Electric protective curtain device for edge vertical hole and construction method
By installing electric protective curtain devices on the side vertical openings in the building structure, the problem of incomplete protection of the side edge of the balcony is solved, a more efficient and safe construction process is achieved, and costs are reduced.
Patent Information
- Application Number
- CN202510026505.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2025-01-08
- Publication Date
- 2025-04-15
- Estimated Expiration
- 2045-01-08
AI Technical Summary
In the existing building structure, the balcony has incomplete protection against the edge of the edge and insufficient steel pipe strength, resulting in high-level operations with high safety hazards, low construction efficiency and high cost.
The electric protective curtain device at the right side vertical opening is adopted, including the track system, the protection system, the lifting system and the power system. The height and stability of the protection system are enhanced through the electric curtain device to ensure the integrity of the sealing and operation safety at high altitudes.
It improves the integrity of the closure of the hole on the edge of the building, provides a safe environment for high-altitude operations, reduces construction risks, improves construction and installation efficiency, material reuse rate, and reduces labor and material costs.
Smart Images

Figure CN119825154A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building decoration and construction, and in particular to an electric protective curtain device for a vertical opening adjacent to an edge and a construction method. Background Art
[0002] During the construction of building decoration, the balcony structure edge protection adopts the traditional "five edges" steel pipe + skirting board protection method, and the protection height is only 1.2m. This protection method is mainly suitable for the protection of the edges and openings of the standard floor (about 3m). However, the existing building structure design has a high floor height, and the balcony facade shape is more common with odd and even floors. The structural floor height of odd and even balconies is generally 6~7m. The following problems exist in this protection: the openings on the side of the building are not completely closed, the strength of the steel pipe is insufficient, the wall and ceiling operations are higher than the edge protection, the construction of personnel involves high-altitude operations, and there is a risk of falling construction materials, which poses a great safety hazard during construction; during the decoration construction, the edge protection measures require wearing safety belts. At the same time, due to safety hazards, the construction efficiency is slow, which seriously affects the construction progress, resulting in low labor utilization and increased construction costs; the slow installation efficiency and low material reuse rate lead to increased installation labor costs and material costs. Summary of the invention
[0003] At least one of the purposes of the present invention is to provide an electric protective curtain device and a construction method for vertical openings on the edge, in order to overcome the problems existing in the above-mentioned prior art. The electric curtain device and the construction method for vertical openings on the edge can effectively improve the integrity of the closure of the openings on the edge of the building, provide a safe environment for working at heights, reduce the construction risks of working at heights, ensure safety, improve construction and installation efficiency and material reuse rate, and reduce labor and material costs.
[0004] In order to achieve the above-mentioned purpose, the technical solution adopted by the present invention includes the following aspects.
[0005] An electric curtain device for a vertical opening adjacent to an edge comprises a track system, a protection system, a lifting system and a power system. The lifting system is arranged on the outer wall of a building and is located at the top of the vertical opening of the structural layer to be decorated. The track system is arranged on the outer wall of the building and is located below the lifting system. The track system is connected to the protection system, and the track system is also connected to the lifting system. The lifting system is used to drive the protection system to move along the track system so that the protection system moves to a preset position of the vertical opening. The power system is arranged on the working surface floor of the structural layer to be decorated, and the power system is connected to the lifting system.
[0006] Preferably, the track system includes a track, a tooth groove and a connecting component, the two tracks are respectively vertically arranged on both sides of the adjacent vertical opening, and the tooth groove is arranged in the track; the connecting component includes a climbing gear, a track bearing, an anti-roll bar, an anchor component and a cross bar; the two climbing gears are respectively meshed and connected with the corresponding tooth grooves, and each climbing gear is connected to the track bearing; each of the track bearings includes a bearing and a connecting shaft, an anti-roll bar is respectively arranged on both sides of each connecting shaft, one end of each connecting shaft is welded to an anchor component, and each of the anchor components includes a connecting rod and a lifting ring, the lifting ring is arranged on the connecting rod, and the cross bar is arranged between the two connecting rods.
[0007] Preferably, the track system also includes one or more connecting components 2, the connecting component 2 includes a climbing gear, a track bearing, an anti-roll bar, an anchor component 2 and a cross bar, one end of the connecting shaft is welded to the anchor component 2, the cross-section of the anchor component 2 is U-shaped, and the anchor component 2 includes a fixing part, a connecting part 1 and a connecting part 2.
[0008] Preferably, the protection system includes a vertical keel, a transverse keel and a protection net, the two ends of the vertical keel are respectively provided with a slot three, the two ends of a plurality of mutually parallel transverse keels are respectively vertically connected to the vertical keel, and a protection net is arranged between two adjacent transverse keels; an anchor plate is arranged on the transverse keel, and the two anchor plates are symmetrically arranged on the left and right to form a slot one, the slot one is used to snap into the buckle, and the buckle is used to connect the protection net.
[0009] Preferably, the lifting system includes a fixed component 1, a fixed component 2 and a transmission component 1, the fixed component 1 is fixed on the outer wall of the building structure, the fixed component 2 is fixed on the working surface floor, the fixed component 1 and the fixed component 2 are connected through the transmission component 1, and the transmission component 1 is connected to the power system.
