201 and the positioning groove 202 with concrete until the concrete solidifies, and then proceeding to the next step;

[0074] S32, using a tool to draw a contour line on the top of the standard bottom extension member 13 to mark the position of the extension portion 32 of the positioning frame 30 on the top of the standard top extension member 12;

[0075] S33, hoisting the positioning frame 30, installing the extension part 32 of the positioning frame 30 between the contour lines drawn in step S22, so that the two sides of the extension part 32 of the positioning frame 30 are aligned with the contour lines, and fixing the extension part 32 to the standard bottom extension member 13 by bolts;

[0076] S34, hoist the side wall 15, install the first turning section 151 of the side wall 15 on the top of the standard floor bottom extension member, fix it to the top of the standard bottom extension member 13 through the second latch structure, and fix the side wall 15 and the extension part 32 with bolts, and install the second turning section 152 of the side wall 15 on the floor slab;

[0077] S35, hoisting the top extension member 14, installing the top extension member 14 on the top of the positioning frame 30, and fixing the top extension member 14 to the side wall 15 through the second latch structure;

[0078] S36, assembling the top floor 23, extending the member connecting portion 101 of the top floor protruding member 14 into the connecting groove 201 of the top floor 23, and aligning the positioning block 102 of the top floor protruding member 14 with the connecting groove 201 and inserting it, fixing the top floor protruding member 14 to the frame body 31 with bolts, calibrating the position of the top floor protruding member 14, and after the calibration is completed, pouring the connecting groove 201 and the positioning groove 202 with concrete until the concrete solidifies;

[0079] S37. Calibrate the positions of the standard bottom extending member 13 and the top extending member 14. After the calibration is completed, remove the bolts and remove the positioning frame 30 to complete the installation of the bay window. The above installation method requires calibration every time the components are installed to ensure the accuracy of the positions between the components and to ensure that the glass windows can be accurately installed.

[0080] The positions of the components mentioned above include the distance between the components, the distance that the components extend beyond the building facade, and the lateral offset of the components.

[0081] The installation method further includes installing the partition plate 40: installing the partition plate 40 on the air conditioner outdoor unit installation groove 103.

[0082] The above-mentioned tools include tools such as ink fountains that can perform linear positioning.

[0083] In the description of the present application, it should be noted that the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.

[0084] Those skilled in the art should understand that the above embodiments are only for the purpose of clearly illustrating the present application, and are not intended to limit the scope of the present application. For those skilled in the art, other changes or modifications may be made based on the above disclosure, and these changes or modifications are still within the scope of the present application.

Claims

1. An assembled bay window installation structure, characterized in that: The bay window structure is installed at the edge of the floor slab, and the floor slab includes the first floor slab, the standard floor slab and the top floor slab; The bay window structure comprises: The protruding member at the bottom of the first floor is installed on the first floor slab; Side walls, the side walls comprising a first turning section and a second turning section perpendicular to each other, the first turning section being mounted on the top of the bottom extending member, the second turning section being mounted on the floor slab, and the side walls being mounted on both sides of the bottom extending member; A standard top extension member is installed on the top of the side wall, and the standard top extension member is also connected to the standard floor slab; A standard bottom extension member is installed on the top of the standard top extension member, and the standard bottom extension member is also connected to the standard floor slab; The top extension member of the top floor is installed on the top of the side wall, and the top extension member of the top floor is also connected to the top floor slab; The bay window structure further includes a positioning frame; The positioning frame includes a frame body and an extension portion formed in the middle of the frame body, the extension portion extends toward the direction in which the bay window extends out of the outer wall, the bottom of the extension portion is fixed to the top of the bottom extending component, the top of the extension portion is fixed to the bottom of the bottom extending component, the two sides of the extension portion are respectively connected to the side walls, and the top and bottom of the frame body are both connected to the floor slab.

2. The assembled bay window installation structure according to claim 1 is characterized in that: The top extending member and the bottom extending member both have a member connecting portion, and the portion of the floor slab corresponding to the member connecting portion is provided with a connecting groove, and the member connecting portion is embedded in the connecting groove; A reserved gap is provided between the side wall of the connecting groove and the component connecting portion, and the reserved gap is used to be filled with concrete; The floor slab also has an extended support section at the portion of the connecting groove, and the extended support section is located between the top protruding member and the bottom protruding member.