[0010] A construction method for an electric curtain device for a vertical opening near an edge, comprising the following construction steps: Step 1: Install the lifting system on the exterior wall of the building; Step 2: Install the power system on the working surface floor; Step 3: Install the track system on the exterior wall of the building; Step 4, connect the lifting system to the connection component 1; Step 5, installing the connection component 2 into the track system; Step 6: Install the protection system on the track system; Step 7, determine whether the total height of the protection system is equal to or greater than the height of the adjacent vertical opening. If the total height of the protection system is equal to or greater than the height of the adjacent vertical opening, lift the protection system to the operating height. If the total height of the protection system is less than the height of the adjacent vertical opening, lift the protection system to a certain height, and then proceed to step 8; Step 8, installing the connection component 2 into the track system in the same manner as step 5; Step nine, after connecting the protection system to be installed with the installed protection system, proceed to step seven.
[0011] Preferably, the step one, installing the lifting system on the exterior wall of the building, comprises in sequence: installing a fixing component one on the exterior wall of the building adjacent to the vertical opening of the structural layer to be decorated, installing a fixing component two on the working surface floor of the structural layer to be decorated, installing a transmission component one on the fixing component two, and connecting the fixing component one and the transmission component one.
[0012] Preferably, the step three of installing the track system on the exterior wall of the building comprises: The tooth grooves are welded and fixed in the track, and the two tracks are respectively fixed vertically on the building outer wall on both sides of the adjacent vertical opening of the structural layer to be decorated by bolts, and the two tracks are arranged in sequence from bottom to top along the height direction of the building outer wall, and the two tracks are respectively fixed on both sides of the adjacent vertical opening and are located below the lifting system; Install the connection component 1, including: Pass one end of the connecting shaft through the circular hole 1 on the climbing gear, so that the climbing gear and the bearing are matched and connected, and a fixing nut is arranged at the end of the connecting shaft, and an anchoring component 1 is welded to the other end of the connecting shaft, and an anti-roll bar is welded on each side of the connecting shaft; One end of the crossbar 1 is welded and fixed on the connecting rod, the crossbar 2 is inserted into the crossbar 1, and the other end of the crossbar 2 is welded and fixed on another connecting rod; Place the two climbing gears into the corresponding tracks respectively so that the climbing gears are meshed with the connecting tooth grooves.
[0013] Preferably, the step 5 of installing the connection assembly 2 into the track system comprises, in sequence: Pass one end of the connecting shaft through the circular hole 1 on the climbing gear, so that the climbing gear and the bearing are matched and connected, and a fixing nut is arranged at the end of the connecting shaft, and the other end of the connecting shaft is welded with the anchor component 2, and an anti-roll bar is welded on each side of the connecting shaft; One end of the crossbar 1 is welded and fixed on the connecting rod, the crossbar 2 is inserted into the crossbar 1, and the other end of the crossbar 2 is welded and fixed on another connecting rod; The climbing gear is meshed with the connecting tooth groove, and there is an installation space for the connecting component 2 between the bottom of the track and the ground, so as to facilitate the installation of the connecting component 2 into the track system.
[0014] Preferably, the step six, installing the protection system on the rail system, includes: connecting the top of the protection system to connection component one, and connecting the bottom of the protection system to connection component two.
[0015] In summary, due to the adoption of the above technical solution, the present invention has at least the following beneficial effects: The track system, protection system and lifting system of the electric curtain device on the edge vertical openings are all made of rigid materials, which effectively improves the integrity of the closure of the building openings, provides a safe environment for high-altitude operations, and reduces the risks of high-altitude construction. The power system uses motor braking to adjust the protection height, and adjusts the height of the protection system according to different vertical opening heights and construction surface heights.
[0016] The construction of the electric curtain device for the vertical openings on the edge adopts different system modular assembly processes, which not only ensures safety but also improves the construction and installation efficiency and material reuse rate, and reduces labor and material costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 is a plan view of the track system structure of an exemplary embodiment of the present invention.
[0018] Figure 2 yes Figure 1 1-1 cross-sectional view of the track system.
[0019] Figure 3 yes Figure 1 2-2 Cross-sectional view of the track system.
[0020] Figure 4 yes Figure 1 Enlarged view of point A in the middle.
[0021] Figure 5 is an elevation view of a protection system according to an exemplary embodiment of the present invention.
[0022] Figure 6 yes Figure 5 Enlarged view of point B in the middle.
[0023] Figure 7 yes Figure 5 Schematic diagram of the structure from another perspective at point B in the middle.
[0024] Figure 8 is a plan view of a lifting system according to an exemplary embodiment of the present invention.
[0025] Fig. 9 is an elevation view of a lifting system and a power system of an exemplary embodiment of the present invention.
[0026] Fig.10 It is a construction flow chart of an electric curtain device for a vertical opening adjacent to an exemplary embodiment of the present invention.
[0027] Symbols in the figure: 1-track system, 11-track, 101-component one, 1011-bottom plate, 1012-side plate, 102-component two, 1021-plate one, 1022-plate two, 1023-plate three, 1024-plate four, 12-tooth groove, 13-connecting component one, 131-climbing gear, 132-track bearing, 1321-connecting shaft, 133-anti-roll bar, 1331-bar one, 1332-bar two, 1333-bar three, 1334-bar four, 134-anchor component 1, 1341-connecting rod, 1342-lifting ring, 135-cross bar, 1351-cross bar 1, 1352-cross bar 2, 14-connecting assembly 2, 141-anchor assembly 2, 1411-fixing piece, 1412-connecting piece 1, 1413-connecting piece 2, 15-fixing nut, 16-slot 1, 17-connecting component 1, 171-spring, 172-anchor sheet, 173-anchor rod, 18-bolt 1, 2-protection system, 21-vertical keel, 22-horizontal keel, 221- Keel 1, 222-Keel 2, 23-Slot 2, 24-Slot 3, 25-Protective net, 26-Snap, 261-Snap spring, 262-Moveable buckle, 263-Fixed buckle, 264-Flange plate, 27-Anchor plate, 271-Bolt 2, 28-Connecting component 2, 29-Bolt 3, 30-Bolt 4, 3-Lifting system, 31-Fixed component 1, 311-Fixed component, 3111-Rear embedded plate, 3112-Fixed keel, 312-Lifting shaft, 313-Limiting device, 3131-limiter, 3132-wire rope, 3133-hook, 314-gear, 32-fixing component 2, 321-protective cover, 322-ground buried plate, 33-transmission component 1, 331-chain, 332-transmission gear 1, 333-transmission gear 2, 334-transmission shaft, 34-anti-dropping nut 1, 35-anti-dropping nut 2, 4-power system, 41-transmission gear 3, 42-motor transmission shaft, 43-brake motor, 44-copper wire, 45-switch, 46-power supply. DETAILED DESCRIPTION
[0028] The present invention is further described in detail below in conjunction with the accompanying drawings and embodiments to make the purpose, technical solutions and advantages of the present invention more clearly understood. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.