3. The assembled bay window installation structure according to claim 1 is characterized in that: A plurality of positioning grooves are also provided at the bottom of the connecting groove, and the positioning grooves are arranged at equal distances along the width direction of the bay window; The portion of the protruding member corresponding to the positioning groove further comprises a positioning block, and the positioning block can be embedded in the positioning groove; There is a gap between the positioning groove and the positioning block.

4. The assembled bay window installation structure according to claim 1, characterized in that: Each of the protruding members has an air conditioner outdoor unit mounting groove on one side close to each other; Wherein, the mounting grooves on the standard top extension member and the standard bottom extension member form a complete air conditioner outdoor unit mounting groove; The bay window structure further includes a partition plate, which is installed on the outside of the protruding component and is used to cover the air conditioner outdoor unit installation groove.

5. The assembled bay window installation structure according to claim 3 is characterized in that: A first latch structure is provided between the top extending member and the bottom extending member, and the first latch structure is used for positioning the top extending member and the bottom extending member when they are installed; A second latch structure is provided between the first turning section and the extending member, and the second latch structure is used for positioning when installing between the first turning section and the extending member.

6. The assembled bay window installation structure according to claim 1, characterized in that: The left and right sides of the extension are detachably connected to the side walls by bolts; The upper and lower sides of the extension portion are detachably connected to the top extending member and the bottom extending member respectively through bolts.

7. The assembled bay window installation structure according to claim 5, characterized in that: The extension portion further has a first reinforcing rib at a portion close to the inner corner, and an angle of 45° is formed between the first reinforcing rib and the inner wall of the extension portion; The frame body further has a second reinforcing rib at a portion close to the inner corner, and the second reinforcing rib forms an angle of 45° with the inner wall of the frame body; The frame member further has a third reinforcing rib at a portion close to the extension portion, and an angle of 45° is formed between the third reinforcing rib and the inner wall of the extension portion.

8. A method for installing a bay window, characterized in that: The installation method is based on the assembled bay window installation structure according to any one of claims 1 to 7; The installation method includes installing the first floor structure, the standard floor structure, and the top floor structure in sequence; The first floor structure installation includes the following steps: S11, hoisting the protruding member at the bottom of the first floor, aligning the member connection part of the protruding member at the bottom of the first floor with the connection groove of the first floor floor slab and pushing it in, and aligning the positioning block of the protruding member at the bottom of the first floor with the positioning groove of the first floor floor slab and embedding it, calibrating the position of the protruding member at the bottom of the first floor, after the calibration is completed, pouring the connection groove and the positioning groove with concrete until the concrete solidifies, and then proceeding to the next step; S12, drawing a contour line at the top of the protruding member at the bottom of the first floor by using a tool to mark the position of the extension portion of the positioning frame at the top of the protruding member at the bottom of the first floor; S13, hoisting the positioning frame, installing the extension part of the positioning frame between the contour lines drawn in step S12, so that the two sides of the extension part of the positioning frame are aligned with the contour lines, and fixing the extension part to the bottom protruding member of the first floor by bolts; S14, hoist the side wall, install the first turning section of the side wall on the top of the protruding member at the bottom of the first floor, fix it to the top of the protruding member at the bottom of the first floor through the second latch structure, and fix the side wall to the extension part through bolts, install the second turning section of the side wall on the floor slab, and wait for the standard floor slab of the second floor to be assembled; S15. After the standard floor slab of the second floor is assembled, the standard top protruding member is installed, and the member connection portion of the standard top protruding member is extended into the connection groove of the standard floor slab of the second floor. At the same time, the positioning block of the standard top protruding member is aligned with the connection groove and embedded, and fixed to the top of the bottom protruding member of the first floor through the second latch structure, and the position of the standard top protruding member is calibrated. After the calibration is completed, the connection groove and the positioning groove are poured with concrete until the concrete solidifies; S16. Fix the standard top extension member to the extension portion by bolts; S17, calibrate the positions of the bottom extension member of the first floor and the standard top extension member. After the calibration is completed, remove the bolts and remove the positioning frame; The installation of a standard layer structure includes the following steps: S21, hoisting the standard bottom protruding member, aligning the member connection part of the standard bottom protruding member with the connection groove of the standard floor slab and pushing it in, and aligning the positioning block of the standard bottom protruding member with the positioning groove of the standard floor slab and embedding it, fixing the standard bottom protruding member with the standard bottom protruding member through the first latch structure, calibrating the position of the standard bottom protruding member, and after the calibration is completed, pouring the connection groove and the positioning groove with concrete until the concrete solidifies, and then proceeding to the next step; S22, drawing a contour line on the top of the standard bottom protruding member by using a tool to mark the position of the extension portion of the positioning frame on the top of the standard top protruding member; S23, hoisting the positioning frame, installing the extension part of the positioning frame between the contour lines drawn in step S22, so that the two sides of the extension part of the positioning frame are aligned with the contour lines, and fixing the extension part to the standard bottom extension member by bolts; S24, hoist the side wall, install the first turning section of the side wall on the top of the standard floor bottom protruding member, fix it to the top of the standard bottom protruding member through the second latch structure, and fix the side wall and the extension part with bolts, install the second turning section of the side wall on the floor slab, and wait for the standard floor slab of the N+1th floor to be assembled; S25. After the standard floor slab is assembled, install the standard top extension member, extend the member connection portion of the standard top extension member into the connection groove of the standard floor slab, and align the positioning block of the standard top extension member with the connection groove and insert it, calibrate the position of the standard top extension member, and after the calibration is completed, pour the connection groove and the positioning groove with concrete until the concrete solidifies; S26, fix the standard top extension member to the frame body by bolts; S27, after the positions of the standard bottom extension member and the standard top extension member are calibrated, the bolts are removed and the positioning frame is removed; The top structure installation includes the following steps: S31, hoisting the standard bottom protruding member, aligning the member connection part of the standard bottom protruding member with the connection groove of the standard floor slab and pushing it in, and aligning the positioning block of the standard bottom protruding member with the positioning groove of the standard floor slab and embedding it, calibrating the position of the standard bottom protruding member, after the calibration is completed, pouring the connection groove and the positioning groove with concrete until the concrete solidifies, and then proceeding to the next step; S32, drawing a contour line on the top of the standard bottom protruding member by using a tool to mark the position of the extension portion of the positioning frame on the top of the standard top protruding member; S33, hoisting the positioning frame, installing the extension part of the positioning frame between the contour lines drawn in step S22, so that the two sides of the extension part of the positioning frame are aligned with the contour lines, and fixing the extension part to the standard bottom extension member by bolts; S34, hoisting the side wall, installing the first turning section of the side wall on the top of the standard floor bottom extension member, fixing it to the top of the standard bottom extension member through the second latch structure, fixing the side wall and the extension part with bolts, and installing the second turning section of the side wall on the floor slab; S35, hoisting the top extension member of the top floor, installing the top extension member of the top floor on the top of the positioning frame, and fixing the top extension member of the top floor to the side wall through the second latch structure; S36, assembling the top floor slab, extending the component connection part of the top floor top extension component into the connection groove of the top floor slab, and then aligning the positioning block of the top floor top extension component with the connection groove and inserting it, fixing the top floor top extension component to the frame body by bolts, calibrating the position of the top floor top extension component, and after the calibration is completed, pouring the connection groove and the positioning groove with concrete until the concrete solidifies; S37. Calibrate the positions of the standard bottom extension member and the top extension member of the attic. After calibration, remove the bolts and remove the positioning frame.

9. The bay window installation method according to claim 8, characterized in that: The position of the component includes the distance between the components, the distance the component extends from the building facade, and the lateral offset of the component.

10. The bay window installation method according to claim 9, characterized in that: The installation method also includes partition installation: installing the partition on the air conditioner outdoor unit installation groove.