[0029] Figure 1-9The structure of an electric protective curtain device for a vertical opening adjacent to an exemplary embodiment of the present invention is shown, comprising a track system 1, a protective system 2, a lifting system 3 and a power system 4. The lifting system 3 is arranged on the outer wall of the building and is located at the top of the vertical opening of the structural layer to be decorated (it can also be arranged near the top of the vertical opening). The track system 1 is arranged on the outer wall of the building and is located below the lifting system 3. The track system 1 is connected to the protective system 2, and the track system 1 is also connected to the lifting system 3. The lifting system 3 is used to drive the protective system 2 to move along the track system 1 so that the protective system 2 moves to a preset position of the vertical opening. The power system 4 is arranged on the working surface floor of the structural layer to be decorated, and the power system 4 is connected to the lifting system 3.
[0030] The track system 1, the protection system 2 and the lifting system 3 are all made of rigid materials, which effectively improves the integrity of the closure of the vertical openings on the edges and provides a safe environment for working at heights. The power system 4 uses motor braking to adjust the protection height. The height of the protection system 2 is adjusted according to different vertical opening heights and construction work surface heights. By adopting different system modular assembly processes, the installation efficiency and material reuse rate are improved, and the labor and material cost investment is reduced.
[0031] The track system 1 includes a track 11, a tooth groove 12 and a connecting component 13. The track 11 is made of a galvanized steel plate with a thickness of 3 mm. The two tracks 11 are vertically arranged on both sides of the adjacent vertical opening. The tooth groove 12 is arranged in the track 11 and is used for the up and down climbing of the connecting component 13. The tooth groove 12 is made of galvanized solid steel with a height of 70 mm. The connecting component 13 is used to connect the track system 1 and the protection system 2. The connecting component 13 is also used to connect the track system 1 and the lifting system 3.
[0032] The track 11 includes a component 101 and a component 102. The component 101 is U-shaped as a whole. The component 101 includes a bottom plate 1011 and a side plate 1012. The bottom plate 1011 is fixed to the outer structure wall by bolts. One end of two parallel side plates 1012 are respectively welded vertically to the bottom plate 1011, and the other end is respectively welded to the component 102. A tooth groove 12 is welded on the inner side of one side plate 1012, and the tooth groove 12 extends in the length direction of the side plate 1012. The two components 102 are symmetrically arranged in the U-shaped opening of the component 101, and a certain distance is left between the two components 102. The component 102 includes a plate 1021, a plate 2 1022, a plate 3 1023 and a plate 4 1024, one end of the plate 1021 is vertically connected to the side plate 1012, the other end extends toward the other side plate 1012 and is vertically connected to one end of the plate 2 1022, the other end of the plate 2 1022 extends toward the bottom plate 1011 and is vertically connected to one end of the plate 3 1023, the other end of the plate 3 1023 extends toward the side plate 1012 and is vertically connected to one end of the plate 4 1024, the other end of the plate 4 1024 extends toward the plate 1 1021; the length of the plate 3 1023 is less than the length of the plate 1 1021, the length of the plate 4 1024 is less than the length of the plate 2 1022, the plates 1 1021, the plates 2 1022, the plates 3 1023 and the plates 4 1024 together form an open slot 1.
[0033] The connecting component 13 includes a climbing gear 131, a track bearing 132, an anti-roll bar 133, an anchoring component 134 and a cross bar 135. The climbing gear 131 is meshed and connected with the tooth groove 12. The climbing gear 131 is used to climb on the tooth groove 12. The climbing gear 131 adopts a solid galvanized gear with a diameter of 150 mm. A circular hole 1 is opened on the climbing gear 131, and the climbing gear 131 is coaxial with the circular hole; the climbing gear 131 is connected to the track bearing 132, and the track bearing 132 includes a bearing (not shown in the figure) and a connecting shaft 1321. The bearing is connected to the connecting shaft 1321, and the bearing is also connected to the climbing gear 131.
[0034] The connecting shaft 1321 adopts a galvanized round steel pipe with a diameter of 16 mm. The first end of the connecting shaft 1321 passes through the round hole on the climbing gear 131 and a fixing nut 15 is arranged at the first end of the connecting shaft 1321. The outer surface of the bearing is matched with the round hole. During the up and down movement of the connecting shaft 1321, the bearing drives the climbing gear 13 to rotate, so that the climbing gear 13 moves up and down along the tooth groove 12. The fixing nut 15 adopts a galvanized hexagonal nut with a diameter of 20 mm. The fixing nut 15 is used to prevent the track bearing from detaching from the climbing gear 13 during the up and down climbing process and the use process.
[0035] An anti-roll bar 133 is arranged on each side of the connecting shaft 1321. The anti-roll bar 133 is used to prevent the climbing gear 131 from disengaging from the tooth groove 12 during the climbing process and causing the device to overturn. The anti-roll bar 133 adopts a plain round steel bar with a diameter of 12 mm. The anti-roll bar 133 includes a rod 1331, a rod 2 1332, a rod 3 1333 and a rod 4 1334. One end of the rod 1331 is vertically welded to the anti-roll bar 133, and the other end extends toward the direction close to the side plate 1012 and is vertically welded to one end of the rod 2 1332. The other end of the rod 2 1332 extends toward the direction close to the plate 1 1021. The rod 1331, the rod 2, the rod 3, the rod 3 and the rod 4 together form an open slot 2, and the open slot 2 moves up and down in the open slot 1.
[0036] The second end of the connecting shaft 1321 is welded to the anchor component 134, and the first end and the second end of the connecting shaft 1321 are opposite to each other. The anchor component 134 includes a connecting rod 1341 and a lifting ring 1342. The connecting rod 1341 is coaxial with the connecting shaft 1321. The connecting rod 1341 adopts a galvanized square steel pipe with a specification of 40mm*40mm*3mm. The first end of the connecting rod 1341 is connected to the second end of the connecting shaft 1321, and the second end of the connecting rod 1341 is used for connecting the track system 1 and the protection system 2. The first end and the second end of the connecting rod 1341 are in pairs, and a lifting ring 1342 is arranged on the connecting rod 1341. The lifting ring 1342 adopts a smooth round steel bar with a diameter of 12mm, and the lifting ring 1342 is used for connecting the track system 1 and the lifting system 3.
[0037] The connecting rod 1341 is also provided with a cross bar 135, and the cross bar 135 includes a cross bar 1351 and a cross bar 1352. The cross bar 1352 is inserted into the cross bar 1351 to adjust the width. The cross bar 1351 is made of a galvanized square steel pipe with a specification of 40mm*40mm*3mm. One end of the cross bar 1351 is vertically connected to the connecting rod 1341 by welding. The cross bar 1352 is made of a galvanized square steel pipe with a specification of 30mm*30mm*3mm. One end of the second cross bar 1352 is inserted into the first cross bar 1351, and the other end of the second cross bar 1352 is vertically connected to another connecting rod 1341; the cross bar 1351 is provided with slots 16 at equal intervals, and the diameter of the slots 16 is 8 mm. One end of the second cross bar 1352 inserted into the first cross bar 1351 is provided with a circular hole 2 connected to the second cross bar 1352, and a connecting component 17 is provided at the second circular hole. After the connecting component 17 is inserted into the slot 16, the cross bar 1351 and the second cross bar 1352 are connected.
[0038] like Figure 4 As shown, the connecting component 17 includes a spring 171, an anchoring sheet 172 and an anchor rod 173. The diameter of the spring 171 is 3 mm. An anchoring sheet 172 is connected to each end of the spring 171. The anchoring sheet 172 is made of a galvanized steel plate with a specification of 20 mm*20 mm*2 mm. The spring 171 and the anchoring sheet 172 are located in the second cross bar 1352. The surface of the anchoring sheet 172 is in contact with the inner wall of the second cross bar 1352. An anchor rod 173 is vertically arranged on each anchoring sheet 172. The anchor rod 173 extends out of the second cross bar 1352 from the second round hole. The anchor rod 173 is made of a plain round steel bar. The diameter is smaller than the diameter of the slot 16, the diameter of the circular hole 2 is not larger than the width of the anchor plate 172 and not smaller than the diameter of the anchor rod 173. When the anchor rod 173 is pressed, the spring 171 is deformed by the pressure from the anchor rod 173, and the end face of the anchor rod 173 enters the interior of the slot 16 but still exceeds the surface of the cross bar 2 1352, which is conducive to the movement of the cross bar 2 1352 inside the cross bar 1351 and the adjustment of the width. When the anchor rod 173 moves to any slot 16, the pressure of the spring 171 is released, and the end face of the anchor rod 173 exceeds the slot 16, fixing the positions of the cross bars 1351 and 1352.
[0039] The track system 1 also includes one or more connecting components 14, which cooperate with the connecting component 1 13 to connect the protection system 2 to improve the stability of the connection of the protection system 2. The connecting component 14 includes a climbing gear 131, a track bearing 132, an anti-roll bar 133, an anchoring component 141 and a cross bar 135. The difference between the connecting component 14 and the connecting component 1 13 is that the second end of the connecting shaft 1321 is welded to the anchoring component 141, and the cross section of the anchoring component 141 is U-shaped. 141 includes a fixing member 1411, a connecting member 1412 and a connecting member 2 1413. The first end of the fixing member 1411 is connected to the second end of the connecting shaft 1321. The second end of the fixing member 1411 is welded with the connecting member 1412 and the connecting member 2 1413 respectively. The first end and the second end of the fixing member 1411 are opposite to each other. The connecting member 1 1412 and the connecting member 2 1413 are used for connecting the track system 1 and the protection system 2. The lifting ring 1342 is only arranged on the connecting rod 1341 of the connecting component 13.
[0040] The protection system 2 includes a vertical keel 21, a horizontal keel 22 and a protection net 25. The vertical keel 21 adopts a galvanized square steel pipe with a specification of 50mm*50mm*4mm. The two ends of the vertical keel 21 are respectively provided with a 42mm*42mm notch 24, and the notch 24 is used to connect the track system 1 and the protection system 2. The notch 24 on the first end of the vertical keel 21 is aligned with the connecting rod 1341 and pressed into it, and then connected by bolt 18 (or connected with the connecting piece 2 1413 by bolt 1), and the notch 24 on the second end of the vertical keel 21 is aligned with the connecting piece 1414. 12 bolt connection; both ends of a plurality of mutually parallel transverse keels 22 are respectively vertically connected to the vertical keels 21, the transverse keels 22 include keel 1 221 and keel 222, keel 1 221 adopts a galvanized square steel pipe with a specification of 40mm*40mm*3mm, keel 222 adopts a galvanized square steel pipe with a specification of 30mm*30mm*3mm, one end of keel 1 221 is connected to a vertical keel 21 by bolt 3 29, one end of keel 222 is connected to another vertical keel 21 by bolt 4 30, and the other end of keel 222 is inserted into keel 1 221.
[0041] An anchor plate 27 is provided on the transverse keel 22 (keel 1 221 and keel 2 222). The anchor plate 27 is made of galvanized angle steel and is L-shaped. One end of the anchor plate 27 is connected to the transverse keel 22. The two anchor plates 27 are symmetrically arranged to form a slot 1. The slot 1 is used to snap into the buckle 26. The buckle 26 is used to connect the protective net 25. The bottom or top of the slot 1 is sealed. The anchor plate 27 is provided with a bolt 271. The length of the bolt 271 is greater than the thickness of the anchor plate 27. The bolt 271 is used to fix the buckle 26.
[0042] The buckle 26 includes a buckle spring 261, a movable buckle 262, a fixed buckle 263 and a flange plate 264. The diameter of the buckle spring 261 is 3 mm. The movable buckle 262 and the fixed buckle 263 are both made of galvanized steel plates with a thickness of 2-3 mm and a width of 20-30 mm. The movable buckle 262 and the fixed buckle 263 are connected by the buckle spring 261. A flange plate 264 is arranged on the fixed buckle 263. The flange plate 264 is made of galvanized steel plates. The flange plate 264 is inserted into a slot 1 formed by the anchor plate 27. The anchor plate 27 and the flange plate 264 are fixed by bolts 271. A protective net 25 is arranged between two adjacent transverse keels 22. The protective net 25 is made of a steel wire mesh with a diameter of 5 mm and a hole size of 100 mm*100 mm. The protective net 25 is inserted into the buckle 26 through the movable buckle 262.
[0043] The keel 1 221 is provided with slots 23 with a diameter of 8 mm at equal intervals, and a circular hole 3 is provided at one end of the keel 222 inserted into the keel 1 221, and a connecting component 28 is provided at the circular hole 3. The circular hole 3 has the same diameter as the circular hole 2, and the connecting component 28 has the same structure and effect as the connecting component 1 116.
[0044] The lifting system 3 includes a fixing component 1 31, a fixing component 2 32 and a transmission component 1 33. The fixing component 1 31 is fixed on the outer wall of the structure, the fixing component 2 32 is fixed on the floor of the working surface, the fixing component 1 31 and the fixing component 2 32 are connected through the transmission component 1 33, and the transmission component 1 33 is connected to the power system 4; the fixing component 1 31 includes a fixing part 311, a lifting shaft 312, a limiting device 313 and a gear 314, and the fixing part 311 includes a rear embedded plate 311 1 and a fixed keel 3112, the rear embedded plate 3111 is made of a galvanized steel plate with a specification of 100mm*100mm*10mm, and the two rear embedded plates 3111 are respectively fixed to the building outer walls on both sides of the adjacent vertical opening by bolts and the height is higher than the setting height of the track 11, the fixed keel 3112 is made of a galvanized square steel pipe with a specification of 40mm*40mm*3mm, and one end of the fixed keel 3112 is connected to the rear embedded plate 3111 by welding, and the fixed keel 31 The other end of 12 is connected to the lifting shaft 312, and the lifting shaft 312 passes through two fixed keels 3112 at the same time; two sets of limit devices 313 are arranged on the lifting shaft 312, and the two sets of limit devices 313 are arranged between the two fixed keels 3112, respectively, and are arranged close to the fixed keels 3112. Each set of limit devices 313 includes two limiters 3131, a wire rope 3132 and a hook 3133. The limiter 3131 is welded to the lifting shaft 312, and the limiter 3131 adopts a thickness of The steel plate is a 35mm thick galvanized steel plate. The cross section of the limiter 3131 is circular. A steel wire rope 3132 is arranged between the two limiters 3131. The diameter of the steel wire rope 3132 is 10mm. The limiter 3131 is used to prevent the steel wire rope 3132 from being entangled and causing tangled wires during the lifting process. A hook 3133 is arranged on the steel wire rope 3132. The hook 3133 adopts a smooth round steel bar with a diameter of 125mm. When lifting, the hook 3133 passes through the lifting ring 1342 to connect the lifting system 3 and the track system 1.
[0045] One end of the lifting shaft 312 is provided with an anti-slip nut 34, which is a galvanized hexagonal nut with a diameter of 15 mm. The lifting shaft 312 is made of a solid galvanized round steel pipe with a diameter of 12 mm. The other end of the lifting shaft 312 extends out of the fixed keel 3112, and a gear 314 is welded at the end of the lifting shaft 312. The gear 314 is a solid galvanized gear with a diameter of 50 mm, and the gear 314 is connected to the transmission component 33.
[0046] The second fixing component 32 includes a protective cover 321 and a ground buried plate 322. The protective cover 321 adopts a galvanized square steel pipe with a specification of 40mm*40mm*3mm, and the ground buried plate 322 adopts a galvanized steel plate with a specification of 100mm*100mm*10mm. The protective cover 321 is connected to the ground buried plate 322 by welding, and the ground buried plate 314 is fixed to the working surface floor of the structural layer to be decorated by bolts. A groove shape is cut in the middle of the protective cover 321.
[0047] The transmission assembly 33 includes a chain 331, a transmission gear 1 332, a transmission gear 2 333 and a transmission shaft 334. The gear 314 and the transmission gear 1 332 are connected by the chain 331. The width of the chain 331 is smaller than the groove width of the protective cover 321. The transmission gear 1 332 adopts a solid galvanized gear with a diameter of 50 mm. The transmission gear 1 332 is arranged in the groove of the protective cover 321; the transmission shaft 334 adopts a solid galvanized round steel pipe with a diameter of 12 mm. One end of the transmission shaft 334 passes through the protective cover 321 and the transmission gear 1 332 and is provided with an anti-slip nut 2 35 at the end. The anti-slip nut 2 35 adopts a galvanized hexagonal nut with a diameter of 15 mm. The transmission shaft 334 is welded to the transmission gear 1 332, and the other end of the transmission shaft 334 is welded to the transmission gear 2 333. The transmission gear 2 333 adopts a solid galvanized gear with a diameter of 16 mm.
[0048] The power system 4 includes a transmission gear three 41, a motor transmission shaft 42, a brake motor 43 and a power supply 46. The motor transmission shaft 42 adopts a solid galvanized round steel pipe with a diameter of 12 mm. One end of the motor transmission shaft 42 is welded to the transmission gear three 41. The transmission gear three adopts a solid galvanized gear with a diameter of 14 mm. The transmission gear three 41 is meshed and connected with the transmission gear two 313. The other end of the motor transmission shaft 42 is connected to the brake motor 43. The brake motor 43 adopts a DC motor (working voltage is 36V, working power is 0.75kW). The positive and negative poles of the brake motor 43 and the power supply 46 are connected through copper wires 44, and the brake motor 43 is controlled by a switch 45.
[0049] In the present invention, the overall height of the single-track protection system 2 is 2-3 m, and the height of the single-track track 11 is 3-4 m.
[0050] Fig.10 The construction flow chart of the electric curtain device for the vertical opening near the edge is shown. Taking the vertical opening near the edge with a structural layer height of 6.6m as an example, the construction method of the electric protective curtain device for the vertical opening near the edge includes the following steps: Step 1, installing the lifting system 3 on the exterior wall of the building, includes: First, install the fixing component 31, including: The two rear embedded plates 3111 are respectively fixed to the building exterior wall adjacent to the vertical opening of the structural layer to be decorated by bolts, and the two rear embedded plates 3111 are respectively fixed to the two sides of the adjacent vertical opening and are located at the top of the adjacent vertical opening; Weld and fix the two fixed keels 3112 to the corresponding rear embedded plates 3111 respectively; Pass the lifting shaft 312 through the two fixed keels 3112 at the same time, set an anti-dropping nut 34 at one end of the lifting shaft 312, weld a gear 314 at the other end of the lifting shaft 312, and then install the chain 331; Then, install the second fixing component 32, fix the ground buried plate 322 on the working surface floor of the structural layer to be decorated, and weld and fix the protective cover 321 on the ground buried plate 322; Finally, install the transmission assembly 33, including: After the transmission gear 1 332 and the chain 331 are meshed, the transmission gear 1 332 and the chain 331 are put into the groove of the protective cover 321 together, so that the transmission shaft 334 passes through the protective cover 321 and the transmission gear 1 332 at the same time; An anti-dropping nut 35 is installed at one end of the transmission shaft 334, and a transmission gear 333 is installed at the other end.
[0051] Step 2, installing the power system 4 on the working surface floor, includes: Connect the power supply 46 and the brake motor 43 through the copper wire 44; Weld the transmission gear 3 41 to one end of the motor transmission shaft 42, and connect the other end to the brake motor 43; The transmission gear 3 41 is inserted into the end of the transmission shaft 42 and meshedly connected with the transmission gear 2 213 .
[0052] Step 3, installing the track system 1 on the exterior wall of the building, includes: First, the tooth groove 12 is welded and fixed in the track 11, and the two tracks 11 are respectively fixed vertically by bolts on the building outer wall on both sides of the adjacent vertical opening of the structural layer to be decorated. The two tracks 11 are arranged in sequence from bottom to top along the height direction of the building outer wall. The two tracks 11 are respectively fixed on both sides of the adjacent vertical opening and are located below the lifting system 3; Then, the connection component 13 is installed, which includes: One end of the connecting shaft 1321 is passed through the circular hole 1 on the climbing gear 131, so that the climbing gear 131 and the bearing are matched and connected, and a fixing nut 15 is set at the end of the connecting shaft 1321, and an anchoring component 134 is welded to the other end of the connecting shaft 1321, and an anti-roll bar 133 is welded on both sides of the connecting shaft 1321; One end of the first crossbar 1351 is welded and fixed to the connecting rod 1341, the second crossbar 1352 is inserted into the first crossbar 1351, and the other end of the second crossbar 1352 is welded and fixed to another connecting rod 1341; Finally, the two climbing gears 131 are placed into the corresponding tracks 11 respectively, so that the climbing gears 131 are meshed with the connecting tooth grooves 12 .
[0053] Step 4: Connect the lifting system 3 to the connection component 13: Lift the connecting component 13 to the lower end of the hook 381, and the hook 381 is fixedly connected to the lifting ring 17.
[0054] Step 5, installing the connection assembly 2 14 into the track system 1, including: One end of the connecting shaft 1321 is passed through the circular hole 1 on the climbing gear 131, so that the climbing gear 131 and the bearing are matched and connected, and a fixing nut 15 is set at the end of the connecting shaft 1321, and the other end of the connecting shaft 1321 is welded with the anchor component 2 141, and an anti-roll bar 133 is welded on both sides of the connecting shaft 1321; One end of the first crossbar 1351 is welded and fixed to the connecting rod 1341, the second crossbar 1352 is inserted into the first crossbar 1351, and the other end of the second crossbar 1352 is welded and fixed to another connecting rod 1341; The climbing gear 131 is meshed with the connecting tooth groove 12. There is an installation space for the second connecting component 14 between the bottom of the track 11 and the ground, so as to facilitate the installation of the second connecting component 14 in the track system 1.
[0055] Step 6, installing the protection system 2 on the track system 1, connecting the top of the protection system 2 to the connection component 1 13, and connecting the bottom of the protection system 2 to the connection component 2 14, which includes: One end of the first keel 221 is bolted to the vertical keel 21, one end of the second keel 222 is inserted into the first keel 221, and the other end of the second keel 222 is bolted to another vertical keel 21; An anchoring plate 27 is provided on the transverse keel 22; According to the width of the adjacent vertical opening, the keel 1 221 and the keel 2 22 are adjusted, and then the width of the protection system 2 is adjusted, so that the width of the protection system 2 is adapted to the width of the adjacent vertical opening; Insert the flange plate 264 on the buckle 26 into the first slot formed by the anchor plate 27 and fix it with the second bolt 271; Insert the protective net 25 into the buckles 26 on two adjacent transverse keels 22; Align the notch 24 on the first end of the vertical keel 21 with the connecting rod 1341 and press it in, then connect it with the bolt 18, and bolt the notch 24 on the second end of the vertical keel 21 to the connecting piece 1412.
[0056] Step seven, determine whether the total height of the protection system 2 is equal to or greater than the height of the adjacent vertical opening. If the total height of the protection system 2 is equal to or greater than the height of the adjacent vertical opening, lift the protection system 2 to the operating height. If the total height of the protection system 2 is less than the height of the adjacent vertical opening, lift the protection system 2 to a certain height (after lifting, ensure that there is enough space from the ground to the bottom of the protection system 2 to install other protection systems 2), and then proceed to step eight.
[0057] Step eight, installing the second connection component 14 into the track system 1 in the same manner as step five.
[0058] Step 9: After the protection system 2 to be installed is connected to the installed protection system 2, proceed to step 7. The process of connecting the protection system 2 to be installed to the installed protection system 2 includes: Connect the top of the protection system 2 to be installed with the connecting component 2 14 at the bottom of the installed protection system 2, and connect the bottom of the protection system 2 to be installed with the connecting component 2 14 installed in step eight, that is, bolt the slot three 24 on the second end of the vertical keel 21 to the connecting piece 2 141 on the installed protection system 2, and bolt the slot three 24 on the second end of the vertical keel 21 to the connecting piece 1 1412 on the connecting component 2 14 installed in step eight.
[0059] The above is only a detailed description of the specific implementation of the present invention, rather than a limitation of the present invention. Various substitutions, modifications and improvements made by those skilled in the relevant art without departing from the principle and scope of the present invention should be included in the protection scope of the present invention.
Claims
1. An electric curtain device for a vertical opening adjacent to an edge, characterized in that: include: A track system (1), a protection system (2), a lifting system (3) and a power system (4), wherein the lifting system (3) is arranged on the outer wall of a building and is located at the top of a vertical opening of a structural layer to be decorated, the track system (1) is arranged on the outer wall of the building and is located below the lifting system (3), the track system (1) is connected to the protection system (2), the track system (1) is also connected to the lifting system (3), the lifting system (3) is used to drive the protection system (2) to move along the track system (1), so that the protection system (2) moves to a preset position of the vertical opening, the power system (4) is arranged on the working surface floor of the structural layer to be decorated, and the power system (4) is connected to the lifting system (3).
2. The electric curtain device for vertical openings adjacent to edges according to claim 1, characterized in that: The track system (1) comprises a track (11), a tooth groove (12) and a connecting component (13); the two tracks (11) are respectively arranged vertically on both sides of the adjacent vertical opening, and the tooth groove (12) is arranged in the track (11); the connecting component (13) comprises a climbing gear (131), a track bearing (132), an anti-roll bar (133), an anchoring component (134) and a cross bar (135); the two climbing gears (131) are respectively meshed and connected with the corresponding tooth groove (12), and each climbing gear (131) is connected to the track. The track bearings (132) are connected to the track bearings (132); each track bearing (132) comprises a bearing and a connecting shaft (1321); an anti-roll bar (133) is arranged on both sides of each connecting shaft (1321); one end of each connecting shaft (1321) is welded to an anchoring member (134); each anchoring member (134) comprises a connecting rod (1341) and a lifting ring (1342); the lifting ring (1342) is arranged on the connecting rod (1341); and the cross bar (135) is arranged between the two connecting rods (1341).
3. The electric curtain device for vertical openings adjacent to edges according to claim 2, characterized in that: The track system (1) further comprises one or more connecting components (14), wherein the connecting component (14) comprises a climbing gear (131), a track bearing (132), an anti-roll bar (133), an anchoring component (141) and a cross bar (135), one end of the connecting shaft (1321) is welded to the anchoring component (141), the cross section of the anchoring component (141) is U-shaped, and the anchoring component (141) comprises a fixing member (1411), a connecting member (1412) and a connecting member (1413).
4. The electric curtain device for vertical openings adjacent to edges according to claim 1, characterized in that: The protection system (2) comprises a vertical keel (21), a transverse keel (22) and a protection net (25); two ends of the vertical keel (21) are respectively provided with a slot three (24); two ends of a plurality of mutually parallel transverse keels (22) are respectively vertically connected to the vertical keel (21); a protection net (25) is arranged between two adjacent transverse keels (22); an anchor plate (27) is arranged on the transverse keel (22); two anchor plates (27) are arranged symmetrically to form a slot one; the slot one is used to snap into a buckle (26); and the buckle (26) is used to connect the protection net (25).
5. The electric curtain device for a vertical opening adjacent to an edge according to any one of claims 1 to 4, characterized in that: The lifting system (3) comprises a fixing component 1 (31), a fixing component 2 (32) and a transmission component 1 (33); the fixing component 1 (31) is fixed to the outer wall of the building structure, the fixing component 2 (32) is fixed to the working surface floor, the fixing component 1 (31) and the fixing component 2 (32) are connected via the transmission component 1 (33), and the transmission component 1 (33) is connected to the power system (4).
6. A construction method for an electric curtain device for a vertical opening adjacent to an edge, characterized in that: The construction steps include: Step 1, installing the lifting system (3) on the exterior wall of the building; Step 2: Install the power system (4) on the working surface floor; Step 3, installing the track system (1) on the exterior wall of the building; Step 4, connecting the lifting system (3) to the connecting component 1 (13); Step 5, installing the second connection component (14) into the track system (1); Step 6, installing the protection system (2) on the track system (1); Step seven, determining whether the total height of the protection system (2) is equal to or greater than the height of the adjacent vertical opening; if the total height of the protection system (2) is equal to or greater than the height of the adjacent vertical opening, lifting the protection system (2) to the operating height; if the total height of the protection system (2) is less than the height of the adjacent vertical opening, lifting the protection system (2) to a certain height, and then proceeding to step eight; Step 8, installing the second connection component (14) into the track system (1) in the same manner as step 5; Step nine, after connecting the protection system to be installed (2) and the installed protection system (2), proceed to step seven.
7. The construction method of the electric curtain device for the vertical opening adjacent to the edge according to claim 6 is characterized in that: The step 1 is to install the lifting system (3) on the exterior wall of the building, which includes: installing a fixing component 1 (31) on the exterior wall of the building adjacent to the vertical opening of the structural layer to be decorated, installing a fixing component 2 (32) on the working surface floor of the structural layer to be decorated, installing a transmission component 1 (33) on the fixing component 2 (32), and connecting the fixing component 1 (31) and the transmission component 1 (33).
8. The construction method of the electric curtain device for the vertical opening adjacent to the edge according to claim 6 is characterized in that: The step three, installing the track system (1) on the exterior wall of the building, comprises: The tooth groove (12) is welded and fixed in the track (11), and the two tracks (11) are respectively fixed vertically on the building outer wall on both sides of the adjacent vertical opening of the structural layer to be decorated by bolts, and the two tracks (11) are arranged in sequence from bottom to top along the height direction of the building outer wall, and the two tracks (11) are respectively fixed on both sides of the adjacent vertical opening and are located below the lifting system (3); The installation connection component 1 (13) includes: Pass one end of the connecting shaft (1321) through a circular hole 1 on the climbing gear (131) so that the climbing gear (131) and the bearing are matched and connected, and a fixing nut (15) is provided at the end of the connecting shaft (1321), and an anchoring component 1 (134) is welded to the other end of the connecting shaft (1321), and an anti-roll bar (133) is welded to each side of the connecting shaft (1321); One end of the first crossbar (1351) is welded and fixed to the connecting rod (1341), the second crossbar (1352) is inserted into the first crossbar (1351), and the other end of the second crossbar (1352) is welded and fixed to another connecting rod (1341); The two climbing gears (131) are respectively placed in the corresponding tracks (11) so that the climbing gears (131) are meshed with the connecting tooth grooves (12).
9. The construction method of the electric curtain device for the vertical opening adjacent to the edge according to claim 6, characterized in that: The step five, installing the connection assembly 2 (14) into the track system (1), comprises: Pass one end of the connecting shaft (1321) through the circular hole 1 on the climbing gear (131) so that the climbing gear (131) and the bearing are matched and connected, and a fixing nut (15) is arranged at the end of the connecting shaft (1321), and the other end of the connecting shaft (1321) is welded with the anchor component 2 (141), and an anti-roll bar (133) is welded to each side of the connecting shaft (1321); One end of the first crossbar (1351) is welded and fixed to the connecting rod (1341), the second crossbar (1352) is inserted into the first crossbar (1351), and the other end of the second crossbar (1352) is welded and fixed to another connecting rod (1341); The climbing gear (131) is meshed with the connecting tooth groove (12), and there is an installation space for the second connecting component (14) between the bottom of the track (11) and the ground, so as to facilitate the installation of the second connecting component (14) in the track system (1).
10. The construction method of the electric curtain device for the vertical opening adjacent to the edge according to any one of claims 6 to 9, characterized in that: The sixth step, installing the protection system (2) on the track system (1), comprises: connecting the top of the protection system (2) to the first connection component (13), and connecting the bottom of the protection system (2) to the second connection component (14).
Citation Information
Patent Citations
Portable lifting inner hanging type adjustable elevator hole protector
CN114352048A
Climbing type safety protecting net
CN204418632U
A safety screen
GB201601473D0
Architectural climbing system with improved structural stability
KR101793403B1
Improved screen system
WO2019162890A1